BOARD AGENDA 28 JUNE 2017 @ 5.30pm
VENUE: HHP BOARD ROOM, CREED COURT, STORNOWAY
No Item Action Page No Time
ATTENDANCE & APOLOGIES
1 Attendance & Apologies Noting 3 5:30pm
PRELIMINARY PROCEDURAL MATTERS
2 Declaration of Interest Noting -
5:35pm –
6:00pm
3 Minute of Board Meeting
24 May 2017 Approval 5
4 Action Sheet Noting 8
5 Date of Next Meeting
6 September 2017 Approval -
6 Health & Safety
Verbal Update Noting -
7 Scottish Housing Regulator
Mr Peter Freer Presentation -
ITEMS FOR DECISION
8 Annual Report & Financial Statements for Year Ended 31 March 2017
Report by Director of Finance and Corporate Services
Approval 11
6:00pm –
6:40pm
9 SHR Returns 2016/17
Report by Director of Finance and Corporate Services Approval 81
10 Budgetary Performance for Year Ended 31 March 2017
Report by Director of Finance and Corporate Resources
Approval 113
11 Management Report to 31 May 2017
Report by Director of Finance and Corporate Resources Noting 121
12 Rule Change
Report by Chief Executive Approval 144
13 Development Plan 2017/18 – 2021/22
Report by Chief Executive Noting 187
14 Development Programme 2017/18
Report by Chief Executive Approval 192
15 Review of ICT Strategy 2017 – 2020
Report by Director of Finance and Corporate Resources Approval 196
16 Tenant Participation Update
Report by Director of Operations Approval 222
17 Lease of Ground in Plasterfield
Report by Director of Operations Approval 236
No Item Action Page No Time
POLICIES
18 Community Grants Policy
Report by Chief Executive Approval 245 6:40pm
– 6:50pm 19 Policy Review June 2017
Report by Chief Executive Approval 254
ITEMS FOR NOTING
20 Review of Corporate Registers
Report by Chief Executive Noting 291 6:50pm
– 6:55pm
MEETING GOES INTO PRIVATE SESSION
PUBLIC SESSION RESUMES
MONITORING REPORTS
26 Business Plan 2015/16 – 2019/20 Year 3 Monitoring Report
Report by Chief Executive
Noting 293
7:10pm –
7:30pm
27 Investment Programme 2017/18 Monitoring Report
Report by Director of Operations
Noting 312
28 Fuel Poverty Update
Report by Director of Operations Noting 316
29 Housing Allocations Annual Report 2016/17
Report by Director of Operations Approval 320
If there are any issues arising from the Monitoring Reports that a member wishes to make they should contact the Chair by 5.00pm on 27 June 2017 so that the item can be discussed at the meeting.
Agenda Item 1
Board Members Notes 24-May-17 28-Jun-17 06-Sep-17 07-Sep-17 15-Nov-17
Mairi Bremner
Jane MacKinnon
Daniel Coyle
Alasdair Mackenzie
Calum Mackay
Iain Macmillan
Kevin Paterson 1
Gordon Murray 2
Roddy Mackay 3
Norman Macleod 4
Member present at meeting
1 - Elected as Board Member at AGM on 7 September 2016
2 - Elected as Council Member following local elections on 4 May 2017 Member not present at meeting
3 - Elected as Council Member following local elections on 4 May 2017
4 - Appointed as Board Member on 24 May 2017 Cancellation of travel due to weather/
technical problems
Member not required to be present at meeting
Special Leave
Board Meetings 2017/18
Mairi Bremner
Jane MacKinnon
Daniel Coyle
Alasdair Mackenzie
Calum Mackay
Iain Macmillan
Kevin Paterson 1
Gordon Murray 2
Roddy Mackay 3
Norman Macleod 4
Member present at meeting
1 - Elected as Board Member at AGM on 7 September 2016
2 - Elected as Council Member following local elections on 4 May 2017 Member not present at meeting
3 - Elected as Council Member following local elections on 4 May 2017
4 - Appointed as Board Member on 24 May 2017 Cancellation of travel due to weather/
technical problems
Member not required to be present at meeting
Board Training 2017/18
Board Members Notes
HEBRIDEAN HOUSING PARTNERSHIP Board Minutes of Meeting held in HHP Board Room, Creed Court, Wednesday 24 May 2017 @ 5.30pm
ATTENDANCE & APOLOGIES
1 The Vice Chair opened the meeting by acknowledging our shared horror at the terrorist attack in Manchester, with two families in Barra affected. Mr Mackay said “it brings the reality of danger nearer to home, we can’t imagine the pain and torment the families are going through and our thoughts and prayers go out to them.”
Attendance & Apologies
Present Apologies Staff & Consultants In Attendance
Calum Mackay Iain Macmillan Dena Macleod (Chief Executive) Kevin Paterson Alasdair Mackenzie John Maciver (Director of Operations) Mairi Bremner Danny Coyle Donald Macleod (Director of Finance & Corporate Alasdair Mackenzie Roddy Mackay Services) Jane Mackinnon Peter O’Donnell (Investment Manager) Angus MacNeil (Assets & Contracts Manager) Angus Smith (Corporate Resources Manager) Angela Smith (Corporate Governance Manager) Isabel Macmillan (Debt Management Officer) Garry Campbell (Debt Management Officer) Rona Morrison (Customer Service Assistant) James Morrison (Finance Assistant) Iona France (Governance Admin Officer – Minute Taker) Jane Ballantyne (TPAS)
Mr Mackay proposed that following the recent local elections, as Council elected Board Member Mr Norman Macleod did not seek re-election to the Council, Mr Macleod is appointed to the Board as a Board appointed Member due to his extensive knowledge of housing and development.
The Board agreed that Mr Macleod be appointed until the 2017 AGM.
PRELIMINARY PROCEDURAL MATTERS
2
Declaration of Interest
There were no declarations of interest.
3 Minute of Board Meeting 16 March 2017
The minute of the Board meeting of 16 March 2017 was submitted and approved as a true and accurate record of the proceedings of that meeting.
4 Action Sheet
The Action Sheet was approved.
5 Date of Next Meeting
The date of the next meeting will be 28 June 2017.
6 Health & Safety
There was nothing to report.
-
Presentation of Awards to Staff
Angus Macneil, Assets & Contracts Manager and Angela Smith, Corporate Governance Manager, were presented with their Level 5 Award in Leadership and Management.
Agenda Item 3
ITEMS FOR APPROVAL
7
Annual Return on the Charter 2016/17 (ARC)
The Partnership’s Annual Return on the Charter 2016/17 (ARC) and Energy Efficiency Standard for Social Housing (EESSH) was presented to the Board for review and approval.
The report summarised performance on arrears, voids, repairs, development and lettings and provided comparisons to the previous year’s data.
Board Members were asked to submit any queries on the ARC to the Corporate Governance Manager by Friday 26 May 2017.
The Tenant Report will be compiled from ARC data and issued to tenants within the Regulator’s timetable.
The Director of Operations highlighted two areas where there have been significant improvements since 2015/16 specifically EESSH and arrears performance and this is mainly due to the work of officers.
The Board approved:
a) the ARC submission for 2016/17 subject to the reconciliation of any queries raised;
b) the format of the Tenant Report 2016/17; and
c) the Energy Efficiency Standard for Social Housing (EESSH) submission for 2016/17.
8 Rule Change
The Chief Executive outlined proposed changes to the Partnership Rules to ensure the governance arrangements are appropriate for the future requirements of the Business Plan and comply with Regulatory Standards.
The Chief Executive further advised following the Office of National Statistics (ONS) reclassification if there were more than 25% of Board Members who were council appointed HHP could be considered a public body. Changing the make up of the Board from council appointed Members to skill based Independent Members would ensure that HHP retained their status of non-public body.
The report had been discussed in detail at the Audit & Risk Committee earlier in the day and the Committee proposed a change to the recommendations. The timetable at Appendix 1 will also be amended in line with advice received from the Regulator whereby the redrafted Rules will require Board approval at the June 2017 meeting.
The Board approved:
a) The Rules be amended to replace Comhairle appointed Board Members with Independent Board Members;
b) Independent Members should be Members of HHP;
c) the geographical split of tenant Board Members be retained unless there are no nominees for a particular area;
d) the timetable and action plan be amended; and
e) the revised Rules are presented to the June 2017 Board Meeting for approval.
9 Development Programme 2012-18 Monitoring Report 2016/17
The report advised the Board of progress with the Development Programme 2016/17 – 2017/18 and sought approval for the Executive Team, in consultation with the Development Workgroup, to explore and potentially purchase sites in line with the 2017/18 Development Plan.
The Director of Operations provided an update on the progress of the current sites.
Mackenzie Lane
The development has been completed and the properties handed over on 3 May 2017. TIG are currently carrying out a survey to establish the reason for the low interest levels for the LIFT properties in the scheme.
Mackenzie Avenue
Work has started on the scheme and is progressing well.
HHP are currently in discussions with the owners in the first phase of the scheme (Mackenzie Park) to amend the title on the Deed of Conditions.
Tarbert Central
Eight objections have been received to the planning application and the design will need to be modified prior to the planning meeting on 8 June 2017.
Cameron Terrace
Although the land is in HHP’s ownership there is a question of whether it has been resumed from crofting tenure. This has led to a delay in progressing the development of the site.
The Board:
a) Noted the progress on the Development Programme for 2017/18; and
b) Approved the exploration and potential purchase of sites in line with the 2017/18 Development Plan and in consultation with the Development Workgroup.
10
ALASDAIR MACKENZIE LEFT THE MEETING AT THIS POINT.
Gifts & Hospitality Policy
The report sought Board approval for the discontinuation of the Gifts and Hospitality Policy as its requirements are included in the Entitlements, Payments & Benefits Policy.
The Board approved the discontinuation of the Gifts and Hospitality Policy.
11 Fire Safety Policy
The revised Fire Safety Policy was brought to the Board for review and approval. There were no major changes to the Policy.
The Board reviewed and approved the revised Fire Safety Policy.
12 ICT Security Policy
The Information Security Policy was presented to the Board for approval. The Policy relates to the equipment use and data management within the organisation. Following an audit of HHP’s internal security in February 2016 it was recommended that a specific policy bringing together all practices and procedures would be beneficial.
The Board approved the ICT Security Policy.
13 Quarterly Treasury Report to 31 March 2017
The Director of Finance and Corporate Services informed the Board of Treasury Management activities in the fourth quarter of 2016/17. The cash balance at 31 March 2017 increased by £0.493m to £7.416 due to Right to Buy receipts and phasing of developments. The Treasury Management Policy requires that if the cash balance exceeds £2.5m the funds should be spread over no fewer than three interest bearing accounts. The Board approved at the meeting on 16 June 2016 that the limit for deposit of cash surpluses held by any one institution to £1.5m for 2016/17 and approval was sought to extend this increase to 2017/18.
Kevin Paterson asked if there was any value in increasing the limit on a permanent basis and the Director of Finance & Corporate Services advised that this would be considered when the Financial Regulations were reviewed.
The Board:
a) noted the quarterly report on the Analysis of Investment and Borrowing;
b) noted the outstanding loans at 31 March 2017 of £5.088m;
c) noted the cash balance at 31 March 2017 of £7.416m; and
d) approved increasing the limit for deposit of cash surpluses held by one institution to £1.5m for 2017/18.
ITEMS FOR NOTING
14 Management Report to 31 March 2017
The Management Report to 31 March 2017 was presented to the Board for review and noting. The Director of Finance & Corporate Services advised that the full Annual Report 2016/17 would be brought to the Board at the June 2017 meeting.
The Board noted the management information at 31 March 2017.
15 Business Plan 2015/16 – 2019/20 Year 3 Monitoring Report
The Business Plan Monitoring Report was presented to the Board to monitor progress on the Business Plan Action Plan agreed in March 2017.
The Board noted the progress in the Business Plan Objectives Monitoring report.
16 Asset Management Strategy 2016 – 2020
The report provided an update on the Asset Management Strategy Action Plan.
The Board noted progress on the Asset Management Strategy Action Plan.
MEETING WENT INTO PRIVATE SESSION
Chairperson Mr Iain MacMillan
SIGNED ………………………………………………………
DATE ………………………………………………………
Action
Point
MINUTE
NUMBER ACTION TO BE TAKEN ACTION BY PROGRESS
1 24 May 17
(1)
Contact Mr Macleod to advise of his nomination to Board. Corporate Governance Manager
Mr Macleod contacted and accepted nomination.
2 24 May 17
(7)
Submit ARC & EESSH to Regulator.
Tenant Report to be issued to tenants.
Corporate Governance Manager
Submitted 26 May 2017.
3 24 May 17
(8)
Progress Rule Change with Harper Macleod.
Amend timetable and Action Plan.
Chief Executive Harper Macleod instructed to prepare draft rules. Item on the agenda.
Timetable amended.
4 24 May 17
(9)
Progress legal work to amend Deed of Conditions.
Convene meeting of Development Work Group to explore potential development sites.
Chief Executive/Director
of Operations
Completed
5 24 May 2017
(10)
Discontinue Gifts & Hospitality Policy Corporate Governance Manager
Completed
6 24 May 2017
(13)
Consider increasing cash limits on a permanent basis when reviewing the Financial Regulations.
Director of Finance & Corporate Services
To be reviewed as part of the next update to the Financial Regulations.
7 16 Mar 17
(9)
Feasibility studies to be carried out in Tarbert, Lochmaddy & Balivanich.
Director of Operations
Document being progressed for feasibility work.
8 16 Mar 17
(11)
Re-tender process to be carried out for Funders Valuation
Stock Condition Survey to be carried out in 2017.
Director of Finance & Corporate Services
Director of Operations
Re-tender process will be initiated in the second half of 2017.
Brief being finalised for issue in June 2017.
9 16 Mar 17
(14)
Add garage roof at Creagan to Roofing Programme.
Install infra-red heating in up to 3 larger properties.
Director of Operations
Virement requested. Purchase order to follow.
2 properties identified.
Board Action Sheet
Agenda Item 4
Action
Point
MINUTE
NUMBER ACTION TO BE TAKEN ACTION BY PROGRESS
10 16 Mar 17
(15)
Submit plans for Tarbert Central to planning once design is completed.
Provide further details to Board Members on Goathill Farm development when available.
Director of Operations
Planning application submitted.
Design team appointed for Goathill Farm Masterplanning and due to report in September 2017.
11 1 Feb 17
(7)
Finance Working Group to look at anomalies in rents and rent structure. Director of Finance & Corporate Services
Rent structure review to be undertaken late in 2017.
12 1 Feb 17
(11)
Progress Level 2 accreditation with Quality Scotland. Corporate Governance Manager
Committed to Excellence + EQUIP purchased on 31 March 2017. Draft Action Plan has been prepared and Quality Scotland will visit Stornoway on 19 July 2017 to conduct group self-assessment.
13 1 Feb 17
(18)
Convene a meeting of the Housing Management Working Group to progress the implications of the Housing (Scotland) 2014 Act.
Director of Operations
Date being arranged.
14 1 Feb 17
(20)
Convene meeting of Investment Working Group to discuss fuel poverty and energy efficiency measures.
Director of Operations
Date being arranged.
15 16 Nov 16
(9)
Tenders to be sought for ICT for 5 years.
ICT Strategy to be presented to Board in February 2017.
Corporate Resources Manager
Castle contract extended to September 2018.
ICT Strategy in development and is on June 2017 agenda.
16 16 Nov 16
(14)
Arrange the demolishment of 20 Winfield Close. Director of Operations
Delayed. Awaiting disconnection of electricity supply by Npower.
Complaint lodged with supplier over delay.
17 16 Nov 16
(24)
A further Gas Audit to be carried out in 2017. Investment Manager Planned for 30 June – 1 July.
18 6 Sep 16
(12)
Add HHP/CNES liaison meetings to calendar once they are confirmed. Corporate Governance Manager
Await confirmation of suitable dates from CNES.
19 6 Sep 16
(18)
Fuel Poverty Survey to be carried out as part of the 2017 Stock Condition Survey.
Director of Operations
Included in brief for survey.
20 22 June 16
(7)
Arrange refresher training on accounting process for Board members at next Business Planning Day.
Corporate Governance Manager
Looking at options and costs for three different areas including finance/accounting process. Discussion to be had with Board re fixing a date after the June 2017 meeting as full Board now in place following Council elections.
Action
Point
MINUTE
NUMBER ACTION TO BE TAKEN ACTION BY PROGRESS
21 16 Mar 16
(21)
Performance Monitoring of Repairs & Maintenance Budget to be reported regularly to the Board.
Director of Operations
Report went to the June Board meeting and a further report to November 2016 meeting. Further report planned for September 2017. Budget update in Management Accounts.
Donald Macleod Page 1 of 4 16/6/17
Agenda Item: A&R - 7 Board - 8
AUDIT & RISK 27 June 2017
BOARD 28 June 2017
ANNUAL REPORT AND FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 MARCH 2017
Report by Director of Finance & Corporate Services
PURPOSE OF REPORT
1.1 To present the Annual Report and Financial Statements for the year ended 31 March 2017 to the Board and Audit & Risk Committee for approval.
SUMMARY
2.1 The Annual Report and Financial Statements for the year ended 31 March 2017 have been prepared and are at Appendix 1. A summary of the Financial Statements will be included in the Newsletter and is at Appendix 2.
COMPETENCE
3.1 The legal, financial or other constraints to any recommendations in this report being implemented are detailed in paragraphs 5.1 to 5.6.
RECOMMENDATIONS
4.1 It is recommended that the:
a) Audit & Risk Committee review the Annual Report for the year ended 31 March 2017 as at Appendix 1 and recommend approval to the Board;
b) Board approve the Annual Report and Financial Statements for the year ended 31 March 2017 as at Appendix 1;
c) Board approve the summary of the Financial Statements as at Appendix 2 for inclusion in the Tenants Newsletter; and
d) Subsidiary Accounts for the year ended 31 March 2017 be noted.
APPENDIX 1 Annual Report and Financial Statements for the year ended 31 March 2017
(DRAFT)
APPENDIX 2 Summary of Financial Statements 2015/16 (To Follow)
APPENDIX 3 HHP Community Housing Accounts (To Follow)
Background Papers
Writer of Report Donald Macleod Tel: 0300 123 0773
Donald Macleod Page 2 of 4 16/6/17
COMPETENCE
Financial 5.1 The Annual Report and Financial Statements report on how the resources for the year
ended 31 March 2017 have been utilised. The cost of auditing and producing copies of the Annual Report and Financial Statements has been provided for in the Annual Report and Financial Statements.
Legal 5.2 The following Partnership Rules are applicable:
a) Rule 4 - As a landlord and managing agent we will: Rule 4.1 - have regard for the requirements of public accountability. Rule 4.2 - use any money we receive carefully and properly.
b) Rule 72 – The Board must send the Partnership’s accounts and Balance Sheet to the Partnership’s auditor. The auditor must then report to the Partnership on the accounts they have examined. In doing this, the auditors must follow the conditions set out in Section 9 of the Friendly and Industrial and Provident Societies Act 1968 and paragraphs 13 (2) and 13 (3) of Schedule 7 Part 3 of the
Housing (Scotland) Act 2001.
c) Rule 73 - The Partnership must provide the Scottish Housing Regulator and the Financial Services Authority with a copy of its accounts and the auditor’s report within six months of the end of the period to which they relate.
5.3 The Annual Report and Financial Statements prepared must comply with the Statement
of Recommended Practice (SORP) - Accounting by Registered Social Landlords 2014 and the Determination of Accounting Requirements issued by the Scottish Housing Regulator.
5.4 The Facility Agreement with our Funders requires the Partnership to submit audited Annual Report and Financial Statements within six months from the end of the period to which they relate and also confirmation from our External Auditor that the Financial Covenants have been met.
5.5 The following Financial Regulations are applicable:
a) 5.10.1 – Preparation of annual accounts is to commence immediately after the end of each financial year and draft accounts are to be prepared for consideration by the auditors and by the Resources Committee no later than three months after the year-end.
b) 5.10.4 - the draft accounts and audit management letter will be reviewed by the
Audit and Risk Committee. On the recommendation of the respective Committees, the draft accounts will be submitted to the Board for approval, and subsequently for adoption at the Annual General Meeting.
RISK
6.1 The risk of not complying with the Legal requirements has been mitigated by completing the preparation of the Annual Reports and Financial Statements within three months of the year end.
Donald Macleod Page 3 of 4 16/6/17
REPORT DETAILS
7.1 A set of accounts for the year ended 31 March 2017 have been prepared and are at Appendix 1 to this report. An audit report will be issued at the meeting of the Committee and the Board.
7.2 Confirmation from Wylie & Bisset that HHP has met the Financial Covenant for 2016/17 as required by our Funder is also expected at the meeting.
7.3 A detailed presentation will be given at the Board meeting on the Accounts and the performance for the year.
7.4 The key financial factors to highlight in the Annual Accounts are that:
a) Operating surplus of £3,196,692 shows an increase from the previous year of £110,870. The key changes are detailed below:
Area £000’s Reason
Rental Income 120 Increase driven by annual rent increase and increased number of properties delivering a full year of rental income.
Depreciation (176) Increase driven by new build properties capitalised in the year.
Repairs 248 Reduction on repairs as a result of large painterworks undertaken in 2015/16.
Reduction in Grants (67) Reduction in deficit fund grant & Increase in Grant Amortization.
Voids (26) Increased Voids driven by low demand properties.
b) Reserves are allocated as shown below:
c) Increase of £1,131,331 in net assets reflecting the investment in transfer properties and the continued development work;
Reserves Allocation
General Repairs 31-Mar
Reserve Asbestos & Renewals Total
£ £ £ £
Balance at 1 April 2016 18,418,490 1,140,261 1,817,649 21,376,400
Surplus 2016/17 1,131,330 1,131,330
Transferred to Reserve (540,000) 140,000 400,000 -
Balance at 31 March 2017 19,009,820 1,280,261 2,217,649 22,507,730
Donald Macleod Page 4 of 4 16/6/17
d) Inclusion of the subsidiary HHP Community Housing and the decision not to prepare group accounts due to the immateriality of the trading activity of the Company during the year; and
e) The statement of comprehensive income includes a significant actuarial loss of £1,502,000 for 2016/17 which has arisen due to a change in the actuarial financial measurement assumptions.
7.5 A separate report is being presented to the Board and detailing performance for the year against the approved budget.
Annual Report &
Financial Statements
A Registered Society under the
Co-operative & Community Benefit Societies Act 2014 No: 2644R (S)
Registered Charity No: SCO 35767
Scottish Housing Regulator registration: No 359
Property Factor Act: No PF000183
FOR THE YEAR ENDED 31 MARCH 2017
Annual Report & Financial Statements 1
CONTENTS
BOARD OF MANAGEMENT, DIRECTOR AND ADVISERS .......................................................................................... 2
REPORT OF BOARD OF MANAGEMENT .................................................................................................................. 5
BOARD STATEMENT ON INTERNAL FINANCIAL CONTROL .................................................................................... 14
STATEMENT OF BOARD RESPONSIBILITIES ........................................................................................................... 14
OPERATING AND FINANCIAL REVIEW ................................................................................................................... 17
INDEPENDENT AUDITOR’S REPORT ...................................................................................................................... 22
REPORT BY THE AUDITORS TO THE MEMBERS OF HEBRIDEAN HOUSING PARTNERSHIP LIMITED ON
CORPORATE GOVERNANCE MATTERS .................................................................................................................. 22
STATEMENT OF COMPREHENSIVE INCOME ......................................................................................................... 26
STATEMENT OF CHANGES IN RESERVES ............................................................................................................... 27
STATEMENT OF FINANCIAL POSITION AS AT 31 MARCH 2017 ............................................................................. 28
STATEMENT OF CASH FLOWS FOR THE YEAR ENDED 31 MARCH 2017................................................................ 29
NOTES TO THE STATEMENT OF CASH FLOWS FOR THE YEAR ENDED 31 MARCH 2017 ....................................... 30
NOTES TO THE FINANCIAL STATEMENTS .............................................................................................................. 31
Annual Report & Financial Statements 2
BOARD OF MANAGEMENT, DIRECTOR AND ADVISERS
Name Category Changes during the year
Appointed Resigned
George Lonie Community 3 Sept 2015 (re-appointed) 6 May 2016
Ian Macmillan Community 7 Sept 2016 (re-appointed)
Daniel Coyle Tenant 7 Sept 2016 (re-appointed)
Alasdair Mackenzie Tenant 7 Sept 2016 (re-appointed)
Calum Mackay Community 7 Sept 2016 (re-appointed)
Jane Mackinnon Community 3 Sept 2015 (re-appointed)
Mairi Bremner Community 7 Sept 2016 (re-appointed)
Kevin P Paterson Tenant 7 Sept 2016 (appointed)
David Blaney Councillor 11 May 2012 3 May 2017
Donald J Macrae Councillor 11 May 2012 3 May 2017
Norman Macleod Councillor
Community
11 May 2012
24 May 2017 (appointed)
3 May 2017
Gordon Murray Councillor 4 May 2017 3 May 2017
Roddy Mackay Councillor 4 May 2017 (appointed)
John Graham Mitchell Councillor 4 May 2017 (appointed)
Annual Report & Financial Statements 3
Secretary and Registered Office Funders Dena Macleod BA CA Creed Court Gleann Seileach Business Park STORNOWAY Isle of Lewis HS1 2QP
Royal Bank Of Scotland plc
RBS Global Banking & Markets Kirkstane House, 139 St Vincent Street, Glasgow, G2 5JF
External Auditors Solicitors
Wylie & Bisset LLP
168 Bath Street
GLASGOW
G2 4TP
Harper Macleod
The Ca’d’oro
45 Gordon Street
GLASGOW
G1 3PE
HBJ Gateley Wareing
19 Canning Street
EDINBURGH
EH3 8EH
Bankers Directors
Royal Bank of Scotland plc
17 North Beach Street
STORNOWAY
Isle of Lewis
HS1 2XH
Chief Executive : Dena Macleod BA CA
Director of Operations: John Maciver BSc MPHIL, FCIH
Director of Finance & Corporate Services: Donald Macleod BAcc, FCCA
Contact Details
Phone: 0300 123 0773
E-mail: [email protected]
Web: www.hebrideanhousing.co.uk
Twitter: HebrideanHousing@HebHousing
Annual Report & Financial Statements 4
REPORT OF BOARD OF MANAGEMENT
Annual Report & Financial Statements 5
REPORT OF BOARD OF MANAGEMENT
The Board of Management presents its report for the year ended 31 March 2017.
OVERVIEW OF BUSINESS
The principal activity of HHP is to provide and manage good quality, affordable accommodation for people in
housing need in the Outer Hebrides. HHP is a charitable RSL and owns and manages a range of houses for
rent, primarily general need accommodation but also some sheltered and supported accommodation. HHP
provides accommodation for homeless people who are referred as statutory homeless and requiring
permanent secure accommodation by Comhairle Nan Eilean Siar.
HHP began its operations in September 2006 with 1,800 houses and since then has acquired an additional 300
houses from 5 locally based RSL’s, 10 houses under the Government’s Rent of the Shelf scheme and has built
more than 350 new affordable houses. 267 houses have been disposed of since September 2006 leaving a
stock at 31 March 2017 of 2,193.
CORE VALUES
HHP’s core value is:
The core value is underpinned by five supporting values:
•We honour commitments made to our tenants and build trust.
•Our decision making processes are open and transparent.
Integrity
•We focus on postive outcomes for our customers. Their views will inform the provision and development of services.
Customer Focus
•We will strive to ensure that there is no discrimination evident in the way we deliver services. All customers will be treated with respect. We shall treat people the way we like to be treated.
Equal Opportunities
•We shall seek to ‘do it right’ at the first time of asking Quality of Service-
Excellence
•We aim to promote sustainable communities where people want to live now and in the future. Sustainability
•We Provide a challenging, supportive and rewarding work environment. Supporting Staff
Annual Report & Financial Statements 6
REGULATION
The Scottish Housing Regulator publishes a Regulation Plan for all social landlords on an annual basis.
The Regulation Plan sets out the level of engagement. HHP, because of its ‘systemic importance’ in the Outer
Hebrides is categorised as ‘medium engagement’ by the Scottish Housing Regulator in the 2017 Regulation
Plan. Given the level of public money invested by HHP on an annual basis it is important that the Regulator
has assurance that the organisation is well managed and achieves value for money.
Two meetings a year take place with the Regulator to review the risks and challenges facing the business and
progress against the Business Plan. 30 year and 5 year financial projections are submitted to the Regulator in
June.
The Regulator has expressed satisfaction with HHP’s progress for 2016/17.
STRATEGY & OBJECTIVES
HHP’s strategy and objectives are detailed in its 30 Year Business Plan. The Business Plan highlights 5 core
business activities which have shaped and will continue to shape the future of HHP and the way housing
services are delivered to tenants:
Investment Programme
HHP continued to invest in tenants homes with over £4 million spent in 2016/17 on improvements to homes
including new bathrooms and kitchens. There was a particular focus on works to alleviate fuel poverty. Over
100 new heating systems were installed and the window replacement reached a major milestone with all
homes now having double glazing.
Investment Programme
New Build Programme
Environmental Improvements
Repairs & Maintenance
Housing Management
Annual Report & Financial Statements 7
Scottish Housing Quality Standard (SHQS)
HHP has met the Scottish Housing Quality Standard. There were however a number of exemptions and
abeyances granted, mainly on the grounds of energy efficiency, due to the challenges posed by being in an
‘off-gas’ area. Plans are now in place through the 4 year Investment Programme to deliver the new Energy
Efficiency Standard for Social Housing (EEESH). SHQS exemptions and abeyances are being addressed over the
same time period.
Repairs and Maintenance
The Board took a decision to extend the current Repairs and Maintenance contract with FES for a further 2
years until 2018. This reflects the positive partnership working between HHP and FES and the mutual goal of
maximising the benefit to tenants. A review is now being undertaken to look at the best model for taking
forward the repairs and maintenance service including the option of taking the service in house.
New Build Programme
HHP has completed more than 370 new houses (325 for Rent and 47 LIFT) since Transfer Day in 2006 which is
ahead of the 275 ten year target. At April 2017 there were 74 houses on site at the MacKenzie Farm
development, 24 of the properties were completed in May 2017 with the remainder due for completion by
September 2019.
Future New Build Projects
4 sites are being progressed at present. 2 in Tarbert, 1 in Leurbost and 1 in Barra. Feasibility works are to be
carried out on a number of other sites. In addition we are working with the Comhairle and other partners to
Masterplan the HHP site at Goathill Farm.
MACKENZIE LANE, STORNOWAY
Annual Report & Financial Statements 8
DYNAMICS OF THE SOCIAL LANDLORD
The Partnership is focused on providing housing within the Outer Hebrides. The population decline of the last
30 years is continuing and the proportion of young people and children is worryingly low. The proportion of
elderly people is forecast to increase significantly. Demand is higher in Stornoway and to a lesser extent in
Tarbert, Balivanich and Castlebay. However there is weakening demand in many areas, particularly South
Lochs, Bernera & Uig and South Uist. This will impact on future strategy for new build programmes.
KEY RISKS IMPACTING ON THE FUTURE
HHP’s 30 year business plan is extremely sensitive to changes in the operating environment and in an effort to
minimise that risk, a risk strategy and risk register has been prepared. The strategy is updated annually and the
register is reviewed quarterly and updated as necessary. Additional resources such as making the housing
officer roles permanent have been made to mitigate the impact of the highest scoring risk - the roll out of
Universal Credit. This has helped in driving a reduction in our arrears balance compared to prior year.
Any risk which materially jeopardises the Partnership’s ability to achieve its Strategic Objectives or conduct its
business is not accepted. HHP’s risk appetite is assessed annually at Board Business Planning days.
GOVERNANCE & MANAGEMENT
HHP is a registered Co-operative and Communities Benefit Society and is governed by a set of Rules
appropriate for a Registered Social Landlord. The Partnership is governed by a voluntary Board of
Management which is supported by a Chief Executive, Executive Team and staff. A full list of Board Members
is at page 3.
All Board Members and staff are required to operate within a set of Standing Orders, policies and financial
regulations.
The composition of the Board includes four tenant representatives. The Board’s skill mix is regularly reviewed,
and where gaps are identified, Board Members seek to identify individuals from within the Partnership’s
existing membership and wider environment to strengthen the range of expertise on the Board. The
Governance structure is shown in Figure 1.
0
50
100
150
200
250
300
350
400
450
2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17
New Build Units
Business Plan Target Actual
Annual Report & Financial Statements 9
Figure 1 Board of Management
New Board Members undergo induction training which includes a “buddy” system where an experienced
Board Member will make themselves available to assist a new Board member.
The Partnership’s Standing Orders allow for one Standing Committee and four Community Liaison Groups.
The Board comprises up to 12 members - 4 tenant members, 4 Comhairle Nan Eilean Siar nominees, 4
community representatives and up to 3 co-optees. As at the 31st
March there were 11 Board members.
HHP’s Rules require that two community and two tenant members step down each year. The current rules are
under review and proposals to amend the rules were presented to the board in May 2017. There will be
elections for the vacant positions at the Annual General Meeting in September 2017.
Tenant and Community members of the Board hold one fully paid £1 share.
During 2016/17 one share was issued to a new member.
The Board is responsible for the overall strategic direction and objectives of HHP. Key responsibilities include
overseeing:
Approval of Business Plan
Delivery of Business Plan
Ensuring compliance with our values and key objectives
Establishing strategic plans to achieve objectives
Appraising the annual financial statements
Establishing a framework of delegation and system of internal control
Achieving the highest standards of governance
Board of Management
Audit & Risk Committee
Spokesperson
Development
Tenants
Repairs & Investments
Finance
Working Groups
Housing Mgt
Investment
Development
Finance
Community Liaison Groups
Lewis
Harris
Uist
Barra
Annual Report & Financial Statements 10
Currently, HHP’s Board has delegated responsibility to the following Standing Committee:
AUDIT & RISK
The Audit & Risk Committee is responsible for ensuring that the activities of the Board are within the law and
regulations which govern the Board, and that an effective internal control system is maintained. Specifically
this Committee:
Reviews HHP’s systems of internal control and risk management
Provides an overview of the internal and external audit functions
Scrutinises the financial statements
Monitors the implementation of internal audit recommendations, external audit reports and
management letters
Reviews the internal audit plan and scope of work
Reviews the effectiveness of the overall risk strategy
TENANT PARTICIPATION
The Board took a decision during the year to continue to broaden and strengthen opportunities for tenants to
engage with HHP and to actively participate in a way that suits them.
TPAS were re-appointed, following competitive procurement to provide a Tenant Participation Development
Service to HHP. This service will continue to support existing tenants and residents groups and will reach out
to all tenants to help them to become involved in the planning and monitoring of services.
HEALTH & SAFETY
The Board places the highest priority on the Health and Safety of tenants, staff and contractors. A Health and
Safety group chaired by the Director of Operations meets regularly with a remit to ensure the Health and
Safety requirements are being met by the Partnership.
POLITICAL AND CHARITABLE DONATIONS
There were no political donations made by HHP during the financial year. A total of £5,000 was donated
during the year to the following local charities:
£1,000 Marie Curie Western Isles
£1,000 Befriending Lewis
£1,000 Action for Children
£1,000 Bethesda
£1,000 Garadh a Bagh a Tuath
Annual Report & Financial Statements 11
DISCLOSURE OF INFORMATION TO AUDITORS
The Board Members who held office at the date of approval of this Board report confirm that, so far as they
are each aware, there is no relevant audit information of which the Partnership’s auditors are unaware; and
each Board Member has taken all the steps that he/she ought to have taken as a Board Member to make
himself/herself aware of any relevant audit information and to establish that the Partnership’s auditors are
aware of that information.
AUDITORS
A resolution to re-appoint Wylie & Bisset as auditors of HHP will be proposed at the Annual General Meeting in
September 2017.
EMPLOYEE POLICIES
The 30 year Business Plan recognises that the well-being of staff is critical to successful service delivery. A core
objective is to be a good employer that attracts and retains high quality staff. HHP will ensure that there is
sufficient and well trained staff to deliver high quality services.
RECRUITMENT
HHP want staff to feel safe in their working environment and that they are treated fairly irrespective of colour,
age, disability, religion or sexual orientation. A Recruitment Policy has been developed which aims to:
Recruit and select the best candidate for every vacancy;
Ensure that access to employment opportunities is based on fair, objective and consistent criteria
TRAINING
HHP is committed to the training and development of all its employees and Board Members. Regular training
needs assessments are carried out for Board Members which feed into Training Plans. During 2016/17 two
HHP managers completed Level 5 Leadership and Management ILM. A training programme for staff for
2017/18 is being compiled from training needs highlighted during the staff performance appraisal system.
Annual Report & Financial Statements 12
INTERNAL FINANCIAL CONTROL
The Board of HHP is responsible for establishing and maintaining systems of internal financial control within
the organisation. By their nature these systems can provide reasonable, but not absolute, assurance against
material mis-statement or loss. The internal control framework is supported by organisational control
measures including, financial and business planning, performance monitoring and reporting, project
management and communication systems. The internal control framework also relies on formal governance
measures including a structure of corporate policies, authorities and responsibilities delegated from the Board
to the Executive Team.
FRAMEWORK OF INTERNAL CONTROL
The key methods by which the Board establishes the framework for providing effective internal financial
controls are dealt with in the next part of this report.
MANAGEMENT STRUCTURE
The organisation for which the Board has overall responsibility is governed by a set of Standing Orders, which
reserves specific powers to the Board and delegates functions and powers to its Officers, Committee and
Working Groups. The Executive Team, comprising of the Chief Executive and the Directors, has two main
functions; Operations and Finance & Corporate Services.
AUDIT & RISK COMMITTEE
The Audit & Risk Committee consists of six members. Meetings are normally held six times a year to review
and approve annual internal and external audit plans, reports and the action taken on issues raised by audit. In
addition the Audit and Risk Committee reviews the corporate risk management arrangements including the
Risk Register.
SYSTEM OF INTERNAL CONTROL
The key elements of the system of internal control are as follows:
Regular meetings of the Board, which has a schedule of matters specifically reserved for its approval
and which are the subject of regular standard reports as required
Appointment of Internal Auditors who work to the standards of the Institute of Internal Auditors and
produce an annual internal audit plan and regular internal audit reports
The review of reports prepared by Internal Auditors by the Audit and Risk Committee on a regular basis
A corporate financial plan with a detailed annual budget, regularly revised forecasts, a comparison of
actual with budget and key performance indicators all of which are reviewed by the Board
IDENTIFICATION OF BUSINESS RISK
Risk management lies with the Board supported by Executive Team. Key risks have been identified as part of
the business planning process and scored to reflect the likelihood of this occurring. Mitigation strategies are
put in place to minimise the impact of identified risk on the organisation.
Annual Report & Financial Statements 13
The most significant risks identified during 2016/17 were the wider economic uncertainty in the Outer
Hebrides (Including population decline), impact of weather events on insurance and rent affordability issues
for tenants.
Increased costs are also being experienced by local contractors on supplies which will inevitably lead to
increased costs in maintenance and new build. The local economy continues to be fragile with risk of
contractors experiencing cash flow problems and the potential for business failure.
CORPORATE RISK
The Risk Register has been updated for 2016/17. The Risk Register is organisation wide and shows each risk,
the significance of the risk and the probability of these risks occurring. The Register also details the impact of
the risks should they occur and who will have responsibility for devising and implementing suitable controls
and mitigating actions.
MANAGEMENT INFORMATION SYSTEMS
Management Information Systems have been established which provide monthly information on key aspects
of the business. Management accounts comparing actual results against budget are presented to the Board
along with performance against key financial and non-financial indicators. HHP’s Executive Team continually
develop the management information produced to provide managers with reliable and up to date information
which enables them to respond quickly to service delivery issues as they arise whilst continuing to achieve the
strategic objectives and goals of the organisation.
INTERNAL AUDIT
On 1 April 2015 the Board re-appointed Scott-Moncrieff as their Internal Auditors. The Internal Auditors
report directly to the Audit and Risk Committee.
The External Auditors have placed reliance on the work carried out by the Internal Auditors on the accounting
systems.
INVESTMENT APPRAISAL
The Financial Regulations provide the framework and procedures for investment appraisal. Expenditure
beyond certain levels requires to be approved by the Board. A Fixed Asset Register is in place which details all
the assets owned by the Partnership.
INVESTMENT
On 1 June 2010 HHP Community Housing Limited was formed as a non-charitable subsidiary of the
Partnership. During 2016/17 there was no activity. The Board during its business planning session have asked
officers to explore potential new areas of business activity. The majority of the proposed areas of activity
would need to be undertaken by the subsidiary due to their nature.
Annual Report & Financial Statements 14
BOARD STATEMENT ON INTERNAL FINANCIAL CONTROL
The Board acknowledges its ultimate responsibility for ensuring that the RSL has in place a system of controls
that is appropriate for the business environment in which it operates. These controls are designed to give
reasonable assurance with respect to:-
• the reliability of financial information used within the Partnership, or for publication;
• the maintenance of proper accounting records;
• the safeguarding of assets against unauthorised use or disposition.
STATEMENT OF BOARD RESPONSIBILITIES
It is the Board’s responsibility to establish and maintain the systems of internal financial control. Such systems can only provide reasonable and not absolute assurance against material financial mis-statement or loss. Key elements of the Association’s systems include ensuring that:
formal policies and procedures are in place, including the ongoing documentation of key system and rules in relation to the delegation of authority, which allow the monitoring of controls and restrict the unauthorised use of the Partnership’s assets;
experienced and suitably qualified staff take responsibility for important business functions and annual appraisal procedures have been established to maintain standards of performance;
forecasts and budgets are prepared which allow the Management Team and the Board to monitor the key business risks, financial objectives and progress being made towards achieving the financial plans set for the year and for the medium term;
monthly financial management reports are prepared promptly, providing relevant, reliable and up to date financial and other information, with significant variances from budget being investigated as appropriate;
regulatory returns are prepared, authorised and submitted promptly to the relevant regulatory bodies;
all significant new initiatives, major commitments and investment projects are subject to formal authorisation procedures, through the Board;
the Audit Committee/Board received reports from management and from external and internal auditors to provide reasonable assurance that control procedures are in place and are being followed and that a general review of the major risks facing the Partnership is undertaken;
formal procedures have been established for instituting appropriate action to correct any weaknesses identified through internal or external audit reports.
The Board has reviewed the effectiveness of the system of internal financial control in existence in the
Partnership for the year end 31 March 2017. No weaknesses were found in internal financial controls which
results in material losses, contingencies or uncertainties which require disclosure in the financial statements or
in the auditor’s report on the financial statements.
The Board of Management is responsible for keeping adequate accounting records which disclose with
reasonable accuracy at any time the financial position of the Partnership and to enable them to ensure the
financial statements comply with the Co-operative & Community Benefits Societies Act 2014, the Housing
(Scotland) Act 2010 and the Determination of Accounting Requirements 2014. It is also responsible for
safeguarding the assets of the Partnership and hence for taking reasonable steps for the prevention and
detection of fraud and other irregularities. It is also responsible for ensuring the Partnership’s suppliers are
paid promptly.
Annual Report & Financial Statements 15
STATEMENT OF DISCLOSURES TO AUDITORS
In so far as the Board of Management are aware:
There is no relevant audit information (information needed by the Partnership’s auditors in connection with preparing their report) of which the Partnership’s auditors are unaware, and
The Board of Management have taken all steps that they ought to have taken to make themselves aware of any relevant audit information and to establish that the Partnership’s auditors are aware of that information.
On behalf of the Board
Iain Macmillan
Chair
Annual Report & Financial Statements 16
OPERATING AND FINANCIAL REVIEW
Annual Report & Financial Statements 17
OPERATING AND FINANCIAL REVIEW
PERFORMANCE IN THE YEAR
A summary of the key performance areas for the year are detailed in the following paragraphs.
HOUSING SERVICES
The strong performance on reducing arrears was sustained with an improvement for the 7th year in a row.
This was achieved despite the ongoing challenges being presented by Welfare Reform. Universal Credit was
rolled out in the Outer Hebrides in May 2015 and although the number of cases has been small this is
increasing and the full roll out is due in May 2018.
Additional Housing Officers were put in place in our Stornoway and Balivanich offices to meet the challenges
being presented by Universal Credit as the roll out continues and these posts were made permanent this year.
The ‘bedroom tax’ continued to be mitigated in full through Discretionary Housing Payments (DHP) and we
acknowledge the continued support of the Comhairle with this.
Weakening demand for housing across the most rural areas of our islands is a continuing concern and one
which the Board is monitoring closely. We will continue to explore options to address this and will work with
the Comhairle to assess the implications of this trend for the Local Housing Strategy.
Void rent loss increased significantly to over 1% as a result of weak demand. Properties were let in an average
of 17 days (excluding low demand properties). This continues the strong performance of previous years but
has dropped slightly.
The level of anti social behaviour continued to be low and we did not take any legal enforcement action during
the year. This also reflects the strong partnership working between HHP, Police Scotland and the Comhairle
which focusses on a proactive and preventative approach.
Partnership working continues to be very important to us and we work through the Community Planning
Partnership and other multi-agency partnerships including Domestic Abuse Forum and Poverty Action Group
to deliver good outcomes for our tenants and communities.
TENANT PARTICIPATION
The Tenant Participation Advisory Service (TPAS) was re-appointed in May 2017 to continue to provide tenant
participation support and development services to HHP. Activity has focussed on developing links with
interested tenants across the islands and supporting existing tenant groups and encouraging new ones. A new
Umbrella group, the Western Isles Housing Association Communities Forum, has been formed and this is
working to establish itself as a focus for participation across the islands. Providing a variety of means of
participation is important particularly since the housing stock is spread over a large geographic area such as
the Outer Hebrides. We have a high number of small schemes consisting of 6 – 20 houses in most cases which
makes participation challenging. Annual events were again held in Stornoway, Balivanich, Tarbert and
Castlebay during the year and these were viewed very positively by those attending. They were also heavily
supported by partners for which we are grateful.
Annual Report & Financial Statements 18
OPERATIONAL REVIEW
PLANNED & CYCLICAL MAINTENANCE
The 5 year planned maintenance programme continued to protect homes and the wider environment. As in
previous years the large amount of fencing within housing areas poses a challenge and work to these has been
limited as priority is given to the fabric of the houses themselves.
Cyclical maintenance programmes were completed during the year including ensuring that all gas systems
were serviced within a 12 month period. Servicing of fire alarms, stair lighting, door entry systems and other
heating systems was also carried out.
INVESTMENT PROGRAMME
This was the second year of our new 4 year framework contract and £4m was invested in tenant’s homes
delivering the following improvements during 2016/17:
Heating Systems 133 Kitchens: 106
Bathrooms: 57 Windows: 55
Roughcasting: 27 Roofing: 18
Addressing fuel poverty continues to be a key priority and this is demonstrated by the investment in new
heating systems. In particular we installed 43 Air Source Heat Pumps in off-gas areas which deliver a good
affordable solution for our tenants. However, we also continue to examine other heating options and installed
a further 25 infra-red heating systems primarily in one bedroom properties during the year. These are being
evaluated to ascertain tenant’s experiences and whether they will meet EEESH requirements. 65 highly
efficient combination gas boilers were installed in the Stornoway area.
SCOTTISH HOUSING QUALITY STANDARD
While the housing stock met the Scottish Housing Quality Standard (SHQS) by the target date of March 2015
there was a significant number of properties covered by exemptions and abeyances. Work continues to
address these as the opportunity arises and 335 were resolved during the year.
AIDS AND ADAPTATIONS
We bid successfully for funding from the Scottish Government and a grant of £254k enabled us to deliver 229
different measures benefiting 128 tenants with health and mobility problems. We worked closely with the
Occupational Therapy Service in assessing need and determining priorities and waiting time was kept as low as
possible for those requiring assistance.
FUEL POVERTY AND EESSH
Fuel poverty continues to be a major issue in the Outer Hebrides. The Scottish Government has set energy
targets under the EESSH scheme and currently, 75% of HHP homes meet this target. HHP will continue to work
towards 100% compliance by the 2020 deadline.
Annual Report & Financial Statements 19
On the wider scale we continued to support the Comhairle as they established an Energy Supply Company
(ESCO). A company called Hebrides Energy has been established and positive progress has been made on this
but unfortunately the preferred partner ceased trading in December 2016, shortly before the full launch was
due. Discussions are now underway with other potential partners and there is significant interest from
suppliers.
Work continues with other Highland Housing Associations and Councils to lobby on and to highlight the impact
of fuel poverty in the Highlands and Islands. For Example there has been significant input into the Scottish
Government Rural Fuel Poverty Task Force and the Competition and Markets Authority (CMA) report on the
energy market reflected the concerns raised by HHP and other partners.
Annual Report & Financial Statements 20
FINANCIAL REVIEW
COMPREHENSIVE INCOME
The turnover for the year to 31 March 2017 was £9.989 million (2016: £12.710m) against operating costs of
£6.792 million (2016: £9.624m). Operating costs for the year included £0.332 million (2016: £0.334m) of
capital investment written off against expenditure. The main source of income was from rental income of
£8.400 million (2016: £8.226m) with £0.886 million (2016: £0.573m) received in grant from The Scottish
Government. None (2016: £0.150m) of the grant received was to support our Business Plan activities. Turnover
on other activities included factoring reflecting the requirements of the Property Factors Act 2011. There were
no LIFT properties sold during the year (2016: 23 LIFT).
The operating surplus on Letting Activities was £3.228 million, 38% of Net Rental Income (2016: £3.106 million,
37% of Net Rental Income).
Funds are being transferred into designated reserves for:
a) Future Repairs and Renewals on new build properties;
b) Funding costs for removing asbestos from transferred properties which may be incurred as a result of
the investment programme;
c) Pension reserve.
FINANCIAL POSITION
HHP’s Financial Position is shown on Page 28. The key factors affecting the balance sheet are:
a) The addition of 22 new units for rent funded largely from Housing Association Grant from the Scottish
Government;
b) The development contract entered into with Comhairle Nan Eilean Siar for investment in the properties
transferred to HHP has now been fully utilised.
c) Stock increased to reflect the Work in Progress on the Mackenzie Lane LIFT scheme;
d) Significant increase in creditors (Both greater than and less than one year) due to the increased Right To
Buy (RTB) receipts as the RTB scheme comes to a close.
CASH FLOW
The Cash Flow is shown on page 29. The net change in cash equivalents was £1.706 million (2016: £2.295m).
The principal cash outflows were operating costs and investment in assets with cash inflow bolstered by RTB
receipts and RHI Income.
CURRENT LIQUIDITY
At 31 March 2017 HHP had cash and short-term deposits of £7.231 million (2016: £5.524m). This was £4.068
million more than forecast in the Annual Financial Strategy for 2016/17 due to opening balances at 1 April
2016 being £1.3 million higher than forecast and incremental RTB receipts in the year of £1.4m. It is not
anticipated that there will be a requirement to draw down funds during 2017/18.
Annual Report & Financial Statements 21
CAPITAL STRUCTURE AND TREASURY MANAGEMENT POLICY
HHP’s activities are funded on the basis of a Business Plan, which is updated annually. The main elements of
HHP’s long term funding are a 30 year loan facility arranged with the Royal Bank of Scotland (RBS), deficit
funding and loan facilities provided by The Scottish Government. The RBS loan facility allows HHP to borrow up
to £15 million. In broad terms, the current Business Plan assumes that borrowing will increase each year until
the maximum of £15 million is reached in 2024 reflecting the significant investment programme in the first ten
years of the plan. Debt is progressively paid off in subsequent years and is projected to be fully paid off by
2036.
The Business Plan assumes capital grants for new build and loans of just under £20 million. The loans are
repayable by year 2036.
The Board receives updates each quarter which detail the debt, cash and interest received. All proposed
changes to banking arrangements and bank signatories are approved by the Board.
The Treasury Management Policy was approved in January 2012. The Treasury Management Policy sets down
the framework for investing and managing cash, raising loans, interest rate management and the use of
financial derivatives by the Group. A key objective of the Policy is to ensure that the Partnership’s loan
portfolio represents the optimum balance of risk in interest rate, loan maturity and fixed rate exposure.
PLANS FOR THE FUTURE
HHP plans to invest £20.1 million over the next 5 years ensuring the Scottish Housing Quality Standard is
maintained in all its properties. £9.895 million of private finance has been earmarked for the 15 new build
projects due for completion in the next 5 years. HHP funding with RBS, together with funding from Scottish
Government and Comhairle Nan Eilean Siar will enable the planned number of units for development to be
delivered.
Annual Report & Financial Statements 22
INDEPENDENT AUDITOR’S REPORT
We have audited the financial statements of Hebridean Housing Partnership for the year ended 31 March 2017
which comprise the Income and Expenditure account, the Balance Sheet, the Cash Flow Statement and related
notes. The financial reporting framework that has been applied in their preparation is applicable law and
United Kingdom Accounting Standards (United Kingdom Generally Accepted Accounting Practice).
This report is made solely to the Partnership's members, as a body, in accordance with the Co-operative and
Communities Benefit Societies Act 2014. Our audit work has been undertaken so that we might state to the
Partnership's members those matters we are required to state to them in an auditors' report and for no other
purpose. To the fullest extent permitted by law, we do not accept or assume responsibility to anyone other
than the Partnership and the Partnership's members as a body, for our audit work, for this report, or for the
opinions we have formed.
Respective responsibilities of the Board of Management and Auditors
As explained more fully in the Board’s Responsibilities Statement set out on page 16, the Board of
Management are responsible for the preparation of the Financial Statements that give a true and fair view.
Our responsibility is to audit and express an opinion the financial statements in accordance with applicable law
and International Standards on Auditing (UK and Ireland). Those standards require us to comply with the
Auditing Practices Board's Ethical Standards for Auditors.
Scope of the audit of the financial statements
An audit involves obtaining evidence about the amounts and disclosures in the financial statements sufficient
to give reasonable assurance that the financial statements are free from material misstatement, whether
caused by fraud or error. This includes an assessment of: whether the accounting policies are appropriate to
the Partnership's circumstances and have been consistently applied and adequately disclosed; the
reasonableness of significant accounting estimates made by the Board of Management; and the overall
presentation of the financial statements. In addition, we read all the financial and non financial information in
the Board of Management’s report to identify any information that is apparently materially incorrect based on,
or materially inconsistent with, the knowledge acquired by us in the course of performing the audit. If we
become aware of any apparent material misstatements or inconsistencies we consider the implications of our
report.
Opinion on financial statements
In our opinion the financial statements:
- give a true and fair view of the state of the Partnership’s affairs as at 31 March 2017 and of its income
and expenditure for the year then ended;
- have been properly prepared in accordance with United Kingdom Generally Accepted Accounting
Practice including FRS 102 “The Financial Reporting Standard applicable in the UK and Republic of
Ireland” and the Statement of Recommended Practice for Social Housing Providers issued in 2014;
and
Annual Report & Financial Statements 23
- have been properly prepared in accordance with the Co-operative and Communities Benefit Societies
Act 2014, the Housing (Scotland) Act 2010, the Determination of Accounting Requirements 2014
issued by the Scottish Housing Regulator.
Matters on which we are required to report by exception
In light of the knowledge and understanding of the Partnership and its environment obtained in the course of
the audit, we have not identified any material misstatements in the Report of the Board of Management.
We are required to report to you under The Co-operative and Community Benefit Societies Act 2014 if, in our
opinion:
The information given in the Report of the Board of Management is inconsistent with the Financial
Statements;
Proper books of accounts have not been kept by the Partnership in accordance with the requirements
of the legislation;
A satisfactory system of control over transactions has not been maintained by the Partnership in
accordance with the requirement of the legislation;
the financial statements are not in agreement with the books of accounts; or
we have not received all the information and explanations necessary for the purposes of our audit.
We have nothing to report in respect of these matters.
Wylie & Bisset LLP
Chartered Accountants
Statutory Auditors
Glasgow
Date: 28 June 2017
Annual Report & Financial Statements 24
REPORT BY THE AUDITORS TO THE MEMBERS OF HEBRIDEAN HOUSING PARTNERSHIP
LIMITED ON CORPORATE GOVERNANCE MATTERS
CORPORATE GOVERNANCE
In addition to our audit of the Financial Statements, we have reviewed your statement on page 15 concerning
the Partnership’s compliance with the information required by the Regulatory Standards (for systemically
important RSLs) in respect of internal financial controls contained within the publication “Our Regulatory
Framework” and associated Regulatory Advisory Notes which are issued by the Scottish Housing Regulator.
BASIS OF OPINION
We carried out our review having regard to the requirements to corporate governance matters within Bulletin
2006/5 issued by the Financial Reporting Council. The Bulletin does not require us to review the effectiveness
of the Partnership’s procedures for ensuring compliance with the guidance notes, nor to investigate the
appropriateness of the reason given for non-compliance.
OPINION
In our opinion the Statement on Internal Financial Control on page 15 has provided the disclosures required by
the relevant Regulatory Standards (for systemically important RSLs) within the publication “Our Regulatory
Framework” and associated Regulatory Advisory Notes issued by the Scottish Housing Regulator in respect of
internal financial controls and is consistent with the information which came to our attention as the result of
our audit work on the Financial Statements.
Through enquiry of certain members of the Board and Officers of the Partnership and examination of relevant
documents, we have satisfied ourselves that the Board’s Statement on Internal Financial Control appropriately
reflects the Partnership’s compliance with the information required by the relevant Regulatory Standards (for
systemically important RSLs) in respect of internal financial controls contained within the publication “Our
Regulatory Framework” and associated Regulatory Advisory Notes issued by the Scottish Housing Regulator in
respect of internal financial controls.
Wylie & Bisset LLP
Chartered Accountants
Statutory Auditors
Glasgow
Date: 28 June 2017
Annual Report & Financial Statements 25
FINANCIAL STATEMENTS
Annual Report & Financial Statements 26
STATEMENT OF COMPREHENSIVE INCOME
FOR THE YEAR ENDED 31 MARCH 2017
The results for the year relate wholly to continuing activities.
These financial statements were approved by the Board on 28th
June 2017 and were signed on its behalf by:
Iain Macmillan Dena Macleod Calum Mackay
Chair Secretary Board Member
The notes on pages 30 to 54 form part of these financial statements
31 March 2017 31 March 2016
£ £
Notes
Turnover 3 9,989,189 12,710,418
Operating expenditure 3 (6,792,497) (9,624,596)
Operating surplus 3 3,196,692 3,085,822
Loss on disposal of property, plant & equipment (218,318) (123,606)
Interest receivable 6 9,568 11,567
Interest payable and financing costs 7 (354,611) (336,222)
Surplus before tax 2,633,330 2,637,561
Actuarial (loss)/gain in respect of pension scheme 22 (1,502,000) 982,000
Total comprehensive income for the year 1,131,330 3,619,561
Annual Report & Financial Statements 27
STATEMENT OF CHANGES IN RESERVES
FOR THE YEAR ENDED 31 MARCH 2017
The notes on pages 30 to 54 form part of these financial statements
Unrestricted
Fund
Current Year £
Balance at 1 April 2016 24,995,961
Surplus from statement of comprehensive income 1,131,330
Balance at 31 March 2017 26,127,291
Unrestricted
Fund
Prior Year £
Balance at 1 April 2015 21,376,400
Surplus from statement of comprehensive income 3,619,561
Balance at 31 March 2016 24,995,961
Annual Report & Financial Statements 28
STATEMENT OF FINANCIAL POSITION AS AT 31 MARCH 2017
These financial statements were approved by the Board on 28th
June 2017 and were signed on its behalf by:
Iain Macmillan Dena Macleod Calum Mackay
Chair Secretary Board Member
The notes on pages 30 to 54 form part of these financial statements
31 March 2017 31 March 2016
£ £
Notes
Fixed Assets
Tangible Assets-Social Housing 8 73,557,295 70,087,014
Tangible Assets-Property, plant & equipment 9 1,528,478 1,659,854
Investments 10 2 2
75,085,775 71,746,870
Current Assets
Stock 388,884 37,451
Trade and other debtors 11 1,422,744 3,883,992
Investments 4,506,628 3,564,265
Cash and cash equivalents 2,724,142 1,959,905
9,042,398 9,445,613
Less: Creditors amounts falling due within one year 12 (2,491,833) (1,101,194)
Net current assets 6,550,565 8,344,419
Total assets less current liabilities 81,636,340 80,091,289
Creditors: amounts falling due after more than one
year 13 (10,583,000) (9,840,869)
Deferred Capital Grants 14 (41,687,852) (41,162,344)
Pension Liability 15 (3,238,000) (1,567,000)
Provisions for liabilities 15 - (2,524,919)
Net Assets 26,127,488 24,996,157
Reserves
Share Capital 16 197 196
Income & Expenditure reserve 26,127,291 24,995,961
26,127,488 24,996,157
Annual Report & Financial Statements 29
STATEMENT OF CASH FLOWS FOR THE YEAR ENDED 31 MARCH 2017
The notes on pages 30 to 54 form part of these financial statements
31 March 2017 31 March 2016
£ £
Note
Net Cash inflow from operating activities 1 6,226,004 6,517,542
Cashflow from investing activities
Purchase of tangible assets (6,810,162) (5,714,504)
Proceeds from sale of tangible fixed assets 733,129 481,934
Grants received 1,822,064 1,291,585
Interest received 9,568 11,567
Acquistion of Shares (1)
Cashflow from financing activities
Interest paid (258,407) (234,612)
Repayments of borrowings (15,595) (58,233)
Net change in cash equivalents 1,706,600 2,295,278
Cash and cash equivalents at the beginning of the year 5,524,170 3,228,892
Cash and cash equivalents at the end of the year 7,230,770 5,524,170
1,706,600 2,295,278
Annual Report & Financial Statements 30
NOTES TO THE STATEMENT OF CASH FLOWS FOR THE YEAR ENDED 31 MARCH 2017
1 CASH FLOW FROM OPERATING ACTIVITIES
Cashflow from Operating Activities
2017 2016
£ £
Surplus for the year 3,196,692 3,085,822
Adjustments for non-cash items:
Depreciation of tangible fixed assets 2,521,583 2,345,470
Amortisation of Capital Reserve - -
Decrease/(increase) in stock (351,433) 762,557
Decrease/(increase) in trade and other debtors (63,669) (248,128)
Increase/(decrease) in trade and other creditors 3,179,175 2,163,404
Receipt of donated land -
Pension costs less contributions payable 112,000 150,000
Carrying amount of tangible fixed asset disposed (949,674) (605,540)
Adjustments for investing or financing activities:
Proceeds from the sale of tangible fixed assets (218,318) (123,606)
Government grants utlised in the year (1,296,556) (1,103,233)
Interest payable 96,205 90,796
6,226,004 6,517,542
Annual Report & Financial Statements 31
NOTES TO THE FINANCIAL STATEMENTS
FOR THE YEAR ENDED 31 MARCH 2017
NOTE 1 ACCOUNTING POLICIES
The following accounting policies have been applied consistently in dealing with items which are considered
material in relation to the Financial Statements, except where noted below.
BASIS OF ACCOUNTING
The Financial Statements of the Partnership are prepared in accordance with FRS 102 as issued by the Financial
Reporting Council and comply with the requirements of the Co-operative and Community Benefit Societies Act
2014, Part 6 of the Housing (Scotland) Act 2010, the Determination of Accounting Requirements 2014 issued
by the Scottish Housing Regulator and the Statement of Recommended Practice (SORP) for social housing
providers issued in 2014.
The financial statements have been prepared on the historical cost basis, except for the revaluation of certain
properties and financial instruments. The principal accounting policies that have been applied consistently to
all periods presented in these financial statements are set out below.
The preparation of financial statements in conformity with FRS102 requires the use of certain critical
accounting estimates. It also requires management to exercise its judgement in the process of applying the
accounting policies selected for use by the Partnership. The areas involving a higher degree of judgement or
complexity, or areas where assumptions and estimates are significant to the financial statements are disclosed
in Note 3. Use of available information and application of judgement are inherent in the formation of
estimates. Actual outcomes in the future could differ from such estimates. Hebridean Housing Partnership Ltd
is a public benefit entity (PBE).
PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS
The Financial Statements contain information about Hebridean Housing Partnership as an individual company
and do not contain consolidated financial information as the parent of a group. The Partnership has taken the
option not to prepare consolidated Financial Statements due to the immateriality of the results of its
subsidiary, HHP Community Housing Limited as detailed in Note 10.
TURNOVER
Turnover, which is stated net of Value Added Tax, represents income receivable from lettings and service
charges, fees receivable, revenue grants and other income.
GRANT INCOME
Grant Income received is matched with the expenditure to which it relates. Social Housing Grant received as a
contribution towards the capital cost of a housing development is recognised in line with the accrual model.
The accrual model results in the grant being recognised over the expected useful life of the housing property
Annual Report & Financial Statements 32
structure and its individual components. Where grant is paid as a contribution towards revenue expenditure, it
is included in turnover.
DEPOSIT AND LIQUID RESOURCES
Cash, for the purpose of the cash flow statement comprises cash in hand and deposits repayable on demand,
less overdrafts repayable on demand. Liquid resources are current asset investments that are disposable
without curtailing or disrupting the business and are readily convertible into known amounts of cash at, or
close to, their carrying value.
PENSION COSTS
The Partnership participates in the Highland Superannuation Scheme and contributions to the pension scheme
are calculated as a percentage of pensionable salaries of the employees, determined in accordance with
actuarial advice. The actual pension cost is charged to the income and expenditure account based on
contributions to the fund. In accordance with FRS102 the future payments in respect of the past service deficit
plan have been discounted and recognised as a provision within the financial statements.
HOUSING PROPERTIES
Housing properties are stated at cost less accumulated depreciation. The cost of properties is their purchase
price together with capitalised repairs. Housing properties in the course of construction are stated at cost and
are not depreciated. Housing properties are transferred to completed properties when they are ready for
letting and are stated at cost. The development cost of housing properties includes:-
1. Cost of acquiring land and buildings; and
2. Development expenditure including administration costs
Where it is considered that there has been any impairment in value this is provided for accordingly.
Expenditure on schemes that are subsequently aborted is written off in the year in which it is recognised that
the schemes will not be developed to completion.
IMPROVEMENTS TO HOUSING PROPERTIES
The Partnership capitalises repairs and improvement expenditure on its housing properties which result in an
enhancement of the economic benefit of the asset.
IMPAIRMENT
Reviews for any impairment of housing properties are carried out on an annual basis where the estimated
remaining economic life of those properties exceeds 50 years. Impairment is recognised where the carrying
value of an income generating unit exceeds the higher of its net realisable value or its value in use. Value in use
represents the net present value of expected future cash flows expected from the continued use of these
assets. Any impairment of assets would be recognised in the Statement of Comprehensive Income.
Annual Report & Financial Statements 33
SHARED OWNERSHIP
Shared ownership properties are split proportionately between current and fixed assets based on the first
tranche proportion.
First tranche proportions will be accounted for as current assets and the related sales proceeds shown in
turnover; and
The remaining element of the share ownership property will be accounted for as a fixed asset and any
subsequent sale will be treated as a part disposal of a fixed asset.
COMMERCIAL PROPERTIES
Commercial properties are valued at existing use value.
PROVISIONS
The Partnership only provides for contractual liabilities that exist at the balance sheet date.
TAXATION
Income and capital gains are generally exempt from tax if applied for charitable purposes.
DEPRECIATION
Depreciation is charged on a straight-line basis to write off the cost of each asset, less any estimated residual
value, over its expected useful life, as set out below. Assets are depreciated in the year of acquisition, from the
date of their acquisition, and in the year of disposal, up to the date of disposal. Land is not depreciated.
Housing Properties and Offices
All of the major components comprised within the Partnership’s housing properties and offices are treated as
separable assets and their costs (after the deduction of any related social housing grant) are depreciated by
reference to the expected useful life of each component, on the following basis:
Years
Roofs 50
Kitchens 20
Bathrooms 30
Showers 10
Heating Boilers 15
Heating Systems 20
Window & Doors 25
Annual Report & Financial Statements 34
Years
Other External Components 15
Structure 60
Other Fixed Assets
All other Fixed Assets are depreciated by reference to the following expected useful lives:
Years
Furniture, Fittings and Office Equipment 5
Computer Hardware and Software 4
SALE OF HOUSING ACCOMMODATION
Properties are disposed of under the appropriate legislation and guidance. All costs and grants relating to the
share of property sold are removed from the Financial Statements at the date of sale. Any grants received that
cannot be repaid from the proceeds of sale are abated and the grant removed from the Financial Statements.
CAPITALISATION OF DEVELOPMENT OVERHEADS
Staff costs that are directly attributable to bringing housing properties into working condition for their
intended use are capitalised.
VALUE ADDED TAX
The Partnership is registered for VAT. A large proportion of its income, including rental receipts, is exempt for
VAT purposes, giving rise to a partial exemption calculation. Expenditure with recoverable VAT is shown net of
VAT and expenditure with irrecoverable VAT is shown inclusive of VAT. VAT on refurbishment works
expenditure included in the development works agreement with Comhairle Nan Eilean Siar is fully recoverable.
Expenditure on these works is shown net of VAT.
DEVELOPMENT AGREEMENT
The Partnership has entered into agreements with Comhairle Nan Eilean Siar whereby the undertaking of
catch up repairs and improvement works remains with the Comhairle, with the obligation sub-contracted to
HHP. This has been shown on the Partnership’s Balance Sheet as a debtor offset by a provision of an equal
amount. As work progresses, both sums will be adjusted downwards by the appropriate amount.
BAD AND DOUBTFUL DEBTS
Provision is made against rent arrears for current and former tenants as well as other miscellaneous debts to
the extent that they are considered potentially irrecoverable.
Annual Report & Financial Statements 35
LEASED ASSETS
Rentals payable under operating leases are charged to the income and expenditure account on a straight line
basis over the lease term.
DESIGNATED RESERVES
Designated reserves are unrestricted reserves earmarked by Directors for particular purposes.
FINANCIAL INSTRUMENTS
Loans provided to HHP Community Housing Limited are classed as basic under the requirements of FRS102,
and are measured at amortised cost. In the case of payment arrangements that exist with customers, these are
deemed to constitute financing transactions and are measured at the present value of the future payments
discounted at a market rate of interest applicable to similar debt instruments.
NOTE 2 CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS
In preparing the financial statements, management is required to make estimates and assumptions which
affect reported income, expenses, assets, liabilities and disclosure of contingent assets and liabilities.
Use of available information and application of judgement are inherent in the formation of estimates, together
with past experience and expectations of future events that are believed to be reasonable under the
circumstances. Actual results in the future could differ from such estimates.
Annual Report & Financial Statements 36
NOTE 3 TURNOVER, OPERATING COSTS AND OPERATING SURPLUS
2017 2016
Operating Operating Operating Operating Operating Operating
Turnover Costs Surplus Turnover Costs Surplus
£ £ £ £ £ £
Income and Expenditure from Lettings
Social Lettings (Note 4) 9,964,555 (6,736,206) 3,228,349 9,938,871 (6,832,963) 3,105,908
Other Activities (Note 5) 24,633 (56,291) (31,658) 2,771,547 (2,791,633) (20,086)
TOTAL 9,989,189 (6,792,497) 3,196,692 12,710,418 (9,624,596) 3,085,822
Annual Report & Financial Statements 37
NOTE 4 PARTICULARS OF TURNOVER, OPERATING COSTS AND OPERATING SURPLUS FROM SOCIAL LETTING ACTIVITIE
General Needs Supported Shared
Housing Accommodation Ownership Other Total 2016
£ £ £ £ £ £
Income from rent and service charges
Rent receivable net of service charges 8,292,729 49,604 3,397 - 8,345,730 8,225,892
Service charges 48,126 3,908 2,376 - 54,410 56,107
Gross Income from rents and service charges 8,340,854 53,512 5,773 - 8,400,139 8,281,999
Less voids (91,570) - - - (91,570) (65,887)
Net Income from rents and service charges 8,249,285 53,512 5,773 - 8,308,570 8,216,112
Grants from Scottish Ministers - - - - - 150,000
Release of deferred capital grant 1,209,599 1,209,599 1,149,173
Other Revenue Grants 446,387 - - - 446,387 423,586
Total Turnover from social letting activities 9,905,270 53,512 5,773 - 9,964,555 9,938,871
Expenditure
Management and Maintenance Administration costs 1,797,564 13,230 2,481 - 1,813,275 1,797,121
Service charges - - -
Planned and Cyclical Maintenance including major repairs 987,724 262 - - 987,986 1,156,533
Reactive Maintenance 1,383,458 4,735 106 - 1,388,299 1,467,858
Bad Debts-rents and service charges 25,063 - - - 25,063 65,981
Depreciation of social housing 2,519,457 - 2,126 - 2,521,583 2,345,470
Impairment of social housing
Operating costs for social letting activities 6,713,267 18,227 4,713 - 6,736,206 6,832,963
Operating surplus on letting activities for 31 March 2017 3,192,004 35,285 1,060 - 3,228,349 3,105,908
Operating surplus on letting activities for 31 March 2016 3,065,596 40,001 311 - 3,105,908
Annual Report & Financial Statements 38
NOTE 5 PARTICULAR OF TURNOVER, OPERATING COSTS AND OPERATING SURPLUS FROM OTHER ACTIVITES
Grants from Other Revenue Other
Scottish Ministers Grants Income
2017 2016 2017 2016 2017 2016
£ £ £ £ £ £ £ £ £
Stage 3 Adaptations - - - - - - - - -
Factoring - - 3,089 3,089 5,059 3,096 11,654 (7) (6,595)
Development & construction of
Property Activities- - 14,897 14,897 32,131 44,496 43,770 (29,599) (11,639)
Sale of Developments - - - - 2,718,646 - 2,718,646 - -
Management Services - - 6,648 6,648 15,711 8,699 17,563 (2,051) (1,852)
Amortization capital reserve - - - - - - - - -
Total from other activites
2017 - - 24,633 24,633 56,291 (31,658)
Total for other activities 2016 - - 2,771,547 2,771,547 2,791,633 (20,086)
Total
Turnover
Other
Operating Costs
Operating
Surplus/ Deficit
Annual Report & Financial Statements 39
NOTE 6 INTEREST RECEIVABLE AND OTHER INCOME
NOTE 7 INTEREST PAYABLE AND SIMILAR CHARGES
Other financing costs include commitment, non-utilisation fees, the amortisation of transaction costs on the
funding arrangements.
Interest Receivable and Other Income
2017 2016
£ £
Interest receivable on deposits 9,330 11,333
Interest receivable on loan to subsidiary 237 234
9,568 11,567
Interest Payable and Similar Charges
2017 2016
£ £
Interest Payable 213,051 219,980
Other Financing costs 84,560 39,242
Net Cost on pension 57,000 77,000
354,611 336,222
Annual Report & Financial Statements 40
NOTE 8 TANGIBLE FIXED ASSETS-SOCIAL HOUSING
Development administration costs capitalised amounted to £58,077 (2016:£53,535) for which Social Housing
Grants amounting to £nil (2016:£nil) were received in the year.
The proceeds of property disposals in the year was £733,130 (2016: £481,934). These units cost £1,343,350
(2016: £808,156) and had a net book value of £951,447 (2016:£605,540). HAG of £134,537 (2016: £178,240) is
due to be repaid in respect of these disposals.
Tangible Fixed Assets
Housing Housing Shared
SOCIAL HOUSING Properties Properties Ownership
held for under held for Total
letting construction letting
£ £ £ £
Current Year Cost
At start of the year 83,170,147 2,165,267 127,643 85,463,057
Additions during the year 3,632,966 3,163,540 - 6,796,506
Transfers in year 3,004,540 (3,004,540) - -
Disposals (1,245,571) - - (1,245,571)
At end of year 88,562,082 2,324,267 127,643 91,013,992
Depreciation
At start of year (15,305,835) - (70,208) (15,376,043)
Provided in year (2,470,430) - (2,126) (2,472,556)
Eliminated on Disposal 391,903 - - 391,903
At end of year (17,384,363) - (72,334) (17,456,697)
Net Book Value
At end of year 71,177,719 2,324,267 55,309 73,557,295
Prior Year
At start of the year 78,203,666 2,354,441 127,643 80,685,750
Additions during the year 2,686,441 3,014,992 - 5,701,433
Transfers in year 3,078,550 (3,194,520) - (115,970)
Disposals (798,510) (9,646) - (808,156)
At end of year 83,170,147 2,165,267 127,643 85,463,057
Depreciation
At start of year (13,219,001) - (68,076) (13,287,077)
Provided in year (2,289,450) - (2,132) (2,291,582)
Eliminated on Disposal 202,616 - - 202,616
At end of year (15,305,835) - (70,208) (15,376,043)
Net Book Value
At end of year 67,864,312 2,165,267 57,435 70,087,014
Annual Report & Financial Statements 41
The cost of new components capitalised in the year was £3,900,126 (2016: £2,686,441)
Components with a cost of £264,957 (2016: £47,791), HAG of £211,367 (2016: £42,318) and accumulated
depreciation of £133,673 (2016: £31,624) were disposed of in the year.
NOTE 9 TANGIBLE FIXED ASSETS-PROPERTY, PLANT AND EQUIPMENT
TANGIBLE FIXED ASSETS
Heritable Commerical Office Computer Other Total
Property, Pland & Equipment Property Property Equipment Equipment Equipment
£ £ £ £ £ £
Current Year Cost
At start of the year 779,066 939,280 81,515 284,443 102,028 2,186,332
Additions during the year - - - 10,717 2,939 13,656
Transfers in year - - - - - -
Disposals (96,006) - - - - (96,006)
At end of year 683,060 939,280 81,515 295,160 104,967 2,103,982
Depreciation
At start of year - (121,554) (74,662) (249,197) (81,065) (526,478)
Provided in year - (22,498) (4,682) (17,337) (4,509) (49,026)
Eliminated on Disposal - - -
At end of year - (144,052) (79,344) (266,534) (85,574) (575,504)
Net Book Value
At end of year 683,060 795,228 2,171 28,626 19,393 1,528,478
Prior Year
At start of the year 915,125 939,280 81,515 278,287 95,113 2,309,320
Additions during the year - - - 6,156 6,915 13,071
Disposals - - - - - -
At end of year 779,066 939,280 81,515 284,443 102,028 2,186,332
Depreciation
At start of year - (99,056) (69,903) (226,927) (76,704) (472,590)
Provided in year - (22,498) (4,759) (22,270) (4,361) (53,888)
Eliminated on Disposal - - - - - -
At end of year - (121,554) (74,662) (249,197) (81,065) (526,478)
Net Book Value
At end of year 779,066 817,726 6,853 35,246 20,963 1,659,854
Annual Report & Financial Statements 42
NOTE 10 INVESTMENTS
NOTE 11 TRADE AND OTHER RECEIVABLES
In accordance with the development agreement accounting policy, £2.5 million was included in the 2016
debtors balance with respect to the expected cost of the development work that Comhairle Nan Eilean Siar has
committed to undertake in order to refurbish the properties. The Comhairle has sub-contracted the
Partnership to carry out the programme of catch-up repairs to the residential accommodation as part of a
development agreement. An identical provision was made in the accounts for this expenditure in 2016. The
debtor and the associated provision has been fully utilised in 2017.
Investments
2017 2016
£ £
Investment in subsidiary undertaking 1 1
Investment in Hebrides Energy CIC 1 1
2 2
Activity Registered Shareholding
HHP Community Housing Ltd Dormant Scotland 100%
Hebrides Energy Offer competitive electricity tariffs Scotland 11.1%
Trade and other receivables
2017 2016
£ £
Rental Arrears 132,907 173,927
Less: provision for bad debts (70,420) (82,512)
62,487 91,415
Amounts owed by subsidary undertaking (due within 1 year) 16,053 15,803
Other debtors 596,149 602,373
Prepayments and accrued income 535,224 489,852
Other debtors (due in more than 1 year) 212,831 2,684,549
Total 1,422,744 3,883,992
Annual Report & Financial Statements 43
NOTE 12 CREDITORS: AMOUNTS FALLING DUE WITHIN ONE YEAR
Outstanding retentions will be financed in due course by additional loan funding.
Creditors-Amounts falling due within one year
2017 2016
£ £
Bank loans and overdrafts 88,736 104,331
Trade payables 32,523 138,899
Contract retentions 152,820 101,486
Accruals and deferred income 1,294,306 645,321
Rent in advance 55,711 53,092
HAG creditor 43,710 58,065
HAG Repayable 134,537 -
RTB Receipts Repayable on demand 689,489 -
Total 2,491,833 1,101,194
Annual Report & Financial Statements 44
NOTE 13 CREDITORS: AMOUNTS FALLING DUE AFTER MORE THAN ONE YEAR
At the year end the Partnership had drawn down £5.88 million on the lending facility. A committed facility of
£15 million was available from the Royal Bank of Scotland along with an uncommitted overdraft facility of
£0.250 million. In setting up this facility the Partnership incurred total arrangement fees of £92,738 in 2017
(2016: £120,093) which are included in debtors and which are being amortised over the period of the loan
drawdown. Security over the housing properties has been granted to the Royal Bank for the period of the
lending facility. Section 107 consent has been granted.
Creditors-Amounts falling due after more than one year
2017 2016
£ £
Bank term loans 5,000,000 5,000,000
RTB Receipts due to the Scottish Government 5,583,000 4,840,869
Total 10,583,000 9,840,869
Bank Term loans are secured by specfic charges on the Partnership's properties and are
repayable at varying rates of interest.
The above creditors are due are follows:
£ £
Between one and two years - -
Between two and five years - -
In five years or more 10,583,000 9,840,869
10,583,000 9,840,869
Annual Report & Financial Statements 45
NOTE 14 DEFFERED CAPITAL GRANTS
Deferred Captial Grants
Housing Housing Shared
Properties Properties Ownership Property
held for under held for Plant & Total
letting construction letting Equipment
£ £ £ £ £
Current Year Cost
At start of the year (38,761,174) (1,610,866) (55,614) (734,690) (41,162,344)
Additions during the year (2,036,459) - - (2,036,459)
Disposals during the year 214,395 - - - 214,395
Transfers in year (1,829,150) 1,829,150 - 90,966 90,966
Amortised in year 1,202,754 - 2,059 777 1,205,590
At end of year (39,173,175) (1,818,175) (53,555) (642,946) (41,687,852)
Prior Year
At start of the year (38,092,093) (1,952,695) (57,678) (871,526) (40,973,992)
Additions during the year (230,516) (1,369,981) - - (1,600,497)
Disposals during the year 306,794 2,118 - - 308,912
Transfers in year (1,797,317) 1,709,692 - 136,059 48,434
Amortised in year 1,051,958 - 2,064 777 1,054,799
At end of year (38,761,174) (1,610,866) (55,614) (734,690) (41,162,344)
Annual Report & Financial Statements 46
NOTE 15 PROVISIONS FOR LIABILITIES AND CHARGES
The provision represents the best estimate of the costs of contracted works for the repair of managed
properties. This agreement is part of the development agreement and as work progresses the provision will be
utilised when the work is actually undertaken.
NOTE 16 SHARE CAPITAL
Shares were held by the following Board members during the year:
Iain Macmillan, Calum Mackay, Jane Mackinnon, Daniel Coyle, Alasdair Mackenzie and Mairi Bremner.
Provisions for Liabilities and Charges
2017 2016
£ £
At 1 April 2016 2,524,919 5,020,572
Created in Year - -
Utilised (2,524,919) (2,495,653)
At 31 March 2017 - 2,524,919
Pension Fund
2017 2016
£ £
At 1 April 2016 1,567,000 2,322,000
Created in Year 1,671,000 (755,000)
Utilised
At 31 March 2017 3,238,000 1,567,000
Share Capital
2017 2016
£ £
Shares of £1 each issued and fully paid
At 1 April 2016 196 195
issued during period 1 1
At 31 March 2017 197 196
Annual Report & Financial Statements 47
NOTE 17 KEY MANAGEMENT EMOLUMENTS
NOTE 18 EMPLOYEE INFORMATION
The number of persons (head count) employed during the year was: 48
In the year to 31 March 2017 the average number of employees of the Partnership, including Executive
Directors, was 40.75 (FTE), (2016 – 43.5 FTE).
OFFICER'S EMOLUMENTS
2017 2016
£ £
Senior Officers are defined as the Chief Executive, the Director of
Resources and Director of Operations
Aggregate emoluments payable to Directors exceeding £60,000 163,743 220,600
(including pension contributions and benefits in kind)
Emoluments payable to the highest paid officer 70,206 78,724
(excluding pension contributions)
During the period the Directors' emoluments
(excluding pension contributions) fell within
the following band distributions:
More than £60,000 but not more than £70,000 - -
More than £70,000 but not more than £80,000 1 1
More than £80,000 but not more than £100,000 - -
Pension contributions 13,058 14,645
The directors are members of the Highland Superannuation Fund and employer's contributions are paid
on the same basis as other members of staff.
Total Expenses reimbursed in so far as not chargeable to UK Income Tax
The Chief Executive retired in Jully 2016, replaced by the then Director of Resources.
The Director of Resources post was renamed "Director of Finance & Corporate Services" and this post was filled in December 2016.
EMPLOYEE INFORMATION
2017 2016
£ £
Staff costs (for the above persons)
Wages and Salaries 1,133,816 1,108,112
Social Security costs 103,768 75,655
Employers' pension costs 217,953 201,793
FRS102 Pension Adjustment (Note 22) 112,000 150,000
1,567,537 1,535,560
Staff costs capitalised (368,667) (353,266)
1,198,869 1,182,294
Annual Report & Financial Statements 48
NOTE 19 OPERATING SURPLUS
NOTE 20 TAXATION
The Partnership is a registered charity and is therefore exempt from Corporation Tax on its charitable
activities. No corporation tax was due on the non-charitable activities in the year (2016: nil).
NOTE 21 CAPITAL COMMITMENTS
OPERATING SURPLUS
2017 2016
£ £
Operating surplus is stated after charging:
Depreciation 2,521,582 2,345,470
Amortised capital grants (1,205,590) (1,054,799)
Repairs:cyclical, major, day to day 2,376,285 2,624,391
Auditor's remuneration
-in their capacity as auditors 13,530 13,020
-in respect of other services - -
CAPITAL COMMITMENTS
2017 2016
£ £
Capital expenditure which has been contracted for but
has not been provided for in the financial statements 6,330,189 3,399,088
Capital expenditure which has been authorised by the
Board but is not contracted 40,021,150 23,561,380
46,351,339 26,960,468
This is to be funded by:
Funding from the Scottish Government 26,539,669 15,519,686
Private Finance 19,811,670 11,440,782
46,351,339 26,960,468
Annual Report & Financial Statements 49
NOTE 22 PENSIONS
The Partnership participates in the Highland Superannuation Fund (HSF) which, as part of the Local
Government Pension Scheme is a defined benefit statutory scheme based. From 1 April 2011 the scheme has
operated the career average revalued earnings with 1/120th
accrual benefit rate. Contributions are charged to
the Income and Expenditure Account so as to spread the cost of pension over employees’ working lives. These
contributions are determined by formal actuarial valuation which takes place every three years, the last
valuation was to 31 March 2014. The main purpose of the valuation is to determine the financial position of
the Scheme in order to determine the level of future contributions required so that the Scheme can meet its
pension obligations as they fall due.
The actuarial valuation assess whether the Scheme’s assets at the valuation date are likely to be sufficient to
pay the pension benefits accrued by members as at the valuation date. Asset values are calculated by
reference to market levels. Accrued pension benefits are valued by discounting expected future benefit
payments using a discount rate calculated by reference to the expected future investment returns.
During the accounting period, the Partnership paid contributions at a rate of 19.5% of pensionable salaries.
Members contributions ranged from 5.5% to 9.3% averaged 5.9%.
As at the balance sheet date there were 44 active members of the Scheme employed by the Partnership. All
new employees join the scheme and have the option to withdrawn after a short period if they so choose.
The fund is administered by Highland Council in accordance with the Local Government Pension Scheme
(Scotland) Regulations 1998 as amended.
It is not possible in the normal course of events to identify the share of underlying assets and liabilities
belonging to individual participating employers. As the Scheme is a multi-employer arrangement where the
assets are co-mingled for investment purposes, benefits are paid from the total scheme assets, and the
contribution rate for all employers is set by reference to the overall financial position of the scheme rather
than by reference to individual employer experience. Accordingly, due to the nature of the Plan, the
accounting charge for the period under FRS102 represents the employer contribution payable.
The Scheme Actuary has prepared an Actuarial Report that provides an approximate update on the funding
position of the scheme as at 31 March 2017. Such a report is required by legislation for years in which a full
actuarial valuation is not carried out. The funding update revealed an increase in the assets of the Scheme to
£8.865 million and indicated an increase in the shortfall of assets compared to liabilities to approximately
£3.238 million.
Since the contribution rates payable to the Scheme have been determined by reference to the last full
actuarial valuation the following notes relate to the formal actuarial valuation as at 31 March 2014.
EMPLOYER MEMBERSHIP STATISTICS
Employer Membership Statistics
Average Age
Number
31-Mar-14 31-Mar-14
Actives 44 52
Deferred Pensionsers 18 50
Pensioners 7 61
Total Salaries/Pensions
£000's
31-Mar-14
982
44
87
Annual Report & Financial Statements 50
INVESTMENT RETURNS
The return on the Fund in market value terms for the period to 31 March 2017 is estimated below based on
actual Fund returns as provided by the Administering Authority and index returns where necessary. Details
are below:
MAJOR CATEGORIES OF PLAN ASSETS AS A % OF TOTAL PLAN ASSETS
The bid value of the Fund’s assets are estimated to be £1,743,000,000 based on information provided by the
Administering Authority.
FINANCIAL ASSUMPTIONS
HISTORIC MORTALITY
Actual returns from 1 April 2016 to 31 December 2016 15.00%
Total returns from 1 April 2016 to 31 March 2017 19.90%
Period Ended 31-Mar-17 31-Mar-16
Equities 70.00% 67.00%
Bonds 17.00% 18.00%
Property 11.00% 11.00%
Cash 2.00% 4.00%
Period Ended 31-Mar-17 31-Mar-16
Pension increase Rate 2.40% 2.20%
Salary increase Rate 4.40% 4.20%
Discount Rate 2.60% 3.50%
Period Ended PensionersProspective Pensioners
CMI2012 model assuming current
rates of improvement have
peaked and will converge to a
long term rate of 1.25% p.a.
CMI2012 model assuming current
rates of improvement have
peaked and will converge to a
long term rate of 1.25% p.a.
31-Mar-17
Annual Report & Financial Statements 51
COMMUTATION
An allowance is included for future retirements to elect to take 50% of the maximum additional tax-free cash
up to HMRC limits for pre-April 2009 service and 75% of the maximum tax-free cash for post-April 2009
service.
CHANGES IN FAIR VALUE OF PLAN ASSETS, DEFINED BENEFIT OBLIGATION AND NET
LIABILITY FOR THE YEAR ENDED 31 MARCH 2017
Assets Obligations Net Liability/
Period ended 31 March 2017 Asset
£000's £000's £000's
Fair Value of Plan Assets 7,305 - 7,305
Present Value of liabilitites - 8,844 (8,844)
Present value of unfunded liabilities - 28 (28)
Opening Position at 31 March 2016 7,305 8,872 (1,567)
Service Cost - 331 (331)
Net Interest
Interest on income on plan assets 257 - 257
Interest cost on defined benefit obligation - 314 (314)
Total Net interest 257 314 (57)
Total defined benefit cost recoginised in P & L 257 645 (388)
Cashflows
Plan Participants contributions 70 70 -
Employers contributions 218 - 218
Contributions in respect of unfunded benefits 1 - 1
Benefits paid (190) (190) -
Unfunded benefits paid (1) (1) -
Expected closing position 7,660 9,396 (1,736)
Remeasurements
Changes in demographic assumptions - - -
Changes in financial assumptions - 2,706 (2,706)
Other experience - 1 (1)
Return on assets excluding amounts in net interest 1,205 - 1,205
Total remeasurements recognised in Other Comprehensive 1,205 2,707 (1,502)
Income (OCI)
Fair Value of plan assets 8,865 - 8,865
Present value of funded liabilities - 12,070 (12,070)
Present value of unfunded liabilities - 33 (33)
Closing position at 31 March 2017 8,865 12,103 (3,238)
Annual Report & Financial Statements 52
NOTE 23 PROPERTY STOCK
The number of units of accommodation owned by the Partnership was as follows:
NOTE 24 REVENUE COMMITMENTS
Property Stock
The number of units of accommodation owed by the Partnership was as follows:
2017 2016 2017 2016
Unimproved
New Build 347 325 74 26
Improved 1,831 1,865
General Needs Housing 2,178 2,190 74 26
Shared Ownership Accommodation 3 3 - -
Supported Housing Accommodation 12 12 - -
Total Housing Stock 2,193 2,205 74 26
Other Property
Garages 42 42
Commerical 7 7 - -
Heritable-Partnership's offices 2 2 - -
Total Other Property 51 51 - -
Units in
Management
Units under
Development
Operating Leases
2017 2016
At 31 March 2017 the Partnership had outstanding commitments for £ £
future minimum lease payments under non-cancellable operating
leases, which fall due as follows:
Within one year 11,271 11,685
In the second to fifth year inclusive 18,449 29,212
29,720 40,897
Annual Report & Financial Statements 53
NOTE 25 SCOTTISH GOVERNMENT GRANTS
The Scottish Government had made available a non-repayable grant of £2.5 million payable over 10 years with
2015/16 being the last year of the grant. As a result there was no drawdown in 2017 as shown:
In addition The Scottish Government has made available a loan to the Partnership of £1,431,620 being the
Comhairle’s share of the Right to Buy receipts received this year.
NOTE 26 RELATED PARTY TRANSACTIONS
BOARD MEMBERS
During the period the tenancies held by tenant Board Members were held on normal commercial terms and
they are not able to use their position to their advantage.
The Partnership retains a register of Members’ interests. There are no interests in related parties requiring to
be declared.
Transactions entered into with members and rent arrear balances at 31 March are as follows:
Rent Charges £10,638
Arrears £37
COUNCILLORS
David Blaney, Norman Macleod, DJ Macrae and Gordon Murray were councillors with Comhairle Nan Eilean
Siar but only Gordon Murray was re-elected on the 4th
of May 2017. Any transactions with the Comhairle are
made an arm’s length, on normal commercial terms and the Councillors cannot use their positions to their
personal advantage.
HHP COMMUNITY HOUSING LTD
HHP Community Housing Ltd is a wholly owned subsidiary of Hebridean Housing Partnership, a company
incorporated in Scotland. All of the directors are Board Members of HHP.
Scottish Government Non-Specific Grants
2017 2016
£ £
Opening balance - 150,000
Grant Funding received & 150,000
applied to investment expenditure
Deferred for application against future expenditure - -
Annual Report & Financial Statements 54
At the year end HHP Community Housing owed Hebridean Housing Partnership £16,053 (2016: £15,803) which
is included in other debtors Note 11.
NOTE 27 LEGISLATIVE PROVISIONS
Hebridean Housing Partnership Limited (“HHP” or “The Partnership”) is registered under the Co-operative and
Community Benefit Societies Act 2014 (previously known as the Industrial and Provident Societies Act 1965)
and is a Housing Association registered with Scottish Housing Regulator (previously Communities Scotland)
under the Housing (Scotland) Act 2010. HHP has charitable status and is registered with OSCR.
POST BALANCE SHEET EVENTS
At the year end, Hebridean Housing Partnership had one active legal case which it was pursuing with regards
to structural issues with one of its housing developments. HHP have appointed an Independent expert to
review the case but their final report was not available at the time of signing the accounts. At present the
assets concerned are held with a lower Net Book Value than their Estimated Value in Use (taking into
consideration they may have a useful life lower than what is currently assumed in the financial statements).
Statement of Financial Position as at 31 March 2017
31 March 2017 31 March 2016 Non-accountant's guide
£ £
Tangible Fixed Assets
Tangible Assets-Social Housing 73,557,295 70,087,014 Houses we own
Tangible Assets-Property, plant & equipment 1,528,478 1,659,854 Offices and equipment
Investments 2 2 Share in Subsidiary & ESCO
75,085,775 71,746,870
Current Assets
Stock 388,884 37,451
Trade and other debtors 1,422,744 3,883,992 Money owed to us
Investments 4,506,628 3,564,265 Short term deposits
Cash at bank and in hand 2,724,142 1,959,905
9,042,398 9,445,613
Creditors: amounts falling due within one year (2,491,833) (1,101,194) Money we owe others
Net current assets 6,550,565 8,344,419
Total assets less current liabilities 81,636,340 80,091,289
Creditors: amounts falling due after more What we owe on loans for building our
than one year (10,583,000) (9,840,869) houses & money due to Scottish Government
Deferred Capital Grants (41,687,852) (41,162,344) Housing Grants received
Pension Liability (3,238,000) (1,567,000)
Provisions for liabilities − (2,524,919)
Net Assets 26,127,488 24,996,157
Capital and Reserves
Share Capital 197 196 Number of members £1 shares
Income and Expenditure reserve 26,127,291 24,995,961
26,127,488 24,996,157
SU
MM
ARY F
INA
NC
IAL S
TAT
EM
EN
TS A
ND
PER
FO
RM
AN
CE F
OR
2016/1
7
Message from the Chair
MESSAGE FROM THE CHAIR
TO FOLLOW
Annual Return on the Charter (ARC)
HHP submitted its fourth Annual Return on the Charter (ARC) in May 2017. How we have
performed in relation to the indicators will be published later in the year in a special report
for tenants. A summary of some of the key indicators is detailed below with a comparison to
2014/15 and 2015/16 ARC data.
DETAIL ARC 2016/17 ARC 2015/16 ARC 2014/15
REPAIRS
Emergency repairs completed 1983 2118 1923
Non-emergency repairs completed 3029 3577 3153
ARREARS
Total arrear as a % of rent due 3.32% 3.82% 4.18%
Former tenant arrear written off £28,222 £31,207 £86,902
VOIDS
Void at year end 20 11 10
Void for more than six months 3 2 0
Void loss 0.85% 0.73% 0.70%
LETTINGS
General needs 225 206 220
New applicants added to housing list 453 412 433
Number of applicants on list 586 578 624
DEVELOPMENT
New build 22 25 8
GENERAL
Rent increase 3.2% 2.1% 3.0%
Financial Overview
Statement of Comprehensive Income for the year ended 31 March 2017
Statement of Changes in Reserves for the year ended 31 March 2017
31 March 2017 31 March 2016
£ £
Unrestricted Fund Opening Balance 24,995,961 21,376,400
Surplus from statement of comprehensive income 1,131,330 3,619,561
Prior Year adjustment − −
Unrestricted Fund Closing Balance 26,127,291 24,995,961
31 March 2017 31 March 2016 Non-accountant's guide
£ £
Turnover 9,989,189 12,710,418 Income from rents and other activities
Operating Expenditure (6,792,497) (9,624,596) Cost of maintenance and management
of properties and other activities
Operating Surplus 3,196,692 3,085,822
Loss on disposal of property, plant & equipment (218,318) (123,606)
Interest receivable 9,568 11,567 Bank interest on deposit accounts
Interest payable and financing costs (354,611) (336,222) Interest on money borrowed
Surplus before tax 2,633,330 2,637,561
Actuarial (loss)/gain in respect of pension scheme (1,502,000) 982,000
Total comprehensive income for the year 1,131,330 3,619,561
Registered Number: SC379412 (Scotland)
HHP COMMUNITY HOUSING LIMITED
REPORT OF THE DIRECTORS AND
UNAUDITED FINANCIAL STATEMENTS
FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
HHP COMMUNITY HOUSING LIMITED
CONTENTS OF THE FINANCIAL STATEMENTS FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________
Page
Company Information 1
Report of the Directors 2
Financial Statements 4
Notes to the Financial Statements 6
HHP COMMUNITY HOUSING LIMITED
COMPANY INFORMATION FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 1
DIRECTORS: N M Macleod
M Bremner
A Mackenzie
C Mackay
SECRETARY: C Mackay
REGISTERED OFFICE: Gleann Seileach Business Park
Willowglen Road
Stornoway
Isle of Lewis
HS1 2QP
REGISTERED NUMBER: SC379412 (Scotland)
HHP COMMUNITY HOUSING LIMITED
COMPANY INFORMATION FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 2
The Directors present their report with the financial statements of the Company for the period 1
April 2016 to 31 March 2017.
PRINCIPAL ACTIVITY
During the financial year the Company has not traded and has received no income and incurred no
expenditure. Consequently, the Company has made neither a profit nor a loss.
INCORPORATION
The Company was incorporated on 1 June 2010.
DIRECTORS
The Directors who have held office during the year from 1 April 2016 to the date of this report are as
follows:
All Directors who are eligible offer themselves for election at the forthcoming Annual General
Meeting.
STATEMENT OF DIRECTORS
The Directors are responsible for preparing the Directors’ Report and the financial statements in
accordance with applicable law and regulations.
Company law requires the Directors to prepare financial statements for each financial year. Under
that law the Directors have elected to prepare the financial statements in accordance with United
Kingdom Generally Accepted Accounting Practice (United Kingdom Accounting Standards and
applicable law). Under company law the Directors must not approve the financial statements unless
they are satisfied that they give a true and fair view of the state of affairs of the Company and of the
profit or loss of the Company for that period. In preparing these financial statements, the Directors
are required to:
Directors Changes during the year
Appointed Resigned
George Lonie 1 June 2010 2 May 2016
David Blaney 1 June 2010 3 May 2017
Calum Mackay 13 September 2012
Mairi Bremner 27 June 2012
Alasdair Mackenzie 27 June 2012
Norman M Macleod 27 June 2012
HHP COMMUNITY HOUSING LIMITED
COMPANY INFORMATION FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 3
Select suitable accounting policies and then apply them consistently;
Make judgements and accounting estimates that are reasonable and prudent; and
Prepare the financial statements on the going concern basis unless it is inappropriate to
presume that the Company will continue in business.
The Directors are responsible for keeping adequate accounting records that are sufficient to show
and explain the Company’s transactions and disclose with reasonable accuracy at any time the
financial positions of the Company and enable them to ensure that the financial statements comply
with the Companies Act 2006. They are also responsible for safeguarding the assets of the Company
and hence for taking reasonable steps for the prevention and detection of fraud and other
irregularities.
This report has been prepared in accordance with the special provisions relating to small companies
within Part 15 of the Companies Act 2006.
ON BEHALF OF THE BOARD
Director:
27 June 2017
HHP COMMUNITY HOUSING LIMITED
FINANCIAL STATEMENTS FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 4
INCOME & EXPENDITURE ACCOUNT
31 March 2017 31 March 2016
£ £
Notes
Turnover - -
Operating Costs - -
Operating Surplus - -
Surplus on sale of fixed assets
-housing properties - -
-other assets - -
Interest receivable and other income - -
Interest payable and other charges (237) (234)
Loss on ordinary activities, before transfer to Reserves (237) (234)
Tax on surplus on ordinary activities - -
Deficit for the Year (237) (234)
Revenue Reserve at 1 April 2016 (16,589) (16,355)
Revenue Reserve at 31 March 2017 (16,826) (16,589)
HHP COMMUNITY HOUSING LIMITED
FINANCIAL STATEMENTS FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 5
BALANCE SHEET
31 March 2017 31 March 2016
£ £
Notes
Current Assets
Cash at bank and in hand 1 1
1 1
Creditors: amounts falling due within one year 2 (16,826) (16,589)
Net current assets (16,825) (16,588)
Total assets less current liabilities (16,825) (16,588)
Capital and Reserves
Called up Share Capital 3 1 1
Revenue Reserve 4 (16,826) (16,589)
SHAREHOLDERS FUNDS (16,825) (16,588)
HHP COMMUNITY HOUSING LIMITED
FINANCIAL STATEMENTS FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 6
AUDIT EXEMPTION STATEMENT
The Company is entitled to exemption from audit under Section 480 of the Companies Act 2006 for
the period ended 31 March 2017 relating to dormant companies.
The Members have not required the Company to obtain an audit of its financial statements for the
period ended 31 March 2017 in accordance with Section 476 of the Companies Act 2006.
For the financial year ended 31 March 2017 the Company was entitled to exemption from audit
under Section 480 Companies Act 2006 relating to dormant companies.
Directors’ responsibilities:
The members have not required the Company to obtain an audit of its financial statements for
the year in question in accordance with Section 476 of the Companies Act 2006; and
The Directors acknowledge their responsibilities for complying with the requirements of the
Companies Act 2006 with respect to accounting records and the preparation of financial
statements.
These financial statements have been prepared in accordance with the provisions applicable to
companies subject to the small companies’ regime.
Approved by the Board and authorised for issue on 27 June 2017
Director
Company Registration No: SC379412
The notes form part of these financial statements.
HHP COMMUNITY HOUSING LIMITED
NOTES TO THE FINANCIAL STATEMENTS FOR THE PERIOD 1 APRIL 2016 TO 31 MARCH 2017
__________________________________________________________________________________
__________________________________________________________________________________ 7
1. ACCOUNTING POLICIES
Accounting Convention
The financial statements have been prepared under the historical cost convention and in
accordance with the Financial Reporting Standard for Smaller Entities (effective January
2015).
The Company has not traded during the year ended 31 March 2017.
2. CREDITORS: Amounts falling due within one year
2017 2016
£ £
Intercompany Creditor 16,826 16,589
3. CALLED UP SHARE CAPITAL
Allotted, issued and fully paid:
Number: Class: Nominal Value 2017 £
2016 £
1 Ordinary £1 1 1
1 Ordinary share of £1 was allotted and fully paid for cash at par during the period
4. REVENUE RESERVE
2017 2016
£ £
Accumulated surplus at 1 April 2016 (16,589) (16,589)
Loss for the year (237) -
Accumulated surplus at 31 March 2017 (16,826) (16,589)
Donald Macleod Page 1 27/6/17
Agenda Item 9
BOARD 28 June 2017
SHR RETURNS 2016/17
Report by Director of Finance & Corporate Services
PURPOSE OF REPORT
1.1 To present Loan Portfolio return (2016/17), Annual Financial Statements (2016/17) and five year plans (2017-2022) required by the Scottish Housing Regulator (SHR) for consideration and approval.
SUMMARY
2.1 The SHR require RSLs to submit three returns on an annual basis. The returns to be submitted to the Scottish Housing Regulator are at Appendix 1 to 3.
COMPETENCE
3.1 Submission of the three returns by the 30 June 2017 will ensure the Partnership’s regulatory requirements are met.
RECOMMENDATIONS
4.1 It is recommended that the Board approve for submission to the Scottish housing regulator
a) the Loan Portfolio Return for 2016/17 as at Appendix 1;
b) the Annual Financial Statements Return for 2016/17 as at Appendix 2;
c) the five year plan Return for 2017-2022 as at Appendix 3; and
d) the 2017 updated 30 year cashflows shown at Appendix 4.
APPENDIX 1 Loan Portfolio Return 2016/17
APPENDIX 2 Annual Financial Statements 2016/17
APPENDIX 3 Five Year Plans 2017-2020
APPENDIX 4 2017 Updated 30 Year Cash Flows
Background Papers None
Writer of Report Donald Macleod Tel: 0300 123 0773
DML Page 2 of 2 27/6/17
COMPETENCE
Financial 5.1 The five year plan considers the resources the Partnership requires for 2017-22 in line
with the assumptions in the 30 Year Business Plan which was approved at the March 2017 Board meeting and subsequently submitted to our funders.
5.2 The five year plan has been set in accordance with current accounting standards. 5.3 The five year plan is expected to change significantly following the recent Government
announcement of additional development funding for the Outer Hebrides. A revision will need to be made once all implications of the additional monies are taken into account including a supply/demand assessment and its impact on the 30 year plan.
Legal 5.4 The Partnership’s Rule 69 states that “The Partnership must keep proper books of
account to cover its income, expenditure transactions and its assets, liabilities and reserves in line with sections 75 and 76 of the Co-operative and Community Benefit Societies Act 2014. It must also set up and maintain a suitable system for controlling its books of accounts, its cash and its receipts and invoices”.
5.5 The Board has ultimate responsibility for the Partnership’s finances and in accordance
with the Financial Regulations the Board has the responsibility to approve the five year plans.
5.6 Any material changes in the assumptions used in the five year plan from those approved
in the 30 year Business Plan will require the approval of our funder.
RISK
6.1 The setting of realistic budgets with robust assumptions reduces the risk of financial loss and failure as highlighted in the Risk Register.
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 1 of 11
RSL: 359 - Hebridean Housing Partnership Ltd ( HHP )
Return Annual Return 2017 31/03/2017
Further Return Details
Accounting Year End Do you have any ISDAs? Does Lender have a floating charge over the company’s assets
Intragroup Lending / Borrowing
March No No Yes
Social Housing Units
Owned by RSL Used for Security Unencumbered % of Unencumbered with positive value
2193 2193 0 0.00
Comment
Total Facility (£’000s) Facility Outstanding (£’000s) Facility Undrawn (£’000s)
15,000.0 5,088.7 9,911.3
1 Facility Detail 1
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 2 of 11
Facility Number
Lender Status Facility Total £’000s
Start Date EndDate
Amount Undrawn
Amount Outstanding
Undrawn Facility For
Details Committed? Next5 Yrs?
Multi Lender
HHPRBS001 Royal Bank of Scotland plc
Live 5,000.0 18/09/2015 10/09/2041 1,500.0 3,500.0 No No
Facility Fees
Details
Arrangement Fees Y
Non-Utilisation Fees Y
Other Fees N
Additional Lenders
1.1.1 Loan Details 1Loan Ref No Status Loan Type Loan Amt O/standing Repayment Terms Purpose Details Ref Rate Margin / All-in Rate
RBSFIXED002 Live Fixed Rate Loan
3,500.0 3,500.0 Interest only followed by structured capital repayments
Affordable Housing Development
Fixed Rate Percentage
5.4830
1.1.2 Additional Loan and Security DetailLoan Ref No First Capital
RepaymentFinal Capital Payment
Int is being First Interest
Deal Expires
Forward Fixes
Security from Social Housing %
Social Housing Security
Basis Date of Valuation
Covenants
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 3 of 11
Payment Value £’000s
RBSFIXED002 01/04/2027 31/03/2035 Paid 19/10/2015 17/04/2027 No 100.00 26,784.0 EUV-SH without sales
31/03/2017 Yes
1.1.2.1.1 Covenant Detail 1
Loan Ref No Seq. No. Type of Covenant Required Level Reporting frequency Date of last report Level Achieved
1 Interest Cover Cashflow deficit £4.8m Annually 31/03/2017 Actual cashflow surplus £1.1m
How is it calculated? total interest paid divided Net Operating Cashflow except in years where there is a deficit.
1.1.3 Loan Details 2Loan Ref No Status Loan Type Loan Amt O/standing Repayment Terms Purpose Details Ref Rate Margin / All-in Rate
RBSVAR003 Live Variable Rate Loan
1,500.0 0.0 Interest only followed by structured capital repayments
Affordable Housing Development
LIBOR 3 month
0.3000
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 4 of 11
1.1.4 Additional Loan and Security DetailLoan Ref No First Capital
RepaymentFinal Capital Payment
Int is being First Interest Payment
Deal Expires
Forward Fixes
Security from Social Housing %
Social Housing Security Value £’000s
Basis Date of Valuation
Covenants
RBSVAR003 21/09/2015 21/09/2015 Paid 18/09/2015 100.00 26,784.0 EUV-SH without sales
31/03/2015 Yes
1.1.4.1.1 Covenant Detail 1
Loan Ref No Seq. No. Type of Covenant Required Level Reporting frequency Date of last report Level Achieved
1 Interest Cover Maximum Annually 31/03/2013 Max deficit £1144KActual deficit £520KInt Cover -1.06
How is it calculated? total interest divided by net operating cashflow except in years where there is a deficit. The funder has set a max deficit level for the years in which a deficitis forecast
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 5 of 11
2 Facility Detail 2Facility Number
Lender Status Facility Total £’000s
Start Date EndDate
Amount Undrawn
Amount Outstanding
Undrawn Facility For
Details Committed? Next5 Yrs?
Multi Lender
HHPRBS2162 Royal Bank of Scotland plc
Live 5,000.0 18/09/2015 17/09/2025 5,000.0 0.0 New Build - Social Housing
Yes Yes No
Facility Fees
Details
Arrangement Fees Y
Non-Utilisation Fees Y
Other Fees N
Additional Lenders
3 Facility Detail 3Facility Number
Lender Status Facility Total £’000s
Start Date EndDate
Amount Undrawn
Amount Outstanding
Undrawn Facility For
Details Committed? Next5 Yrs?
Multi Lender
HHPRBS2163 Royal Bank of Scotland plc
Live 5,000.0 18/09/2015 17/09/2025 3,411.3 1,588.7 Working Capital
Yes Yes No
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 6 of 11
Facility Fees
Details
Arrangement Fees Y
Non-Utilisation Fees Y
Other Fees N
Additional Lenders
3.1.1 Loan Details 1Loan Ref No Status Loan Type Loan Amt O/standing Repayment Terms Purpose Details Ref Rate Margin / All-in Rate
RBSVAR1043 Live Variable Rate Loan
1,500.0 1,500.0 Interest only - Bullet repayment at end of term from refinancing
Affordable Housing Development
LIBOR 3 month
1.25
3.1.2 Additional Loan and Security DetailLoan Ref No First Capital
RepaymentFinal Capital Payment
Int is being First Interest Payment
Deal Expires
Forward Fixes
Security from Social Housing %
Social Housing Security Value £’000s
Basis Date of Valuation
Covenants
RBSVAR1043 10/09/2041 Paid 28/10/2015 100 26,784.0 EUV-SH without sales
31/03/2017 Yes
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 7 of 11
3.1.2.1.1 Covenant Detail 1
Loan Ref No Seq. No. Type of Covenant Required Level Reporting frequency Date of last report Level Achieved
4210 Interest Cover Cashflow deficit £4.8m for 2016/17 Annually 31/03/2017 Surplus £1.1m
How is it calculated? Annual Cashflow Deficit CovenantIn respect of each Financial Year specified in Part A where the ratio in column 2 is less than zero, the Annual Cashflow Deficit for that Financial Year shall not be a greater negative figure than that set out in Part A of Schedule 5, as amended each year by the Lender in line with the agreed Business Plan.Net Operating Cashflow CovenantIn respect of each Financial Year specified in Part B where the ratio in column 2 is equal to or greater than zero, the ratio of Net Operating Cashflow to Total Interest for that period shall not be less than the ratio setout in Part B of Schedule 5, as amended each year by the Lender in line with the agreed Business Plan.Part A31March2017 4,824,49031March2018 1,513,38031March2019 2,457,18031March2020 1,675,19031March2021 2,186,03031March2022 430,65031March2032 532,73031March2033 1,971,530Part B31March2023 1.6931March2024 1.8731March2025 2.5031March2026 2.9731March2027 4.40
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 8 of 11
31March2028 4.4531March2029 5.2431March2030 3.8831March2031 4.4631March2034 5.2931March2035 10.7031March2036 16.531March2037 15.7831March2038 1.5631March2039 113.47
3.1.3 Loan Details 2Loan Ref No Status Loan Type Loan Amt O/standing Repayment Terms Purpose Details Ref Rate Margin / All-in Rate
RBSVAR1044 Live Variable Rate Loan
187.7 88.7 Interest only - Bullet repayment at end of term from refinancing
Capital Investment LIBOR 3 month
1.25
3.1.4 Additional Loan and Security DetailLoan Ref No First Capital
RepaymentFinal Capital Payment
Int is being First Interest
Deal Expires
Forward Fixes
Security from Social Housing %
Social Housing Security
Basis Date of Valuation
Covenants
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 9 of 11
Payment Value £’000s
RBSVAR1044 10/09/2041 Paid 28/08/2015 100 26,784.0 EUV-SH without sales
31/03/2017 Yes
3.1.4.1.1 Covenant Detail 1
Loan Ref No Seq. No. Type of Covenant Required Level Reporting frequency Date of last report Level Achieved
4211 Interest Cover Cash flow deficit 2016/17 £4.8m Annually 31/03/2017 Surplus £1.1m 2016/17
How is it calculated? Annual Cashflow Deficit CovenantIn respect of each Financial Year specified in Part A where the ratio in column 2 is less than zero, the Annual Cashflow Deficit for that Financial Year shall not be a greater negative figure than that set out in Part A of Schedule 5, as amended each year by the Lender in line with the agreed Business Plan.Net Operating Cashflow CovenantIn respect of each Financial Year specified in Part B where the ratio in column 2 is equal to or greater than zero, the ratio of Net Operating Cashflow to Total Interest for that period shall not be less than the ratio setout in Part B of Schedule 5, as amended each year by the Lender in line with the agreed Business Plan.Part A31March2017 4,824,49031March2018 1,513,38031March2019 2,457,18031March2020 1,675,19031March2021 2,186,03031March2022 430,650
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 10 of 11
31March2032 532,73031March2033 1,971,530Part B31March2023 1.6931March2024 1.8731March2025 2.5031March2026 2.9731March2027 4.4031March2028 4.4531March2029 5.2431March2030 3.8831March2031 4.4631March2034 5.2931March2035 10.7031March2036 16.531March2037 15.7831March2038 1.5631March2039 113.47
LOAN PORTFOLIO SYSTEM
«ApplicationFormName»«CreatedOn» Page 11 of 11
4 Intra Group Finance 120 has value when required 20. Please enter Loan Reference Number.
4.1 Intragroup LendingSeq. No. Status Borrower Relations
hipAmount Provided
Balance Outstanding
Purpose of Loan
Loan Purpose Details
Duration (months)
First Repayment Date
Part of Funds Borrowed
Loan Ref No
Lender Aware
1 Live HHP Community Housing Ltd
Subsidiary 16.1 16.1 Working Capital
48 28/02/2018 Yes - Yes
Security Type of Security
Security Details Security Value
Loan Agreement
Repayment Period (mo)
Repayment Terms
Ref Rate Margin / All-in rate
Start Date End Date
No Yes 12 Payment start date deferred-bullet repayment of interest and capital at maturity
Base 1.0000 01/03/2014 28/02/2018
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017
RSL Reg No and Name 359
Hebridean Housing Partnership Ltd
Statement of Comprehensive Income£'000 £'000
Turnover 9,989.2Operating costs (6,792.5)Exceptional items 0.0Operating surplus/(deficit) 3,196.7
Gain/(loss) on disposal of property, plant and equipment (218.3)Share of operating surplus/(deficit) in joint ventures and associates 0.0Interest receivable 9.6Interest payable (354.6)Other financing (costs)/income 0.0Release of negative goodwill 0.0Movement in fair value of financial instruments 0.0Decrease in valuation of housing properties 0.0Reversal of previous decrease in valuation of housing properties 0.0Total (563.3)
Surplus/(deficit) before tax 2,633.4
Tax (payable)/recoverable 0.0
Surplus/(deficit) for the year 2,633.4
Unrealised surplus/(deficit) on revaluation of housing properties 0.0Actuarial (loss)/gain in respect of pension schemes (1,502.0)Change in fair value of hedged financial instruments 0.0
Total comprehensive income for the year 1,131.4
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017RSL Reg No and Name 359 Hebridean Housing Partnership Ltd
Statement of Changes in Equity
Share capital Revenue reserve Restricted reserveRevaluation
reserve
Total excluding non-controlling
interest£'000 £'000 £'000 £'000 £'000
Balance at beginning of the year 0.2 24,996.0 0.0 0.0 24,996.2Issue of shares 0.0 0.0 0.0 0.0 0.0Cancellation of shares 0.0 0.0 0.0 0.0 0.0Surplus/(deficit) from statement of comprehensive income 0.0 1,131.3 0.0 0.0 1,131.3Transfer from revaluation reserve to revenue reserve 0.0 0.0 0.0 0.0 0.0Transfer of restricted expenditure from unrestricted reserve 0.0 0.0 0.0 0.0 0.0Balance at end of the year 0.2 26,127.3 0.0 0.0 26,127.5
Non-controlling interest
Total including non-controlling
interest Restricted fund Unrestricted fund£'000 £'000 £'000 £'000
Balance at beginning of the year 0.0 24,996.2 0.0 24,996.2Issue of shares 0.0 0.0 0.0 0.0Cancellation of shares 0.0 0.0 0.0 0.0Surplus/(deficit) from statement of comprehensive income 0.0 1,131.3 0.0 1,131.3Transfer from revaluation reserve to revenue reserve 0.0 0.0 0.0 0.0Transfer of restricted expenditure from unrestricted reserve 0.0 0.0 0.0 0.0Balance at end of the year 0.0 26,127.5 0.0 26,127.5
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017
RSL Reg No and Name 359
Hebridean Housing Partnership Ltd
Statement of Financial Position£'000 £'000
Non-current assets
Intangible assets and goodwill 0.0
Housing properties-NBV 73,557.3Negative goodwill 0.0Net housing assets 73,557.3
Non-current investments 0.0Other plant, property and equipment 1,528.5Investments in joint ventures and associates 0.0Total non-current assets 75,085.8
Receivables due after more than one year 212.8
Current Assets
Investments 0.0Stock and work in progress 388.9Trade and other receivables due within one year 1,209.9Cash and cash equivalents 7,230.8Total current assets 8,829.6
Payables: amounts falling due within one year (2,491.8)
Deferred income: amounts falling due within one year
Scottish housing grants (SHG) 0.0Other grants 0.0Total deferred income: amounts falling due within one year 0.0
Net current assets/(liabilities) 6,337.8
Total assets less current liabilities 81,636.4
Payables: amounts falling due after more than one year (10,583.0)Provisions 0.0Pension asset/(liability) (3,238.0)
Deferred income: amounts falling due after more than one year
Scottish housing grants (SHG) (41,687.9)Other grants 0.0
Total deferred income: amounts falling due after more than one year (41,687.9)
Total long term liabilities (55,508.9)
Net assets 26,127.5
Capital & reserves
Share capital 0.2Revaluation reserves 0.0Restricted reserves 0.0Revenue reserves 26,127.3Total reserves 26,127.5
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017
RSL Reg No and Name 359
Hebridean Housing Partnership Ltd
Statement of Cash Flows£'000 £'000
Net cash inflow/(outflow) from operating activities 6,226.0
Tax paid/(refunded) 0.0
Cash flow from investing activities
Acquisition and construction of properties (6,810.2)Purchase of other non current assets 0.0Sales of properties 733.1Sales of other non current assets 0.0Capital Grants received 1,822.1Capital Grants repaid 0.0Interest received 9.6Net cash inflow/(outflow) from investing activities (4,245.4)
Cash flow from financing activities
Interest paid (258.4)Interest element of finance lease rental payment 0.0Share capital received/(repaid) 0.0Funding drawn down 0.0Funding repaid (15.6)Early repayment and associated charges 0.0Capital element of finance lease rental payments 0.0Withdrawal from deposits 0.0Net cash inflow/(outflow) from financing (274.0)
Net change in cash and cash equivalents 1,706.6
Cash and cash equivalents at beginning of the year 5,524.2Cash and cash equivalents at end of the year 7,230.8
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017RSL Reg No and Name 359 Hebridean Housing Partnership Ltd
Note 1 - Particulars of turnover, operating costs and operating surplus or deficit
Turnover Operating CostsOperating
Surplus/(Deficit)£'000 £'000 £'000
Affordable letting activities 9,964.5 (6,736.3) 3,228.2Other activities 24.8 (56.3) (31.5)Total 9,989.3 (6,792.6) 3,196.7
Note 2 - Particulars of turnover, operating costs and operating surplus or deficit from affordable letting activities
General Needs Social Housing
Supported Social Housing
Accommodation
Shared Ownership
Housing Other Total£'000 £'000 £'000 £'000 £'000
Rent receivable 8,292.7 49.6 3.4 0.0 8,345.7Service charges 48.1 3.9 2.4 0.0 54.4Gross income 8,340.8 53.5 5.8 0.0 8,400.1
Voids (91.6) 0.0 0.0 0.0 (91.6)Net income 8,249.2 53.5 5.8 0.0 8,308.5
Grants released from deferred income 1,209.6 0.0 0.0 0.0 1,209.6Revenue grants from Scottish Ministers 0.0 0.0 0.0 0.0 0.0Other revenue grants 446.4 0.0 0.0 0.0 446.4
Total turnover: letting 9,905.2 53.5 5.8 0.0 9,964.5
Management and maintenance administration costs (1,797.6) (13.2) (2.5) 0.0 (1,813.3)Service costs 0.0 0.0 0.0 0.0 0.0Planned maintenance (987.7) (0.3) 0.0 0.0 (988.0)Reactive maintenance (1,383.5) (4.7) (0.1) 0.0 (1,388.3)Bad debts written (off)/back (25.1) 0.0 0.0 0.0 (25.1)Depreciation: housing (2,519.5) 0.0 (2.1) 0.0 (2,521.6)Impairment 0.0 0.0 0.0 0.0 0.0
Operating costs (6,713.4) (18.2) (4.7) 0.0 (6,736.3)
Operating surplus/(deficit) 3,191.8 35.3 1.1 0.0 3,228.2
UnitsUnits owned and managed at year end 2,178.0 12.0 3.0 51.0 2,244.0Units managed, not owned at year end 0.0 0.0 0.0 0.0 0.0Units owned, not managed at year end 0.0 0.0 0.0 0.0 0.0Units held for demolition at year end 0.0 0.0 0.0 0.0Total units owned / managed 2,178.0 12.0 3.0 51.0 2,244.0
Cost per unitManagement & maintenance administration 825.3 1,100.0 833.3 0.0 808.1Planned maintenance 453.5 25.0 0.0 0.0 440.3Reactive maintenance 635.2 391.7 33.3 0.0 618.7Total direct maintenance 1,088.7 416.7 33.3 0.0 1,059.0Total management & maintenance 1,914.0 1,516.7 866.7 0.0 1,867.0
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017RSL Reg No and Name 359 Hebridean Housing Partnership Ltd
Note 3 - Particulars of turnover, operating costs and operating surplus or deficit from other activities
Grants from Scottish Ministers
Other revenue grants
Supporting people income Other income Total turnover
Other operating costs
Operating surplus/(deficit)
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Wider role 0.0 0.0 0.0 0.0 0.0 0.0 0.0Care and repair 0.0 0.0 0.0 0.0 0.0 0.0 0.0Investment property activities 0.0 0.0 0.0 0.0 0.0 0.0 0.0Factoring 0.0 0.0 0.0 3.1 3.1 (3.1) 0.0Support activities 0.0 0.0 0.0 0.0 0.0 0.0 0.0Care activities 0.0 0.0 0.0 0.0 0.0 0.0 0.0Contracted out services undertaken for RSLs 0.0 0.0 0.0 0.0 0.0 0.0 0.0Contracted out services undertaken for others 0.0 0.0 0.0 0.0 0.0 0.0 0.0Developments for sale to RSLs 0.0 0.0 0.0 0.0 0.0 0.0 0.0Developments for sale to non-RSLs 0.0 0.0 0.0 0.0 0.0 0.0 0.0Uncapitalised development administration costs 0.0 0.0 0.0 14.9 14.9 (44.5) (29.6)Other activities 0.0 0.0 0.0 6.8 6.8 (8.7) (1.9)
Total 0.0 0.0 0.0 24.8 24.8 (56.3) (31.5)
Supplementary Items£'000
Chief executive emoluments excluding pension contribution 70.2Total staff costs 1,567.5Total key management personnel emoluments 163.7External auditors' fees - audit 13.5Auditors' fees - other 0.0Capitalised maintenance costs 0.0Capitalised development administration costs 43.2Capitalised interest costs 0.0Receivables - net rental 62.5Pension deficit recovery payments due within one year 0.0Pension deficit recovery payments due after more than one year 0.0Intra-group lending 0.0Housing loans due within one year 88.7Other loans due within one year 0.0Intra-group borrowing due within one year 0.0Overdraft / bridging finance 0.0Housing loans due after more than one year 5,000.0Other loans due after more than one year 0.0Intra-group borrowing due after more than one year 0.0Accumulated depreciation 18,032.2Intra-group receivables 16.1Other intra-group payables 0.0
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017RSL Reg No and Name 359 Hebridean Housing Partnership Ltd
Contextual Information
Accounting year end
Date financial statements authorised
Are the financial statements qualified?
External auditors' name
Internal auditors' name
Contingent liabilities Legal action NoLSVT contract compliance NoNone NoPension NoRepayment of SHG NoOther No
Do you account for housing assets on a revaluation basis?Calendar year of last housing asset revaluation
Staff Pension SchemesWhich scheme(s) are you members of?Highland Pension FundNoneNoneNoneNoneNoneNoneNoneHow many staff members not currently contributing to any scheme?SHAPS financial assessment risk ratingAre you appealing this risk rating?
How many particpating members in each scheme?44
2N/AN/A
0000000
Wylie & Bisset
Scott-Moncrieff
No
No
March
28/06/2017
Audited Financial Statements ReturnFinancial Statements
Reporting Year 2017
RSL Reg No and Name 359
Hebridean Housing Partnership Ltd
Accounts Information
Date return approved
Approver
Approver job title Director of Finance & Corporate Services
28/06/2017
Donald Macleod
2017359 Hebridean Housing Partnership Ltd
Interest cover (%)
Gearing (%) Voids (%) Arrears (%) Bad debts (%) Staff costs / turnover (%)
Key management personnel /
staff costs (%)
Turnover per unit (£)
2,413.2 (8.2) 1.1 0.8 0.3 15.7 10.4 4,451.5
LiquidityCurrent ratio Gross surplus
/ (deficit) (%)Net surplus /
(deficit)Debt burden Net debt per
unit (£)Debt per unit
(£)Income from non-rental
activities (%)
Other activities surplus / operating
surplus (%)3.5 32.0 26.4 0.5 -955 2,268 16.8 (1.0)
Reporting Year
Audited Financial Statements ReturnRatios Report
Profitability Diversification
Financial capacity Efficiency
Financing
RSL Reg No and Name
Financial Projections & Assumptions
Hebridean Housing Partnership Ltd 3590 1 2 3 4 5
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
PLEASE USE "0" FOR NIL VALUES THROUGHOUT THIS RETURN Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
£'000 £'000 £'000 £'000 £'000 £'000
STATEMENT OF COMPREHENSIVE INCOME
Gross rents 10 : 8,345.7 8,462.7 8,812.1 9,339.0 9,875.8 10,495.0
Service charges 11 : 54.4 35.0 36.4 37.7 38.8 40.0
Gross rents & service charges 12 : 8,400.1 8,497.7 8,848.5 9,376.7 9,914.6 10,535.0 10+11
Rent loss from voids 13 : 91.6 170.2 177.1 186.9 197.0 209.3
Net rent & service charges 14 : 8,308.5 8,327.5 8,671.4 9,189.8 9,717.6 10,325.7 12-13
Developments for sale income 15 : 0.0 433.4 2,387.8 1,095.0 1,460.0 1,095.0
Grants released from deferred income 16 : 1,209.6 893.2 921.3 1,004.3 1,098.4 1,203.7
Grants from Scottish Ministers 17 : 0.0 0.0 0.0 0.0 0.0 0.0
Other grants 18 : 253.5 120.0 120.0 120.0 120.0 120.0
Other income 19 : 217.5 5.0 5.2 5.4 5.5 5.7
TURNOVER 20 : 9,989.1 9,779.1 12,105.7 11,414.5 12,401.5 12,750.1 SUM(14:19)
Less:
Housing depreciation 22 : 2,521.6 2,265.1 2,470.0 2,784.3 3,002.7 3,280.9
Impairment written off / (back) 23 : 0.0 0.0 0.0 0.0 0.0 0.0
Management costs 25 : 1,813.3 2,817.3 2,320.0 2,414.9 2,419.0 2,502.9
Planned maintenance - direct costs 26 : 988.0 1,965.8 1,280.8 1,306.0 1,429.2 1,481.8
Re-active & voids maintenance - direct costs 27 : 1,388.3 1,207.0 1,166.0 1,214.8 1,260.8 1,292.7
Maintenance overhead costs 28 : 0.0 0.0 0.0 0.0 0.0 0.0
Bad debts written off / (back) 29 : 25.1 169.8 176.4 185.9 195.5 206.4
Developments for sale costs 30 : 44.5 433.4 2,387.8 1,095.0 1,460.0 1,095.0
Other activity costs 31 : 11.8 15.0 15.6 16.1 16.6 17.1
Other costs 32 : 0.0 98.1 80.4 61.7 42.8 44.0
33 : 4,270.9 6,706.4 7,427.0 6,294.4 6,823.9 6,639.9 SUM (25:32)
Operating Costs 35 : 6,792.5 8,971.5 9,897.0 9,078.7 9,826.6 9,920.8 22+23+33
Exceptional Items - (Income) / Expense 36 :
OPERATING SURPLUS/(DEFICIT) 37 : 3,196.6 807.6 2,208.7 2,335.8 2,574.9 2,829.3 20-35-36
Gain/(Loss) on disposal of PPE 39 : (218.3) 228.8 0.0 0.0 0.0 0.0
Interest receivable and other income 40 : 9.6 12.7 4.9 6.0 18.3 15.4
Interest payable and similar charges 41 : 354.6 368.2 452.5 780.3 947.0 1,040.5
Increase / (Decrease) in Negative Goodwill 42 : 0.0 0.0 0.0 0.0 0.0 0.0
Other Gains / (Losses) 43 : (1,502.0) 0.0 0.0 0.0 0.0 0.0
SURPLUS/(DEFICIT) ON ORDINARY ACTIVITIES BEFORE TAX 45 : 1,131.2 680.9 1,761.1 1,561.5 1,646.2 1,804.2 37+39+40-41+42+43
Tax on surplus on ordinary activities 47 : 0.0 0.0 0.0 0.0 0.0
SURPLUS/(DEFICIT) FOR THE YEAR AFTER TAX 49 : 1,131.2 680.9 1,761.1 1,561.5 1,646.2 1,804.2 45-47
2017
5 Yr Financial Projections Projections & Assumptions- Page 1 of 5 Printed 27/06/2017 @ 17:06
Ratios
Hebridean Housing Partnership Ltd 359-2 -1 0 1 2 3 4 5
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
Year -2 Year -1 Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
Financial capacity
Interest cover % 2,413.1 209.1 851.8 554.9 473.4 480.9
Gearing % 13.2 27.4 40.9 46.6 53.7 54.0
Efficiency
Voids % 1.1 2.0 2.0 2.0 2.0 2.0
Arrears % 0.8 9.0 9.0 7.6 8.6 8.3
Bad debts % 0.3 2.0 2.0 2.0 2.0 2.0
Staff costs / turnover % 12.0 15.0 12.5 13.8 13.0 13.1
Turnover per unit (£) 4,555.0 4,559.0 5,581.2 5,130.1 5,475.3 5,448.8
Liquidity
Current ratio 3.6 26.4 21.2 34.3 31.6 23.6
Profitability
Gross surplus / Deficit % 32.0 8.3 18.2 20.5 20.8 22.2
Net surplus / Deficit % 11.3 7.0 14.5 13.7 13.3 14.2
Financing
Debt Burden 1.1 1.1 1.1 1.6 1.7 1.6
Net debt per unit (£) 1,569.1 3,419.4 5,384.3 6,310.5 7,537.4 7,750.1
Debt per unit (£) 4,866.3 4,916.0 6,253.1 7,971.6 9,048.5 8,766.2
Diversification
Income from non-rental activities % 2.2 0.1 0.1 0.1 0.1 0.0
Other Activities Surplus to Operating Surplus % 6.4 (1.2) (0.5) (0.5) (0.4) (0.4)
2017
The Ratio calculations for Year -1 and Year -2 are not available. We are aware of this and it will
be resolved for next year. In the meantime the Ratio values are all calculated in the relevant AFS
returns. Details of how the Ratios are calculated are included in the User Guide.
5 Yr Financial Projections Ratios- Page 1 of 1 Printed 27/06/2017 @ 17:05
Financial Projections & Assumptions
Hebridean Housing Partnership Ltd 3590 1 2 3 4 5
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
PLEASE USE "0" FOR NIL VALUES THROUGHOUT THIS RETURN Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
£'000 £'000 £'000 £'000 £'000 £'000
2017
STATEMENT OF FINANCIAL POSITION
Non-Current Assets
Intangible Assets & Goodwill 54 : 0.0 0.0 0.0 0.0 0.0 0.0
Housing properties - Gross cost or valuation 57 : 76,761.9 82,219.8 97,409.7 109,613.0 118,706.9 125,336.3
Less
Housing Depreciation 59 : 2,521.6 2,236.3 4,706.3 7,490.6 10,493.3 13,774.2
Negative Goodwill 60 : 0.0 0.0 0.0 0.0 0.0 0.0
NET HOUSING ASSETS 61 : 74,240.4 79,983.5 92,703.4 102,122.4 108,213.6 111,562.1 57-59-60
Non-Current Investments 63 : 0.0 0.0 0.0 0.0 0.0 0.0
Other Non Current Assets 64 : 845.4 818.0 790.7 763.3 735.9 715.7
TOTAL NON-CURRENT ASSETS 65 : 75,085.8 80,801.5 93,494.1 102,885.7 108,949.5 112,277.8 54+61+63+64
Current Assets
Net rental receivables 68 : 62.5 748.1 776.4 698.3 832.6 861.7
Other receivables, stock & WIP 69 : 1,749.1 (20.5) 17.6 17.6 17.6 17.6
Investments (non-cash) 70 : 0.0 0.0 0.0 0.0 0.0 0.0
Cash at bank and in hand 71 : 7,230.8 3,210.2 1,884.4 3,695.9 3,422.7 2,377.8
TOTAL CURRENT ASSETS 72 : 9,042.4 3,937.8 2,678.4 4,411.8 4,272.9 3,257.1 SUM(68:71)
Payables : Amounts falling due within One Year
Loans due within one year 75 : 88.7 0.0 0.0 0.0 0.0 0.0
Overdrafts due within one year 76 : 0.0 0.0 0.0 0.0 0.0 0.0
Other short-term payables 77 : 2,403.3 149.1 126.2 128.6 135.1 138.2
TOTAL CURRENT LIABILITIES 78 : 2,492.0 149.1 126.2 128.6 135.1 138.2 75+76+77
NET CURRENT ASSETS/(LIABILITIES) 80 : 6,550.4 3,788.7 2,552.2 4,283.2 4,137.8 3,118.9 72-78
TOTAL ASSETS LESS CURRENT LIABILITIES 82 : 81,636.2 84,590.2 96,046.3 107,168.9 113,087.3 115,396.7 65+80
Payables : Amounts falling due After One Year
Loans due after one year 85 : 10,583.0 10,544.9 13,563.0 17,736.8 20,494.9 20,513.0
Other long-term payables 86 : 0.0 0.0 0.0 0.0 0.0 0.0
Grants to be released 87 : 41,687.9 43,998.9 50,675.8 56,063.3 57,577.2 58,064.4
88 : 52,270.9 54,543.8 64,238.8 73,800.1 78,072.1 78,577.4 85+86+87
Provisions for liabilities & charges 89 : 3,238.0 3,238.2 3,238.2 3,238.2 3,238.2 3,238.2
NET ASSETS 90 : 26,127.3 26,808.2 28,569.3 30,130.6 31,777.0 33,581.1 82-88-89
Capital & Reserves
Share capital 93 : 0.0 0.0 0.0 0.0 0.0 0.0
Revaluation reserve 94 : 0.0 0.0 0.0 0.0 0.0 0.0
Restricted reserves 95 : 0.0 0.0 0.0 0.0 0.0 0.0
5 Yr Financial Projections Projections & Assumptions- Page 2 of 5 Printed 27/06/2017 @ 17:06
Financial Projections & Assumptions
Hebridean Housing Partnership Ltd 3590 1 2 3 4 5
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
PLEASE USE "0" FOR NIL VALUES THROUGHOUT THIS RETURN Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
£'000 £'000 £'000 £'000 £'000 £'000
2017
Revenue reserves 96 : 26,127.3 26,808.2 28,569.3 30,130.6 31,777.0 33,581.1
TOTAL CAPITAL & RESERVES 97 : 26,127.3 26,808.2 28,569.3 30,130.6 31,777.0 33,581.1 SUM(93:96)
Pension Liability - as included above 99 : 3,238.0 3,238.0 3,238.0 3,238.0 3,238.0 3,238.0
Intra Group Receivables - as included above 100 : 0.0 0.0 0.0 0.0 0.0 0.0
Intra Group Payables - as included above 101 : 0.0 0.0 0.0 0.0 0.0 0.0
Balance check 102 : TRUE TRUE TRUE TRUE TRUE TRUE
5 Yr Financial Projections Projections & Assumptions- Page 3 of 5 Printed 27/06/2017 @ 17:06
Financial Projections & Assumptions
Hebridean Housing Partnership Ltd 3590 1 2 3 4 5
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
PLEASE USE "0" FOR NIL VALUES THROUGHOUT THIS RETURN Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
£'000 £'000 £'000 £'000 £'000 £'000
2017
STATEMENT OF CASHFLOWS
Net Cash from Operating Activities
Operating Surplus/(Deficit) 106 : 3,196.6 807.6 2,208.7 2,335.8 2,574.9 2,829.3 37
Depreciation & Amortisation 107 : 2,521.6 2,292.5 2,497.3 2,811.7 3,030.1 3,301.1
Impairments / (Revaluation Enhancements) 108 : 0.0 0.0 0.0 0.0 0.0 0.0
Increase / (Decrease) in Payables 109 : 3,179.2 (1,197.5) 0.0 0.0 0.0 0.0
(Increase) / Decrease in Receivables 110 : (63.7) 859.4 0.0 0.0 0.0 0.0
(Increase) / Decrease in Stock & WIP 111 : (351.4) 409.4 (38.0) 0.0 0.0 0.0
Gain / (Loss) on sale of non-current assets 112 : (218.3) 0.0 0.0 0.0 0.0 0.0
Other non-cash adjustments 113 : (2,037.9) (2,148.9) (972.6) (924.0) (1,226.1) (1,229.9)
NET CASH FROM OPERATING ACTIVITIES 114 : 6,226.0 1,022.5 3,695.4 4,223.5 4,378.9 4,900.5 SUM(106:113)
Tax (Paid) / Refunded 116 : 0.0 0.0 0.0 0.0 0.0 0.0
Return on Investment and Servicing of Finance
Interest Received 119 : 9.6 12.7 4.9 6.0 18.3 15.4
Interest (Paid) 120 : (258.4) (495.1) (434.4) (762.2) (928.9) (1,022.3)
RETURNS ON INVESTMENT AND SERVICING OF FINANCE 121 : (248.8) (482.4) (429.5) (756.2) (910.6) (1,006.9) 119+120
Capital Expenditure & Financial Investment
Construction or acquisition of Housing properties 124 : (3,163.5) (3,628.6) (11,231.1) (7,826.3) (5,049.9) (2,438.8)
Improvement of Housing 125 : (3,633.0) (4,350.8) (3,958.8) (4,377.0) (4,043.9) (4,190.6)
Construction or acquisition of other Land & Buildings 126 : - 0.0 0.0 0.0 0.0 0.0
Construction or acquisition of other Non-Current Assets 127 : (13.7) 0.0 0.0 0.0 0.0 0.0
Sale of Social Housing Properties 128 : 733.1 214.4 0.0 0.0 0.0 0.0
Sale of Other Land & Buildings 129 : - 0.0 0.0 0.0 0.0 0.0
Sale of Other Non-Current Assets 130 : - 0.0 0.0 0.0 0.0 0.0
Grants (Repaid) / Received 131 : 1,822.1 3,204.3 7,598.2 6,391.8 2,612.3 1,690.9
CAPITAL EXPENDITURE AND FINANCIAL INVESTMENT 132 : (4,255.0) (4,560.7) (7,591.7) (5,811.5) (6,481.5) (4,938.5) SUM(124:131)
NET CASH BEFORE FINANCING 134 : 1,722.2 (4,020.6) (4,325.8) (2,344.2) (3,013.2) (1,044.9) 114+116+121+132
Financing
Equity drawdown 137 : - 0.0 0.0 0.0 0.0 0.0
Debt drawndown 138 : - 0.0 3,000.0 4,155.7 2,740.0 0.0
Debt repayment 139 : (15.6) 0.0 0.0 0.0 0.0 0.0
Working Capital (Cash) - Drawn / (Repaid) 140 : - 0.0 0.0 0.0 0.0 0.0
NET CASH FROM FINANCING 141 : (15.6) 0.0 3,000.0 4,155.7 2,740.0 0.0 SUM(137:140)
INCREASE / (DECREASE) IN NET CASH 143 : 1,706.6 (4,020.6) (1,325.8) 1,811.5 (273.2) (1,044.9) 134+141
Cash Balance
Balance Brought Forward 146 : 5,524.2 7,230.8 3,210.2 1,884.4 3,695.9 3,422.7 148 (Prior Year)
Increase / (Decrease) in Net Cash 147 : 1,706.6 (4,020.6) (1,325.8) 1,811.5 (273.2) (1,044.9) 143
CLOSING BALANCE 148 : 7,230.8 3,210.2 1,884.4 3,695.9 3,422.7 2,377.8 146+147
Difference between Closing Balance and Cash at bank and in hand 149 : 0.0 0.0 0.0 0.0 0.0 0.0 148-71
5 Yr Financial Projections Projections & Assumptions- Page 4 of 5 Printed 27/06/2017 @ 17:06
Financial Projections & Assumptions
Hebridean Housing Partnership Ltd 3590 1 2 3 4 5
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
PLEASE USE "0" FOR NIL VALUES THROUGHOUT THIS RETURN Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
£'000 £'000 £'000 £'000 £'000 £'000
2017
ADDITIONAL INFORMATION
Units:
Number of units owned at end of period 154 : 2,193 2,145 2,169 2,225 2,265 2,340 [prevyr]154+161-173-174-175
Number of units managed at end of period (exclude factored units) 155 : 2,193 2,177 2,193 2,193 2,193 2,193
New Social Rent Properties added 157 : 22 (16) 24 56 40 75
New MMR Properties added 158 : 0 0 0 0 0 0
New Low Costs Home Ownership Properties added 159 : 0 0 0 0 0 0
New Properties - Other Tenures added 160 : 0 0 0 0 0 0
Total number of new affordable housing units added during year 161 : 22 (16) 24 56 40 75 SUM (157:160)
Financed by:
Scottish Housing Grants 164 : 1,579.2 1,282.7 2,626.4 5,412.4 4,060.8 7,988.9
Other public subsidy 165 : 250.0 0.0 0.0 0.0 0.0 0.0
Private finance 166 : 908.2 0.0 0.0 0.0 0.0 0.0
Sales 167 : 0.0 0.0 0.0 0.0 0.0 0.0
Cash reserves 168 : 0.0 0.0 0.0 0.0 0.0 0.0
Other 169 : 0.0 0.0 0.0 0.0 0.0 0.0
Total cost of new units 170 : 2,737.4 1,282.7 2,626.4 5,412.4 4,060.8 7,988.9 SUM (164:169)
Number of units lost during year from:
Sales including right to buy 173 : 34 32 0 0 0 0
Demolition 174 : 0 0 0 0 0 0
Other 175 : 0 0 0 0 0 0
Assumptions:
General Inflation (%) 178 : - 0.0 3.4 3.1 2.5 2.5
Rent increase - Margin above General Inflation (%) 179 : - 0.0 0.5 0.5 1.0 1.0
Operating cost increase - Margin above General Inflation (%) 180 : - 0.0 0.5 0.5 0.5 0.5
Direct maintenance cost increase - Margin above General Inflation (%) 181 : - 0.0 0.4 0.4 0.4 0.4
Average cost of borrowing (%) 182 : 4.4 3.5 4.2 5.7 5.3 5.1
Employers Contributions for pensions (%) 183 : 0.2 0.0 0.0 0.0 0.0 0.0
Employers Contributions for pensions (£'000) 184 : 218.0 0.0 0.0 0.0 0.0 0.0
SHAPS Pensions deficit contributions (£'000) 185 : 0.0 0.0 0.0 0.0 0.0 0.0
Total staff costs (including NI & pension costs) 187 : 1,198.9 1,468.6 1,515.6 1,570.1 1,617.2 1,665.7
Full time equivalent staff 188 : 40.8 0.0 0.0 0.0 0.0 0.0
EESSH Capital Expenditure included above 190 : 540.6 652.6 593.8 656.6 606.6 628.6
EESSH Revenue Expenditure included above 191 : 0.0 0.0 0.0 0.0 0.0 0.0
5 Yr Financial Projections Projections & Assumptions- Page 5 of 5 Printed 27/06/2017 @ 17:06
CASH FLOW FORECAST | HHP 5 Year Plan 2017-18 v 1.0 | Plan
Period: 01 April 2017 - 31 March 2047 2018 2019 2020 2021 2022 2023 2024£000's £000's £000's £000's £000's £000's £000's
OPERATING ACTIVITIESCash Received From Customers 9,828.40 12,490.90 11,482.10 12,622.30 12,605.70 10,611.10 11,216.70Cash Paid To Suppliers -7,267.00 -7,280.00 -5,688.40 -6,626.20 -6,039.50 -3,937.70 -4,146.50Cash Paid To Employees -1,468.60 -1,515.60 -1,570.10 -1,617.20 -1,665.70 -1,715.70 -1,767.20Net Cash From Operating Activities 1,092.90 3,695.40 4,223.60 4,378.90 4,900.50 4,957.60 5,303.00
Returns On Investments & Servicing Of FinanceInterest Collected 12.7 4.9 6 18.3 15.4 13.5 16.7Interest Charges -495.1 -434.4 -762.2 -928.9 -1,022.30 -1,022.30 -1,022.30Net Cash From Investment Returns & Finance Servicing -482.3 -429.5 -756.1 -910.5 -1,007.00 -1,008.80 -1,005.60
Provisions for tax
INVESTING ACTIVITIESAcquisition And Construction Of Properties -7,979.40 -15,189.90 -12,203.30 -9,093.90 -6,629.40 -3,559.10 -3,234.00Purchase Of Other Fixed AssetsGrants 3,204.30 7,598.20 6,391.80 2,612.30 1,690.90Sales Of Properties 214.4Sales Of Other Fixed AssetsOther (Purchases) SalesNet Cash From Investment Activities -4,560.70 -7,591.70 -5,811.60 -6,481.50 -4,938.50 -3,559.10 -3,234.00
Net Cash Before Financing -3,950.20 -4,325.80 -2,344.10 -3,013.20 -1,045.00 389.7 1,063.40
FINANCINGEquity DrawdownLoan Draw downs 3,000.00 4,155.70 2,740.00Capital RepaymentsLoan Working Capital MovementsWorking Capital Loan Drawdown 672.1 2,096.50Working Capital Loan Repayment -672.1 -2,096.50Net Cash From Financing 3,000.00 4,155.70 2,740.00
BALANCE BROUGHT FORWARD 7,160.40 3,210.20 1,884.40 3,695.90 3,422.70 2,377.80 2,767.50INCOME LESS PAYMENTS -3,950.20 -1,325.80 1,811.60 -273.2 -1,045.00 389.7 1,063.40CLOSING BANK POSITION 3,210.20 1,884.40 3,695.90 3,422.70 2,377.80 2,767.50 3,830.90
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034£000's £000's £000's £000's £000's £000's £000's £000's £000's £000's
11,326.10 11,843.90 12,226.90 12,793.30 12,886.80 13,444.90 13,877.60 14,521.20 14,627.40 15,261.70-4,267.70 -4,450.50 -4,581.40 -4,741.00 -4,837.80 -4,971.40 -5,108.80 -5,253.70 -5,475.50 -5,545.10-1,820.20 -1,874.80 -1,931.10 -1,989.00 -2,048.70 -2,099.90 -2,152.40 -2,206.20 -2,261.30 -2,317.905,238.20 5,518.50 5,714.40 6,063.30 6,000.30 6,373.60 6,616.40 7,061.20 6,890.50 7,398.70
22.6 6.2 18 28.6 36.5 45 55.9 70 76.3 75.1-1,022.30 -664 -654.8 -654.8 -654.8 -654.8 -655.8 -655.8 -655.8 -596.5
-999.8 -657.8 -636.9 -626.3 -618.3 -609.8 -599.9 -585.9 -579.6 -521.4
-2,958.40 -2,789.50 -2,341.00 -3,854.80 -3,567.20 -4,223.70 -3,367.70 -3,408.10 -6,652.20 -4,683.00
-2,958.40 -2,789.50 -2,341.00 -3,854.80 -3,567.20 -4,223.70 -3,367.70 -3,408.10 -6,652.20 -4,683.00
1,280.00 2,071.20 2,736.60 1,582.20 1,814.90 1,540.20 2,648.80 3,067.20 -341.2 2,194.40
-5,000.00 -2,000.00
250-250
-4,750.00 -250 -2,000.00
3,830.90 360.8 2,182.00 4,918.60 6,500.80 8,315.70 9,855.90 12,504.70 15,571.90 15,230.70-3,470.00 1,821.20 2,736.60 1,582.20 1,814.90 1,540.20 2,648.80 3,067.20 -341.2 194.4
360.8 2,182.00 4,918.60 6,500.80 8,315.70 9,855.90 12,504.70 15,571.90 15,230.70 15,425.10
2035 2036 2037 2038 2039 2040 2041 2042 2043 2044£000's £000's £000's £000's £000's £000's £000's £000's £000's £000's
15,753.30 16,484.70 16,605.40 17,326.20 17,884.90 18,716.00 18,853.20 19,672.20 20,307.10 21,251.70-5,698.90 -5,865.30 -6,019.90 -5,852.50 -5,577.10 -5,722.30 -5,879.40 -6,045.90 -6,277.20 -6,428.70-2,375.80 -2,435.20 -2,496.10 -2,558.50 -2,622.50 -2,688.00 -2,755.20 -2,824.10 -2,894.70 -2,967.107,678.60 8,184.20 8,089.40 8,915.20 9,685.30 10,305.70 10,218.50 10,802.30 11,135.30 11,855.90
72.7 68 49.1 60.6 63.6 68.2 76.5 87.6 84.7 85.3-417.4 -158.1-344.7 -90.1 49.1 60.6 63.6 68.2 76.5 87.6 84.7 85.3
-4,626.00 -5,100.20 -3,859.70 -8,067.00 -9,345.00 -8,724.90 -9,240.60 -7,889.60 -12,696.50 -10,884.50
-4,626.00 -5,100.20 -3,859.70 -8,067.00 -9,345.00 -8,724.90 -9,240.60 -7,889.60 -12,696.50 -10,884.50
2,707.90 2,993.90 4,278.80 908.8 403.9 1,649.00 1,054.50 3,000.30 -1,476.50 1,056.70
-4,000.00 -9,291.30
-4,000.00 -9,291.30
15,425.10 14,133.00 7,835.50 12,114.30 13,023.10 13,427.00 15,076.00 16,130.50 19,130.80 17,654.30-1,292.10 -6,297.50 4,278.80 908.8 403.9 1,649.00 1,054.50 3,000.30 -1,476.50 1,056.7014,133.00 7,835.50 12,114.30 13,023.10 13,427.00 15,076.00 16,130.50 19,130.80 17,654.30 18,711.00
2045 2046 2047 Total£000's £000's £000's £000's
21,407.40 21,348.30 22,037.60 461,315.00-6,604.90 -6,821.60 -6,882.00 -169,893.90-3,041.20 -3,117.30 -3,195.20 -67,992.30
11,761.30 11,409.40 11,960.40 223,428.80
92.1 110.9 129.2 1,570.20-13,132.60
92.1 110.9 129.2 -11,562.40
-9,655.80 -8,275.50 -8,581.70 -202,681.70
21,497.50214.4
-9,655.80 -8,275.50 -8,581.70 -180,969.80
2,197.60 3,244.80 3,507.90 30,896.60
9,895.70-20,291.30
3,018.60-3,018.60
-10,395.70
18,711.00 20,908.60 24,153.40 7,160.402,197.60 3,244.80 3,507.90 20,501.00
20,908.60 24,153.40 27,661.30 27,661.30
Agenda Item 10
BOARD 28 June 2017
BUDGETARY PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2017
Report by Director of Finance & Corporate Services
PURPOSE OF REPORT
1.1 To present a report on the performance against budget for the year ended 31 March 2017 to the Board for approval including an overview of Board Members’ expenses and consultancy spend for the year. The report also presents to the Board for approval any budget carry forward requirements.
SUMMARY
2.1 The report on the performance against budget, including consultancy spend and Board Members’ expenses for the year ended 31 March 2017 has been prepared and is at Appendix 1.
2.2 Proposals for carrying forward underspend from 2016/17 into 2017/18 are at Appendix 2.
COMPETENCE
3.1 The legal, financial or other constraints to any recommendation in this report are contained in Paragraphs 5.1 to 5.4.
RECOMMENDATIONS
4.1 It is recommended that the Board:
a) review the performance against budget for the year ended 31 March 2017 as at Appendix 1;
b) approve the carry forward of £824,492 of slippage into 2017/18 as detailed in Appendix 2;
c) note the Financial Covenant for 2016/17 as detailed in Appendix 3; and
d) approve a recommendation to the AGM that £5,000, or another sum, of the surplus be donated to local charities during 2017/18.
APPENDIX 1 H Budgetary Performance for 2016/17
APPENDIX 2 Carry Forward Slippage 2016/17
APPENDIX 3 Financial Covenant 2016/17
Background Papers Corporate Sponsorship 17 March 2012
Writer of Report Donald Macleod Tel: 0300 123 0773
Page 2 of 2 23/6/17
COMPETENCE
Financial 5.1 The Report deals with how the financial resources of the Partnership have been utilised.
5.2 The borrowing requirements for 2017/18 will need to be reviewed to ensure the carry forward of underspend does not impact materially on the approved annual financing strategy or on the financial covenants set for 2017/18.
Legal 5.3 The following Partnership rules are applicable:
Rule 81.2 – At an Annual General Meeting, members may decide to use profits in the following ways:
Rule 81.2.1 – to set aside an amount recommended by the Board to allow the Partnership to carry out the objects of the Partnership.
Rule 81.2.2 – to give an amount recommended by the Board to charitable voluntary groups which further the objects of the Partnership.
5.4 The following Standing Orders are applicable:
Part 2 a) The decision to approve and amend Budgets, including virements in excess of £50,000, is reserved to the Board.
RISK
6.1 The budgets approved by the Board ensure that the Financial Covenant for the financial year will be achieved. Failure to contain spend within approved budgets could result in the Financial Covenant not being achieved with the corresponding penalties being applied by the Funder which could have a significant impact on the Finances of the Partnership. The Financial Covenant for 2016/17 was a maximum cash flow deficit of £4,824,490. Appendix 3 shows the covenant position at 31 March 2017.
REPORT DETAILS
7.1 A review of performance against budget has been carried out and a high level report is at Appendix 1 together with explanations for material variances from approved budgets. A more detailed analysis is available from the Finance Manager on request.
7.2 Appendix 2 details proposals for carrying forward budgets into 2017/18 totalling £824,492. It is worth noting that this includes previous Board approved carryover of £300K for investment, £80K RHI enhancement to repairs & £110K for unadopted infrastructure.
7.3 In June 2016 the Board approved a recommendation to the Membership of the AGM that £5,000 be donated to 5 local charities. The donations were very much appreciated by the local charities and it is proposed that a similar recommendation be placed before the Membership of the 2017 AGM.
BUDGETARY PERFORMANCE 2016/17 APPENDIX 1
2013/14 2014/15 2015/16 2016/17 2016/17
ACTUAL ACTUAL ACTUAL ACTUAL BUDGET VARIANCE
Line £ £ £ £ £ £ %
1 Net Rental Income (7,674,021) (8,152,319) (8,151,824) (8,282,597) (8,112,640) 169,957 (2.09)
2 Grants (716,031) (705,830) (573,586) (446,387) (818,920) (372,533) 45.49
3 Grant Amortisation 0 0 (1,149,173) (1,209,599) (1,200,000) 9,599 (0.80)
4 Right to Buy (31,980) (8,783) 61,039 127,511 (53,300) (180,811) 339.23
5 Other Income (434,749) (436,371) (3,126,518) (394,210) (365,060) 29,150 (7.99)
6 Interest Received (7,027) (7,899) (11,333) (9,330) (11,000) (1,670) 15.18
7 Total Income (8,863,808) (9,311,203) (12,951,396) (10,214,613) (10,560,920) (346,307) 3.28
8 Employee Costs 1,300,191.30 1,306,601.44 1,364,628.96 1,420,709.56 1,561,960.00 141,250.44 9.04
9 Premises Costs 44,906.01 25,612.12 40,063.94 36,514.04 46,620.00 10,105.96 21.68
10 Supplies and Services 204,533.34 203,686.38 216,530.88 210,407.37 245,760.00 35,352.63 14.39
11 Administration Costs 65,534.96 75,487.18 62,562.38 83,375.56 173,110.00 89,734.44 51.84
12 Corporate Expenses 359,199.74 397,801.16 453,593.95 465,807.98 666,850.00 201,042.02 30.15
13 Total Management Costs 1,974,365.35 2,009,188.28 2,137,380.11 2,216,814.51 2,694,300.00 477,485.49 17.72
14 General Repairs 997,773 1,235,806 1,315,928 1,227,907 1,038,460 (189,447) (18.24)
15 Specific Repairs 33,531 42,235 54,072 57,200 49,535 (7,665) (15.47)
16 Rechargeable Repairs 51,141 12,333 16,950 29,903 38,200 8,297 21.72
17 Insurance Repairs 58,033 93,771 66,560 52,210 55,000 2,790 5.07
18 Non Dwelling Repairs 11,382 14,155 14,347 21,087 30,380 9,293 30.59
19 Total Response Repairs 1,151,859 1,398,300 1,467,858 1,388,307 1,211,575 (176,732) (14.59)
20 Planned Maintenance 585,237 531,550 750,469 622,601 586,990 (35,611) (6.07)
21 Estate Works 23,384 31,648 43,389 33,668 157,470 123,802 78.62
22 Total Planned Maintenance 608,621 563,198 793,858 656,269 744,460 88,191 11.85
23 Investment Programme 3,580,616 3,433,581 3,022,586 4,217,963 5,174,395 956,432 18.48
24 Development Programme 2,477,647 2,319,230 2,757,075 3,168,364 4,948,221 1,779,857 35.97
25 Non Housing Investment 1,194 - 13,257 225 30,000 29,775 99.25
26 Total Capital Investment 6,059,457 5,752,811 5,792,918 7,386,552 10,152,616 2,766,064 27.24
Commentary on Performance
Total Income
Grants Budget includes £440K of HEEPS monies capitalised at Year End.
Right to Buy A large number of properties sold during the year had substantial investment works carried out in
previous years and has resulted in a loss being made on the sale.
Interest Received Lower interest rates post Brexit and a £450 hit coming from a prior year adjustment contributes to
lower interest payments being received this year.
Total Management Costs
Significant costs savings were made in all areas.
Employee Costs Savings in Employee Costs are due to delays in filling vacancies during the year.
Administration Costs The savings come from reduced recruitment costs, community support and slippage in training costs.
Corporate Costs Provision was made in Corporate Costs for legal fees required to provide title security to our Funder.
The cost of the work has been transferred to the Balance Sheet resulting in a saving being shown on
Corporate costs.
In addition Finance Consultants fees (Treasury Mgt, General and Property Consultants, VAT) were significantly
lower than expected.
Total Response Repairs Cost
Overspend in Total Response Repairs Cost was mainly due to overspend in Responsive and Void Repairs.
Responsive Repairs were broadly within budget during the summer months but increased over the winter during the more
inclement weather.
Void Repairs have been under pressure due to a large number of voids since the beginning of the Financial Year coupled with
the decision to vacate Cnoc Mor and Dun Berisay.
Total Response & Planned Repairs Costs
Final out-turn shows an overspend of £195K which has accumulated through the year. The repairs budget for 2017/18 has been uplifted
by £80K (RHI Income) and spend will be continually monitored through 2017/18.
Total Capital Investment
Due to the nature of capital investment it is inevitable there will be slippage and acceleration occurring throughout the financial
year. It is proposed to carry forward budgets where projects were not completed by 31 March 2017 and to accept savings on
projects where works were accelerated.
BUDGETARY PERFORMANCE 2016/17 APPENDIX 1
Commentary on Net Rental Income
Commentary on Grant Income
Commentary on Right to Buy
Commentary on Employee Costs
Commentary on Management Costs
Net Rental Income exceeded budget by 2.1%. This was due mainly to the following:
a) The voids performance being better than budget; and
b) The number of bad debts written off was less than expected.
Grant income has reduced year on year as a result of the deficit funding Grant from
the Scottish Government coming to an end in 2015/16.
The partnership continue to be active in its utilisation of stage 3 adaptation grants
and HEEPs.
The level of RTBs for 2016/17 continued to be high as the scheme ended 31st July
2016.
However, the total RTB income shows a loss as a number of properties had a high
discount and a significant level of investment expenditure which has resulted in a
loss on sale of the asset.
Employee costs were under budget by £141K which is made up of
Salaries £84.1k Savings are mainly due to a delay in
filling vacant posts.
Pensions & NI £30.4k
Travel & Sub £19.0k Level of travel was less than
expected.
Average employee cost has risen from £32.4k to £34.9k.
Management costs are £477k under budget due to slippage and savings.
Premises £10k Due to maintenance and energy cost
Administration £90k Mainly due to
Recruitment £20k
Training £34k
Community Support £20k
Consultants £74k Reduced financial consultancy
£52k variance is corporate legal costs driven by capitalised securities work.
7.2
7.4
7.6
7.8
8.0
8.2
8.4
2013 2014 2015 2016
(£)
Mill
ion
s
Net Rental Income
0
200
400
600
800
2013 2014 2015 2016
(£)
Tho
usa
nd
s
Grant Income
140
100
60
20
20
60
2013 2014 2015 2016
(£)
Tho
usa
nd
s
Right to Buy
0.000.200.400.600.801.001.201.401.60
2013 2014 2015 2016
(£)
Mill
ion
s
Employee costs
0
100
200
300
400
500
600
700
800
900
2013 2014 2015 2016
(£)
Tho
usa
nd
s
Management Costs
Corporate Costs Supplies & Svcs Costs Admin Costs Premises Costs
APPENDIX 1
IF Page 1 of 3 23/6/17
BOARD MEMBERS EXPENSES 2016/17
1.1 Expenses are claimed at the end of every calendar month using the approved Claim Form with all necessary receipts attached.
1.2 All Claim Forms are checked and approved for payment by the Chief Executive and payment made within 10 working days.
1.3 T details the areas of expenditure incurred during the year against budget.
1.4 On analysing the data, there has been an overall underspend of 36% on the total budget allocated to Board Members.
1.5 Reasons for the underspend have been ascribed to:
a. members on the Board who are already up in Stornoway on other business, either only claiming part or none of their expenses from HHP;
b. the increased use of Skype for Board Members in the Southern Isles to attend training and meetings remotely;
c. inability to attend Board Meetings for personal reasons;
Target Attendance 85%
Actual for 2016/17 70%
Actual for2015/16 68%
Actual for 2014/15 68%
d. inability to attend Board Training for personal reasons; and
e. training events coinciding with Board Meeting dates, and Board Members attending training events already arranged for staff.
Target Attendance 85%
Actual for 2015/16 73%
Actual for 2015/16 54%
Actual for 2014/15 44%
APPENDIX 1
IF Page 2 of 3 23/6/17
1.6 From the chart below we can see the majority of expenditure is incurred in Island Subsistence and Island Travel. This is to be expected.
CHART FOR BOARD MEMBERS’ EXPENSES
Conference Fees20%
Mainland Travel & Subsistence
13%
Island Travel32%
Island Subsistence32%
Board Training3%
Budget Spend
APPENDIX 1
IF Page 3 of 3 23/6/17
Conference
Fees
Mainland
Travel
Mainland
Subsistence
Island
Travel
Island
Subsistence
Board
Training Total
David Blaney 860.00£ 325.10£ 137.29£ 803.80£ 1,046.95£ -£ 3,173.14£
Iain Macmillan 252.00£ 297.48£ 6.85£ -£ -£ -£ 556.33£
Mairi Bremner 550.00£ 278.50£ 96.00£ 988.40£ 1,165.35£ -£ 3,078.25£
Daniel Coyle -£ -£ -£ 85.50£ 153.35£ -£ 238.85£
Jane MacKinnon -£ -£ -£ 794.08£ 218.55£ -£ 1,012.63£
Alasdair Mackenzie -£ -£ -£ 22.95£ -£ -£ 22.95£
Board Catering -£ -£ -£ -£ 120.00£ -£ 120.00£
Board Training -£ -£ -£ -£ - 238.25£ 238.25£
Totals 1,662.00£ 901.08£ 240.14£ 2,694.73£ 2,704.20£ 238.25£ 8,440.40£
£23,240.00
36%Board & Area Committee Members Budget Allowance Underspend
Board & Area Committee Members Expenses 2016/17
Budget Allocation for 2016/17
Appendix 3
Annual Cashflow Deficit - March 17
Line Detail £
Income £
1 Dwelling rents (net) 8,295,341
2 Non Dwelling rents (net) 13,228
3 Right to Buy Sales 1,431,620
4 Grant Funding 446,387
5 Other Income 24,633
6 Grant received for New Build 1,624,351
7 Sale of LIFT received -
8 Grant on LIFT received 719,752
9 Insurance Receipts -
10 Total Income 12,555,314
Expenditure
13 Supervision & Management 1,960,372
14 Response Repairs 1,388,307
15 Estate Works 33,668
16 Planned/Cyclical Maintenance 954,319
17 Investment Programme 3,900,126
18 Office Alterations and IT 2,981
19 LIFT Costs 1,091,071
20 Opening Balances -
21 Development Costs 3,168,364
22 Total Expenditure 12,499,207
23 Net Operating Cashflow 56,107
24 Interest Paid 354,611
25 Interest Collected (9,568)
26 Security Fees Capitalised 84,356
27 Total Interest 429,399
28 Annual Cashflow Surplus/(Deficit) 373,292-
Interest Ratio 765%
Covenant Requirement
Maximum Annual Cashflow deficit (4,824,490)
Tolerance 4,451,198
-92%
Jackie Macleod Page 1 of 2 23/6/17
BOARD 28 June 2017
MANAGEMENT REPORT TO 31 MAY 2017
Report by Director of Finance & Corporate Services
PURPOSE OF REPORT
1.1 To present a Management report for the month ended 31 May 2017 for the Board to review.
SUMMARY
2.1 This is the Management report to 31 May 2017 and the information is presented in compliance with regulations and to provide Board Members with assurance that expenditure is within approved budgets and income collected is on target. A copy of the report is at Appendix 1.
2.2 Details of all material variances are contained in the report at Appendix 1.
COMPETENCE
3.1 The legal, financial or other constraints to any recommendation in this report are contained in Paragraphs 5.1 to 6.1.
RECOMMENDATIONS
4.1 It is recommended that the Board notes the management information at 31 May 2017 as detailed in Appendix 1.
COMPETENCE
APPENDIX 1 H Management Report to 31 May 2017
Background Papers None
Writer of Report Katia Petteloot Tel: 0300 123 0773
Agenda Item 11
Jackie Macleod Page 2 of 2 23/6/17
Financial 5.1 The Board approved budgets for 2017/18 in February 2017 which projected a surplus for
the year of £1,911,630.The Revised Budget figure is £2,037,630.
Legal 5.2 There are no legal matters arising from the consideration of this report. 5.3 HHP’s Financial Regulations require that this report complies with statutory
requirements, accounting standards and appropriate codes of practice.
RISK
6.1 The key risk is that HHP does not meet its Financial Covenants on an ongoing basis. The covenant for 2017/18 has been reset at an annual cashflow deficit of £1,513,380.
Hebridean Housing Partnership Registered Scottish Charity SCO 35767
2017/18
Management Reports To 31 May 2017
APPENDIX 1
Hebridean Housing Partnership Management Reports
2
Introduction The Management Reports for 31 May 2017 are attached and if Board Members or Managers
have any areas of concern or would like additional information they should contact the
Finance and Business Services Manager or the Director of Finance & Corporate Services.
The Management Reports are made up of three sections:
Section 1:High Level Summary
• Written by the Director of Finance & Corporate Services. This section shows in graphical format how HHP is performing in relation to the annual budget for 2017/18.
Section 2:Management Accounts
• Prepared by the Finance and Business Services Manager. Provides an Income & Expenditure Account, Balance Sheet and detailed operational budgets for the period. The Management Acounts include a more detailed commentary from Budget Managers on performance.
Section 3:Key Financial Performance Measures
• Prepared by the Finance and Business Services Manager including a review of Financial Covenants to provide the Board with assurance that the Covenant for 2017/18 will not be breached.
Hebridean Housing Partnership Management Reports
3
Section 1-High Level Summary
Commentary on Performance by Director of Finance & Corporate
Services
The forecast out-turn is exceeding the revised budget as Grant Income is now confirmed
by Scottish Government to £126K higher than budget. RTB sales continue to drive a loss,
partially offset with better rental/voids performance.
Repairs & Maintenance are currently running over budget (£63K), mainly due to planned
maintenance. This has been reviewed and is driven by budget profiling with the full year
outturn on budget.
Repairs & Maintenance-based: overspend of £2K for Responsive Repairs and £13K
for Void Repairs for the year. This is partly offset by the YTD (Year to Date)
underspend in Handymen costs of £11K;
£
Initial approved Surplus 1,911,630
Slippage Carried Forward from 2016/17 -
Virement/Adjustment -
Revised Surplus 1,911,630
Changes identified this financial year
Additional Income 126,000
Cost (increases)/decreases -
Depreciation -
Grant Amortisation -
Forecast Surplus to 31 March 2018 2,037,630
Increase in funds required to meet forecast out-turn (126,000)
Hebridean Housing Partnership Management Reports
4
Cashflow continues to be healthy due to the Right to Buy receipts received YTD. Cash has
been placed on higher interest deposit accounts in accordance with Financial Regulations.
Right to buy ceased on 31st July 2016. There currently are 15 applications outstanding
with 1 application awaiting an offer being made.
The financial covenant for 2017/18 has yet to be formally approved by our Funders.
Schedule 5 Part A “Annual Cash Flow Deficit Cover” currently represents the Financial
Covenant Levels as per the Funders’ letter dated 11 November 2016. This will be updated
once we have formal approval of the 2017/18 covenants from our funders.
0 20 40 60 80 100 120
Rental Income
Grants Income
Other Income
Income
Above Below On Target
0 20 40 60 80 100 120
Interest
Management Costs
Repairs & Maintenance
Investment
Development
Expenditure
Above Below On Target
Hebridean Housing Partnership Management Reports
5
Section 2 Management Accounts
Page
Summary Income & Expenditure Account 6
Balance Sheet at 31 May 2017 7
Rental Income 8
Supervision & Management Costs 9
Repairs & Maintenance 10
Estate Works 11
Aids & Adaptations 12
Investment 13
Non-Housing Investment 14
Development 15
Hebridean Housing Partnership Management Reports
6
Income & Expenditure Account
For the period ended 31 May 2017
Commentary on Performance
The main points to note are
Line 6 Total Income The forecast out-turn is exceeding the revised budget as Grant Income has been confirmed by Scottish Government at £126K higher than budget. RTB sales continue to drive a loss, partially offset with better rental/voids performance.
Line 11 Total Operating expenditure Void repair and Planned Maintenance are two areas that currently
run over YTD budget by £80k. This is partly offset by a saving in Supervision & Management of £58k. The current repairs overspend YTD is driven by budget profiling and its expected that spend for the full year will be within budget.
Line 12 Operating Surplus The operating surplus is currently 12% ahead of budget largely due to higher
than expected rental income and high number of RTB sales in the first 2 months of the current Financial Year.
Line 21 Development Included in total budget are £816k sales proceeds and £889k HAG on the LIFT programme. More detailed explanations of variances can be found on pages 8 to 14
Line BUDGET ACTUAL
Initial Revised to Spend to Budget Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 to date date Budget Budget (under) 31/03/2017=8
£ £ £ £ £ % £ % £ £
1 Dwelling rents (net) 8,214,570 8,214,570 1,369,280 1,452,346 (83,066) -6% 6,762,224 82.32% 8,214,570
2 Non Dwelling rents (net) 13,200 13,200 1,760 6,063 (4,303) -244% 7,137 54.07% 13,200
3 Right to Buy Sales (102,480) (102,480) (17,060) (97,339) 80,279 -471% (5,141) 5.02% (102,480)
4 Grant Funding 120,000 120,000 120,000 24,514 95,486 80% 95,486 79.57% 126,000 246,000
5 Other Income 44,450 44,450 10,780 9,642 1,138 11% 34,808 78.31% 44,450
6 TOTAL INCOME 8,289,740 8,289,740 1,484,760 1,395,225 89,535 6% 6,894,515 83.17% 126,000 8,415,740
7 Supervision & Management 2,351,970 2,351,970 419,520 361,226 58,294 14% 1,990,744 84.64% - 2,351,970
8 Response Repairs 1,231,510 1,231,510 188,610 185,983 2,628 1% 1,045,528 84.90% - 1,231,510
9 Estate Works 175,570 175,570 6,730 21,615 (14,885) -221% 153,955 87.69% - 175,570
10 Planned/Cyclical Maintenance 645,710 645,710 68,130 121,732 (53,602) -79% 523,978 81.15% 645,710
11 Total Operating Expenditure 4,404,760 4,404,760 682,990 690,555 (7,565) -1% 3,714,205 84.32% - 4,404,760
12 Operating Surplus/(Deficit) 3,884,980 3,884,980 801,770 704,671 97,099 12% 3,180,309 81.86% 126,000 4,010,980
13 Interest received 5,000 5,000 500 227 273 55% 4,773 95.46% 5,000
14 Interest paid 457,650 457,650 68,780 43,638 25,142 37% 414,012 90.46% 457,650
15 Surplus/(Deficit) 3,432,330 3,432,330 733,490 661,259 72,231 10% 2,771,071 80.73% 126,000 3,558,330
16 Depreciation 2,720,700 2,720,700 253,400 430,717 (177,317) -70% 2,289,983 84.17% 2,720,700
17 Grant Amortisation (1,200,000) (1,200,000) - (200,576) 200,576 (999,424) 83.29% (1,200,000)
18 Surplus/(Deficit) 1,911,630 1,911,630 480,090 431,118 48,972 10% 1,480,512 77.45% 126,000 2,037,630
CAPITAL INVESTMENT
19 Housing Investment Programme 4,227,230 4,227,230 541,990 68,650 473,340 87% 4,158,580 98.38% 126,000 4,353,230
20 Non Housing Investment 30,000 30,000 - 197 (197) 29,803 99.34% - 30,000
21 Development Programme 1,152,340 1,242,020 (558,010) 566,566 (1,124,576) 202% 675,454 54.38% - 1,242,020
5,409,570 5,499,250 (16,020) 635,413 (651,433) 4066% 4,863,837 88.45% 126,000 5,625,250
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
7
Balance Sheet at 31 May 2017
Commentary on Performance Note 1 Fixed Assets Fixed Assets are shown at gross cost and are reduced by the depreciation charge
for the period. Note 2 Development The value of work in progress on current properties and new developments.
& Investment Note 3 Trade Debtors Reduction in Sundry debtors & the removal of the accrued benefit income
accrual driving the majority of the reduction in Trade Debtors since Mar’17. Sundry debtors consisted of grant claims for HEEPS at Year End to be settled in Q1 of current Financial Year.
More detailed information is available in the Performance Report. Note 4 Cash Delays in development and investment works commencing as well as the
increased RTB sales have contributed to the increase in cash balances.
31 May 2017 31 March 2017
£ £
Notes
Fixed Assets
1 Tangible assets-social housing 1 72,939,788 73,557,295
2 Development & Investment Programme 2 635,413 -
3 Tangible assets - property, plant and equipment 845,415 845,418
4 Landbank 683,060 683,060
5 Investments 2 2
75,103,678 75,085,775
Current Assets
6 Stock 388,883 388,883
7 Trade and other debtors due within one year 3 181,153 1,209,913
8 Debtors due after more than one year 212,831 212,831
9 Short-term deposits 4,516,324 4,506,629
10 Cash at bank and in hand 4 3,401,698 2,724,142
13 Loan to subsiduary -
8,700,889 9,042,398
11 Creditors: amounts falling due within one year 5 (918,715) (2,491,833)
Net current assets 7,782,175 6,550,565
Total assets less current liabilities 82,885,852 81,636,340
12 Creditors: amounts falling due after more than one
year 6 (11,604,345) (10,583,000)
13 Deferred capital grants 7 (41,484,908) (41,687,852)
14 Pension Liability (3,238,000) (3,238,000)
15 Net Assets 26,558,600 26,127,488
Capital and Reserves
16 Share Capital 197 197
17 Revenue Reserve 26,558,403 26,127,291
26,558,600 26,127,488
Hebridean Housing Partnership Management Reports
8
Rental Income
For the period ended 31 May 2017
Commentary on Performance Line 6 Total Income Rental income came in ahead of target and the voids performance is
also better than forecasted, resulting in net income for the year being above budget .
Line BUDGET ACTUAL
Initial Revised to Spend to Budget Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 to date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 Dwelling Rent Gross 8,549,350 8,549,350 1,424,900 1,473,240 (48,340) -3% 7,076,110 82.77% (89) 8,549,261
2 Non Dwelling Rent Gross 14,520 14,520 2,420 6,759 (4,339) -179% 7,761 53.45% 63 14,583
3 Voids - Dwelling (166,680) (166,680) (27,600) (20,152) (7,448) 27% (146,528) 87.91% 76,014 (90,666)
4 Voids - Other (1,320) (1,320) (660) (696) 36 -5% (624) 47.28% 416 (904)
5 Bad Debts (168,100) (168,100) (28,020) (741) (27,279) 97% (167,359) 99.56% 74,472 (93,628)
6 TOTAL 8,227,770 8,227,770 1,371,040 1,458,410 (87,370) -6% 6,769,360 82.27% 150,876 8,378,646
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
9
Supervision & Management Costs
For the period ended 31 May 2017
Commentary on performance Line 6 Employee Costs Savings are due the delay in implementing the annual salary increase
and short delays in filling vacant posts, specifically within the Finance, Housing Services and Customer Services teams.
Line Heading BUDGET Actual
Initial Revised to Spend to Budget Budget Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 to date to date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 Salaries and Wages 1,161,020 1,161,020 196,760 177,962 18,798 10% 983,058 85% 1,161,020
2 National Insurance 113,380 113,380 18,960 17,069 1,891 10% 96,311 85% 113,380
3 Pension Costs 215,370 215,370 36,000 33,714 2,286 6% 181,656 84% 215,370
4 Other Employee Costs 42,860 42,860 6,140 2,270 3,870 63% 40,590 95% 42,860
5 Travel & Subsistence 33,700 33,700 3,240 3,599 (359) -11% 30,101 89% 33,700
6 EMPLOYEE COSTS 1,566,330 1,566,330 261,100 234,615 26,485 10% 1,331,715 85% - 1,566,330
7 Premises Costs 44,900 44,900 5,140 1,078 4,062 9% 43,822 98% 44,900
8 IT & Telecoms 209,490 209,490 26,680 26,862 (182) 0% 182,628 87% 209,490
9 Area Offices 25,200 25,200 4,200 - 4,200 17% 25,200 100% 25,200
10 Payroll & Cashdesk 14,200 14,200 3,700 1,445 2,255 16% 12,755 90% 14,200
11 External Finance Services 4,010 4,010 - 4,010 (4,010) -100% - 0% 4,010
12 SUPPLIES & SERVICES 297,800 297,800 39,720 33,394 6,326 16% 264,406 89% - 297,800
13 Postage, Printing & Stationery 44,700 44,700 8,140 2,700 5,440 67% 42,000 94% 44,700
14 Admin Furniture & Equipment 3,000 3,000 520 54 466 90% 2,946 98% 3,000
15 Training Courses 55,450 55,450 5,960 5,331 629 11% 50,119 90% 55,450
16 Community Support 34,310 34,310 - 1,938 (1,938) 32,372 94% 34,310
17 Health & Safety 9,250 9,250 1,240 606 634 51% 8,644 93% 9,250
18 Recruitment Costs 20,500 20,500 3,420 60 3,360 98% 20,440 100% 20,500
19 ADMINISTRATION COSTS 167,210 167,210 19,280 10,689 8,591 45% 156,521 94% - 167,210
20 Professional Fees 355,860 355,860 48,180 33,898 14,282 30% 321,962 90% 355,860
21 Insurance 221,350 221,350 38,580 42,543 (3,963) -10% 178,808 81% 221,350
22 Affliation Fees 29,650 29,650 4,940 5,526 (586) -12% 24,124 81% 29,650
23 Charitable Donations 5,000 5,000 - - - 5,000 100% 5,000
24 Governance 41,600 41,600 4,620 138 4,482 97% 41,462 100% 41,600
25 Bank Charges 9,500 9,500 1,600 - 1,600 100% 9,500 100% 9,500
26 Public Relations/Marketing 15,080 15,080 2,500 423 2,077 83% 14,657 97% 15,080
27 CORPORATE EXPENSES 678,040 678,040 100,420 82,528 17,892 18% 595,512 88% - 678,040
28 Fees charged to capital (348,410) (348,410) - - - (348,410) 100% (348,410)
29 VAT Received - Partial Exemption (9,000) (9,000) (1,000) - (1,000) 100% (9,000) 100% (9,000)
31 RECHARGES (357,410) (357,410) (1,000) - (1,000) 100% (357,410) 100% - (357,410)
32
TOTAL SUPERVISION AND
MANAGEMENT COST 2,351,970 2,351,970 419,520 361,226 58,294 14% 1,990,744 85% - 2,351,970
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET VARIANCE forecast out-turn
Hebridean Housing Partnership Management Reports
10
Repairs & Maintenance
For the period ended 31 May 2017
Commentary on performance Line 29 Total Repairs The overall forecast out-turn position shows two budget areas different
to the approved YTD budget but running within full year budget:
Repairs & Maintenance: overspend of £2K for Responsive Repairs and £13K for Void Repairs for
the year. This is partly offset by the YTD underspend in Handymen costs of £11K.
Planned Maintenance comes in at £63K over YTD budget, driven by budget profiling with the
forecast out-turn on budget.
Void repairs are are above budget YTD but this is offset with savings on void loss income.
Line Heading CURRENT YEAR BUDGET BUDGET ACTUAL
Initial Revised to Spend to Budget to Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 Responsive Repairs 756,205 756,205 116,820 118,961 (2,141) -2% 637,244 84% 756,205
2 Void Repairs 180,250 180,250 22,900 35,598 (12,698) -55% 144,652 80% 180,250
3 Handymen 121,950 121,950 20,930 9,508 11,422 55% 112,442 92% 121,950
4 GENERAL REPAIRS 1,058,405 1,058,405 160,650 164,068 (3,418) -2% 894,337 84% - 1,058,405
5 Decoration Allowance 46,530 46,530 12,170 5,740 6,430 53% 40,790 88% 46,530
6 Furnished Units - - - - - - 0
6 Council Tax empty properties 9,800 9,800 1,600 588 1,012 63% 9,212 94% 9,800
7 Minor Aids & Adaptations 500 500 - - - 500 500
8 Compensation 10,195 10,195 1,500 552 948 63% 9,643 95% 10,195
9 SPECIFIC ITEMS 67,025 67,025 15,270 6,880 8,390 55% 60,145 90% - 67,025
10 Rechargeable Repairs 48,900 48,900 8,880 14,113 (5,233) -59% 34,787 71% 48,900
11 Rechargeable Repairs Recoverable (10,700) (10,700) - (9,076) 9,076 (1,624) 15% (10,700)
12 Insurance Repairs 55,000 55,000 3,200 60,849 (57,649) -1802% (5,849) -11% 55,000 110,000
13 Insurance Claims Recoverable (17,500) (17,500) - (55,000) 55,000 37,500 -214% (55,000) (72,500)
14 RECOVERABLE EXPENDITURE 75,700 75,700 12,080 10,886 1,194 10% 64,814 86% - 75,700
15 Commercial Properties 1,200 1,200 200 - 200 100% 1,200 100% 1,200
16 Communal Lighting 29,180 29,180 410 4,149 (3,739) -912% 25,031 86% 29,180
17 NON DWELLING REPAIRS 30,380 30,380 610 4,149 (3,539) -580% 26,231 - 30,380
18 Planned maintenance 506,800 506,800 48,050 110,857 (62,807) -131% 395,943 78% 506,800
19 Gas Servicing 60,000 60,000 10,000 8,813 1,187 12% 51,187 85% 60,000
20 Estate Management 14,320 14,320 1,860 800 1,060 57% 13,520 94% 14,320
21 Heating Servicing 44,360 44,360 7,270 500 6,770 93% 43,860 99% 44,360
22 Stair Lifts and Door Entry Systems 2,080 2,080 950 762 188 20% 1,318 63% 2,080
23 Gutter Cleaning 9,300 9,300 - - - 9,300 100% 9,300
24 Sewage Pumps - - - - - - 0
25 Energy Costs - - - - - - 0
26 Dun Berisay Heat 8,150 8,150 - - - 8,150 8,150
27 CYCLICAL MAINTENANCE 645,710 645,710 68,130 121,732 (53,602) -79% 523,978 81% - 645,710
28 TOTAL REPAIRS & MAINTENANCE 1,877,220 1,877,220 256,740 307,714 (50,974) -20% 1,569,506 84% - 1,877,220
BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
11
Estate Works
For the period ended 31 May 2017
Commentary on Performance Line 4 Total Estate Works Discussions have taken place with Scottish Water to find a solution for
the adoption of sewage systems. However, it appears there are a number which will not be adopted and therefore works will have to proceed by HHP to take these tanks up to a satisfactory specification. A brief is being prepared in order to allow tendering to engineers to prepare these specifications.
Drainage works on Scott Road in Tarbert are currently on hold as
consent is needed from all home owners before work can commence.
Line Heading BUDGET ACTUAL
Initial Revised to Spend to Budget to Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 Garage Repairs 3,110 3,110 500 - 500 100% 3,110 100% 3,110
2 Unadopted Infrastructure 129,510 129,510 3,260 1,347 1,913 59% 128,163 99% 129,510
3 Grounds Maintenance 42,950 42,950 2,970 20,268 (17,298) -582% 22,682 53% 42,950
4 TOTAL ESTATE WORKS 175,570 175,570 6,730 21,615 (14,885) -221% 153,955 88% - 175,570
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
12
Aids & Adaptations
For the period ended 31 May 2017
Line Heading BUDGET ACTUAL
Initial Revised to Spend to Budget to Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
Revenue Repairs
1 Minor Aids & Adapations 500 500 - - 500 100% 500
Investment Programme
2 Aids & Adapations 120,000 120,000 120,000 48,308 71,692 40% 71,692 60% 126,000 246,000
Grants
3 Received (120,000) (120,000) (120,000) - (120,000) 0% (120,000) 100% (126,000) (246,000)
4 TOTAL AIDS & ADAPTATIONS - 500 - 48,308 (48,308) (47,808) -9562% - 500
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
13
Investment Expenditure
For the period ended 31 May 2017
Commentary on Performance Line 20 Unallocated Expenditure A combination of slippage and savings has been set aside for
2017/18 investments and is reflected within the revised budgets. Line 22 Spend to Date The overall underspend of £473K is driven by budget profiling. Works
are due to complete at the end of July/ August. Over/(Under) As contracts are awarded amendments are made to the original
budget to reflect actual cost per unit. This column shows the areas where there are savings and cost overruns. The unallocated expenditure budget fully offset forecast overrun in other areas.
Out-turn The overall programme is within budget.
Line Heading BUDGET ACTUAL
Initial Revised to Spend to Budget to Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 Roofs 77,000 77,000 - - - 77,000 100% 3,300 80,300
2 Insulation 161,880 161,880 - - - 161,880 100% 161,880
3 Roofs 238,880 238,880 - - - 238,880 100% 3,300 242,180
4 Kitchen 536,250 536,250 62,070 - 62,070 100% 536,250 100% 14,520 550,770
5 Bathrooms 61,200 61,200 30,600 - 30,600 100% 61,200 100% 8,250 69,450
6 OT Aids & Adaptations 120,000 120,000 24,000 48,308 (24,308) -101% 71,692 60% 126,000 246,000
7 Showers 44,400 44,400 22,200 - 22,200 100% 44,400 100% 1,650 46,050
8 Heating 1,848,180 1,848,180 239,280 4,532 234,748 98% 1,843,648 100% 58,850 1,907,030
9 Rewiring - - - - - - -
10 Smoke/C02 Detectors 116,000 116,000 40,780 - 40,780 100% 116,000 100% 116,000
11 Internals 2,726,030 2,726,030 418,930 52,840 366,090 87% 2,673,190 98% 209,270 2,935,300
12 Windows 257,990 257,990 - 3,050 (3,050) 254,940 99% 257,990
13 Windows & Doors 257,990 257,990 - 3,050 (3,050) 254,940 99% - 257,990
14 Roughcast house & wall 32,760 32,760 - - - 32,760 100% 32,760
16 Fencing 233,260 233,260 - 12,760 (12,760) 220,500 95% 233,260
17 Drainage/Sewers - - - - - - -
18 Structure - - - - - - 100% -
19 Other - - -
20 Unallocated Expenditure 738,310 738,310 123,060 123,060 100% 738,310 100% (86,570) 651,740
21 Efficiency Savings - - - - - -
22 Externals 1,004,330 1,004,330 123,060 12,760 110,300 90% 991,570 99% (86,570) 917,760
23 Total Investment 4,227,230 4,227,230 541,990 68,650 473,340 87% 4,158,580 98% 126,000 4,353,230
FORECAST OUT-TURNCURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING
Hebridean Housing Partnership Management Reports
14
Non Housing Investment
For the period ended 31 May 2017
Line Heading BUDGET ACTUAL
Initial Revised to Spend to Budget to Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 Total Uist Office - -
-
2 Furniture & Fittings 197 (197) (197) 197 197
3 Office Equipment 30,000 30,000 - - - 30,000 (197) 29,803
4 Total Stornoway Office -
5 Total 30,000 30,000 - 197 (197) 29,803 - 30,000
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
15
Development Expenditure
For the period ended 31 May 2017
Commentary on Performance Line 8 LIFT £816k sales proceeds and £889k HAG are forecasted for Financial Year
2017/18. Overall Spend to Date The purchase of the former Police Station building in Tarbert was
completed on the 18th of April. Contract completions Melbost 3 stage 3 and Melbost 4 works began on site in March’17.
Mackenzie Lane was handed over in May’17.
Line BUDGET ACTUAL
Initial Revised Budget to Spend to Budget to Budget to Revised Revised Over/ at
Budget Budget 31-May-17 31-May-17 date date Budget Budget (under) 31-Mar-18
£ £ £ £ £ % £ % £ £
1 New Build 5,919,860 5,919,860 354,220 558,739 (204,519) -58% 5,361,121 91% 5,919,860
2 Retentions 13,000 13,000 13,000 - 13,000 100% 13,000 100% 13,000
2 LIFT 1,216,430 1,306,110 249,920 265,757 (15,837) -6% 1,040,353 80% 1,306,110
3 Total Development Costs 7,149,290 7,238,970 617,140 824,496 (207,356) -34% 6,414,474 89% - 7,238,970
Housing Association Grant
4 New Build (4,291,800) (4,291,800) (349,690) (196,974) (152,716) 44% (4,094,826) 95% (4,291,800)
7 Retentions - - - - - - -
5 LIFT (1,705,150) (1,705,150) (825,460) (60,956) (764,504) 93% (1,644,194) 96% (1,705,150)
6 Total Grants (5,996,950) (5,996,950) (1,175,150) (257,930) (917,220) 78% (5,739,020) 96% - (5,996,950)
Private Finance required
7 New Build 1,628,060 1,628,060 4,530 361,765 (357,235) -7886% 1,266,295 78% - 1,628,060
Retentions 13,000 13,000 13,000 - 13,000 100% 13,000 100% - 13,000
8 LIFT (488,720) (399,040) (575,540) 204,801 (780,341) 136% (603,841) 151% (399,040)
9 Private Finance required 1,152,340 1,242,020 (558,010) 566,566 (1,124,576) 202% 675,454 54% - 1,242,020
CURRENT YEAR BUDGET BUDGET VARIANCE BUDGET REMAINING FORECAST OUT-TURN
Hebridean Housing Partnership Management Reports
16
Section 3: Key Financial Performance Measures
Page
Financial Covenants 17
Key Ratios 19
Right to Buy 20
Cash flow Forecast 21
Hebridean Housing Partnership Management Reports
17
Financial Covenants
For the period ended 31 May 2017
The revised facility agreement with our Funders has one Financial Covenant, Interest
Cover. Where a deficit is projected in any financial year, the covenant is based on an
absolute sum rather than a percentage, so the covenant for 2017/18 is a maximum cash
flow deficit of £1,513,380. This new covenant figure has been agreed with our funders,
and will be confirmed in the next months. The covenant will be met in March 2018.
Interest Cover
Covenants for 2017/18 Deficit (£1,513,380)
Forecast to 31 March 2018 (£689,955)
Tolerance available £823,425
Reduction in expenditure required to achieve covenant £0
Hebridean Housing Partnership Management Reports
18
Annual Cash flow Deficit
Line Detail Current Position Forecast
Income £ £
1 Dwelling rents (net) 1,452,346 8,214,570
2 Non Dwelling rents (net) 6,063 13,200
3 Right to Buy Sales 445,200 1,242,985
4 Grant Funding 24,514 246,000
5 Other Income 9,642 44,450
6 Grant received for New Build 196,974 4,291,800
7 Sale of LIFT received - -
8 Grant on LIFT received 60,956 1,705,150
9 Insurance Receipts - 17,500
10 Total Income 2,195,694 15,775,655
Expenditure
13 Supervision & Management 361,226 2,700,380
14 Response Repairs 185,983 1,231,510
15 Estate Works 21,615 175,570
16 Planned/Cyclical Maintenance 121,732 645,710
17 Investment Programme 68,650 4,004,820
18 Office Alterations and IT 197 29,000
19 LIFT Costs 265,757 1,306,110
20 Opening Balances
21 Development Costs 558,739 5,919,860
22 Total Expenditure 1,583,898 16,012,960
23 Net Operating Cashflow 611,797 (237,305)
24 Interest Paid 43,638 457,650
25 Interest Collected (227) (5,000)
26 Total Interest 43,411 452,650
27 Annual Cashflow Surplus/(Deficit) 568,386 (689,955)
Interest Ratio 7% -191%
Covenant Requirement
Maximum Annual Cashflow deficit (1,513,380) (1,513,380)
Tolerance 2,081,766 823,425
-138% -54%
Hebridean Housing Partnership Management Reports
19
Financial Ratios
For the period ended 31 May 2017
Key RatiosCurrent Forecast 2016/17
Current Ratio 9.24 9.24 6.14
(Current Assets/Current Liabilities)
Net Debt Per Unit
Borrowing/ stock units £2,279.98 £2,279.98 £2,314.89
Voids% 1.41% 1.96% 0.80%
Voids as % of Rental Income Due
Bad Debts % 0.05% 1.96% 0.80%
Bad Debts written off as % of Rental Income Due
Staff Cost/Turnover % 16.82% 18.89% 12.08%
Gross Surplus 50.51% 46.86% 24.28%
Operating Surplus/Turnover
Net Surplus 30.90% 23.06% 28.48%
Net Surplus/Turnover
Hebridean Housing Partnership Management Reports
20
Right to Buy
For the period ended 31 May 2017
With the Right to Buy ending in 2016 the number of sales has been increasing. The average
receipts per month are forecast over 12 months however it is likely that receipts will
cease in a shorter time period. As this period becomes clearer the figures will be adjusted
accordingly.
The level of receipts is above forecast and the loss on sale of the assets is currently within
overall budget but is higher than budget YTD. Although sales are higher than estimated
high discounts have resulted in a loss YTD.
Right to buy receipts impact on the cash flow and therefore the covenants, so the critical
measure is the level of receipts rather than the profit or loss made on sale.
Right to Buy receipts £
Forecast for 2017/18 1,242,985
Average per month 103,582
Budgeted to 31 May 2017 207,164
Actual to May 2017 445,200
Less HAG to be repaid to Scottish
Government
0
Net Receipts 445,200
Receipts exceeding forecast 238,036
RIGHT TO BUY
Full Year Full Year Full Year to May
2015/2016 2015/2016 2016/2017 2017/2018
Number of applications received 54 63 79 n/a
Full Year Full Year Full Year to May
2015/2016 2015/2016 2016/2017 2017/2018
Number of sales 17 40 48 12
Cash Flow Forecast 2017/18
The above cash flow shows the actual income received and the payments made for the period to May’17 with projections for the remainder
of the year.
Monthly Cash Flow Forecast Version 1
Year Ended 30-Apr-17 31-May-17 30-Jun-17 31-Jul-17 31-Aug-17 30-Sep-17 31-Oct-17 30-Nov-17 31-Dec-17 31-Jan-18 28-Feb-18 31-Mar-18 Total
31-Mar-18 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Cash on Hand at beginning of month 2,909,082 3,473,789 3,634,328 4,642,740 4,246,317 4,444,902 4,313,588 4,225,789 4,215,635 4,096,136 4,120,825 4,216,963 3,124,861
Cash Receipts
Rent 632,160 749,718 440,288 512,448 1,039,353 723,144 696,221 622,390 611,137 712,143 627,093 607,828 7,973,922
Sale of Assets 378,020 149,610 728,915 - - - - - - - - - 1,256,545
Grant Income 758,153 187,538 24,521 242,995 244,477 244,477 243,741 242,995 171,658 168,720 168,720 2,783,880 5,481,876
Bank Interest - - - - - - - - - - - - -
Insurance Claims - - - - - - - - - - - - -
Other income 46,997 122,908 7,926 65,613 66,568 63,144 43,537 37,015 33,859 23,185 23,859 7,780 542,391
Loan/Other cash injection - - - - - - - - - - - - -
Total 1,815,329 1,209,775 1,201,649 821,056 1,350,398 1,030,766 983,498 902,400 816,655 904,048 819,672 3,399,488 15,254,734
Total Cash Available 4,724,411 4,683,563 4,835,978 5,463,796 5,596,715 5,475,668 5,297,086 5,128,190 5,032,289 5,000,184 4,940,498 7,616,451
Cash Paid Out
Payroll 118,798 121,462 123,978 124,209 124,209 124,209 124,209 124,209 124,209 124,209 124,209 124,209 1,482,121
Management Costs 117,702 42,185 24,494 64,880 64,880 114,880 64,880 64,880 114,880 64,880 64,880 64,880 868,300
Repairs 42,350 319,988 7,834 152,961 146,089 151,584 160,407 176,021 176,669 177,722 99,772 421,876 2,033,272
Investment 513,259 138,085 33,601 562,393 570,581 541,236 373,171 317,274 290,223 198,729 204,503 66,690 3,809,745
Development 398,735 427,159 1,996 230,171 230,171 230,171 230,171 230,171 230,171 230,171 230,171 3,797,820 6,467,077
- - - - - - - - - - - - -
Total 1,190,843 1,048,879 191,902 1,134,614 1,135,930 1,162,080 952,838 912,555 936,153 795,710 723,535 4,475,476 14,660,515
Cash Paid Out (Non P & L)
Loan Interest 59,779 356 1,336 82,865 15,883 - 118,459 - - 83,648 - 16,115 378,441
Transfer to Deposit Account - - - - - - - - - - - - -
Total 59,779 356 1,336 82,865 15,883 - 118,459 - - 83,648 - 16,115 378,441
Total Cash Paid out 1,250,622 1,049,235 193,238 1,217,479 1,151,812 1,162,080 1,071,297 912,555 936,153 879,359 723,535 4,491,591
Cash Position at End of Month 3,473,789 3,634,328 4,642,740 4,246,317 4,444,902 4,313,588 4,225,789 4,215,635 4,096,136 4,120,825 4,216,963 3,124,861 -
Deposit Acct At end of Month 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137 3,750,137
Total Funds Available 7,223,926 7,384,465 8,392,877 7,996,453 8,195,039 8,063,725 7,975,926 7,965,771 7,846,273 7,870,962 7,967,100 6,874,998
Making our house your home
Dena Macleod 15-Jun-17
BOARD ITEM12
A&R ITEM 11
RULE CHANGE
Audit & Risk 27 June 2017 Board 28 June 2017
Report by Chief Executive
Purpose of Report
1.1 To consider a revised set of Partnership Rules for presentation to the Membership at a
Special General meeting for approval. The revised Rules ensure the governance
arrangements are appropriate for the future requirements of the business plan,
comply with Regulatory Standards and comply with the model rules as revised by
SFHA in 2015.
Summary
2.1 The Board considered amending the Rules at its meeting on 24 May 2017 to replace
Council appointed Board Members with Independent Board Members and agreed to
our lawyers being instructed to prepare a revised set of Rules on that basis.
2.2 The revised Rules showing the proposed changes are at Appendix 1 for consideration
and approval and a summary of each change and the reason for the change is at
Appendix 2.
2.3 The views of Western Isles Housing Association Communities Forum and the Comhairle
on the proposed changes have been obtained and are at Appendix 3.
Competence
3.1 The exercise will cost approximately £3,500 in fees and there will be a requirement for
a number of statutory meetings with members, and permissions obtained from
Scottish Housing Regulator, FCA and OSCR. Full details are at Paragraphs 5.1 to 8.2.
Recommendations
4.1 It is recommended that the:
a) Audit & Risk Committee consider the revised Rules and recommend approval to
the Board; and
b) Board:
i) Approve the revised Rules at Appendix 1;
ii) note the changes at Appendix 2;
iii) note the results of the consultation exercise at Appendix 3;
iv) approve the timetable and action plan at Appendix 4.
APPENDIX 1: Revised Rules
APPENDIX 2: Changes to Rules
APPENDIX 3: Consultation Results
APPENDIX 4: Timetable and Action Plan
Background Papers: Board Report on Rule Change presented on 24 May 2017
Writer of Report: Dena Macleod
Dena Macleod 15-Jun-17
Competence
Financial
5.1 The costs involved in amending the rules are estimated to be £3,500 which are mainly
legal and registration costs. There will be a cost to arranging the Special General
Meeting.
5.2 The costs can be met from the budgets for corporate legal fees and meetings.
Legal
6.1 Rule 21.1 to 23 and 88.1 to 88.3 make provision to change the Rules and call a Special
General Meeting.
6.2 Standing Orders 12.1 to 12.5 outline the role and remit of the Board which includes
“ensuring there is a balance of skills, experience and diversity of equality on the
Board”. Part 2 states changes in Rules are a matter reserved to the Board. Reviewing
the Rules is a referred function of the Audit & Risk Committee.
6.3 Approval for Rule changes is required from SHR, the FCA and OSCR.
6.4 The Office of National Statistics recently re-classified housing associations as public
bodies. The Scottish Government is currently drafting legislation to effectively reverse
the re-classification.
6.5 The Revised Rules at Appendix 1 have been prepared by our lawyers, Harper
Macleod.
Regulatory Guidance
7.1 The relevant Regulatory Standards are:
Standard 6
The Governing Body and senior officers have the skills
and knowledge they need to be effective
6.1 The RSL has a formal, rigorous and transparent process for the election,
appointment and recruitment of governing body members. The governing
body annually assesses the skills, knowledge and diversity it needs to provide
capable leadership, control and constructive challenge to achieve the RSL’s
purpose, deliver good tenant outcomes and manage its affairs.
6.2 The RSL plans effectively to achieve the appropriate and effective
composition and profile of governing body members through ongoing
performance evaluation and active succession planning. The governing body
is able to assure that any non-executive member seeking re-election after nine
years continuous service can demonstrate their continued effectiveness.
Risk
8.1 Governance of the Partnership is critical to its long term viability. Reviewing and
updating the Rules to allow for skills based appointments will reduce the risk of non
compliance with the Regulatory requirements.
Dena Macleod 15-Jun-17
Report Details
Background
9.1 At the meeting of the Board on 24 May 2017 the Board considered changing the
Rules for two reasons:
a) to ensure HHP would not be classified as a public body as a result of the ONS
reclassification of housing associations; and
b) the Board has the right mix of skills and experience to enable it to give effective
strategic direction and deliver good tenant outcomes.
ONS Re-classification
9.2 On 29 September 2016 the Office of National Statistics reclassified housing
associations in Scotland as public non-financial corporations and in response to this
the Scottish Government have put in place proposals to reverse this decision to
ensure that housing associations are classified as private bodies. The legislation to re
classify housing associations is currently planned to be presented to the Scottish
Parliament in September 2017.
9.3 The current view is that if Stock Transfer RSLs have more than 25% of their Board
Members who are Council appointed, this could be deemed as a public body having
a level of control over the RSL and therefore the RSL would be classified as a public
body.
9.4 Council appointed Board Members make up 36% of the Board Members (33% if all
positions were filled) so if our constitution is not changed we will be caught in the ONS
reclassification. So in spite of the legislation the Scottish Government are putting in
place to effectively reverse the reclassification, HHP would still be caught up in being
classified as a public body meaning our borrowing will be counted as public
borrowing and could have implications on our ability to draw down grants.
Position of the Comhairle
9.5 The proposed changes to the Rules have been discussed with the Comhairle and
their view is at Appendix 3 (to be updated to reflect their view).
Rule Change Proposals
9.6 The current structure is:
Board
4 Tenants
2 Lewis
1 Harris
1 Uist & Barra4 Community
4 Council Appointed
1 Board appointeed
2 co-optees
Dena Macleod 15-Jun-17
9.7 A number of different structures could be put in place:
Option Structure Comment
1 Reduce the number of Council
Appointed Board Members to 3
and increase either the Tenants or
Community Board Members from
4 to 5.
Whilst this option would address the
objective of not being caught in the
ONS reclassification it does not meet
the need of ensuring the appropriate
mix of skills on the Board and also
makes succession planning for Board
Members more challenging.
2 Replace the Council Appointed
Board Members with Community
Board Members.
As above.
3 Replace the Council Appointed
Board Members with Independent
Board Members.
This option addresses both the ONS
reclassification issue and should
provide the best opportunity to ensure
the appropriate mix of skills on the
Board and will assist in putting good
succession planning for Board
Members in place.
9.8 The Rules have been revised to reflect Option 3 and they have also been updated to
take account of the requirement of the 2015 Model Rules.
9.9 The changes to the Rules will also ensure that Comhairle members, if they meet the
criteria, are not prevented from standing for nomination under any of the three
categories.
.
Dena Macleod 15-Jun-17
APPENDIX 1-REVISED RULES
Model Rules 2013 (as amended)
These are the Rules
of
Hebridean Housing Partnership Limited
Based upon SFHA Charitable Model Rules (Scotland) 2013
(as amended 2015)
Registered under the Co-operative and Community Benefit Societies Act 2014
and the Housing (Scotland) Act 2010
Published by
the Scottish Federation of Housing Associations in co-operation with The Scottish Housing Regulator
3rd Floor, Sutherland House,
149 St Vincent Street, Glasgow, G2 5NW
Tel: 0141 332 8113 Fax: 0141 332 9684
Further guidance
Further Advice A separate document is also available from the SFHA Rules Service, which gives guidance on the use of these rules and the options. Advice is also available from staff at The Scottish Housing Regulator. Advice on the procedural aspects of making a Rule registration application or Rule Amendment application is also available from the SFHA Rules Service.
CONTENTS PAGE
ITEM Introduction:
- Name
- Objects
Membership
- Applying for membership
Ending your membership
Representing an Organisation
Share Capital
- Shares
- Transferring shares
Borrowing Powers
General Meetings
- Annual General Meeting
- Special General Meeting
- Notice of Meetings
Procedure at General Meetings
- Proxies/Representatives/Postal Votes
- Voting
Proceedings at General Meetings
The Board of Management
- Composition of the Board
- Interests
Electing and Appointing Board Members
- Co-optees
- Eligibility for the Board
Powers of the Board of
Management
Board Procedure
- Special Board Meetings
- Sub-committees
PAGE NO
1
1
3
4
4
57
8
10
11
13
16
17
ITEM The Secretary and Officer Bearers
- Role of the Chair
Financial Guarantees for Officers
The Board’s Minutes, Seal,
Registers and Books
- Minutes
- Execution of Documents and Seal
- Registers
- Registered Name
- Documentation
Accounts
The Auditor
Annual Returns and Balance Sheet
Surpluses and Donations
Investments
Inspecting the Register
Disputes
Statutory Applications to the Financial
Conduct Authority
Copies of Rules
Closing Down the Partnership
Changing the Rules
Interpreting these Rules
Appendices:
- Appendix 1: Proxy form
- Appendix 2: Cancellation of Proxy
Signatures of Board Members
PAGE NO
19
21
21
22
23
24
24
24
25
25
25
25
26
26
27
30
32
1
INTRODUCTION Name 1 The name of the Society shall be Hebridean Housing Partnership Limited (hereinafter
referred to as the “Partnership”).
Objects 2 The objects of the Partnership are: 2.1 to provide for the relief of those in need by reason of age, ill-health, disability, financial
hardship or other disadvantage through the provision, construction, improvement and management of land and accommodation and the provision of care; and
2.2 any other purpose or object permitted under Section 24 of the Housing (Scotland) Act 2010 which is charitable both for the purposes of Section 7 of the Charities and Trustee Investment (Scotland) Act 2005 and also in relation to the application of the Taxes Acts.
3 The permitted activities and powers of the Partnership will include anything which is necessary or expedient to help the Partnership achieve these objects. The Partnership will operate principally in the administrative area of Comhairle Nan Eilean Siar.
4.1 The Partnership shall not trade for profit and any profits shall only be applied for the purpose of furthering the Partnership’s objects and/or in accordance with these Rules.
4.2 Nothing shall be paid or transferred by way of profit to Members.
5 The registered office of the Partnership is at: Creed Court, Gleann Seileach Business Park, Willowglen, Stornoway, Isle of Lewis, HS1 2QP.
MEMBERSHIP
6 The Members of the Partnership shall be those persons or organisations who hold a
share in the Partnership and whose names are entered in the Register of Members.
2
Applying for Membership 7.1 7.2 7.2.1 7.2.2 7.3
The Board shall set, review and publish its membership policy for admitting new Members. There shall be two categories of membership, being: Tenant Members, which category shall be sub-divided into the following four sub-categories: 7.2.1.1 Lewis Tenant Members; 7.2.1.2 Harris Tenant Members; 7.2.1.3 Uist Tenant Members; and 7.2.1.4 Barra Tenant Members; and Community Members. No-one can be a Member in more than one category at any one time.
7.4 7.4.1 7.4.2 7.4.3
If you are applying for membership you must send a completed and signed application form and the sum of one pound (which will be returned to you if the application is not approved) to the Partnership’s registered office. Whilst it is the Partnership’s intention to encourage membership, the Board has absolute discretion in deciding on applications for membership and the following shall constitute grounds for refusal of an application for membership: Where membership would be contrary to the Partnership’s Rules or policies; Where a conflict of interest may exist which, even allowing for the disclosure of such an interest, may adversely affect the work of the Partnership; Where the Board considers that accepting the application would not be in the best interests of the Partnership.
7.5 Your application shall be considered by the Board as soon as reasonably practicable after its receipt by the Partnership. An application for membership will not be considered by the Board within the period of 14 days before the date of a general meeting. The Board has the power in its absolute discretion to accept or reject the application.
7.6 If the Board approves your application, you will immediately become a Member and your name and other necessary particulars will be included in the Register of Members within seven working days. You will then be issued one share in the Partnership.
7.7 For the avoidance of doubt, the Board shall have deemed to have admitted an Independent Board Member as a Member from the date on which he/she was appointed under Rule 40.5 and his/her name and other necessary particulars will be included in the Register of Members within seven working days.
8 You can apply for membership of the Partnership from the age of 16.
9 No Member can hold more than one share in the Partnership.
3
10 If you change your address, you must let the Partnership know by writing to the Secretary at the registered office within three months. This requirement does not apply if you are a tenant of the Partnership and have moved home by transferring your tenancy to another property owned and managed by the Partnership. Where any such transfer of tenancy results in a Tenant Member residing in a property which qualifies for a different Tenant Membership Category then the Member shall be deemed to have his/her category of membership altered accordingly.
ENDING YOUR MEMBERSHIP
11.1 Your membership of the Partnership will end and the Board will cancel your share and
record the ending of your membership in the Register of Members if:
11.1.1 You resign your membership giving seven days notice in writing to the Secretary at the Partnership’s registered office;
11.1.2 The Board reasonably believes that you have failed to tell the Partnership of a change of address as required by Rule 10;
11.1.3 If you are a Tenant Member and cease to be a tenant but meet the qualifying criteria to be a Community Member, you will automatically become a Community Member from the date on which your tenancy ends, and the Secretary will amend the Register of Members to reflect the change in your category of membership;
11.1.4 If you are a Community Member (including someone who has changed from being a Tenant Member in terms of Rule 11.1.3) and cease to have or maintain sufficient local connection with the Western Isles, we will end your membership and cancel your share;
11.1.5 For five annual general meetings in a row you have not attended, submitted apologies, exercised a postal vote or appointed a representative to attend and vote on your behalf by proxy;
11.1.6 The Partnership receives a complaint about your behaviour and two-thirds of the Members voting at a special general meeting agree to end your membership. The following conditions apply to this procedure:
11.1.6.1 the complaint must be in writing and must relate to behaviour which could harm the interests of the Partnership.
11.1.6.2 the Secretary must notify the Member of the complaint in writing not less than one calendar month before the meeting takes place;
11.1.6.3 the notice for the special general meeting will give details of the business for which the meeting is being called;
11.1.6.4 you will be called to answer the complaint at the meeting. The Members present will consider the evidence supporting the complaint and any evidence you decide to introduce;
11.1.6.5 the Members can vote in person or through a representative by proxy; 11.1.6.6 if you receive proper notice but do not go to the meeting without providing a
good reason, the meeting will go ahead without you and the Members will be entitled to vote to end your membership.
4
11.2
If your membership is ended in accordance with Rule 11.1.6, you will immediately cease to be a Member from the date that the resolution to end your membership was passed and any further application for membership by you will need to be approved by two-thirds of the Members voting at a general meeting.
REPRESENTING AN ORGANISATION
12.1 An organisation which is a Member is free to nominate any person it considers suitable
as its representative to the Partnership. That person will represent all of the organisation’s rights and powers at general meetings.
12.2 To confirm the identity of a representative, the organisation must send the Partnership a copy of the authorisation or appointment of an individual as a representative. This should be signed by a Director, Secretary or Authorised Signatory of the organisation which signature must be witnessed, or in the case of a local authority, by the Chief Executive, or properly authorised Officer of the local authority.
12.3 An organisation can change the identity of the person entitled to represent that organisation at any time by confirming the identity of the new representative in terms of Rule 12.2 and withdrawing the authority of the original representative.
12.4 If you are a representative in terms of Rule 12.2, of an organisation which is a Member, you cannot be a Member as an individual yourself. If you are already a Member as an individual when you start to represent an organisation which is a Member, the Partnership will suspend your membership as an individual, until such time as you are no longer a representative of an organisation which is a Member.
SHARE CAPITAL
Shares 13 The share capital of the Partnership will be raised by issuing one-pound shares to
Members. Shares cannot be held jointly. Joint tenants of the Partnership may each become individual Members.
14 There is no interest, dividend or bonus payable on shares.
Transferring Shares 15 You shall not be entitled to any property of the Partnership in your capacity as a
Member and your share is not withdrawable or transferable save in the circumstances set out in Rules 16 and 17.
16 You cannot sell your share but you can transfer it if the Board agrees.
17.1 If you die or end your membership or have your membership ended, or you are a representative of an organisation which no longer exists, the Board will cancel your share (except in those circumstances outlined in Rules 17.2 and 17.3) and the value of the share will then belong to the Partnership.
5
17.2 You can nominate the person to whom the Partnership must transfer your share in the Partnership when you die, as long as the person that you nominate is eligible for membership under these Rules and in terms of the Partnership’s membership policies. On being notified of your death, the Board shall transfer or pay the full value of your share to the person you have identified. Your nomination must be in the terms required by the Co-operative and Community Benefit Societies Act 2014.
17.3 If you die or become bankrupt and your personal representative or trustee in bankruptcy seeks to claim your share, the Board (to the extent that your personal representative or trustee in bankruptcy has right) will transfer or pay the value of your share in terms of your representative’s or trustee’s instructions.
BORROWING POWERS
18.1 The Partnership can borrow money as long as the total borrowing at any time is not
more than £200 million.
18.2 In respect of any proposed borrowing for the purposes of Rule 18.1, the amount remaining undischarged of any index-linked loan previously borrowed by the Partnership or any deep discounted security shall be deemed to be the amount needed to repay such borrowing in full if the pre-existing borrowing became repayable in full at the time of the proposed borrowing.
18.3 For the purposes of Rule 18.1 in respect of any proposed borrowing intended to be index-linked or on any deep discounted security the amount of borrowings shall be deemed to be the proceeds of such proposed borrowings that would be receivable by the Partnership at the time of the proposed borrowing.
18.4 The Partnership will not pay more than the market rate of interest as determined by the Board having regard to the terms of the loan on any money borrowed.
18.5 The Partnership will not accept money on deposit.
18.6
The Partnership can lend money to an organisation which is a subsidiary of the Partnership within the meaning of the Companies Act 2006 or the Co-operative and Community Benefit Societies Act 2014 at a market rate of interest as determined by the Board having regard to the terms of the loan. Where the Partnership is using a loan facility to on lend it must comply with the Regulatory Framework and Regulatory Guidance issued by The Scottish Housing Regulator from time to time.
18.7 The Partnership may borrow money from such lawful sources as is permitted by its Treasury Management Policy subject always to the requirement that the Partnership will comply with the Regulatory Framework and Regulatory Guidance issued by The Scottish Housing Regulator from time to time.
6
18.8 The Partnership shall have the power to enter into and perform a Rate Cap Transaction, or series of Rate Cap Transactions, or to enter into a Collar Transaction or series of Collar Transactions or to enter into an Interest Rate Swap Transaction or series of Interest Rate Swap Transactions (each a “Transaction”) where in relation to any such Transaction the following conditions are satisfied namely that: 18.8.1 the relevant instruments relate solely to amounts denominated in Sterling or, if
the Euro has been adopted as currency in the United Kingdom, its equivalent amount in Euros;
18.8.2 the relevant Transaction provides (in the case of an Interest Rate Swap Transaction) for the Partnership to undertake to pay a specified fixed rate on an applicable notional sum denominated in Sterling or, if the Euro has been adopted as currency in the United Kingdom, its equivalent amount in Euros, but not otherwise;
18.8.3 the relevant Transaction in the case of a Collar Transaction provides for the simultaneous buying of an instrument relating to a rate cap and the selling of an instrument providing for a floor at a lower strike price to such Cap;
18.8.4 any counterparty to the Transaction is one of the principal clearing banks in the
United Kingdom; 18.8.5 the Board or a duly authorised sub-committee established under the Rules
considers the entry by the Partnership into such Transaction to be in the best interests of the Partnership;
PROVIDED that at the time of entry into any Transaction the sum of the Calculation Amount of any Transaction previously entered into and remaining in effect, and the Calculation Amount of the proposed Transaction shall not exceed (a) the aggregate amount of the Partnership’s Variable Rate Borrowings either at the Effective Date or (b) having regard at the Effective Date to the Partnership’s obligations to repay Variable Rate Borrowings, the amount of Variable Rate Borrowings which will be outstanding at any time on or prior to the proposed Termination Date.
18.9 Before exercising its power under Rule 18.8 the Partnership shall obtain and consider proper advice on the question whether the Transaction is satisfactory having regard to: 18.9.1 the possible fluctuations in the rate of interest payable by the Partnership on its
Variable Rate Borrowings during the terms of the relevant Transaction;
18.9.2 the Partnership’s ability to meet its payment obligations under such Borrowings during the term of the relevant Transaction if such Transaction was or were not entered into;
18.9.3 the payment obligation under the relevant Transaction(s); 18.9.4 the terms and conditions of the relevant Transaction(s); and
18.9.5 the Partnership’s actual and projected annual income and expenditure position.
7
18.10 For the purposes of Rule 18.9 proper advice shall mean the advice of a person who is reasonably believed by the Board to be qualified by his/her ability in the practical experience of financial matters and the appropriate Transaction; such advice may be given by a person notwithstanding that he/she gives it in the course of his/her employment as an Officer.
18.11 A person entering into a relevant Transaction with the Partnership who has received a written certificate signed by the Secretary confirming the Partnership’s compliance with Rules 18.8 and 18.9 shall not be concerned to enquire further whether or not the Partnership has complied with the provisions of Rules 18.8 and 18.9 and such Transaction shall be valid at the date it is entered into and throughout its term in favour of such person (or any assignee or successor in title) whether or not the provisions of Rules 18.8 and 18.9 have been complied with.
18.12 For the purposes of this Rule 18: “Calculation Amount”, “Effective Date” “Floating Rate Payer”, “Term” and “Termination Date” have the respective meanings given in the 2000 International Swaps and Derivatives Association (ISDA) Definitions as amended from time to time; “Variable Rate Borrowings” mean any borrowing by the Partnership pursuant to Rule 18.1 in respect of which the rate of interest has not been fixed for a term in excess of twelve months and the term “fixed” shall exclude any borrowing where the rate of interest is indexed in accordance with a retail price index or other published index; “Rate Cap Transaction”, “Collar Transaction” and “Interest Rate Swap Transaction” mean respectively any transaction so designated within the meaning of the category “Swap Transaction” as defined in the 2000 ISDA Definitions as amended from time to time.
18.13 Subject to the foregoing provisions the Board can determine and change the conditions under which the Partnership borrows or lends money.
19. The Partnership shall not lend money to Members.
GENERAL MEETINGS Annual General Meeting 20. The Partnership will hold a general meeting known as the annual general meeting within
six months of the end of each financial year of the Partnership. The functions of the annual general meeting are to:
20.1 present the Chairperson’s report on the Partnership’s activities for the previous year;
20.2 present the accounts, balance sheet and auditor’s report; 20.3 elect Board Members. 20.4 appoint the auditor for the following year; and 20.5 consider any other general business included in the notice calling the meeting.
Special General Meeting
8
21.1 All general meetings other than annual general meetings are known as special general meetings. The Secretary will call a special general meeting if:
21.1.1 the Board requests one; or 21.1.2 at least four Members request one in writing. If there are more than 40
Members, at least one-tenth of all the Members must ask for the meeting.
21.2 Whoever asks for the meeting must give the Secretary details of the business to be discussed at the meeting.
21.3 If a special general meeting is requested, the Secretary must within 10 days of having received the request give all Members notice calling the meeting. The meeting must take place within 28 days of the Secretary receiving the Members’ request. The Secretary should decide on a time, date and place for the meeting in consultation with the Board or the Chairperson, but if such consultation is not practicable the Secretary can on his/her own decide the time, date and place for the meeting.
21.4 If the Secretary fails to call the meeting within 10 days, the Board or the Members who requested the meeting can arrange the meeting themselves.
21.5 A special general meeting must not discuss any business other than the business mentioned in the notice calling the meeting.
Notice for Meetings 22.1 The Secretary will call all general meetings by written notice posted or sent by fax or
email to every Member at the address, fax number or email address given in the Register of Members at least 14 days before the date of the meeting. This notice will give details of:
22.1.1 the time, date and place of the meeting; 22.1.2 whether the meeting is an annual or special general meeting; 22.1.3 the business for which the meeting is being called.
22.2 The Board may ask the Secretary to include with the letter or send separately to
Members any relevant papers or accounts. If a Member does not receive notice of a meeting or papers relating to the meeting, this will not stop the meeting going ahead as planned. Each communication sent to a Member by post, addressed to his/her registered address, shall be deemed to have arrived 48 hours after being posted. Each communication sent to a Member by fax or email shall be deemed to have arrived on the day it is sent.
23 The proceedings of a meeting shall not be invalidated by the inadvertent failure of the Partnership to send a notice calling the meeting to any Member.
PROCEDURE AT GENERAL MEETINGS
24.1 For a meeting to take place there must be at least seven Members either present at the
venue or represented at the venue by a representative approved in terms of Rule 27.1. If there are more than 70 Members, at least one-tenth must either be present or represented at the venue by a representative in terms of Rule 27.1.
9
24.2 If not enough Members are present in person or by representative within half an hour of the time the meeting was scheduled to start, the meeting shall be rescheduled to the same day the following week at the same time and at such place as may be fixed by the Chairperson of the meeting and announced at the meeting. There is no need to give notice to Members of the rescheduled meeting. If at that meeting there are not enough Members present in person or by representative at the scheduled starting time the meeting can still go ahead.
25 If a majority of Members present agree, the Chairperson of a meeting can adjourn the meeting. No business can be discussed at the adjourned meeting other than the business not reached or left unfinished at the original meeting. There is no need to give notice to Members of the adjourned meeting.
26.1 The Chairperson of the Board or in his/her absence the Vice-Chairperson will be Chairperson at all meetings of the Partnership. If there is no Chairperson or Vice-Chairperson present or neither is willing to act, the Members present must elect a Member of the Board to be Chairperson of the meeting. If no Board Members are present, the Members present must elect a Member to be Chairperson of the meeting.
26.2 If the Chairperson arrives later, after the meeting has commenced, he/she will take over as Chairperson of the meeting as soon as the current agenda item is concluded.
Proxies/Representatives/Postal Votes 27.1 To appoint a representative to vote on your behalf by proxy, you must let the
Partnership have a properly completed document in the form shown in Appendix 1. Your representative does not need to be a Member. The document must reach the Partnership at least five days before the meeting at which you want to be represented.
27.2 If there is any doubt about whether your representative has authority to vote, the Chairperson will decide and his/her decision will be final.
27.3 The maximum number of proxy votes that may be cast by any one person is 10.
27.4 To reverse your appointment of a representative, you must let the Partnership have a properly completed document in the form shown in Appendix 2. The document must be presented to the Partnership before the meeting at which you no longer want to be represented convenes. Alternatively, if you declare yourself present before the meeting convenes, the appointment of a representative to vote on your behalf will automatically fall.
27.5
The Chairperson will report to the meeting the details of any documents seeking to appoint a representative received but which are not valid. If you represent an organisation, your authorisation or appointment as a representative requires to be in accordance with the terms of Rule 12.2.
27.6 If there is to be an election of Tenant or Community Board Members at an annual general meeting, you can vote by post. Not less than 14 days before a meeting is held at which one or more Board Members will be elected, you will receive a ballot paper for the election. You can vote in the election by returning the ballot paper to the Secretary at least five days before the day of the meeting, or by bringing your ballot paper along to the meeting.
10
Voting 28 If a decision of a meeting is put to the vote, the outcome will be determined by the
majority of those Members voting. Voting will be by a show of hands except where a poll is requested or required. Votes cannot be taken on resolutions which conflict with any provisions of these Rules or the law.
29.1 29.2
Where a vote is by a show of hands every Member present in person has one vote. Where a vote is by a poll every Member present in person or who has appointed a representative has one vote. Where an appointed proxy is present, and he/she advises the Chairperson, the Chairperson shall direct that the vote is by a poll. In relation to the election of Board Members, the vote is by a poll using the ballot paper issued to the Members prior to the meeting; votes received by post in advance of the meeting will be counted in the total number of votes at the meeting.
30 If there is an equal number of votes for and against a resolution, or in relation to the election of Board Members, the Chairperson will have a second and deciding vote. The Chairperson’s announcement of the decision of a vote will be final and conclusive. The decision is then recorded in the minutes of the meeting. There is no need to record the number of votes for or against the decision.
31.1 A poll can be required before or immediately after a vote by a show of hands, if at least one-tenth of the Members present at the meeting (in person or by proxy through a representative appointed in accordance with Rule 27.1) request this.
31.2 A poll must take place as soon as the Chairperson has agreed to it, in line with the Chairperson’s instructions. The result of the poll will stand as the decision of the meeting.
PROCEEDINGS AT GENERAL MEETINGS 32 All speakers must direct their words to the Chairperson. All Members must remain quiet
and orderly while this is happening.
33 You will not be allowed to speak more than once on any individual matter unless it is to explain something or ask for an explanation until every other Member has had the chance to speak. You will then have the opportunity to speak a second time on a matter but only if the Chairperson agrees. Where the Chairperson raised the matter for discussion initially, he/she shall be permitted to make a final reply on the matter.
34 The Chairperson will decide how long each speaker is allowed to speak, allowing equal time to each speaker.
35 If any point arises which is not covered in these Rules, the Chairperson will give his/her ruling. If the Chairperson’s ruling is challenged by more than one person, the Chairperson will step down and those present will decide the point raised on a majority vote. If the vote is tied, the Chairperson’s original ruling is carried.
36 Meetings must not last longer than two hours unless at least two-thirds of the Members present agree after the end of that time to continue the meeting.
11
THE BOARD OF MANAGEMENT
Composition of the Board 37.1 The Partnership shall have a Board of Management which shall have a minimum of
seven and a maximum (including co-optees) of 15 persons. The Partnership shall keep up to date a register of the names of the Board Members which shall be made available to any person at no cost. The names of Board Members will also be published by the Partnership on its website, and in its annual reports and other similar documentation.
37.2 The composition of the Board shall include:
37.2.1 37.2.2 37.2.3
up to four Independent Board Members; up to four Tenant Board Members (made up in accordance with the provisions of Rule 37.3); and up to four Community Board Members.
37.3 Subject to the aftermentioned proviso, of the Tenant Board Members at any one time:
37.3.1 37.3.2 37.3.3
no more than two shall be Lewis Tenant Members; no more than one shall be a Harris Tenant Member; and no more than one shall be either a Uist Tenant Member or a Barra Tenant Member,
provided that, if there are fewer Tenant Members standing for election to any of the Tenant Board Membership Categories set out in Rules 37.3.1 to 37.3.3 above than the number of available places, then it shall be competent for a Tenant Member from another Tenant Membership Category who satisfies the criteria for election as a Tenant Board Member to be elected to fill the relevant place or places.
37.4 Rule 37.2 shall be subject to the overriding proviso that the members of any one Board Member Group shall at any time always be less than one half of those places on the Board which are filled at that time. Should any one Board Member Group (excluding co-optees) comprise one half or more of the filled Board places at any time, the Board will be under an obligation to take such steps as the Board considers appropriate to restore the balance of the Board’s composition so that the members of any one Board Member Group do not comprise one half or more than one half of the places on the Board which are filled. In fulfilling this obligation, the Board will initially seek to recruit new Board Members, and only if balance cannot be restored in this way will any Board Member be required to resign from the Board. Should any such resignation be required, the procedure for dealing with the same will be determined by the Board, but in so doing the Board will seek to avoid any disproportionate impact on any one Board Member Group, so far as is practicable.
37.5 A person must be aged 18 or over and a Member to become a Board Member (including any person appointed to fill a casual vacancy) other than:
37.5.1 a person appointed as a co-optee or appointed by The Scottish Housing Regulator who must be aged 18 or over but need not be a Member; or
12
37.5.2 a person appointed as an Independent Board Member, who must be aged 18 or over and need not be a Member to be appointed as an Independent Board Member, but shall, upon appointment, become a Member in terms of Rule 7.
37.6 An employee of the Group (including the Partnership), or a Close Relative of any such employee, may not be a Board Member.
37.7 No Board Member may take office until they have agreed to and signed the Partnership’s code of conduct for Board Members.
37.8 The Board shall assess annually the skills, knowledge, diversity and objectivity that it needs for its decision making and what is contributed by the Board Members by way of annual performance reviews. The Board must be assured that any Board Member who has continuous service on the Board of nine years or more and who is seeking re-election or re-appointment is able to demonstrate his/her continued effectiveness as a Board Member before he/she may stand for re-election or re-appointment.
37.9 Each of the Board Members shall, in exercising his/her role as a Board Member, act in the best interests of the Partnership, its tenants and service users and will not place any personal or other interests ahead of his/her primary duty to the Partnership; and, in particular, must:
37.9.1 seek, in good faith, to ensure that the Partnership acts in a manner which is in accordance with its objects.
37.9.2 act with the care and diligence which it is reasonable to expect of a person who is managing the affairs of another person.
37.9.3 in circumstances giving rise to the possibility of a conflict of interest between the Partnership and any other party:
37.9.3.1 put the interests of the Partnership before that of the other party, in taking decisions as a Board Member;
37.9.3.2 where any other duty prevents him/her from doing so, disclose the conflicting interest to the Partnership and refrain from participating in any discussions or decisions involving the other Board Members with regard to the matter in question;
37.9.4 ensure that the Partnership complies with any direction, requirement, notice or duty imposed on it by the Charities and Trustee Investment (Scotland) Act 2005.
Interests 38.1 The Board shall set and periodically review its policy on payments and benefits. If a
person is a Member, employee of the Partnership or serves on the Board or any sub-committee he/she must not receive any payment or benefit unless it is permitted by the policy. In making any payment or conferring any benefit the Partnership shall act at all times with transparency, honesty and propriety.
13
38.2 If a person serves on the Board or any sub-committee he/she must declare any personal or other external interests on an annual basis in accordance with the Partnership’s Code of Conduct for Board Members. If while serving on the Board that person has any conflict of interest in any contract or other matter about to be discussed at a meeting, he/she must tell the Board. He/she will be required to leave the meeting while the matter is discussed and will not be allowed to vote on the matter or to stay in the meeting while any vote on the matter is being held. If that person is inadvertently allowed to stay in the meeting and vote on the matter, his/her vote will not be counted.
38.3 If a person serves on the Board or any sub-committee he/she must not receive any payment or benefit unless it is permitted by the Charities and Trustee Investment (Scotland) Act 2005 and as set out in the Partnership’s policy referred to in Rule 38.1. He/she shall also comply with the requirements of the Charities and Trustee Investment (Scotland) Act 2005 in respect of any conflict of interest that might arise.
ELECTING AND APPOINTING BOARD MEMBERS
39.1 At the end of every annual general meeting, two Tenant Board Members and two
Community Board Members must retire. Anybody appointed as a co-optee under Rule 42.1 or to fill a casual vacancy under Rule 41 and who retires for that reason, shall not count towards the foregoing requirements. The retiring Board Members should be selected in accordance with Rule 39.2
39.2 The retiring Board Members should be those in their respective Board Member Groups who have served the longest on the Board since the date of their last election. If two or more Board Members within the same Board Member Group have served equally long and cannot agree who should retire, they must draw lots.
39.3 Board Members must also retire if they have been co-opted onto the Board under Rule 42.1 or have filled casual vacancies under Rule 41.
39.4 If a Board Member retires from the Board in terms of Rule 39 before or on the date of the next annual general meeting, that Board Member can stand for re-election without being nominated.
40.1 If, at the annual general meeting, the number of Tenant Members standing for election to a Tenant Board Membership Category is equal to the number of vacancies in that Tenant Board Membership Category in terms of Rule 37.3 the Chairperson will at the general meeting declare them to be elected without a vote.
40.2 If there are more Tenant Members standing for election to a Tenant Board Membership Category than there are vacant places in that Tenant Board Membership Category, then those present at the general meeting or those exercising a postal vote in accordance with Rule 27.6, who are entitled to vote, in terms of this Rule 40, will elect the Tenant Board Members for that Tenant Board Membership Category onto the Board in accordance with Rule 29.2. You must not give more than one vote to any one candidate.
14
40.3 If, at the annual general meeting, the number of Community Members standing for election is equal to the number of Community Board Members to be elected in terms of Rule 37.2 the Chairperson will at the general meeting declare them to be elected without a vote. If there are more Community Members standing for election than there are vacant Community Board Member places then those present at the general meeting or those exercising a postal vote in accordance with Rule 27.6, will elect the Community Board Members onto the Board in accordance with Rule 29.2. You must not give more than one vote to any one candidate.
40.4 The Partnership will post or send by fax or email intimation of the intended date of the annual general meeting and information on the nomination procedure to each Member at the address, fax number or email address given in the Register of Members of the Partnership not less than 49 days before the date of the meeting. Tenant Members may only nominate other Tenant Members from the same Tenant Membership Category to which they belong. Nominations for election to the Board must be in writing and in the form specified by the Partnership and must give the full name, address and occupation of the Member being nominated. A Member cannot nominate himself/herself for election to the Board. Nominations must be signed by and include a signed statement from the Member being nominated to show that they are eligible to join the Board in accordance with Rules 37.7 and 43, and that they are willing to be elected. Nomination forms can be obtained from the Partnership and must be completed fully and returned by hand or by post to the Partnership’s registered office at least 35 days before the general meeting.
40.5 The Board will be entitled at any time to appoint up to four Independent Board Members to the Board. A person so appointed by the Board must be a person who the Board considers will enhance the skills, knowledge, diversity and/or objectivity of the Board and its decision-making. The manner of identifying, selecting and appointing Independent Board Members shall be determined by the Board from time to time. When appointing Independent Board Members the Board must determine the proposed duration of the appointment, which must be no longer than three years (but without prejudice to a retiring Independent Board Member being eligible to be re-appointed by the Board).
41 If an elected Board Member leaves the Board between the annual general meetings, this creates a casual vacancy and the Board can appoint a Member to take their place on the Board until the next annual general meeting.
Co-optees 42.1 The Board can co-opt to the Board or sub-committee anyone the it considers is suitable
to become a Board Member or member of a sub-committee. Co-optees do not need to be Members, but they can only serve as co-optees on the Board or sub-committee until the next annual general meeting or until removed by the Board. A person co-opted to the Board can also serve on any sub- committees.
42.2 A person appointed as a co-optee shall undertake the role of Board Member or member of a sub-committee and accordingly will be subject to the duties and responsibilities of a Board Member. Co-optees can take part in discussions at the Board or any sub-committees and vote at Board and sub-committee meetings on all matters except those which directly affect the Rules, the membership of the Partnership or the election of the Partnership’s Office Bearers. Co-optees may not stand for election, nor be elected as one of the Office Bearers of the Board.
15
42.3 Board Members co-opted in this way must not make up more than one-third of the total number of the Board or sub-committee members at any one time. The presence of co-optees at Board Meetings will not be counted when establishing whether the minimum number of Board Members are present to allow the meeting to take place as required by Rule 48 and the presence of co-optees will not count towards the quorum for sub-committee meetings.
Eligibility for the Board 43.1 A person will not be eligible to be a Board Member and cannot be appointed or elected
as such if:
43.1.1 he/she has been adjudged bankrupt, has granted a trust deed for or entered into an arrangement with creditors or his/her estate has been sequestrated and has not been discharged;
43.1.2 he/she has been convicted of an offence involving dishonesty which is not spent by virtue of the Rehabilitation of Offenders Act 1974 or an offence under the Charities and Trustee Investment (Scotland) Act 2005;
43.1.3 he/she is a party to any legal proceedings in any Court of Law by or against the Partnership;
43.1.4 he/she is or will be unable to attend Board Meetings for a period of 12 months; 43.1.5 he/she has been removed from the Board of another registered social landlord
within the previous five years; 43.1.6 he/she has resigned from the Board in the previous five years in
circumstances where the resignation was submitted after the date of his/her receipt of notice of a special Board meeting convened to consider a resolution for his/her removal from the Board in terms of Rule 44.5;
43.1.7 he/she has been removed from the Board in terms of Rules 44.4 or 44.5 within the previous five years;
43.1.8 he/she has been removed, disqualified or suspended from a position of management or control of a charity under the provisions of the Law Reform (Miscellaneous Provisions) (Scotland) Act 1990 or the Charities and Trustee Investment (Scotland) Act 2005;
43.1.9 he/she has been removed from the office of charity trustee or trustee for a charity by an order made by the Charity Commissioners for England and Wales or by Her Majesty’s High Court of Justice in England on the grounds of any misconduct in the administration of the charity for which he/she were responsible or to which he/she were privy, or which his/her conduct contributed to or facilitated;
43.1.10 a disqualification order or disqualification undertaking has been made against that person under the Company Directors’ Disqualification Act 1986 or the Company Directors Disqualification (Northern Ireland) Order 2002 (which relate to the power of a Court to prevent someone from being a director, liquidator or administrator of a company or a receiver or manager of company property or being involved in the promotion, formation or management of a company); or
43.1.11 at an annual general meeting, he/she has served as a Board Member for a continuous period of nine years or more and the Board has not resolved to permit him/her to stand again or otherwise be nominated for re-election.
16
43.2 A person cannot be re-elected or re-appointed as a Board Member if the Board is not satisfied in terms of Rule 37.8 of the individual’s continued effectiveness as a Board Member. In these circustamces the Board must not allow the individual to stand for re-election or re-appointment.
44 A Board Member will cease to be a Board Member if:
44.1 he/she resigns his/her position as a Board Member in writing; 44.2 he/she ceases to be a Member unless he/she is a co-optee in terms of Rule
42.1 or an appointee of The Scottish Housing Regulator; 44.3 he/she misses four Board Meetings in a row without special leave of absence
previously being granted by the Board either at his/her request or by exercise of the Board’s discretion;
44.4 the majority of Members within the same Membership Category as the relevant Board Member voting at a general meeting decide this. The Members at the meeting within the relevant Membership Category may then elect someone else from that Membership Category to take his/her place. If a replacement is not elected at the meeting, the Board may appoint a Board Member in terms of Rule 41;
44.5 the majority of those remaining Board Members present and voting at a special meeting of the Board convened for the purpose decide to remove him/her as a Board Member. The resolution to remove him/her as a Board Member must relate to one of the following issues:
44.5.1
failure to perform to the published standards laid down by the Scottish Federation of Housing Partnerships and/or The Scottish Housing Regulator adopted and operated by the Partnership;
44.5.2 failure to sign or failure to comply with the Partnership’s code of conduct for Board Members; or
44.5.3 a breach of the Partnership’s Rules, standing orders or other policy requirements;
44.6 he/she becomes ineligible as a Board Member in terms of Rule 43; 44.7 he/she is a co-optee whose period of office is ended in accordance with Rules
39.1 or 42.1; 44.8 he/she is a Board Member retiring in accordance with Rule 39.1; or 44.9 he/she is an Independent Board Member and the period of their appointment
as determined by the Board in accordance with Rule 40.5 comes to an end.
POWERS OF THE BOARD OF MANAGEMENT
45 The Board is responsible for directing the affairs of the Partnership and its business and may do anything lawful which is necessary or expedient to achieve the objects of the Partnership. The Board is not permitted to exercise any powers which are reserved to the Partnership in general meetings either by these Rules or by statute. The Board is responsible for the leadership, strategic direction and control of the Partnership with the aim of achieving good outcomes for its tenants and other service users in accordance with the Regulatory Standards and Regulatory Guidance issued by The Scottish Housing Regulator from time to time.
46 The Board acts in the name of the Partnership in everything it does. A third party acting in good faith and without prior notice does not need to check if the powers of the Board have been restricted, unless they are already aware that such a restriction may exist.
47 Amongst its most important powers, the Board can:
17
47.1 buy, sell, build upon, lease or exchange any land and accept responsibility for any related contracts and expenses;
47.2 agree the terms of engagement and remuneration of anyone employed in connection with the business of the Partnership and act as employer for anyone employed by the Partnership;
47.3 grant heritable securities over land owned by the Partnership and floating charges over all or any part of property and assets both present and in future owned by the Partnership. This includes accepting responsibility for any related expenses;
47.4 decide, monitor and vary the terms and conditions under which property owned by the Partnership is to be let, managed, used or disposed of;
47.5 appoint and remove solicitors, surveyors, consultants, managing agents and employees, as required by the Partnership’s business;
47.6 refund any necessary expenses as are wholly necessary incurred by Board Members and sub-committee members in connection with their duties;
47.7 compromise, settle, conduct, enforce or resist either in a Court of Law or by arbitration any suit, debt, liability or claim by or against the Partnership;
47.8 accept donations in support of the activities of the Partnership.
BOARD PROCEDURE
48 It is up to the Board to decide when and where to hold its ordinary meetings, but it must
meet at least six times a year. There must be at least four Board Members present for the meeting to take place. For the meeting to take place the Board Members present must represent at least two Board Member Groups.
49 The Board will continue to act while it has vacancies for Members. However, if at any time the number of Board Members falls below seven, the Board can continue to act only for another two months. If at the end of that period the Board has not found new Members to bring the number of Board Members up to seven, the only power it will have is to act to bring the number of Board Members up to seven.
50 Board Members must be sent written notice of Board meetings posted, or delivered, by hand or sent by fax or email to the last such address for such communications given to the Secretary at least seven days before the date of the meeting. The accidental failure to give notice to a Board Member or the failure of the Board Member to receive such notice shall not invalidate the proceeding of the relevant meeting.
51 Board Meetings can take place in any manner which permits those attending to hear and comment on the proceedings.
52 All speakers must direct their words to the Chairperson. All Board Members must remain quiet and maintain order while this is happening. The Chairperson will decide who can speak and for how long.
53 If any point arises which is not covered in these Rules, the Chairperson will give his/her ruling which will be final.
54 All acts done in good faith as a result of a Board Meeting or sub-committee meeting will be valid even if it is discovered afterwards that a Board Member was not entitled to be on the Board.
18
55 A written resolution signed by not fewer than three-quarters of the Board Members or three quarters of the members of a sub-committee will be as valid as if it had been passed at a Board Meeting or sub-committee meeting duly called and constituted.
Special Board Meetings 56.1 The Chairperson or two Board Members can request a special meeting of the Board by
writing to the Secretary with details of the business to be discussed. The Secretary will send a copy of the request to all Board Members within three working days of receiving it. The meeting will take place at a place mutually convenient for the majority of Board Members, normally the usual place where Board Meetings are held, between 10 and 14 days after the Secretary receives the request.
56.2 No other business may be discussed at the meeting other than the business for which the meeting has been called.
56.3 If the Secretary does not call the special meeting as set out above, the Chairperson or the Board Members who request the meeting can call the meeting. In this case, they must write to all Board Members at least seven days before the date of the meeting.
57 If a Board Member does not receive notice of the meeting, this will not prevent the meeting going ahead.
Sub-committees 58.1 The Board can delegate its powers to sub-committees or to staff or to Office Bearers.
The Board will establish the terms of reference for such delegation, which will be set down in writing and communicated to the recipient of the delegated powers. Such delegation will be set out down in writing in standing orders, schemes of delegated authority or other appropriate documentation. In the case of a sub-committee such delegation shall include the purposes of the sub-committee, its composition and quorum for meetings. A minimum number of members for a sub-committee shall be three. There must be at least three of the members of a sub-committee present for the meeting to take place. The Board shall be responsible for the on-going monitoring and evaluation of the use of delegated powers.
58.2 The meetings and procedures of sub-committees or otherwise must comply with the relevant terms of reference.
58.3 Any decision made by sub-committee must be reported to the next Board Meeting.
58.4 The Board can establish and delegate powers to sub-committees, designated as Area Committees, to take decisions relating to the management and maintenance of properties within a particular geographical area. The Board will determine the membership and delegated responsibility of an Area Committee in its terms of reference. An Area Committee shall exercise such delegated powers notwithstanding the provisions of Rules 42.1 and 42.3 which provisions shall not apply to Area Committees.
19
THE SECRETARY AND OFFICE BEARERS
59.1 The Partnership must have a Secretary, a Chairperson and any other Office Bearers the
Board considers necessary. The Office Bearers, except for the Secretary, must be elected Board Members and cannot be co-optees. An employee may hold the office of Secretary although not be a Board Member. The Board will appoint these Office Bearers. If the Secretary cannot carry out his/her duties, the Board, or in an emergency the Chairperson, can ask another Office Bearer or employee to carry out the Secretary’s duties until the Secretary returns.
59.2 The Secretary and the other Office Bearers will be controlled, supervised and instructed by the Board.
59.3 The Secretary’s duties include the following (these duties can be delegated to an appropriate employee with the Secretary assuming responsibility for ensuring that they are carried out in an effective manner):
59.3.1 calling and going to all meetings of the Partnership and all the Board Meetings;
59.3.2 keeping the minutes for all meetings of the Partnership and Board; 59.3.3 sending out letters, notices calling meetings and relevant documents to
Members before a meeting; 59.3.4 preparing and sending all the necessary reports to the Financial Conduct
Authority and The Scottish Housing Regulator; 59.3.5 ensuring compliance with these Rules; 59.3.6 keeping the Register of Members and other registers required under these
Rules; 59.3.7 supervision of the Partnership’s seal; 59.3.8 keeping all the books of accounts and receiving all contributions and
payments owned to the Partnership; and 59.3.9 paying over the contributions and payments received by the Partnership as
instructed by the Board.
59.4 The Secretary must produce or give up all the Partnership’s books, registers, documents and property whenever requested by a resolution of the Board, or of a general meeting.
59.5 At its first meeting after registration of the Partnership, the Board will elect the Chairperson of the Partnership. Thereafter a Chairperson will be appointed on an annual basis at the next scheduled Board Meeting held after each annual general meeting. Role of the Chair The Chairperson is responsible for the leadership of the Board and ensuring its effectiveness in all aspects of the Board’s role and to ensure that the Board properly discharges its responsibilities as required by law, the Rules and the standing orders of the Partnership. The Chairperson will be delegated such powers as is required to allow the Chairperson to properly discharge the responsibilities of the office. Among the responsibilities of the Chairperson are that:-
59.5.1 the Board works effectively with the senior staff;
20
59.5.2 an overview of business of the Partnership is maintained;
59.5.3 the Agenda for each meeting is set;
59.5.4 meetings are conducted effectively;
59.5.5 minutes are approved and decisions and actions arising from meetings are
implemented;
59.5.6 the standing orders, code of conduct for Board Members and other relevant
policies and procedures affecting the governance of the Partnership are
complied with;
59.5.7 where necessary, decisions are made under delegated authority for the
effective operation of the Partnership between meetings;
59.5.8 the Board monitors the use of delegated powers;
59.5.9 the Board receives professional advice when it is needed;
59.5.10 the Partnership is represented at external events appropriately;
59.5.11 appraisal of the performance of Board Members is undertaken, and that the
senior staff officer’s appraisal is carried out in accordance with the agreed
policies and procedures of the Partnership; and
59.5.12 the training requirements of Board Members, and the recruitment and
induction of new Board Members is undertaken.
59.6 The Chairperson must be elected from the Board Members (excluding co-optees) and must be prepared to act as Chairperson until the end of the next annual general meeting (unless he/she resigns the post). The Chairperson can only be required to resign if a majority of the remaining Board Members present at a special meeting agree to this.
59.7 If the Chairperson is not present at a Board meeting or is not willing to act, the Board Members present will elect another Board Member to be Chairperson for the Board Meeting. If the Chairperson arrives at the meeting late, he/she will take over as Chairperson of the Board meeting as soon as the current agenda item is concluded.
59.8 If the votes of the Board Members are divided equally for and against an issue, the Chairperson will have a second and deciding vote.
59.9 The Chairperson can resign his/her office in writing to the Secretary and must resign if he/she leaves the Board or is prevented from standing for, or being elected to the Board under Rule 43. The Board will then elect another Board Member as Chairperson.
59.10 The Chairperson can be re-elected but must not hold office continuously for more than five years.
FINANCIAL GUARANTEES FOR OFFICERS
21
60.1 The Board shall take out fidelity guarantee insurance to cover all Office Bearers and employees who receive or are responsible for the Partnership’s money, or, these office bearers and employees must be covered by a bond as set out in Schedule 1 of the Co-operative and Community Benefit Societies Act 2014, or a guarantee under which they promise to account for and repay money due to the Partnership accurately.
60.2 The Board shall have the power to purchase and maintain indemnity insurance for, or for the benefit of, persons who are, or were at any time, Board Members, officers or employees of the Partnership. A Board Member may form part of a quorum and vote at a meeting where such insurance is under consideration notwithstanding the terms of Rules 38.1 and 38.2.
61 Office Bearers and employees will not be responsible for the Partnership’s loss while they are carrying out their duties unless there has been gross negligence or dishonesty. If an Office Bearer or employee is dishonest, the Partnership will try to recover any loss that it has suffered and may alert the police or other relevant authority.
THE BOARD’S MINUTES, SEAL, REGISTERS AND BOOKS
Minutes 62 Minutes of every general meeting, Board Meeting and sub-committee meeting must be
kept. Those minutes must be presented at the next appropriate meeting and if accepted as a true record, signed by the Chairperson of the meeting at which they are presented. All minutes signed by the Chairperson of the meeting shall be conclusive evidence that the minutes are a true record of the proceedings at the relevant meeting.
Execution of Documents and Seal 63 The Partnership shall execute deeds and documents in accordance with the provisions
of the Requirements of Writing (Scotland) Act 1995 and record the execution in the register. The use of a common seal is not required. The Partnership may have a seal which the Secretary must keep in a secure place unless the Board decides that someone else should look after it. The seal must only be used if the Board decides this. When the seal is used, the deed or document must be signed by the Secretary or a Member of the Board or another person duly authorised to subscribe the deed or document on the Partnership’s behalf and recorded in the register.
Registers 64 The Partnership must keep at its registered office a Register containing:
64.1 the names and addresses of the Members and where provided for the
purposes of electronic communication, fax numbers and email addresses; 64.2 a statement of the share held by each Member and the amount each Member
paid for it; 64.3 the date each person was entered in the Register as a Member and the date
at which any person ceased to be a Member of the Partnership; 64.4 a statement of other property in the Partnership, whether in loans or loan
stock held by each Member; and
22
64.5 the names and addresses of the Office Bearers of the Partnership, their positions and the dates they took and left office.
65.1
The Partnership must also keep at its registered office:
65.1.1 a second copy of the Register showing the same details as above but not the statements of shares and property. This second register must be used to confirm the information recorded in the original Register;
65.1.2 a register of loans and to whom they are made; and 65.1.3 a register showing details of all loans and charges on the Partnership’s land.
65.2 The inclusion or omission of the name of any person from the original Register of
Members shall, in the absence of evidence to the contrary, be conclusive that the person is or is not a Member of the Partnership.
Registered Name 66 The registered name of the Partnership must be clearly shown on the outside of every
office or place where the Partnership’s business is carried out. The name must also be engraved clearly on the Partnership’s seal and printed on all its business letters, notices, adverts, official publications, website and legal and financial documents.
Documentation 67 The Partnership’s books of account, registers, securities and other documents must be
kept at the registered office or any other place the Board decides is secure.
68 At the last Board Meeting before the annual general meeting, the Secretary must confirm in writing to the Board that Rules 62 to 67 have been followed or, if they have not been followed, the reasons for this. The Secretary’s confirmation or report must be recorded in the minutes of the Board Meeting.
ACCOUNTS 69 The Partnership must keep proper books of accounts to cover its income, expenditure
transactions and its assets, liabilities and reserves in line with Part 7 of the Co-operative and Community Benefit Societies Act 2014. It must also set up and maintain a suitable system for controlling its books of accounts, its cash and its receipts and invoices.
70 The Board must send the Partnership’s accounts and balance sheet to the Partnership’s auditor. The auditor must then report to the Partnership on the accounts it has examined. In doing this, the auditor must follow the conditions set out in Part 7 of the Co-operative and Community Benefit Societies Act 2014 and Part 6 of the Housing (Scotland) Act 2010.
71 The Partnership must provide The Scottish Housing Regulator and the Financial Conduct Authority with a copy of its accounts and the auditor’s report within six months of the end of the period to which they relate.
THE AUDITOR
23
72.1 Each year the Partnership must appoint, at a general meeting of the Partnership, a qualified auditor to audit the Partnership’s accounts and balance sheet. In this Rule “qualified auditor” means someone who is a qualified auditor under Section 91 of the Co-operative and Community Benefit Societies Act 2014.
72.2 None of the following can act as auditor to the Partnership:
72.2.1 a Board Member or employee of the Partnership; 72.2.2 a person who is a partner of, or an employee or employer of a Board Member
or employee of the Partnership; 72.2.3 an organisation which is a Member of the Partnership.
73 The Partnership must appoint an auditor within three months of being registered by the
Financial Conduct Authority. The Board will appoint the auditor unless there is a meeting of the Partnership within that time. The Board may appoint an auditor to fill in a casual vacancy occurring between general meetings of the Partnership. The Board shall take such steps as it considers necessary to ensure the continuing independence of the Partnership’s auditor including the periodic review of the need for audit rotation. The Partnership must send a copy of its accounts and the auditor’s report to The Scottish Housing Regulator within six months of the end of the period to which they relate.
74.1 An auditor appointed to act for the Partnership one year will be re-appointed for the following year unless:
74.1.1 a decision has been made at a general meeting to appoint someone else or specifically not to appoint them again; or
74.1.2 they have given the Partnership notice in writing that they do not want to be re-appointed; or
74.1.3 they are not a qualified auditor or are excluded under Rule 72.2; or 74.1.4 they are no longer capable of acting as auditor to the Partnership; or 74.1.5 notice to appoint another auditor has been given.
74.2 To prevent an auditor being re-appointed or to appoint another person as auditor, not
less than 28 days notice must be given to the Partnership that the matter requires to be discussed at the next meeting of the Partnership.
74.3 The Partnership shall give notice to the auditor who is to be asked to step down that the matter will be discussed at the next meeting of the Partnership. If possible the Partnership will also give proper notice of this matter to the Members but if this is not possible, the Partnership can give notice by advertising in the local newspaper at least 14 days before the meeting.
74.4 The retiring auditor may make representations to the Partnership or give notice that he/she intends to make representations at the meeting and the Partnership must tell the Members of any representations made by the auditor under Section 95 of the Co-operative and Community Benefit Societies Act 2014 .
ANNUAL RETURNS AND BALANCE SHEET
24
75.1 Every year, within the time allowed by the law, the Secretary shall send to the Financial Conduct Authority the annual return in the form required by the Financial Conduct Authority.
75.2 The Secretary must also send:
75.2.1 a copy of the auditor’s report on the Partnership’s accounts for the period covered by the return; and
75.2.2 a copy of each balance sheet made during that period and of the auditor’s report on that balance sheet.
76 The Partnership must provide a free copy of the latest annual return and auditor’s reports to Members or people with a financial interest in the Partnership.
77 The Partnership must always keep a copy of the latest balance sheet and auditor’s report publicly displayed at its registered office.
78 The Partnership must comply with the requests of The Scottish Housing Regulator for annual returns.
SURPLUSES AND DONATIONS
79.1 The Partnership must not distribute its surpluses to Members.
79.2 The Board shall set and review periodically its policy for the donation of funds to charities. Such donations must further the objects of the Partnership and the Board shall report to the Members on such donations.
INVESTMENTS
80 The Partnership’s funds may be invested by the Board in such manner as is permitted
by its Investment Policy subject always to the requirement that the Partnership will comply with the Regulatory Framework and Regulatory Guidance issued by The Scottish Housing Regulator from time to time.
INSPECTING THE REGISTER
81 Any Member or person having a financial interest in the Partnership can inspect their
own account. They may also inspect the second copy of the Register of Members which shall be made available to them for inspection within seven days of the request of a Member or eligible person. The books must be available for inspection at the place they are kept at all reasonable hours. The Board may set conditions for inspecting the books. The Partnership will also maintain a register of the names of those Members who have given consent for this purpose which shall be made available for inspection within seven days of the request of any person.
DISPUTES 82 Every dispute between the Partnership or the Board and:
82.1 a Member; or
25
82.2 a person aggrieved who has ceased to be a Member within the previous six months; or
82.3 a person claiming under the Rules of the Partnership,
shall be dealt with in accordance with these Rules and any procedures determined by the Board from time to time but without prejudice to all rights which any person may have to raise an action on the matter in any court with competent jurisdiction, including without prejudice the Sheriff Court in the Sheriffdom in which the Partnership's registered office is located.
STATUTORY APPLICATIONS TO THE FINANCIAL CONDUCT
AUTHORITY 83 Any 10 Members of the Partnership who have been Members for at least the 12
previous months can apply to the Financial Conduct Authority to appoint an accountant or actuary to inspect and report on the Partnership’s books on payment to the Financial Conduct Authority of the costs required.
84.1 One-tenth of Members can apply to the Financial Conduct Authority to:
84.1.1 appoint an inspector to examine and report on the affairs of the Partnership; or
84.1.2 call a special general meeting of the Partnership.
84.2 If there are more than 1000 Members in the Partnership, only 100 Members need to apply to the Financial Conduct Authority in terms of Rule 84.1.
COPIES OF RULES 85 The Secretary shall, on demand, provide a copy of the Rules of the Partnership free of
charge to any Member who has not previously been given a copy and, upon payment of such fee as the Partnership may require, not exceeding the amount specified by law, to any other person.
CLOSING DOWN THE ASSOCIATION
86.1 The Partnership may be closed down in either of the following ways:
86.1.1 by an order or resolution to wind up the Partnership as set out in the
Insolvency Act 1986 and/or Section 105 of the Housing (Scotland) Act 2010; or
86.1.2 in accordance with Section 119 of the Co-operative and Community Benefit Societies Act 2014 , by an instrument of dissolution to which not less than three-fourths of the Members have given their consent testified by their signatures to the instrument.
26
86.2 The prior approval of the Office of the Scottish Charity Regulator is required before the Partnership can be dissolved. The Partnership must submit its application for approval to the Office of the Scottish Charity Regulator not less than 42 days before the date on which the Partnership intends to dissolve.
87 If any property remains after the Partnership has paid its debts, this property will be transferred to such other charitable registered social landlord as determined by The Scottish Housing Regulator.
CHANGING THE RULES 88.1 Any of these Rules can be changed or deleted and new Rules can be introduced if:
88.1.1 three-quarters of the votes at a special general meeting are in favour of the
change(s); and 88.1.2 The Scottish Housing Regulator has approved the change(s).
88.2 Where an amendment of these Rules affects the purposes of the Partnership the prior
approval of the Office of the Scottish Charity Regulator is required. The Partnership must submit its application for approval to the Office of the Scottish Charity Regulator not less than 42 days before the date on which the Partnership intends to amend its purposes. Any other amendment of these Rules requires to be notified to them within three months of the change having been made.
88.3 The Partnership must apply to the Financial Conduct Authority to register every rule change as set out in treasury regulations. Each Member must receive a copy of the change. No change is valid until it has been registered by the Financial Conduct Authority.
88.4 The Partnership can change its name if:
88.4.1 three-quarters of the votes at a special general meeting are in favour of the change; and
88.4.2 the Financial Conduct Authority approves the change in writing. 88.4.3 the Office of the Scottish Charity Regulator has given its prior approval. The
Partnership must submit its application for approval to the Office of the Scottish Charity Regulator not less than 42 days before the date on which the Partnership intends to change its name.
88.5 If the Partnership changes its name in terms of Rule 88.4 it must inform The Scottish Housing Regulator in writing within 14 days.
88.6 The Partnership can change its registered office but must:
88.6.1 notify The Scottish Housing Regulator and the Financial Conduct Authority of the change in registered office within seven working days of the decision having been made; and
88.6.2 notify the Office of the Scottish Charity Regulator within three months of the change having been made.
27
INTERPRETING THESE RULES
89.1 In these Rules, the following words and phrases have the meanings given below:
89.1.1 “A person claiming through a Member” includes an heir executor assignee or
nominee. This heading would be used in connection with disputes about the transfer of a Member’s share after his death. It would also cover executors of a former Member.
89.1.2 “Barra Tenant Member” means a Tenant Member residing in the geographical area of Barra.
89.1.3 89.1.4 89.1.5
“Board” means the Board of Management appointed in line with Rule 38. “Board Meeting” means a meeting of the Board. “Board Member” means a member of the Board.
89.1.6 “Board Member Group” means either (a) the total number of Tenant Board members on the Board at any time, called the Tenant Board Member Group; (b) the total number of Community Board Members on the Board at any time, called the Community Board Member Group; or (c) the total number of Independent Board Members on the Board at any time called the Independent Group;
89.1.7 “Chairperson” means the Chairperson of the Partnership referred to in Rule 59.1.
89.1.8 “Close Relative” means someone who is the spouse or civil partner of a person, or (being either of the same or different sex) who cohabits with that person, or is that person’s parent, grandparent, child, stepchild, grandchild, brother or sister.
89.1.9 “Community Board Member” means a Board Member elected from the category of Community Members.
89.1.10 89.1.11
“Community Member” means a Member of the Partnership who is a resident member of the community of the Western Isles and who is not a tenant of the Partnership and shall include any member of an organisation (other than the Council ) in terms of Rule 12. “Council” means Comhairle Nan Eilean Siar or any statutory successor to that body which is responsible as local authority for the Western Isles administrative area (or, if there is more than one such successor body, the body responsible for the housing function) and “Councillor” is an elected member of the Council.
89.1.13
“Financial Conduct Authority” means the registering authority for societies registered under the Co-operative and Community Benefit Societies Act 2014 and the Credit Unions Act 1979 set up in terms of the Financial Services Act 2012 or its successor body.
89.1.14 “Group” means the Partnership and any organisation which is its parent, its subsidiary or is a subsidiary of its parent.
89.1.15 89.1.16 89.1.17
“Harris Tenant Member” means a Tenant Member residing in the geographical area of Harris. “Independent Board Member” means a Member who is appointed to the Board pursuant to Rule 40.5; “Lewis Tenant Member” means a Tenant Member residing in the geographical area of Lewis.
28
89.1.18 89.1.19
“Member” means a member of the Partnership whose name is entered in the Register of Members. “Membership Category” means any of the categories of membership of the Partnership as set out in Rule 7.2.
89.1.20 “Office Bearer” means the Chairperson, Secretary, and such other Officer Bearer appointed under Rule 59.1.
89.1.21 “Office of the Scottish Charity Regulator” means the body set up under the Charities and Trustee Investment (Scotland) Act 2005 to regulate charities in Scotland.
89.1.22 “organisation” means a legal body which exists separately and distinctly from its members and includes companies, building societies, community benefit societies, local authorities and so on and also for the purposes of these Rules includes unincorporated organisation such as social clubs, branches of political parties or trade unions and other voluntary bodies.
89.1.23 89.1.24
“Partnership” means the registered social landlord referred to in Rule 1 whose Rules these are. “property” includes everything which can be passed on by inheritance (including loans, certificates, books and papers).
89.1.25 “Register of Members” means the register of members referred to in Rule 64. 89.1.26 “Rules” means the registered Rules of the Partnership.
“Secretary” means the Office Bearer appointed by the Board to be the Secretary of the Partnership or anyone authorised by the Board to stand in for the Secretary.
89.1.27 “Taxes Acts” means Part 11 of the Corporation Tax Act 2010 as read with Schedule 6 of the Finance Act 2010 and any statute or statutory provision which amends, extends, consolidates or replaces the same.
89.1.28 89.1.29 89.1.31 89.1.32 89.1.33 89.1.34
“Tenant Board Member” means a Board Member elected from any one category of Tenant Members and included within the Tenant Board Member Group. “Tenant Board Membership Categories” means the three categories of Tenant Board Membership representing the geographical areas of (a) Lewis, (b) Harris, and (c) the Uists and Barra respectively and Tenant Board Membership Category shall be any one of these. “Tenant Member” means any person who is from time to time a tenant under a lease entered into with the Partnership and is a Member. “Tenant Membership Categories” means the four categories of tenant membership representing the geographical areas of (a) Lewis, (b) Harris, (c) the Uists and (d) Barra respectively and as referred to in Rule 7.2 and Tenant Membership Category shall be any one of these. “The Scottish Housing Regulator” means The Scottish Housing Regulator as established pursuant to Section 1 of the Housing (Scotland) Act 2010. “The Western Isles” means that local government administrative area for which the Council have responsibility.
89.1.35 “Uist Tenant Member” means a Tenant Member residing in the geographical areas of the Uists.
89.1.36 “Vice-Chairperson” means the vice-chairperson appointed in terms of the Partnership's standing orders.
89.1.37 Words in the singular also include the plural. Words in the plural also include the singular.
89.1.38 A reference to law or statute is a reference to that law or statute as re-enacted, amended or replaced.
29
89.2 In the event of Sterling joining the Euro any sums of money referred to in Sterling in these Rules shall be redenominated into Euros at the rate of exchange applying for such redenomination as at the date of joining the Euro.
30
APPENDIX 1
PROXY FORM You must use the wording shown below to appoint a representative to vote at a meeting for you. Please see Rule 27.1 for more details. I (insert name) am a member of (insert name) ______________ Limited. My address is: (please insert). I hereby appoint (insert name) who lives at (insert address) to be my representative and vote for me at the Partnership’s meeting on (insert date) and any other dates that meeting continue on.
Your name
Your signature
Date
31
APPENDIX 2
CANCELLATION OF PROXY You must use the wording shown below to reverse your application to send a representative to vote at a meeting for you. Please see Rule 27.4 for more details. I (insert name) am a member of (insert name) ______________ Limited. My address is: (please insert). I hereby revoke the appointment of (insert name) as my representative to vote for me at the Partnership’s meeting on (insert date) made by me on the (insert date). I no longer authorise the person referred to above to represent me at the meeting referred to above.
Your name
Your signature
32
SIGNATURE OF BOARD MEMBERS
Date
1.
2.
3.
4.
Members
5.
6.
7.
Secretary
CO-OPERATIVE AND COMMUNITY BENEFIT SOCIETIES ACT 2014
Registration Number R
Limited has today been registered
under
the Co-operative and Community Benefit Societies Act 2014.
Date
Dena Macleod 15-Jun-17
APPENDIX 2-CHANGES TO RULES
Rule
number
Reason for
amendment
Comment
4 2015
amendment to
model rules
New wording, which adds further detail on the use of the
Partnership's profits.
7.2 Requested
amendment
Rule 7.2.3 relating to the Council membership category has
been deleted.
7.7 Requested
amendment
This new rule provides for deemed admittance of an
Independent Board Member once they have been
appointed.
15 2015
amendment to
model rules
New rule relating to the Members not being entitled to the
Partnership's property.
37.2.1 Requested
amendment
Amendment to refer to Independent Board Members
instead of Council Board Members within the composition of
the Board.
(37.2.4) Requested
amendment
This rule has been deleted to remove the reference to an
Appointed Board Member within the composition of the
Board.
37.3 Requested
amendment
This rule has been amended slightly to ensure that vacant
positions for one category of Tenant Board Member can be
filled by candidates of another category, provided they are
eligible for election as a Tenant Board Member.
37.5 Requested
amendment
New wording to provide that candidates for Independent
Board Members do not need to be a Member to become a
Board Member but will do so once appointed.
37.9 2015
amendment to
model rules
New wording to clarify the 9 year rule for Board Members'
terms of office.
(40.3, 40.5
and 40.6)
Requested
amendment
These rules have been deleted on the basis that any
Member can vote for all categories of Board Members.
(40.8) Requested
amendment
This rule has been deleted as there will no longer be Council
Board Members.
40.6 Requested
amendment
This rule has been amended to incorporate the provisions for
Independent Board Members.
42 2015
amendment to
model rules
New wording to include references to sub-committee
members for co-optees.
43.2 2015
amendment to
model rules
New rule referencing the 9 year rule, providing that the
Board needs to be satisfied of a Board Member's continued
effectiveness before that person can stand for re-election.
59.5 Requested
amendment
The last sentence of this rule has been removed so that any
Board Member can be nominated as the Chairperson.
59.11 Clarification We have suggested a new rule for the appointment of a
Vice Chairperson to reflect the references to a Vice
Chairperson within the current rules.
89.1 Requested
amendment
The definitions have been updated to reflect the requested
amendments.
Dena Macleod 15-Jun-17
APPENDIX 3- CONSULTATION
TENANT PARTICIPATION OFFICER
The Tenant Participation Officer discussed the Rule Change with tenants
and the general view was that this would be a very good move for HHP. The
idea of recruiting board members based on their skill, ability and
experience to operate at board level will help to strengthen the
governance of the organisation.
It will also support the view that HHP is an independent functioning
organisation and place it in a stronger position. Good representation is
important but equally it is important that there is full tenant representation
and comprehensive support for tenants and all Directors to operate at this
level.
VIEW FROM COMHAIRLE TO FOLLOW
Dena Macleod 15-Jun-17
APPENDIX 4-TIMETABLE & ACTION PLAN
Item Description Responsible Timescale
1 Approve changes to Rules Board 24 May 2017
2 Job Descriptions and basis of Skills
Assessment prepared
Corporate
Governance Manager
10 June 2017
3 Rules updated Legal Advisor 10 June 2017
4 Tenant & Comhairle Consultation Corporate
Governance Manager
24 May 2017 –
23 June 2017
5 Consultation with Funder Director of Finance &
Corporate Services
23 June 2017
6 Scottish Housing Regulator (In
Principle) consent
Legal Advisor 23 June 2017
7 Arrange for Special General
Meeting of Members to approve
rule change
Corporate
Governance Manager
/ Membership
14 July 2017
8 Rules approved by SHR Corporate
Governance
Manager/Legal
Advisor
July 2017
9 Rules approved by FCA Legal Advisor July 2017
10 Skills Assessment Corporate
Governance Manager
21 July 2017
11 Advertise for Independent Board
Members
Corporate
Governance Manager
/ Personal Assistant
26 July 2017
12 OSCR Notification Corporate
Governance Manager
31 July 2017
13 Interviews and appointment Board/Executive Team 16 August 2017
14 New Board in place Chief
Executive/Corporate
Governance Manager
September 2017
15 Training Plan 2017/18 for Board
members
Corporate
Governance Manager
November 2017
Jackie Macleod Page 1 of 2 16/6/17
Agenda Item 13
BOARD 28 June 2017
DEVELOPMENT PLAN 2017/18 TO 2021/22
Report by Chief Executive
PURPOSE OF REPORT
1.1 To update the Board on the Scottish Government Grant funding available for 2018/19 to 2020/21.
SUMMARY
2.1 The Scottish Government announced on 13 June 2017 the Resource Planning Assumptions (RPA) for Affordable Housing for the next three financial years which provides certainty on the level of funding available for housing. The amount allocated to the Comhairle is £25.147m which brings the total for 2017/18 - 2020/21 to £30.918m. This is a significant increase (£7.791m) from what is currently included in our Development Plan.
2.2 Our five year Development Plan is being updated to take account of the announcement and will be available for the September Board meeting.
2.3 A copy of the Scottish Government press release is at Appendix 1.
COMPETENCE
3.1 The financial, legal and other constraints are detailed at paragraphs 5 and 6.
RECOMMENDATIONS
4.1 It is recommended that the Board note:
a) The RPA’s announced by the Scottish Government for 2018/19 to 2020/21 of £25.147m as shown at Appendix 1; and
b) The five year Development Plan for 2017/18 to 2021/22 will be updated in discussion with the Comhairle and the Development Workgroup and be presented to the Board in September 2017 for review and approval.
APPENDIX 1 Scottish Government Press Release
Background Papers None
Writer of Report Dena Macleod Tel: 0300 123 0773
Jackie Macleod Page 2 of 2 16/6/17
COMPETENCE
Financial 5.1 Provision has been made in the approved Business Plan for £9.688m of private finance to
deliver the Development Programme. The announcement by the Scottish Government of the additional funds available for affordable housing will result in the level of private finance required being increased in the region of £3 million.
5.2 The impact of increasing the development programme on the Partnership’s long term
finances will be fully assessed. A report will be brought back to the Board in September showing the available options to enable decisions to be taken.
5.3 Approval of our Funder will be required for any increase to the Development Programme
in the Business Plan.
RISK
6.1 Development is inherently risky due to the level of funds involved and the consequences of building the wrong type of properties in the wrong location. It is even more so at a time when there is general economic uncertainty, forecasts on population decline and weakening demand. Risk will be mitigated by carrying out feasibility work to ascertain the suitability and capacity of potential sites for development and working with the Community Planning Partnership to support the work they are undertaking to ensure the forecasts on population decline do not become a reality. The greater risk could be doing nothing.
6.2 Risk related to a particular development is assessed as part of the feasibility study.
6.3 Development has a lengthy lead-in time and significant work is required to ensure that the 2018/19 programme can be delivered on target. In particular the strategic direction needs to be set which will then inform site acquisition work particularly in rural areas. Site acquisition can be a difficulty and lengthy process and at present no land bank exists in rural areas. This should be based on strategic priorities.
Jackie Macleod Page 1 of 3 16/6/17
Agenda Item 14
BOARD 28 June 2017
DEVELOPMENT PROGRAMME 2017/18
Report by Chief Executive
PURPOSE OF REPORT
1.1 To advise the Board of progress with the Development Programme 2017/18 and a proposed change to the current policy on how Shared Equity properties are allocated.
SUMMARY
2.1 Mackenzie Avenue is on site and progressing well. Issues raised by Building control as a result of the change in layout required to deliver savings, are being addressed and will not affect the overall timescales of the project.
2.2 The design work is underway by consultants LDN Architects and first draft of the design is being reviewed.
2.3 The design team for Tarbert Central submitted a planning application which received strong objections and will be considered by the Planning Committee on 20 June 2017. An update will be provided at the Board meeting.
2.4 Construction options for Corran Ciosmul are being reviewed to identify the benefits of “offsite construction”. Following completion of the review tender documents will be prepared for the next stage of the development.
2.5 Appendix 1 provides a summary of spend for the 2017/18 programme and details of the spend to date on individual projects can be found in the private papers.
2.6 The Development Workgroup met on 5 June 2017 to explore the options for landbanking and a draft note of the meeting is at Appendix 2.
2.7 TIG are currently redrafting the Policy on the allocation of Shared Equity properties to amend the basis from first come first served to the equivalent of a waiting list.
COMPETENCE
3.1 The financial, legal and other constraints are detailed at paragraphs 5 and 6.
RECOMMENDATIONS
4.1 It is recommended that the Board:
a) Note the progress on the Development Programme for 2017/18;
b) Note the forecast out-turn spend on the Development Programme for 2017/18 at Appendix 1; and
c) Delegate the approval of the revised Policy to the allocation of Shared Equity properties to the Development Workgroup.
Jackie Macleod Page 2 of 3 16/6/17
COMPETENCE
Financial 5.1 There is a private finance budget of £1.2m for the 2017/18 Development Programme.
RISK
6.1 Development is inherently risky. Feasibility work to ascertain the suitability and capacity of potential sites for development helps to reduce risk. Feasibility studies are jointly funded by HHP and the Comhairle and are undertaken by Tighean Innse Gall.
6.2 Risk related to particular development is assessed as part of the feasibility study.
REPORT DETAILS
Progress on Site
Mackenzie Avenue (Melbost Phase 3 Stage 3 and Melbost Phase 4)
7.1 Work started on site in March 2017 and the handover of the first phase is planned for June 2018 with the final completion in September 2019.
Cameron Terrace, Lochs
7.2 TIG has been instructed to progress this site to tender. It is proposed that this be on a Design Build basis using the new HHP house designs.
Acquisition
8.1 An update is provided in the paragraphs below highlighting projects where there has been progress or significant change since the last meeting of the Board. The projects where there has been no change are:
• Stoneyfield
Tarbert Police Station
8.2 The property has now been acquired and the design team have commenced work.
Tarbert Central
8.3 The site is currently in the Comhairle’s ownership and there is a potential legal matter which requires to be addressed prior to the site being transferred to HHP. In addition 8 objections have been received to the planning application and this will need to be determined at Committee. An update will be provided at the meeting.
Other Sites Being Explored
8.4 There are a number of other potential development sites being explored: Perceval Road, Stag Road, Back Care Unit, Lochmaddy Police House, Lady Matheson School on Scotland Street, site at Tarbert (near Harris House), Balivanich, Scott Road Tarbert and the HIAL site at Stornoway airport.
Jackie Macleod Page 3 of 3 16/6/17
Master Planning
9.1 Architects, Robert Potter and Partners have been appointed and master planning is underway with a view to the master plan being completed by September 2017.
9.2 An indicative project plan has been prepared showing when the project is likely to start on the ground showing a site start which is almost a year later than expected and provided for in our Development Plan. Concern has been raised by the Chief Executive and Director of Operations at both the Project Board and Project teams about the impact the delay may have on the funding currently available from Scottish Government.
9.3 This is an extremely important project for the islands and if it is to be delivered within a timescale that will maximise the utilisation of Scottish Government Grants for housing, additional staffing resources will be required at both the Comhairle and HHP. Item 25 on the agenda is a report outlining the additional resource required from HHP’s perspective.
APPENDIX
APPENDIX
1
2
Development Programme Forecast Out-turn 2017/18
Note of Development Working Group Meeting of 5 June 2017 (To be issued at
meeting)
Background Papers None
Writer of Report Dena Macleod Tel: 0300 123 0773
Development Programme PROGRESS TO 31 MAY 2017 APPENDIX 1
Amend to
Budget 31 May 17 Remaining Out-turn Budget 31 May 17 Remaining Out-turn Budget 31 May 17 Remaining Out-turn Private Finance
AREA £ £ £ £ £ £ £ £ £ £ £ £ £
New Build 5,919,860 558,739 - 5,919,860 (4,291,800) (196,974) - (4,291,800) 1,628,060 361,765 - 888,160 (739,900)
Retentions 13,000 - 13,000 - - - - 13,000 - - 13,000 -
Shared Equity 1,216,430 265,757 89,680 1,306,110 (1,705,150) (60,956) - (1,705,150) (488,720) 204,801 89,680 (399,040) 89,680
Mortgage to Rent - - - - - - - - - - - - -
Land banking - - - - - - - - - - - - -
TOTAL 7,149,290 824,496 89,680 7,238,970 (5,996,950) (257,930) - (5,996,950) 1,152,340 566,566 89,680 502,120 (650,220)
OVERALL COMMENT ON PROGRESS OF PROGRAMME PROGRAMMES WITH TIME DELAYS
Projects on site progressing well Tarbert Central - planning concerns going to committee in June, failure to secure approval will have an impact on
MacKenzie Lane handed over May 2017. start date.
Mackenzie Avenue: work continues on site with small deviation to cash flow expected to be
caught up in June.
Tarbert Police Station purchase completed 17/04/2017 - planning proposals to be drafted
second quarter 2017/18.
Tenders and planning applications for Corran Ciosmul, Cameron Terrace and Tarbert Central
due to go out in the second quarter of 2017/18.
PROGRAMMES WITH PROJECTED BUDGET OVERRUNS PROPOSALS FOR BRINGING PROGRAMME WITHIN BUDGET
Melbost 3 Stage 3 and Melbost 4 -cost savings to initial tender identified and work is
progressing on this basis.
COST GRANTS & SALES PROCEEDS PRIVATE FINANCE
BRD-28JUN17-14 Development Programme 2017 18 Appendix 1 - summary 1 16/06/2017
Angus Smith Page 1 of 4 23/6/17
Agenda Item A&R 12
Board 14
APPENDIX ICT Strategy 2017 - 2020
Background Papers None
Writer of Report Angus Smith Tel: 0300 123 0773
BOARD 28 June 2017
REVIEW OF ICT STRATEGY 2017 - 2020
Report by Director of Finance & Corporate Services
PURPOSE OF REPORT
1.1 To present to the Board for approval the proposed revised ICT strategy for Hebridean Housing Partnership covering the period 2017 to 2020.
SUMMARY
2.1 This Strategy is focussed on the review, replacement and development of our core hardware infrastructure and software systems. A significant percentage of our IT equipment is now over 10 years old, and both hardware and software is rapidly coming to end of life status. This means that it will no longer be supported or maintained, or will be unable to meet HHP’s operation needs.
2.2 It also focusses on improving tenant inclusion – their access to services and information, as well as harnessing the opportunities provided by the internet and new equipment to better manage our assets.
2.3 The Strategy also aims to ensure that infrastructure and systems are developed in order to achieve real and measureable business efficiencies and cost savings.
2.4 This is taking place against significant and upcoming technological advances, changes in the ICT marketplace, increasing security threats, and the requirements of HHP’s own business plan. It has been developed in conjunctions with feedback from officers, tenants, service/support providers, and best practice across the Housing sector.
COMPETENCE
3.1 Issues relating to legal and financial matters as well as associated risks are detailed at section 5.
RECOMMENDATIONS
4.1 It is recommended that:
a) Audit & Risk Committee consider the revised ICT Strategy (2017–2020) and recommend approval to the Board;
b) Board approve the revised ICT Strategy (2017–2020) at Appendix 1.
Angus Smith Page 2 of 4 23/6/17
COMPETENCE
Financial 5.1 There are total estimated costs of approximately £63K associated with the proposed ICT
developments over the next five years which have been identified initially. These costs are offset by potential financial savings and efficiency gains amounting to £145K. Both sets of figures, broken down by year are included for planning purposes.
5.2 The current approved budgets allowed for in the 30 year Business Plan provides for £35K
of expenditure per annum. Further costs identified above this level, together with savings identified, will be reported back to the Board for approval as development of the Strategy progresses.
Legal 5.3 The strategy aims to strengthen procedures and systems in relation to information
security; to better fulfil the requirements of the Data Protection Act and the forthcoming European General Data Protection Regulation (GDPR); and to lay the groundwork for the possible future inclusion of Housing Associations within Freedom of Information legislation.
RISK 6.1 HHP identifies and maintains a register of potential IT risks that the business may face.
As ICT is one of the critical areas the business relies on to function, it is one of the key functions addressed in HHP’s Business Continuity plan, for which procedures, testing and training are being developed.
6.2 HHP faces increasing operational and security risks due to the age of significant elements of both our hardware and software infrastructure, exacerbated by increasing obsolescence, breakdown and software ceasing to be supported.
6.3 HHP will mitigate these ICT risks through the implementation and regular review of this Strategy; appropriate and ongoing staff training; appropriate insurance cover; and ongoing development and testing of its business continuity processes.
REPORT DETAILS
7.1 The fundamental underpinnings of this strategy are unchanged in that it is designed to meet HHP’s Business Plan requirements and core objectives, but revisions are necessary to reflect ongoing and rapid technological and social changes over the last 5 years. In addition however, now that HHP has been in existence for 10 years, a more fundamental root and branch review of the equipment and software being used is required to ensure that these tools continue to be relevant and appropriate.
7.2 Relevant technological and social changes include:
The roll out of 4G availability and mobile services across the islands;
Faster speed Fibre broadband;
Increased expectation of online self-service and use of social media;
Software suppliers increasingly moving to supply their goods on a subscription only basis;
Angus Smith Page 3 of 4 23/6/17
New Data Protection Regulations coming in from May 2018;
Increasing Cloud Hosting for services; and
Increasing internet connectivity capability of equipment (Internet of Things).
7.3 The strategy will therefore change from a fixed 4-5 year document, to a rolling 4 year model, which is continually reviewed and updated.
7.4 Its aims are consistent with the delivery of our core objectives:
To provide efficient service to our tenants and stakeholders and delivering value for money by procuring effectively;
To widen Digital Inclusion and to improve Tenant access to Digital Services;
To ensure that Security is at the forefront of all IT Development;
To ensure that HHP responds effectively and pragmatically to technological changes;
To enable staff to deliver a high quality and efficient service; and
To develop the requirements for internet enabled equipment to be installed in our properties for better asset management.
7.5 The strategy attached here is therefore intended to be an initial high level document, highlighting the general development areas needed to meet the requirements of our Business Plan, and the ways in which we will investigate and assess the future needs of the organisation.
7.6 As elements are implemented, and investigations and improvements are considered and progressed, they will be brought back to the Board for approval, and for specific decisions if required.
7.7 The development areas identified in the Strategy are:
a) Hardware
b) Software
c) Hosting
d) Telephony
e) Web Services
f) Network
g) Internet of Things/Asset Management
The Strategy also provides estimated costs and times frames for any changes, as well as:
i. Investigation of New services, products and infrastructure
Angus Smith Page 4 of 4 23/6/17
ii. The development of software, including associated service contracts and maintenance agreements; and
iii. End of life technology and contract management. 7.8 We will continue to review of applications and support contracts to ensure: best value;
the implementation and development of systems to changing legislation (including Universal Credit); tenant needs; web and mobile services; the requirements of a future Repairs Contract; data management; and the maintenance of ICT security.
7.9 A greater emphasis is being placed on quantifying, measuring and reporting of cost and efficiency savings - to ensure that the benefits of proposed changes deliver their intended outcomes. KPIs will be developed to show progress here.
7.10 The strategy also looks to promote the development and use of untapped features and capabilities within our existing software and hardware infrastructure; changes to our processes to meet new challenges and current best practice; and the training of staff to ensure that systems are being fully and accurately utilised.
INFORMATION & COMMUNICATION TECHNOLOGY STRATEGY 2017-2020
Section Resources
Date Policy Approved 28 June 2017
Review Period 4
Review Due June 2020
Version 4.0
RSL No.359; A Registered Charity (No. SCO35767); A Registered Society under the Co-operative and Community Benefit Societies Act 2014 Reg No 2644R(S); Registered Social Landlord Reg No:359; Registered Property Factor: PF000183
APPENDIX 1
CHANGE HISTORY
Version No Date Change By
V 1.0 10 August 2006 First Draft Dena Macleod
V 2.0 13 February 2008 Revision for Period 2008 – 2011 Angus Smith
V3.0 9 February 2011 Revision for Period 2011 – 2016 Angus Smith
V4.0 1 February 2017 Revision for Period 2017 – 2020 Angus Smith
AMS
1
HHP ICT STRATEGY 2017 - 2020
Introduction
1.1 This strategy has been produced for the management of Hebridean Housing Partnership. It should
not be reproduced or circulated to any other body without prior written agreement. 1.2 The scope of this Strategy is that of a high level document which defines the strategic direction
for Information and Communication Technology (ICT) in line with HHP’s Business Plan over a rolling four years period – currently 2017 to 2020.
1.3 It will be a continually assessed strategy, keeping abreast of technological development and
regulatory requirement, whilst providing the necessary authorisation and approval for specific procurement and implementations to meet HHP’s specific needs.
1.4 HHP’s vision is to provide good quality and affordable homes and to secure consistently excellent
housing services throughout the Outer Hebrides. We will use the opportunity provided by new technologies to support and improve the business processes of the organisation and its strategic objectives, with emphasis on delivering five main outcomes. These are:
a) Digital Inclusion: The delivery of improved services, information access and engagement for
the benefit of our tenants, members, partners, suppliers and staff;
b) The increase in efficiency of, and cost effectiveness of, our services and their delivery across
the whole of the Outer Hebrides, thereby freeing resources for other front-line services;
c) To develop best practice and appropriate operating, management and reporting tools and
procedures. This is to allow HHP and its Board and management to effectively meet the needs
of the business within its regulatory framework, and within a joined up, proactive and
cohesive structure;
d) To ensure that security and data security is at the forefront of how ICT is managed; and
e) To develop appropriate IOT (Internet of Things) technologies – improving the management of
our assets through the use of internet linked equipment.
1.5 The strategy will also seek to address and reflect changes and developments in the wider IT world, including:
a) The new Data Protection Regulations (GDPR) due to be implemented from May 2018;
b) The roll out of 4G and mobile services;
c) Cloud based resources – both for applications and hosting;
d) Faster speed Fibre Broadband;
e) Software increasingly being supplied on a subscription only basis;
f) A general expectation of self service and internet services
AMS
2
Strategy Overview 2.1 The Strategy is formulated in such a way as to ensure that the general direction of ICT is not
constrained, rather it builds on the knowledge and experience gleaned from existing programmes of work to influence future change.
2.2 The Strategy encompasses six main developmental areas, which are co-dependent and
interrelated, and this increasing interrelation requires additional consideration and planning as we move forward. The areas are:
1. HHP Hardware
This is the equipment required by HHP in its operation.
PC’s
Laptops
Printers
Photocopiers
Monitors
Tablets
Security
Cameras
Information Screens
2. HHP Software
The software used by HHP in its operation.
Systems for Housing Management
Finance
Financial Modelling
Office Administration
Communication
Reporting etc.
3. Hosting
Externally Provided Hardware and Support
Server Specification
Local Servers
Helpdesk
4. Telephony
Fixed Telephony
Mobile Telephony
Video and Audio Conferencing
AMS
3
5. Web Services
Intranet
Mobile Working
Public Website/Apps
Social Media
6. HHP Network Arrangements
The network used by HHP in its operation.
Connectivity
Firewalls
Internal Network (Fixed and Wi-Fi)
Local servers
Email and web filtering
7. Internet of Things
Using technology and internet connectivity to monitor and better manage our assets in
realtime.
Sustainable Living Assistants (monitoring heating, lighting and electricity use)
Smoke and Carbon Monoxide detectors
Remotely managed Gas supply
Remotely managed stopcocks
Communal Lighting and access
2.3 The investigation and development objectives of each of these seven areas are detailed at Appendix 1.
2.4 For this Strategy to be successful;
a) There must be a real partnership between all those who manage, use and develop ICT.
b) ICT must be a key consideration in HHP’s business planning process.
c) A strategic and consistent view on how technology is applied across the organisation is
needed;
d) The delivery of new ICT must provide value for money and/or efficiency gains
e) There must be a commitment to develop the right ICT skills for all employees
f) The risks associated with ICT must be properly managed.
g) ICT must be developed and maintained over the period of the strategy
2.5 Appropriate staff training, as well as KPI’s and Targets will be developed in order to assess
progress, and will be considered as part of the review and reporting process.
AMS
4
Developing and Delivering the Strategy
3.1 HHP is committed to finding solutions for the delivery of services and facilities that best meet its
needs. These will be identified and achieved through research and training; knowledge sharing with
other Housing Associations and other similar organisations; and discussion and collaboration -
particularly with those groups and individuals (both internal and external) that are direct recipients
of the services provided.
3.2 Ensuring day to day delivery of the ICT Strategy, as approved, will be the responsibility of the
Director of Finance & Corporate Services, supported by a project team comprising of the Corporate
Resources Manager, the IT Officer and the Business Support Officer as well as representatives from
each of HHP’s operational teams (Housing Services, Finance, Property Services and Customer
Services).
3.3 Any significant deviations, either in terms of cost and/or direction will be referred back to the
Executive Team.
3.4 The current strategy has been developed in conjunction with, and with consultation and feedback
from:
HHP Business Plan (Business Planning Days 2016/7);
HHP Executive Team;
HHP Managers;
External Partners;
Internal Staff ICT survey 2015 and 2017;
Tenants Survey 2015; and
ICT User Groups
3.5 The way in which HHP services are delivered are constantly changing and many of these changes
cut across departments and areas. It is essential that we monitor and plan the changes and co-ordinate them so as to avoid opportunities being missed, to ensure that duplication is avoided, and that the strategy relates closely to objectives defined in our key planning documents.
3.6 Each Development Area within the ICT strategy (detailed at Appendix 1) and any new additions
wil be, where applicable, reviewed against five components. The five components are:
a) Project or initiative background; The reasons why the development is required and any
efficiencies and cost savings it can generate;
b) Other technology required in its delivery;
c) Delivery and implementation issues, and any impact on other services/processes;
d) The cost of procurement or other resources required in its delivery; and
e) How it will be developed and maintained going forward.
3.7 If additional IT solutions are required, we will aim to procure ‘off the shelf’ packages where
possible (i.e. no bespoke development) with an emphasis being placed on products that integrate with or are data compatible with our current software.
AMS
5
Threats to implementation 4.1 The strategy supports the priorities identified in HHP’s Business Plan, but the delivery of the
objectives may be influenced or adjusted in the short to medium term by factors such as:
a) The development of HHP’s business continuity plans;
b) The roll out of fibre and mobile internet connectivity in the islands;
c) Changes to legislation – for example, in relation to welfare reform or data protection;
d) Available finance to purchase/implement development
4.2 Meeting these challenges and achieving HHP’s objectives will require effective project management by the Project Team, with involvement from Officers, Management and Board Members within HHP - together with regular reviews of the strategy and its associated implementation plans.
Hardware/Software Procurement 5.1 HHP’s Standing Orders require, in relation to major purchases, prior consultation with and
approval by Board. It is recommended that the Corporate Resources team are involved in the evaluation of any new applications or services that require ICT support at the earliest possible opportunity.
Partnership Procurement 6.1 Opportunities for partnership procurement are being explored with other organisations, such as
other Housing Associations in Scotland who use the same software systems. As a Public Body, HHP has access to a number of Scotland and UK wide Framework agreements for the provision of ICT services.
Timescales and Priorities
7.1 Indicative timelines for the Strategy Implementation areas 1-6 are included at Appendix 2. Some
of the deadlines and targets are statutory and are therefore fixed. Others are dependent on the completions of evaluations and intermediary steps. The Strategy will therefore need to change and be flexible as technologies, reviews and business needs and priorities develop.
AMS
6
Strategy Review and Update 8.1 The Strategy will be reviewed as follows:
1) Ongoing review and update carried out by Corporate Resource staff, to confirm progress of
action plan, and the feasibility of its phased delivery timescales.
2) Regular review by the HHP’s Executive Team and Board, in with any amendments arising from
the review being factored into the Business Planning and Budget Setting processes.
AMS
7
Appendix 1 ICT Developmental Area 1 - HHP Hardware
Objective
“Providing the equipment and resources required to deliver services.”
Deliverables/Development Requirements 1.1 PC’s & Servers
To implement a 3 year PC and printer replacement plan costed at £30K (£10K per year) – equipment to meet HHP’s current base specifications;
To replace PC’s with the PC, Laptop or Tablet most appropriate - based on job role and business continuity requirements;
o Review use of existing iPads for Board Members and develop replacement strategy o Consider use of tablets for Clerks of Works and Housing Officers in relation to mobile
working
To upgrade all desktops to Windows 10 Enterprise Operating System;
To upgrade our servers to Windows Server 2016 Operating System;
1.2 General
To review the use of VDI (Virtual Desktop Infrastructure) i.e. how we connect to and use software held in the datacentre, in light of improved connectivity, integrated internet access, and use of local systems
To replace Shared Office Printers;
To replace Photocopiers at the one million copy mark (estimated to be in 2019)
To contribute to reduced energy use by HHP;
To reduce paper printing;
AMS
8
ICT Developmental Area 2 - HHP Software
Objective “Ensuring that our software is fit for purpose, and is the best solution for HHP’s needs.”
Deliverables/Development Requirements
2.1 General
Investigation of resource required for specialised coding and system development, against changes to current HHP processes where they can be made more efficient and less bespoke.
Investigation into automation of manual tasks and integration into systems where possible
To ensure that data held by HHP conforms to current and future data protecton requirements.
2.2 General Ledger
Review Financial System and other options and assess for suitability
Upgrade current system if necessary to meet business and hosting requirements
Investigate other financial systems
2.3 Housing Management System- Current
To develop a plan for workflow improvements
To develop improved arrears management processes
To develop letters and communication
Implementation of changes for Universal Credit
Improved integration with Repairs Contractor
To complete Planned Maintenance integration to Financial System
To integrate data from the Stock Condition Survey 2017
To review and provide training on CRM and development of html front end dashboard
Development of processes for areas such as Permissions and Anti-social behaviour
Review of processes in relation to Housing Act 2014 and any changes required by the updated Allocations Policy
To develop reporting tools to meet internal and ARC requirements
To investigate bulk SMS texting, and SMS texting built into automated processes
To investigate the ability to use incoming SMS for services
2.4 Housing Management System- Review
To review Housing systems requirements and whether the current system is fit for purpose
AMS
9
2.5 Document Management System
To develop the requirement and implement a solution that: o Improves invoice management; o Integrates with Finance and Housing Systems; o Provides a defined indexing system which allows fast searches and document retrieval.
2.6 Microsoft Office
To upgrade to Office 2016
To Investigate Office365 licensing options
2.7 Adobe Acrobat Pro/Reader
To review the use and licensing of PDF software
Investigation of alternatives
2.10 Personnel Software System Requirements to be developed and solutions sought
2.11 Contractors
To investigate software requirements should HHP decide to take the repairs function in-house.
1.12 Payment Systems
To allow credit and debit card payments to be taken at HHP Offices (Trial to begin in June 2017).
AMS
10
ICT Developmental Area 3 - HHP Hosted Infrastructure
Objective “Defining and delivering the required wider hardware infrastructure.”
Deliverables/Development Requirements
3.1 Hosted Solution
Review requirements in terms of processors, storage, memory, servers and backup;
Upgrade underlying software (Operating Systems, SQL, VMWare, Citrix, Office) ;
Investigate internet access through the hosted environment (with appropriate filtering etc.);
Tender for post 2018 provider;
Assess impact of increased licensing costs;
Assess any additional requirements of new or upgraded software;
3.2 Local Servers
Review use of local servers o whether the services that they host are better maintained locally, in the datacentre, or in
the cloud
3.3 Local Helpdesk
To review its hosting environment – local, datacentre, cloud
To require all issues to be logged and actioned through the helpdesk
To provide a solution for a secure door access system for Uist office
AMS
11
ICT Developmental Area 4 - Telephony
Objective “Ensuring we have the right tools to speak and listen to the outside world.”
Deliverables/Development Requirements 4.1 General
To increase flexibility, mobile working and business continuity options.
4.2 Video and Audio Conferencing
To investigate solutions for video conferencing in both offices for peer to peer desk based connectivity
4.3 Mobile Phones
To Review requirements and use, in relation to 4G availability, Wi-Fi calling, telephony use, camera, tablet requirements and other requirements (thermal imaging, mobile working, applications).
4.4 Telephony
To investigate VOIP (Voice over Internet Protocol) and cloud based telephone systems. Initial investigation has identified potential annual savings of £13K per year.
To investigate other low cost options for telephoning HHP
AMS
12
ICT Developmental Area 5 - Web Services: Intranet, Public Website & Mobile Working
Objective
“Promoting and enabling Digital Inclusion, and providing the equipment and applications for both tenants and staff to access and use HHP services.”
Deliverables/Development Requirements
5.1 Intranet
To develop internal HHP intranet for information sharing and training – a one stop shop for
policies, procedures, plans and objectives
To improve document version control (see also Document Management under software)
5.2 Mobile Working
To investigate mobile working:
o By administrative staff who are away from the office; o By Housing Officers and Clerks of Work who require access to rent, allocations, repairs and
planned maintenance systems out on site and as they visit tenants; and o as part of the development of business continuity processes; and
To develop smarter and joined up working between systems and mobile staff members
Undertake three month trial of mobile working solution from MIS in 2017
5.3 Website/Apps
To assess requirements, and to develop our website and mobile applications to provide tenant based services for:
o Real-time Rent Information/statements o Rent and other payment collection o Repairs o Allocations (void properties, assets available, applications) o General contact, feedback and complaints o Surveys o Real-time chat o Investment programme o Policies documentation o Video information
Initial assessment of cost is £7.5K (based on current housing software system)
5.4 Social Media
To explore opportunities for tenants to communicate with HHP and be informed, and to promote the Partnership further through this medium.
AMS
13
ICT Developmental Area 6 - HHP Network Arrangements
Objective
“Ensuring that HHP’s offices and data centre are linked efficiently and securely, and that data and access are managed appropriately”
Deliverables/Development Requirements
6.1 Connectivity
To implement 40mb Asynchrous Fibre Connectivity between HHP Offices and our Datacentre (now being implemented)
To upgrade backup lines to faster broadband services
6.2 Firewalls
To replace the existing Office Firewalls for increased security and new internet links
6.3 Network (Fixed and Wireless (Wi-Fi))
To complete the network wiring in Stornoway Office
To replace the Wi-Fi system to allow office wide, and public/private access
To allow Citrix access through Wi-Fi
6.4 Email and Web Filtering
Email currently being managed through the hosted platform
Review options for web filtering in relation to upgraded internet connectivity
AMS
14
ICT Developmental Area 7 – Internet of Things
Objective
“To improve asset management through the interconnection via the Internet of computing devices embedded in everyday objects, enabling them to send and receive data.”
Deliverables/Development Requirements
6.1 General
To develop and cost appropriate specifications and technologies to be fitted in our new build
properties and in our current assets at the time of investment works or as part of equipment
replacement programs. Specifically related to:
a Sustainable Living Assistants
Monitoring of heating, lighting and electricity use in properties – to assess the efficiency and performance in day to day use.
b Smoke and Carbon Monoxide Detectors
Immediate warning to HHP should a detector stop functioning.
c Remotely managed Gas supply
The ability to remotely stop gas flow should a fault be detected, or should access be denied for an annual gas inspection, thereby limiting further damage or injury
d Remotely managed stopcocks
The ability to remotely stop water should a fault be detected, thereby limiting further damage or injury.
e Heating System Control
The ability to respond to heating system faults as quickly as possible, especially important for elderly or vulnerable tenants
AM
S
15
Appendix
2 – In
dic
ativ
e T
imeta
ble
s
1.
Hard
ware
4 year project timeline
IT Stream
Hardware Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
PC's/Laptops Replacement cycle Replacement cycle Replacement cycle Replacement cycle
Tablets Replacement cycle
Printers Replacement Stornoway General
Photocopiers Replacement Stornoway Replacement Uist
Cameras/
SecuritySet up Stornoway and Uist Set up in Uist Replacement Stornoway
Information
ScreensSet up Uist
Generator Purchase
2017 2018 2019 2020
AM
S
16
2.
Softw
are
Software
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Housing
Management
System
Under review
Accounting
SystemUnder review
BRIXX Training
Adobe
Acrobat
Pro/Reader
Autocad
Personnel
Software
System/Time
and
Attendance/
Door Entry
Document
Management Under review
2017 2018 2019
AM
S
17
3.
Ho
sting
IT Stream Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hosted
SolutionCastle contract ends
Local Servers Replacement
Firewalls
Local
Helpdesk
2019
Extended hosting contract for Castle Hosting tender process
2017 2018
Dependancy on fibre
Replacement
AM
S
18
4.
Tele
ph
on
y
4 year project timeline
IT Stream
TelephonyJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Mobile
Landline/ VOIP
Contract ends
instant
messaging
conferencing
2017 2018 2019 2020
Mobile Phone contract ended
Testing of BT SIM's
Evaluate testingresults
Idenitify options from
testing
Procurement
AM
S
19
5.
We
b Se
rvices
IT Stream Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Internet
Intranet
Remote
working
Social media
2017 2018
Signed offWork in bothoffices to begin
Student placement to work on this
AM
S
20
6.
Ne
two
rk Arran
gem
ents
IT Stream Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Fibre Internet
Intranet
Firewalls
Wi-Fi/Internal
2017 2018 2019
Signed offWork in bothoffices to begin
Student placement to work on this
Dependancy on fibre
Jackie Macleod Page 1 of 3 23/6/17
Agenda Item 16
BOARD 28 June 2017
TENANT PARTICIPATION UPDATE
Report by Director of Operations
PURPOSE OF REPORT
1.1 This report updates the Board on issues around tenant participation.
SUMMARY
2.1 The Board approved a Tenant Participation Strategy in June 2016 and activity is ongoing to deliver on this strategy. A summary of current activity is at Appendix 1.
2.2 Activity includes the establishment of a repair service scrutiny group and information on this group is at Appendix 2.
2.3 A funding request has been received from the Cearns Community Association and Western Isles Housing Association Communities Forum to support 6 places at the TPAS (Scotland) Annual Conference in November 2017.
2.4 The Forum wish to have a clear approach to funding expenses for tenants taking part in participation activities. This is set out at Appendix 4.
COMPETENCE
3.1 The legal, financial or other constraints to the recommendations in this report are contained in paragraph 5.
RECOMMENDATIONS
4.1 It is recommended that:
a) Board agree to fund 6 places for the Cearns Community Association and Western Isles Housing Association Communities Forum at the annual TPAS Conference in November 2017; and
b) Board approve refunding tenant expenses in line with the Forum’s policy at Appendix 4.
APPENDIX 1 Summary of Tenant Participation Activity
APPENDIX 2 Tenant Scrutiny Group on Repair Service
APPENDIX 3 Letter from Western Isles Housing Association Communities Forum
APPENDIX 4 Policy on Funding Tenant Expenses
Background Papers None
Writer of Report John Maciver Tel: 0300 123 0773
Jackie Macleod Page 2 of 3 23/6/17
COMPETENCE
Financial 5.1 The cost of each place at the TPAS Conference is £660 for twin occupancy. TPAS have
offered HHP 6 places for the cost of 5. 5.2 Six places would therefore cost £3,300. This can be funded from existing community
support budgets. 5.3 Budgetary provision has been made to support tenant participation. Funding will be
made available to the Forum as appropriate or costs may be met directly by HHP.
Legal 5.4 There are no specific legal implications to the report.
RISK
6.1 Strong tenant participation represents good practice and reduced risk by helping to improve strong service delivery and processes to best meet the needs of service users. It also complies with regulatory expectations.
REPORT DETAILS
Background
7.1 Effective tenant involvement and participation is something that all good landlords aspire to deliver. It is important that tenants feel that they have opportunities to engage with HHP and to be involved in decision making.
7.2 The tenant satisfaction survey in 2015 found that only 60% of tenants were satisfied with options for participation. It is also a clear expectation from the Regulator that Registered Social Landlords engage effectively with tenants.
7.3 TPAS have been engaged to work with HHP in developing tenant participation and communication and considerable activity is ongoing in all areas to encourage and promote participation.
7.4 At present a scrutiny group has been set up which is focusing on the repair service. This work is ongoing but the group have made some observations on the Repair Policy. Information on the group and their initial views and queries are at Appendix 1 for information. This will be discussed and tested further with the group and will inform the Repair Policy review which is programmed to start shortly.
Participation Activity
8.1 Appendix 1 to the report provides an update on current activity. In addition the annual HHP tenant event was held in the Town Hall in May 2017 and events are currently being organised for Uist and Barra.
TPAS Conference
9.1 The Annual TPAS (Scotland) Conference is being held between 3 and 5 November 2017. This is billed as the only Conference which is aimed primarily at tenants.
Jackie Macleod Page 3 of 3 23/6/17
9.2 HHP has since 2006 funded several places at this Conference which has been mainly attended by representatives from the Forum and the Cearns Community Association. This has been funded from Tenant Participation budgets.
9.3 A request has again been received from the Cearns Community Association and the new Western Isles Housing Association Communities Forum which are Registered Tenant Organisations, for funding to enable 6 representatives to attend the Conference.
Tenant Expenses
10.1 The payment of expenses to tenants is important to ensure that they are able to participate effectively and to prevent cost being a barrier to tenant involvement. The Forum wish to ensure that a clear Policy is in place and they have provided a draft at Appendix 4 for approval.
10.2 Legitimate costs would be funded by HHP through existing community support budgets.
APPENDIX 1
TENANT PARTICIPATION ACTIVITY
Current Activities
Setting up of a tenant led scrutiny group on repairs.
Review of tenant participation section of the website working alongside the Customer Services Manager. This will provide clear easy to follow information for tenants regarding their housing service and participation and engagement information.
Contributions to the content and format of the Tenants Annual Report.
Ongoing work with the Western Isles Foyer and engaging with service users.
Review of tenant events and activities. An open drop in session has been held at the Bridge Centre, Stornoway over the past few months.
Contribution to the newly formed Communication Group. This will provide a space to pool ideas and resources to review and improve tenant faced communication.
Ongoing support for the tenant umbrella organisation (Western Isles Housing Association Communities Forum).
Ongoing and regular contact with all the tenant groups via email, Facebook, text and face to face.
Outline project plan developed for three HHP consultations planned for this year. The tenant consultations include rent, allocations and repairs.
Two new tenant information leaflets developed and printed and further ones being planned.
Review of letting standards and opportunities for tenants to review and feedback on these standards. Further work is planned to consider the change of tenancy process.
Scottish Housing Charter update session planned for this summer.
TENANT PARTICIPATION – TENANT SCRUTINY GROUP ON REPAIR SERVICE
SUMMARY This provides an interim report from the focus group. The work of the group is ongoing and they will produce a final report with recommendations later in the year. The group want to contribute to the policy review.
At this stage the recommendations section will focus on the repairs service and the Repairs and Maintenance Policy.
The focus group have agreed to take a closer look at two elements of the overall repairs and maintenance service. These are Air Source Heat Pumps and planned & cyclical maintenance.
The work of the focus group sits under the tenant scrutiny structure. It is essential to consider the pace and method when forming a tenant group to undertake work and tasks associated with scrutinising service areas and performance. This can be a fragile process and requires a tenant centred approach to developing this process.
INTRODUCTION
Tenant Scrutiny in Context
Tenant Scrutiny is about tenants being actively involved in reviewing how housing services are being delivered and how they can be improved. This approach provides an opportunity to develop partnership working between tenants and landlords to deliver excellent housing services.
Tenant led inspections are a popular way of involving tenants improving housing services. This is a process where tenants independently inspect a housing service to review how well it is working and to identify recommendations for improvement.
This approach allows tenants to inspect housing services from a tenants perspective
Hold service providers to account
Contribute to improvement in housing services, whilst ensuring policies and
procedures are clearly understood and implemented
Inform policy development and delivery
Ensure resources are used effectively and service delivered provide value for money
Benchmark and share good practice
The benefits are:
Opportunities to involve new people in tenant participation activities
Building capacity of organisations and individuals
Involving tenants in a constructive and practical way
Enhancing the landlords customer care focus
Developing relationships between tenants, tenants organisations and landlord staff
Meeting the requirements of the Scottish housing regulator and Scottish Social
Housing Charter
Driving forward improvements on housing services
FOCUS GROUP RECRUITMENT
A number of recruitment drives have been undertaken over the past 18 months, via social media, word of mouth, through RTO’s and Homeward to test the idea of a focus group. A number of tenants were approached under the umbrella of the Western Isles Communities Housing Association Forum and asked to form a focus group.
SELECTING A SERVICE AREA
The Forum had pre-selected a number of areas from tenant feedback. The repairs service was selected by tenants following feedback in the tenant satisfaction survey. The repairs and maintenance service is comprised of numerous service areas. Following a presentation detailing the whole service, the tenants selected to focus on ASHP and planned maintenance.
The group will also consider and review the draft letting standards, change of tenancy process and rechargeable repairs at a later point in its work programme.
SCRUTINY PROCESS
The focus group is following an agreed plan. This will include:
Administration
Agreeing term of reference for the project and code of conduct.
Agreeing the scope of the project
Information and relevant fact finding regrading repairs.
Understanding procedures and policies
Reality checking
What happens in practice
Tenant feedback
RECOMMENDATIONS
What the tenants liked
The group have now met on four occasions to consider information, reports and the Policy.
The tenants have identified good practice and information relating to repairs and maintenance.
Findings & Recommendations
Appendix 2.1 outlines the group suggestions and recommendations with regards to the HHP Repairs and Maintenance Policy.
FINDINGS RECOMMENDATIONS FROM THE GROUP
Repairs & Maintenance Policy Review
The repairs focus group went through the policy. The numbering
relates to the paragraphs in the policy. The bullet points are
general recommendations.
3.5 The section on keeping in repair the structure and exterior of all dwellings. Can this be more clearly defined for example what is included.
4.1 Record keeping – Suggest that this includes multiple reports about repairs.
5.1 The group would like to discuss improvement in terms of the information provided to tenants.
5.2 Tenants would like to be kept informed about the repairs and would also like the procedure of having repair request number implemented.
6.1 This section needs to be much clearer and information provided about what and why tenants are expected to pay. The group suggest an indicative cost of rechargeable work is developed into an information leaflet for tenants.
9.7 This area will be considered in further detail by the group.
The tenants would like the policy to clarify who is responsible for first service, and when it is a contractor installation, is the cost included in the installation cost?
10.1 Does this mean that it can be 10 or 15 years before particular schemes are visited maintenance?
11.2 How does this impact on the rent payable by the tenant?
13.1 The section on tenant consultation – The tenants welcome the opportunity to get involved in all areas of consultation as outlined in this paragraph. It is their experience that this has not been implemented in terms of choices or consultation. The tenants queried the choice of primary heating statement.
15.1 Handyman service. Tenants would like this service to be better publicised as many tenants are unaware of this service and how it works.
17.1 Aids and adaptations – The budget is around 120k per annum.
Paperwork & Administration
The group recommend that the database for the investment and
repairs work is amalgamated into one database. The group
understand that this is being undertaken and would like to know
the timescale.
Staff Roles & Decision Making
The above information can support the Customer Services Team to
identify the issue and solution and get it right first time if people
know the makeup and fabricate of the building?
Communication
The group would like to see all contractors undertake training in
terms of customer services and trade competencies. There is a
variation in the quality of work from the contractors. Various
trade, health and safety, competency, knowledge and practice
based training.
The group would like to highlight and stress the importance of
keeping tenants informed throughout the process from reporting a
repair to having it completed. They feel that this area requires
further work.
The group suggest an increase in the opportunity and feedback in
terms of tenants surveyed and satisfaction. The group recommend
that following each contractor visit tenants are offered an
opportunity to feedback. Only 5% of tenants were surveyed in
2016/17.
Standards & Value for money
The group would like to suggest more considerations given to stock
standardisation in terms of minimising costs, knowledge and
availability of parts.
Consideration and review the time taken to carry out certain
repairs, possible wasted journeys when the equipment is not
available in the van or not enough and have to go back for stock.
This has quite an impact when travelling to Ness or Harris.
The group suggest using photos as a way of communicating
directly and visually the repair.
Use of photos, apps for improving efficiency – FES FM Ltd have
included the use of photos in their enhanced contract.
The group would like to understand what happens when the
repairs, post investment works, appears to be loaded on to the
repairs budget when the contractor is still responsible.
The group would like more information about value for money –
trips out without the right/any equipment in the van, efficiencies
in terms of travel, communication between the two organisations.
The group would like clarification about the post repair
satisfaction note/survey. Is there a process for tenants to sign off
the work/job.
The group queried the use of resources deployed in supporting
tenants use their heating systems correctly? Can HHP develop
guidance/instructions for all heating systems, particularly new
ones? This is a particular issue in the first year and suggest
investigating other methods.
APPENDIX 4
WESTERN ISLES HOUSING ASSOCIATION COMMUNITIES FORUM
TRAVEL EXPENSES GUIDANCE
Bus, Train, Ferry and Plane Amount Please provide
You have to make your own arrangements using the most cost effective transportation. This can be booked and pre-paid through the Tenant Participation Worker.
Bus/Train ticket to the form unless a return ticket/or bus pass is used. These can be produced if requested.
Car use - Mileage
Car sharing is encouraged. The journey mileage including the return journey can be claimed. The allowance payable for car travel will not exceed the allowance payable for public transport for the same journey.
45p per mile Mainland rate 30p per mile
The driver has to complete the form detailing the mileage and the amount claimed. Please note that it is the responsibility of the car driver to have the relevant legal documentation including motor insurance for the vehicle
Taxi Fares
Taxi sharing is encouraged. Taxis will only be paid if the tenant/resident is unable to use public transport due to health and/or mobility problems. This should be agreed in advance with the Tenant Participation Development Worker.
Please attach the taxi receipt to the form.
Car Parking
This can be claimed for the period of the event.
Actual cost will be paid
Please attach the car parking ticket to the form.
Carers & Childcare Allowances
Carer expenses will be paid if you have to provide care for a family member(s). Care expenses will only be paid to registered care organisations or child minders. Family members providing care will not be paid expenses.
Payment will be made directly to the registered care organisation or the registered child minder.
APPENDIX 4
Subsistence Guidance (Food & Accommodation)
Amount Please provide
Allowances for meals (food and non alcoholic drink). Cash may be given to the tenant/resident before the event. This should be discussed with the Tenant Participation Worker. Overnight accommodation can be booked and prepaid through the Tenant Participation Development Worker.
Breakfast - £10.00 Lunch - £10.00 Late evening meal after 8pm £25.00 Accommodation will be from £75.00 - £85.00
Please attach all receipts to the form and any under spend must be returned to a Tenant & Community Engagement Officer as soon as possible after the event.
Telephone Calls
Where an individual makes telephone calls in relation to their involvement in the costs of the calls will be refunded.
Please attach a photocopy of your itemised bill highlighting the relevant calls on the form.
Incidental Expenses
Tenants and residents may incur other incidental expenses such as costs for Printer paper, Printer, cartridges, internet access, postage, stationary or mobile phones for which reasonable costs can be reimbursed where there has been prior agreement.
Please attach the relevant receipts to the form.
MAKING A CLAIM Prior agreement from Tenant Participation Development Worker must always be obtained for attendance to events when expenses are to be claimed. All people making a claim have to complete the Tenant & Community Engagement Expenses Form (See Appendix One) and attach the relevant receipt(s). These forms are available from the Tenant Participation worker Tenant & Customer Services Team The completed form must be given to the Tenant Participation Development Worker who will authorise and arrange for payment. PAYMENT Payments up to £100 will be paid from Petty Cash within 3 working days. Payments over £100 will be paid directly to the individual or organisation’s bank account within 30 days.
Jackie Macleod Page 1 of 2 16/6/17
Agenda Item 17
BOARD 28 June 2017
LEASE OF GROUND IN PLASTERFIELD
Report by Director of Operations
PURPOSE OF REPORT
1.1 The report provides information on a request received from the group Men’s Shed Stornoway to erect a shed in Plasterfield.
SUMMARY
2.1 A request has been received from a new group, Men’s Shed Stornoway, to erect a shed on an area of ground owned by HHP in Plasterfield. This request and supporting papers are attached at Appendix 1.
2.2 The area of ground was in the past part of the garden of number 76 Plasterfield. However, it is not being maintained by the current tenant and is in fact fenced off from the remainder of the garden. The area is largely unmaintained although the neighbouring residents are doing some tidying up work.
2.3 There is support from the neighbours, community and elected members for the proposal which seeks to provide a facility to improve community interaction and to enable the community to be more pro-active in improving the area and environment. Information is still required from the group on some of the details of their proposal. In particular we wish confirmation on the exit strategy should the group fail. However the Board are requested to approve the principle of the proposal and to delegate the decision on final approval to the Chief Executive.
COMPETENCE
3.1 The legal, financial or other constraints to the recommendations in this report are contained in paragraph 5.
RECOMMENDATIONS
4.1 The Board are asked to approve that:
a) In Principle permission be given to Men’s Shed Stornoway to erect a shed in Plasterfield and that annual rental be in line with garage site rental; and
b) The final decision be delegated to the Chief Executive subject to agreement being reached with the group on the detailed terms and conditions.
APPENDIX 1 Letter from Men’s Shed Stornoway Dated 30 May 2017 and Supporting Papers
Background Papers None
Writer of Report John Maciver Tel: 0300 123 0773
Jackie Macleod Page 2 of 2 16/6/17
COMPETENCE
Financial 5.1 There are no direct financial implications for the proposal. It is proposed that the rental
charged be set in line with garage site rents which are £100.19.
Legal 5.2 The detailed terms and conditions will be agreed with the Men’s Shed group. The
proposal is consistent with HHP’s charitable aims.
RISK
6.1 The most significant risk is that the group fails and that the shed is left on site. An exit strategy will be agreed with the group which mitigates this risk.
Jackie Macleod Page 1 of 2 23/6/17
Agenda Item Board – 18 A&R - 13
AUDIT & RISK 27 June 2017
BOARD 28 June 2017
COMMUNITY GRANTS POLICY
Report by Director of Operations
PURPOSE OF REPORT
1.1 This report presents a proposed policy to address community requests for financial assistance for consideration by the Board.
SUMMARY
2.1 The Board agreed on 1 February 2017 to develop a policy framework for community requests for financial assistance.
2.2 A draft Policy is attached at Appendix 1 which sets out a framework for the provision of grants to community groups. In particular it is a requirement of the policy that any proposals benefit HHP tenants.
2.3 The draft Policy draws heavily on approaches taken by other RSLs. It is proposed that formal consultation with tenants be undertaken.
COMPETENCE
3.1 The legal, financial or other constraints to the recommendations in this report are contained in paragraph 5.
RECOMMENDATIONS
4.1 It is recommended that:
a) Audit & Risk Committee consider the Draft Community Grants Policy at Appendix 1 and recommend approval to the Board;
b) Board approve Draft Community Grants Policy at Appendix 1.
APPENDIX 1 Draft Community Grants Policy
Background Papers None
Writer of Report John Maciver Tel: 0300 123 0773
Jackie Macleod Page 2 of 2 23/6/17
COMPETENCE
Financial 5.1 There is no budget provision for a scheme of this nature at present. The Board would
require to consider this issue as part of the annual budget setting process.
Legal 5.2 Any funding provided to external groups would require to be consistent with HHPs
charitable aims.
RISK
6.1 There are no specific risks associated with the report.
COMMUNITY GRANT FUND
Section Operations
Date Policy Approved by Board 28 June 2017
Review Period 3
Review Due June 2020
Version 1.0
A Registered Charity (No. SCO35767); A Registered Society under the Co-operative and Community Benefit Societies Act 2014
Reg No 2644R(S); Registered Social Landlord Reg No:359; Registered Property Factor: PF000183
APPENDIX 1
CONTENTS
COMMUNITY GRANT FUND ..............................................................................1
Policy Change History ...................................................................................1
Interpretations & Abbreviations .......................................................................2
Introduction ..............................................................................................3
Aims .......................................................................................................3
Eligible Groups ...........................................................................................3
Priorities ..................................................................................................3
Healthy Living and Well Being ........................................................... 3
Environmental Improvements and Sustainability ..................................... 3
Young People, Children and Older People ............................................. 3
Employment Training and Skills ......................................................... 4
Community Support and Safety .......................................................... 4
Decision Making ..........................................................................................4
Application Process ......................................................................................4
Condition of Grant .......................................................................................4
Ineligible Projects .......................................................................................4
Equal Opportunities .....................................................................................5
Policy Review .............................................................................................5
1
POLICY CHANGE HISTORY
Version Change Applied Date By
1.0
2
INTERPRETATIONS & ABBREVIATIONS
The following interpretation and abbreviations are used in this policy:
Word Interpretation
HHP or Partnership Hebridean Housing Partnership
Board Means the Board of the Hebridean Housing Partnership
Board Members All Members of the Board including co-opted Members
All references to the masculine gender in this policy shall read as equally applicable to the feminine gender
3
COMMUNITY GRANTS POLICY
INTRODUCTION
1.1 The HHP Community Grant Fund is available to support small scale community projects that will improve the quality of life for residents and make a real difference to the neighbourhoods which HHP serve. The fund offers up to £ TBD* for projects which aim to make a difference to the lives of our tenants, residents and their communities.
*to be determined
AIMS
2.1 The policy seeks to support activity by local groups to improve the lives and environment in their area.
ELIGIBLE GROUPS
3.1 The fund is open to charities, tenant and residents’ groups and voluntary organisations. There must be a benefit to HHP tenants residing within the area from the project being proposed.
3.2 Groups must be based in an area which serves one or more HHP estates or streets. Normally groups should have a registered bank account with two signatories who are not related and who don’t live at the same address?
3.3 It may however be possible to fund projects where the group do not have a bank account and where the costs can be paid directly by HHP.
PRIORITIES
4.1 Successful applicants will be able to demonstrate that their project supports one or more of the following priorities.
Healthy Living and Well Being
4.2 We aim to support residents to live happy, healthy and fulfilled lives, with access to the care and support services they need. We are particularly interested in projects which aim to reduce isolation, build connections and friendships
Environmental Improvements and Sustainability
4.3 We aim to make our neighbourhoods greener and cleaner places to live and to assist our residents to live more sustainable lifestyles. We are particularly interested in projects which actively engage people in improving spaces or places as well as projects which support greener lifestyle choices.
Young People, Children and Older People
4.4 We want to support the most vulnerable in our communities. We want to provide opportunities for our young people and to ensure our elderly are supported.
4
Employment Training and Skills
4.5 We aim to support residents in developing skills and accessing training opportunities in order to enter into, and sustain, employment. We are particularly interested in projects which aim to increase employability, gain qualifications and help people progress into work. We also aim to ensure that everyone is able to access the basic financial services products that are needed to participate in a modern society. We are interested in projects which increase the confidence of people to manage their money.
Community Support and Safety
4.6 We aim to ensure that our communities are safe places to live and are equipped with the infrastructure they need to shape their aims and aspirations. We are particularly interested in projects which aim to bring the community together and to make our communities feel safer and increase a sense of belonging and pride.
DECISION MAKING
5.1 Decisions on whether projects will be supported are made by the Board of HHP.
APPLICATION PROCESS
6.1 Applicants to the fund will be required to submit an application form providing details of their project and group.
6.2 All applications will be assessed and a report will be presented to the next meeting
of the HHP Board following completion of this assessment. 6.3 Applicants will be notified of the decision as quickly as possible thereafter.
CONDITION OF GRANT
7.1 It will be a condition of any grant offer that the applicant will work with officers to record expenditure, to monitor progress and to share stories. Officers will work to support successful applicants to make sure that the project is a success.
7.2 The grant offer will set out the payment arrangements for the grant and the
timescale for the grant.
INELIGIBLE PROJECTS
8.1 The following activities are not eligible for funding and will not be supported.
Routine repairs or maintenance.
Political or religious activities.
Ongoing running costs e.g. insurance, utility costs, rent, salaries
Funding individuals or projects which only benefit one person
Fixtures and fittings e.g. chairs, tables etc. unless the project cannot run without the specialised equipment
Sponsorship or projects which are motivated mainly by marketing or branding
Alcohol
5
EQUAL OPPORTUNITIES
9.1 HHP is committed to providing fair and equal treatment to all its customers and service users and will not discriminate against any individual, household or group on the grounds of:
sex or marital status;
race or colour;
disability;
age;
sexual orientation;
language or social origin;
employment status or;
other personal attributes, including beliefs or opinions such as religious beliefs or political opinions.
POLICY REVIEW
10.1 This policy will be reviewed every 3 years in line with the Policy Review Schedule.
Making our house your home
Dena Macleod 28-Apr-17
BOARD ITEM 19
A&R ITEM 14
POLICY REVIEW JUNE 2017
Audit & Risk 27 June 2017 Board 28 June 2017
Report by Chief Executive
Purpose of Report
1.1 To consider and approve the policies due for review this month.
Summary
2.1 The Board has agreed a schedule for reviewing its policies and there were four
policies due for review this month.
2.2 The following policies have been revised and can be found at Appendices 1 to 4:
• Equal Opportunities;
• Training and Development;
• Risk Management; and
• Repairs and Maintenance.
2.3 There have been minor changes made to all the polices to reflect current
management arrangements and changes to legislation. The exception to this is the
Repairs and Maintenance policy which is being updated for lettable standard and
repairs target. The Repairs and Maintenance policy will require to go out for
consultation before being approved.
Competence
3.1 The financial and legal constraints to the recommendation in this report being
implemented are detailed at Paragraphs 5.1 to 8.2.
Recommendations
4.1 It is recommended that the Audit & Risk Committee consider the revised policies and
recommend approval to the Board.
Board approve the:
a) Equal Opportunities Policy at Appendix 1;
b) Training & Development Policy at Appendix 2;
c) Risk Management Policy and Strategy at Appendix 3; and
d) Repairs and Maintenance Policy at Appendix 4 for consultation.
APPENDIX 1 Equal Opportunities Policy
APPENDIX 2 Training & Development Policy
APPENDIX 3 Risk Management Policy and Strategy
APPENDIX 4 Repairs and Maintenance Policy (To Follow)
Background Papers:
Writer of Report: Dena Macleod
Dena Macleod 28-Apr-17
Competence
Financial
5.1 The costs involved in implementing the revision to the policies are:
Policy Costs Notes
Equal Opportunities None
Training and
Development
Training Budget for 2017/18
Risk Management None
Repairs and
Maintenance
To be
determined
once lettable
standard
agreed
The voids budget for 2017/18 was
increased by £70K to allow for an
improved lettable standard. The revised
lettable standard may require funding in
excess of the £70K allocated.
Legal
6.1 The approval and amendment of policies is a matter reserved to the Board.
6.2 The Board has referred the following function to the Audit & Risk Committee:
“monitoring and reviewing policies and procedures relating to the Board’s system of
internal control, risk evaluation and corporate governance”
The two policies which do not fall within the Audit & Risk Committee referred functions
are Training and Development and Repairs and Maintenance.
Regulatory Guidance
7.1 The relevant Regulatory Standards are:
Standard 4
The Governing Body bases its decisions on good quality
information and advice and identifies and mitigates risks
to the organisation’s purpose
4.3 The governing body identifies risk that might prevent it from achieving the
RSL’s purpose and has effective strategies and systems for risk management
and mitigation, internal control and audit.
Risk
8.1 Governance of the Partnership is critical to its long term viability. Reviewing and
updating polices ensures a solid foundation for good governance and mitigates the
risk.
Dena Macleod 28-Apr-17
Report Details
Background
9.1 The Board has put in place a system for reviewing all its polices which is generally on a
three year cycle. There are a number of polices due for review at each Board
meeting and where there are only minor amendments the policies will be collated
into one report.
Policy review
9.2 Minor changes have been made to the policies with the exception of the Repairs and
Maintenance Policy which has been updated for proposed changes to the lettable
standard and repairs targets.
9.3 The Repairs and Maintenance Policy will be issued for consultation and a final policy
brought back to the Board in September 2017 for approval.
Item Description Changes
1 Equal Opportunities Minor
2 Training and Development Minor - removed Para on change
management which is no longer
relevant.
Updated Para 13 to replace Skill
Seekers with Modern
Apprenticeships
3 Risk Management Minor
4 Repairs and Maintenance Lettable standard improved and
change to repairs targets
�Equal Opportunities Policy
Effective Date: � July 2017
Review Date: � June 2020
Approved by HHP Board: 28 June 2017
1 | P a g e
EQUAL OPPORTUNITIES POLICY
INTRODUCTION
1.1 HHP is committed to promoting an environment of respect, understanding,
encouraging diversity and eliminating discrimination by providing equal
opportunities for all. HHP has a consistent approach to promoting equality
through the entire employment relationship from the recruitment process to
the termination of employment.
1.2 All employees are required to abide by this policy which covers discrimination
by and towards members of the public, governing body, contractors and
staff from other agencies.
AIMS
2.1 This Policy aims to:
• Integrate equality and diversity practices.
• Ensure that employees are treated with fairness and respect from each
other, members of the public, governing body members and contractors.
• Require HHP to implement fair employment practices ensuring that job
applicants and employees receive equal treatment.
• Ensure that people are recruited and employees promoted solely on the
basis of their own merit, ability and potential.
• Promote an environment appropriate to the needs of those from all walks
of life and a culture that respects and values difference and promotes
dignity, equality and diversity.
BACKGROUND
3.1 U.K Governments have been addressing equality and diversity issues for many
years. As Government tackled inconsistencies in previous legislation the new
Equality Act 2010 was introduced. The introduction of the Act saw previous
discrimination legislation abolished and replace with one single piece of
legislation. This policy is compliant with the current legislation.
DEFINITIONS
Diversity
4.1 HHP is committed to valuing and managing people’s differences to enable
all employees to contribute and realise their full potential.
4.2 Making sure people are treated fairly and given fair chances.
4.3 It is not about treating everyone in the same way but there is recognition that
people’s needs are met in different ways. Equality focusses on areas covered
by the law and described as Protected Characteristics of race, sex, disability,
age, gender reassignment, marriage and civil partnership, pregnancy and
maternity, religion or belief and sexual orientation.
2 | P a g e
Direct Discrimination
4.4 Treating someone less favourably than another based on a protected
characterisation.
Indirect Discrimination
4.5 A policy, practice, procedure or criteria that applies to everyone in the same
way but might disadvantage a particular protected group and which cannot
be justified in relation to the job.
Harassment
4.6 Conduct that violates a person’s dignity or creates an intimidating, hostile,
degrading, humiliating or offensive working environment. The intention of the
perpetrator is irrelevant. It is the impact which determines whether
harassment has taken place.
Implementation of the Policy
4.7 While the Director of Finance & Corporate Services will be responsible for,
implementing the operation of this policy, it is the responsibility of every
manager, supervisor and employee to ensure that the terms of the policy are
observed. All new employees and Board Members will receive training on this
policy as part of the induction process. Copies of the policy are freely
available.
4.8 Appropriate training and guidance will be available to promote equality and
diversity among staff.
4.9 Breaches of the Equal Opportunities Policy will be regarded as misconduct
and will lead to disciplinary action.
RECRUITMENT POLICY
5.1 HHP’s Recruitment Policy is consistent with the Equal Opportunities Policy. All
staff involved at any stage in the recruitment and selection process will
receive equality and diversity awareness training. This is to ensure that
everyone involved in recruitment will not discriminate knowingly or
unknowingly by asking questions which may lead to discrimination.
TRAINING AND DEVELOPMENT
6.1 Training and development opportunities will be given to all staff according to
their job role. All employees must be able to participate and enjoy training
opportunities or activities without discrimination or fear of harassment.
MONITORING AND REVIEW OF POLICY
7.1 Responsibility for monitoring the application of this policy will rest with the
Chief Executive.
7.2 The policy will be reviewed every three years with amendments being made
as appropriate and communicated to all staff and relevant stakeholders.
3 | P a g e
POLICY REVIEW
8.1 Policies are regularly reviewed to take account of
• Changes in legislation, rules, regulations and guidance
• Changes in the organisation
• Best practice
8.2 The policy will be reviewed on a three year cycle.
3
4 | P a g e
HANGE HISTOR
POLICY CHANGE HISTORY
Version Change Applied Date By
2.00 Updated in line with legislative
changes February 2014 Angus Lamont
3.00 June 2017 Dena Macleod
5 | P a g e
INTERPRETATIONS & ABBREVIATIONS
The following interpretation and abbreviations are used in this policy:
Word Interpretation
HHP or Partnership Hebridean Housing Partnership
Board Means the Board of the Hebridean Housing Partnership
Board Members All Members of the Board including co-opted Members
All references to the masculine gender in this policy shall read as equally applicable
to the feminine gender
HHP is a registered society under the Co-operative and Community Benefit Societies Act 2014, Registered Number: 2644R(S),Registered Office: Creed Court, Gleann
Seileach Business Park, Willowglen Road, STORNOWAY, Isle of Lewis HS1 2QP. It is a charity registered in Scotland, Charity Number:SCO35767, registered as Registered
Social Landlord with the Scottish Housing Regulator, Registration Number:359 and registered as a Property Factor, Registration Number PF000183
Email: [email protected]
Web: www.hebrideanhousing.co.uk
Phone:0300 123 0773
�Training & Development Policy
Effective Date: � July 2017
Review Date: � June 2020
Approved by HHP Board: 28 June 2017
1 | P a g e
TRAINING & DEVELOPMENT POLICY
INTRODUCTION
1.1 The policy applies to all employees of Hebridean Housing Partnership (HHP).
AIMS
2.1 Employees are the organisation’s most valuable asset. The aim of this policy is
to develop a well managed, corporately driven, training and development
initiative which will maximise the employee’s personal development along
lines which will aid the Partnership in meeting its objectives and maximising
corporate performance.
POLICY PRINCIPLES
3.1 The Partnership is fully committed to the training and development of all its
employees and Board Members. We are committed to the principles of
lifelong learning and recognise that, in times of change, the adaptability and
flexibility of the workforce will help determine whether we thrive or fail.
Lifelong learning is about helping all individuals, of all backgrounds and
abilities, to enhance their employability in a rapidly changing economy and
developing individuals’ self fulfilment through their achievements. HHP will
strive to:
(i) offer consistently high quality learning opportunities.
(ii) promote equality and widening of access to training and
development opportunities.
(iii) increase the use of e-learning and opportunities to learn on-line.
(iv) continuously seek out new methods and forms of learning.
(v) seek opportunities to work with local training providers and University of
the Highlands and Islands to provide training, where appropriate.
3.2 The Board is committed to the training and development of all staff. Training
and development will be used as a means of supporting change and
improving quality. HHP will communicate to their staff how their work as an
individual contributes to the achievement of the overall business objectives.
The Training Policy will be aligned to the Partnership’s Business Plan.
3.3 The Board will positively encourage equal access to training and
development from all staff.
CORPORATE TRAINING PLAN
4.1 The Partnership will develop a Training Plan that will define how the
development needs of the organisation will be met over the period of the
plan, within budget parameters and in line with business planning objectives.
4.2 Progress towards meeting those needs will be reviewed on an annual basis.
The Staff Appraisal Procedure will contribute to the process.
4.3 Responsibility for assessing training needs rests with line managers at staff
level, whilst the Chairman is responsible for the Chief Executive’s assessment.
2 | P a g e
4.4 Budget responsibility for training overall rests with the Chief Executive.
4.5 Corporate responsibility for the delivery of the Training Plan rests with the Chief
Executive.
INDUCTION TRAINING
5.1 All newly recruited staff will undertake a general induction course.
5.2 All staff newly recruited or transferred between departments will receive
appropriate departmental induction training.
5.3 All staff newly recruited or transferred between departments will participate in
the Staff Appraisal Process to identify training needs. The outcome will be an
introductory individual training plan.
5.4 All staff will receive mandatory training in Health and Safety Awareness.
INDIVIDUAL TRAINING PLANS
6.1 All staff will receive the necessary training to be able to carry out the duties
required of their post effectively.
PERSONAL DEVELOPMENT
7.1 Everyone has a responsibility for his own personal development.
7.2 All staff should:
(i) take individual responsibility and ensure they develop the skills needed
to achieve their goals or objectives.
(ii) identify their strengths and weaknesses and how they can build on
strengths and address weaknesses.
(iii) set clear development objectives – making objectives achievable,
realistic and challenging.
(iv) consider the needs of the organisation – including objectives to
develop as a team member.
(v) allow sufficient time and resources to achieve development
objectives.
(vi) participate in an annual performance appraisal and six-monthly
reviews of progress and performance against objectives with their
Manager and revise plans as appropriate.
(vii) compare self-perception with feedback on their performance from
their Manager and seek to improve future performance as a result.
7.3 Managers will analyse business plan objectives and through the appraisal
process will identify training needs required to enable staff to deliver the
objectives.
7.4 As part of its commitment to Equal Opportunities, the Partnership will ensure
that staff are exposed to awareness training in relation to disadvantaged
groups.
7.5 Training records will be maintained for all staff.
3 | P a g e
PERFORMANCE APPRAISAL
8.1 Performance Appraisal is critical to both manager/staff. Staff must be
engaged in the process for it to have validity. Encouraging self-examination
and some element of self-target setting best enthuses motivation and
commitment.
8.2 The Partnership has a Performance Appraisal Scheme.
DEVELOPING STAFF: MANAGEMENT RESPONSIBILITIES
9.1 Managers have a responsibility to ensure appropriate training & development
opportunities are made available for all staff. Managers should:
(i) involve staff in identifying their own development needs – and assist
them in identifying their own strengths and weaknesses.
(ii) discuss development needs and plans with staff and gain their
commitment in planning how to meet identified needs.
(iii) be clear about the objectives of development plans – these should be
relevant and realistic.
(iv) balance business needs with individual aspirations – plans should help
develop the skills required to meet current/future demands and career
aspirations.
(v) use available resources effectively – when developing plans with staff.
(vi) participate in an annual performance appraisal with staff and six-
monthly reviews of progress and performance to check against
objectives and revise plans as appropriate.
9.2 Training and development needs will be jointly agreed by Managers and staff
at appraisal interviews.
PROFESSIONAL MEMBERSHIP FEES
10.1 The Partnership will reimburse annual fees paid by employees for membership
of professional institutions subject to the following criteria:
(i) Membership must be directly relevant to the work of the Partnership.
(ii) Only one set of fees will be reimbursed where the employee is a
member of more than one institution.
(iii) Receipts for claims are to be submitted to and endorsed by the Chief
Executive/Board.
10.2 Payment will be made net of tax.
EQUALITY OF ACCESS TO TRAINING AND DEVELOPMENT
OPPORTUNITIES
11.1 All staff will have equal access to suitable training and development
opportunities.
11.2 All training and development opportunities will be communicated effectively
throughout the organisation.
4 | P a g e
FURTHER EDUCATION AND VOCATIONAL TRAINING
12.1 Staff will be encouraged to consider a range of training and development
opportunities such as, further education, vocational training, short external
courses, in-house training, conferences and seminars, mentoring and
coaching.
12.2 Employees wishing to pursue part-time vocational courses directly relevant to
their career development with the Partnership will be given the opportunity to
discuss with their Manager any assistance which can be given.
12.3 Attendance on further education courses shall be at the recommendation of
their Manager and Executive Team.
12.4 When an employee is pursuing an approved course of study, he will be
eligible for financial assistance as detailed below:
(i) Full salary;
(ii) All prescribed course fees and other approved educational expenses
arising from employee’s attendance at a course;
(iii) All travelling expenses incurred arising out of the course and
associated practical placements;
(iv) Accommodation costs incurred for courses up to 5 days, up to a
maximum of the Partnership’s subsistence for absences of 24 hours or
more;
(v) Accommodation costs incurred for course over one week up to a
maximum of 24% of the Partnership’s subsistence rate for absences of
24 hours or more;
(vi) A meal allowance for lunch as per the Subsistence Rates, paid per day
to all trainees attending block release courses over one week; and
(vii) A special claim form for claiming training expenses is obtainable form
the Personnel section. may be given with approved costs and fees.
12.5 Where possible, subject to the needs of the service, employees will be given
the opportunity to attend day release and appropriate block release courses
leading towards approved qualifications.
12.6 In order to qualify for assistance it will be necessary for employees to have
their manager’s authorisation as to the course of study which they wish to
undertake.
12.7 Continuity of assistance will be subject to satisfactory performance on the
part of the employee concerned.
12.8 The fees paid are to be regarded as a loan. The loan will be written off 12
months following the relevant course/examination. The Partnership will have
a right to require the employee to refund the full or a proportion of the cost of
fees where the employee voluntarily leaves their employment within those 12
months, or where the employee or the training institution prematurely
terminates their course or where the employee is dismissed summarily from
their employment.
12.9 Withdrawal from a course will result in repayment of the fees paid on the basis
above, unless:
5 | P a g e
(i) the employee, on presentation of written justification, has obtained the
Board’s agreement to withdrawal.
(ii) The employee has had to withdraw due to long-term sickness, maternity
leave or redundancy.
12.10 Where financial assistance is given for the full purchase cost of reference
books these books will, upon completion of the course or relevant section of
the course, become the property of the Partnership and will be placed in the
library.
MODERN APPRENTICE
13.1 The Partnership is committed to providing training programmes for young
people. The training programmes provided for young people will be planned
and incorporate recognised qualifications, relevant training and practical
experience.
13.2 An employee who:
(i) is aged 16 or 17;
(ii) is not receiving full-time secondary or further education; and
(iii) has not attained qualifications from secondary education
may take time off during working hours in order to undertake study or training
leading to a relevant qualification. If an employee is 18 years old and is
undertaking study or training leading to a relevant qualification, and began
this course of study prior to becoming this age, the employee may also take
reasonable time off to complete the training or course of study.
PERFORMANCE MONITORING
14.1 In order to assess the impact of training and development on meeting
objectives and improving future effectiveness, the Partnership will:
(i) Review current training requirements of staff through Staff Appraisal
Process;
(ii) Seek to establish in advance the anticipated benefits of training;
(iii) Undertake post training evaluation;
(iv) Assess contribution of training and development to the achievement of
the organisation’s objectives and performance; and
(v) Use the results of the evaluation process to assess future training
requirements.
14.2 Board to receive annual report on expenditure of training budget against
expenditure and an evaluation of the outcomes of the training plan and how
the training has contributed to the achievement of the Business Plan
objectives.
COMPLAINTS
15.1 Individuals who feel they are unjustifiably denied a career development
opportunity may use the grievance procedure to pursue their complaint.
REVIEW
16.1 The Board will review the Policy every three years.
6 | P a g e
HANGE HISTOR
POLICY CHANGE HISTORY
Version Change Applied Date By
3.0 No changes made 06.01.14 Seonaid Paton
4.0 Deletion of Trade Union training as
covered in the Special Leave Policy 13.06.17 Seonaid Paton
7 | P a g e
INTERPRETATIONS & ABBREVIATIONS
The following interpretation and abbreviations are used in this policy:
Word Interpretation
HHP or Partnership Hebridean Housing Partnership
Board Means the Board of the Hebridean Housing Partnership
Board Members All Members of the Board including co-opted Members
Personnel Section PA and Corporate Governance Admin Officer
All references to the masculine gender in this policy shall read as equally applicable
to the feminine gender
HHP is a registered society under the Co-operative and Community Benefit Societies Act 2014, Registered Number: 2644R(S),Registered Office: Creed Court, Gleann
Seileach Business Park, Willowglen Road, STORNOWAY, Isle of Lewis HS1 2QP. It is a charity registered in Scotland, Charity Number:SCO35767, registered as Registered
Social Landlord with the Scottish Housing Regulator, Registration Number:359 and registered as a Property Factor, Registration Number PF000183
Email: [email protected]
Web: www.hebrideanhousing.co.uk
Phone:0300 123 0773
�Risk Management Policy &
Strategy
Effective Date: � July 2017
Review Date: � June 2018
Approved by HHP Board: 28 June 2017
1 | P a g e
RISK MANAGEMENT POLICY & STRATEGY
INTRODUCTION
1.1 HHP faces a variety of risks. While risk cannot be eliminated, it can be
identified, assessed and responded to.
1.2 Risk can be defined as uncertain future events or actions that might prevent
the organisation from maintaining good performance, meeting pre set
targets, goals and plans which result in loss being incurred.
1.3 Risks can be financial, physical or reputational.
1.4 HHP will ensure that risk management plays an integral part in the
governance and management of the organisation at strategic and
operational level.
AIMS
2.1 This Policy aims to:
• Identify risk in a changing environment
• Define the level of risk capacity and score accordingly
• Assess the likelihood of such risk arising and the impact on the
organisation should they arise, and once assessed prioritising the risk
• Respond to material risk and minimise risk through an appropriate system
of controls which limit and manage the level of risk such that residual risk
can be borne without serious permanent damage to the Partnership.
Ensure that risk management flows through our business at both strategic
and operations levels.
ESSENTIAL ELEMENTS
3.1 Risk management can be defined as the culture, process and structures that
are implemented by an organisation to manage potential risks and their
adverse effects.
3.2 HHP has in place a risk management strategy which will be reviewed annually
by the Board. A risk register is in place, which identifies the risks, assesses the
impact of these risks and the proposed action that needs to be put in place
to minimise the impact.
3.3 HHP will insure risks that are deemed appropriate to insure in proportion to the
level of risk. This will be done in accordance with HHP’s policy on insurance.
KEY ASPECTS
4.1 The key aspects of risk management can be identified as follows:-
• Identification of risks
• Assessment of risks
• Decision on level of risk appetite
• Allocation of ownership of risk
2 | P a g e
• Development of action plan
• Monitoring and review arrangements
4.2 Risk management should be established and integrated within existing
management processes, including planning, performance management and
project management.
4.3 Risk management is used as a tool to ensure that HHP can respond to
changing demands, improve performance and make the most effective use
of resources.
PLANNING
5.1 Risk management needs to be an integral part of HHP’s planning and
decision making process. Strategic and operational risks are identified as a
key part of business planning. As an integral part of the Business Planning
process HHP defines the level of risk capacity and score accordingly.
5.2 The identification of risks should be considered at the planning stage so that
decisions on future priorities and projects are made with knowledge of
potential risk.
5.3 Approved projects include risk management in the implementation plan and
post implementation evaluation.
RISK CATEGORIES
Strategic
6.1 Risks which affect the planning by the organisation, partnership arrangements
and those created by the establishment of the organisation.
Operational
6.2 Risks which relate to the delivery of investment on the ground. Risks in this
area could include issues such as site contamination, procurement matters,
staffing and compliance.
Financial
6.3 Risks which include the potential impacts and requirements of obtaining
private sector funding, loss of income or increase in expenditure.
PRIORITISING RISK
7.1 Generally, the identification of risks will result in a long list of potential events.
These risks are not equally likely to occur and the impact of each risk will not
be the same. Some risks will have a major affect on the financial stability of
the organisation or its service provision while others will not have a material
effect on the financial stability of the organisation or its service provision.
7.2 Risks can be prioritised using a combination of likelihood of the event
happening and the level of impact which the event could have. Risks which
are in the high impact and high likelihood category will be given the higher
priority.
7.3 The Risk Register reflects the level of priority.
3 | P a g e
GOVERNANCE ARRANGEMENTS
8.1 The Board is responsible for ensuring the adequacy of the Partnership’s risk
management framework and in particular that they are aware of and
understand key business risks in a changing environment.
8.2 The Audit & Risk Committee will take an overview of risk systems on behalf of
the Board. Each meeting of the Committee reviews the Risk Register.
8.3 The Audit & Risk Committee will make arrangements to identify, review,
evaluate and manage risk and consider the reports by officers on their
evaluation of key business risks.
8.4 All reports to the Board shall include a comment on any aspect of risk which
has been identified in implementing a recommendation.
ALLOCATION OF OFFICER FOR EACH RISK
9.1 Individual Officers should be assigned responsibility for key risks. This ensures
that the responsibility for further work on a particular risk is clearly identified.
9.2 The Executive Team are responsible for:
• Setting the risk management framework;
• Assessing risks based on recommendations from the Risk Co-ordinator and
Team Leaders
• Ensuring the process is operated effectively and efficiently and
• Reporting to the Audit & Risk Committee and Board.
9.3 The Risk Co-ordinator, Team Leaders and staff are responsible for the day to
day management of the process and for identifying, categorising risk and
reporting to Executive Team.
9.4 The Corporate Resources Administration Officer is the designated Risk Co-
ordinator. The Corporate Resources Officer will deputise in the absence of
the Risk Co-ordinator. The Risk Co-ordinator will ensure that staff are aware of
their roles and responsibilities, that the risk registers are maintained, reviewed
and updated and that the appropriate reporting is carried out.
REPORTS
10.1 The Risk Register is reviewed and updated on an ongoing basis by those staff
given delegated responsibility.
10.2 The Risk co-ordinator will ensure regular reports to Management Team on the
medium and high level risks prior to each meeting of the Audit & Risk
Committee.
10.3 The Risk Co-ordinator will ensure that the Audit & Risk Committee receive
reports on the Risk Register at each meeting.
10.4 The Chief Executive will provide the Board with an annual update of HHP’s
Risk Strategy.
10.5 The Chief Executive will ensure that appropriate officers will provide the Audit
& Risk Committee with an annual review of risk which will comprise an
4 | P a g e
assurance report which reviews the risk management framework and the
operation of the process, including any key risks that have materialised.
10.6 Risk will be considered by the Board and Standing Committees as part of the
routine operations decision making process on all aspects of HHP’s activities.
RISK CAPACITY
11.1 HHP will determine at its Board Business Planning Day its risk capacity annually
taking account of:
• An agreed level of financial loss that is acceptable on all identified and new
potential risk
• An assessment level of the number of potential risks that may materialise at
any one time.
• The limit of free reserves that are available to absorb potential losses of any
new projects
RISK MANAGEMENT CYCLE TIMETABLE
12.1 HHP will operate an annual risk management cycle based on the Business
Year. This cycle will have the following key milestones:
DATE ACTIVITY RESPONSIBILITY
April Annual review of Risk Strategy Chief Executive /
Executive Team
June Report on Annual Review of Risk
Strategy to Audit & Risk
Committee
Chief Executive
Each meeting of Audit & Risk
Committee will review the Risk
Register
Risk Co-ordinator &
Management Team
December Agree risk capacity for next
business year
Management Team &
Board Business Planning
Day
February Report on risk capacity from
Business Planning Day to Board
Management Team/Risk
Co-ordinator
MONITORING AND REVIEW OF POLICY
13.1 Responsibility for monitoring the application of this policy will rest with the
Chief Executive.
13.2 The policy will be reviewed every year with amendments being made as
appropriate and communicated to all staff and relevant stakeholders.
5 | P a g e
HANGE HISTOR
POLICY CHANGE HISTORY
Version Change Applied Date By
2.0 Revised Risk Management Cycle
Timetable June 2014 A Lamont
3.0 Minor Amendments June 2015 A Lamont
4.0 Review and no changes June 2016 A Lamont
5.0
Minor Amendments to reflect
changes in management
arrangements Par 9.2
June 2017 Dena Macleod
6 | P a g e
INTERPRETATIONS & ABBREVIATIONS
The following interpretation and abbreviations are used in this policy:
Word Interpretation
HHP or Partnership Hebridean Housing Partnership
Board Means the Board of the Hebridean Housing Partnership
Board Members All Members of the Board including co-opted Members
All references to the masculine gender in this policy shall read as equally applicable
to the feminine gender
HHP is a registered society under the Co-operative and Community Benefit Societies Act 2014, Registered Number: 2644R(S),Registered Office: Creed Court, Gleann
Seileach Business Park, Willowglen Road, STORNOWAY, Isle of Lewis HS1 2QP. It is a charity registered in Scotland, Charity Number:SCO35767, registered as Registered
Social Landlord with the Scottish Housing Regulator, Registration Number:359 and registered as a Property Factor, Registration Number PF000183
Email: [email protected]
Web: www.hebrideanhousing.co.uk
Phone:0300 123 0773
REPAIRS & MAINTENANCE POLICY
Section Operations
Date Policy Approved by Board 25 June 2014
Review Period Every 3 Years
Review Due June 2017
Version 2.1
RSL No.359; A Registered Charity (No. SCO35767); A Registered Society under the Co-operative and Community Benefit Societies Act 2014
Reg No 2644R(S); Registered Social Landlord Reg No:359; Registered Property Factor: PF000183
CONTENTS
REPAIRS & MAINTENANCE POLICY .....................................................................1
Policy Change History ...................................................................................1
Interpretations & Abbreviations .......................................................................2
Introduction ..............................................................................................3
Aims .......................................................................................................3
LEGAL OBLIGATIONS .....................................................................................4
RECORD KEEPING ........................................................................................4
INFORMATION TO TENANTS .............................................................................5
Reporting Repairs ............................................................................................................................. 5
Tenants Handbook ............................................................................................................................ 5
RECHARGEABLE REPAIRS ................................................................................5
TENANTS’ RIGHT TO CARRY OUT ALTERATIONS AND IMPROVEMENTS ............................6
RIGHT TO COMPENSATION FOR IMPROVEMENTS .....................................................6
CATEGORIES FOR REPAIR AND MAINTENANCE ........................................................6
Emergency Repairs – 4 hours or 24 hours ..................................................................................... 7
Urgent Repairs – 3 days or 7 days .................................................................................................. 7
Routine Repairs – 20 days ................................................................................................................ 7
Planned Maintenance ....................................................................................................................... 8
Long Term Planned Maintenance and Improvements ................................................................ 8
STOCK CONDITION SURVEY .............................................................................8
CHANGE OF TENANCY ...................................................................................8
RIGHT TO REPAIR ........................................................................................8
Exceptions .......................................................................................................................................... 9
TENANT CONSULTATION ................................................................................9
INSURANCE ................................................................................................9
HANDYMAN SERVICE ................................................................................... 10
PROCEDURES FOR REPAIRS AND MAINTENANCE .................................................... 10
AIDS & ADAPTATIONS .................................................................................. 10
BUDGETING ............................................................................................. 10
CONFLICT OF INTEREST ............................................................................... 10
Review................................................................................................... 10
BREACHES OF POLICY ................................................................................. 10
1
POLICY CHANGE HISTORY
Version Change Applied Date By
2.1
Revisions to incorporate Board decisions and position with factoring. Revisions to ensure consistency with other policies.
2
INTERPRETATIONS & ABBREVIATIONS
The following interpretation and abbreviations are used in this policy:
Word Interpretation
HHP or Partnership Hebridean Housing Partnership
Board Means the Board of the Hebridean Housing Partnership
Board Members All Members of the Board including co-opted Members
All references to the masculine gender in this policy shall read as equally applicable to the feminine gender
3
REPAIRS & MAINTENANCE
INTRODUCTION
1.1 The Hebridean Housing Partnership, referred to as ‘the Partnership’, believes that the quality of its maintenance service is of great importance, not only to ensure the satisfaction of tenants but to protect the value of its housing stock.
1.2 Maintenance Procedures set out how the Maintenance Policy will be implemented and are contained in a separate document.
1.3 The Partnership’s policy on the procurement of maintenance works is detailed in the Procurement Policy. The policy details the procurement route options and the selection and appointment of consultants and contractors.
AIMS
2.1 The Partnership recognises that the quality of the repair and maintenance service provided to tenants is extremely important and the service provided must be responsive, efficient and cost effective.
2.2 The aim and key features of the repair and maintenance policies will be:
(i) to ensure that the Partnership discharges its legal responsibilities for repairing and maintaining its properties;
(ii) to maintain clear property records together with a system for recording reported repairs, works instructed, any insurance details, completion dates and final costs;
(iii) to ensure that tenants and factored owners are fully informed of both their responsibility and the Partnership’s responsibility for repairs and maintenance;
(iv) to determine clear rules for the re-charging of repairs where appropriate;
(v) to ensure that tenants are fully informed of the procedures for reporting repairs and of the procedures for seeking approval to carry out tenants’ improvements and the right to compensation;
(vi) to ensure the Partnership confirms with the Right to Repair
(vii) to ensure that the Procurement for Building Works is adhered to for the selection of contractors, the selection of procurement routes and the procedures for inviting and accepting tenders;
(viii) to ensure that aids and adaptations are administered in line with the Special Needs Housing Policy and the Occupational Therapy referral process;
(ix) to agree clear delegation of responsibilities for the authorisation, execution and monitoring of works. The Repairs and Maintenance policy will allow for emergencies to be dealt with effectively;
(x) to ensure that the Partnership’s performance in carrying out its repair and maintenance functions is adequately managed;
(xi) to ensure the policy is effectively discharged the Partnership will appoint a senior manager with this responsibility;
(xii) to ensure that all works are carried out within an agreed budget that is monitored periodically;
4
(xiii) to maintain the probity of the Partnership, due regard will be given to any conflicts of interest arising from the implementation of repairs and maintenance; and
(xiv) to ensure that the Repair and Maintenance Policy remains adequate for its purposes the Partnership will review the policy every three years.
LEGAL OBLIGATIONS
3.1 The Partnership will meet all its legal requirements in terms of repairs, maintenance and also improvements carried out by tenants and will comply in all respects with the Housing (Scotland) Act 2001 and any amending or superceding Regulations.
3.2 The respective liability of landlord and tenant for repairs and maintenance will be clearly defined in the Minute of Lease or Scottish Secure Tenancy Agreement, a copy of which will be provided to all tenants. Any disputes regarding the respective liability for repairs and maintenance will be referred to the Board of Management for consideration.
3.3 The Partnership will fully support its tenants’ rights to carry out improvements as part of its policy of maintaining its houses to the highest standard and will seek to assist any tenant wishing to avail him/herself of this right.
3.4 All operations carried out by the Partnership will comply with the appropriate Building Regulations 1948 and any amending or superseding Regulations.
3.5 The Partnership is legally required, through the Scottish Secure Tenancy Agreement, to do the following:
Keep houses in a condition which is habitable, wind and watertight and, in all respects, reasonably fit for human habitation. Ensure all repairs will be carried out within a reasonable period.
Keep in repair the structure and exterior of all dwellings and common areas;
Keep in repair and proper working order installations for the supply of water, gas, electricity, sanitation, space and water heating; etc
Undertake tenant consultation;
Permit reasonable tenants’ alterations and improvements;
Offer compensation for improvements at termination of tenancy
RECORD KEEPING
4.1 The Partnership will maintain the following records:
(i) A record will be maintained on a scheme by scheme basis to record details of the specification, fittings and fixtures of each house.
(ii) A record will be kept for each property and each scheme detailing:
Details of repairs reported and/or maintenance
Details of repair and maintenance instructions issued to Contractors
Cost of repairs and maintenance
Details of recoveries due from tenants/insurance company/others
(iii) A record of tenant improvement applications, together with supporting documentation on approvals, inspections, etc.
5
(iv) An insurance Register will be maintained to record the level of cover for each property and the date of policy renewal.
INFORMATION TO TENANTS
5.1 The Partnership recognises that it has a duty to keep tenants informed of repair procedures and tenant/landlord obligations in respect of repairs and maintenance. Information for tenants will be clear and precise and the information provided will incorporate:
(i) the Partnership’s Policy on Repairs and Maintenance.
(ii) The Scottish Secure Tenancy Agreement.
(iii) Periodic Circulars on repairs procedures, right to repair, right to compensation for improvements, etc.
Reporting Repairs
5.2 The Partnership will provide an emergency service for reporting repairs. During working hours general and emergency repair requests can be reported to any of the area offices. All tenants requesting a repair will be given a repair request number that the caller can use to follow through a repair.The Partnership has an arrangement with Comhairle Nan Eilean Siar to provide a service that will allow all emergency repair requests outwith working hours to be reported and actioned via the Faire control centre that is staffed round the clock.
5.3 The Partnership has an appointment system for routine repair works.
Tenants Handbook
5.4 The Partnership will publish and inform all tenants of their responsibilities and the Partnership’s responsibilities in carrying out repairs and the Partnership’s policy and rules in relation to repairs and maintenance.
5.5 The Partnership will publish information on performance against repairs and maintenance targets annually.
RECHARGEABLE REPAIRS
6.1 The Partnership recognises that there may be occasions when a tenant requests that the Partnership carry out a repair that is the responsibility of the tenant. The Partnership may agree to such requests where there is Health and Safety concern for the well being of the tenant or other occupants of the property.
6.2 Invoices for such work will be charged out to tenants on a monthly basis.
6.3 Rechargeable repairs are these where damage has been wilfully or negligently caused the property by the tenantsm their household or by visitors to their home. Damage which is due to fair wear and tear will not be recharged.
6
TENANTS’ RIGHT TO CARRY OUT ALTERATIONS AND IMPROVEMENTS
7.1 The Partnership shall fully support its tenants’ right to carry out improvements. Applications to carry out improvements (other than internal decoration) shall be made in writing to the Partnership and considered by the relevant Senior Manager and approval shall not be unreasonably withheld.
7.2 Permission will normally be granted subject to the following conditions:
(i) The Partnership must be satisfied that any proposed improvements will meet relevant standards of safety and workmanship.
(ii) The work will not detract from the future letting of the property.
(iii) Upon receipt of an application, the Partnership will normally advise the applicant of whether they can proceed within twenty-eight days.
(iv) An inspection will be required before any work proceeds and will be required upon completion.
(v) On termination of a tenancy, the Partnership shall have the power to make a payment to the tenant that it considers to be appropriate in respect of any work carried out by the tenant.
(vi) If an applicant is not satisfied with the outcome of an application to carry out an improvement, then the tenant shall have the right to question that decision through the Partnership’s Complaints Policy.
RIGHT TO COMPENSATION FOR IMPROVEMENTS
8.1 In the Housing (Scotland) Act 2001 Section 30 imposes the duty for landlords to compensate for qualifying works.
When the tenant has carried out certain improvement works with the consent of the Partnership they are entitled to be compensated for the cost of those works when the tenancy comes to an end.
8.2 “Qualifying Works” are only those works which were started after 30 September 2002.
8.3 Compensation is not payable when any of the following criteria apply:
The work was carried out without the Partnership’s consent
The value of work is less than £100
The tenancy has been terminated by a court order
The tenant is exercising Right to Buy
8.4 A tenant must lodge their claim for compensation in the period from 28 days before termination of the tenancy to 21 days after.
The Partnership will respond within 28 days and will assess the appropriate compensation based on the regulations that apply at that time.
CATEGORIES FOR REPAIR AND MAINTENANCE
Repairs and Maintenance Targets
7
9.1
Priority Completion target
Emergency Complete within 4 hours or 24 hours
Urgent -Priority 1 Complete within 3 days
Urgent - Priority 2 Complete within 7 days
Routine Day to Day Repairs Complete within 20 days
The definition of repairs to be carried out in these categories is set out below.
Emergency Repairs – 4 hours or 24 hours
9.2 This category will include any repair defined by the Right to Repair scheme or where there is a risk to health and safety or is required to avoid serious damage to property,
Eg. a) Electrical Fault
b) Water Burst or loss of water
Urgent Repairs – 3 days or 7 days
9.3 These are repairs which are defined by the Right to Repair scheme or which are
essential work which is needed to prevent or remove serious inconvenience to
tenants or which if not attended to quickly could result in damage to the property.
Routine Repairs – 20 days
9.4 These are repairs that do not fall into the emergency or urgent categories and which can wait a short time before they are dealt with.
Performance Management
9.5 A Perofrmance Management system is in place and performance will be measured on indicators including:
% completions within target
Tenant Satisfaction
Right First Time
Appointments arranged and kept
Quality of completed work
9.6 The Performance Management will develop and evolve. Performance measures will not be confined to the above.
8
Planned Maintenance
9.7 A 5 year planned maintenance programme will be implemented to maintain the fabric of properties and their environment and to take a preventative approach to maintenance. An annual cyclical maintenance programme will also be undertaken to fulfil legal requirements and protect Health and Safety. These works include
a) Gas Servicing (annually) ;
b) Air Source Servcing (annually);
c) Communal lighting, fire detection systems, stairlifts/hoists, door entry systems, communal TV/satellite systems (annually or more frequent);
d) Cleaning of gutters and downpipes (every 2 years); and
e) Flue Cleaning for solid fuel heating systems
Long Term Planned Maintenance and Improvements
9.8 This category will include works of replacement and/or renewal of fixtures and fittings to maintain and improve the housing stock for example:
a) Replacement of kitchen units
b) Replacement of bathroom fittings
c) Replacement of heating systems
d) Re-roofing
9.9 The relevant Senior Manager will prepare an annual long-term planned maintenance investment strategy for Board of Management approval.
STOCK CONDITION SURVEY
10.1 The Partnership will carry out a systematic condition survey every five years. The survey will be rotated across the stock to ensure all houses are visited. The information gathered will include the energy efficiency of the stock. The stock condition survey will inform the long-term investment strategy for maintenance.
CHANGE OF TENANCY
11.1 Before the commencement of a new tenancy the Partnership will inspect the house and identify any works necessary to make the house wind and watertight and reasonably fit for human habitation.
11.2 The Partnership will notify the tenant of any work that requires to be carried out where that work will not be complete before the tenancy commences.
RIGHT TO REPAIR
12.1 Under the Housing (Scotland) Act 2001, Scottish Secure Tenants and short Scottish secure tenants have the right to have small urgent repairs carried out by their landlord within a given timescale. This is called the Right to Repair scheme. The scheme covers certain emergency or urgent repairs up to the value of £350. These repairs are known as ‘qualifying repairs.’
12.2 The Partnership must attend and make secure or provide a facility by the stated deadline or the tenant has the right to:
9
1. Instruct another contractor from the Partnership’s list of approved contractors to do the work;
2. Receive compensation. The amount tenants may be eligible for is calculated at £15 and then £3.00 for every working day in the period, commencing on the day after the last day of what would have been the maximum and ending with the day on which the qualifying repair is completed, subject to a maximum amount of £100.
12.3 Any outstanding debts to the Partnership will be deducted from any compentsation to be paid.
Exceptions
12.4 These rights do not apply if:
1. There are circumstances of an exceptional nature beyond the control of the landlord or the contractor who is carrying out the repair that prevent the repair being carried out.
2. The repair value is over £350 (the scheme only applies to small urgent repairs).
3. Access has not been available for the contractor or surveyor.
TENANT CONSULTATION
13.1 The setting of priorities for long term maintenance will involve tenants and will be taken forward in accordance with the Tenant Participation Strategy and in consultation with Registered Tenant Organisations.
13.2 Consultation will take place with tenants on any major review of the policy or significant changes in the way the services are delivered.
13.3 The specification of components incorporated in improvement programmes e.g. windows, doors, kitchen units and sanitary ware, will be to a high standard. Tenants will have the opportunity to participate in the improvement works to their homes by having an input into some of the works carried out to their homes, including:-
A choice of primary central heating fuel source from solid fuel, electric, mini bulk gas or mains gas (where available)
Customised kitchen layouts and specification
The opportunity to contribute financially to a higher specification for selected works e.g. fire surround, decorative standard.
The list is not intended as exhaustive and each contract will be considered on its own merits and appropriate tenant choices included in the contract.
INSURANCE
14.1 Where repairs are the subject of insurance claims, the insurance company shall be notified as soon as possible of the impending claim and the minimum requirements of the insurance company in terms of inspection, number of quotations, etc., will be complied with.
10
HANDYMAN SERVICE
15.1 The Partnership has an in-house handyman service throughout the islands to provide a fast and effective response to minor repairs, which are outiwth the scope of any contract and to provide an enhanced service to the elderly and disabled.
PROCEDURES FOR REPAIRS AND MAINTENANCE
16.1 The Partnership will develop detailed Procedures for Repairs and Maintenance which will include standard reports to the Board of Management, record keeping, recording of repairs, instructing works, , insurance procedures, decoration allowances, the repair of voids, rechargeable repairs, tenant satisfaction surveys, out of hours emergencies etc.
AIDS & ADAPTATIONS
17.1 The Partnership has will carry out aids and adaptations to existing properties to meet tenants’ special need subject to budgetary provision and support from Scottish Government.
BUDGETING
18.1 The Partnership will produce an annual maintenance and repair budget for all areas of expenditure, which will be approved by the Board of Management and reviewed quarterly in order that adjustments can be made, as required.
CONFLICT OF INTEREST
19.1 No Company may be used where any Director or Manager is a relative of any Board or Staff Member. The Partnership will at all times comply with Part 1 of Schedule 7 of the Housing (Scotland) Act 2001.
REVIEW
20.1 Policy is to be reviewed every three years. The Board of Management recognises that all policies and procedure should be reviewed regularly and monitoring of the effectiveness of the policies and procedures should be by considering periodic reports from staff.
20.2 The Board of Management shall receive the following reports:
(i) Planned maintenance Investment Strategy (Annually)
(ii) Performance against Investment Strategy (Quarterly)
(iii) Repairs and Maintenance Budget (Annually)
(iv) Budget – v – Actual (Quarterly) (‘Actual’ to include committed items)
(v) Repairs and Maintenance Performance against Targets (Every 6 months – Contract Service Review)
(vi) Repairs and Maintenance Tenant’s Satisfaction Survey (as required)
BREACHES OF POLICY
21.1 If a Board Member knowingly breaches the conditions of this policy this will be grounds for removal from Office in accordance with the Partnership’s procedures for removal of a Board Member.
11
21.2 If a staff member knowingly breaches the conditions of this policy this will be grounds for disciplinary action.
Iona France Page 1 of 2 16/6/17
Agenda Item 20
BOARD 28 June 2017
REVIEW OF CORPORATE REGISTERS: ENTITLEMENTS, PAYMENTS & BENEFITS, MEMBERSHIP, GIFTS & HOSPITALITY
Report by Chief Executive
PURPOSE OF REPORT
1.1 To assure Board Members that HHP’s registers are functioning in accordance with the Partnership’s constitutional documents, regulatory and legal requirements, and that they are fully up to date.
SUMMARY
2.1 In order to ensure good governance, probity and transparency, HHP must keep a number of registers recording business transactions and working practices across a number of areas.
2.2 Registers are updated regularly and reviewed annually to ensure compliance in accordance with Rule 64.
2.3 This report is concerned with the following registers and seeks to give assurance to the Board that they are functioning appropriately:
• Membership Register;
• Entitlements, Payments & Benefits Register; and
• Gifts & Hospitality Register.
COMPETENCE
3.1 There is no financial constraint to the recommendation in this report being implemented. Legal aspects are detailed at 5.4.
RECOMMENDATIONS
4.1 It is recommended that the Board notes this review.
Background Papers HHP Rules and Standing Orders
Guidance Note 5: Regulatory Standards of Governance and Financial
Management
Writer of Report Angela Smith Tel: 0300 123 0773
Iona France Page 2 of 2 16/6/17
COMPETENCE
Financial 5.1 There are no financial constraints to the recommendation in this report being
implemented.
Legal 5.2 There is a legal and regulatory requirement to ensure that registers are kept by the
Partnership.
RISK
6.1 The risks of not keeping and reviewing registers could lead to the Partnership being in breach of statute and regulation. It could also lead to a perceived lack of transparency and probity from tenants and other stakeholders.
REPORT DETAILS
Membership Register
7.1 The Membership Register is fully up to date in accordance with Rule 64. Members’ names and addresses are detailed in addition to the names and addresses of the Office Bearers of the Partnership, their positions, and the dates they took and left office.
Entitlements, Payments & Benefits Registers
7.2 The Scottish Housing Regulator’s Guidance Note 5: Regulatory Standards of Governance and Financial Management does not prohibit payments and benefits to staff and connected persons, but requires that RSLs manage them within a clear policy framework to ensure transparency, honesty and propriety.
7.3 Payments and Benefits to employees and connected persons are controlled by the Entitlements, Payments & Benefits Policy and recorded in three registers, as follows:
• The Entitlements, Payments & Benefits Register (general) records instances of applications for housing or LIFT properties being made;
• The Entitlements, Payments & Benefits Register (special exceptions) records instances of benefits being granted, such as houses being allocated and ‘de minimis’ payments being made; and
• The Entitlements, Payments & Benefits Register (transactions) records any transactions between connected persons and, for example, contractors that may be on HHP’s Framework. Permissions are sought from the Chief Executive in instances like these and full disclosures made and retained on staff personal files.
7.4 All of the Entitlements, Payments & Benefits Registers are fully up to date.
Gifts & Hospitality Register
7.5 In May 2017 the Gifts & Hospitality Policy was discontinued as its requirements were fully covered by the Entitlements, Payments & Benefits Policy. Gifts and hospitality to and from the Partnership are now controlled by the Entitlements, Payments & Benefits Policy. The Gifts & Hospitality Register was retained for continuity and it is fully up to date.
7.6 Gifts to the Partnership are raffled and the proceeds are donated to local charities throughout the year.
Jackie Macleod Page 1 of 2 16/6/17
Agenda Item 26
BOARD 28 June 2017
BUSINESS PLAN 2015/16 - 2019/20 - YEAR 3 MONITORING REPORT
Report by Chief Executive
PURPOSE OF REPORT
1.1 To enable the Board to monitor progress on the Business Plan Action Plan agreed in March 2017.
SUMMARY
2.1 The 5 Year Business Plan 2015/16 – 2019/20 was updated and approved by the Board on 15 March 2017.
2.2 The Business Plan Objectives Monitoring report is at Appendix 1 and shows progress being made on the agreed actions.
COMPETENCE
3.1 There are no legal or financial constraints arising from the recommendations in this report.
RECOMMENDATIONS
4.1 It is recommended that the Board note the progress in the Business Plan Objectives Monitoring report at Appendix 1.
APPENDIX 1 Business Plan Objectives Monitoring Report
Background Papers None
Writer of Report Dena Macleod Tel: 0300 123 0773
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 1 - Placing tenants at the centre of everything we do
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
1.1 Provide opportunities for tenants to engage in service review and design
Annual report of opportunities provided
Director of Operations
Work ongoing with Western Isles Housing Association Communities Forum. Focus group meeting held on Repairs – April & May 2017.
1.2 Continue to support and work with Western Isles Housing Association Communities Forum to ensure tenants voices and views are heard
Review of Tenant Participation Strategy
Director of Operations
Completed June 2016.
Hold tenant events in Stornoway, Tarbert, Barra, Balivanich and North & South Uist
Annually Area Managers & Service
Development Manager
All events for 2016 held.
Event held in Stornoway – May 2017 and events being planned for Uist and Barra.
Review staff resource for tenant involvement
May 2017 Service Development
Manager
Contract for renewal of tenant participation support tendered and TPAS appointed – April 2017.
Tenant Participation Action Plan-delivering key objectives
September 2014
Service Development
Manager
Completed. Reviewed annually. Next review due Sept 2017.
1.3 Engage wider community Contribute actively to Community Planning Partnership Management and Outcome Groups
Chief Executive & Director of Operations
Membership of CPP, Health & Wellbeing & Communities sub group.
OHCPP Board Member Chief Executive Member of Partnership and Population Sub Group.
APPENDIX 1
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
Priority Outcome Group Chief Executive Membership of the three priority groups
1. Sustainable Population Priority Group
2. Sustainable Economic Growth Priority Group
3. Improving Quality of Lift Priority Group
By Executive Team.
Chief Executive Membership of Child Protection Committee.
Director of Operations
Membership of Health & Social Care Planning Group.
1.4 Build partnership and identify further opportunities to improve life outcomes for tenants and residents
Opportunities identified Director of Operations
Work ongoing on poverty awareness through Poverty Action Group and Welfare Reform Officers Group.
Lobbying of SSE ongoing with partners locally and Highlands & Islands Group.
Clauses and initiatives in connection with NHS, Skills Scotland and community groups incorporated into 2015-19 Investment Framework.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
1.5 Seek funding opportunities to support service development
Ongoing
1.6 Develop customer centered culture in individuals and teams
Team building day held June 2017 Executive Team Team Day held 7 June 2017 – feedback to be collated.
1.7 Review the current structure of Board Membership in May in light of ONS classification
Rules Review May 2017 Chief Executive Completed.
Rules Update Sept 2017 Chief Executive Report with changes discussed at Board.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 2-Investing income in a sustainable way
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
2.1 Better understand the needs of our tenants by improving the collection and the use of customer profile data and thereby target efforts to assist maximizing benefit uptake and manage introduction of Universal Credit
Customer profiles for tenants affected by Bedroom Tax
February 2018 Service Development
Manager
Data being collected at tenant contact.
Process to be developed.
Profiles for impact of Universal Credit
February 2018 Service Development
Manager
2.2 Develop IT systems to enable recording and management of customer data
IT system in place February 2018 Service Development
Manager
Project plan in place and on schedule.
2.3 Use Tenant Participation Development Services from TPAS to create communication and involvement mechanisms
Mechanisms in place Annual review of strategy
November 2017
Director of Operations
Contact made with groups and Community Associations.
Informal tenants group set up.
TPAS social media page set up.
Focus Group in place.
2.4 Carry out follow up Tenant Satisfaction Survey Action Plans
Action Plan to Board November 2015
Service Development
Manager
Completed
Deliver Plan November 2016
Service Development
Manager
Completed
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
2.6 Carry out Tenant Satisfaction Survey
Survey complete August 2018 Service Development
Manager
2.7 Work with partners to deliver the affordable warmth strategy for our tenants
Fuel poverty report November 2017
Investment Manager
Actions largely complete.
Partnerships in place with SSE and Citrus and local agencies.
2.8 Identify further works to improve energy efficiency of homes and seek to fund a programme to deliver this
Develop and cost proposals for next stage of insulation works
Investment Manager
Complete. Further measures being evaluated to improve under-floor insulation.
Window double glazing programme complete
2016 Investment Manager
Complete
Insulation programme within framework
2016-2019
Asset & Contracts Manager
Additional works being carried out using Eco/Government funding.
2.9 Action Plan for SHQS abeyances and exemptions
Abeyances to be dealt within time frame of investment plan
2016-2019 Investment Manager
Abeyances being addressed as opportunity arises.
Exemptions Investment Manager
Heating programme continues to address exemptions
Programme excluding abeyances
Investment Manager
2016/17 complete. 2017/18 works ongoing
2.10 Continue to strengthen partnership working with CNES, TIG, Greenspace, community organisations etc
6 month/annual review for feedback
Chief Executive & Director of Operations
Members of Health & Social Integration Planning group
Regular meetings in place with TIG/CNES
Members of Western Isles Fuel Poverty Action Group and ESCO
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
Energy Monitoring Bid submitted to Local Energy Scotland in collaboration with Greenspace.
Working with Community Trusts.
2.11 Engage with CNES and other Community Planning Partners to identify housing requirements for future population demographic projections
Contribute to development of Local Housing Strategy and highlight HHP priorities
Contribute to LOIP
July 2017 Chief Executive &
Director of Operations
Participation in MOWG.
Member of Community Planning Partnership Population Workgroup.
Housing needs assessment being updated to inform Business Plan. Can’t be updated until Local Housing Strategy completed.
2.12 Ongoing work to co-ordinate all strategic plans in relation to housing
Meeting held with Chair of Housing & Communities Committee.
2.13 Contribute to Health & Social Integration Plan
Participate in Health & Social Care Integration Forum
March 2016 Chief Executive Membership of Health & Social Care Planning Group. Political feed in to new build programme – special needs.
Business Planning Session January 2016
Executive Team Commitment in Business Plan update Year 2.
2.14 Develop and agree Asset Management Strategy
Review Asset Management Strategy
Strategy in place
Annual review undertaken
May 2016
May 2017
Investment Manager & Asset
& Contract Manager
Complete.
Update report to Board – May 2017.
2.15 Work with partners to address fuel poverty
Reduce % of tenants in fuel poverty from 63% to under 60%
Re-survey in 2017
Investment Manager
Membership of ESCO.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
Working with CAB and Citrus Energy to promote advice and assistance.
Monitoring project with CES successfully completed.
Thermal imaging technology introduced.
Monitoring process for individual houses in place.
Engagement with key stakeholders to inform decision
Meetings held with OFGEM via Investment Working Group and CNES and TIG invited to contribute.
Working to support CNES with lobbying of SSE.
Working with Highlands & Islands Group to pursue projects.
2.16 Prepare Action Plan for the Energy Efficiency Standard for Social Housing (EESSH)
Plan agreed
Measured through ARC on a yearly basis
Achieve EESSH by 2020
Review in 2017
Investment Manager
EPC’s issued after every heating replacement, C.O.T and insulating works.
S.C.S will add additional EPC information.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 3 – Delivering continuous improvement
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
3.1 Complete Self Assessment Plan
Self Assessment inspection
Plan complete Inspection November
2015
Corporate Governance Manager
Completed. Accreditation received 1 December 2015
3.2 Re-assess self assessment methodology
Decision taken February 2017 Corporate Governance Manager
HHP will begin to work towards Level 2 Accreditation with group self assessment to be completed with Quality Scotland on 19 July 2017.
3.3 Implement new performance measures agreed by Finance Working Group linking performance with resources
New P.I Report – more in line with ARC requirements
Executive Team
agreement November
2015
Update
Corporate Governance Manager
Some financial performance measures include in Resources Annual Performance Report.
New reports in place and we are seeking feedback from Board and staff regarding use etc.
3.4 Arrange to visit 2 of the top performing RSL’s in peer group to benchmark X P.I
Benchmarking report revised targets
September 2017
Corporate Governance Manager
Executive Team will select the areas to be benchmarked.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 4 – Providing efficient effective housing services of high quality
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
4.1 Improve core service performance on range of indicators to achieve top quartile performance
Arrears < 2.5% of gross debit (to be reviewed as Welfare Reform develops)
Quarterly Area Manager Year end figure of 1.7% for current tenants.
Void loss < 0.8% Monthly & End of Year
Area Manager Ahead of target when low demand excluded. Low demand is having significant negative impact on performance.
Average re-let time (excluding difficult to let less than 20 days)
Monthly & End of Year
Area Manager Average re-let @ 16 days in 2016/17.
Performance continues to be affected by low demand.
Repairs on target > 95% On contractual target
Reviewed monthly & annually
Asset & Contracts Manager
Contractual Performance at 98% on target.
Reporting systems being revised to enable reporting from Active H system.
4.2 Report on all indicators that are in top quartile
Report provided September Corporate Governance Manager
Prepared for Business Plan in February 2017.
4.3 Improve customer access to information and service
Further develop website to provide better information, improve accessibility to services – on-line services available
December 2016
I.T Officer
Corporate Resources Manager
Website has been rebuilt.
New added functionality added for improved mobile phone access.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
4.4 Empower individuals to deliver for customers
Review delegated authorities
Refresher event on delegated authorities for all staff
June 2017 Executive Team Meeting with Manager to review and implement.
4.5 Improve performance reporting and management systems to provide a tool to drive performance
75% of relevant ARC reports from Active H for ARC submission 2017
31 May 2017 Corporate Governance Manager & Service
Development Manager
Working on I T system reporting to enable more effective control of accessing month-end data.
4.6 Achieve Committed to Excellence accreditation
Implement Self Assessment Action Plan
Review progress
Inspection November
2015
Executive Team
Corporate Governance
Officer
Accreditation received December 2015.
4.7 Repairs Service Review (Part of wider review of services which are provided externally)
Instigate long term project on review of future service.
Team in place to review bringing repairs service in house
2020 Director of Operations
Project to be established.
4.8 Improve services to factored properties and transparency of charges.
Written procedure in place
Visit other Housing Associations experienced in factoring
March 2017
December 2017
Service Development
Manager & Area Manager
Process review ongoing.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
4.9 Value for Money – develop approach
Value for Money Strategy prepared
31 July 2017 Director Finance & Corporate Services
Ground work on measure underway.
4.10 Develop measures/definitions of effectiveness and efficiency
Publish service standards and targets as part of Charter reporting
30 September 2017
Service Development Manager & Finance &
Business Services Manager
Tenant Report published October 2016.
4.11 Publicise quality standards for customers
To be incorporated into above & leaflets for each service provided as they are developed
By 31 August each year
Service Development Manager & Corporate Governance Manager
Tenant Report published October 2016.
4.12 Identify cost of implementing proposed rent structure
Decision taken on whether implementation is affordable
Director of Finance & Corporate Services
On hold due to Universal Credit.
4.13 Consult on proposed rent structure
To be determined by above
Director of Operations
On hold due to Universal Credit.
4.14 Develop tenants report. Feedback from stakeholders required
Review approach to ARC report annually
May/June 2016
Corporate Governance Manager
Feedback received and incorporated into report which has been published and sent to all tenants.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
4.15 Determine business case for providing student and/or furnished accommodation using hard to let houses
Review need/demand and property type and location
31 December 2017
Director of Operations
Position with UHI developments being clarified prior to progressing further.
Business modelling for student accommodation in Stornoway
Director of Finance & Corporate Services
Position with UHI developments being clarified prior to progressing further.
4.16 Carry out a study on affordability of rents
Affordability Study commission
20 June 2017 Director of Operations
Scope of work to be clarified. Initial investigation through SCS household survey.
Complete 30 November 17
Director of Operations
Impact Assesses 31 December 2017
Director of Finance & Corporate Services
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 5 – Being a good employer that attracts and retains high quality staff
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
5.1 Appraisals and training needs request to be completed.
All SDA’s completed on time
By 31 August each year
Chief Executive Review process for 2017
10 % complete.
5.2 Training Plan to be prepared.
Training Plan to be delivered
Effectiveness of training to be assessed
Training Plan prepared
Training Plan delivered
Training Plan reviewed
Following SDA completion
November each year
Admin Officer (Corporate Resources)
Prepared due to Board November 2015.
5.3 Staff survey Survey undertaken September 2015 Executive Team Action Plan being implemented.
Review of results November 2015
5.4 Annual pay review Recommendation for 2017/18
May 2017 Chief Executive Consultation underway.
5.5 Review grading structure Recommendation on grading structure/implementation
2017/18
2018/19 (implementation)
Chief Executive Identifying external consultants to support work.
Staff meeting held.
5.6 Review opportunities to participate in Modern Apprentice Scheme, provision of trainee posts and secondments
Review undertaken 31 March 2018 Chief Executive Meeting held with Skills Development Scotland. Report to September 2017 Board meeting.
5.7 Review of induction process New induction process implemented
September 2017 Director of Finance & Corporate Services
New member of staff inducted in May. Induction process revised with detailed 1st week plan in diary ensuring they had the correct training and completed Risk Modules.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
5.8 Review of appraisal system New or revised system September 2018 Chief Executive Initial review underway.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 6 – Delivering Value for Money
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
6.1 Identify overhead costs v direct service delivery and benchmark these
Define overhead v direct identifying benchmarking partners
Director of Finance & Corporate Services
Initial work done – appropriate benchmarking partners to be selected.
6.2 Develop peer review against top quartile RSL’s
Partners identified and information obtained
May 2017 Corporate Governance Manager
Peers reviewed prior to Business Plan being finalized to determine where HHP want to be.
6.3 Identify duplication and inefficiencies in processes and streamline these
Detailed process maps developed for key areas including:
Service Development
Manager
Investment Investment complete
January 2016
Investment process map complete.
Factoring August 2017 Factoring process mapped and being reviewed.
Repairs August 2017 I T development required including gateway for contractors.
6.4 Identify costs/unit in investment and repair programmes and identify implications of reducing these
Monitor during contracts and at budget setting to increase scope of investment programme
Annually by the June Board
Asset & Contract Manager
Ongoing analysis of repair costs.
Regular reports to Board.
6.5 Explore opportunities with partners to achieve savings
Development of Procurement Strategy
31 December 2016
Corporate Resources Officer
Report to Board November 2016.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
6.6 Deliver new build programme in a more cost effective way reducing per unit cost
Analysis of costs of current approach.
31 August 2017
Executive Team
6.7 Subsidiary activity – review options that subsidiary can undertake
Subsidiary active T.B.A Director of Finance & Corporate Services
Resources Team restructured to provide support for the development of the Subsidiary.
6.8 Undertake review of impact of LIFT properties in the Stornoway area
Survey successful applicants.
Carry out market analysis to ascertain demand.
March 2016
December 2017
Chief Executive Development Workgroup review following completion of Local Housing Strategy.
6.9 Undertake review of demand/need for 3+ bedroom houses in some rural areas e.g South Lochs, Bragar, Uig, North Uist, South Uist & Barra
Annual Allocation Report to Board.
June – Annually
Director of Operations
June 2016.
Update to Business Planning Day – January 2016 and Board report March 2016.
Report to Board – June 2017.
6.10 Provide temporary accommodation to CNES as required
Annual Review Annually Director of Operations
Ongoing
Review of allocations to homeless applicants as required by CNES
Annual Review
6.11 Review SLA with Homeless Service with CNES
Annual Review. 4th quarter of financial year
Area Manager To be reviewed by March 2017.
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
6.12 Review arrangements with Foyer in relation to leased properties
Arrangements to be concluded
Operating model to be agreed
Director of Operations
Discussion commenced regarding operating model.
6.13 Work to prevent homelessness amongst HHP tenants through tenancy breakdown
Joint working arrangements in place with partners e.g CPN Team, CAB and Social Work.
Ongoing
Area Managers
Liaison arrangements in place with CPN Team and CAB.
Quarterly meetings to continue.
In place – ongoing.
Tenancy sustainability after 1 year > 90%.
Ongoing Sustainability rate at 90% for new tenancies.
6.14 Provide advice and assistance to housing applicants on options and ensure effective signposting
Eviction rate < 0.15% Ongoing ARC lead monitoring
Housing Officers continue to work with tenants to aim to achieve the targets.
Explore formal accreditation on advice and assistance
To start in July 2017 with continuous refreshers
Service Development
Manager/Corporate Resources Admin
Officer
Develop housing options information for applicants to support advice provision
Service Development Manager/Area
Manager
BUSINESS PLAN OBJECITVES- MONITORING REPORT 2015/16 TO 2019/20
OBJECTIVE 7 – Making the biggest impact on the economic well being of communities throughout the Outer
Hebrides that resources allow
REF ACTION REQUIRED MILESTONES TIMEFRAME LEAD OFFICER PROGRESS
7.1 Support local suppliers and contractors.
Source majority of supplies locally
Ongoing Investment Manager/Corporate Resources Officer
Support of local economy now formal aspiration/requirement of HHP’s Procurement Strategy.
7.2 Apprenticeships – commitment from contractors to recruit and retain apprentices.
All major contracts to include recruitment & retain apprentices
Ongoing Asset & Contracts Manager/Investment
Manager
In place and ongoing.
7.3 Support CNES/CPP (check) Strategy of making Stornoway a University town.
Working in partnership for student/lecturer accommodation
Ongoing Chief Executive
7.4 Participate in Economic Outcome Group.
Ongoing Chief Executive
7.5 Examine opportunities for pilot projects for innovative developments that link with community projects
Opportunities explored 2017-2020 Executive Team
Jackie Macleod Page 1 of 2 16/6/17
Agenda Item 27
BOARD 28 June 2017
INVESTMENT PROGRAMME 2017/18 MONITORING REPORT
Report by Director of Operations
PURPOSE OF REPORT
1.1 To provide an update on the delivery of the 2017/18 Investment Programme.
SUMMARY
2.1 The works for the 2017/18 programme are being delivered through the Investment Framework. The report provides information on progress of works at Appendix 1 and a financial update at Appendix 2.
COMPETENCE
3.1 The legal, financial or other constraints to any recommendations in this report being implemented are detailed in paragraph 5.
RECOMMENDATIONS
4.1 It is recommended that the Board notes the 2017/18 Investment Programme progress and financial updates at Appendices 1 and 2.
APPENDIX 1 2017/18 Progress Report
APPENDIX 2 2017/18 Financial Update
Background Papers None
Writer of Report Angus E MacNeil Tel: 0300 123 0773
Jackie Macleod Page 2 of 2 16/6/17
COMPETENCE
Financial 5.1 The Board approved an Investment Programme for 2015-2019 in November 2014 subject
to annual budget approval. 5.2 The investment budget for the 2017/18 Investment Programme is approved at £4.227m.
Works are being procured and costs at Appendix 2 will be updated as surveys are completed.
5.3 Proposals for the use of the unallocated budget will be presented to the September 2017
Board meeting.
Legal 5.4 The decision to approve or amend Strategy, Business Plan and budgets including
virements to or from a budget head in excess of £50,000 is reserved to the Board. 5.5 Financial Regulations require that actual forecast and progress on the Investment
Programme be reported to each routine meeting of the Board.
RISK
6.1 There are risks highlighted in the Risk Register which are relevant to Investment including specifically failure of a major contractor.
6.2 An approved grant application for the sum of £246k for general adaptations was confirmed by the Scottish Government on 14 June 2017. This full funding will now supersede the temporary allocation of £100k previously set up within the budget.
REPORT DETAILS
Progress of 2017/18 Programme
7.1 Tendering of Lots is currently in progress as detailed at Appendix 1.
7.2 Tendering of Lots is being staggered in order to afford contractors on the Framework every opportunity to tender for each Lot. Feedback is provided to the contractors after tendering for each Lot.
7.3 The Board agreed in June 2015 to switch window and kitchen replacement at Church Road, Berneray. The programme has been adjusted to reflect this decision.
Additional Works – Unallocated Budget
8.1 Works continue to be prioritised and costed in order to provide recommendations to the Board in September 2017. EESSH related works are being considered as a priority in relation to this budget and discussions with external agencies in relation to grant funded initiatives are continuing to minimise the impact on budgets. Common area improvements are also being evaluated to address abeyances from SHQS.
8.2 Projects will be prioritised to achieve or to maintain SHQS and to meet EESSH.
8.3 The Stock Condition Survey being carried out in the coming months may also identify further works to be carried out.
2017/18 Current Progress Appendix 1
Works Notes Contractor Progress to end May
Lewis and Harris
Window and Doors 17 units *TBC Tender to be issued w/c 12 June
Heating 83 units *TBC Tender to be issued w/c 12 June
Gas Heating 86 units Alex Murray Construction On site
Bathrooms & Showers 16 units Alex Murray Construction On site
Kitchens 80 units O'Mac Construction Site start 4 July
Roofing 7 units *TBC Tender issued. Return 16 June
Roughcasting 6 units *TBC Tender issued. Return 16 June
Electrical Works 400 units *TBC Tender to be issued w/c 19 June
Environmental 61 units *TBC Tender to be issued w/c 12 June
OT Referral based Alex Murray Construction On site
Energy efficiency - Rooms in roof Insulation
Investment pogramme to be revised upon completion
of works with 100% funding which are currently on
site
Uist and Barra
Windows 8 units *TBC Tender to be issued w/c 12 June
Bathrooms & Showers 5 units *TBC Tender issued. Return 21 June
Kitchens 39 units *TBC Tender issued. Return 16 June
OT Referral based FES FM Ltd On site
Energy efficiency - Rooms in roof Insulation
Investment pogramme to be revised upon completion
of works with 100% funding which are currently on
site
* TBC - To be confirmed
Page 1 of 1
INVESTMENT PROGRAMME FINANCIAL UPDATE APPENDIX 2
Line SUMMARY ACTUAL
Initial Revised Spend to Revised Revised Slippage/ Over/ at
Budget Budget 31 May 2017 Budget Budget Saving B/F 31 Mar 18
£ £ £ £ % £ £
1 INVESTMENT -VAT
2 Roofs & Roughcast 109,760 109,760 - 109,760 100% - - 109,760
3 Insulation 144,840 144,840 - 144,840 100% - - 144,840
4 Total Externals 254,600 254,600 - 254,600 100% - - 254,600
5 Internal
6 Kitchens 446,250 446,250 - 446,250 100% - - 446,250
7 Bathrooms 61,200 61,200 - 0% - - 61,200
8 Heating 1,770,740 1,770,740 4,531 0% - 2,000 1,772,740
9 Windows 257,990 257,990 3,050 0% - - 257,990
10 Total Internal 2,536,180 2,536,180 7,581 446,250 18% - 2,000 2,538,180
11 Other
12 Smoke Detectors & Fire Doors 116,000 116,000 - 116,000 100% - - 116,000
13 Fencing 233,260 233,260 12,760 220,500 95% - - 233,260
14 Total Investment VAT 3,140,040 3,140,040 20,341 3,119,699 99% - 2,000 3,142,040
15 INVESTMENT -NON VAT
16 OT Works 120,000 120,000 3,599 116,401 97% - - 120,000
17 Showers 44,400 44,400 - 44,400 100% - - 44,400
18 Subsidence - - - - - - -
19 Total Investment Non VAT 164,400 164,400 3,599 160,801 98% - - 164,400
20 INVESTMENT-5RSL
21 Insulation 17,040 17,040 - 17,040 100% - - 17,040
22 Kitchens 90,000 90,000 - 90,000 100% - - 90,000
23 Heating 77,440 77,440 - 77,440 100% - - 77,440
24 Smoke Detectors - - - - - - -
25 Total Investment 5 RSL 184,480 184,480 - 184,480 100% - - 184,480
26
27 Unallocated & Efficiency Budgets
28 Unallocated budgets 738,310 738,310 - 738,310 100% (2,000) 736,310
29 Efficiency Savings - - - - -
30 Total Budget Available 738,310 738,310 - 738,310 100% - (2,000) 736,310
31
32 Total Investment 4,227,230 4,227,230 23,940 4,203,290 99% - - 4,227,230
2017-2018 BUDGET REMAINING FORECAST OUT-TURN
BRD-28JUN17-27 Investment Programme 2017-18 Appendix 2 - SUMMARY ONLY
Summary
16/06/2017
18:35
Jackie Macleod Page 1 of 4 16/6/17
Agenda Item 28
BOARD 28 June 2017
FUEL POVERY UPDATE
Report by Director of Operations
PURPOSE OF REPORT
1.1 To update Board on the investment works and other initiatives which are in place to reduce the impact of fuel poverty on HHP tenants.
SUMMARY
2.1 Fuel Poverty has been recognised as a problem in the UK since the mid-1970s when there was an observation that many people had difficulty in paying their energy bills due to low income and high and rising fuel costs. At the time fuel poverty was broadly defined as not being able to afford to keep warm. Since then, the concept of fuel poverty has gained increasing political recognition and is now a cross-cutting policy issue at the forefront of poverty and climate change strategies.
2.2 The Outer Hebrides has the highest level of fuel poverty in the United Kingdom.
2.3 HHP continues to tackle fuel poverty primarily through the Investment programme but is also proactive in other initiatives through the Affordable Warmth Strategy and Business Plan objectives.
2.4 A household fuel poverty survey will form part of the Stock Condition survey in 2017 which will provide an update on the level of fuel poverty amongst tenants.
COMPETENCE
3.1 The legal, financial or other constraints to the recommendations in this report are contained in paragraphs 5 and 6.
RECOMMENDATIONS
4.1 It is recommended that this report is noted.
Background Papers None
Writer of Report Peter O'Donnell Tel: 0300 123 0773
Jackie Macleod Page 2 of 4 16/6/17
COMPETENCE
Financial 5.1 Measures to address fuel poverty have been incorporated and costed as part of the
investment framework. 5.2 Government funding of £430k was achieved in 2016/17 which allowed works to be
brought forward and opportunities continue to be pursued.
Legal 5.3 There are no legal duties in considering this report.
RISK
6.1 Fuel poverty is recognised within the HHP Risk Register. Increased energy costs and the impact on tenants’ income can affect their ability to sustain their tenancy.
REPORT DETAILS
Investment Works
7.1 Fuel poverty primarily affects HHP homes off the gas grid although tenants with gas can also find themselves in difficulty. The triggers of fuel poverty are as follows:
• Energy efficiency of the home;
• Fuel costs; and
• Household income.
7.2 Work is ongoing to finance these as far as possible as set out below.
Energy Efficiency
8.1 To date HHP has installed 680 heat pumps, 61 infrared systems, 24 quantum storage systems and 91 new gas condensing boilers. All our homes have loft and cavity insulation where possible. 259 houses with a room in the roof have now been insulated with a combination of HHP and Scottish Government funding.
8.2 There is Board approval in place for a further 355 new heating systems and plans for another 178 heating systems to be installed in 2019. Recent Government funding has enabled HHP to progress more insulation works than anticipated resulting in the current insulation programme being largely completed. A revised plan is now being deployed.
8.3 The energy efficiency of HHP homes can be improved through other factors such as improving double glazing, increasing cylinder insulation, switching tariffs and installing under floor insulation. Our rolling investment programme will continually improve the energy efficiency of our homes but under floor insulation is proving extremely difficult to both fund and install. Government funding is predominantly concentrating on wall insulation and HHP were recently unsuccessful in bidding for a small under floor insulation project. Our investment team will continue to seek opportunities to fund this work.
Jackie Macleod Page 3 of 4 16/6/17
Fuel Costs
9.1 The volatility of fuel costs can have a big impact on tenants’ energy bills. Recent SSE price increases have taken tariffs for storage heating customers to an unprecedented level, reaching 21.9p per kWh. Although this is offset by lower heating and hot water costs of 11.06p per kWh at peak times there is still a 12% rise on both tariffs and this only increases the possibility of tenants slipping further into fuel poverty.
9.2 A cap put on prepayment meters has resulted in a safety net for a lot of tenants as their tariffs did not increase. This price cap is in place till 2020 and the levels are updated on 1 April and 1 October each year so prices could still go up or down throughout the year. The price cap will cease when smart meters have been rolled out which is still predicted to be in 2020.
9.3 HHP is working with Citrus Energy to protect tenants on expensive tariffs and help them switch where possible. There is, however, still a large proportion of tenants who favour SSE and refuse to switch. This brand loyalty still provides the toughest challenge to moving tenants to cheaper tariffs.
Household Income
10.1 The ability to influence household income is generally outwith the control of HHP but it should be noted that our yearly spend on development, investment and repairs brings is worth £9m annually to the island economy and allows the construction industry in particular to employ local workers and bring in much needed apprenticeship schemes.
10.2 HHP continues to signpost tenants to appropriate agencies for further help on income maximisation where benefit checks and debt reduction can bring much needed support.
Energy Monitoring
11.1 HHP will be using the 2017 heat pump servicing programme to undertake a survey for those tenants with heat pumps. The survey will ascertain whether tenants are happy with the following aspects of their heating:
• comfort;
• control;
• usage;
• satisfaction; and
• electricity supplier.
11.2 As part of the servicing HHP has asked FES to log meter readings to enable running costs to be evaluated. Our next review of fuel poverty will include these running costs and the outcome of the survey.
Hebrides Energy
12.1 The Hebrides Energy project being delivered by Comhairle Nan Eilean Siar and other partners including HHP suffered a set back when their provider, GB Energy, collapsed. Discussions are ongoing with potential new partners and all options are being explored.
Jackie Macleod Page 4 of 4 16/6/17
Highlands and Island Housing Associations (HIHA)
13.1 In April 2017 the HIHA group produced an update on the analysis of the difference in electricity costs for standard tariffs between north and south Scotland where previously SSE had charged around 2p extra to supply electricity to the north. Since 2015 SSE has halved the difference between costs north and south. In 2015 the difference in costs was £128 but by April 2017 this had reduced to £72. Their standard rate in North of Scotland now costs 1.2p more per unit than the South whereas in 2015 the difference was 2.4p. This would indicate that the lobbying by the Highlands and Islands group along with other pressures has proved successful although there is still work to be done to reduce this gap to 0.7p which OFGEM has identified as the true differential in supply costs.
Funding Opportunities
14.1 In the previous fuel poverty review HHP was bidding for two streams of funding to deliver an academic study on heating and energy within HHP homes and developing an energy efficiency brochure. Unfortunately both bids, although well received, failed to receive any funding.
14.2 In December 2016 HHP bid for insulation funding through the Home Energy Efficiency Programme for Scotland Area Based Scheme (HEEPS ABS). The scheme was administrated through Comhairle Nan Eilean Siar and HHP were successful in receiving an initial funding of £340k. Due to our progress and ability to take on more works, two further sums of £50k were given to HHP taking our total to £440k which enabled 89 room in roof properties to be insulated.
14.3 In May 2017 HHP was approached by an insulation firm to explore the possibility of accessing Energy Company Obligation (ECO) funding to enable more room in roof properties to be insulated at no cost to HHP. ECO funding now has a particular strand to address funding for housing associations where homes have an EPC of ‘E’ or less. A trial was carried out at Caladh Siar, Harris, to assess installation standards which was successful and we are now surveying properties for further works to be carried out this year. Updates will be brought to the Board through the Investment reports.
Mina Maclean Page 1 of 2 16/6/17
Agenda Item 29
BOARD 28 June 2017
HOUSING ALLOCATIONS - ANNUAL REPORT 2016/17
Report by Director of Operations
PURPOSE OF REPORT
1.1 This report provides statistical information on housing allocations during 2016/17 and outlines a number of the key issues surrounding supply and demand for housing.
SUMMARY
2.1 The report at Appendix 1 is the seventh report to the Board setting out information on supply and demand. This will continue to develop to indicate trends and will help to inform decisions on the requirement for, and location of, new supply.
2.2 This report is also important for monitoring equality in terms of access to housing.
2.3 The level of demand for housing is an important issue for the business and one which needs to be closely monitored. The demand as demonstrated by waiting lists is not high particularly outwith the Stornoway area. This information should inform strategic planning and the future shape of the development programme. Options will need to be run through the Business Plan model to assess the impact of changes in demand.
COMPETENCE
3.1 There are no financial implications to the report.
RECOMMENDATIONS
4.1 It is recommended that:
a) The report at Appendix 1 is noted; and
b) The quotas for allocating properties in Stornoway remain at 50% for homeless applicants.
APPENDIX 1 Housing Allocations Report for 2016/17
Background Papers None
Writer of Report Mina Maclean Tel: 0300 123 0773
Mina Maclean Page 2 of 2 16/6/17
COMPETENCE
Financial 5.1 There are no direct financial implications in the report.
Legal 5.2 There are no specific legal implications in the report.
RISK
6.1 Demand for housing is an important issue for HHP. Lack of demand will impact on income and the strength of the business. There is evidence that demand for housing is continuing to reduce and particularly so in rural areas and this is reflected in the risk register.
�Allocations Report
2016/17
Author: � Mina Maclean Senior Housing Officer (Allocations)
Publication Date: � June 2017
1 | P a g e
ALLOCATIONS REPORT 2016/17
Contents
AIMS ..................................................................................................... 2
WAITING LIST AT 31 MARCH 2017 ............................................................. 2
PERCENTAGE OF DEMAND BY AREA .......................................................... 4
BREAKDOWN OF APPLICANTS ON WAITING LIST FROM 2010-2017 (INCLUDING
SUSPENDED & DEFERRED) ......................................................................... 5
APPLICATIONS RECEIVED DURING 2016/17 ............................................... 5
PERCENTAGE OF WAITING AND TRANSFER APPLICATIONS BY HOUSEHOLD
TYPE ..................................................................................................... 6
PERCENTAGE OF APPLICANTS BY ETHNIC ORIGIN ....................................... 7
NUMBER OF CANCELLED APPLICATIONS .................................................... 8
SUSPENSIONS AND DEFERRED APPLICATIONS ............................................. 9
HOUSING SUPPLY .................................................................................. 10
NEW TENANTS SATISFACTION WITH CONDITION OF THE HOUSE ................... 12
REASONS FOR TERMINATIONS ................................................................. 13
WAITING TIMES FOR APPLICANTS ............................................................ 13
LOW DEMAND PROPERTIES...................................................................... 15
HOMELESS APPLICANTS .......................................................................... 15
QUOTAS FOR ALLOCATING HOUSES ......................................................... 15
CONCLUSION ....................................................................................... 15
2 | P a g e
ALLOCATIONS REPORT 2016/17
AIMS
1.1 The aims of this report are
• to provide information on the supply and demand for social housing in
the Outer Hebrides
• inform decisions on the requirement for, and location of, new supply
• monitoring equality in terms of access to housing
WAITING LIST AT 31 MARCH 2017
2.1 The map below shows the number of applicants on the waiting list at 31
March 2017 and incorporates first choice area of preference:
3 | P a g e
2.2 As can be seen demand is highest at the main centres of population and is
currently weaker in the rural areas.
2.3 The waiting list broken down to show waiting and transfer applicants
(excluding 25 suspended and 57 deferred) is below:
2.4 Overall the waiting list has remained about the same as it was at 31 March
2016, however there has been a reduction of nearly 20% over the last five
years.
4 | P a g e
PERCENTAGE OF DEMAND BY AREA
3.1 The chart shows that the largest demand by a considerable distance is for the
Stornoway area with 59% of applicants recording this as their preference. The
next largest areas of demand at 5% are Back/Tong, Tarbert,
Creagorry/Kileravagh and Eoligarry/Scallery.
5 | P a g e
BREAKDOWN OF APPLICANTS ON WAITING LIST FROM 2010-2017 (INCLUDING
SUSPENDED & DEFERRED)
4.1 The chart below shows the number of applicants on the waiting list over the
last seven years. The figures in this chart include, waiting, transfer and also
suspended and deferred applications.
4.2 There has been an 8.6% decrease in the total number of applicants from 31
March 2016 and a 6.2% decrease in waiting list applications. Since 31 March
2011 waiting list applications have fallen by 20%
APPLICATIONS RECEIVED DURING 2016/17
5.1 The total number of applications received during 2016/17 was 453 an
increase of 10% from the previous year.
5.2 The average time taken to process these applications was 4 days.
6 | P a g e
PERCENTAGE OF WAITING AND TRANSFER APPLICATIONS BY HOUSEHOLD
TYPE
6.1 Single people make up 54% of the applicants with 31% aged 26-59. 28% of
applicants are households with children.
6.2 In 2013/14 the figures were 51% of applicants were single with 28% aged 26-
59. 25% applicants were households with children.
7 | P a g e
PERCENTAGE OF APPLICANTS BY ETHNIC ORIGIN
7.1 The chart below shows that the largest applicant group is white Scottish at
77% with 16% of applicants being of other white British origin. White Irish and
other white backgrounds make up 4%. 1% did not provide information.
7.2 In 2013/14 the percentage of White Scottish was 75% with 12% being white
British origin. White Irish and other white background was 4%. 7% did not
provide information.
8 | P a g e
NUMBER OF CANCELLED APPLICATIONS
8.1 During the year 269 applications were cancelled. The primary reason for
applications being cancelled was due to non-return of review forms and
there were 120 applications cancelled as a result of this. The rolling review
process is important in keeping data live and up to date.
9 | P a g e
SUSPENSIONS AND DEFERRED APPLICATIONS
9.1 In some circumstances applicants will be suspended from the waiting list.
Suspended applicants are reviewed every month to ensure that the
suspension is still relevant. There are currently 25 applications suspended, 6
are suspended because of current tenant arrears, 4 are suspended because
of former tenant arrears and 3 because of conduct issues. 12 applicants are
suspended for refusing two offers of housing which met their choices.
9.2 57 applicants do not wish to be housed at present and are deferred until such
time as their circumstances. 2 applicants are deferred pending further
information.
10 | P a g e
HOUSING SUPPLY
10.1 In total 203 (excluding new build) were re-let during 2015/16. There were 37
lets made to transfer applicants. There were 11 Direct Lets.
10.2 The number of relets by area is shown below. 54 lets (26.6%) were in the
Stornoway area with 18 lets (8.9%) in Balivanich and 19 lets (9.36%) in
Lochboisdale.
10.3 In the 2013/14 report the figures were 95 lets (49.48%) in the Stornoway area, 7
lets (3.64%) in Balivanich and 7 lets (3.64%) in Lochboisdale.
11 | P a g e
10.4 71 lets (33%) were for 1 bedroom properties and 73 lets (34%) were 2 bedroom
properties. 66 lets (31%) were of 3 bedroom properties.
10.5 In the 2013/14 report the figures were 65 lets (33%) of 1 bedroom properties
and 84 lets (43%) of 2 bedroom properties.
10.6 The graph below shows applicants housed during the year by household type
and by ethnic origin. 14% of lets were to couples with children, 13% were to
couples, 18% were to single parents and 44% were to single people. These
figures are broadly in line with the proportion of households on the waiting list.
12 | P a g e
10.7 70% of lets were to white Scottish applicants and 27% to other white groups.
This is broadly in line with the make-up of waiting lists.
NEW TENANTS SATISFACTION WITH CONDITION OF THE HOUSE
11.1 A questionnaire is sent to new tenants within the first week of the tenancy
starting asking various questions regarding the standard, decoration,
cleanliness of the property and the quality of repairs carried out. 46% of
questionnaires were returned and 90% of tenants said they were satisfied with
the condition of the house. 4% were dissatisfied due to decoration and the
condition of the property.
13 | P a g e
REASONS FOR TERMINATIONS
12.1 The reasons for terminations are, 10% moved to the private sector, while 14%
moved to the mainland.
WAITING TIMES FOR APPLICANTS
13.1 The waiting time from the date of application to commencement of tenancy
for the Homeless List, Transfer List and Housing List are shown in the following
three charts.
0 200 400 600 800 1000
2 apt
3 apt
4 apt
5 apt
983
487
440
0
0
536
299
0
Homeless List - No of Days
7A (Balivanich)
3C (Stornoway)
14 | P a g e
0 200 400 600 800 1000 1200
2 apt
3 apt
4 apt
5 apt
175
1000
1061
0
308
0
0
0
441
91
33
0
Transfer List - No of Days
7A (Balivanich)
5A (Tarbert)
3C (Stornoway)
0 200 400 600 800 1000 1200 1400 1600
2 apt
3 apt
4 apt
5 apt
1300
490
954
0
1485
243
0
0
396
265
375
0
Housing List - No of Days
7A (Balivanich)
5A (Tarbert)
3C Stornoway)
15 | P a g e
LOW DEMAND PROPERTIES
14.1 The low demand for many rural areas is increasing and is a cause for concern.
At the time of writing there were 13 properties which could not be let due to a
lack of demand. The longest void period on one property is currently 41
weeks.
14.2 Overall 180 houses are now classed for ARC purposes as being low demand.
Annual void loss has increased steadily in recent years from 0.5% in 2013/14 to
0.8% in 2016/17. Further information and potential interventions will be
reported to future Board meetings.
HOMELESS APPLICANTS
15.1 In total 52 statutory homeless applicants were housed during 2016/17. Of
these 22 were housed in the Stornoway area. This is 42% of lets in Stornoway
against a target quota of 50%. This quota is to be reviewed annually and it is
proposed that it continue at 50% of re-lets in the Stornoway area. There has
been no request by the Comhairle to amend the current quota. Of all
allocations made throughout the Western Isles 26% were made to statutory
homeless applicants.
QUOTAS FOR ALLOCATING HOUSES
16.1 Within the Stornoway area it is proposed that houses will continue to be
allocated on a one to one ratio between homeless applicants and
mainstream/transfer applicants.
16.2 The quota for waiting applicants is 35% and for transfer applicants in the
Stornoway area is 15%.
16.3 The quotas are to be reviewed at the Housing Working Group when the
Allocation Policy is revised after the provisions of the Housing Scotland Act
2014 are enacted.
CONCLUSION
17.1 The information in this report allows trends and changes in demand and
supply to be tracked. It also provides a base from which an assessment can
begin to be made as to whether the allocation policy is meeting any
objectives set and whether those most in housing need are being housed.
17.2 There are some key points to note. The supply of vacancies is primarily of 1
and 2 bedrooms which relates well to the fact that 54% of the waiting list is
single people.
17.3 The percentage of lets made by ethnic group is in line with the composition of
the waiting list although the numbers are small.
17.4 Demand against supply needs to be closely monitored. On a simplistic level
there are 511 applicants on the waiting list excluding transfer applicants. This
figure includes suspended and deferred applications. If deferred applicants
are excluded the figure is 469. When this is compared to the supply of
housing at an average of approximately 200 per annum the level of demand
16 | P a g e
per vacancy is not high. This position is consistent with previous years and is
an important issue in business terms.
17.5 There is a concern that we are continuing to increase supply through the
Development programme while demand is shrinking. Discussions are ongoing
with the Comhairle as to how these trends can be investigated and
addressed through the Local Housing Strategy development process.
HHP is a registered society under the Co-operative and Community Benefit Societies Act 2014, Registered Number: 2644R(S),Registered Office: Creed Court, Gleann
Seileach Business Park, Willowglen Road, STORNOWAY, Isle of Lewis HS1 2QP. It is a charity registered in Scotland, Charity Number:SCO35767, registered as Registered
Social Landlord with the Scottish Housing Regulator, Registration Number:359 and registered as a Property Factor, Registration Number PF000183