blackice basel roadmap (final review)blackiceinc.com/.../2017/07/blackice-basel-roadmap.pdf ·...

27
BASEL ROADMAP BLACKICE INC. REFERENCE PRESENTATION FEBRUARY 2017

Upload: vodang

Post on 01-May-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

BASEL ROADMAPBLACKICE INC. REFERENCE PRESENTATIONFEBRUARY 2017

Page 2: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

BASEL ROADMAP BASICS

Page 3: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

3

BASEL IMPLEMENTATION VS. BASEL COMPLIANCE

In order for an institution to successfully meet BCBS and regional SBV Basel regulations, two components are necessary:u Successful implementation and governance of a Basel Program; andu An ongoing accurate and comprehensive compliance self-assessment against Basel requirements.

An institution’s approach to manage a Basel Program is an input into the compliance self-assessment.

Governance

Resources

DeliverablesTesting

Approvals

Governance

Identify Measures of

Success

AssessmentReport

Monitor

Project Implementation Compliance Assessment

Page 4: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

4

Basel II Capital Accord

1. Minimum Capital Requirements 2. Supervisory Review 3. Market Discipline

§ Improved Disclosure of Capital Structure

§ Improved Disclosure of Risk Measurement and Management Practices

§ Improved Disclosure of Risk Profile

§ Improved Disclosure of Capital Adequacy

The 3 Pillars of Basel II

§ Three different approaches to calculate minimum capital requirements for:ü Credit Risk ü Operational Riskü Market Risk (Two)

§ Compliance defined re. each approach

§ Incentives to move to more sophisticated risk management approaches

§ Self assessment for capital adequacy

§ Supervisory review

§ Expectation of higher capital than minimum

§ Intervention at an early stage as prevention

Data Business Process Regulatory DisclosureImplementation

Components

Page 5: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

5

• Info Assessment• Data History /

Quality

• Risk Models & Ratings:• PD, EAD, LGD• Rating Scales

• Methodologies & Tools• Segmentations• Products / Markets

• Policies & Governance

• Systems & Processes

• Documentation

• Capital Testing

• Reporting

Basel II Capital Accord

1. Minimum Capital Requirements 2. Supervisory Review 3. Market Discipline

Data Business Process Regulatory Disclosure

Where To Start Along The Pillars – What’s in Place

StartingPoint

Process Tools

Org / People

Page 6: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

6

KEY BASEL ASSESSMENTS & DELIVERABLES

The identification of key deliverables necessary to demonstrate adherence to Basel and SBV guidance will leverage a self-assessment against current activities versus end-state, and include the following six areas.

Governance & Policies

Internal & Regulatory Reporting

Impact to internal processes and resources

Implementation of Calculator

Impact to Source Systems

Identification of Data

Page 7: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

OVERVIEW ROADMAP FOR BASEL II

Page 8: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

8

• Customer Management

• Origination

• Underwriting

• Facility Management

• Collateral Management

• Collection / Recovery

• Portfolio Management

• Financial Management Reporting

• CRM & Packages

• Decision Support / Business Intelligence

• Data Warehousing / Data Management

• Sub-Ledger / Accounting Systems

• G/L & Financial Reporting

• Governance

• Subject Matter Experts

Scope For

Execution

ASSESS THE OPERATING ENVIRONMENT – IMPROVE WHAT IS ALREADY IN PLACE

Process Tools

Org / People

Areas of

Focus

Gaps

• Process• Systems• Data• Models• Organization

Page 9: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

9

Governance

DataDefinitions

• Obligor• Exposure• Default

Processes& Systems

Underwriting

Sub-Ledger

Asset MgtCRM

Ratings & Models

PDLGD

EAD

PDLGD

EAD

Data

Data Architecture

Data Repository

Analytics& Reporting

Analytics

Reporting

ReportData

Resources &Management

Collect Data

Store Data

Model Data

PUT THINGS TOGETHER - HAVE A FRAMEWORK

Page 10: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 0

Operational Risk

Data Processing

Functional Domains

Common Operational FrameworkM e t a d a t a

Pre-requisite Data Business Metadata

Data DeliveryData LayoutData Management

Enterprise Wide Model

Business Intelligence

Common ETL Layer

Reporting

Analytics

SpecificViews

Risk AnalyticsAnd Modeling

Financial Modeling Engine

Functional Modeling

A DATA ARCHITECTURE PERSPECTIVE IS CRITICAL

Core Banking

Credit Cards

Internal Source Systems

General Ledger

External Systems

External Ratings

Market Data

Source Traceability

Validation

ETL

Data Quality

Edit and Reload

Audit Trail

Warehouse Staging

ETL

Credit Risk

Market Risk

Market Risk Engine

Credit Risk Engine

Operational Risk Engine

Page 11: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 1

• Exposure At Default

• Loss Given Default

• Probability of Default

• Stress Testing

• Effective Maturity

• Earnings At Risk

• Customer / Party Information

• Underwriting Scores / Credit Ratings

• Customer Facilities

• Account Balances

• Collection Transactions

• Loss Events

• Asset Classification / Product LinkagesG

ranu

lar D

ata

Cap

ture

dC

alcu

latio

ns

Data To Be Collected Must Be Organized In A

Functional Model

CustomersAssets

TransactionsAgreements

Products

LocationsOrganization

Finance

Enterprise Risk Data Model

Data Dictionary

Implementation Considerations

• Pre-defined Basel II data model available with Data Dictionary

• Mapping data to source systems will require the most effort

• Documentation & Data SME’s – critical to the process

PUTTING DATA TOGETHER – THE DATA MODEL

Operational Risk

Enterprise Wide Model

Credit RiskMarket Risk

Page 12: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 2

GOVERNANCE & POLICIES

u Creation of new polices such as:- Risk Management Framework- Risk Appetite Framework- Stress Testing Policy- Economic Capital- ICAAP Manual- Line of Business Lending Practices- Data Governance- Operational Risk Framework- Model Validation Policy- Liquidity Risk Management Policy- Trading and Non-Trading Standards- Capital Markets Risk Management Framework- Business Continuity Management- Anti-money Laundering- Recovery Plan- Roles and Accountabilities

Page 13: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 3

BASEL II PROGRAM ORGANIZATION

PortfolioFacilitator(3)

Program Control Office

TechnologyIndustry/ Regulatory Regulat-

ions

Special Projects(2)

Executive Sponsorship

Third Party Advisors

Core Advisory Group(1)

Basel Executive Steering Committee

PMO Leadership

Regulatory Business Technology

Denotes core Basel Project Management Office resources

Denotes individual work streams for project execution and other content expertise

Market RiskCredit Risk

RetailCorporates,Sovereignsand Banks

Securitiz-Ation Trading

Room

Non -TradingEquities

IRRBB Market Risk

Smalland

MediumEnterprises

PortfolioFacilitator(3)

Operational Risk & Other Work Streams

MarketDiscipline

OperationalRisk

Internal Audit

PortfolioFacilitator(3)

PortfolioFacilitator

PortfolioFacilitator(3)

Notes:1. A subset of the Basel Executive Steering Committee that meets

more regularly and is able to address urgent high-level issues 2. Includes Business Management, Communications and other

special projects (e.g., Data Governance, Security, Program Integration Testing, Reconciliation and Adjustments and Reporting cycle, etc.)

3. Portfolio Facilitators report into PMO Special Projects

Page 14: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

EXAMPLES OF CREDIT RISK PROJECT SCOPE

Page 15: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 5

SAMPLE PROJECT: IMPLEMENTATION OF RWA ENGINE

► Obtain/ develop data mapping/ reference data mapping specification/ technical and infrastructure specification from client which data source (at account level, i.e. loan, investment, trade finance, guarantee …)

► Develop configuration and configuration specification for RWA calculation. Configuration will contain but not limited to the following information:

§ Mapping logic from core banking/source systems to engine for credit risk, market risk and operational risk

§ Calculation specification

► Complete ETL process based on Data Mapping Specification and Reference Data Mapping Specification

► Deploy RWA Engine and generate SBV reports/ Pillar 3 reports

► Perform SIT&UAT

► Final deployment and post implementation support

► Build operational model for consolidation process (Roles and Responsibilities for ongoing process)

Key activities

► Generate RWA, capital requirements for market risk and operational risk and CAR► Generate Dashboard to satisfy SBV disclosure requirement and/or Pillar 3 disclosure requirements

Initiative Objectives

Deliverables

► Data mapping/ reference data mapping specification/ technical and infrastructure specification

► Configuration and configuration specification

► RWA engine and dashboard for reporting

► Selected management reports and operational model

Others

► Project duration: 6 months

► Key benefit:

§ RWA engine

§ Improve data mapping/ reference data mapping specification/ technical and infrastructure specification

§ Dashboard for SBV disclosure and Pillar 3 disclosure

§ Better CAR management

► Minimum Human resource requirements

§ Basel team:

o 1 Manager

o 4-5 Senior/staff

§ IT team:

o 1 Manager

o 1-2 Senior

§ Finance/ accounting team:

o 1 Manager

o 1 Senior

§ Business unit (if needed)

Page 16: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 6

SAMPLE PROJECT: CONSTRUCT AND COMPLETE ALL POLICY, PROCEDURE FOR CREDIT RISK MANAGEMENT

► Strategies/ Policies for credit risk are needed to be built/ completed:

§ RWA calculation (built when implementing RWA solution project)

§ Strategy/ Risk appetite (built during implementing ICAAP project)

§ Credit risk management policies, e.g. credit rating policy, credit authorization, credit risk assessment, special borrowing policy, real estate lending

§ Portfolio management (built during implementing project to build comprehensive policy for loan portfolio management)

§ Early warning system (built during implementing early warning system project)

§ Credit rating system and modelling (PD, LGD, EAD) (built during implementing related projects)

§ Stress-testing (built during implementing stress-testing project)

► Build guidance and process accompanied to these mentioned policies

Key activities

► Enhance current existing policies and build new policies for credit risk management to comply with Basel II

Initiative Objectives

Deliverables

► Roadmap for development and enhancement of all policies and procedures to support Credit Risk Management

► Official documentation for Credit Risk Policies and Procedures

Others

► Project duration: 6 months and continuance process

► Key benefit:

§ Give BOD, Senior Management, and all staff fundamental understanding and control of credit risk management

§ Basis for all related projects to be planned and implemented

§ Increase/ enhance bank’s capability of understanding and managing Credit Risk

► Minimum Human resource requirements

§ 1 manager

§ 1 senior officer and 3 staffs from credit risk department

§ 1-2 senior officer from wholesale department

§ 1-2 senior officer from retail department

Page 17: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

ICAAP

Page 18: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 8

THE ICAAP USE TEST

Yes No

Board

RMC/AC

CRC/GCC/SET

StressTesting

RiskAppetiteCapitalPlan

Enterprise-wide

Financial& EconomicRegulatory

Governace&Controls InternalCapitalAdequacyAssessmentProcess(ICAAP)

CapitalPlan

RegulatoryReviews

Financial&StrategicPlanLiquidityManagement

BSRAProcess

RiskManagementFinance/Treasury

Internal&ExternalA

udit

(RiskAppetitemetrics,P&L,RequiredandAvailableCapital,StressImpacts,Liquiditymetrics,Limits)Aggregation,LinkagesandReporting

Policiesa

ndProcedu

res

ICAAPSelf-AssessmentPackage(SAP)

Reconcile

Stress

CRC/ALCo/RMC

CRC/ALCo/RMC

MPRC/CMRC/CC/IC Credit Market Oper'l Other Liquidity OtherVetting/Validation Concentration/Diversification VaR Limits StressTesting

CRC/ALCo/RMC

NIAP,RSA,RLR

Environmentalscans Credit Market Oper'l OtherRisks EmergingRisksMitigationBusinessReviews

(RM)

Financial&

StrategicPlans

RiskMeasurement,Monitoring&Reporting

Economic

Capital(EC)

(Finance)

Testing

Regulatory

Capital(RC)

(Finance/RM) (RM)

CapitalPlan

RegulatoryReviews

RiskIdentification

Internal&ExternalA

udit

Policiesa

ndProcedu

res

Reconcile

(Treasury)

&Liquidity

Stress

CapitalAdequate?0

10

20

RC ICAAP Tier1

Page 19: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

1 9

ICAAP RISKS THAT NEED TO BE ASSESSED

Page 20: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

2 0

RISK APPETITE FRAMEWORK

The Enterprise Risk Appetite Framework (RAF) sets out the Bank’s overall approach to risk appetite and provides a common understanding among stakeholders of how risk appetite is established, managed and governed. It supports the establishment and ongoing effectiveness of the Bank’s Risk Appetite Statement (RAS), associated metrics and limits, and sets out the roles and responsibilities in the governance process. The RAS articulates the aggregate level and types of risk the Bank is willing to assume, or to avoid, in pursuit of its strategy and business objectives and sets the basic goals and measurement metrics, which defines tolerance levels for various risks.

As shown in the diagram below, a risk appetite is informed by the Bank’s vision, mission, and values as well as strategy and objectives; it also considers risk capacity and associated constraints. Risk appetite is articulated in the Bank’s RAS which includes qualitative and quantitative elements as well as limits to define the level of risks the Bank is willing to take on in pursuing its strategic objectives for business growth and shareholder return. The RAS supports a Enterprise Risk Management Framework which sets out the Bank’s approach to risk management, and is in turn supported by risk limits, policies, standards, procedures, processes and controls.

Page 21: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

2 1

CAPITAL MANAGEMENT AND PLANNING

Basel II requires Banks to take a number of factors into account for capital planning: u Capital adequacyu Impacts of planned capital activities on overall capital levels and business mixu Consistency of capital plans with strategic plans u Consistency with the risk profile and current and prospective operating environmentu Risk / Return tradeoffu Net income and its variabilityu Forward looking stress tests and scenariosu The business cycle and potential adverse changes in market conditions

Page 22: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

2 2

ENTERPRISE-WIDE STRESS TESTING

Basel II requires Banks to conduct stress testing to help assess capital adequacy and risk appetite.

Stress and scenario analysis are useful in assessing economic downturns and business cycle impacts.

Comprehensive stress testing should be embedded into the risk management framework of the organization.

A Board approved Stress Testing policy is necessary to ensure the required standards and procedures exist to satisfy regulatoryrequirements under Pillar II of the Basel II Revised Framework and help test the adequacy of capital during stressed businessconditions. This involves the use of various techniques to assess the potential vulnerability to “stressed” business conditions.

Key principles of the policy and for effective enterprise-wide stress testing include:u Stress testing should be integrated into the firms’ risk management framework including limits, risk appetite assessment

and capital management/planning;u Stress tests should be plausible and measure the effect of extreme moves in risk factors;u Comprehensive stress testing should include multivariate analysis, sensitivity and scenario based tests. Stress tests should

include scenarios that stress several factors at the same time because in reality, when stress events occur they are more likely to involve adverse moves in several risk factors;

u Stress scenarios should cover on- and off-balance sheet positions of all major portfolios in the trading book and the banking book. They should also reflect specific risk characteristics of the portfolios. All related risk factors should be identified and stressed;

u Comprehensive documentation for scenario development, selection of risk factors, translation of scenarios into impacts on risk factors and parameters, and remedial actions when pre-established limits are exceeded;

u Stress testing should be consistent with activities for Recovery and Resolution planning.

Page 23: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

2 3

ENTERPRISE-WIDE STRESS TESTING

While stress testing may be well developed, it is often done in isolation for specific risk types and portfolios. The challenge is integrating this on an enterprise-wide basis.

Process:u Economics to provide guidance on a handful of variables (such as GDP, inflation, unemployment rate, short term interest

rates, stock market movement etc) for specific macro economic events (Recession, Pandemic, Inflation Escalation, etc.).u Individual Work Streams to arrive at risk factor shocks relevant to their portfolios based on general direction from

Economics. Work streams also to have their own portfolio specific scenarios and will develop procedures, processes and the technology infrastructure to enable calculation of stress results.

u Stressed loss and capital calculations to target initially a one year time horizon in order to enable aggregation and comparison against capital. This time horizon will then be extended as experience develops in line with the risks in the portfolios.

u Consolidation of Stress testing results across the enterprise for analysis and reporting to Senior Management to take place on a best effort basis until systems allow for regular and timely runs.

u Results produced by each business group to include losses and changes required in Economic and Regulatory capital.

Page 24: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

COMPLIANCE SELF ASSESSMENT

Page 25: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

2 5

BLACKICE SOLUTION - GCD

The Governance & Compliance Database (GCD™) is an application that allows financial institutions to assess adherence to Minimum Regulatory Requirements, guidance defined by the regulator or to requirements specific to the institution (e.g., internal expectations, policies, industry best practices etc.).

It facilitates the capture of compliance information to meet regulatory, Board and Senior management responsibilities including:u Gap assessments; u Compliance status;u Commentary evidence and supporting artifacts.

The primary benefit for a regulator is that the GCD™provides a view to an institution’s assessment, and provides a consistent approach to allow the comparison of assessments across multiple institutions.

The GCD™ also mitigates the risk and challenges often faced by regulators in completing their regulatory oversight.

Page 26: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

2 6

INTERPLAY OF THE THREE BASEL PILLARS

While the three Pillars are independent they interact in the following ways:u Pillar I calculations are tested by the ICAAP process in Pillar II for completeness and congruence of risks and capital.

- Stress testing is an example of such a Pillar II test.u Pillar I will also provide a new feedback loop with Pillar II, for example based upon unexpected credit migrations relative to

prior expectations.u Feedback from public disclosure from Pillar III will inform Pillar II discussions as to conservatism and provide benchmarking

opportunities that do not exist today.

Various forums will communicate and allow an understanding of the impacts of these feedback loops including:u The Risk Management Committee of the Board.u The Senior Executive Team.u Balance Sheet Measurement, Monitoring and Control, especially with respect to the capital planning process. u A Models and Parameter Risk Committee.

Page 27: BlackIce Basel Roadmap (Final Review)blackiceinc.com/.../2017/07/BlackIce-Basel-Roadmap.pdf · REFERENCE PRESENTATION ... The 3 Pillars of Basel II ... Enhance current existing policies

This presentation and content are property of BlackIce Enterprise Risk Management Inc. and may not be reproduced or copied without express consent.

BlackIce Enterprise Risk Management Inc.#310 – 207 West Hastings St.Vancouver BC, Canada V6B 1H7

Visit Us at www.blackiceinc.comContact at [email protected]