MAHAN POWER PROJECT 2X600 MW
BOILER STEAM DRUM LIFTING #2
10th /11th JANUARY 2011
1
![Page 2: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/2.jpg)
2
ARRIVAL OF STEAM DRUM AT MAHAN SITE (30.11.2010)
![Page 3: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/3.jpg)
3
BOILER DRUM #2: UNLOADING AT LIFTING LOCATION(30.11.2010)
![Page 4: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/4.jpg)
4
PREPARATION WORK FOR STEAM DRUM LIFTING(10.01.2011)
DRUM ‘U’ RODS
STEAM DRUM
![Page 5: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/5.jpg)
5
STRAND JACK ARRANGEMENT FOR DRUM LIFTING(10.01.2011)
STRAND JACK
COMPRESSOR UNIT
MAIN OPERATOR DESK
![Page 6: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/6.jpg)
6
RIGHT HAND SIDE ‘U’ ROD INSERTION WORK(10.01.2011)
‘U’ ROD
![Page 7: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/7.jpg)
7
LOAD TEST BEFORE DRUM LIFTING(10.01.2011)
![Page 8: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/8.jpg)
8
DRUM LIFTING PUJA CEREMONY (10.01.2011)
![Page 9: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/9.jpg)
9
BOILER DRUM IN TILTED FOR LIFTING
![Page 10: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/10.jpg)
10
BOILER DRUM TILTING COMPLETED
![Page 11: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/11.jpg)
11
DRUM LIFTING STARTED IN EARLY MORNING -7:29 AM (11.01.2011)
![Page 12: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/12.jpg)
12
BOILER DRUM LIFTING UPTO EL 77.104 M
![Page 13: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/13.jpg)
13
DRUM STARIGHTINING TO HORIZONTAL POSITION
![Page 14: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/14.jpg)
14
HORIZONTAL POSITIONING
![Page 15: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/15.jpg)
15
HORIZONTAL POSITIONED AND FINAL LEVEL REACHED
![Page 16: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/16.jpg)
16
U BOLTS INSERTED AND CLAMPED ON TOP – LOAD ON U BOLTS
![Page 17: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/17.jpg)
17
STEAM DRUM AT ITS FINAL POSITION – 11.01.2011 - 7:30PM
![Page 18: Boiler#2 Drum Lifting](https://reader033.vdocuments.site/reader033/viewer/2022061112/54577675b1af9f4a118b49fa/html5/thumbnails/18.jpg)
18
Thank you
Team Mahan