bim checklist
TRANSCRIPT
Thinking of upgrading or changing to a BIM workflow?
Flexible License options
Training available locally
Team Work Capabilities
Full BIM Workflow
Accredited to IFC standard
Reference External BIM Models
Rapid 2D DetailingRapid 2D Detailing
Fully Coordinated 2D and 3D
Variable Presentation styles
Built in CineRender engine
Integrated Energy Evaluation
Apple Mac compatible
Windows compatible
iOS & AndiOS & Android Model Viewers
Automated Revision Control
ELEMENT ARCHICADCURRENTSOFTWARE NOTES
Award Winning Passive House
A two storey, four-bedroom home in West Kirby, England for a price of £240,000. This build recently won the Domestic New Build category of the Buildings and Energy Efficiency Awards.
TheThe house has now been occupied for 2 years and the energy cost for heating, lighting, hot water and cooking was less than £15 per year for this period. A similar house designed to meet normal building regulations would use £2500 worth of energy each year.
“We are delighted to have won this award because it proves eco homes don’t have to be over expensive or need to be conspicuously unconventional in appearance.”
Colin Usher, Director, John McCall Architects
Its energy saving design which includes solar panels and an air-to-water air source heat pump (ASHP) decreases their annual energy bills dramatically.
AA BIM workflow was used throughout the design process, allowing John McCall Architects to model and simulate all aspects of the building’s performance. EcoDesigner STAR's advanced BEM export interfaces (such as gbXML and PHPP) allow full collaboration workflow with building energy consultants.