bim sarah birchall and jo harris 25 th september 2014
TRANSCRIPT
![Page 1: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/1.jpg)
BIM
Sarah Birchall and Jo Harris
25th September 2014
![Page 2: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/2.jpg)
2Making buildings better 2
Overview - BIM
What?
Why?
How?
Potential….
![Page 3: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/3.jpg)
3Making buildings better 3
What is Building Information Modelling (BIM)?
There are many definitions of what BIM is, but at its core BIM is:
‘…a managed approach to the collection and exploitation of information across a project.’
![Page 4: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/4.jpg)
4Making buildings better 4
The BIM Process
1 Process for data management (BS 1192/PAS 1192)
2 A method for housing the data (BIM software model)
3 A method for distributing the data (COBie + other documents)
From inception to demolition
![Page 5: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/5.jpg)
5Making buildings better 5
So why all the fuss now?
Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016.
Levels of maturity
BIM Level 2
![Page 6: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/6.jpg)
6Making buildings better 6
‘Refined’ definition of Level 2 BIM
“The seven pillars of (BIM) wisdom”
1. PAS 1192-2
2. PAS 1192-3
3. BS 1192-4 (available Autumn 2014)
4. BIM Protocol
5. GSL (Government Soft Landings)
6. Digital plan of work
7. Classification
![Page 7: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/7.jpg)
7Making buildings better 7
TSB competition
Digital Plan of Work
Classification system
Digital presentation tool
![Page 8: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/8.jpg)
8Making buildings better 8
PAS 1192-2:2013
PAS 1192-2:2013
Specification for information management for the capital/delivery phase of construction projects using building information modelling
![Page 9: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/9.jpg)
9Making buildings better 9
Information in PAS 1192-2:3013
Fundamental principles for Level 2 information management
Plain Language Questions (PLQ) Employers Information requirements (EIR) BIM Execution Plan (BEP) Project Implementation Plan (PIP) Master Information Delivery Plan (MIDP) Task Information Delivery Plan (TIDP)
Project delivery team roles, responsibilities and authority
![Page 10: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/10.jpg)
10Making buildings better 10
PAS 1192-3:2014
PAS 1192-3:2014
Specification for information management for the operational phase of assets using building information modelling
![Page 11: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/11.jpg)
11Making buildings better 11
Overview of information management in PAS 1192-3
Organizational information requirements (OIR)“data and information required to achieve the organization’s
objectives”
Asset information requirements (AIR)“data and information requirements of the organization in relation
to the asset(s) it is responsible for”
Asset information model (AIM)“data and information that relates to assets to a level required to support an organization’s asset management system”
![Page 12: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/12.jpg)
12Making buildings better 12
PAS 1192-3 Asset
PAS 1192-2Project
ModelsRequirements
Relating the PAS 1192-2 and 1192-3 components
![Page 13: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/13.jpg)
13Making buildings better 13
BS 1192-4
BS 1192-4:2014
Collaborative production of information
Part 4: Fulfilling employers information requirements using COBie – Code of practice
![Page 14: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/14.jpg)
14Making buildings better 14
![Page 15: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/15.jpg)
15Making buildings better 15
Contents of draft BS 1192-4
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Business process
5 Purposes
6 Management and quality criteria
7 Execution
![Page 16: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/16.jpg)
16Making buildings better 16
Building Information Model (BIM) Protocol
“The Protocol identifies Building Information Models that are required to be produced by members of the Project Team and puts in place specific obligations, liabilities and associated limitations on the use of the models. The Protocol can also be used by clients to require the adoption of particular ways of working – such as the adoption of a common naming standard”
![Page 17: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/17.jpg)
17Making buildings better 17
Building Information Model (BIM) Protocol1. Definitions
2. Priority of contract documents
3. Obligations of the Employer
4. Obligations of the project team member
5. Electronic data exchange
6. Use of models
7. Liability in respect of a model
8. Termination
Appendix 1: Levels of detail and the model production and delivery table
Appendix 2: Information requirements
![Page 18: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/18.jpg)
18Making buildings better 18
GSL (Government Soft Landings)
Soft Landings
“…a form of graduated handover for new and refurbished buildings, where the project team is contracted to watch over the building, support the occupant and to fine-tune the building’s systems for up to 3 years post-completion.”
![Page 19: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/19.jpg)
19Making buildings better 19
Government Soft Landings (GSL) GSL
– Taken the principles of Soft Landings and developed it for use within its own procurement strategy
– Differences – the use of metrics to demonstrate compliance with the stated project outcomes
– Four focus areas:1. Functionality and effectiveness - buildings designed to meet
the needs of the Occupiers; effective, productive working environments
2. Environmental – meet Government performance targets in energy efficiency, water usage and waste production
3. Facilities Management – a clear, cost efficient strategy for managing the operations of the building
4. Commissioning, Training and Handover – projects delivered, handed over and supported to meet the needs of the End Users
![Page 20: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/20.jpg)
20Making buildings better 20
Digital Plan of Work
![Page 21: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/21.jpg)
21Making buildings better 21
Classification
Classification Searching for like ‘things’ in a
model Combining models as all ‘things’
are consistently classified Enabling the aggregation of like
‘things’ in a model for the purposes of measurement, purchasing, maintenance, etc
A common language for all people constructing and managing assets
![Page 22: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/22.jpg)
22Making buildings better 22
Example: Classification in a hospital FM environment
Classify four ways: Spaces – every space is classified Activities – all the activities which can be carried out within each space are
classified Systems – the systems serving each space are classified Objects – the objects belonging to each system are classified
In the event of chiller failure: The spaces served by the chilled water system can be identified The activities affected within those spaces can be identified The objects in the rest of the system(s) can be identified
![Page 23: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/23.jpg)
23Making buildings better 23
….so if you meet the requirements set out in these seven components, then you will be Level 2 BIM compliant.
![Page 24: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/24.jpg)
24Making buildings better 24
The potential
Strip the waste from processes. Achieved by sharing information…. To enable right first time installation and operation that meets the needs of the users
Information about the use of the building which is informative to the operators
Better buildings, with clear operational efficiencies and
the best whole life value
![Page 25: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/25.jpg)
25Making buildings better 25
BIM4FM
![Page 26: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/26.jpg)
26Making buildings better 26
Information to make better decisions
![Page 27: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/27.jpg)
27Making buildings better 27
BIM in Operations
The majority of operaters, owners and occupiers (69.0%) recognise that BIM will become increasingly important in day-to-day working practices within the next 2-3 years (if it is not already).
BIM is definitely here to stay and is growing in importance
![Page 28: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/28.jpg)
28Making buildings better 28
Organisational requirements
PAS 1192-3
![Page 29: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/29.jpg)
29Making buildings better 29
Potential for Operations
FM engaged at start of construction projects with supply chain considering client input
User focus during the construction process
Competitive advantage in the FM supply chain
Clear understanding of operational risk
![Page 30: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/30.jpg)
30Making buildings better 30
How it fits…
BS 1192-4
BIM Protocol GSL Digital plan of work
Classification
![Page 31: BIM Sarah Birchall and Jo Harris 25 th September 2014](https://reader036.vdocuments.site/reader036/viewer/2022062714/56649d165503460f949ebfa7/html5/thumbnails/31.jpg)
31Making buildings better 31
BIM Summary
1. What? a managed approach to the collection and exploitation of information across a project.
2. Why? Government will require fully collaborative 3D BIM (Level 2) as a minimum by 2016.
3. How? UK Government’s BIM Level 2 requirement by use of seven components (pillars).
4. Potential….There is a huge potential, particularly for operators