    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 1 of 29

    SECTIONVIII-BILL OF QUANTITIES

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    I. Site Worksa) Site Enclosure 780.00 m Pesos

    and ctvs.

    (P ) /m P

    b) Staking and Lay-out 1.00 lot Pesos

    and ctvs.

    (P ) P

    Sub Total I P

    II. Earthworksa) Excavation 351.00 m Pesos

    and ctvs.

    (P ) /m P

    b) Gravel Bedding 83.00 m Pesos

    and ctvs.

    (P ) /m P

    c) Selected Filling 477.00 m Pesos

    Materials

    and ctvs.(P ) /m P

    d) Soil Poisoning 780.00 m Pesos

    and ctvs.

    (P ) /m P

  • 8/11/2019 Bill of Quanties

    2/31

  • 8/11/2019 Bill of Quanties

    3/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 3 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    VI. Roof and Roof Framinga) Roof Framing 275.00 m Pesos

    and ctvs.

    (P ) /m P

    b) Ga. # 26 Pre-painted 275.00 m Pesos

    Long Span Roofing

    And accessories

    and ctvs.

    (P ) /m P

    Sub Total VI P

    VII. Ceilinga) 3/16 thk. Fiber 1,340.00 m Pesos

    Cement Board on

    Metal Furring

    and ctvs.

    (P ) /m P

    Sub Total VII P

    VIII. Tiling & Stone Worksa) 600mm x 600mm 804.72 m Pesos

    Polished Tiles

    and ctvs.

    (P ) /m P

    b) 300mm x 300mm 229.14 m Pesos

    Polished Tiles

    and ctvs.

    (P ) /m P

    c) 300mm x 300mm 55.31 m PesosCeramic Tiles

    and ctvs.

    (P ) /m P

  • 8/11/2019 Bill of Quanties

    4/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page4 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    d) 600mm x 600mm 125.21 m Pesos

    Granite Tiles

    and ctvs.

    (P ) /m P

    e) 300mm x 300mm 8.81 m Pesos

    Mosaic Tiles

    and ctvs.

    (P ) /m P

    f) 300mm x 600mm 55.92 m Pesos

    Decorative Tiles

    and ctvs.

    (P ) /m P

    g) Granite Slab 16.88 m Pesos

    and ctvs.

    (P ) /m P

    h) Stone Finish 39.39 m Pesos

    and ctvs.

    (P ) /m P

    i) Decorative Stone 3.38 m Pesos

    and ctvs.

    (P ) /m P

    Sub Total VIII P

    IX. Doors & Windows1) Doors

    a) D-1 (3.0m x 4.0m.) 1.00 set Pesos

    Two Leaves double

    Acting Glass Door

    w/ Sidelite & Transom and ctvs.

    (P ) /set P

  • 8/11/2019 Bill of Quanties

    5/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 5 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    b) D-1a (3.0m x 4.50m.) 2.00 sets Pesos

    Two Leaves double

    Acting Glass Door

    w/ Sidelite and ctvs.

    (P ) /set P

    c) D-2 (2.80m x 4.50m.) 3.00 sets Pesos

    Two Leaves double

    Acting Door

    and ctvs.

    (P ) /set P

    d) D-3 (2.40m x 4.50m.) 3.00 sets Pesos

    Two Leaves doubleActing Door with

    Sidelite and ctvs.

    (P ) /set P

    e) D-4 (0.90m x 2.10m.) 5.00 sets Pesos

    KD Panel Door on 2

    X 6 KD Jambs with

    HD Knob & Hinges and ctvs.

    (P ) /set P

    f) D-5 (0.80m x 2.10m.) 16.00 sets Pesos

    KD Panel Door on 2X 6 KD Jambs with

    HD Knob & Hinges and ctvs.

    (P ) /set P

    g) D-6 (0.70m x 2.10m.) 6.00 sets Pesos

    KD Panel Door on 2

    X 6 KD Jambs with

    HD Knob & Hinges and ctvs.

    (P ) /set P

    h) D-7 (0.70m x 1.80m.) 2.00 sets Pesos

    Panel Door, Swing, thk. Melamine

    Board w/ edging & and ctvs.

    accessories (P ) /set P

  • 8/11/2019 Bill of Quanties

    6/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 6 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    i) D-8 (0.80m x 1.80m.) 9.00 sets Pesos

    Panel Door, Swing,

    thk. MelamineBoard w/ edging & and ctvs.

    accessories (P ) /set P

    j) 2x 6 Jambs, Hard 3.00 sets Pesos

    Wood, Kiln Dried

    and ctvs.

    (P ) /set P

    2) Windowsa) W-1 (1.00 x 3.35m.) 8.00 sets Pesos

    Awning with FixedGlass

    and ctvs.

    (P ) /set P

    b) W-2 (2.10 x 3.65m.) 2.00 sets Pesos

    Awning with Fixed

    Glass

    and ctvs.

    (P ) /set P

    c) W-3 (6.00 x 1.10m.) 3.00 sets PesosAwning with Fixed

    Glass

    and ctvs.

    (P ) /set P

    d) W-4 (5.50 x 4.00m.) 1.00 set Pesos

    Awning with Fixed

    Glass

    and ctvs.

    (P ) /set P

    e) W-5 (2.00 x 2.00m.) 1.00 set PesosAwning with Fixed

    Glass

    and ctvs.

    (P ) /set P

  • 8/11/2019 Bill of Quanties

    7/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 7 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    f) W-6 (2.00 x 2.00m.) 1.00 set Pesos

    Fixed Window

    and ctvs.

    (P ) /set P

    g) W-7 (2.65 x 2.50m.) 1.00 set Pesos

    Fixed Window

    and ctvs.

    (P ) /set P

    h) W-8 (5.86 x 5.80m.) 1.00 set Pesos

    Fixed Window

    and ctvs.

    (P ) /set P

    i) W-9 (5.50 x 2.50m.) 1.00 set Pesos

    Awning with Fixed

    Glass

    and ctvs.

    (P ) /set P

    j) W-10 (0.90 x 4.00m.) 1.00 set Pesos

    Fixed

    and ctvs.

    (P ) /set P

    k) W-11 (1.85 x 2.50m.) 1.00 set Pesos

    Fixed

    and ctvs.

    (P ) /set P

    l) W-12 (0.50 x 2.40m.) 1.00 set PesosAwning

    and ctvs.

    (P ) /set P

  • 8/11/2019 Bill of Quanties

    8/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 8 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    m) W-13 (1.20 x 1.10m.) 1.00 set Pesos

    Awning with Fixed

    and ctvs.

    (P ) /set P

    n) W-13a (0.40 x 0.80m.) 1.00 set Pesos

    Awning with Fixed

    and ctvs.

    (P ) /set P

    o) W-14 (0.40 x 0.80m.) 7.00 sets Pesos

    Awning

    and ctvs.

    (P ) /set P

    p) W-14a (0.40 x 0.60m.) 14.00 sets Pesos

    Awning

    and ctvs.

    (P ) /set P

    Sub Total IX P

    X. Paintinga) Walls 3,678.00 m Pesos

    and ctvs.

    (P ) /m P

    b) Ceiling 1,073.00 m Pesos

    and ctvs.

    (P ) /m P

    c) Doors 66.96 m Pesos

    and ctvs.

    (P ) /m P

  • 8/11/2019 Bill of Quanties

    9/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 9 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    Sub Total X P

    XI. Electrical Works1) Panel Boards @ GFa) BMDP (300AT, 3P, 600 1.00 unit Pesos

    Vac w/ 1-60AT; 1-110AT;

    1-125AT; 1-175AT, 3P

    and ctvs.

    (P ) /unit P

    b) MDP-1 (150AT, 3P, 600 1.00 unit PesosVac Main Breaker with

    1-15AT, 2P; 1-60AT, 2P;

    1-40AT, 3P; 1-50AT, 3P; and ctvs.

    2-70AT, 3P 600Vac (P ) /unit PBranches

    c) UPS Panel (60AT, 2P, 1.00 unit Pesos250Vac Main with

    4-15AT, 2-20AT 2P

    Branches) and ctvs.

    (P ) /unit P

    d) L.O. & D.C.O. Panel 1.00 unit Pesos(40AT, 3P, 250Vac Main

    w/ 6-15AT; 2-20AT, 2P

    Branches and ctvs.

    (P ) /unit P

    e) ACU Panel (70AT, 3P, 1.00 unit Pesos250Vac Main with

    1-15AT, 7-20AT, 3P

    Branches) and ctvs.

    (P ) /unit P

    f) Elevator Panel (70AT, 1.00 unit Pesos3P, 600Vac Main with

    3-15AT, 1-60AT, 3PBranches) and ctvs.

    (P ) /unit P

  • 8/11/2019 Bill of Quanties

    10/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 10 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    g) Elevator Water Tank 1.00 unit PesosPanel (70AT, 3P, 250Vac

    Main with 1-15AT,7-20AT, 3P Branches) and ctvs.

    (P ) /unit P

    2) Panel Boards @ 2F

    a) MDP-2 (100AT, 3P, 600 1.00 unit PesosVac Main Breaker with

    1-100AT, 2P; 1-30AT, 3P;

    1-50AT, 3P; 600Vac and ctvs.Branches (P ) /unit P

    b) UPS Panel (125AT, 2P, 1.00 unit Pesos250Vac Main with

    3-15AT, 7-20AT 2P

    Branches) and ctvs.

    (P ) /unit P

    c) L.O. & D.C.O. Panel 1.00 unit Pesos(30AT, 3P, 250Vac Main

    w/ 5-15AT; 3-20AT, 2P

    Branches and ctvs.

    (P ) /unit P

    d) ACU Panel (100AT, 3P, 1.00 unit Pesos250Vac Main with

    2-30AT, 4-40AT, 2-50AT,

    3P Branches) and ctvs.

    (P ) /unit P

    3) Panel Boards @ 3F

    a) MDP-3 (110AT, 3P, 600 1.00 unit PesosVac Main Breaker with

    1-100AT, 2P; 1-30AT, 3P;

    1-50AT, 3P; 600Vac and ctvs.

    Branches (P ) /unit P

    b) UPS Panel (100AT, 2P, 1.00 unit Pesos250Vac Main with

    5-15AT, 3-20AT 2P

    Branches) and ctvs.

    (P ) /unit P

  • 8/11/2019 Bill of Quanties

    11/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 11 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    c) L.O. & D.C.O. Panel 1.00 unit Pesos(30AT, 3P, 250Vac Main

    w/ 5-15AT; 3-20AT, 2PBranches and ctvs.

    (P ) /unit P

    d) ACU Panel (60AT, 3P, 1.00 unit Pesos250Vac Main with

    10-20AT, 3P Branches)

    and ctvs.

    (P ) /unit P

    4) Panel Boards @ 4F

    a) MDP-4 (150AT, 3P, 600 1.00 unit PesosVac Main Breaker with

    3-15AT, 3P; 1-50AT, 3P;

    1-60AT, 3P, 1-100AT, 2P and ctvs.600Vac Branches) (P ) /unit P

    b) UPS Panel (100AT, 2P, 1.00 unit Pesos250Vac Main with

    2-15AT, 2-20AT 2P

    Branches) and ctvs.

    (P ) /unit P

    c) L.O. & D.C.O. Panel 1.00 unit Pesos(30AT, 3P, 250Vac Main

    w/ 5-15AT; 3-20AT, 2P

    Branches and ctvs.

    (P ) /unit P

    d) ACU Panel (60AT, 3P, 1.00 unit Pesos250Vac Main with

    10-20AT, 3P Branches)

    and ctvs.

    (P ) /unit P

    5) Lighting Fixtures

    a) 21W T5 Flourescent 30.00 sets PesosLamp

    and ctvs.

    (P ) /set P

  • 8/11/2019 Bill of Quanties

    12/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 12 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    b) 11W CFL Vertical 28.00 pcs. PesosDownlight

    and ctvs.

    (P ) /pc. P

    c) 6W LED Vertical 52.00 pcs. PesosDownlight (6 casing)

    and ctvs.

    (P ) /pc. P

    d) 5W CFL Vertical 15.00 pcs. Pesos

    Downlight

    and ctvs.

    (P ) /pc. P

    e) 18W CFL Vertical 45.00 pcs. PesosDownlight

    and ctvs.

    (P ) /pc. P

    f) 24W LED Floodlight 3.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    g) 600VA Chandelier 4.00 units PesosLighting

    and ctvs.

    (P ) /unit P

    h) 22W LED Flou. Lighting 120.00 pcs. Pesosw/ Louver & reflector

    and ctvs.

    (P ) /pc. P

  • 8/11/2019 Bill of Quanties

    13/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 13 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    i) 3W Signage Lighting 46.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    j) 3W LED Emergency 47.00 units PesosLight

    and ctvs.

    (P ) /unit P

    k) Exhaust fan 4.00 units Pesos

    and ctvs.

    (P ) /unit P

    l) Accent Lighting 3.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    m) LED Downlight 1.00 pc. Pesos

    and ctvs.

    (P ) /pc. P

    6) Wiring Devices

    a) One-Gang Switch, 11.00 sets PesosWide Series

    and ctvs.

    (P ) /set P

    b) Two-Gang Switch, 27.00 sets PesosWide Series

    and ctvs.

    (P ) /set P

  • 8/11/2019 Bill of Quanties

    14/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 14 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    c) Three-Gang Switch, 34.00 sets PesosWide Series

    and ctvs.

    (P ) /set P

    d) Three-way Switch, 10.00 sets PesosWide Series

    and ctvs.

    (P ) /set P

    7) Power Devices

    a) Single Receptacle 47.00 sets PesosOutlet, Wide Series

    and ctvs.

    (P ) /set P

    b) Duplex Receptacle 89.00 sets PesosOutlet, Grounding

    Type

    and ctvs.

    (P ) /set P

    c) Special Purpose Outlet 86.00 sets Pesos

    and ctvs.

    (P ) /set P

    8) Wires & Cables

    a) 2.0mmTHHN/THWN 16.00 rolls PesosCopper Wire

    and ctvs.

    (P ) / roll P

    b) 3.5mmTHHN/THWN 40.00 rolls PesosCopper Wire

    and ctvs.

    (P ) / roll P

  • 8/11/2019 Bill of Quanties

    15/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 15 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    c) 5.5mmTHHN/THWN 8.00 rolls PesosCopper Wire

    and ctvs.

    (P ) / roll P

    d) 8.0mmTHHN/THWN 5.00 rolls PesosCopper Wire

    and ctvs.

    (P ) / roll P

    e) 14mmTHHN/THWN 300.00 mts. Pesos

    Copper Wire

    and ctvs.

    (P ) / m. P

    f) 22mmTHHN/THWN 300.00 mts. PesosCopper Wire

    and ctvs.

    (P ) / m. P

    g) 30mmTHHN/THWN 300.00 mts. Pesos

    Copper Wire

    and ctvs.

    (P ) / m. P

    h) 38mmTHHN/THWN 300.00 mts. PesosCopper Wire

    and ctvs.

    (P ) / m. P

    i) 50mmTHW Copper 150.00 mts. PesosWire

    and ctvs.

    (P ) / m. P

  • 8/11/2019 Bill of Quanties

    16/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 16 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    9) Conduits & Fittings

    a) 15mm Flexible 6.00 rolls Pesos

    Metallic Conduit

    and ctvs.

    (P ) / roll P

    b) 15mm EMT Conduit 1,000.00 lngths Pesos

    and ctvs.

    (P ) / length P

    c) 20mm EMT Conduit 200.00 lngths Pesos

    and ctvs.

    (P ) / length P

    d) 25mm EMT Conduit 80.00 lngths Pesos

    and ctvs.

    (P ) / length P

    e) 32mm EMT Conduit 30.00 lngths Pesos

    and ctvs.

    (P ) / length P

    f) 40mm EMT Conduit 30.00 lngths Pesos

    and ctvs.

    (P ) / length P

    g) 50mm EMT Conduit 30.00 lngths Pesos

    and ctvs.

    (P ) / length P

  • 8/11/2019 Bill of Quanties

    17/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 17 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    h) 65mm EMT Conduit 30.00 lngths Pesos

    and ctvs.

    (P ) / length P

    i) 80mm EMT Conduit 200.00 lngths Pesos

    and ctvs.

    (P ) / length P

    10) Boxes & Pull Boxes with Cover

    a) Metallic Utility Box, 320.00 pcs. Pesos2 x 4

    and ctvs.

    (P ) / pc. P

    b) Metallic Octagonal Box, 770.00 pcs. Pesos4 x 4

    and ctvs.

    (P ) / pc. P

    c) Metallic Pull Box, 50.00 pcs. Pesos4 x 4

    and ctvs.

    (P ) / pc. P

    d) Metallic Pull Box, 30.00 pcs. Pesos6 x 8 x 8

    and ctvs.

    (P ) / pc. P

    e) Metallic Pull Box, 20.00 pcs. Pesos6 x 12 x 12

    and ctvs.

    (P ) / pc. P

  • 8/11/2019 Bill of Quanties

    18/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 18 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    11) Miscellanneous/Consumables

    a) Miscellaneous/Consu- 1.00 lot Pesos

    Mables (Electl./RubberTapes, Solderless Con-

    Nectors, Exp. Bolts, and ctvs.etc) (P ) / lot P

    Sub Total XI P

    XII. Auxilliray Works1) Fire Alarm System

    a) Addressable Fire Alarm 1.00 unit PesosControl Panel, up to

    99 Loops (UL Listed)

    and ctvs.(P ) /unit P

    b) Addressable Type 42.00 pcs. PesosSmoke Detector

    and ctvs.

    (P ) /pc. P

    c) Heat Detector 22.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    d) Addressable Pull 4.00 pcs. PesosStation

    and ctvs.

    (P ) /pc. P

    e) Fire Alarm Bell 4.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

  • 8/11/2019 Bill of Quanties

    19/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 19 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    f) # 18/2 TF Wire 4.00 boxes Pesos

    and ctvs.

    (P ) /box P

    g) Octagonal Box, PVC, 70.00 pcs. Pesos4 x 4

    and ctvs.

    (P ) /pc. P

    h) Utility Box 10.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    i) 20mm uPVC Flexible 8.00 rolls PesosConduit

    and ctvs.

    (P ) /roll P

    j) Mini-monitor Module 2.00 sets Pesos

    and ctvs.

    (P ) /set P

    k) Back up Battery, 12V 1.00 set Pesos

    and ctvs.

    (P ) /set P

    l) Miscellaneous (PVC 1.00 lot Pesosfittings, G.I. Wire,

    elbows, etc.)

    and ctvs.

    (P ) /lot P

  • 8/11/2019 Bill of Quanties

    20/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page20 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    2) Telephone Systema) PABX Unit, 8 x 32 1.00 unit Pesos

    Configuration; andExpandable

    and ctvs.

    (P ) /unit P

    b) Port Analogue Trunk 1.00 unit PesosCard

    and ctvs.

    (P ) /unit P

    c) 8 Port Digital Hybrid 1.00 unit PesosExtension Card

    and ctvs.

    (P ) /unit P

    d) 16-Port Digital 2.00 units PesosExtension Card

    and ctvs.

    (P ) /unit P

    e) Power Supply, M-Type 1.00 unit Pesos

    and ctvs.

    (P ) /unit P

    f) Back-up Battery 1.00 unit PesosAdapter

    and ctvs.

    (P ) /unit P

    g) Sealed Lead Acid 2.00 units PesosBattery, 12V

    and ctvs.

    (P ) /unit P

  • 8/11/2019 Bill of Quanties

    21/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page21 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    h) Amphenol Cable 3.00 units PesosAssembly, 2m.

    and ctvs.

    (P ) /unit P

    i) Telephone Surge Pro- 3.00 units Pesostector, (3 incoming

    Lines)

    and ctvs.

    (P ) /unit P

    j) Hi tech AVR, 500 Watts, 1.00 unit Pesos

    With Power On Delay

    and ctvs.

    (P ) /unit P

    k) Panasonic KX-T7633 1.00 unit Pesos

    and ctvs.

    (P ) /unit P

    l) Single Telephone Line 16.00 units Pesos

    and ctvs.

    (P ) /unit P

    m) Telephone Outlet 16.00 sets Pesos

    and ctvs.

    (P ) /set P

    n) Telephone Drop Wire 100.00 mts. Pesos

    and ctvs.

    (P ) /m. P

  • 8/11/2019 Bill of Quanties

    22/31

  • 8/11/2019 Bill of Quanties

    23/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page23 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    e) Power Supply 16.00 units Pesos

    and ctvs.

    (P ) /unit P

    f) BNC Connector 28.00 units Pesos

    and ctvs.

    (P ) /unit P

    g) RG6 Cable 180.00 mts. Pesos

    and ctvs.

    (P ) /m. P

    h) # 16 Flatcord 180.00 mts. Pesos

    and ctvs.

    (P ) /m. P

    i) 20mm PVC Pipe 120.00 lngths Pesos

    and ctvs.

    (P ) /lngth. P

    j) 25mm PVC Pipe 60.00 lngths Pesos

    and ctvs.

    (P ) /lngth. P

    k) 32mm PVC Pipe 4.00 lngths Pesos

    and ctvs.

    (P ) /lngth. P

  • 8/11/2019 Bill of Quanties

    24/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page24 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    l) Telephone Plate 16.00 sets Pesos

    and ctvs.

    (P ) /set P

    m) Utility Box, PVC 16.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    n) Junction Box, PVC 15.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    o) Pull Box, 4 x 10 x 10 5.00 pcs. Pesos

    and ctvs.

    (P ) /pc. P

    p) Miscellaneous and 1.00 lot Pesos

    Consumables (PVCSolvent Cement, PVC

    Fittings, etc.) and ctvs.

    (P ) /lot P

    Sub Total XII P

    XIII. Plumbing Worksa) PVC Pipe and Fittings 1.00 lot Pesos

    and ctvs.

    (P ) /lot P

    b) PPR Pipe and Fittings 1.00 lot Pesos

    and ctvs.

    (P ) /lot P

  • 8/11/2019 Bill of Quanties

    25/31

  • 8/11/2019 Bill of Quanties

    26/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page26 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    b) 6mm thk. mar. Ply on 1.00 lot Pesos2 x 3 Hor. & Vert.

    Studdings

    and ctvs.

    (P ) /lot P

    c) Handrails/Railings/Grab 1.00 lot PesosBar (Stainless)

    and ctvs.

    (P ) /lot P

    Sub Total XIV P

    XV. Mechanical WorksA. Fire Sprinkler SystemA.1 Ground Floor

    a) Sprinkler Head, NTP, 34.00 pcs. PesosPendent, Wet Type,

    Quick Response, 165F,

    Bulb Type w/ Escutcheon and ctvs.Plate (P ) /pc. P

    b) Fire Hose Cabinet with 1.00 set Pesos100 ft. 38mm Hose

    and ctvs.

    (P ) /set P

    c) B.I. Pipes, Schedule 40 1.00 lot Pesosincluding fittings and

    accessories

    and ctvs.

    (P ) /lot P

    d) Gate / Angle Valves 1.00 lot Pesos

    and ctvs.

    (P ) /lot P

  • 8/11/2019 Bill of Quanties

    27/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page27 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    e) Miscellaneous and 1.00 lot PesosConsumables (Union Pa-

    tente, Sight Glass, Blind

    Flange, Angle Bar, Gasket, and ctvs.Bolts, Nuts & Washer,etc) (P ) /lot P

    A.2 Second Floora) Sprinkler Head, NTP, 31.00 pcs. Pesos

    Pendent, Wet Type,

    Quick Response, 165F,

    Bulb Type w/ Escutcheon and ctvs.Plate (P ) /pc. P

    b) Fire Hose Cabinet with 1.00 set Pesos100 ft. 38mm Hose

    and ctvs.

    (P ) /set P

    c) B.I. Pipes, Schedule 40 1.00 lot Pesosincluding fittings and

    accessories

    and ctvs.

    (P ) /lot P

    d) Gate / Angle Valves 1.00 lot Pesos

    and ctvs.

    (P ) /lot P

    e) Miscellaneous and 1.00 lot PesosConsumables (Union Pa-

    tente, Sight Glass, Blind

    Flange, Angle Bar, Gasket, and ctvs.Bolts, Nuts & Washer, etc.) (P ) /lot P

    A.3 Third Floora) Sprinkler Head, NTP, 36.00 pcs. Pesos

    Pendent, Wet Type,

    Quick Response, 165F,

    Bulb Type w/ Escutcheon and ctvs.Plate (P ) /pc. P

  • 8/11/2019 Bill of Quanties

    28/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page28 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    b) Fire Hose Cabinet with 1.00 set Pesos100 ft. 38mm Hose

    and ctvs.

    (P ) /set P

    c) B.I. Pipes, Schedule 40 1.00 lot Pesosincluding fittings and

    accessories

    and ctvs.

    (P ) /lot P

    d) Gate / Angle Valves 1.00 lot Pesos

    and ctvs.

    (P ) /lot P

    e) Miscellaneous and 1.00 lot PesosConsumables (Union Pa-

    tente, Sight Glass, Blind

    Flange, Angle Bar, Gasket, and ctvs.Bolts, Nuts & Washer, etc.) (P ) /lot P

    A.4 Fourth Floor

    a) Sprinkler Head, NTP, 31.00 pcs. PesosPendent, Wet Type,

    Quick Response, 165F,

    Bulb Type w/ Escutcheon and ctvs.Plate (P ) /pc. P

    b) Fire Hose Cabinet with 1.00 set Pesos100 ft. 38mm Hose

    and ctvs.

    (P ) /set P

    c) B.I. Pipes, Schedule 40 1.00 lot Pesosincluding fittings and

    accessories

    and ctvs.

    (P ) /lot P

  • 8/11/2019 Bill of Quanties

    29/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page29 of 29

    ItemDescription Quantity Unit Unit Cost Total Cost

    No.

    d) Gate / Angle Valves 1.00 lot Pesos

    and ctvs.

    (P ) /lot P

    e) Miscellaneous and 1.00 lot PesosConsumables (Union Pa-

    tente, Sight Glass, Blind

    Flange, Angle Bar, Gasket, and ctvs.Bolts, Nuts & Washer, etc.) (P ) /lot P

    f) Elevator; including Tes- 1.00 unit Pesos

    ting & Commissioning

    and ctvs.

    (P ) /unit P

    Sub Total XV P

    TOTAL BID COST P

  • 8/11/2019 Bill of Quanties

    30/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City

    Page 30 of 29

  • 8/11/2019 Bill of Quanties

    31/31

    Subject : BILL OF QUANTITIESName of Project : Construction of Proposed Document Processing Division BuildingLocation : M.H. Del Pilar Street, Molo, Iloilo City