BIM FUNDAMENTALS

RECORD MODELLING

BS 1192:2007 INFORMATION NAMING & SUITABILITY CODES

INFINITE BIM

SIÂN MORRIS| BIM CONSULTANT

Page 2: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

2

SIÂN MORRIS| BIM CONSULTANT

INFINITE BIM SPEAKER ABOUT

PRIMARY ROLES

BIM CONSULTANT

INFORMATION MANAGEMENT (PIM)

ARCHITECTURAL TECHNOLOGIST

BRE BIM LEVEL2 CERTIFICATION

Page 3: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

3 RECORD MODELLINGINFINITE BIM

THANK YOU

Page 4: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

4

‘BIM FUNDAMENTALS’:

RECORD MODELLING

BS 1192:2007 INFORMATION NAMING & SUITABILITY CODES

BS 1192:2007 NAMING PROTOCOL

BIM PROCESS/FLOW

NAMING METHOD

SUITABILITY CODES

Page 5: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

5

‘BIM FUNDAMENTALS’:BS 1192:2007 INFORMATION NAMING & SUITABILITY CODES

BS 1192:2007 NAMING PROTOCOL

Page 6: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

6 RECORD MODELLING

Where’s the acoustic report?

Is this the latest copy?

Which job is this for?

NAMINGBS 1192:2007 NAMING PROTOCOL

002-ARCH. SECIFICATION

DARLEY AVE –GF PLANS

RF’s REPORT UPDATE0000.2017.0003.05694117.01.24 ACO REPO

WHAT IS THE LANGUAGE OF INFORMATION?

Page 7: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

7 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL BIM FUNDAMENTALS

EIR TenderBid

ReviewContract CDE Mobilise RIBA 2 RIBA 3 RIBA 4 RIBA 5 RIBA 6 RIBA 7

Page 8: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

8

NAMING

RECORD MODELLINGNAMINGBS 1192:2007 NAMING PROTOCOL

OVERVIEW

Page 9: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

9

WHATS IN A NAME?

RECORD MODELLING

DISTINGUISHING & IDENTIFYING

BS 1192:2007 NAMING PROTOCOL NAMING

Page 10: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

10 RECORD MODELLING

SO WHATS IN A BIM NAME?

BS 1192:2007 NAMING PROTOCOL NAMING

Page 11: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

DOCUMENTATION11 BS 1192:2007 NAMING PROTOCOL NAMING

Page 12: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

12 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 13: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

13 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL

UNRAVELLING THE SYSTEM

NAMING

Page 14: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

14 RECORD MODELLING

WHICH PROJECT DOES IT REFER TO?

PROJECT

BS 1192:2007 NAMING PROTOCOL NAMING

Page 15: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

15 RECORD MODELLING

PROJECT

…. independent and recognizably distinct from any individual

organization’s internal job number.

BS 1192:2007 NAMING PROTOCOL

UNIQUE PROJECT REFERENCE NUMBER

NAMING

Page 16: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

16 RECORD MODELLING

PROJECT = ABC123

2 – 6 Characters

BS 1192:2007 NAMING PROTOCOL NAMING

ABC123

Page 17: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

17 RECORD MODELLING

THE COMPANY WHO PRODUCED THE DATA?

ORIGINATOR

ABC123

PROJECT = ABC123

BS 1192:2007 NAMING PROTOCOL NAMING

Page 18: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

18 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

3 – 6 Characters

PROJECT = ABC123

BS 1192:2007 NAMING PROTOCOL NAMING

INFINITE BIM LIMITED

Page 19: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

19 RECORD MODELLING

VOLUME OR SYSTEM?

ORIGINATOR = IBL

ABC123 - IBL

= ABC123

BS 1192:2007 NAMING PROTOCOL

VOLUME

NAMING

PROJECT

Page 20: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

20 RECORD MODELLING

ABC123 - IBL

BS 1192:2007 NAMING PROTOCOL NAMING

THERE SHOULD BE AT LEAST ONE VOLUME PER ROLE

… EXPLICITLY DESIGNATED TO BE NONE

OVERLAPPING- Volume?

Page 21: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

21 RECORD MODELLING

ABC123 - IBL

BS 1192:2007 NAMING PROTOCOL

ARCHITECT STRUCTURE MEP

NAMING

… EXPLICITLY DESIGNATED TO BE NONE

OVERLAPPING- Volume?

Page 22: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

22 RECORD MODELLING

ABC123 - IBL

BS 1192:2007 NAMING PROTOCOL NAMING

WHEREVER POSSIBLE, REPITIONS OF THE SAME

CODES, PER ROLE, SHOULD BE AVOIDED

A MORE COMPLICATED/LARGER PROJECT MAY NEED TO BE DIVIDED INTO SEVERAL DIFFERENT VOLUMES.

THE VOLUME STRATEGY MUST BE AGREED AT THE BEGINNING OF A PROJECT.

NOT TO BE CONFUSED WITH COBIE ZONES.

- Volume?

Page 23: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

23 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

1 – 2 Characters

VOLUME = A1

- A1

ZZ FOR DATA THAT CONTAINS ALL VOLUMES

BS 1192:2007 NAMING PROTOCOL NAMING

PROJECT = ABC123

Page 24: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

24 RECORD MODELLING

LEVEL THE DATA REFERS TO?

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS

ZZ ALL LEVELS

XX NO LEVEL

GF GROUND FLOOR

00 BASE LEVEL OF BUILDING

01 FLOOR ONE

02 FLOOR TWO

M1 MEZZANINE ABOVE 01

B1 LEVELS BELOW 00 ARE PREFIXED

WITH ‘B’

BS 1192:2007 NAMING PROTOCOL NAMING

Page 25: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

25 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

2 Characters

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

BS 1192:2007 NAMING PROTOCOL NAMING

Page 26: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

26 RECORD MODELLING

WHAT FORM IS THE DATA?

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

BS 1192:2007 NAMING PROTOCOL NAMING

TYPE

Page 27: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

27 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

BS 1192:2007 NAMING PROTOCOL NAMING

TYPE

Page 28: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

28 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

BS 1192:2007 NAMING PROTOCOL NAMING

TYPE

Page 29: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

29 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

BS 1192:2007 NAMING PROTOCOL NAMING

TYPE

2 Characters

= M3

- M3

Page 30: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

30 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE

BS 1192:2007 NAMING PROTOCOL NAMING

ROLE /DISCIPLINE?

Page 31: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

31 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE

BS 1192:2007 NAMING PROTOCOL NAMING

Page 32: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

32 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

1 Characters

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

BS 1192:2007 NAMING PROTOCOL NAMING

Page 33: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

33 RECORD MODELLING

CLASSIFICATION

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION

BS 1192:2007 NAMING PROTOCOL NAMING

Page 34: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

34 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

‘UNICLASS 2015 is a unified classification for the UK industry covering all construction sectors’

https://toolkit.thenbs.com/articles/classification/

Page 35: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

35 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 36: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

36 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

UNICLASS 2015

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION = Co_35_10_37

BS 1192:2007 NAMING PROTOCOL NAMING

- Co_35_10_37

Page 37: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

37 RECORD MODELLING

ABC123 - IBL - A1 - ZZ - M3 - A

BS 1192:2007 NAMING PROTOCOL NAMING

- Co_35_10_37

Page 38: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

38 RECORD MODELLING

ABC123 - IBL - A1 - ZZ - M3 - A

BS 1192:2007 NAMING PROTOCOL NAMING

- Co_35_10_37

Page 39: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

39 RECORD MODELLING

ABC123 - IBL - A1 - ZZ - M3 - A

BS 1192:2007 NAMING PROTOCOL NAMING

- Co_35_10_37

Page 40: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

40 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

UNICLASS 2015

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION = Co_35_10_37

BS 1192:2007 NAMING PROTOCOL NAMING

- Co_35_10_37

Page 41: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

41 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION

BS 1192:2007 NAMING PROTOCOL NAMING

Page 42: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

42 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION

NUMBER =

BS 1192:2007 NAMING PROTOCOL NAMING

NUMBER

Four integer numeric digits, with leading zeros

Page 43: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

43 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION

NUMBER

BS 1192:2007 NAMING PROTOCOL NAMING

NUMBER

Page 44: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

44 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION

NUMBER

BS 1192:2007 NAMING PROTOCOL NAMING

NUMBER

Page 45: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

45 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE = A

- A

CLASSIFICATION

NUMBER = 0001

BS 1192:2007 NAMING PROTOCOL NAMING

Four integer numeric digits, with leading zeros

- 0001

Page 46: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

46 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE

- A

CLASSIFICATION

NUMBER

BS 1192:2007 NAMING PROTOCOL NAMING

DESCRIPTION

DESCRIPTION

= A

- 0001

Page 47: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

47 RECORD MODELLING

ORIGINATOR = IBL

ABC123 - IBL

PROJECT = ABC123

VOLUME = A1

- A1

LEVELS = ZZ

- ZZ

TYPE = M3

- M3

ROLE

= BLDG1

- A

CLASSIFICATION

NUMBER

BS 1192:2007 NAMING PROTOCOL NAMING

DESCRIPTION

Descriptive text to aid recognition

DESCRIPTION

= A

_ BLDG1- 0001

Page 48: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

48 RECORD MODELLING

MODEL FILE NAME

BS 1192:2007 NAMING PROTOCOL NAMING

ABC123–IBL-A1–ZZ–M3–A-0001_BLDG1

DRAWING FILE NAME

ABC123–IBL-A1–00–DR–A-0001_GAPlan

Page 49: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

49

SUITABILITY & REVISION CODES

RECORD MODELLINGNAMINGBS 1192:2007 NAMING PROTOCOL

OVERVIEW

Page 50: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

50 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 51: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

51 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

ALL OR NOTHING

Page 52: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

52 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 53: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

53 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 54: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

54 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

MODEL FILES

DRAWING FILES

DOCUMENTS

Page 55: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

55 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 56: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

56 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Page 57: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

57 RECORD MODELLINGBS 1192:2007 NAMING PROTOCOL NAMING

Work in ProgressABC123‐IBL‐A1‐ZZ‐M3‐A-001_BLDG1

Data Drop/Stage CompletionABC123‐IBL‐A1‐ZZ‐M3‐A-001_BLDG1

For CoordinationABC123‐IBL‐A1‐ZZ‐M3‐A-001_BLDG1

‐S0‐P01.1‐S1‐P01

‐A1‐C01

Page 58: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

58 RECORD MODELLING

MODEL FILE NAME (SHARED FOLDER)

ABC123 – IBL - A1 – ZZ – M3 – A -100 _ BLDG1

BS 1192:2007 NAMING PROTOCOL NAMING

- S1 - P01

Page 59: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

59 RECORD MODELLING

ELEMENT NAME

BS 1192:2007 NAMING PROTOCOL NAMING

MODEL FILE NAME (SHARED FOLDER)

ABC123 – IBL - A1 – ZZ – M3 – A - 0001 _ BLDG1

ROLE = A

CLASSIFICATION = Pr_40_50_12

PRESENTATION = M

DESCRIPTION = ChairOffice

- S1 - P01

Page 60: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

60 RECORD MODELLING

ELEMENT NAME

BS 1192:2007 NAMING PROTOCOL NAMING

MODEL FILE NAME (WIP FOLDER)

ABC123 – IBL - A1 – ZZ – M3 – A - 0001 _ BLDG1

A-Pr_40_50_12-M_ChairOffice

- S1 - P01

Page 61: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

61

STEPS TO SUCCESS

RECORD MODELLING

ACHIEVING BS 1192:2007 ZEN

CONCLUSION KEY STEPS TO SUCCESSBS 1192:2007 NAMING PROTOCOL

Page 62: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

62 RECORD MODELLINGCONCLUSION KEY STEPS TO SUCCESS

EIR TenderBid

ReviewContract CDE Mobilise RIBA 2 RIBA 3 RIBA 4 RIBA 5 RIBA 6 RIBA 7

FOLLOW THE PROCESS!

IT’S SET OUT THIS WAY FOR

A REASON

BS 1192:2007 NAMING PROTOCOL

Page 63: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

ROLE OF THE INFORMATION MANAGERAPPOINTMENT ‘CAN’ AND IS EXPECTED TO SHIFT THROUGH THE LIFE OF THE PROJECT

CIC BIM PROTOCOL REQUIRES THE APPOINTMENT OF AN INFORMATION MANAGER AT ALL STAGES

CONCULSION INFORMATION MANAGEMENT

Stage 0 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7

Strategy Brief Concept Definition DesignBuild &

Commission

Handover &

Closeout

Operation &

End of Life

Employer/Employer’s Agent

Employer/FM

Design Lead

Construction Lead

Info Manager

Mobilisation, Setup CDE, Verify Information, Advise non-compliance Advice and Input into the EIR Collate AIM Manage AIM

BS 1192:2007 NAMING PROTOCOL63

Page 64: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

64 RECORD MODELLINGCONCLUSION KEY STEPS TO SUCCESS

EIR TenderBid

ReviewContract CDE Mobilise RIBA 2 RIBA 3 RIBA 4 RIBA 5 RIBA 6 RIBA 7

ADOPT INDUSTRY STANDARDS

DON’T REINVENT THE WHEEL

RECRUIT INSDUSTRY TRAINED

STAFF WITH EASE

COLLABORATE WITH INDUSTRY COMPLIANT FIRMS

ELIMINATE MAINTENANCE

OF IN-HOUSE STANDARDS

REDUCE INDUCTION PROCEDURES

BS 1192:2007 NAMING PROTOCOL

Page 65: BIM FUNDAMENTALS · 2017. 1. 27. · 63 bs 1192:2007 naming protocol. 64 conclusion record modellingkey steps to success eir tender bid review contract cde mobilise riba 2 riba 3

65

BS:1192-2 INFORMATION NAMING & SUITABILITY CODES

RECORD MODELLING

THANK YOU FOR ATTENDING