Current Situation
3
• 30 million tonnes ofsolid waste
• 4,400 million cubicmeters of liquid waste
India
Potential in India
•Solid Waste: 1457 MW
•Liquid Waste: 226 MW
4
5
Potential StatewiseWet waste from urban area, Banana Stem from farms, Vegetable Market area in Jalgaon (No :1 State Maharahtra)
Technology
6
Urban Waste
Solid
Thermal
Incineration
Gasification
Pyrolysis
Biological
Land filling Composting Biomethanation
Biogas
Power
Liquid
Merits of Biomethanation
• Preservation of environment
• Residue used as soil conditioner
• Energy generation
• Carbon Credits
7
Technical feasibility of Biomethanation Plant
8
Parameters related with
Technical
Feasibility
Need for obtaining
waste with desired
composition
• Annual seasonal
variation in waste
composition.
• Identification of
points for collection
of waste.
• Source specific
collection of waste.
Ensuring process kinetics
• Digester Temperature & pH
• Carbon to Nitrogen ratio
• Maintenance of
COD/BOD values of the
reactor feed
Waste at processing
site
• Removal of non
biodegradables
• Removal of
binders like soil
particles, stones,
etc.
• Adjustment of
water content in
the feed to the
reactor.
Feedstock
9
75%
25%
3 % of Global banana production
16 % of India’s banana production
66 % farmers involved in banana
farming
Advantage of banana stem
10
•Bananas give very high biomass
production
•Easily available
•Available in all seasons
•Stems and leaves can be separated for
more value addition
Commercial viability
11
• Input 20 tons
– Dry Matter 15 %
– Output Gas 7,200 m3
– Output Electricity 1.2 MW
• 96% pure methane
• Production cost
– Gas Rs.8.00 per kg Sell Rs.50 per kg
– 1 kg gas = 4 Units electricity
– 1 Unit = Rs.6.83 (Source: Solapur
power)
Return on Investment
12
Sell only gas
ROI – 4 to 5 years
Electricity generation
ROI – 10 to 11 years
Target Customers
13
– Khandesh Mall
– Auto Rickshaws running on petrol
– Power co- generation at Bhusawal
power plant
Case for Micro grids
14
Extraction processing & Transport
Conversion
Distribution
Delivered to Customer
Electricity
Extraction processing & Transport
No Conversion
Distribution
Delivered to Customer
Bio CNG
32% efficient 92 % efficient
95 %
efficient
34%
efficient
32%
efficient 92 %
efficient
93 %
efficient
Conclusion
15
•Technology is optimum at 36 C° suitable in a (sub)
tropical climate like India
• Biogas plant needs minimum maintenance costs and
can produce gas for at least 20 years without major
problems and re-investments
•The slurry / residue is a clean organic fertilizer that
potentially increases agricultural productivity
Appendix