BIM PROJECT EXECUTION PLANNING
Thursday, January 11, 2012
Ralph KreiderGraduate Research Assistant
CIC Research Program
Penn State University
![Page 2: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/2.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GBIM Project Execution Planning Procedure
![Page 3: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/3.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
“Begin with the end in mind.”
Identifying BIM Goals and Uses
![Page 4: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/4.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GBIM Goals
![Page 5: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/5.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GIdentifying BIM Goals and Uses
![Page 6: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/6.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GIdentifying BIM Goals and Uses
![Page 7: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/7.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GFrequency and Benefit of Uses
3D Coordination
Design Revie
ws
Design Auth
oring
Constructi
on Syste
m Desig
n
Existing Conditions M
odeling
3D Control a
nd Planning
Programming
Phase Planning (4
D Modelin
g)
Record
Modelin
g
Site U
tilizati
on Planning
Site Analysis
Structu
ral Analysis
Energy Analy
sis
Cost Esti
mation
Sustainabilit
y LEED
Evaluation
Building Syste
m Analysis
Space M
anagement /
Tracking
Mech
anical A
nalysis
Code Validation
Lighting Analy
sis
Other E
ng. Analysis
Digital F
abricati
on
Asset M
anagement
Building M
aintenance
Schedulin
g
Disaste
r Planning
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
55%
60%
65%
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6FrequencyBenefit
![Page 8: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/8.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GBIM Use Selection Worksheet
Proceed?
Value
Responsible Party
Capabilities & Resources
BIM Use
![Page 9: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/9.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GDesign BIM Project Execution Process
![Page 10: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/10.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GLevel Two Process Maps
![Page 11: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/11.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GDevelop Information Exchanges
INFOEXCHANGE
INFO
EXCHANGE
![Page 12: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/12.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GInformation Exchange Worksheet
= Output Inadequacy (Revise Information) OR= Input Inadequacy (Revise Responsible Party)
![Page 13: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/13.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GSupporting Infrastructure
![Page 14: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/14.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GPlan Template
![Page 15: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/15.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
Need BIM Champion(s)Owner Involvement is CriticalNeed team Buy-in and TransparencyThe Planning Procedure should allow for Adaptations
by the Project TeamThe Project Execution Plan must be considered a
Living DocumentPlanning takes Resources and it is Critical that
Resources are Available
Lessons Learned
![Page 16: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/16.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GSponsors: The Charles Pankow Foundation The Construction Industry Institute (CII) Penn State Office of Physical Plant The Partnership for Achieving Construction Excellence (PACE) Industry Partners:
LACCD USACE Balfour Beatty
Whiting Turner Clark Construction Group Jacobs
Barton Malow GSA MA DCAM
Dana ‘Deke’ Smith Mark Butler Derek Cunz Mark Falzarano
Ed Gannon Greg Gidez Francois Grobler Steve Hagan
Steve Hutsell Mark Konchar Soad Kousheshi Rob Leicht
Kurt Maldovan Victor Sanvido Alexander Zolotov
Craig Dubler Shane Goodman Colleen Kasprzak
Ralph Kreider Eric Nulton
Chitwan Saluja Nevena Zikic
Chimay Anumba Sam Hunter John Messner
Advisory Board Members
PSU Research Team Students:
Faculty:
ACKNOWLEDGEMENTS
![Page 17: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/17.jpg)
BIM PROJECT EXECUTION PLANNING
Download the Guide at:
bim.psu.edu? Ralph KreiderGraduate Research Assistant
CIC Research Program
Penn State University
![Page 18: BIM PROJECT EXECUTION PLANNING Thursday, January 11, 2012 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University](https://reader038.vdocuments.site/reader038/viewer/2022110101/56649e8a5503460f94b8ee98/html5/thumbnails/18.jpg)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
Create a PxP TemplateAdd sections on decision makingMap BIM Process
Level 1 and Level 2Map Design Process
Level 1 – Project TeamLevel 2 – Individual Process
Information ExchangesWhat information is required
Keep it up to Date