www.finncont.com BODY WELL INSTALLATION GUIDE 1/2 Please read through the entire installation guide before beginning the installation! Version 4.2 D24939

Upload: others

Post on 18-Oct-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

BODY WELL INSTALLATION GUIDE

1/2

Please read through the entire installation guide before beginning the installation!

Version 4.2 D24939

Page 2: BODY WELL INSTALLATION GUIDE - Finncont

Blok body well installation guide

www.finncont.com

Installation restrictions

2

The minimum distance between the widest part of a body well and a wall or fence must be 55 cm, i.e. approx. 50 cm from the outer edge of the framing

If a fence must be erected closer than 50 cm from a body well, its foundation can be laid during the body well’s construction. If the wall/fence does not require a cast foundation, and screw piles or a similar attachment method has been used instead, it may be constructed 5 cm from the framing after the framing has been installed.

A

B

Page 3: BODY WELL INSTALLATION GUIDE - Finncont

Blok body well installation guide

www.finncont.com

Installation restrictions

If there is an lifting container or a waste bin shelter at the end of the container row, the fence must be at least 50 cm from the framing. If, however, the fence is closer, its maximum height must not exceed 80 cm. This is vital for allowing the container lid to be opened properly.

If the fence is installed closer than 50 cm from the framing, we recommend that the fence be lower than the framing (less than 1 m tall). Otherwise, when the containers are emptied in the winter, any snow on top of the fence/lid will easily get inside the containers.

3

C

D

< 50 cm MAX 80 cm

< 100 cm

Page 4: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installation restrictions

4

The parts of the fence located above the ground can only be installed after the containers’ framing and lids have been installed.

If the wall/fence does not require a cast foundation, and screw piles or a similar attachment method has been used instead, it may be constructed 5 cm from the framing after the framing has been installed.

A

B

Blok body well installation guide

Page 5: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Blok body well installation guide

5

HANDLING THE BODY WELLS AT THE INSTALLATION SITE The body wells must be lifted off the transport vehicle in a upright position by using the loops installed for this purpose. Slings no less than 1 m long or lifting beam must be used when lifting. The body wells must not be dropped, tilted on their sides or rolled at either the installation site or temporary storage area. The body wells must be kept upright while in temporary storage and while the products are in still encased in their protective plastic cover.

INSTALLATION SITE Containers must always be installed according to the instructions and recommendations, and unhindered access for waste collection vehicles close to the containers must be guaranteed, even in winter conditions. The containers are equipped with lifting bags that can be lifted up from above and emptied through the bottom. Any fences, trees, bushes, posts, roof structures, eaves, etc. around the installation site must be taken into account. Before the installation, the containers must be inspected, the ground’s suitability for the installation must be verified (excavation), and a map of cables and pipes at the installation site must be acquired. If the installation site is located on so-called wet soil, any additional anchoring that may be required must be provided (securing the anchor feet with concrete). ANCHORING WITH CONCRETE Concrete should be used to anchor down the body wells if the installation site is extremely wet or its groundwater level can rise to high levels. A 5 m3 container requires 0.75 m3 of concrete and a 3 m3 container requires 0.5 m3. Spread the concrete evenly over the anchor feet, creating a layer of roughly 300 mm in width and 100 mm–150 mm in thickness. Check that the body well is level and let the concrete hydrate for approximately 1–2 h, after which you can complete the filling process. ANCHORING THE SURFACE CONTAINERS If necessary, the containers can be attached to the base with screws or bolts. The attachment method depends on the material of the base.

Page 6: BODY WELL INSTALLATION GUIDE - Finncont

1.

www.finncont.com

DIMENSIONS OF THE INSTALLATION PIT • A minimum of 1,750 mm in depth for deep containers • A minimum of 750 mm in depth for short containers • The bottom of the hole must be at least 500 mm larger than

the container on each side so that the container can be correctly installed. More space will allow the work to go smoother.

• Compaction every 200 mm. • A max 100 kg compactor

Blok body well installation guide

6

Page 7: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Blok body well installation guide

7

A finishing layer of approximately 100 mm, filling the space up to the container’s installation level with crushed rock, rock dust or a similar material. PLEASE NOTE! Any tiling, asphalting, etc. must be taken into consideration when deciding on the height of the finishing layer. Make sure the surface is sloped to allow any surface water to run away from the containers. Sloping should start outside the framing area. Framing area has to be level.

An evenly spread filler layer up to the finishing layer; crushed rock of 0/16 mm or 0/32 mm is recommended. Compaction every 200 mm. An anchor layer in accordance with the illustration; a 500 mm layer using 0/32 mm crushed rock. Careful compaction every 200 mm to protect the container from excess pressure. We recommend using a compactor of max 100 kg.

Compacted base layer The installation hole for the containers must be dug according to the instructions. Any risk of a collapse must be taken into account. The bottom of the installation hole must be level and compacted. Crushed rock 0/16. Verify that the bottom is level by using a spirit level or a laser. Permitted height deviation 1 cm.

D

C B

A

The surface of the compacted base layer must be 1,525 mm (deep) or 510 mm (short) lower than the final ground level (including any asphalt or tiling). The specific ground level is determined towards the end of the filling process by taking measurements from the top of the container.

2.

Page 8: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Anchor plates are placed between the body wells, and the plate ends must be positioned at the same level as one another. The iron bars delivered with the containers are placed between the anchor feet at the front and back of the body wells, and these bars are used to determine the distance between the bottoms of the containers.

Blok body well installation guide

8

3.

825 mm

Page 9: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

The positioning planks attached at the factory are used to position the tops of the body wells in relation to one another. Once the planks on top of the body wells are in a straight line and their ends are firmly against each other, they are attached to one another with screws. The plank ends must be positioned with great care and accuracy. The positioning planks may only be detached from the body wells once the installation pit has been completely filled. Once the planks have been attached to each other, verify that all the containers are perfectly vertical by placing a spirit level on top of the container rim.

Blok body well installation guide

9

4.

Page 10: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the lifting container The lifting container’s body well bottom end is positioned using the iron bars (bars come in two lengths). One of the anchor feet of an body well of lifting container is always plastic, the other one metal. The metal foot must always be placed at the centre line of large containers and the plastic foot on the outer edge. The top of the lifting container’s body well is positioned similarly to the other container bodies using the frame attached to it.

10

Blok body well installation guide

5.

Page 11: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Once the body wells are in their correct positions, you can start filling the pit with 0/32 mm crushed rock. The pit around the body wells should be filled as evenly as possible. Initially, begin filling the space underneath the body wells and between the anchor feet carefully with a spade in order to ensure that the soil provides uniform support to the container from all sides. The compaction of the anchoring and filler layers must be carefully done no less than every 200 mm. We recommend using a compactor of max 100 kg. The final ground level including any tiling or asphalting must be 950 mm (±10 mm) lower than the container’s top edge. Any tiling or asphalting must be done before installing the framing, meaning that the surface must be at its final height before the framing is installed. Please pay extra attention when installing the underground parts! If the body wells are not in line and at the same level, the framing elements will not fit.

Blok body well installation guide

11

6.

Page 12: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

INSTALLATION GUIDE FOR THE FRAMING AND LIDS

Please read through the entire installation guide before beginning the installation!

2/2

Version 3.0

Page 13: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Parts and structure

13

BIN SHELTER, 1 DOOR

ORGANIC WASTE

DIVIDED

NORMAL

BIN SHELTER

T-PIECE ORGANIC WASTE

BACK WALL

TOP SUPPORT FOR BIN SHELTER

PARTITION WALL

END WALL

CORNER SUPPORT FOR

DOOR

BIN SHELTER FLOOR 1/2

BIN SHELTER DOOR

5

6

7

Page 14: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Parts and structure

14

BIN SHELTER, 2 DOORS

T-PIECE

TOP SUPPORT FOR BIN SHELTER

TOP SUPPORT FOR BIN SHELTER

PARTITION WALL

END WALL

CORNER SUPPORT FOR

DOOR

BIN SHELTER FLOOR 1/2

BIN SHELTER FLOOR 1/2

BIN SHELTER DOOR

BIN SHELTER DOOR

ORGANIC WASTE

CORNER PIECE ORGANIC WASTE

BACK WALL ADJUSTABLE

FOOT

END WALL

PARTITION WALL

CORNER PIECE

ADJUSTABLE FOOT

T-PIECE

ORGANIC WASTE FRONT WALL

ORGANIC WASTE CORNER SUPPORT

CORNER SUPPORT FOR DOOR

5

6

6

5 8

7

Page 15: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com 15

NORMAL

DIVIDED

1

6

4

3

2

6

DIVIDED FRONT WALL

CENTRAL PROFILE

ADJUSTABLE FOOT

DIVIDED BACK WALL

CORNER SUPPORT

T-PIECE

T-PIECE NORMAL BACK WALL

CORNER SUPPORT

NORMAL FRONT WALL

ADJUSTABLE FOOT

Page 16: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Parts and structure

16

CORNER SUPPORT

ORGANIC WASTE CORNER SUPPORT

ADJUSTABLE FOOT

TOP SUPPORT FOR BIN SHELTER

CORNER SUPPORT FOR DOOR

BIN SHELTER FLOOR 1/2

T-PIECE

CORNER PIECE FOR DOOR

CORNER PIECE

HINGED LID FOR ORGANIC WASTE CONTAINER AND BIN SHELTER

LID FOR DIVIDED CONTAINER

LID FOR NORMAL

CONTAINER

Page 17: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Parts and structure

17

1

The framing parts are numbered for easier installation. Check that the number is correct before the final installation of a part.

NORMAL FRONT WALL

DIVIDED FRONT WALL

NORMAL BACK WALL

DIVIDED BACK WALL

END WALL

2 3

4 5

PARTITION WALL

6

BIN SHELTER DOOR

7

ORGANIC WASTE FRONT WALL 8

ORGANIC WASTE BACK WALL

9

PLINTH PROFILE

Page 18: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

1.

Installing the framing

Place all the partition walls (6) to stand upright between the containers. If the container row ends with a bin shelter, its partition wall will have a pre-installed threaded rod for adjusting the bin shelter’s height. A sheet metal doorstop has also been attached with POP rivets to the end of this partition wall, on the side of the door.

Installation guide for the framing and lids

18

Always begin the installation of the front and back walls from the centre of the row. Attach the front and back walls to the partition walls with 4.8x12 POP rivets (black anodised head). Five rivets in each corner. Make sure that the container is at the centre of the surrounding framing elements and that the front wall of the framing is in line with the container row.

2.

4 6

2

Page 19: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing

Install the adjustable foots at the corners of the framing around a container. Each foot is positioned underneath the horizontal bars of the framing elements. At this point, the top-most plate is lifted up with nuts, so that the entire framing is no less than 5 mm above the ground. If a bin shelter is to be installed next to the container, no adjustable foot should be placed in the corner next to the shelter door. Instead, the partition wall will have its own adjustment mechanism.

Installation guide for the framing and lids

19

3.

Page 20: BODY WELL INSTALLATION GUIDE - Finncont

DIVIDED OR NORMAL CONTAINER 4 bolts per wall.

Place imag

e here

www.finncont.com

DIVIDED/ORGANIC WASTE (the surrounding framing is half the width of an normal container’s framing) Front and back walls,

2 bolts per wall

End wall, no bolts

A partition wall opposite an end wall, 7 bolts

Installing the framing

Place M6x16 bolts in the grooves on the sides of the upper horizontal profiles:

Installation guide for the framing and lids

20

4.

x4

BACK WALL

END WALL PARTITION WALL

FRONT WALL

x7

x2

x2

Page 21: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installation guide for the framing and lids

BIN SHELTER (same size as a organic waste container) Front and back walls or

door, 2 bolts per wall END WALL Use 2 bolts if there is

just one door

Use 4 bolts if there are two doors

A partition wall opposite an end wall, 7 bolts

Place imag

e here

Installing the framing

PLEASE NOTE! Regardless of the model, the end-wall bolts must always be slid into place before attaching the wall.

21

BACK WALL OR DOOR

x2

x2 FRONT WALL OR DOOR

x7 x2 x4

END WALL

1 DOOR:

2 DOORS:

PARTITION WALL

Page 22: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing

Attach the corner support to the frame corners using the bolts you just inserted, M6 washers and M6 nyloc nuts. Place the larger corner sipports in the corners of the normal and divided containers. The smaller corner supports are placed on the wall opposite the hinge of the divided container. The separate corner support for doors is placed in the bin shelter, on the back side of the door.

Installation guide for the framing and lids

22

5.

Page 23: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing DIVIDED CONTAINER Place the central profile on top of the container and adjust the position of the framing elements accordingly. The framing elements must be positioned so that the partition walls between the containers are at an equal distance from the containers on either side. The framing elements are in the correct position when these distances are the same. Surface containers come with pre-attached dividing walls, and you will only need to attach the container’s central profile. Surface containers may also be moved around to ensure that they are at the centre of the framing elements. DEEP AND SHORT CONTAINERS Attach the dividing wall’s top end with the separate mounting brackets intended for dividing walls. 1. Set the top end of the dividing wall in the correct position, i.e. directly

underneath the central profile, which is on top of the framing elements, and attach the dividing wall’s mounting brackets to the container body’s top ring with Ø 4.8x25 self-drilling screws (4 per bracket).

2. Make sure that the dividing wall is touching the base, i.e. that the wall’s top edge is not higher than the body well’s top surface.

3. Use these mounting brackets as a jig to drill the necessary holes into the dividing wall and attach the wall to its brackets using M8x35 hexagon head screws and nyloc nuts.

Installation guide for the framing and lids

23

1

6.

Page 24: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing

Attach the divided container’s central profile by using the outer holes of the T-pieces and 4.8x25 self-drilling screws.

Installation guide for the framing and lids

24

7.

4.8x25 mm SELF-DRILLING SCREW x2

Page 25: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing

Continue installing the framing elements the same way towards both ends of the row. The framing elements of a divided container are installed the same way as those of an normal container. The installation of the bin shelter is described later in this guide.

Installation guide for the framing and lids

25

8.

Page 26: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing

ATTACHING AN END WALL Before attaching an end wall, make sure that you have selected the correct one. If the last container of the row has a hinged lid (i.e. organic waste container or bin shelter), the top of the partition wall’s top profile will have pre-drilled holes for the hinge (illustration below).

Installation guide for the framing and lids

In addition to the holes on top of the top profile, there is a threaded bar attached to the wall in the bottom corner of the wall with the door, if the last compartment is a bin shelter.

26

9.

Page 27: BODY WELL INSTALLATION GUIDE - Finncont

www.finncont.com

Installing the framing

Installation guide for the framing and lids

ATTACHING AN END WALL Slide the corner piece inside the front wall’s top profile (illustration) before attaching the front wall to the end wall.

PLEASE NOTE! Before attaching an end wall, place the necessary bolts in the wall’s groove (see p. 14). Attach the front and end wall to each other as normal with rivets (same way as front and partition walls). The installation of the bin shelter door and end wall is described separately. (see p. 25).

27

10.

Page 28: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Assembling the bin shelter

Place the bin shelter´s bottom element on the ground next to the partition wall. If the bin shelter only has a single door, the floor element should be placed on the side of the door. If there are two doors, there will also be two floor pieces, back to back.

Make sure that the height adjustment bolts of the partition wall are in the holes in the floor.

28

1.

2.

Page 29: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Assembling the bin shelter

If the bin shelter only has one door, place two M6x16 hexagon head screws in the end wall groove. If there are two doors, use four bolts.

If the bin shelter has just one door, install the stationary back wall first. (Remember to attach the corner piece to the back wall before attaching it to the end wall.)

29

3.

4.

END WALL

x2 2

DOORS:

1 DOOR:

x4

BACK WALL

1 DOOR

Page 30: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Assembling the bin shelter

Attach the bin shelter’s top support to the end with the door by using the bolts and nyloc nuts in the grooves. The edge of the support will be 2.8 cm from the end of the horizontal profile. If the bin shelter has two doors, attach another top support to the other end following the same instructions.

Install the smaller corner support in the corner of the stationary wall and partition wall, and attach the lid support 10 cm to one side of the partition wall’s centre line.

30

6.

5.

Page 31: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Assembling the bin shelter door

Place the pre-assembled door with hinges next to the end wall and attach the profiles to one another. During the installation, the profiles must be turned to lock them together.

Attach the profiles to each other using five 4.8x12 rivets. Make sure that the door hinge can move freely and that the door works correctly.

31

1.

2.

5 RIVETS

Page 32: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Assembling the bin shelter door

Open the door 90 degrees and slide one half of the corner piece into its correct position inside the end wall’s upper profile.

Attach a corner support for the door on the door’s top edge on the side of the magnet (as well as washers and nyloc nuts) using two M6x16 bolts.

32

3.

4.

Page 33: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Adding finishing touches and adjusting the framing

Attach T-pieces in between the containers’ corners by pushing them gently into place. Please note that the delivery may include three different types of T-pieces. The normal T-piece is wider than the T-piece of the bin shelter, and the latter can be either right-handed or left-handed

Attach the T-pieces with M5x40 socket screws (inner holes).

33

1.

2.

Page 34: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Adding finishing touches and adjusting the framing

The corner pieces do not require screws.

Adjust the top rim of the framing with the adjusting feet until level.

34

3.

4.

Page 35: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Adding finishing touches and adjusting the framing

Slide one of the plinth profile ends into the hole formed by the front wall’s end profile and bottom profile.

Place a 5 mm bolt, screwdriver or a similar object in the bottom hole in the profile’s other end. Use the object to pull the profile’s other end into its correct place against the vertical profile. Once the object is flush against the vertical profile, the profile will be centred sideways.

35

5.

6.

Page 36: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Adding finishing touches and adjusting the framing

Attach the plinth profile as low as possible, i.e. with its bottom edge touching the ground. Otherwise, the attachment holes in the upper edge will not be aligned with the horizontal profile of the framing. Adjustments up to approximately 2 cm are possible.

The plinth profile has pre-drilled holes. Use the plinth profile as a jig when drilling the attachment holes into the bottom profile. Use 4.8x12 rivets with black heads for the attachment.

36

7.

8.

Page 37: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Adding finishing touches and adjusting the framing

If the container row includes one or more bin shelters, attach the shelter’s floor element(s) to the end wall and partition wall. Use the pre-drilled holes in the shelter’s bottom element as a jig when drilling the attachment holes into the end wall and partition wall. Attach the floor to the walls with 4.8x20 rivets.

If the container row includes an lifting container, lower it down to the correct position inside its body well. Make sure that the hatch at the bottom is closed and the opening device secured. The opening device handle should face the container’s front wall. Attach the organic-waste sack that came as part of the delivery using an octagonal hoop. The round hoop underneath the container during transport is only used as transport support for this product. 37

9.

10.

Page 38: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Installing a hinged lid/lifting container and bin shelter

If both ends of the row have hinged lids, check before installing which lid fits which end. Place the lid in its correct position on top of the container. Make sure that the ends of the hinges are level with the ends of the wall’s upper profile. This will ensure that the pre-drilled holes in the upper profile are aligned with the holes in the hinge.

Place an aluminium plate on top of the plastic hinge. Attach the hinge using 4.8x20 POP rivets.

38

1.

2.

Page 39: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Installing a hinged lid/lifting container and bin shelter

Attach the lid limiter to a free M6x16 bolt on the opposite framing wall. washer – limiter – washer – nut

Make sure that the lid closes properly. The lid may have been bent out of its correct shape during transport and storage. It is important to ensure that the lid fits properly. The lid will regain its correct dimensions when left in place for a few days.

39

3.

4.

Page 40: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Installing other lids

The other lids must be positioned using a lifting hook.

The orange tape on the front side of the lid indicates the waste fraction in question. Place the lids according to the tapes and waste fraction signs attached to the framing.

40

1.

2.

Page 41: BODY WELL INSTALLATION GUIDE - Finncont

Installation guide for the framing and lids

www.finncont.com

Installing other lids

Make sure that the lid fits properly on all sides when lowered down, i.e. the rim of the lid sits evenly on top of the profile. The lid may have been bent out of its correct shape during transport and storage. It is important to ensure that the lid fits properly. The lid will regain its correct dimensions when left in place for a few days.

41