Intelligent management of distribution grids „Smart Grid“AHK Symposium „ Smart Grid“ Dublin / Ireland 06.05.2014
Torsten Linnemann – General Sales Manager / Power Distribution Systems
Bilfinger Mauell GmbH
Bilfinger
At work around the world for our clients
Bilfinger Power Systems Group
Page 2
Output volume by region | 2012
39% Germany
44% Europe outside Germany
8% America
5% Africa
4% Asia
Business Segments Bilfinger SE
Bilfinger Power Systems Group
Page 3
Bilfinger SE
Construction Infrastructure
Industrial
Services
Industrial
Technologies
Power Systems
Hochbau Facility ServicesGovernment
Services
INDUSTRIAL
POWER
BUILDING AND
FACILITY
CONSTRUCTION
Bilfinger Power Systems Group Page 4
Management structure
Bilfinger Power Systems
Bilfinger SE
Bilfinger Power Systems GmbH central departments
Machinery &
Apparatus
Engineering
Nucelar &
Environmental
Technologies
Piping
TechnologyEnergy Technology
Bilfinger
Power Africa
Bilfinger Deutsche
Babcock Middle East
Babcock Borsig
Steinmüller
Bilfinger
MaschinenbauBabcock Noell
Bilfinger Piping
Technologies
Bilfinger MCE
Aschersleben
Bilfinger Rotring
Engineering
Bilfinger RosinkBilfinger Duro
Dakovic Montaza
Bilfinger
Babcock
CZ
Bilfinger
Babcock
Tyazhmash
Power Plants
Envi Con &
Plant Engineering
Bilfinger MCE
Berlin
Electrical and I&C
Technology
Bilfinger Mauell
Bilfinger
ELWO S.A.
Bilfinger
Mauell ESG
In-House Development , Manufacturing and Project Realization
Page 5
Innovation, quality and solidity Since 1957 460 members of staff worldwide 340 in Germany Worldwide activities
In-house Develpoment of hard- and software for Process Control Systems Manufacturing of automation hardware modules and components,
control panels and automation devices Planning and manufacturing of control room equipment Project realization and management over the whole project
lifecycle Deep process know-how for power generation and distribution
Bilfinger Power Systems Group
Taylored solutions for the requirements of our customers !
Business Fields
Page 6
POWER DISTRIBUTION
CONTROL SYSTEMS
POWER STATION
CONTROL SYSTEMS
CONTROL ROOM
TECHNOLOGY
AUTOMATION EQUIPMENT
Bilfinger Power Systems Group
Our Services
Development
Planning
Engineering
Manufacturing
Commissioning
Maintenance
World wide - Service
Project Management
Consulting
Supervision
Hard Coal fired Power Plant: World Class efficiency and
controlability with lowest CO2 emissions
page 7
Need original picture (this is copy
from pdf of presentation)
Client Vattenfall AB
Location Moorburg, Germany
Execution 2009 – 2014 (in execution)
Services Main DCS Supplier
Project Description
Process Automation with ME 4012SN
Simulator
Plant Description
Hard coal fired power plant (2x820MWe)
Controllability 35 % - 100 %, max 103 %
Net efficiency > 46.5 % (61% fuel
utilization with district heat)
Specific CO2 emission: 750 g/kWhel
Model based automation design ensures wide range controllability
Bilfinger Power Systems Group
References Power Distribution Control
Substation control transformer stations 220/380 kV
Page 8
Client e.on, RWE, TENNET, Amprion
Location Germany, Netherlands, …
Execution since 1980
Services Substation automation 400/220
110/20kV
Project Description
More than 300 substations 400/220 kV
More than 1000 substations 110/20 kV
Plant Description
Remote Terminal Units
Connection to Network Control Center
Local SCADA
Protection integrated
Bilfinger Power Systems Group
Control Room Planning and Control Room Technology
Control Rooms
Page 9Bilfinger Power Systems Group
Intelligent management of distribution grids „Smart Grid“
Agenda
Why does a distribution grid needs intelligent management?
What is the solution?
Is this solution already available?
Summary
Bilfinger Mauell GmbH page 10
Why does a distribution grid needs intelligent management?
Yesterday and today
Page 11
New supply structure
due to:
Changed feed-in conditions
Wind power
Photovoltaic energy
Nuclear phase-out
Combined heat and power
plants
Biomass energy
New electrical consumers
Electric vehicles
Heat pumps
Electrical energy storage
Bilfinger Mauell GmbH
Problem 1: Voltage band violation
Page 12Bilfinger Mauell GmbH
1
Distribution substation
Service connection
MV grid
Maximum load
U/V
Length
Impermissible voltage increase
due to PV feed-in
253
230
207
V> DIN EN50160
Effects of voltage band violation acc. to DIN EN 50160 ±10
Overvoltage: Damage to end customer equipment
Undervoltage: Malfunction
Problem 2: Equipment overload
Page 13Bilfinger Mauell GmbH
2
Distribution substations
129.8 A
Branch 2
Branch 1
72.1 A 187.6 ANAYY 4x50 SE, Ir = 142 A
10 kV/ 0.4 kV
Current,nom = 100 kVA
Branch 3
Local overload due to high in-feed and at the same time high consumption
Occurrence of cross currents
Page 14Bilfinger Mauell GmbH
Grid strengthening
total
Current grid
admission
capacity
P
Existing grid
Conventional
grid extension
Automation
by implementing new
technology Depending on company-
specific requirements!
t
Grid extension – how much is needed?
What is the solution?
Conventional versus intelligent grid
Page 15Bilfinger Mauell GmbH
DER integration requires a combination of grid
extension measures and implementation of
measuring and control technology
What is the solution?
Grid monitoring
Page 16Bilfinger Mauell GmbH
What is the solution?
Grid automation
Bilfinger Mauell GmbH page 17
Intelligent
Smart Grid automation iNES
KVS
Broadband
Powerline
Power-consuming loads
(heat pumps, electric vehicles and
feeders (PV))
aBOX
mBOX
Transformer
station
sBOX
GSI Grid State Identification
IGC Intelligent Grid Control
Communication
e.g. GPRS
Grid parameters
Integration in existing IT infrastructur
Page 18Bilfinger Mauell GmbH
Smart grid application for Mainova, Frankfurt
Project Description
Realization of two smart grids in the 400V distribution
grid
Intelligent grid protection instead of large investments
in new power lines
Automatic power control of decentralized generation
Automatic voltage regulation
Integrated grid state estimation
Is the solution already available?
Bilfinger Mauell GmbH page 19
Smart grid application for “DSO”, Ireland
Bilfinger Mauell GmbH is interested in:
Local partnerships for the development and
realisation of similar projects, focused on
the exceptions of the irish grid operators
and local regulations.
Potential in Ireland with local Partners?
Bilfinger Mauell GmbH page 20
Realization step by step
Page 21Bilfinger Mauell GmbH
Gradually implementing "intelligence"
in the urban grid!
sbox
sboxGPRS
mbox
aboxmbox
PLC
PLC
Logic
IGC
Logic
GSI
sbox
Logic
GSI
GPRS
GPRS
Individual components
Page 22Bilfinger Mauell GmbH
iNES sBOX
- technical specifications -
Page 23Bilfinger Mauell GmbH
iNES mBOX
- technical specifications-
Page 24Bilfinger Mauell GmbH
iNES aBOX
- technical specifications-
Page 25Bilfinger Mauell GmbH
Summary
Page 26Bilfinger Mauell GmbH
Increasing amount of DERs requires intelligent grid management
The solution and it’s components are available
Cost-intensive conventional grid extension can be reduced
The solution is working independently
The solution can be integrated in different IT infrastructures
(Grid operation and service centers)
Bilfinger Mauell |
Solutions for energy generation and distribution
Bilfinger Mauell GmbHAm Rosenhügel 1-742553 Velbert
Mr. Torsten LinnemannGeneral Sales Manager / Power Distribution Systems
Phone + 49 2053 13-458Fax + 49 2053 13-562Mail [email protected]
www.mauell.bilfinger.com