BIRKENHEAD ANNUAL STACK
MONITORING REPORT
Oct 2015 – Sept 2016
Version: 1
Submitted: 31st October 2016
[Pick the date]
EPA LICENCE NO: 1126
Report Prepared By: Daniel Mellor
Certified By: Tim Radimissis
[Adelaide Brighton Cement Birkenhead Works. License Number:
Authored by: Lloyd Felicity
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
2 Annual Stack Monitoring Report
Annual Report Oct 2015 –Sept 2016
Monitoring Objective The aim of the Annual Monitoring Report is to identify and report on emissions to
compare actual emissions from Adelaide Brighton Cement Birkenhead Works against
the Environment Protection (Air Quality) Policy 1994, Authorisation 1126 and Exemption
Authorisation 12368. Furthermore the aim of the report is to continuously monitor and
provide reasons for the particulate emissions exceeding reporting limits in order to
establish key areas where opportunities lie for process and mechanical improvements to
reduce the level of stack dust emissions from the site.
Monitoring Plan Monitoring of stacks 4A and 4B on the Birkenhead site is performed using Durag Dust
and Opacity Meters. These meters provide continuous % opacity and this is converted
to mg/Nm3 using a calibration curve. The results are then summarized as one hourly
averages based on 10 minute averages for the purpose of this report.
The license that Adelaide Brighton Cement operates under in regard to stack emissions
is summarized below.
Environment Protection (Air Quality) Policy
o Schedule 1 (1) - limit of 250mg/Nm3 stack 4A and 4B
o Exemptions under schedule 6
Kiln or calciner light up &/or purge – max 10 minutes
Level 3 combustibles trip – max 5 minutes
Power failure – duration of emergency situation
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
3 Annual Stack Monitoring Report
Stack emissions testing for calibration of opacity meter – provided
that an EPA authorised officer is on site
Reporting Levels
o All emissions in excess of 80 mg/m3 (Stack 4B) and 150 mg/m3 (Stack 4A)
The Environmental Protection Authority (EPA) must be notified as soon as practicably
possible of all emissions in excess of the Schedule 1 (1) limit or reporting limit and cause
as well as remedial actions must be communicated. Where particulate emissions
exceed the Schedule 1(1) limit and the cause is not explicitly covered by the Schedule 6
exemptions an investigation will be carried out by the EPA to ensure that ABC
Birkenhead has taken all reasonable and practicable measures to reduce the emissions.
Monitoring Results
Presentation of Results
The graphs below detail, the hourly averages of 10 minute averages of stack emissions
from 4A and 4B stacks. For each month there is a graph for 4A stack and 4B stack. The
thin red line indicates the ABC Birkenhead license reporting level and the heavy red line
indicated the Air Quality Policy Schedule 1 limit. The tables below each chart show the
results of RCA (root cause analysis) that was undertaken for hourly average particulate
emissions above the Air Quality Policy Schedule 1 limit or the ABC Birkenhead license
reporting levels. RCA on particulate emissions above the ABC Birkenhead license
reporting levels are also conducted.
Tag RCA Number Description
0
50
100
150
200
250
300
1/10
3/10
5/10
7/10
9/10
11/10
13/10
15/10
17/10
19/10
21/10
23/10
25/10
27/10
29/10
31/10
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for October 2015
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
5 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/11
3/11
5/11
7/11
9/11
11/11
13/11
15/11
17/11
19/11
21/11
23/11
25/11
27/11
29/11
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4A Stack Emissions for November 2015
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
6 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/12
3/12
5/12
7/12
9/12
11/12
13/12
15/12
17/12
19/12
21/12
23/12
25/12
27/12
29/12
31/12
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for December 2015
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
7 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/10
3/10
5/10
7/10
9/10
11/10
13/10
15/10
17/10
19/10
21/10
23/10
25/10
27/10
29/10
31/10
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4B Stack Emissions for October2015
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
8 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/11
3/11
5/11
7/11
9/11
11/11
13/11
15/11
17/11
19/11
21/11
23/11
25/11
27/11
29/11
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for November 2015
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
9 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/12
3/12
5/12
7/12
9/12
11/12
13/12
15/12
17/12
19/12
21/12
23/12
25/12
27/12
29/12
31/12
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for December 2015
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
10 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/1
3/1
5/1
7/1
9/1
11/1
13/1
15/1
17/1
19/1
21/1
23/1
25/1
27/1
29/1
31/1
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for Jan 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
11 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/2
3/2
5/2
7/2
9/2
11/2
13/2
15/2
17/2
19/2
21/2
23/2
25/2
27/2
29/2
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4A Stack Emissions for Feb 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
12 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/3
3/3
5/3
7/3
9/3
11/3
13/3
15/3
17/3
19/3
21/3
23/3
25/3
27/3
29/3
31/3
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for Mar 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
13 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/1
3/1
5/1
7/1
9/1
11/1
13/1
15/1
17/1
19/1
21/1
23/1
25/1
27/1
29/1
31/1
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4B Stack Emissions for Jan 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
14 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/2
3/2
5/2
7/2
9/2
11/2
13/2
15/2
17/2
19/2
21/2
23/2
25/2
27/2
29/2
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for Feb 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
15 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/3
3/3
5/3
7/3
9/3
11/3
13/3
15/3
17/3
19/3
21/3
23/3
25/3
27/3
29/3
31/3
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for Mar 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
16 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/4
3/4
5/4
7/4
9/4
11/4
13/4
15/4
17/4
19/4
21/4
23/4
25/4
27/4
29/4
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for April 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
17 Annual Stack Monitoring Report
Tag Description
A1 4A field failure – kiln taken offline.
0
50
100
150
200
250
300
1/5
3/5
5/5
7/5
9/5
11/5
13/5
15/5
17/5
19/5
21/5
23/5
25/5
27/5
29/5
31/5
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for May 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
A1
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
18 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/6
3/6
5/6
7/6
9/6
11/6
13/6
15/6
17/6
19/6
21/6
23/6
25/6
27/6
29/6
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for June 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
19 Annual Stack Monitoring Report
Tag Description
B1 Kiln/calciner trip
0
50
100
150
200
250
300
1/4
3/4
5/4
7/4
9/4
11/4
13/4
15/4
17/4
19/4
21/4
23/4
25/4
27/4
29/4
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4B Stack Emissions for April 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
B1
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
20 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/5
3/5
5/5
7/5
9/5
11/5
13/5
15/5
17/5
19/5
21/5
23/5
25/5
27/5
29/5
31/5
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for May 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
21 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/6
3/6
5/6
7/6
9/6
11/6
13/6
15/6
17/6
19/6
21/6
23/6
25/6
27/6
29/6
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for June 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
22 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/7
3/7
5/7
7/7
9/7
11/7
13/7
15/7
17/7
19/7
21/7
23/7
25/7
27/7
29/7
31/7
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for July 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
23 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/8
3/8
5/8
7/8
9/8
11/8
13/8
15/8
17/8
19/8
21/8
23/8
25/8
27/8
29/8
31/8
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4A Stack Emissions for August 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
24 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/9
3/9
5/9
7/9
9/9
11/9
13/9
15/9
17/9
19/9
21/9
23/9
25/9
27/9
29/9
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4A Stack Emissions for September 2016
4A Stack Emission Hourly Average (mg/Nm3) 4A Reporting Limit (150 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
25 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/7
3/7
5/7
7/7
9/7
11/7
13/7
15/7
17/7
19/7
21/7
23/7
25/7
27/7
29/7
31/7
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3 )
4B Stack Emissions for July 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
26 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/8
3/8
5/8
7/8
9/8
11/8
13/8
15/8
17/8
19/8
21/8
23/8
25/8
27/8
29/8
31/8
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for August 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
27 Annual Stack Monitoring Report
Tag RCA Number Description
0
50
100
150
200
250
300
1/9
3/9
5/9
7/9
9/9
11/9
13/9
15/9
17/9
19/9
21/9
23/9
25/9
27/9
29/9
Stac
k Em
issi
on
Co
nce
ntr
atio
n (m
g/N
m3)
4B Stack Emissions for September 2016
4B Stack Emission Hourly Average (mg/Nm3) 4B Reporting Limit (80 mg/Nm3) State (Schedule) Limit (250 mg/Nm3)
Monitoring Results – Quality Assurance / Quality Control Evaluation
The data shown in the graphs above was calculated using an opacity curve generated by
a number of iterations of spot testing by Axiom Air whom are accredited for compliance
with ISO/IEC 17025. The opacity meters are also calibrated daily as per the suppliers
standard.
Key Process Improvements for the period
(for more detailed analysis of improvement initiatives refer to the quarterly reports)
As part of our continuous improvement commitment the emissions reduction team
formed last year has continued to work on new and existing projects to mitigate
emissions, including:
Plant Stack Emissions Improvement Team
Following an FLSmidth Airtech specialist site visit in November 2015 to review the
operability of the site electrostatic precipitators and fabric filter bag house,
improvements were trialed and implemented on all of the electrostatic precipitator field
controllers. Changes were made to improve the collecting efficiency during process
upsets (e.g. Raw mill starts) and during normal operation to reduce the emissions. The
change lowered baseline emissions on 4A and 4B electrostatic precipitator during both
normal and unstable operating conditions.
Annual shutdown improvements
Installation of kiln ventilation fan which allowed for extensive bypass ESP
maintenance. The new ventilation infrastructure allowed much greater scope in
the bypass ESP, and a significant amount of mechanical work and optimization
was performed.
4B ESP major maintenance, with regular mechanical maintenance along with
major outlet dampening wall replacement.
Installation of build-up inhibiting kiln ‘blasters’ to prevent process instability
from affecting the bypass system. This instability was a major cause of 4A stack
excursions.
New bypass dust handling system installed to eliminate dust blockages and
potential excursions in the handling system.
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
29 Annual Stack Monitoring Report
Bypass Operation Optimisation
The Birkenhead technical and operations team have been analyzing the operation of the
bypass system over the past 12 months to investigate how the environment footprint
can be minimized as much as possible. The outcome of this investigation was an
improvement on the gas conditioning bypass system, which was intended to increase
the collection efficiency of the bypass electrostatic precipitator.
The graph above shows the dramatic improvement from the changes made on 5/8/16.
The blue line represents the particulate emissions measured on 4A stack, while the red
line indicates the bypass temperature control (high resolution version in Q3 quarterly
report). The emissions on 4A stack have dropped considerably, and the process is more
resilient to disturbances. The change observed has greatly contributed to future project
plans for emissions reduction on site.
Cooler Bag Filter trials
New cooler filter bags were trialled in cell 4 of the kiln 4 cooler bag filter during the
annual shutdown. This area showed the greatest wear rates in the previous campaign,
and so it was determined to be the best location for a trial. The trial bags were made
from a higher durability weave, as well as additional designed reinforcement around the
cuffs of the bags.
[Adelaide Brighton Cement Birkenhead Works. License Number: 1126
30 Annual Stack Monitoring Report
Conclusion
This is the ninth annual report generated as a result of a new license. There were no
incidents with an hourly average particulate concentration above 250mg/Nm3 on 4B or
4B stack. There was one incidents based on a one hourly average over the reporting
limit of 150mg/Nm3 on 4A stack where the 4A ESP experienced a field failure. The kiln
was taken offline to repair. There was one incident above the reporting limit of
80mg/Nm3 on 4B stack, which was occurred during a combustibles trip on the
kiln/calciner.