billing project report
TRANSCRIPT
-
7/27/2019 Billing Project Report
1/178
SALES AND BILLING IN SAP (PRODUCTION PLANNING)
SUBMITTED BY : MADHURI R
ROLL NUMBER: 13P35Y0019
SUBMITTED TO : GEMS B SCHOOL
YEAR OF SUBMISSION: 2014
-
7/27/2019 Billing Project Report
2/178
-
7/27/2019 Billing Project Report
3/178
TABLE OF CONTENTS
Preface1. Acknowledgment
2. Declaration
3. Abstract
4. Company profile
5. Introduction to ERP concepts
6.1 What is ERP?6.2 Benefits of the ERP software
7. SAP Concepts
7.1 SAP-Company and Software Package
7.2 SAP R/3 Client Server Architecture
7.3 SAP database organization
7.4 Application Modules of SAP
7.5 Advantages of SAP
8. Introduction to PP Module
8.1 What is PP?
8.2 Enterprise Structure
8.3 Customization9. Define plant
10. Define company code
11. Define MRP Controller
12.Production Planning
13.Bibliography
-
7/27/2019 Billing Project Report
4/178
PREFACE
I am the student of GEMS B SCHOOL ( BHARATHIAR
UNI VERSI TY), Bangalore studying in2nd semester . As a part of 2-year MBA course, I have undergone a
project as a Major project Work on I ntroduction to SAP PP Module
& SALES AND BI LL ING SYSTEM to facilitate them with an
automated software besides the error prone manual work .
Enterpri se Resource Planning is that growing segment of information
technologies that fu lf i l l needs of the enterpr ises l ike qual i ty, time to
market, customer satisfaction, performance and profitability very
ef fectively and eff icientl y.
The aim of the project is to provide an integrated environment to an
enterprise with SAP software with al l its advantages over the manual
system. All the operations of the company can be integrated in to an
overall system for planning, controll ing and monitor ing.
The work done in thi s project has been done using the SAP ECC4.7
tool. SAP R/3 SD module is a very effective tool for SALES AND
BI LL ING SYSTEM . Thi s report provides the knowledge regarding
the technology used in the project.
-
7/27/2019 Billing Project Report
5/178
ACKNOWLEDGEMENT
For every accomplishment we need t h e cooperation and help of
others. As knowledge advances by s t e p s notbyl e a p s so, a b i l i t y
advances by encouragement and guidance.
First of all would like to thank GEMS B SCHOOL f o r providing an
opportunity to create this project. Then I would like t o thank OSWAL
GROUP Ltd, B a n g a l o r e for providing suchworking environment.
I express my deep sense of gratitude and feeling of indebtedness toOSWAL for providing all the facilities and its staff. I also express my
gratitude to my project guide, for their bold attention in this particular
time of the project and guide me as per according to progress of my
project work on SALES AND BILLING SYSTEM of PP Module
in SAP.
MADHURI RGEMS B SCHOOL
(BHARATHIAR UNIVERSITY)
-
7/27/2019 Billing Project Report
6/178
DECLARATION
This is to certify that this project entitled Billing System in SAP
submitted as the partial fulfillment of the requirement for degree ofMBA. in GEMS B SCHOOL ( BHARATHIAR UNIVERSITY),
submitted to the Institute is authentic record of our own work carried outat the end of third semester Bangalore, has been approved by the project
in charge after an oral examination on the same, in collaboration with anHead of I.T Department .
5
-
7/27/2019 Billing Project Report
7/178
-
7/27/2019 Billing Project Report
8/178
ABSTRACT
This report covers the introductory concepts about the ERP software.
The ERP software used is SAP Software. Enterprise Resource Planning,
a software solution that addresses the enterprise needs taking the process
view of an organization to meet the organizational goals tightly
integrating all functions of an enterprise.
Enterprise Resource Planning, a business management system that
integrates all facets of the business, including planning, manufacturing,
sales, and marketing. ERP had its origins in manufacturing and
production planning. In the mid -90s it was extended to other back-
office functions such as financial management and human resource
management. More recently these systems have addressed applications
specific to higher education such as student systems and grants
management.
SAP is an ERP software product capable of integrating multiple
business applications, with each application representing a specific
business area. These applications update and process transactions in
real time mode.
This report covers the pp Module in SAP for a new enterprise. The
customization includes the customization of the Master Data as well as
that of the transaction Data. After this, the enterprise would be ready to
run SD Module in SAP.
-
7/27/2019 Billing Project Report
9/178
Application Implementation is done in SAP R/3 with database in Oracle. The
company has SAP R/3 4.7 application, which enables the effective and streamlined
operations of the department, in an online integrated way.
The staff skills are enhanced through proper training and deploying the
appropriate resources of the company to get the maximum result.
The team members are highly motivated and professionals, who have been the
most helpful to me. They are always open to any queries and problems that I face
during the course of my training and guide me suitably. I am very impressed by their
style of functioning and feel very privileged at being here in such a professional
atmosphere, which shall help me, a lot in guiding and shaping my future in the
industry.
The Systems Department Team
Mr. Nitesh kumar General Manager, IT
Mr. Narinder Singh Manager, IT
Mr. Sunish Gupta ABAP Consultant
Mr. Adhish Prabhakar ABAP Consultant
Mr. Siddharth Sharma pp
-
7/27/2019 Billing Project Report
10/178
2. Project Review
2.1 EVOLUTION OF ERP
Automation was a magic word in the beginning. The focus then shifted to computers
and the trends were to replace the human power with the microprocessor power,
pink slip the employee and hopefully the faults and the costs will come down. From
then onwards, automation was considered the panacea for all ills of business. But
there was much that was wrong with this approach. As these automation packages
use to come in different forms and in a non-integrated fashion, loading too much
Information Technology on to these in- efficient processes and packages that leads
to double entendre.
Actually confusion was that companies developed separate computer applications to
satisfy the needs of their particular functional segment. e.g. Accounts, Purchase,
Inventory and Planning. Such systems grew as inconsistent islands of information,
and hence their consolidation was not possible which lead to numerous
organizational problems and data inconsistencies are likely to occur. As a result the
decision-makers were denied of access to timely information for making urgent
business decisions. This gave rise to the need of an integrated system (ERP) that
would address the information requirements of the entire enterprise.
-
7/27/2019 Billing Project Report
11/178
DEFINE ERP
Enterprise Resource Planning, a software solution that addresses the enterprise
needs taking the process view of an organization to meet the organizational goals
tightly integrating all functions of an enterprise.
Fig 3:- Enterprise Resource Planning
Short for Enterprise Resource Planning, a business management system that
integrates all facets of the business, including planning, manufacturing, sales, and
marketing. As the ERP methodology has become more popular, software applications
have emerged to help
-
7/27/2019 Billing Project Report
12/178
Business managers implement ERP in business activities such as inventory control,
order tracking, customer service, finance and human resources.
ERP had its origins in manufacturing and production planning . In the mid -90s it
was extended to other back-office functions such as financial management and human
resource management. More recently these systems have addressed applications
specific to higher education such as student systems and grants management .
Enterprise Resource Planning software, or ERP, doesn't live up to its acronym. Forget
about planningit doesn't do much of thatand forget about resource, a throwaway
term. But remember the enterprise part. This is ERP's true ambition. It attempts to
integrate all departments and functions across a company onto a single computer
system that can serve all those different departments' particular needs.
-
7/27/2019 Billing Project Report
13/178
SCOPE OF ERP
The various areas that can be covered under the concept of Enterprise
Resource
Planning (ERP) are discussedbelow:-
Fig4:-Areas covered under ERP
Customer Relations
o Sales Support
o Delivery
o Billing
o Credit
Logistics
o Procurement
o Production
o Materials Mgt.
-
7/27/2019 Billing Project Report
14/178
Human Resources
o Payroll
o Organization
o Hiring
Treasury
o Commitments
o Investmentso Currencies
.
-
7/27/2019 Billing Project Report
15/178
2.2 EXPLORING ERPS BENEFITS
Integrated, uniform, relevant and up-to-date information is vital for the existence for
the enterprise. ERP brings together people who work on share tasks within the same
enterprise. Some of the tangible benefits of ERP are
Reduction of lead-time by 60%
99% on time shipments
Doubled business
Increase of inventory turns to over 30%
Manufacturing of single bicycle time reduced to 80%
Better customer satisfaction
Improved vendor performance
Increase flexibility
Reduced quality cost
Improved workflow and efficiency.
Improved access to information.
Improved controls and program alerts.
Improved resource utility
Improved information accuracy
Improved decision making capability
Another reason to consider ERP is to improve workflow and efficiency. As an
example, online requisitions can be completed and workflow processes can forward
the form along the approval path more rapidly than with traditional paper processes.
-
7/27/2019 Billing Project Report
16/178
Another reason to consider ERP is the ability to improve controls and to program
alerts. Alerts, for example, can be programmed to warn budget managers about
budgets that are in danger of running out of funds and to implement controls that
prevent individuals from overspending budgets.
SHORTCOMINGS OF ERP
Problems with ERP systems are mainly due to inadequate investment in ongoing
training for the involved IT personnel - including those implementing and testing
changes - as well as a lack of corporate policy protecting the integrity of the data in
the ERP systems and the ways in which it is used.
Disadvantages
Customization of the ERP software is limited.
Re-engineering of business processes to fit the "industry standard"
prescribed by the ERP system may lead to a loss of competitive
advantage. ERP systems can be very expensive leading to a new
category of "ERP light" solutions
ERPsare often seen as too rigid and too difficult to adapt to the
specific workflow and business process of some companiesthis
is cited as one of the main causes of their failure.
Many of the integrated links need high accuracy in other
applications to work effectively. A company can achieve
minimum standards, then over time "dirty data" will reduce the
reliability of some applications.
Resistance in sharing sensitive internal information between
departments can reduce the effectiveness of the software.
-
7/27/2019 Billing Project Report
17/178
Some large organizations may have multiple departments with
separate, independent resources, missions, chains-of-command, etc,
and consolidation into a single enterprise may yield limited benefits.
2.3INTRODUCTION TO SAP R/3 - ENTERPRISE
SOFTWARE
Integrated software that supports the information flows among the processes in
the supply chain.
Sap R/3 is an ENTERPRISE SOFTWARE.
Fig5:- Flow of information in Enterprise Software
Enterprise software is integrated software that facilitates the flow of
information among all the processes of an organizationssupply chain.
-
7/27/2019 Billing Project Report
18/178
A supply chain describes the chronological and logical relationships of
business transactions from original supply to final consumption.
A value chain encompasses those activities in the supply chain that add value to a product or
service of an organization.
A value chain views all the business events from the receipt of a customer order
to the delivery of that order. For example, value is added when the production
process takes raw materials and transforms them into a finished product, when
the product is sold to the customer. A company is profitable if the price
consumers are willing to pay for a product exceeds the costs of creating value.
THREE -TIER CLIENT/SERVER ARCHITECTURE
The R/3 Basis is the business operating system software that resides on the database
server, the application server, and the clients of the end user of the R/3 installation.
The SAP R/3 Basic system is a multi-tier client/server system. The classic
configuration of a SAP R/3 System contains the following software layers:
Presentation Layer
Application Layer
Database Layer
PRESENTATION LAYER
Presentation Layer contains the software components that make up the SAPGUI
(Graphical User interface). This layer is the interface between the SAP R/3 Systems
-
7/27/2019 Billing Project Report
19/178
and its users. The SAP R/3 system uses the SAPGUI to provide an intuitive
graphical user interface for entering and displaying data. The presentation layer
sends the users input to the application server, and receives data from it.
APPLICATION LAYER
The application layer consists of one or more application servers and a message
server. Each application server contains a set of services used to run in the SAP R/3
System.
Theoretically, you only need one application server to run a SAP R/3 System. In
practice, the services are distributed across more than one application server. This
means that not all application servers will provide the full range of services. The
message server is responsible for communication between the application servers. It
passes requests from one application server to another within the system. It also
contains information about application server groups and the current load balancing
within them. It uses this information to choose an appropriate server when a user
logs onto the system.
DATABASE LAYER
The database layer consists of a central database system containing all of the data in
the SAP R/3 System. The database system has two components - the database
management system (DBMS), and the database itself. SAP does not manufacture its
own database. Instead, the SAP R/3 System supports the following database systems
from other suppliers: ADABAS D, DB2/400 (on AS/400), DB2/Common Server,
-
7/27/2019 Billing Project Report
20/178
DB2/MVS, INFORMIX, Microsoft SQL Server, ORACLE, and ORACLE Parallel
Server.
The database does not only contain the master data and transaction data from your
business applications, all data for the entire SAP R/3 System is stored there. For
example, the database contains the control and Customizing data that determine how
your SAP R/3 System runs. It also contains the program code for your applications.
Applications consist of program code, screen definitions, menus, function modules,
and various other components. These are stored in a special section of the database
called the SAP R/3 Repository, and are accordingly called Repository objects. You
work with them in the ABAP Workbench.
The following diagram depicts the whole scenario -
Fig 6:- Software layers of R/3 system
-
7/27/2019 Billing Project Report
21/178
FEATURES OF 3-TIER ARCHITECTURE
SCALABILITY
Adding more applications or more users to the system. When more users are added
to the system, another application server may be added to handle the additional
processing demands of those users.
FLEXIBILITY
The number of application modules may be increased without changing the Basis
System software that runs on the application servers and the database server.
ON-GOING MAINTENANCE
Business functions included in the system may be removed and replaced by other
functions that better match current business practices. Also, changes in organization
structure can be made using the R/3 Reference Model and does not require changes
in the Basis Software system.
-
7/27/2019 Billing Project Report
22/178
2.4 ADVANTAGES OF SAP R/3
Fig 7:- Advantages of SAP R/3
The SAP R/3 software helps in providing the various functions in the system
-
7/27/2019 Billing Project Report
23/178
SECURITY THROUGH INTEGRATION
It helps in providing full-fledged integration of the various data transfers and
high quality reports can be made easily.
SAVING TIME WITH INTEGRATION
The consolidation software helps to shorten the time needed to close the books,
The financial transactions in the ledger are integrated with the consolidation
database and helps in getting the required information at any time.
AUTOMATION OF CONSOLIDATION PROCEDURE
It helps in reducing the time and expenses to manually enter all the documents
especially in the area of consolidation investments.
COST EFFECTIVE AUDITS
The system generates printed audit reports and allows the auditor to perform
interactive analysis of special detailed information directly on the screen.
CUSTOMIZING THE SOFTWARE AS PER THE NEEDS
It is helpful in making new programs as per the requirements.
PRE-FIGURED FOR THE FAST IMPLEMENTATION
System comes with a variety of useful consolidations, which can be put to use
immediately or can be employed after minimal adjustments. The system
includes several industry-related plans.
EASY TO LEARN AND USE
-
7/27/2019 Billing Project Report
24/178
The system is user friendly and context-sensitive help functions and extensive
online documentation allows learning the system easily.
ACCOUNTING AUTONOMY
Running your consolidation on a separate computer increases the accounting
departments autonomy. This is very helpful during the closing period when
there is lot of workload.
INFORMATION SYSTEM
The controlling component includes versatile reporting functions. Exception
reporting and interactive navigation through the database enhances the
preparation of information.
APPLICATION MODULES
SAP has several layers. The Basis System is the heart of the data operations and
should be not evident to higher level or managerial users. Other customizing and
implementation tools exist also. The heart of the system from a managers view
point is the application modules.
-
7/27/2019 Billing Project Report
25/178
Fig 8:- R/3 Core business processes
These modules may not all be implemented in a typical company but they are all
related and are listed below:
FI Financial Accounting-designed for automated management and external
reporting of general ledger, accounts receivable, accounts payable and other sub-
ledger accounts with a user defined chart of accounts. As entries are made
relating to sales production and payments journal entries are automatically
posted. This connection means that the "books" are designed to reflect the real
situation.
CO Controlling--represents the company's flow of cost and revenue. It is a
management instrument for organizational decisions. It too is automatically
updated as events occur.
-
7/27/2019 Billing Project Report
26/178
AM Asset Management--designed to manage and supervise individual aspects
of fixed assets including purchase and sale of assets, depreciation and
investment management
PS Project System--is designed to support the planning, control and monitoring
of long-term, highly complex projects with defined goals.
WF Workflow--links the integrated SAP application modules with cross-
application technologies, tools and services
IS Industry Solutions--combine the SAP application modules and additional
industry-specific functionality. Special techniques have been developed for
industries such as banking, oil and gas, pharmaceuticals, etc.
HR Human Resources--is a complete integrated system for supporting the
planning and control of personnel activities.
PM Plant Maintenance--In a complex manufacturing process maintenance
means more than sweeping the floors. Equipment must be services and rebuilt.
These tasks affect the production plans.
MM Materials Management--supports the procurement and inventory
functions occurring in day-to-day business operations such as purchasing,
inventory management, reorder point processing, etc.
QM Quality Management--is a quality control and information system
supporting quality planning, inspection, and control for manufacturing and
procurement.
-
7/27/2019 Billing Project Report
27/178
PP Production Planning--is used to plan and control the manufacturing
activities of a company. This module includes; bills of material, routings, work
centers, sales and operations planning, master production scheduling, material
requirements planning, shop floor control, production orders, product costing,
etc.
SD Sales and Distribution--helps to optimize all the tasks and activities carried
out in sales, delivery and billing. Key elements are; pre-sales support, inquiry
processing, quotation processing, sales order processing, delivery processing,
billing and sales information system.
2.5 MODULES IMPLEMENTED AT HERO
The ERP package implementation at Hero Cycles covers the following seven
modules :-
1. Cost Controlling
2. Sales and Distribution
3. Material Management
4. Production Planning & Control
5. Plant Maintenance
6. Quality Management
7. Financial Accounting
-
7/27/2019 Billing Project Report
28/178
3.1 SAP CONFIGURATION
Oswal Group has implemented SAP R/3 having following features:
SAP R/3 release 4.7 Enterprise
SAP version 4.7 Enterprise upgrade from 4.0B as Front-end.
Currently supporting 150 users
All the departments work under the environment of
IBM AIX with RS/6000 SP Server, IBM P630 Server.
Oracle 8.0.6 upgraded to Oracle 9.2.0.4 as Backend RDBMS for R/3 system.
ABAP/4 as application programming language.
Windows 98 as client operating system.
Three-tier architecture
Class B IP addressing
Core Builder 9000 (switch from 3COM) is used to provide networking (Client
Server) connections to various department within organization.
-
7/27/2019 Billing Project Report
29/178
3.2 TRAINEE SERVER (IDES)
SAP IDES the "Internet Demonstration and Evaluation System" in the R/3
System, represents a model company. SAP IDES is a normal R/3 but with lots of
DEMO data. It is purely for education .It is a training server, used to give training to
users. When sap is implemented in company, first IDES is installed so that users
become familiar with different screens and transaction codes. It is simple to use and
has a variety of master and transaction data, and is used for demos, online/classroom
training, and presentations. IDES uses easy-to-follow business scenarios to show
you the comprehensive functions of the R/3 System. The focal point of IDES,
however, is not the functionality itself, but the business processes and their
integration. SAP regularly updates the IDES data (master data, transaction data, and
customizing). Above all, IDES shows you the possibilities of the integrated
applications in the SAP System. IDES cover all aspects of a business enterprise,
including Human Resources, Financial Accounting, Product Cost Planning, Overhead
Management, Profitability Analysis, Planning, Sales and Distribution, Materials
Management, Production and much more.
System Requirement to install IDES
For installing IDES 46C on a Laptop, you need:-
Windows server
160 GB HDD512 MB RAM
-
7/27/2019 Billing Project Report
30/178
INTRODUCTION TO
PRODUCTION PLANNING
-
7/27/2019 Billing Project Report
31/178
3.3 PHASES OF IMPLEMENTATION OF SAP
Accelerated SAP (ASAP) is an approach specifically developed by SAP to help
customers implement the SAP software as quickly and efficiently as possible.
The Accelerated SAP Roadmap consists of the following phases
Project Preparation
Business Blueprint
Realization
Final Preparation
-
7/27/2019 Billing Project Report
32/178
Go-Live&Support
Fig9:-various phases for implementing sap
1. Project Preparation
It consists of identifying team members and development strategy as how to go.
ASIS (Existing Process followed, requirements)
TOBE (Requirement analysis and best process recommended)
Difference between (ASIS) & (TOBE) is GAP analysis
2. Business Blueprint
-
7/27/2019 Billing Project Report
33/178
It is a legal documentation between client and the company (implementer/service
provider) .We has to understand the current business process of client and analyzing
the business and prepare documentation. It is a detailed documentation for the client.
3. Realization
This phase is used to implement or migrate the entire business of client from Non-
SAP environment to SAP environment.
4. Final Preparation (Preparation for Production Use)
This phase is used for testing and end user training. After successfully completion of
this phase client is ready to run business in SAP R/3.
5. Go-Live & Support
In this phase we deliver the project end date and end user training at client site.
4.1 ENTERPRISE STRUCTURE
In enterprise structure we learn how to portray the specific organizational structure
of our company in r/3 system. First we analyze the structures and procedures in our
company
and then match them to the SAP structures .To help us portray our structures various
organizational elements are defined as eg. In standard version .Normally these
would not cover all our needs thus we extend the elements and define them as
-
7/27/2019 Billing Project Report
34/178
required .as soon as our organizational units are ready; access is located so that no
other changes can be made.
The enterprise structure consists of:
DEFINE:-
Controlling area
Company
Company code
Plant
Storage location
Purchase organization
Sales area
Sales organization
Distribution Channel
Division
Company:-
A Company is an organizational unit in accounting which represents a business
organization according to the requirements of commercial law in a particular
country.
Company code:-
A company code is a smallest independent accounting unit that represents an
individual company.
Plant:-
A Plant is an organizational unit where we can manufacture the goods, store goods,
sale our goods, and we can also provide services & we can do purchasing also.
-
7/27/2019 Billing Project Report
35/178
Storage Location:-
It is a place where products before and after manufacturing are stored.
Purchasing Organization:-
Organizations that discuss with Vendor terms and conditions of purchase.
Sales organization:-
Sales organization is an organizational unit which is responsible of certain product
and liability of that product. A company code can have several sales organizations
Distribution channel:-
Distribution channel is the way in which products or services reaches the customers.
Division: - Division is the way of grouping materials, products or services. This
represents companysproduct line like nature of material. It tells about spectrum of
products.
Controlling area:-It is the highest organization with reference to costing material.
Just like the company itself, each company code in a company has a controlling
area.
Sales area:- It comprises of sales org , distribution channel & division.
-
7/27/2019 Billing Project Report
36/178
4.2 FLOW CHART OF ENTERPRISE STRUCTURE
CONTROLLING
AREA
COMPANYPURCHASING
ORGANIZATION
COMPANY CODE 1 COMPANY CODE 2
COMPANY CODE 3
PLANT
MAINTENANCE
area
PLANT 1 PLANT 2
PLANT 1 PLANT 2 PLANT3
Sales
SL 2SL 1
SL 2
SALESORGANIZATION
DISTRIBUTION
CHANNEL
DIVISION
Fig10:-Flow chart of Enterprise Structure
-
7/27/2019 Billing Project Report
37/178
SNAPSHOTS OF ENTERPRISE STRUCTURE
LOGON SCREEN OF SAP
When we double click the sap logon icon on the desktop the following screen
appears which prompts you to logon on following servers
1. IDES (Internal Demonstration Evaluation Server):-Purely for educationalpurposes
2. Production Server:The checked project are used here with the livedata.
Double click on ides server
-
7/27/2019 Billing Project Report
38/178
USER AUTHENTICATION CHECK
-
7/27/2019 Billing Project Report
39/178
USER AUTHENTICATION CHECK
New password.I
Clent _fB'O'Ol
.,YseL Jsapuser IPassword 'l'.f
Language n
I I>1sooomIDEs OVR!i21I start rpjsybex - Mastennglo 0SAP Document1 M1crosof
-
7/27/2019 Billing Project Report
40/178
Fields entered are:-
1. User name
2. Password
-
7/27/2019 Billing Project Report
41/178
SAP WELCOME SCREEN
The SAP Easy Access screen is where you will start every session, and is the primary
user navigation area.
-
7/27/2019 Billing Project Report
42/178
ENTERPRISE STRUCTURE
TRANSACTION CODESPRO
INITIAL SCREEN
-
7/27/2019 Billing Project Report
43/178
1. DEFINE COMPANY
Company:- A Company is an organizational unit in accounting which represents a
business organization according to the requirements of commercial law in a
particular country.
Menu Path: PRO Enterprise Structure Definition Financial
AccountingDefine Company
After following this path then execute (dbl click ) then go to New Entries
-
7/27/2019 Billing Project Report
44/178
-
7/27/2019 Billing Project Report
45/178
I
-
7/27/2019 Billing Project Report
46/178
Fields Entered are:-
Company:- 4444
Company name:- G & G Enterprises
Country:- IN (India)
Language Key:- EN (English)
Currency:- INR (Indian Rupee)
-
7/27/2019 Billing Project Report
47/178
-
7/27/2019 Billing Project Report
48/178
To save your entries click on save. Then a request number is generated .This request
number is stored on the main server and thus later with the help of this number we
can trap the transaction performed.
Always write down the SAP document number. If you need to view a document
in the future, using the document number is the easiest way to find to it.
-
7/27/2019 Billing Project Report
49/178
View of Created Company
Our Company 4444- G & G Enterprises is added in the list.
Thus after generation of request our company is added in the list of existing
companies
-
7/27/2019 Billing Project Report
50/178
DEFINING COMPANY CODE
Company code:-A company code is a smallest independent accounting unit that
represents an individual company.
Menu Path:- Enterprise StructureDefinitionFinancial AccountingEdit,
Copy, Delete Company CodeEdit Company Code Data
-
7/27/2019 Billing Project Report
51/178
After navigating through the above menu path the list of already existing company
codes is displayed. To define your own company code click on new entries and
make the above shown entries
Details Of Added Entries
-
7/27/2019 Billing Project Report
52/178
Request generated
After making required entries, click on save a request code is generated and our
company code is added in the list of existing company codes.
-
7/27/2019 Billing Project Report
53/178
DEFINE PLANT
Plant: - A Plant is an organizational unit where we can manufacture the goods, store
goods, sale our goods, and we can also provide services & we can do purchasing
also.
Menu Path:- Enterprise Structure Defination Logistic General Define,
Copy, Delete, Check PlantDefine Plant
-
7/27/2019 Billing Project Report
54/178
After that go to New Entries
-
7/27/2019 Billing Project Report
55/178
Details of added Entries
Fields Entered are:-
City Code:- 0001
Factory calendar:- 01
-
7/27/2019 Billing Project Report
56/178
Editing Plant
In this screen we add additional information about the plant like who is running this
plant.
Fields Entered are:-
Title:- Ms.
Name:- Gurpreet
Country:- IN (India)
Language:- EN (English)
After making required entries, click on save a request code is generated and our
plant is added in the list of existing company codes.
-
7/27/2019 Billing Project Report
57/178
Customizing of Plant Parameters
Menu Path:- Spro Production MRP Plant Parameters Carry Out
Overall Maintenance
We need to do all these customizing so that Enterprise Structure we create should
support all the planning & scheduling functions we need to perform.
-
7/27/2019 Billing Project Report
58/178
Maintenance ofNumber Range
Assign Number Ranges
Iir- 4447 Plant1
Numberranges/
I. Planned orders To maint
I Reserv./depend.reqmts I To maint.
I Purchase requisitions I To maint
I MRPlists I To maint.
I Sim.dependentreqmts I To maint.
I....IIJ el",;iJ l.l:i SAPLogon520 =I ....:JsynacliveGui>
-
7/27/2019 Billing Project Report
59/178
Details of MRP Controller:-
-
7/27/2019 Billing Project Report
60/178
In this details we add Plant Name, MRP Controller, Telephone no. , Recipient
Name,
Business Area, Recipient Type. These are some of the mandatory fields which we
have to fill so that we can see all the details at the end report.
Maintenance of Floats
-
7/27/2019 Billing Project Report
61/178
It specify extra time to be allowed for Production
Fields Entered:-
1. Schedule Margin Key:-000
2. Opening Period:-003
3. Float Before Period:-003
4. Float After Production:-005
5. Release Period:-010
-
7/27/2019 Billing Project Report
62/178
Maintenance Of Conversion
Conversion
i- r 4447 Plant!
Conversion/
I Planned order-> production order I To main!.
I Plannd order-> purch.requisilion I To main!.
II
!iJIStariJJU@;l Logon620 11 -=ISynactiveGu TIItonveioiii JJIWMicrosoltWor
I>IOPPQ"N IDES-I Jirv:'-.Q
OVR fjA
12:46PM
61
-
7/27/2019 Billing Project Report
63/178
Conversion of Planned Order to Production Order on clicking on this we get
Fields Entered:-
Production order: PP01 (Standard Production Order (Int no.))
Process order: PI01 (Process Order (Internal Number Assignment))
After this click on save button & then go back to conversion screen so that we can
maintain second option in same way.
-
7/27/2019 Billing Project Report
64/178
Maintenance of BOM/Routing Selection
Fields Entered:-
Plant:- 4447
BOM select Id:- 01
Routing select Id:- 01
-
7/27/2019 Billing Project Report
65/178
Maintenance of Param: Detailed Scheduling
For this we have to enter following Fields which we have to define by our own:-
Plant 4447
Production Scheduler 420
Name of Production Scheduler ABC
Production Profile 111111
Name of Production Profile PP Scheduling
-
7/27/2019 Billing Project Report
66/178
After maintaining all Parameters
-
7/27/2019 Billing Project Report
67/178
DEFINE STORAGE LOCATION
Storage Location:- It is a place where products before and after manufacturing are
stored.
Menu Path:- Enterprise Structure Definition Material Management
Maintain Storage Location
Now we have to enter Work area or plant where we work i.e. 4447
-
7/27/2019 Billing Project Report
68/178
Details of Added Entries
Fields Entered are:-
Storage Location No. :- SL1
Description:- Storage Location
-
7/27/2019 Billing Project Report
69/178
After making required entries, click on save a request code is generated and our
Storage Location is added in the list of existing Storage locations.
DEFINE PURCHASING ORGANIZATION
Purchasing Organization:-Organizations that discuss with Vendor terms and
conditions of purchase.
Menu Path:- Enterprise Structure Definition Material Management
Maintain Purchasing Organization
-
7/27/2019 Billing Project Report
70/178
-
7/27/2019 Billing Project Report
71/178
Details of Added Entries
Fields Entered are :-
Purchasing Organization:- 4445 & 4446
Purchasing Organization Description:- Product Purchasing
After making required entries, click on save a request code is generated and our
Purchasing Organization is added in the list of existing Purchasing Organizations.
-
7/27/2019 Billing Project Report
72/178
DEFINE SALES ORGANIZATION
Sales organization:-Sales organization is an organizational unit which is
responsible of certain product and liability of that product. A company code can
have several sales organizations
Menu Path:-Enterprise Structure Definition Sales & Distribution
Define, Copy, Delete Sales Organization
1
-
7/27/2019 Billing Project Report
73/178
Details of Added Entries
After making required entries, click on save a request code is generated and our
Sales Organization is added in the list of existing Sales Organizations.
-
7/27/2019 Billing Project Report
74/178
DEFINE DISTRIBUTION CHANNEL
Distribution channel:- Distribution channel is the way in which products or
services reaches the customers.
Menu Path:-Enterprise Structure Definition Sales & Distribution
Define, Copy, Delete Check Distribution Channel Define Distribution
Channel
-
7/27/2019 Billing Project Report
75/178
Details of Added Entries
Fields Entered are:-
Distribution Channel:- 42 & 43
Description:- Product Distribution & For Billing
After making required entries, click on save a request code is generated and our
Distribution Channels is added in the list of existing Distribution Channels.
-
7/27/2019 Billing Project Report
76/178
DEFINE DIVISION
Division: - Division is the way of grouping materials, products or services. This
represents companysproduct line like nature of material. It tells about spectrum of
cts.
Menu Path:- Logistic Material Master Settings for keyfields Define
Divsion
-
7/27/2019 Billing Project Report
77/178
Details of Added Entries
Fields Entered are:-
Division:- D0 & D2
Description:- Product & Electricity
-
7/27/2019 Billing Project Report
78/178
After making required entries, click on save a request code is generated and our
Distribution Channels is added in the list of existing Distribution Channels
DEFINE CONTROLLING AREA
Controlling area:-It is the highest organization with reference to costing material.
Just like the company itself, each company code in a company has a controlling
area.
MenuPath:- Enterprise Structure Definition Controlling Maintain
Controlling AreaMaintain Controlling Area
-
7/27/2019 Billing Project Report
79/178
-
7/27/2019 Billing Project Report
80/178
Details of Added
Entries
Fields Entered are:-
Controlling Area:- 4445
Currency Type:- 10
Chart of Accounts:- INT (Integer)
Fiscal Year Variant:- K4
After making required entries, click on save a request code is generated and our
Controlling Area is added in the list of existing Controlling Area.
-
7/27/2019 Billing Project Report
81/178
ASSINGMENTS
The Process of Assignment builds Relationships among plant, Storage location,
Purchasing Organization, Sales Area.
Assignment of Company Code to Company
Menu Path:- Enterprise Structure Assignment Financial Accounting
Assign Company Code to Company
After this we have to enter Company i.e4444 against Company code i.e4445. Then
we have to save after that request will generate which will result in final screen.
-
7/27/2019 Billing Project Report
82/178
Final Screen
Change View "Assignment:Company Code-> Company":Ovetview
'ji> [IDCil
Position.. =r Entry 43 of 211
-
7/27/2019 Billing Project Report
83/178
Now your Company Code has been assigned to your Company.
Assignment of Controlling Area to Company
Menu Path:- Enterprise Structure Assignment Controlling Assign
Company Code to Controlling Area
-
7/27/2019 Billing Project Report
84/178
After this we have to click on Assignment of Company Code to Controlling Area,
then on NEW ENTRIES.
Details of Added Entries
-
7/27/2019 Billing Project Report
85/178
Final Screen
-
7/27/2019 Billing Project Report
86/178
Now your Company Codes has been assigned to your Controlling area.
-
7/27/2019 Billing Project Report
87/178
Assignment of Plant to Company Code
Menu Path:- Enterprise StructureAssignmentLogistic(General)Assign
Plant to Controlling Area
-
7/27/2019 Billing Project Report
88/178
Company Code 4445 get selected
87
-
7/27/2019 Billing Project Report
89/178
-
7/27/2019 Billing Project Report
90/178
Now click on Continue, then a request will be generated and then and your plant i.e
plant1 get assigned to your Company Code 4445.
Final Screen
-
7/27/2019 Billing Project Report
91/178
Allocation of Plants->Company Code:Overview
Assign Analyze error(s) Delete
Company codePlants
4300 India
4400 Thailand
E._G & 61 enterprices4447 Pla nt1
4446 G & 62 enterprices
L4448 Pl ant3
4500 IDES Canada for 4500
4510 SAP Plant - E.as.tern Canada4520 SAP Plant - Central Canada
4530 Vancouver
4540 Red Deer Fac111ty
4518 US Company
L4514 Fort Worth
4520 Canadian 2 Company
4600 Mala ysia
4700 Indonesia
4800 Phil;pp;nes
4801 KL Knitwears
-
7/27/2019 Billing Project Report
92/178
Assignment of purchasing Organization to Company Code
Menu Path:- Enterprise Structure Assignment Material Management
Assign Purchasing Organization to Company Code
After going through the above path then a list of Company code screen will be
opened & then we have to select our Company code & then click on that so that a
list of Purchasing Organizations will be opened.
-
7/27/2019 Billing Project Report
93/178
List of Purchasing Organizations
Now we have to select our Purchasing Organization i.e4446 so that it could be
assigned to Company Code. After that we have to save & a request will be generated
and then Purchasing Organization will be assigned to Company Code.
-
7/27/2019 Billing Project Report
94/178
Final Screen
Purchasing Organizations -> Company Code: Ovetview
Assign Analyze error(s) Delete Select/Deselect Move Deselect
Company code
Purchase Organizations
4000 IOES Canada
4009 microsoft company
4100 Korea
4200 Taiwan
4300 India
4400 Thailand
E._G & 61 enterprices4445 product purchasing
4446 G & 62 enterprices
L4446 product purchasing
4500 IDES Canada for 4500
4500 SAP Canadian Company
4510 Eastern Purch Org4520 Central Purch Org4530 Western Purch Org
US Company
L_4514 Fort Worth Purch Org
4520 Canadian 2 Company
-
7/27/2019 Billing Project Report
95/178
Assignment of purchasing Organization to Plant
Menu Path:- Enterprise Structure Assignment Material Management
Assign Purchasing Organization to Plant
After going through the above path then a list of Purchasing Organization screen
will be opened & then we have to select our Purchasing Organization & then click
on that so that a list of Plant will be opened.
-
7/27/2019 Billing Project Report
96/178
List of Plants
Now we have to select our plant i.e4447 so that it could be assigned to Purchasing
Organization. After that we have to save & a request will be generated and then
Plant will be assigned to Purchasing Organization.
-
7/27/2019 Billing Project Report
97/178
Final Screen
Plants >Purchasing Organization:Overview
Assign Analyze error(s) Delete SelectiDeselect Deselect
Purch. organizationPlants
3050 LIDES UK
L 3D50 UK
3111 OEM US
4000 IDES Canada
4000 Toronto4100 Plant 4100
4202 fabric purchasing
L4200plant nahar1
4203 f abric purchasing2
L4201pla nt 1
4444 IDES puchasing org.
PL1 product1on housePL2 product1on house new
product purchasing
L4447 Pl ant1
4446 product purchasing
L4448 Pl ant3
4500 SAP Canadian Company
I
-
7/27/2019 Billing Project Report
98/178
Assignment of Sales Organization to Company Code
Menu Path:- Enterprise Structure Assignment Sales & Organization
Assign Sales Organization to Company Code
After going through the above path then a list of Company Code screen will be
opened & then we have to select our Company Code & then click on that so that a
list of Sales Organization will be opened.
-
7/27/2019 Billing Project Report
99/178
List of Sales Organizations
Now we have to select our Sales Organization i.e4449 so that it could be assigned to
Company Code. After that we have to save & a request will be generated and then
Sales Organization will be assigned to Company Code.
-
7/27/2019 Billing Project Report
100/178
Final Screen
-
7/27/2019 Billing Project Report
101/178
4.4 PRODUCTION PLANNING MODULE
SAP PP is the Production Planning module of the SAP ERP software package from
SAP AG. Production Planning is integrated with other modules such as SD, MM and
QM. Production Planning is looks after planning part in industry.
The production planning is concerned with the planning and programming of
materials and equipment, start & ending dates of activities undertaken in industry,
procurement of materials (Raw materials, Semi Finished goods), Storage and
inventory control, goods recipt, goods transfer from one location to other location.
Production Planning is one of the functional modules in SAP. It is the branch of
logistics that deals with the tangible components of a supply chain interdependent
collection of organizations that supply materials. Specifically, production planning
covers the Planned Independent Requirements, Production orders, Production
requisitions of different materials present in the storage location.
SAP PP is all about Planning & scheduling. These resources include man,
manpower and materials. The main functionality within PP includes Planned
Independent Requirement(PIR), Material Requirement planning(MRP),Planned
Order, Production Order, Confirmation, Goods receipt. The module has important
-
7/27/2019 Billing Project Report
102/178
master data material master, Bill of material, Routing & Work Center. Broadly,
the various levels that can be defined for a SAP PP implementation are: Company,
Company Code, Plant, Storage Location and Purchasing Organization, Controlling
area, Sales Organization.
DATA IN SAP
There are two types of data in SAP:-
1. Master data
2. Transaction data
1. Master data:-
These data can not change frequently and are basic for execution of trasaction.eg:-Material master, BOM , Routing and Work center etc.
Master Data in PP Module are as Follows:-
o Material Master
o Bill Of Material (BOM)
o Work Center
o
Routing
2. Transaction data:-
-
7/27/2019 Billing Project Report
103/178
There are perpetual data which can change, generated with time and generated from
transaction e.g. planned order, production order, purchase requisition order etc.
MATERIAL MASTER
Businesses related information is maintained in material master. The information of
material is arranged in logically view depending upon business function. There is a
transaction code for creating, editing, displaying and deleting.
It include Various Views:-
Basic View
MRP View
Workscheduling View
Accounting View
Quality View
Sales View
Costing View
Table3:-T-codes for Material Master
Create Change Display Display Changes Set Deletion Flag
MM01 MM02 MM03 MM04 MM06
MINIMUM REQUIREMENT TO CREATE A MATERIAL MASTER
-
7/27/2019 Billing Project Report
104/178
-
7/27/2019 Billing Project Report
105/178
-
7/27/2019 Billing Project Report
106/178
SAP Easy A ccess
ffi I I Othermenu I .iiiil # I .... .... I ffi Create rote I t!JjiJ Assign users [), Documentation J'V Cl SAP menuD OfficeD Cross-Application ComponentsD LogisticsD Accounting D Human ResourcesD Information SystemsD Toots
"" Cl Favorites
l ----_:- j-0.-i___-i--W f !] 7ApDEMO SYSTEMSl!illSE16- Data Browser THE BEST-RUNDEMOS RUNIDES
....IDES R/3
II
-
7/27/2019 Billing Project Report
107/178
CREATE MATERIAL INITIAL SCREEN
Fields Entered Are:-
1. Industry Sector- M (Mechanical engineering)
2. Material Type- FERT (Finished product)
Hit enter
-
7/27/2019 Billing Project Report
108/178
SELECT VIEW SCREEN
SELECTED VIEWS:-
Basic Data 1
Basic Data 2
Purchasing
MRP 1
MRP 2
MRP 3
MRP 4
Work Scheduling
Accounting
Costing
-
7/27/2019 Billing Project Report
109/178
Organizational Level
Fields Entered:-
Plant:- 4447
Storage Location:- SL1
-
7/27/2019 Billing Project Report
110/178
Basic Data 1
Fields Entered:-
Material Description:-Fan
Base Unit of Measure:-pc
Material Group:-00120
-
7/27/2019 Billing Project Report
111/178
Base Data 2
-
7/27/2019 Billing Project Report
112/178
Purchasing Screen
Fields Entered:-
Purchasing Group :- 000
-
7/27/2019 Billing Project Report
113/178
MRP 1 Screen
-
7/27/2019 Billing Project Report
114/178
Fields Entered:-
MRP Type:- PD( Planned)
MRP Controller:- 111
Lot Size:- EX(lot for lot Order Quantity)
MRP 2 Screen
-
7/27/2019 Billing Project Report
115/178
Fields Entered:-
Procurement Type:- X(Internal as well as External procurement)
Special Procurement:- 11
In-house Production:- 10 days
Goods Receipt processing:- 10 days
Planned Delivery Time:- 5 days
Schedule Margin Key:- 000
MRP 3 Screen
114
-
7/27/2019 Billing Project Report
116/178
-
7/27/2019 Billing Project Report
117/178
Work Scheduling
Fields Entered:-
Production Scheduler:- 420
Production Scheduler Profile:- 111111
-
7/27/2019 Billing Project Report
118/178
-
7/27/2019 Billing Project Report
119/178
Accounting 1 Screen
Fields Entered:-
Valuation Class:- 7920
Price Control:- S(Standard Price)
Standard Price:- 100
-
7/27/2019 Billing Project Report
120/178
Costing 1 Screen
After this we will save & then FERT Material will be created by giving a message
ie. Material 1798 created like this we can create other material also.
-
7/27/2019 Billing Project Report
121/178
Bill of Material(BOM)
Components used in making a product and quantity of components. It can be at one
level not multiple level. There is a transaction code of creating, editing, and
displaying the BOM.
Transaction codes :
Creation- CS01
Change- CS02
Display- CS03
Minimum requirement to create BOM
1. Material code
2. Plant code that is for which plant, which create BOM usage
3. BOM usage/type
NOTE:-
BOM can be created for in-house produced products, finished/semi
finished products but not for the raw material.
One material can have multiple BOM.
Structure of BOM:-
Header:-
For which material/product BOM is created. In this, we mention:
Base quantity: For how much quantity, BOM is being created.
-
7/27/2019 Billing Project Report
122/178
Administrative data: who has created and date of creation.
Item overview :- List of components used in BOM.
Sub Item :- It is the Installation point of item in the BOM.
BOM status :- It tells us whether BOM is active or inactive for particular
application. It
is mentioned in BOM Header.
Types of BOM category:-
Production BOM:
Sales BOM
Functional Location BOM
Engineering/Design BOM
Universal BOM
BOM Group:-
Several BOM can be groups together in BOM group using head of material .We can
create BOM by using variant BOM .They should be in same plant.
Group BOM:-
If a BOM is created without maintaining a plant ,then group BOM is created. Later
this BOM is required for allocation of plant.Using plant transaction ,Group BOM is
allocated to plant.Group BOM can be allocated to any number of plants.
T code for plant allocation of Group BOM:CS07
-
7/27/2019 Billing Project Report
123/178
Variant BOM:-It is created for different material where most of the component of
the material are same, only few vary. Variant BOM of material is created as a
variant of already created material .Variant BOM and Multiple BOM are mutually
exclusive to each other.
Customizing of BOM
Menu Path:- SPRO Logistics- General Material Master Basic
SettingsMaterial TypesDefine Attributes of Material Types
-
7/27/2019 Billing Project Report
124/178
Screen For Creating of Bill of Material(BOM)
Transaction Code:- cs01
Menu Path :- Logistics Production Master Data Bill of Material Bill
of MaterialsMaterial BOMCS01(Create)
-
7/27/2019 Billing Project Report
125/178
CREATE BOM INITIAL SCREEN
Fields Entered Are:-
Plant :- 4447
BOM Usage :- 1
Hit enter
-
7/27/2019 Billing Project Report
126/178
-
7/27/2019 Billing Project Report
127/178
Fields Entered Are:-
Component:- 1793, 1799
Quantity:- 5, 5
Hit Enter
After this click on save a request will be generated and the BOM will be created.
WORK CENTER
Work center is a place where operation is carried out. It is created at plant level.In
this, we have to maintain an External No.
Transaction code :-
Create :- CR01
Change :- CR02
Display :- CR03
Work center Category:-
It is a mandatory entry while creating work center, which contrasts the maintenance
of fields default Value of the fields in work center.
Views in Work Center:
o Basic Data
o Default views for Operation. (Values set in this will get copied in the
Routing automatically)
o Capacity
-
7/27/2019 Billing Project Report
128/178
o Scheduling
o Costing
Standard Value Key:
It activates which activity is to be consumed at the work center
If reference indicator is set, then the value of control key cannot be
changed inrouting
In Work center, we assign the cost center
Many work centers can be assigned to one cost center. But the same
work centers can't be assigned to another cost center keys
Max. 6. can be maintained, for more activities Two work centers can be
made with divided activities.
Control Key:
It is a mandatory entry for an operation which controls:
Whether the operation is relevant to Scheduling
CRP i.e. Capacity Requirement Planning
Inspection Characteristics.
Auto G.R. (Goods Received)
Rework, (Work Again For Improvement)
Costing.
Standard Text Key.
Pooled Capacity:-
-
7/27/2019 Billing Project Report
129/178
It is the capacity category which is shared by Several Work centers.
E.g. One man- many M/c's
Back flush is present in.
-Material Master. (In MRP2, View)
-Work center
-Routing
-Production order
-
7/27/2019 Billing Project Report
130/178
Display iMG
g I Existing BC Sets BC Sets forActivity Activated BC Sets forActivity lUI Release Notes I Change Log Where Else L
I> @!II QualityManagement 0o
I> PlantMaintenance and Customer Service BI> Customer Service
"" Production
"" Basic Data
I> Bill of Material
"" Work Center
klist usage
1> StandardValue
Determine person responsible
. . ove t1me matnxGActivity ubsystems
Define defaultwork center
I> Routing Dat CapacityPlanning
Setup work center screen sequence GDefine graphics profile B
II 1> (SPRO1!J DES INsfiA
l JJ;TIAPLogoH !l iD'MicrosoftH IJ...::JsynactiveH.J IProduction -Display 1.. ,1= IJ tV:>--'i 114PM ll
129
-
7/27/2019 Billing Project Report
131/178
Screen for Creating of Work Center
Transaction Code:- CR01
Menu Path:- Logistics
Production
Master Data
Work Centers
WorkCenter CR01(Create)
-
7/27/2019 Billing Project Report
132/178
-
7/27/2019 Billing Project Report
133/178
Basic Data
Fields Entered Are:-
Person Responsible:- 777
Usage:- 009
-
7/27/2019 Billing Project Report
134/178
Default Value
Fields Entered are:-
Control Key:- PP01
Setup:- MIN (Minute)
Machine:- MIN (Minute)
Labor:- MIN (Minute)Hit Enter
-
7/27/2019 Billing Project Report
135/178
Capacities
Fields Entered Are:-
Setup Formula:- SAPR05
Processing Formula:- SAPR06
Teardown Formula:- SAPR03
Hit Enter
-
7/27/2019 Billing Project Report
136/178
Scheduling
Fields Entered Are:-
Capacity Category:- 001
Setup Formula:- SAP001
Processing Formula:- SAP002
Teardown Formula:- SAP007
Hit Enter
-
7/27/2019 Billing Project Report
137/178
Costing
Fields Entered Are:-
Cost Center:- 4220
Activity Type:- 4221, 4220, 4223
After this we have to save and then Work Center is created.
-
7/27/2019 Billing Project Report
138/178
ROUTING
Sequence of operations to create a material is called routing.
VARIOUS OPERATIONS PERFORMED:-
Sampling:-We take particular of material, we inspect it and AQL (Acceptance Quality level) is
made by R& D department.AQL means which parameters are to be used i.e.
Mechanical, chemical Parameters etc and these are defined in SAP as Inspection
characteristics.
Supply Chain:-
CustomerPlantVender
SCM (Supply Chain Mgt.) Components:
SAP R/3
mySAP SCM.
APO ( Advance Planning Optimizer
ICH ( International Collaborated Hub)
EM (Event Mgmt.)
SAP BW (Business Info Warehouse)
Routing:-
-
7/27/2019 Billing Project Report
139/178
Work centers are used in Routing.
ADVANTAGES:-
1. We know process of Production.
2. Scheduling
3. Capacity Planning
4. Costing
5. To book the Production
Task List:-
Different Types of Task list (we call Routing as Task list)
1. Routing (N)
2. Reference Operation set (s):-These are used in Discrete Mfg.
3. Rate Routing (R)
4. Reference Rate Routing Operation Set (m):- Used in Repetitive mfg.
5. Standard N/W (0):-Used in Project System
6. Inspection Plant (Q):- Used in quality mfg
7. Master Recipe:-Used in Process Industries
Reference Operation set:-It is a kind of task list which is created without
maintaining a material.
Structureof Routing:-
Header Materials with Group No &Group Counter
Sequence
Operation
-
7/27/2019 Billing Project Report
140/178
Work Center PRT Component allocation Inspection characteristics Control
key
Screen For Creating RoutingTransaction Code:- CA01
Menu Path :- LogisticsProduction Master Data Routing Routings
Standard RoutingCA01(Create)
-
7/27/2019 Billing Project Report
141/178
-
7/27/2019 Billing Project Report
142/178
CREATE ROUTING INITIAL SCREEN
Fields Entered Are:-Usage :- 1 (Production)
Status:- 4 (Released)
Hit enter and then click on Operation so that we assign Work Centers to different
Operations.
-
7/27/2019 Billing Project Report
143/178
Assigning of Work Centers
Fields Entered Are:-
Work Centers:- 1555, 1556
Standard Key :- 46, 47
Hit Enter then save your Routing will be saved.
-
7/27/2019 Billing Project Report
144/178
4.5 FLOW OF PP For
Discrete Manufacturing
PIR/SO
MRP Planned
Orders Production
Orders
Confirmation
GR
-
7/27/2019 Billing Project Report
145/178
Planned Independent Requirement
Planned Independent Requirement (PIR):-
PIR is used for maintaining the requirement which could be week wise, monthly
wise or yearly wise. For estimating the requirement forecasting is done.
T code for PIR is: MD61
T code for changing PIR is: MD62
Planned order:-
A request created in the planning run for a plant to trigger the procurement of a plant
material for a certain quantity for a specific date.
Initial Screen for Creating PIR
Hit Enter
-
7/27/2019 Billing Project Report
146/178
Creating Requirement
After this we have to Enter and to see the requirement we have to run MRP
MRP:-Material requirement Planning:
-MRP is the planning coverage of shortage with the suitable receipt element.
T Code for MRP: MD02
MRP contain the following steps: NRC(Net
Requirement Calculation)
PQC(Procurement Quantity Calculation)
-
7/27/2019 Billing Project Report
147/178
Procurement Type
Scheduling
BOM explosion
MRP Procedures:-
Whether and how material is planned.
-MRPPD--- planning will take place.
Consumption Base Planning.
Reorder point lavel planning.
Forcast based planning.
Time based planning.
-Master production scheduling
-MRP in external procurement
-GR Processing time.
Execution in MRP:-
(1) Total Planning:-
All Material are planned, it can be run online or background.
T Code is: MD01
(2) Single item Planning:-
Only selected material are planned.
Single item single level planning
T Code is: MD02
Single item multi level planning
T Code is: MD03
-
7/27/2019 Billing Project Report
148/178
Single item iterative planning
T Code is: MD43
Customizing of MRP
-
7/27/2019 Billing Project Report
149/178
Stock Requirement List
To change this requirement to Planned Order we have to run Single Item Multiple
Level MRP.
-
7/27/2019 Billing Project Report
150/178
MRP Screen
-
7/27/2019 Billing Project Report
151/178
Planned Order
Now we have to Double click on planned order so that we can change that into
Production Order.
-
7/27/2019 Billing Project Report
152/178
Stock Requirement List
Now we have to Dbl click on Production Order to convert planned order to
production order.
-
7/27/2019 Billing Project Report
153/178
-
7/27/2019 Billing Project Report
154/178
-
7/27/2019 Billing Project Report
155/178
-
7/27/2019 Billing Project Report
156/178
Production Order:- These are used in Discrete Manufacturing scenano where
product Stability is less it is basically the order given by l'viRP Controller to the
Shop floor people to start production.
20 PC Scrap portion
ExpectYieldVar
0.00
BasicDates Scheduled Confirmd
Finish 23.04.2009 24 00 23.04.2009 24:00
Start
Release
23.04.2009 00 00 23.04.2009 00:20
23.04.2009
00 00
Scheduling
Type
Reduction
Note
Priority
2 Backwards
No reduction carried out
No schedulingnote
Scheduling margin 000
Float bef.prod
Float after pro
Release period
Workdays
Workdays
Workdays
-
7/27/2019 Billing Project Report
157/178
Customizing of Release Production Order
Menu Path:- Production-+ Shop Floor Control-+ Operation-+ Avail Check-+
Define Checking Control
Display iMG
g I Existing BC Sets BC Sets forActivity Activated BC Sets forActivity lUI Release Notes I Change Log Where Else L
Structure
I> Pru u"liuuPluuiuy GI> Capacity Requirements Planning BI> MaterialRequirements Planning
"" Shop Floor ControlI> Master Data
"" Operations
l> Task List Selectionl> Bill of Material Selection Capacity Requirements Planningl> Change Management for Production Orders (DCM)
l> Confirmation
Define Print Control Gl> Schedule Background Jobs G
I>ISPROIDES INS fiA
ID - 1$1mr;fSAPLogo... JI!WMicrosolt .. lnactrve.. Joductron...llf Floi.play L l Jlrw.!j u@l
-
7/27/2019 Billing Project Report
158/178
-
7/27/2019 Billing Project Report
159/178
Confirmation
Confirmation:- Declaring completion of an operation consumption of an activity is
called confirmation. It can be at order level or at operation level. Confirmation is
saved against already created confirmation.
-Even if full Qty. Confirmed, then also PCNF status will come, if partial
confirmation is selected during CNF.
-Even if partial is confirmed, then also CNF status will come if final
confirmation is selected during CNF.
-In automatic conformation, system itself selects the status i.e. PCN for CNF.
Types of Confirmation T Code
1. Time Ticket Confirmation CO11n
2. Time Even Confirmation CO19
3. Collective Confirmation CO12
4. Progressive Confirmation CO1f
Effects of confirmation:-
1. Order gets updated
2. Capacity Requirement gets required (In capacity Planning in orders)
3. Actual costs gets debited
4. HR data gets posted.
5. Material document may get (if auto GR is done. Then it will be posted, otherwise
not).
Note:-When confirmation is posted
6. GI of back flush component takes place.
7. GR of header material takes place if auto GR is set
-
7/27/2019 Billing Project Report
160/178
-
7/27/2019 Billing Project Report
161/178
-
7/27/2019 Billing Project Report
162/178
-
7/27/2019 Billing Project Report
163/178
After Confirmation Production Order
Here we can check the status of Production Order.
GMPS:- Goods Moment Posted.
It means final Confirmation has been done.
-
7/27/2019 Billing Project Report
164/178
-
7/27/2019 Billing Project Report
165/178
10. 104- Reversal.
11. 105- GR from Inspection.
12. 106-Reversal.
13. 561- Initial Stock Update.
Transfer Posting to Stock Transfer:- MB1B
1. 311- For stock transfer from storage location to Storage location.
2. 312-Reversal of 311.
3. 301-Transfer from Plant to Plant
4. 302-Reversal of 301.
5. 309-Transfer from Material to Material.
6. 310-Reversal of 309.
7. 313-Removal of stock from one Storage Location.
8. 314- Reversal of 313.
9. 315- Placement of Stock in another Storage Location.
10. 316- Reversal of 315.
-
7/27/2019 Billing Project Report
166/178
-
7/27/2019 Billing Project Report
167/178
-
7/27/2019 Billing Project Report
168/178
5. FUTURE SCOPE
In SAP PP Planning is done through MRP or MPS, but there is a limitation in PP
that the planning is not done across supply chain i.e. vendor ,plants and customersso its advanced version is APO(Advanced Planning and Optimizing), in this
planning is done across the supply chain. In APO there are many planning tools
i.e.:-
DEMAND PLANNING:-It is based on historical data which is taken
from BW (Information warehouse).
GATP (Global Available to Promise):- IT is checking the
availability/feasibility to meet sales order quantity while creating sales order.
SNP (Supply Network Planning):- It is mid to long term planning across
the supply chain. It is finite planning.
PPDS (Production Planning and Detailed Scheduling):- This is the
detailed Production Planning with the location in shorter horizon.
TVPS (Transport Planning Vehicle Schedule):-IT means to select the
shortest path for transportation so that the transportation cost is reduced.
The limitations of the PP module are overcome by the advanced version APO.
-
7/27/2019 Billing Project Report
169/178
-
7/27/2019 Billing Project Report
170/178
-
7/27/2019 Billing Project Report
171/178
screens to develop and use are provided. The user can simply point
the cursor and click the mouse to operate
ID S International Demonstration and Education System. A sample
application provided for faster learning and implementation
IMG Implementation Guide Hierarchical structure reflecting the R/3
component hierarchy and contains all configuration activities
Industry
Sectors
When you create a material master record, you are required to classify
the material according to industry sector and material type. Industry
sectors have control functions in the R/3 System. For example, it is
factor determining the screen sequence and field selection in
material master record. Once you have assigned an industry sector o
material, you cannot change the industry sector again afterwards.
The standard R/3 System contains the following industry sectors. The
ID used to identify the industry sector internally appears in
parentheses.
Plant engineering and construction (A)
Chemical industry (C)
Mechanical engineering (M)
Pharmaceuticals (P)
Invoice: Invoice is a document, which is issued to a buyer (Company) from
the supplier (vendor) for the payment. The following information ismaintained in invoice
Invoice date, Posting date, Invoice ref number, tax amount, amount,
tax code, terms of payments, vendor address, banking accounting
-
7/27/2019 Billing Project Report
172/178
information etc
Lot size Quantity to be produced or to be procured.
DescriptionText of up to 40 characters that briefly describes a material. You mayhave only one description for each material, but it may exist in as
many different languages as you like.
Material group Grouping of materials and services according to their characteristics.
Material type Groups together materials with the same basic attributes, for
example, raw materials, semi finished products, or finished products.
When creating a material master record, you must assign the material
to a material type
ng
price
Price that changes in consequence of goods movements and the entry
of invoices, and which is used to valuate a material. The moving
average price is calculated by dividing the value of the material by
the quantity of material in stock. It is recalculated automatically by
the system after each goods movement or invoice entry.
nt
yp : -
- It is a three-digit code, which plays a role of important control
function in inventory management. It acts as a central role in
automatic account determination. It determines which stock account
or consumption account is updated in financial accounting.
R on . The person responsible for a group of materials within MRP in a
plant or company. Any material that takes part in material
requirements planning must be assigned to an MRP controller
MRP type Key that controls the MRP procedure (MRP or reorder point) to be
used for planning a material. It contains additional control
-
7/27/2019 Billing Project Report
173/178
parameters, for example, for using the forecast for the materials
planning, for firming procurement proposals and so on.
NumbRanges:
Number ranges are maintained for each & every document, Posted inthe SAP System. The maximum numbers of digit allowed are
18digits (99, 9999, 9999, 9999, and 9999).
Two types of number ranges: -
Internal number ranges - System will automatically define numbers
to all documents
External number ranges - User has to give doc number externally
while creating document
Opening period Number of workdays subtracted from the order start date ,to
determine the creation date
Price control Indicator determining the procedure used for material valuation.
Two procedures are available in the standard system:
Valuation at standard price
Valuation at moving average price or (if the material ledger
has been activated) periodic unit price
u nt
type
Classification determining whether a material is produced in-house,
procured externally, or both.
u has
requisition
Request or instruction to Purchasing to procure a certain quantity of a
material or a service so that it is available at a certain point in time.
u has ng
group
(MM) A Purchasing Group is a grouping of departments or areas that
purchase in R/3 used for assigning Purchase Requisition approval
rules. The Purchasing Group field is a required field on a Purchase
-
7/27/2019 Billing Project Report
174/178
Requisition and is assigned to each authorized R/3 user that is part of
that Purchasing Group. For example, several users from the same
department or area may use the same Purchasing Group.
u has ng
p u nt
time
Time that purchasing department requires to convert a purchase
requisition into a purchase order
u has ng
u k y
Key defining the valid reminder days and tolerance limits applicable
to this material for the purchasing department.
The purchasing value key serves as an entry aid.
R on on
account
G/L account, to which transactions in the subsidiary ledgers, (such as
in the customer, vendor or assets areas), are automatically updated. It
is generally the case that several sub ledger accounts post to a
common reconciliation account. This ensures that the s
n the sub ledger accounts are accurately reflected in the general
ledger (i.e. in line with balance sheet conventions).
Release period Number of workdays between the planned start date of the
production order and the date for releasing the order. If the order
release indicator is set, the production order is released by a
background program that takes all dates into account.
Reservation: - It stores requisition created from particular cost center to particular
department for issuing the material reservation posted in the system.
It leads to decrease in stock.
R/3 R/3 is an ERP system offered by the SAP company. The R/3 stands
-
7/27/2019 Billing Project Report
175/178
for real-time / three-tiered architecture, defined as follows:
The "R" in R/3 = real time. During real-time processing, data is
processed immediately, the moment the data is entered into the
system. This is different than a "batch mode", in which data is stored
and all transactions are processed together, at a later time.
The "3" in R/3 = A three-tier computer architecture comprised of
three operational layers as outlined below. The SAP R/3 system uses
a special type of client/server architecture consisting of three well-
defined and separate processes, each running on a different platform
S h du ng
Agreement
Outline agreement on the basis of which materials are procured at a
series of predefined points in time over a certain period.
Schema Group It allows to group together the purchasing organizations, which uses
the same calculation schema.
Schema Group
Vendor
The main function of it is to identify or to pick the right process and
conditions for a particular vendor
Sp
p u nt
type
An indicator in the material master record that defines external
procurement or in-house production of the material more precisely.
S k ans
(S ):
It is method of removal of material from one location and
transferring it to another location. This process is performed betweentwo plants and two storage locations.
Stock types The different stock types are
1. Unrestricted use stock
2. Quality inspection stock
-
7/27/2019 Billing Project Report
176/178
3. Blocked stock
4. Warehouse stock
ans os ng
(TP): -
- It is a general term of stock transfer that changes the stock type or
stock categories. The difference between transfer posting and stock
transfer is: -
TP is logical stock transfer and ST is a physical stock transfer.
VALUATION A THE VALUATION AREA SETTING IS USED TO CALCULATE TOTAL STOCK .
Valuation Class It is used to determine which stock account is updated during the
goods movement of a material. It is maintained in Accounting 1 view
in material master record
SAP TRANSACTIONS
For performing any kind of task in the SAP R/3 ERP system, a transaction is used.
SAP provides a standard set of transactions to manipulate i.e. insert, update, delete
and display data in the system. A transaction code is a four-character command that
tells the system location of a task. Each SAP screen has a unique transaction code. A
transaction code may contain only letters such as zstm or a combination of letters
and numbers such as me51. In SAP, you can use transaction codes as a shortcut or
alternative to using the navigation path to get to a system task.
Listed below are the commands used in combination with the transaction codes.
Command + Trans
Description
Code
/n + Transaction code End current system task and go to new system task
Create a new session and go to new system task without closing
/o + Transaction codeprior session
/o List open sessions
/i or /nend Log off
-
7/27/2019 Billing Project Report
177/178
BIBLIOGRAPHY
BOOKS:-
SAP PP ( FUNCTIONALITY AND TECHNICAL CONFIGURATION)
BY MARTIN
SAP ONLINE LIBRARY HELP
WEBLINKS:-
www.sap.com
www.sapinfo.com
www.sapzone.com
www.sap-img.com
www.sapgenei.com
www.help.sap.com
http://www.sap.com/http://www.sapinfo.com/http://www.sapzone.com/http://www.sap-img.com/http://www.sapgenei.com/http://www.help.sap.com/http://www.help.sap.com/http://www.help.sap.com/http://www.sapgenei.com/http://www.sap-img.com/http://www.sapzone.com/http://www.sapinfo.com/http://www.sap.com/ -
7/27/2019 Billing Project Report
178/178