book indesign group

Upload: corey-scott

Post on 03-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Book Indesign Group

    1/24

  • 7/28/2019 Book Indesign Group

    2/24

    InDesign Group Consortium

    InDesign group operates in the fields of Planning, Architecture and engineering for public and private sectors. It was founded

    with the aim to create a dynamic organization able to work on complex projects and manage them in different phases. To cover

    all aspects of the Project Design, InDesign Group has a multidisciplinary team: Urabanistes, Architects, Engineers and Managers

    of various and special profiles to treat specific aspects of projects. The mobilized Human Resources are related with the given

    projects deadlines and theircomplexities.

    InDesign group intervient dans les domaines d'Urbanisme, dArchitecture et dingnierie pour les clients de secteurs publics et

    privs. Elle a t Fonde dans l'objectif de crer un organisme dynamique capable de travailler sur des projets complexes et de

    les contrler diffrentes phases. Pour couvrir tous les domaines de la Matrise d'uvre, InDesign Groupe possde une quipe

    pluridisciplinaire, d'Urabanistes, d'Architectes, d'Ingnieurs et de Gestionnaires de profils divers et de Spcialistes de profils

    particuliers pour traiter les aspects spcifiques des projets. Les moyens humains mobiliser sont consquents compte tenu des

    dlais impartis pour la ralisation des projets ainsi que leurs c omplexits.

  • 7/28/2019 Book Indesign Group

    3/24

    EMBASSY OF EGYPT IN TUNISIAThe Owner

    EGYPTIAN ARAB REPUBLIC

    Architects

    Tawfik Abdelgawed

    Aida Ben Henda Triki

    Structural Design

    InDesign Engineering

    Othman Touil

    Consulting Engineer

    Electricity and fire safety Ali Hamrouni

    Fluids Design TOUIL Abdelhamid

    The Contest Date July 2009

    Project Area 5000 m2

    Project Cost 6.000.000 TND.TTC

    The building of Egyptian Embassy in Tunisia represents the cultural symbolism relating to the

    country he represents. Expression invokes a fusion of cultural influences. Specifically

    stratification ranging from architecture of ancient Egypt to the Ottoman architecture in a

    contemporary. This project is a focal point consists of an elegant manner of a cultural, political

    and trade contact between Tunisia and Egypt. The project idea is to create a building that

    reference a modern image of openness and exchange while allowing the identity of a well-

    marked country whose history speaks volumes.

    Lambassade dEgypte en Tunisie est un btiment sensible de part la haute symbolique culturelle

    relative au pays quil reprsente. Son expression invoque une fusion dinfluences culturelles.

    Plus prcisment une stratification allant de larchitecture de lEgypte antique larchitecture

    Ottomane dans une lecture contemporaine. Ce projet est un point focal compos dune manirelgante pour un contact culturel, politique et commercial entre la TUNISIE et lEGYPTE. Lide du

    projet est de crer un btiment qui renvoi une image moderne douverture et dchange tout en

    prservant lidentit bien marqu dun pays dont lhistoire en dit long.

  • 7/28/2019 Book Indesign Group

    4/24

  • 7/28/2019 Book Indesign Group

    5/24

    CULTURAL COMPLEX SILIANAThe Owner

    Ministry of Culture and Heritage Preservation.

    Regional Directorate of Equipment and Transport Siliana.

    Architects

    Aida Ben He nda TR IK I

    Atallah Ramzi

    Bani Abdelwaheb

    Consulting EngineersStructural Design Nasri Elidi

    Electrical and Fire Safety Nouri Nizar

    Fluids Design Kallel Lotfi

    The Contest Jun 2008

    Project Area 2500 m2

    Project Cost 3.000.000.000 TND.TTCDate of starting the works October 2010

    Expected date of completion works December 2011

    A cultural center for its function is a symbolic project who references to a burgeoning. The bet in

    this project was to pass a compromise between a sense of openness and modernity on the one

    hand and a cultural experience on the other hand. In addition this project should offer users a

    powerful tool away from tinkering scenographic house neighborhood culture.

    The land is at the heart of the city, the implantation was done spontaneously on the main street

    paving project in the city. Our project is a gesture of urban structure carried by a vector of

    culture (theater, music, shows and Cinema) which extends the concept of town center and is

    involved in its valorization and social property.

    Un centre culturel de part sa fonction est un projet qui renvoi une symbolique foisonnante. Le

    pari dans ce projet a t de russir un compromis entre une ide douverture et de modernit

    dune part et un vcu culturel prsent. En outre ce projet doit offrir aux utilisateurs un outil

    performant loign des bricolages scnographiques des maisons de culture de quartier. Le

    terrain tant au cur de la ville, limplantation sest faite spontanment sur la rue principale

    ouvrant ainsi le projet sur la ville. Notre projet est un geste de structuration urbaine port par

    un vecteur culturel (thtre, musique, spectacles et cinma runis) qui largit la notion de

    centre ville et participe sa valorisation foncire et sociale.

  • 7/28/2019 Book Indesign Group

    6/24

    CULTURAL COMPLEX SILIANA

  • 7/28/2019 Book Indesign Group

    7/24

    CULTURAL COMPLEX SILIANA

  • 7/28/2019 Book Indesign Group

    8/24

    SECONDARY SCHOOL KASSERINEThe Owner

    MINISTRY OF EDUCATION AND PROFESSIONAL TRAINING

    Regional Directorate of the equipment and the Planning the territory of Governorate KASSERINE

    Architects

    Aida Ben Henda Triki

    Ramzi Atallah

    MeherBouricha

    Structural Design

    InDesign Engineering

    Othman Touil

    Consulting Engineer

    Electrical and Fire Safety Nizar Nouri

    Fluids Design Kallel Lotfi

    The Contest Date July 2009

    Ranking 3rd

    prize

    The concept can be summed up as follows: the project derives its strength from the curve

    gesture of the primary volume that includes the administration and the multipurpose room thus

    marking an entry for welcoming of students arriving of two meaningson the main street. A major

    axis structure the classrooms and the central court around which is organized administration, the

    sociocultural unity and that of the teachers. Our worry was to keep an aisle of cypress existing

    which constitutes in our project the culmination to the sport hall from the central court. Propose

    an ambiance where the vegetal is expressed or the light created with the set of volumes of

    spaces designed a pleasant game of shadows and light has been our major worry throughout the

    design process.

    Lide du partise rsume tel suit : le projet tire sa force du geste courbe du volume principal qui

    inclue ladministration et la salle polyvalente marquant ainsi une entre accueillante des lves

    venant des deux sens sur la rue principale. Un axe majeur structure les salles de classes et la cour

    centrale autour de laquelle sorganise ladministration, lunit socioculturelle et celle des

    enseignants. Notre souci a t de conserver une alle de cypre existante.qui constitue dans

    notre projet laboutissement la salle de sport a partir de la cour centrale. Proposer une

    ambiance ou le vgtal sexprime ou la lumire cre avec le jeu de volumes des espaces conus

    un agrable jeu dombres et de lumire a t notre souci majeur tout au long du processus de

    conception.

  • 7/28/2019 Book Indesign Group

    9/24

  • 7/28/2019 Book Indesign Group

    10/24

    LABORATORY AND WORKSHOP FOR S.P.L.TThe Owner

    Society of promotion of the Lake of Tunis. S. P. L. T

    Architects

    Aida Ben Henda Triki

    Consulting Engineer

    Structural Design Nasri Elidi

    Electricity and fire safety Mohammed Zinoubi

    Fluids Design Kallel Lotfi

    The Contest Date July 2009

    The Contest Date July 2005

    Project Area 1500 m2

    Project Cost 1 300 000 TND.TTC

    Work Start Date February 2007

    Completion Date December 2008

    The project is developed around the idea of a boat that dropped its moorings to the lake shore.

    The proximity of the site to the lake of Tunis has directed towards the adoption of the

    metaphor of the boat in the image of the project. The functional dichotomy between two

    entities noisy / quiet - dirty / clean manifests itself at the level of volumetry by buildings a body

    of "composite" : A party in carpentry dedicated to the vehicles of SPLT & a part in "hard"

    reserved for the laboratory. The project aims to establish a relationship with his site. Here we

    have developed two key ideas: The first is "to affirm the presence of the building" Which is

    reflected in the work on the external image of the building. The second stems from a

    questioning that is " what we will observe of the site ?". Technics of framing of view

    manifested in different types of opening: Opening in a band which allows you to benefit from a

    selected view (panoramic) on the subdivision to "Berge du Lac". The portholes (circular

    opening), which emphasizes the notion of the trip to report always with the naval metaphor.

    The project asserts its presence by the horizontality, a result manifest by portic of about twentymeters which masks the structure of the workshops and create continuity of the the building.

    Le projet se dveloppe autour de lide dun bateau qui largue ses amarres aux berges du lac.

    La proximit du site au lac de Tunis a sans doute orient vers ladoption de la mtaphore du

    bateau dans limage du projet. La dichotomie fonctionnelle entre deux entits bruyante/calme

    sale/propre se manifeste au niveau de la volumtrie par un corps de btiment composite :

    une partie en charpente ddie aux engins de la S.P.L.T. et une partie en dure rserve au

    laboratoire. Le projet essaye dtablir des rapports avec son site. Ici on a dvelopp deux ides

    majeures: La premire tant daffirmer la prsence du btiment. Qui se traduit par le

    travail sur limage extrieure de ldifice. La seconde dcoule dun questionnement quest ce

    quon va observer du site ?. Des techniques de cadrage de vue se manifestent travers

    diffrents types douverture : Ouverture en bande qui permet de bnficier dune vue choisie

    (panoramique) sur le lotissement des berges du lac. Des hublots (ouverture circulaire) qui

    accentue la notion du voyage en rapport toujours avec la mtaphore navale. Le projet affirmesa prsence par une horizontalit manifeste rsultat dun portique dune vingtaine de mtres

    qui vient masquer la charpente des ateliers et crer ainsi la continuit de lensemble.

  • 7/28/2019 Book Indesign Group

    11/24

  • 7/28/2019 Book Indesign Group

    12/24

  • 7/28/2019 Book Indesign Group

    13/24

  • 7/28/2019 Book Indesign Group

    14/24

    INDESIGN GROUP

    RUE ABDERRAZEK ECHRAIBI RES. ERRIADH

    BLOC FOLLA Apt. 11 - MENZAH 7, ARIANA

    Tl/Fax. : 216 71 23 05 15

    Tl GSM : 216 24 06 15 73

    E-mail : [email protected]

  • 7/28/2019 Book Indesign Group

    15/24

    ADMINISTRATION FOR S.P.L.TThe Owner

    S.P.L.T THE PROMOTION SOC IE TY OF LACOFTUNIS

    Architects

    Aida Ben Henda TRIKI

    Consulting Engineer

    Structural design Nasri Elidi

    Electricity and fire safety Mohammed Zinoubi

    Fluids Design Kallel Lotfi

    The Contest Date July 2009Project Area 500 m2

    Project Cost 800 000 dt.TTC

    Work Start Date June 2010

    Completion Date August 2011

    It is a construction project of a building to Administrative vocation. The project is

    distinguished by the simplicity of its volume and lightness of its expression. It is inscribed of

    his immediate environment as an anchor because of these horizontals. White is his

    predilection color contrasting with the blue sky and the glazing. The main ideas of the project

    are summarized as follows: The spaces are organized around 3 empty (patios) that structured

    the composition. In the axis of the entrance is the first patio of whose is a culmination for a

    meeting room common, the second patio comprises a set of offices and the third is a space of

    service. A secondary access is provided for the administration, another completely

    independent for the locker rooms of the laborers.

    Il sagit du projet de construction dun btiment vocation Administrative. Le projet se

    distingue par la simplicit de son volume et la lgret de son expression. Ses horizontales

    linscrivent dans son environnement immdiat tel une ancre. Le blanc est sa couleur de

    prdilection contrastant avec le bleu du vitrage et du ciel. Les ides principales du projet se

    rsument tel suit : les espaces sarticulent autour de 3 vides (patios) qui structurent la

    composition. Dans laxe de lentre se trouve le premier patio dont laboutissement est une

    salle de runion commune, le deuxime patio regroupe un ensemble de bureaux et le troisime

    est un espace de service. Un accs secondaire est prvu pour ladministration, un autre

    compltement indpendant pour les vestiaires des ouvriers.

  • 7/28/2019 Book Indesign Group

    16/24

  • 7/28/2019 Book Indesign Group

    17/24

    GREENHOUSE DESIGN

    The Owner

    BIOTECHNOLOGYRESEARCH CENTER BORJ CEDRIA - TUNISIA

    CENTRE DE RECHERCHE BIOTECHNOLOGIQUE BORJ CEDRIA TUNISIE

    Structural Designer

    InDesign Engineering

    The Contest Date Feb. 2009

    Project Area 230 m2

    Project Cost 90 000 dt.TTC

    Work Start Date March 2009Completion Date August 2009

    It is a construction project to buildtwo greenhouses in steel structure. Execution drawings of

    the steelstructurewere generatedfrom a3D model.

    Il sagit du projet de construction de deux serres en charpente mtallique.

    Les plans dExcution de la Charpente Mtallique en t gnrs partir d'un modle 3D.

  • 7/28/2019 Book Indesign Group

    18/24

    GREENHOUSE DESIGN

  • 7/28/2019 Book Indesign Group

    19/24

    INDUSTRIAL ZONE OF DERNAHURBAN DEVELOPMENT PLAN, INFRASTRUCTURE AND BUILDING DESIGN

    The Owner

    GENERAL AUTHORITY OF INDUSTRIAL ZONES

    SUB CONTRACTOR OF WSP INTERNATIONAL SWEDEN

    Urban Design

    Ben Henda Aida

    Bouchadekh Nadhir

    Architectural Design

    InDesign Architecture

    Infrastructure Designer

    InDesign Engineering sarl.

    Consulting Engineer

    Gas Network D es ign Touil Abdelhamid

    Electricity and fire safety Hamrouni Ali

    Telecommunication Design May Salem

    Supervisors

    Architecture Triki A.

    Infrastructure Gharairi A.Building Design Touil O.

    The Contest Date Feb. 2010

    Project Area 112 ha

    The development of the economic and industrial system and the preservation of the local and

    environmental sustainability are of great interest. Besides this primary and general objective,

    investment charts have identified 15 objectives which can be grouped into three main

    components:

    1. Development of the industrial growth through the cost reduction and the increase of

    the direct investment and t he identification of the industrial priorities;

    2. Improvement of the used technologies, the administration and the skills through the

    establishment of centres for support services, capacity building and quality control;3. Connection with other active sectors by improving the environment and establishing a

    demographic equilibrium and a better use of the transportation system.

    Analysing the general characteristics of the industrial area project Elfataih in Dernah site,

    one can conclude that responding even partially to the latter objectives requires great efforts.

  • 7/28/2019 Book Indesign Group

    20/24

    INDUSTRIAL ZONE OF DERNAH

  • 7/28/2019 Book Indesign Group

    21/24

    FACULTY OF FUNDAMENTAL & APPLIED SCIENCESUNIVERSITY POLE OF SIDI ABDALLAH ALGERIA

    The Owner

    DIRECTION DES EQUIPEMENTS PUBLICS WILAYA DALGER

    SUB CONTRACTOR OF SAPCOT AFFRIQUE

    Structural Designer

    InDesign Engineering sarl.

    Fluids Network Design

    Touil Abdelhamid

    The Contest Date Feb. 2010

    Project Area 16 000 m

  • 7/28/2019 Book Indesign Group

    22/24

    FACULTY OF FUNDAMENTAL & APPLIED SC

    Lobjet vis dans notre missions, est dtablir la

    conception des btiments de la facult des Sciences

    Fondamentale et Applique et leurs notes de calcul. La

    conception parasismique tait vrifie par la mthode

    d'analyse modale et spectrale et selon les rgles RPA99.

    The referred object in our mission is to establish the

    buildings design of the Faculty of Fundamental and

    Applied Sciences, with their computing notes. The

    Seismic design was checked by modal and spectral

    analysis method, and according to the RPA99 Standard.

    3D Finite Element Model

    Seismic Simulation

    ENCES

  • 7/28/2019 Book Indesign Group

    23/24

    RAPID RAILWAY NETWORK STATIONSSTATIONS RFR LIGNE E - TUNISIA

    The Owner

    MINISTERE DE TRANSPORT - TUNISIA

    SUB CONTRACTOR OF GLOULOU COMPANY

    Structural Designer

    InDesign Engineering sarl.

    Supervisors

    Building Design Touil Othman

    The Contest Date Jan. 2011

    Project Area 5 810 m

    Project Cost 16 261 000 dt.TTC

    Our mission is part of the structural building design, on behalf of the GLOULOU Company, on

    the implementation ofall planned stations in line E of the Rapid Railway Network of Tunis.

    Notremission s'inscrit dans le cadrede la conceptionstructurale des btiments, au nomde la

    Socit GLOULOU, portant sur la ralisation des stations prvues dans la ligne E du RseauFerroviaire Rapide de Tunis.

  • 7/28/2019 Book Indesign Group

    24/24

    RAPID RAILWAY NETWORK STATIONS

    Stations Surfaces

    m2

    Ennajeh 0 840

    Ettayarane 0 850

    Ezzouhour 2 0 630

    Hrairia 1 600

    Bougatfa 1 890

    Total Surface 5 810

    3D Computing Model

    Simulation of the Soil-Structure Interaction