Page 1: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIDDING DOCUMENT

PROCUREMENT OF CIVIL WORKS

BIDDING DOCUMENT

FOR COMPLETION OF REMAINING WORKS AT

DEOGHAR CAMPUS

INSTITUTE BUILDING

BIRLA INSTITUTE OF TECHNOLOGY

MESRA, RANCHI -835215

Page 2: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 1 of 62 Signature of contractor with seal

BIDDING DOCUMENT

PROCUREMENT OF CIVIL WORKS

CONSTRUCTION OF

A. For completion of Remaining works of Institute building at B.I.T., Deoghar

Campus

FOR THE YEAR 2015-2016

COMPLETE BIDDING DOCUMENT

Page 3: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 2 of 62 Signature of contractor with seal

INDEX

Description Clause No.

Invitation For Bid (IFB)

Procurement notice

Competitive bidding

Section 1 Instruction to bidders (ITB)

A. General

Scope of bid 1

Eligible bidders 2

Qualification of the bidder 3

One bid per bidder 4

Cost of bidding 5

Site Visit 6

B. Bidding Documents

Contents of bidding documents 7

Amendments of bidding documents 8

C. Preparation of bids

Language of the bid 9

Documents comprising the bid 10

Bid prices 11

Currencies of bid and payments 12

Bid validity 13

Bid security 14

Format and signing of bids 15

D. Submission of bids

Sealing and marking of bids 16

Deadline of the submission of bids 17

Late bids 18

Modification and withdrawal of bids 19

E. Opening and Evaluation

Bid opening 20

Process to be confidential 21

Clarification of financial bids 22

Examination of bids and determination of responsiveness 23

Correction of Errors 24

Evaluation and comparison of financial bids 25

F. Awards of contract

Awards of criteria 26

Employers right to accept any bid and to reject any or all bids 27

Notification of award and signing of agreement 28

Performance security 29

Advance payment and security 30

Corrupt and fraudulent practices 31

List of key plant & equipment to be deployed on contract work Annexure I

List of key personal to be deployed on contract work Annexure II

Section 2 Qualification Information

For individual bidder 1

Additional requirements 2

Sample format for evidence of access to or availability of credit facilities

Page 4: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 3 of 62 Signature of contractor with seal

Bank certificate

Undertaking

Section 3 Conditions of contract

Definitions 1

Interpretation 2

Language and Law 3

Engineer In-charge’s decision 4

Delegation 5

Communications 6

Sub-contracting 7

Personnel 8

Employer’s and contractor’s risk 9

Employer’s risk 10

Contractor’s risk 11

Insurance 12

Site investigation reports 13

Queries about the contract data 14

Contractor to construct the work 15

The works to be completed by intended completion date 16

Approval by the Engineer’s In-charge 17

Safety 18

Possession of the site 19

Access to the site 20

Instructions 21

B. Time Control

Programme 22

Extension of the intended completion date 23

Delayed ordered by the Engineer In-charge 24

Management meetings 25

C. Quality Control

Identifying defects 26

Tests 27

Correction of defects 28

Uncorrected defects 29

B. Cost Control

Bill of Quantities 30

Rate of new items in the quantities and escalation in rate 31

Variations 32

Cash flow forecasts 33

Payment certificates 34

Payments 35

Tax 36

Currencies 37

Retention 38

Liquidated damages 39

Advance payment 40

Securities 41

Cost of repairs 42

C. Finishing the contract

Completion 43

Taking over 44

Page 5: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 4 of 62 Signature of contractor with seal

Final account 45

Termination 46

Payment upon termination 47

Property 48

Release from performance 49

D. Special conditions of contract

Labour 50

Settlement of disputes 51

Section 4 Contract Data

Contract Data

Section 5 Form of bid

Form of bid

Section 6 Securities and other form

Bid security (Bank Guarantee)

Performance of Bank Guarantee

Bank guarantee for advance payment

Latter of acceptance

Issue of notice to proceed with the work

Agreement form

Undertaking

Section 7 Technical specifications and Bill of Quantities Technical specifications

Bill of quantities

BOQ of Institute building Annexure A

Section 8 Drawings

Drawings of Institute building Annexure B

Page 6: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

ANNEXURE A

Figure Words

1 Providing coarse clean sand in filling in foundation trenches or in plinth

including ramming and watering in layers not exceeding 150 mm thick with

all leads and lifts including cost of all materials, labours, royalty and taxes

153.35 Cum

2 Providing designation 75A Brickwork in CM (1:6) in Superstructure with

approved quality of clean coarse sand of FM 2 to 2.5 including providing

10 mm thick mortar joints, cost of screening materials, raking out joints to

224.48 Cum

3 Providing 125 mm thick reinforced designation 75A Brickwork in CM

(1:4) in Superstructure with approved quality of clean coarse sand of FM 2

to 2.5 including providing 10 mm thick mortar joints, cost of screening

797.65 Sqm

4 Extra for brickwork for each consecutive floor above first floor including

watering and scaffolding all complete as per direction of E/I in Second

floor

158.94 Cum

5 Extra for brickwork for each consecutive floor above first floor including

watering and scaffolding all complete as per direction of E/I in third floor 40.21 Cum

6 Providing PCC M100 with nominal mix (1:3:6) in foundation with

approved quality of stone metal grade III (50 mm to 25 mm size) clean

coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement

83.45 Cum

7 Providing RCC M200 with nominal mix (1:1.5:3) in lintel with approved

quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of

F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in

7.52 Cum

8 Providing RCC M200 with nominal mix (1:1.5:3) in roof slab with

approved quality of stone chips 20 mm to 6 mm size graded and clean

coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement

83.43 Cum

9 Providing RCC M200 with nominal mix (1:1.5:3) in beam of all types with

approved quality of stone chips 20 mm to 6 mm size graded and clean

coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement

26.11 Cum

10 Providing RCC M200 with nominal mix (1:1.5:3) in columns with

approved quality of stone chips 20 mm to 6 mm size graded and clean

coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement

12.92 Cum

11 Providing av. 63 mm thick RCC M200 with nominal mix (1:1.5:3) chajja

with approved quality of stone chips 20 mm to 6 mm size graded and clean

coarse sand of F.M. 2.5 to 3 including making drip coarse in concrete,

98.99 Sqm

12 Extra for RCC or PCC work for each consecutive floor above first floor

complete as per direction of E/I in Second floor 136.76 Cum

13 Extra for RCC or PCC work for each consecutive floor above first floor

complete as per direction of E/I in Third floor 8.46 Cum

BILL OF QUANTITIES

Amount (Rs.)

NAME OF WORK- REMAINING WORKS OF INSTITUTE BUILDING

BIT DEOGHAR CAMPUS

Sl. No. Description of work Quantity Unit Rate to be entered by the

bidder (Rs.)

Page 7: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

14 Supplying, fitting and fixing good quality, well dressed and well seasoned

local teak wood work in choukhats in doors, widows skylights, fanlights

and C/W celetial windows openings, including wedge over all clamps

1.17 Cum

15 Providing and fixing M.S. tubular frames for doors, windows, ventilators

and cupboard with rectangular/ L type sections, made of 1.60 mm thick

M.S. sheet, joints mitered, welded and grinded finish, with profiles of

1140.00 Kg

16 Supplying, fitting and fixing 38 mm thick good quality well dressed and

well seasoned sal wood battened shutters, ledged and braced in doors and

windows, with oxidised iron fittings such as hinges, sliding door, bolts,

28.35 Sqm

17 Supplying, fitting and fixing 38 mm thick good quality, well dressed, well

seasoned teak wood fully panneled shutters in doors and windows with 25

mm thick panels with one side plain and one side chamferred with oxidised

54.00 Sqm

18 Supplying, fitting and fixing 35 mm thick solid core type non-decorative

single leaf flush door shutters in doors and windows with black board core

blended with high quality phenol formaldehyde synthetic resin both side

123.75 Sqm

19 Supplying,fitting and fixing 30 mm thick solid core type non decorative,

single leaf flush door shutters in doors and windows with black board core

blended with high quality phenol formaldehyde synthetic resin both side

506.00 M

20 Providing tor steel reinforcement of 8 mm dia rods as per approved design

and drawing excluding carraige of bars to work site, cutting, bending and

binding with cost of wire, removal of rust, placing the rods in position all

23.00 MT

21 Supplying,fitting and fixing fully glazed steel door , windows or

ventilations of standard rolled 'Z' and mullion steel sections and size as per

IS-1038 joints met and welded with with100x16x3 mm M.S. lugs fixed in

203.65 Sqm

22 Supplying, fitting and fixing M.S. Grill gate with M.S. grills made of 20x6

mm M.S. flats or 16 mm M.S. square bars fitted on 25x25x6 mm M.S.

angle frame applying a coat of red lead paint, carraige to work site, hoisting

5434.24 Kg

23 Providing designation 75A one brick flat soling joints filled with local sand

including cost of watering taxes royalty all complete as per building

specification and direction of E/I

834.74 Sqm

24 Providing and laying hydraulically machine pressed terrazo tiles 20 mm

thick of approved texture with dowm marble chips of approved shade,size

and quality, laid on 19mm, thick bed of lime mortar (1:1:1) with neat

782.64 Sqm

25 Providing and laying 25 mm thick kota stone tiles in risers of steps, skirting

and pillars of approved size, texure and colour laid over 12 mm thick

cement mortar (1:3) and joined with grey cement slurry mixed with

206.97 Sqm

26 Providing and laying 25 mm thick makrana marble tiles in risers of steps

skirtig and pillars of approved size, texture and colour laid over 12 mm

thick c.m (1:3) and joined with white cement slurry mixed, including cost

15.00 Sqm

27 Providing and laying precast ceramic glazed tiles in walls and floors over

12 mm cement mortar (1:3) and jointed with grey cement slurry, flush

pointed with white cement and matching pigments including rubbing,

461.07 Sqm

28 Providing 12 mm thick cement plaster (1:6) with clean coarse sand of F.M.

1.5 including screening, curing with all leads and lifts ofwater, scaffolding,

taxes and royalty all complete as per building specification and direction of

2882.25 Sqm

29 Providing 6 mm thick cement plaster (1:4) in ceiling with clean coarse

sand of F.M. 1.5 including screening, curing with all leads and lifts

ofwater, scaffolding, taxes and royalty all complete as per building

736.95 Sqm

Page 8: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

30 Providing 1.5 mm cement punning including curing, carraige of water with

all leads and lifts as per building specification and direction of E/I 930.86 Sqm

31 Providing 25 mm thick cement plaster (1:6) with clean coarse sand of F.M.

1.5 including screening, curing with all leads and lifts ofwater, scaffolding,

taxes and royalty all complete as per building specification and direction of

629.36 Sqm

32 Providing and applying plaster of paris putty of 2 mm thickness over

plastered surface to prepare the surface even and smooth complete 4910.76 Sqm

33 Extra for plaster work over exterior surface for each consecutive floor

above first floor including cost of scaffolding etc. all complete as per

direction of E/I

629.36 Sqm

34 Providing two coats of oil bound washable distemper of approved shade

and make over a coat of cement primer over new surface including

preparing the plastered surface by rubbing smooth with pumice stone or

19871.98 Sqm

35 Providing two coats of plastic emulsion paint of approved shade and make

over a coat of cement primer over new Exterior surface including preparing

the plastered surface by rubbing smooth with pumice stone or fine sand

9419.67 Sqm

36 Extra for each coat of cement wash, distemper, paint or sowcem over

exterior surface for each consecutive floor above first floor including

scaffolding etc. all complete as per specification and direction of E/I

9419.67 Sqm

37 Providing primer one coat of approved shade and make over new wooden

surface including preparing the surface after cleaning removing dirt, scales,

smokes, grease and sand papering including cost of scaffolding and taxes

619.87 Sqm

38 Providing two coats of synthetic enamel paint of approved shade and make

over new wooden surface including preparing the surface after cleaning

removing dirt, scales, smokes, grease and sand papering including cost of

619.87 Sqm

39 Providing one coat of red lead paint of approved shade and make over new

steel surface including preparing the surface after cleaning removing dirt,

scales, smokes, grease and sand papering including cost of scaffolding and

633.93 Sqm

40 Providing two coats of synthetic enamel paint of approved shade and make

over new steel surface including preparing the surface after cleaning

removing dirt, scales, smokes, grease and sand papering including cost of

633.93 Sqm

41 Cutting and polishing of mosaic/ kota stone flooring over old surface

including cost of machine, carborandum stone, cement compund, oxalic

acid etc. complete

8000.00 Sqm

42 Providing and fixing 6 mm thick reflected glass with necessary aluminium

powder coated frame and accessories etc. complete 203.58 Sqm

43 Fabricating and fixing Mullium Z section in window

975.73 Kg

44 Providing and fixing Rain water pipe of 150 mm dia with necessary clamp,

screws etc. including cost of one shoe at bottom and one bend at roof 867.00 M

45 Providing and fixing sheet covering over expansion joints with iron screws

as per design with Non asbestos fibre cement board 6 mm thick as per

IS:14862 200 mm wide

120.00 M

Page 9: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

46 Providing and fixing sheet covering over expansion joints with iron screws

as per design with Non aluminium fluted strips 3.15 mm thick as per

IS:14862 200 mm wide

540.00 M

B SANITARY, WATER SUPPLY AND SEWARAGE

47 Providing and fixing water closet squatting pan (Indian type W.C pan)

with 100mm sand cast iron P or S trap , 10 ltr. Low level with PVC flusing

cistern with manully controlled device conforming to IS 7231 with all

fittings and fixtures copmleted including cutting and marking good the

walls and floors wherever required

17.1.1 white vitreous china orissa pattern W.C pan of size 580x440mm

with integral type foot restes 14.00 Each

48 Providing and fixing white vitreous china flat back or wall corner type

lipped front urinal basin of 430x260x350mm and 340x410x265mm sizes

respctively with automatic flushing cistern with standard flush pipe and

C.P. brass spreaders with brass unions and G.I clamps complete including

painting of fittings and brackets cutting and marking good the walls and

floors wherever required

17.4.3 Range of three urinal basin with 10 ltr. White PVC automatic

flushing cistern 3.00 Each

49 Providing and fixing wash basin with C.I brackets 15mm C.P. brass pillar

taps 32mm C.P.brass waste of standard pattern including painting of fitting

and bracktes, cuttings and marking good the walls wherever required

17.7.2 White vitreous china wash basin size 630 x 450mm with a single 15

mm C.P.brass pillar tops 16.00 Each

50 Providing and fixing a pair of white vitreous china foot rests of standard

pattern for squatting pan water closet:

17.17.2 250x125x25 mm 14.00 Pair

51 Providing and fixing G.I. inlet connection for flush pipe connecting with

W.C. pan. 14.00 Each

TOTAL (A) Rs.

Page 10: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

52 Providing and fixing P.V.C. waste pipe for sink or wash basin including

P.V.C. waste pipe fitting complete

17.28.2.2 Flexible pipe 40 mm dia 16.00 Each

53 Providing and fixing 100 mm sand cast iron grating for gully trap 16.00 Each

54 Providing and fixing 600x450mm beveled edge mirror of superior glass

complete with 6mm thick hard borad ground fixed to wooden cleats with

C.P brass screws and washers complete 16.00 Each

55 provding and fixing soil waste and vent pipes

17.35.1.1 100 mm Sand cast iron S&S pipe as per IS 1729 80.00 Mtr.

56 Providing and fixing M.S holder - bat clamps of approved design to sand

cast iron / cast iron pipe embedded in and including cement concrete blocks

10x10x10cm of 1:2:4 mix including cost of cutting holes and making good

the walls etc.

17.37.1 For 100mm dia pipe 60.00 Each

57 providing and fixing bend of required degree with access door, insertion

rubber washer 3mm thick bolts and nuts complete

17.38.1.1 100 mm Sand cast iron S&S as per IS 1729 6.00 Each

58 Providing and fixing plain bend of required degree.

17.39.1.1 100 mm dia Sand cast iron S & S as per IS-1729 12.00 Each

59 Providing and fixing single equal junction of required degree with access

door insertion rubber washer 3mm thick bolts and nuts complete

17.43.1.1 100 mm Sand cast iron S&S as per IS 1729 8.00 Each

60 Providing and fixing terminal guard

17.56.1.1 100 mm Sand cast iron S&S as per IS 1729 4.00 Each

61 Providing lead caulked joints to sand cast iron/ centrifugally cast (spun)

iron pipes and fittings of diameter:

17.58.1 100 mm 40.00 Each

62 Providing and fixing M.S. stays and clamps for sand cast iron/ centrifugally

cast (spun) iron pipes of diameter:

17.59.1 100 mm 15.00 Each

Page 11: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

63 Painting sand cast iron/centrifugally cast (spun) iron soil, waste vent pipes

and fittings with two coats of synthetic enamel paint of any colour such as

chocolate grey or buff etc. over a coat of primer (of approved quality) for

new work :

17.65.1 100 mm diameter pipe 80.00 Meter

64 Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c

making good the wall etc. : Internal work exposed on wall

18.10.3 25 mm dia nominal bore 20.00 Meter

65 Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c

making good the wall etc. concealed pipe, including painting with anti

corrosive bitumastic paint, cutting chases and making good the wall:

Internal work exposed on wall

18.11.1 15 mm dia nominal bore 30.00 Meter

18.11.2 20 mm dia nominal bore 55.00 Meter

66 Providing and fixing brass bib cock of approved quality

18.15.1 15mm nominal bore 14.00 Each

67 Providing and fixing brass stop cock of approved quality

18.16.2 20 mm nominal bore 16.00 Each

68 Providing and fixing gun metal gate valve with C.I wheel of approved

quality ( screwed end)

18.17.1 25mm nominal bore 6.00 Each

C INTENAL ELECTRIFICATION WORKS

69 Wiring for light point/ fan point/ exhust fan point / call bell point with 1.5

Sq.mm. FRLS PVC insulated Copperconductor single core cable in surface/

recessed steel conduit, with piano type switch, phenolic laminated sheet,

suitable size MS box and earthing the point with 1.5 sq.mm. FRLS PVC

insulated copper conductor single core cable etc. as required 1.1.2 Group B

214.00 Point

TOTAL ( B) (Rs.)

Page 12: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

70 S/F PVC conduit Supplying and fixing of following sizes of PVC conduit

along with accessories in surface / recess including cutting recessed conduit

as required

1.21.2 25 mm 200.00 Metre

71 S/F metal boxes Supplying and fixing metal box of following sizes

(nominal size) on surface or in recess with suitable size of phenolic

laminated sheet cover in front including painting etc as required

1.22.1 75 mm x 75 mm x 60 mm deep 25.00 Metre

1.22.5 180 mm x 100 mm x 60 mm deep 22.00 Metre

1.22.7 200 mm x 150 mm x 60 mm deep 42.00 Metre

72 Supplying and fixing metal box of 150 mmx 75 mmx 60 mm deep(nominal

size) on surface or in recess with suitable size of phenolic laminated sheet

cover in front including providing and fixing 3 pin 5/6 amps socket outlet

and 5/6 amps piano type switch, connection, painting etc. as required. (For

light plugs to be used in non resindential buildings)

19.00 Each

73 Supplying and fixing metal box of 180 mmx 100 mmx 60 mm

deep(nominal size) on surface or in recess with suitable size of phenolic

laminated sheet cover in front including providing and fixing 6 pin 5/6

amps socket outlet and 15/16 amps piano type switch, connection, painting

etc. as required. 18.00 Each

74 Supplying and fixing 3 pin, 5 amp ceiling rose on the existing junction box/

wooden block including connection etc. as required 20.00 Each

75 Supplying and fixing brass baten/ angle holder including connection etc. as

required 54.00 Each

76 Supplying and fixing stiff pendent with 600 mm long, 20 mm dia x 1.6 mm

thick steel conduit, aluminium cast back plate and brass holder complete,

including wiring the down rod with 1.5 Sq. mm. FRLS PVC insulated,

copper conductor, single core cable and painting etc. as required

24.00 Each

Page 13: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

77 Installation, testing and commissioning of pre-wired, flourescent fitting/

compact flourescent fitting of all types, complete with all accessories and

tube etc., including supplying and fixing ball and steel conduit upto 30 cm

length, painting and wiring the down rods and connection with 1.5 Sq. mm.

FRLS PVC insulated, copper conductor, single core cable and earthing etc.

as required 60.00 Each

78 Providing and fixing extra conduit down rod of 20 mm dia, 2x10 cm length

wiring with 2x1.5 sq.mm. FRLS PVC insulated, copper conductor, single

core cable including painting etc. as required. 336.00 Each

79 Installation, testing and commissioning of ceiling fan, including wiring the

down rods of standard length (upto 30 cm) with 1.5 Sq.mm. FRLS PVC

insulated, copper conducter, single core cable, including providing and

fixing phenolic laminated sheet cover on the fan box as required

24.00 Each

80 Providing and fixing following capacity TP & N disconnector fuse switch

unit inside the existing panel board with ISI marked HRC fuses including

drilling holes in cubicle panel, making connections, etc. as required

2.1.3 100 Amp TP & N 1.00 Each

81 Supplying and fixing following way, single pole and neutral, sheet steel,

MCB distribution board, 240 volts, on surface/ recess, complete with tinned

copper bus bar, neutral bus bar, earh bar, din bar, interconnections, powder

painted including earthing etc. as required (But

withoutMCB/RCCB/isolator)

2.3.7 2 + 8 way/10 way, Double door 6.00 Each

2.3.8 2 + 12 way/14 way, Double door 4.00 Each

82 Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve,

miniature circuit breaker suitable for inductive load of following poles in

the existing MCB DB complete with connections, testing and

commissioning etc. as required.

2.10.1 Single pole 20.00 Each

2.10.2 Single pole and neutral 16.00 Each

2.10.5 Triple pole and neutral 10.00 Each

Page 14: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

83 Fixing fan of 1400 mm sweep including cost of necessary screws, cover

plates, wire etc. complete but excluding the cost of fan (fan will be supplied

by the department) 24.00 Each

84 Fixing tube fittings including the cost of necessary screws, ceiling rose,

cover plate etc. complete but excluding the cost of fitting ( fitting will be

supplied by the department) 32.00 Each

TOTAL (C) ( Rs.)

TOTAL (A+B+C) (Rs.)

Page 15: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 5 of 62 Signature of contractor with seal

INVITATION FOR BID

(IFB)

Page 16: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 6 of 62 Signature of contractor with seal

BIRLA INSTITUTE OF TECHNOLOGY

MESRA, RANCHI-835215, JHARKHAND(India)

Procurement Notice

Tender Reference No.- BIT/Deoghar/T/01 Date:- 01/09/2015

1. Name of the work : Completion of Balance work of Institute

Building, at Birla Institute of Technology,

Deoghar Campus, Po. – Jasidih -814142,

Deoghar, Jharkhand

2. Estimated cost (Rs.) : Rs. 146.00 Lacs

3. Time of completion : 12 months

4. Last date/ Time for receipt of bids : 26/09/2015, 1.00 P.M.

5. Date of publication of tender on website : 01/09/2015

6. Email of procurement officer : [email protected]

Further details can be seen on website http://www.bitmesra.ac.in

Registrar

B.I.T., Mesra, Ranchi

Page 17: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 7 of 62 Signature of contractor with seal

BIRLA INSTITUTE OF TECHNOLOGY

MESRA, RANCHI- 835215

INVITATION FOR BIDS (IFB)

COMPETITIVE BIDDING

Tender Reference no. BIT/Deoghar/T/01 Dated :- 01/09/2015

On behalf of the Birla Institute of technology, Sealed item rate tenders are hereby invited for the following

work from contractors registered in the approved list of appropriate class of CPWD, State PWD, Railways,

MES, Post & Telegraph Department, Semi‐Govt. organizations or those who have worked for BIT Mesra

and its off-campuses in appropriate class and have successfully completed minimum one/two/three similar

works during last Five years ending last day of July 2015 for carrying out the following work at BIT

Mesra, Deoghar campus. The bid shall be submitted in the office of Registrar, B.I.T., Mesra, Ranchi :

Sl.

No.

Name of the work Approximate

value of work

(Rs.)

Bid

security

(Rs.)

Cost of

Document

(Rs.)

Period of

completion

1 2 3 4 5 6

1. Completion of Remaining works

of Institute building at BIT

Deoghar campus.

146.00 Lacs

1.50 Lacs

5000.00

08 Months

Period of availability of tenders at the website /date & time of bidding / last date of clarification/date of

opening of tender papers are as given below:

1. Cost of bidding document to be downloaded from website bitmesra.ac.in, and the same to be

deposited along with a non-refundable fee as indicated in the form of demand draft of any

Bank payable at Ranchi in favour of Birla institute of technology, Mesra.

2. Bids must be accompanied by Security amount specified for the work in the table above, payable at

Ranchi and drawn in favour of Birla Institute of Technology, Mesra. Bid security will have to be

in anyone of the forms as specified in the bidding document and shall have to be valid for 45 days

beyond the validity of the bid.

3. Cost of bidding document and Bid Security shall be deposited in the office of the Registrar on all

working days between 10.00 AM to 4.00 PM up to 1.00 P.M. of 26/09/2015 either by registered

post /Speed post or by hand. Only those applications will be entertained whose cost of bidding

document and bid security is received before 1.00 P.M. on 26/09/2015. The Birla institute of

technology will not be held responsible for the postal delay, if any, in the delivery of the document

or non-receipt of the same.

4. Tenderer(s) shall enclose self-attested Xerox copy of his/her valid registration, Sales tax, Income

Tax Clearance, TIN, PAN, Audited turnover, Character Certificate, Labour License,service Tax

registration , Work experience, partnership deed etc.

5. Other details can be seen in the bidding documents.

Page 18: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 8 of 62 Signature of contractor with seal

SECTION 1 INSTRUCTIONS TO BIDDERS (ITB)

A. GENERAL

Page 19: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 9 of 62 Signature of contractor with seal

1. Scope of Bid

1.1 The BIRLA INSTITUTE OF TECHNOLOGY, MESRA RANCHI invites bids for the

construction of works (as defined in these documents and referred to as “ the works”) detailed

in the table given in IFB. The bidders may submit bids for all of the works detailed in the table

given in IFB.

1.2 The successful bidder will be expected to complete the works by the intended completion date

specified in the Contract data.

1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives

(bidder/tenderer, bid/tender, bidding/tendering, etc.) are synonymous.

2 Eligible Bidders

2.1 This invitation for Bids is open to all bidders.

3 Qualification of the Bidder

3.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a

preliminary description of the proposed work method and schedule, including drawings and

charts, as necessary. The proposed methodology should include programme of construction

backed with equipment planning and deployment duly supported with broad calculations and

quality assurance procedures proposed to be adopted justifying their capability of execution and

completion of work as per technical specifications, within stipulated period of completion.

3.2 All bidders shall also furnish the following information in Section 2.

(i) Evidence of access to or availability of credit facilities (minimum 10% or estimated

cost)certified by the bankers.

(ii) Undertaking that bidder would be able to invest a minimum of cost upto 25% of the

contract value of work, during implementation of contract.

(iii) Power of attorney.

3.3 All bidders shall include the following information and documents with their bids in Section

2:

(i) copies of original documents defining the constitution or legal status, place of

registration, and principal place of business; written power of attorney of the signatory

of the Bid to commit the Bidder;

(ii) Total monetary value of construction work performed for each of the last five years.

(iii) Experience in works of a similar nature and size for each of the last five years, and

details of works underway or contractually committed; and clients who may be

contacted for further information on these contracts;

(iv) Major items of construction equipment proposed to carry out the Contract;

(v) Qualifications and experience of key site management and technical personal

proposed for Contract;

(vi) Reports on the financial standing of the Bidder, such as profit and loss statements and

auditor’s reports for the past five years;

(vii) Evidence of access to line (s) of credit and availability of other financial resources

facilities (10% of contract value), certified by the Bankers(not more than 3 months

old)

(viii) Undertaking that the bidder will be able to invest a minimum cash upto 25% of

contract value of work, during implementation of work.

(ix) Authority to seek references from the Bidder’s bankers;

(x) Information regarding any litigation, current or during the last five years, in which the

Bidder is involved, the parties concerned, and disputed amount; and

(xi) The proposed methodology and programme of construction, backed with equipment

planning and deployment, duly supported with broad calculations and quality

control procedures proposed to be adopted, justifying their capability of execution and

completion of the work as per technical specifications within the stipulated period of

Page 20: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 10 of 62 Signature of contractor with seal

completion as per milestones.

3.4 Bids from Joint ventures are not acceptable.

3.5 (I) To qualify for award of the contract, each bidder in its name should have in the

last five years as referred to in Appendix.

3.5.1 Achieved a minimum annual financial turnover (in all classes of civil engineering

construction works only) amount indicated in Appendix in any one year (usually not less

than one and a half times the estimated cost of the project);

3.5.2 Satisfactorily completed (not less than 90% of contract value),as a prime contractor (or as a

nominated subcontractor, where the subcontract involved execution of all main items of

work described in the bid document, provided further that all other qualification criteria are

satisfied) at least one similar work of value not less than amount indicated in Appendix

(usually not less than 50%of estimated value of contract of last five years);

3.5.3 The contractor or his identified sub-contractor should possess required valid electrical

license for executing the building electrification works.

3.5.4 The contractor should possess required valid license for executing the water supply/sanitary

engineering works.

(II) Each bidder should further demonstrate

3.5.5 Availability (either owned or leased or by procurement against mobilization advances) of

the following key and critical equipment for this work:

3.5.6 Based on the studies, carried out by the Engineer the minimum suggested Major equipment

to attain the completion of works in accordance with the prescribed construction schedule

are shown in the Annexure-I The bidders should, however, undertake their own studies and

furnish with their bid, a detailed construction planning and methodology supported with

layout and necessary drawings and calculations (detailed) as stated in clause 3.3(iii) above to

allow the employer to review their proposals. The numbers, types and capacities of each

plant/equipment shall be shown in the proposals along with the cycle time for each operation

for the given production capacity to match the requirements.

3.5.7 Availability for this work of personnel with adequate experience as required; as per

Annexure-II, Failing his so doing, the same may be provided by the Engineer In-charge at

the expense of the contractor and the expenses may be deducted from any money due to the

contractor under the contract and I or from his Security Deposit..

3.5.8 Liquid assets and/or availability of credit facilities of no less than amount indicated in

Appendix (credit lines/letter of credit/certificates from Banks for meeting the funds

requirements etc.- usually the equivalent of the estimated cash flow for 3 months in peak

construction period.)

(III) To qualify for a package of contracts made up of this and other contracts for

which bids are invited in the IFB,

3.5.9 The bidder must demonstrate having experience and resources sufficient to meet the

aggregate of the qualifying criteria for the individual contracts.

Bidder’s compliance with the qualifying criteria except to the extent stated in 3.5(I) above.

3.5.10 Bidders who meet the minimum qualification criteria will be qualified

3.5.11 Even though the bidders meet the above qualifying criteria, they are subject to be

disqualified if they have :made misleading or false representations in the forms, statements

and attachments in proof of the qualification requirements; and/or record of poor

performance such as abandoning the works, not properly completing the contract,

Page 21: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 11 of 62 Signature of contractor with seal

inordinate delays in completion, litigation history, or financial failures etc.; and/or

participated in the previous bidding for the same work and had quoted unreasonably high

bid prices and could not furnish rational justification to the employer.

4 One Bid per Bidder

4.1 Each bidder shall submit only one bid. A bidder who submits or participates in more than one

Bid will cause all the proposals with the Bidder’s participation to be disqualified.

5 Cost of Bidding

5.1 The bidder shall bear all costs associated with the preparation and submission of his Bid, and

the BIRLA INSTITUTE OF TECHNOLOGY will in no case be responsible and liable for those

costs.

6 Site Visit

6.1 The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine the

Site of Works and its surroundings and obtain all information that may be necessary for

preparing the Bid and entering into a contract for construction of the Works. The costs of

visiting the Site shall be at the Bidder’s own expense.

B. BIDDING DOCUMENTS

7 Content of Bidding Documents

7.1 The set of bidding documents comprises the documents listed below and addenda issued in

accordance with Clause 8:

Section Particulars Volume No.

1 Invitation for Bid

I

2 Instruction to Bidders 3 Qualification Information, and other

forms

4 Conditions of contract

5 Contract Data

6 Form of bid II

7 Securities and other forms

8 Technical Specifications and Bill of Quantities III

9 Drawings IV

7.2 Each of the Volumes I, II, III, IV will be available in bid document online on website

http://www.bitmesra.ac.in for bidder(s). Documents to be submitted by the bidder(s) in

compliance to section 2 will be prepared by him and submitted in the office of The Registrar,

B.I.T. Mesra, Ranchi, as per instruction given.

7.3 The bidder is expected to examine carefully all instructions, conditions of contract, contract

data, forms, terms, technical specifications, bill of quantities, forms, Annexes and drawings in

the Bid Document. Failure to comply with the requirements of Bid Documents shall be at the

bidder’s own risk. Bids which are not substantially responsive to the requirements of the Bid

Documents shall be rejected.

8 Amendment of Bidding Documents

8.1 Before the deadline for submission of bids, the Employer may modify the bidding documents

by issuing addenda.

8.2 Any addendum thus issued shall be part of the bidding documents and shall be

communicated in writing by post or by e-mail to all the purchasers of the bidding

documents. Prospective bidders shall acknowledged receipt of each addendum in writing or ble

to the Employer. The Employer will assume no responsibility for postal delays.

Page 22: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 12 of 62 Signature of contractor with seal

8.3 To give prospective bidders reasonable time in which to take an addendum into account in

preparing their bids by e-mail, the Employer may, at his discretion, extend as necessary the

deadline for submission of bids.

C. PREPARATION OF BIDS

9 Language of the Bid

9.1 All documents relating to the bid shall be in the English language.

10 Documents Comprising the Bid

The bid to be submitted by:

10.1 The bid shall be submitted by the bidder in the office of the Registrar, BIT, Mesra as per

instruction.

11 Bid Prices

11.1 The contract shall be for the whole works as described in Sub-Clause 1.1. based on the priced

Bill of Quantities submitted by the Bidder.

11.2 The bidder shall fill in rates in figures as well as in the BOQ. Items for which no rate or price is

entered by the bidder will not be paid for by the Employer when executed and shall be deemed

covered by the other rates and prices in the Bill of Quantities.

11.3 All duties, taxes, and other levels payable by the contractor under the contract, or for any other

cause shall be included in the rates, prices and total Bid Price submitted by the Bidder.

11.4 The rates and prices quoted by the bidder shall be fixed for the duration of the Contract and

claim of any escalation in any circumstances shall not be entertained.

12 Currencies of Bid and Payment

12.1 The unit rates and the prices shall be quoted by the bidder entirely in Indian Rupees. All

payment shall be made in Indian Rupees.

13 Bid Validity

13.1 Bids shall remain valid for a period not less than 120 days after the deadline date for bid

submission specified in Clause 17. A bid valid for a shorter period shall be rejected by the

Employer as non-responsive.

13.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may

request that the bidders may extend the period of validity for a specified additional period. The

request and the bidders’ responses shall be made in writing or by E-mail. A bidder may refuse

the request without forfeiting his bid security. A bidder agreeing to the request will not be

required or permitted to modify his bid, but will be required to extend the validity of his bid

security for a period of the extension.

13.3 Bid evaluation will be based on the bid prices without taking into consideration the above

correction.

14 Bid Security

14.1 The Bidder shall furnish, as part of his Bid, a Bid security of Rs. 1.50 Lacs (Rs. One Lac Fifty

Thousand) only for this particular work. This bid security shall be in favour of Birla Institute of

Technology, Mesra Payable at Ranchi and may be in one of the following forms:

i) Receipt of Demand Draft deposited in the accounts of B.I.T., Mesra.

ii) Deposit-at-call receipt from any scheduled Indian bank from any of the branches of

SBI/ Nationalised / Scheduled Bank situated within the state of Jharkhand

approved by the Reserve bank of India.

iii) Fixed deposit receipt, a certified cheque or an irrevocable letter of credit, issued by any

scheduled Indian Bank approved by the Reserve Bank of India

14.2 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall

be valid for 45 days beyond the validity of the bid.

Page 23: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 13 of 62 Signature of contractor with seal

14.3 Any bid not accompanied by an acceptable Bid Security and not secured shall be rejected by

the Employer as non-responsive.

14.4 The Bid security of unsuccessful bidders will be returned within 28 days of the end validity

period specified in sub-Clause 13.1.

14.5 The Bid security of the successful bidder will be discharged when the bidder has signed the

Agreement and furnished the required Performance Security.

14.6 The Bid security may be forfeited

(a) If the Bidder withdraws the Bid after Bid opening during the period of Bid validity;

(b) If the Bidder does not accept the correction of the Bid Price, pursuant to Clause 24; or

(c) In the case of a successful Bidder, if the Bidder fails within the specified time limit to

i. sign the Agreement; or

ii. furnish the required Performance Security.

15 Format and Signing of Bid

15.1 The bidder shall submit the bids as per instruction to bidder.

D. SUBMISSION OF BIDS

16 Sealing and Marking of Bids

16.1 Bidders shall follow the Method of submission of bid as mentioned in Instruction to Bidders

17 Deadline for Submission of the Bids

17.1 As mentioned in Instruction to Bidders

17.2 The Employer may extend the deadline for submission of bids by issuing an amendment, in

which case all rights and obligations of the employer and the bidders previously subject to the

original deadline will then be subject to the new deadline.

18 Late Bids

18.1 Any Bid received by the Employer after the deadline prescribed in Clause 17will be returned to

the bidder.

19 Modification and Withdrawal of Bids

19.1 Bidders may modify or withdraw their bids by giving notice in writing before the deadline

prescribed in Clause 17.

19.2 Bidders shall follow the Method of submission modification & withdrawal of bid as

mentioned in Instruction to Bidders.

19.3 No bid may be modified after the deadline for submission of Bids

19.4 Withdrawal or modification of a Bid between the deadline for submission of bids and the

expiration of the original period of bid validity specified in Clause 13.1 above or as extended

pursuant to clause 13.2 may result in the forfeiture of the Bid security pursuant to Clause 14.

E. BID OPENING AND EVALUATION

20 Bid Opening

20.1 The acceptance of tender will rest with Birla Institute of Technology, Mesra, Ranchi which

does not bind itself to accept the lowest or any tender & reserves to itself the right to reject any

or all the tenders received without assigning any reason/s thereof.

20.2 The Institute also reserves to itself the right of accepting the whole or any part of the tender

&the tenderers shall be bound to perform the same at the rates quoted.

21 Process to be Confidential

21.1 Information relating to the examination, clarification, evaluation, and comparison of Bids and

Page 24: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 14 of 62 Signature of contractor with seal

recommendations for the award of a contract shall not be disclosed to Bidders or any other

persons not officially concerned with such process until the award to the successful Bidder has

been announced. Any effort by a Bidder to influence the Employer’s processing of Bids

rejection of his Bid.

22 Clarification of Financial Bids

22.1 To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his

discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit rates. The

request for clarification and the response shall be in writing or by cable, but no change in the

price of substance of the Bid shall be sought, offered, or permitted except as required to

confirm the correction of arithmetic errors discovered by the Employer in the evaluation of the

Bids.

22.2 No Bidder shall contact the Employer on any matter relating to his bid from the time of the bid

opening to the time the contract is awarded. If the bidder wishes to bring additional information

to the notice of the Employer, it should do so in writing.

22.3 Any effort by the Bidder to influence the Employer in the Employer’s bid evaluation, bid

comparison or contract award decisions may result in the rejection of the Bidders’ bid.

23 Examination of Bids and Determination of Responsiveness

23.1 During the detailed evaluation of “Technical Bids”, the Employer will determine whether each

Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly signed; (c)

is accompanied by the required securities and; (d) is substantially responsive to the

requirements of the Bidding documents. During the detailed evaluation of the “Financial Bid”,

the responsiveness of the bids will be further determined with respect to the remaining bid

conditions, i.e., priced bill of quantities, technical specifications, and drawings.

23.2 A substantially responsive “Financial Bid” is one which conforms to all the terms, conditions,

and specifications of the Bidding documents, without material deviation or reservation. A

material deviation or reservation is one (a) which affects in any substantial way the scope,

quality, or performance of the Works; (b) which limits in any substantial way, inconsistent with

the Bidding documents, the Employer’s rights or the Bidder’s obligations under the Contractor

or (c) whose rectification would affect unfairly the competitive position of other Bidders

presenting substantially responsive Bids.

23.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and

may not subsequently be made responsive by correction or withdrawal of the non-conforming

deviation or reservation.

24 Correction of Errors

24.1 “Financial Bids” determined to be substantially responsive will be checked by the Employer for

any arithmetical errors. Errors will be corrected by the Employer as follows:

a) where there is a discrepancy between the rates in figures and in word, the rate in words

will govern; and

b) where there is a discrepancy between the unit rate and the line item total resulting form

multiplying the unit rate by the quantity, the unit rate as quoted will govern.

24.2 The amount stated in the “Financial Bid” will be corrected by the Employer in accordance with

the above procedure and the bid amount adjusted with the concurrence of the Bidder in the

following manner:

a) If the Bid price increases as a result of these corrections, the amount as stated in the bid

will be the ‘bid price’ and the increase will be treated as rebate;

b) If the bid price decrease as a result of the corrections, the decreased amount will be

treated as the ‘bid price’. Such adjusted bid price shall be considered as binding upon

the Bidder. If the Bidder does not accept the corrected amount the Bid will be rejected,

and the Bid security may be forfeited

Page 25: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 15 of 62 Signature of contractor with seal

25 Evaluation and Comparison of Financial Bids

25.1 In evaluating the Bids, the Employer will determine for each Bid the evaluated Bid Price by

adjusting the Bid Price as follows:

i) Making any corrections for errors pursuant to clause 24; or

ii) Making an appropriate adjustments for any other acceptable variations, deviations; and

iii) Making appropriate adjustments to reflect discounts or other price modifications

offered.

25.2 The Employer reserves the right to accept or reject any variation or deviation. Variations and

deviations and other factors, which are in excess of the requirements of the bidding documents

or otherwise result in unsolicited benefits for the Employer shall not be taken into account in

Bid evaluation.

25.3 The estimated effect of the price adjustment conditions of the Conditions of Contract, during

the period of implementation of the Contract, will not be taken into account in Bid evaluation.

25.4 A bid which contains several items in the Bill of Quantities which are unrealistically priced low

and which cannot be substantiated satisfactorily by the bidder, may be rejected as non-

responsive.

F. AWARD OF CONTRACT

26 Award of Criteria

26.1 Subject to Clause 27, the Employer will award the Contract to the Bidder whose Bid has been

determined

(i) to be substantially responsive to the bidding documents and who has offered the lowest

evaluated Bid Price; and

(ii) to be within the available bid capacity adjusted to account for his bid price which is

evaluated the lowest in any of the packages opened earlier than the one under

consideration. In no case, the contract shall be awarded to any bidder whose available bid

capacity is less than the evaluated bid price, even if the said bid is the lowest evaluated

bid. The contract will in such cases be awarded to the next lowest bidder at his evaluated

bid price

(iii) However, Employer reserve the right to award the contract to any bidder, after proper

negotiation, if he feels so, as per his suitability for the work

27 Employer’s Right to Accept any Bid and to reject any or all Bids

27.1 Notwithstanding Clause 26, the Employer reserves the right to accept or reject any Bid to

cancel the bidding process and reject all bids, at any time prior to the award of Contract,

without thereby incurring any liability to the affected Bidder or Bidders or any obligation to

inform the affected Bidder or Bidders of the grounds for the Employer’s action.

28 Notification of Award and Signing of Agreement

28.1 The Bidder whose Bid has been accepted will be notified of the award by the employer prior to

expiration of the Bid validity period by post or Email or facsimile confirmed by registered

letter. This letter (hereinafter and in the Conditions of Contract called the “Letter of

Acceptance”) will state the sum that the Employer will pay the contractor in consideration of

the execution, completion, and maintenance of the Works by the contractor as prescribed by the

contract (hereinafter and in the contract called the “Contract Price”).

28.2 The notification of award will constitute the formation of the Contract, subject only to the

furnishing of a performance security in accordance with the provisions of Clause 29.

28.3 The Agreement will incorporate all agreements between the Employer and the successful

Page 26: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 16 of 62 Signature of contractor with seal

Bidder. It will be signed by the Employer and sent to the successful Bidder, within 15 days

following the notification of award along with the Letter of Acceptance. Within 7 days of

receipt, the successful Bidder will sign the Agreement and deliver it to the Employer.

28.4 Upon the furnishing by the successful Bidder of the Performance Security, the Employer will

promptly notify the other Bidders that their Bids have been unsuccessful.

29 Performance Security

29.1 Within 7 days of receipt of the Letter of Acceptance, the successful Bidder shall deliver to the

Employer a Performance security in any of the forms given below for an amount equivalent to

2% of the Contract price A bank guarantee from any of the branches of SBI/ Nationalised /

Scheduled Bank situated within the state of Jharkhand in the form given in Section 8; or

Certified Cheque/Bank Draft as indicated in Appendix.

29.2 If the performance security is provided by the successful Bidder in the form of a Bank

Guarantee, it shall be issued from any of the branches of SBI/ Nationalised / Scheduled Bank

situated within the state of Jharkhand.

29.3 Failure of the successful Bidder to comply with the requirements of Sub-Clause 29.1 shall

constitute grounds for cancellation of the award and forfeiture of the Bid Security.

30 Advance Payment and Security

30.1 The Employer will provide an Advance Payment on the Contract Price as stipulated in the

Conditions of Contract, subject to maximum amount, as stated in the Contract Data.

31 Corrupt or Fraudulent Practices

31.1 The Employer will reject a proposal for award if it determines that the Bidder recommended for

award has engaged in corrupt or fraudulent practices in competing for the contract in question

and will declare the firm ineligible, either indefinitely at any time determines that the firm has

engaged in corrupt or fraudulent practices in competing for the contractor, or in execution.

ANNEXURE-I

Page 27: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 17 of 62 Signature of contractor with seal

List of Key Plant & Equipment to be deployed on Contract work [Reference C1. 3.5.5]

Sl. No. Type of Equipment Maximum age

as on 01.01.2015

(Years)

Equipment

required

min

1. Water Tanker 5 01

2. Concrete Mixer Machine 5 01

ANNEXURE-II

Page 28: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 18 of 62 Signature of contractor with seal

List of Key Personal to be deployed on Contract Work [Reference C1.3.5.7]

Sl. No. Personel Qualication No.

1. Site Engineer Diploma Civil + 10 Years Experience ( 5 years as Manager) 01

2. Quantity Surveyor Diploma Civil + 10 years Experience 01

3. Electrical Engineer Diploma Electrical + 10 years Experience or ITI + 15 years

Experience

01

4. Work Supervisor Intermediate + 10 years Experience 01

TOTAL 04

Page 29: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 19 of 62 Signature of contractor with seal

SECTION 2

QUALIFICATION INFORMATION

QUALIFICATION INFORMATION

Page 30: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 20 of 62 Signature of contractor with seal

The information to be filled in by the bidder in the following pages will be used for purposes of

qualification as provided for in Clause 3of the Instructions to Bidders. This information will not be

incorporated in the Contract.

1. For Individual Bidders

1.1 Constitution or legal status of Bidder

[Attach copy]

Place of registration: _________________________________

Principal place of business: _________________________________

Power of attorney of signatory of Bid

[Attach]

1.2 Total Value of Civil Engineering Construction work performed in last five years:***

Sl. No. Financial Year Value of work (Rs. in Lacs)

1. 2014-2015

2. 2013-2014

3. 2012-2013

4. 2011-2012

5. 2010-2011

1.3 Work performed as prime contractor, work performed in the past as a nominated sub-contractor

will also be considered provided the sub-contract involved execution of all main items of work

described in the bid document, provided further that all other qualification criteria are satisfied

(in the same name) on works of a similar nature over the last five years.**

Project

Name

Name of

the

Employer*

Description

of work

Contract

No.

Value of

Contract

(Rs. Lacs)

Date

of issue

of

work

order

Stipulated

Period of

completion

Actual date

of

completion*

Remarks

Explaining

Reasons

for delay&

work

Completed

* Attach certificate(s) from the Engineer(s)-in-Charge

**Immediately preceding the financial year in which bids are received.

*** Attach certificate from Chartered Accountant

1.4 Information on Bid capacity (works for which bids have been submitted and works which are yet

to be completed) as on the date of this bid.

Page 31: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 21 of 62 Signature of contractor with seal

(A) Existing commitments and on-going works:

Description

of works

Place

& State

Contract

No.

Name &

Address of

Employer

Value of

Contract

(Rs Lacs)

Stipulated

Period of

Completion

Value of

Works*

remaining

To be

completed

(Rs Lacs)

Anticipated

date of

completi

on

* Attach certificate(s) from the Engineer(s)-in-Charge

(B) Works for which bids already submitted:

Description Of

work

Place &

State

Name &

Address of

Employer

Estimated

value of

works (Rs

Lacs)

Stipulated

period of

completion

Date when

decision is

expected

Remarks

If any

1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [ref.

Clause 3.5.5. The Bidder should list all the information requested below. Refer also to Sub

Clause 3.3(iv) of the Instructions to Bidders.

Sl. Type of Equipment Maximum age

as on 01.01.2012

(Years)

Equipment

required

min

1.. Water Tanker

2. Concrete Mixes with Integral Weigh Batching facility

3. Builder Hoist

4. Generator

5.. Bar Cutting Machine

6. Bar Bending Machine

7.. Welding Machine

8. Plate Compactor

9. Vibrator (Needle)

10. Vibrator ( Surface)

11. Concrete Mixer Machine

12. Steel Plate with fitting

13. Staging Pipe (Acrow) with fitting

14. Any other

1.6 Qualifications and experience of key personnel required for administration and execution of the

Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to sub Clause 4.3 (e) of

Page 32: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 22 of 62 Signature of contractor with seal

instructions to Bidders and Sub Clause 9.1 of the Conditions of Contract

Sl.

No.

Personel Qualication(s) No.

1. Site Engineer

2. Quantity Surveyor

3. Electrical Engineer

4. Work Supervisor

TOTAL

Attach copies of certificates on possession of valid license for executing water supply/sanitary

work/building electrification works [Reference Clause 3.3 (v) & 3.5.6]

1.7 Financial reports for the last five years: balance sheets, profit and loss statements, auditors’

reports (in case of companies/corporation), etc. List them below and attach copies.

1.8 Evidence of access to financial resources to meet the qualification requirements: Cash in hand,

lines of credit, etc. List them below and attach copies of support documents.

1.9 Name, address, and telephone, telex, and fax numbers of the Bidders’ bankers who may provide

references if contacted by the Employer.

1.10 Information on litigation history in which the Bidder is involved

Other

Party(ies)

Employer Cause of dispute Amount involved Remarks showing

Present status

1.11 Proposed work methods and schedule. The Bidder should attach descriptions, drawings and

charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB

Clause 3.1 &3.3 (1)]

1.12 Programme

1.13 Quality Assurance Programme

2 Additional Requirements.

2.1 Bidders should provide any additional information required to fulfill the requirements of Clause

3of the Instructions to the Bidders, if applicable.

(i) Affidavit

(ii)Undertaking

Page 33: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 23 of 62 Signature of contractor with seal

SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT FACILITIES

(Clause 3.2 (i) OF ITB)

BANK CERTIFICATE

Page 34: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 24 of 62 Signature of contractor with seal

This is to certify that M/s. ______________________________________ is a reputed

Company with a good financial standing.

If the contract for the work, namely ______________________________________ is awarded to the

above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs.

____________________ to meet their working capital requirements for executing the above contract

during the contact period.

__________________________

(Signature)

Name of Bank

Senior Bank Manager

Address of the Bank

AFFIDAVIT

Page 35: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 25 of 62 Signature of contractor with seal

1. I, the undersigned, do hereby certify that all the statements made in the required

attachments are true and correct.

2. The undersigned also hereby certifies that neither our firm M/S _____________________

_____________________________________have abandoned any work of any contract

awarded to us for such work have been rescinded, during last five years prior to the date of

this bid.

3. The undersigned hereby authorize(s) and request(s) any bank, person, firm or corporation

to furnish pertinent information deemed necessary and requested by the Department to

verify this statement or regarding my (our) competence and general reputation.

4. The undersigned understand and agrees that further qualifying information may be

requested, and agrees to furnish any such information at the request of the

Department/Project implementing agency.

____________________________________

(Signed by an authorized Officer of the Firm)

______________________

Title of officer

______________________

Name of Firm

______________________

DATE

UNDERTAKING

Page 36: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 26 of 62 Signature of contractor with seal

I. the undersigned do hereby undertake that our firm M/s ____________________________

_______________________ would invest a minimum cash up to 25% of the value of the work

during implementation of the Contract.

____________________________________

(Signed by an Authorized Officer of the Firm)

_____________________________

Title of Officer

_____________________________

Name of Firm

______________________________

DATE

Page 37: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 27 of 62 Signature of contractor with seal

SECTION 3

CONDITIONS OF CONTRACT

CONDITIONS OF CONTRACT

Page 38: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 28 of 62 Signature of contractor with seal

A. GENERAL

1. Definitions

1.1 Terms which are defined in the Contract data are not also defined in the Conditions of

Contract but keep their defined meanings. Capital initials are used to identify defined terms.

Bill of Quantities means the priced and completed Bill of Quantities forming part of the

Bid.

The Completion Date is the date of completion of the Works as certified by the

Engineer in accordance with Sub clause 49.1.

The Contract is the contract between the Employer and the Contractor to execute,

complete and maintain the Works. It consists of the documents listed in Clause 2.3 below.

The Contract Data defines the documents and other information which comprise

the Contract.

The Contractor is a person or corporate body whose Bid to carry out the Works has

been accepted by the Employer .

The Contractor’s Bid is the completed Bidding document submitted by the

Contractor to the Employer and includes Technical and Financial bids.

The Contract Price is the price state in the Letter of Acceptance and thereafter as

adjusted in accordance with the provisions of the Contract.

Days are calendar days; months are calendar months.

A Defect is any part of the Works not completed in accordance with the Contract.

The Defects Liability Period is the period named in the contract Data and

calculated from the Completion Date.

The Employer is Registrar, Birla Institute of Technology, Mesra Ranchi, who will

employ the contractor to carry out the Works.

The Employer’s representative will be the Director, Birla Institute of Technology,

Deoghar campus, The Employer’s representative will act on behalf of Employer.

The Engineer In-charge is the Project in-charge, Birla Institute of Technology,

Deoghar campus Data (or any other competent person appointed and notified to the

contractor to act in replacement of the Engineer in-charge) who is responsible for

supervising the Contractor, administering the Contract, certifying payments due to the

Contractor issuing and valuing Variations to the Contract, awarding extensions of time.

Equipment is the Contractor’s machinery and vehicles brought temporarily to the Site to construct the Works.

The Initial Contract Price is the Contract Price listed in the Employer’s Letter of

Acceptance.

The Intended Completion Date is the date on which it is intended that the Contractor shall

complete the Works. The Intended Completion Date is specified in the Contract Data. The

Intended Completion date may be revised only by the Engineer by issuing an extension of

time.

Materials are all supplies, including consumables, used by the contractor for

incorporation in the Works.

Plant is any integral part of the Works which is to have a mechanical, electrical,

electronic or chemical or biological function.

The Site is the area defined as such in the Contract Data.

Page 39: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 29 of 62 Signature of contractor with seal

Site Investigation Reports are those which were included in the Bidding documents and are

factual interpretative reports about the surface and the sub-surface conditions at the site.

Specification means the Specification of the Works included in the Contract and any

modification or addition made or approved by the Employer.

The Start Date is given in the Contract Data. It is the date when the Contractor shall

commence execution of the works. It does not necessarily coincide with any of the

Site Possession Dates.

A Subcontractor is a person or corporate body who has a contract with the Contractor to

carry out a part of the work in the Contract which includes work on the Site.

Temporary Works are works designed, consulted, installed, and removed by the

contractor which are needed for construction or installation of the Works.

A Variation is an instruction given by the Employer, which varies the works.

The Works are what the Contract requires the Contractor to construct, install, and turn over

to the Employer, as defined in the Contract Data.

2. Interpretation

2.1 In interpreting these Conditions of Contract, singular also means plural, male also means

female or neuter, and the other way around. Headings have no significance. Words have their

normal meaning under the language of the Contract unless specifically defined. The Engineer

will provide instructions clarifying queries about the Conditions of Contract.

2.2 If sectional completion is specified in the Contract Data, references in the Conditions of

Contract to the Works, the Completion Date, and the Intended Completion Date apply to any

Section of the Works (other than references to the Completion date and Intended Completion

date for the whole of the works

2.3 The documents forming the Contract shall be interpreted in the following order of priority:

(i) Agreement

(ii) Letter of Acceptance, notice to proceed with the works

(iii) Contractor’s Bid

(iv) Contract Data

(v) Conditions of Contract including Special Conditions of Contract

(vi) Specifications

(vii) Drawings

(viii) Bill of Quantities and

(ix) Any other document listed in the Contract Data as forming part of the Contract.

3. Language and Law

3.1. The language of the Contract and the law governing the contract are English

4. Engineer In-charge’s Decisions

4.1. Except where otherwise specifically stated, the Engineer In-charge will decide contractual

matters between the Employer and the Contractor in the role representing the Employer.

5. Delegation

5.1. The Engineer In-charge may delegate any of his duties and responsibilities to other people

after notifying the Contractor and may cancel any delegation after notifying the Contractor

6. Communications

6.1. Communications between parties which are referred to in the conditions are effective only

Page 40: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 30 of 62 Signature of contractor with seal

when in writing. A notice shall be effective only when it is delivered (in terms of Indian

Contract act).

7. Sub-Contracting

7.1. The Contractor may not sub-contract any portion of work in any circumstances.

8. Personnel

8.1. The Contractor shall employ the key personnel named in the Schedule of Key Personnel as

referred to in the Contract Data to carry out the functions stated in the Schedule or other

personnel approved by the Engineer In-charge

8.2. If the Engineer In-charge asks the Contractor to remove a person who is a member of the

Contactor’s staff of his work force , the Contractor shall ensure that the person leaves the

Site within seven days and has no further connection with the work in the Contract.

9. Employer’s and Contractor’s Risks 9.1. The Employer carries the risks which this Contract states are Employer’s risks, and the

contractor carries the risks which this Contract states are Contractor’s risks.

10. Employer’s Risks

10.1. The Employer is responsible for the excepted risks which are (a) in so far as they directly

affect the execution of the Works in India, the risks of war, hostilities. invasion, act of foreign

enemies, rebellion, revolution, insurrection or military or usurped power, civil war, riot

commotion or disorder (unless restricted to the Contractor’s employees), and contamination

from any nuclear fuel or nuclear waste or radioactive toxic explosive; or (b) a cause due

solely to the design of the Works, other than the Contractor’s design.

11. Contractor’s Risks

11.1. All risks of loss or damage to physical property and of personal injury and death which arise

during and in consequence of the performance of the Contract other than the excepted risks

are the responsibility of the Contractor.

12. Insurance

12.1 The Contractor shall provide, in the joint names of the Employer and the Contractor,

insurance cover from the Start Date to the end of the Defects Liability Period, in the amounts and deductibles stated in the Contract data for the following events which are due to the

Contractor’s risks:

a) loss of or damage to the Works, Plants and Materials

b) loss of or damage to Equipment;

c) loss of or damage of property (except the Works, Plant, Materials and Equipment) in

connection with the Contract; and

d) personal injury or death.

12.2 Policies and certificates for insurance shall be delivered by the Contractor to the Employer for

the approval before the Start Date. All such insurance shall provide for compensation to be

payable in the types and proportions of currencies required to rectify the loss or damage

incurred.

12.3. If the Contractor does not provide any of the policies and certificates required, the Employer

may effect the insurance which the Contractor should have provided and recover the premiums the Employer has paid from payments otherwise due to the Contractor or, if no

payment is due, the payment of the premiums shall be a debt due.

12.4. Alterations to the terms of an insurance shall not be made without the approval of the

Employer. Both parties shall comply with any conditions of the insurance policies.

13. Site Investigation Reports

13.1. The Contractor, in preparing the Bid, shall rely on any site investigation reports referred to in

Page 41: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 31 of 62 Signature of contractor with seal

the Contract data, supplemented by any information available to the Bidder.

14. Queries about the Contract Data

14.1. The Engineer In- charge will clarify queries on the Contract Data

15. Contractor to Construct the Works

15.1. The Contractor shall construct and install the Works in accordance with the Technical

Specification and Drawings.

16. The Works to be Completed by the Intended Completion date

17.1. The Contractor may commence execution of the Works on the Start Date and shall carry out

the Works in accordance with the programme submitted by the Contractor, as updated with

the approval of the Engineer In-charge, and complete them by the Intended Completion Date.

17. Approval by the Engineer In-charge

17.1. The Contractor shall be responsible for design of Temporary Works.

17.2 The Engineer In-charge approval shall not alter the Contractor’s responsibility for design of

the Temporary Works.

17.3 The Contractor shall obtain approval of third parties to the design of the Temporary Works

where required.

17.4 All drawings prepared by the Contractor for the execution of the temporary or permanent

Works, are subject to prior approval by the Engineer before their use.

18. Safety

18.1. The Contractor shall be responsible for the safety of all activities on the Site.

19. Possession of the Site

19.1. The Employer shall give possession of all parts of the site to the Contractor.

20. Access to the Site

20.1. The Contractor shall allow the engineer In-charge and any person authorized by the Engineer

In-charge access to the Site, to any place where work in connection with the contract is being

carried out or is intended to be carried out and to any place where materials or plant are being

manufactured/ fabricated / assembled for the works.

21. Instructions

21.1. The Contractor shall carry out all instructions of the Engineer In-charge pertaining to works

which comply with the applicable law where the site is located.

21.2. The Constructor shall permit the Employer to inspect the Contractor’s accounts and records

relating to the performance of the Contractor and to have them audited by auditors appointed

by the Employer, if so required by the Employer

B. TIME CONTROL

22. Programme

22.1. Within the time stated in the Contract Data the Contractor shall submit to the Engineer In-

charge for approval a Programme showing the general methods, arrangements, order, and

timing for all the activities in the Works along with monthly cash flow forecast.

22.2. An update of the Programme shall be a programme showing the actual progress achieved on

each activity and the effect of the progress achieved on the timing of the remaining work

including any changes to the sequence of the activities .

22.3. The Contractor shall submit to the Engineer In-charge, for approval, an updated Programme

at intervals no longer than the period stated in the Contract data. If the Contractor does not

submit an updated Programme within this period, the Engineer In-charge may withhold the

amount stated in the Contract Data from the next payment certificate and continue to

withhold this amount until the next payment after the date on which the overdue Programme

Page 42: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 32 of 62 Signature of contractor with seal

has been submitted.

22.4. The Engineer’s approval of the Programme shall not alter the Contractor’s obligations. The

Contractor may revise the Programme and submit it to the Engineer In-charge again at any

time. A revised Programme is to show the effect of Variations and Compensation Events.

23. Extension of the Intended Completion Date

23.1. The Employer shall extend the Intended Completion Date if a Variation is issued which

makes it impossible for Completion to be achieved by the Intended Completion Date without

the Contractor taking steps to accelerate the remaining work and which would cause the

Contractor to incur additional cost.

23.2. The Employer on recommendation of Engineer In-charge shall decide whether and by how

much to extend the Intended Completion date within 35 days of the Contractor asking the

Engineer In-charge for a decision upon the effect of a Variation and submitting full

supporting information. If the Contractor has failed to give early warning of a delay or has

failed to cooperate in dealing with a delay, the delay by this failure shall not be considered in

assessing the new intended Completion Date.

23.3. The Engineer In-charge shall within 14 days of receiving full justification from the contractor for extension of Intended Completion Date refer to the Employer his decision. The Employer

shall in not more than 21 days communicate to the Engineer in-charge the acceptance or

otherwise of the Engineer’s decision.

24. Delays Ordered by the Engineer In-charge

24.1. The Engineer In-charge may instruct the Contractor to delay the start or progress of any

activity within the Works.

25. Management Meetings 25.1. Either the engineer In-charge or the Contractor may require the other to attend a

management meeting. The business of a management meeting shall to review the plans for remaining work and to deal with matters raised in accordance with the early warning procedure.

25.2. The Engineer In-charge shall record the business of management meetings and is to provide copies of his record to those attending the meeting and to the Employer. The responsibility of the parties for actions to be taken is to be decided by the Engineer In-charge either at the management meeting or after the management meeting and stated in writing to all who attended the meeting.

C. QUALITY CONTROL

26. Identifying Defects

26.1. The Engineer In-charge shall check the Contractor’s work and notify the Contractor of any

defects that are found. Such checking shall not affect the Contractor’s responsibilities. The Engineer In-charge may instruct the Contractor to search for a Defect and to uncover and test

any work that the Engineer considers may have a Defect.

27. Tests

27.1. If the Engineer In-charge instructs the Constructor to carry out a test not specified in the Specification to check whether any work has a Defect and the test shows that it does, the Contractor shall pay for the test and any samples.

28. Correction of Defects

Page 43: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 33 of 62 Signature of contractor with seal

28.1. The Engineer In-charge shall give notice to the contractor of any Defects before the end of the

Defects Liability Period, which begins at completion and is defined in the Contract Data. The

defects Liability Period shall be extended for as long as defects remain to be corrected.

28.2. Every time notice of a defect is given, the Contractor shall correct the notified Defect within the length of time specified by the Engineer’s notice.

29. Uncorrected Defects

29.1. If the contractor has not corrected a Defect within the time specified in the Engineer’s notice, the Engineer In-charge will assess the cost of having the Defect corrected, and the Contractor will pay this amount.

D. COST CONTROL

30. Bill of Quantities

30.1. The Bill of Quantities shall contain items for the construction, installation, testing, and

commissioning work to be done by the Contractor.

30.2. The Bill of Quantities is used to calculate the Contract Price. The Contractor is paid for the quantity of the work done at the rate in the Bill of Quantities for each item.

31. Rate of new items in the Quantities and escalation in rate

31.1 For such type of items, if any, which are not included in the bill of quantity and for which rate

is not mentioned by the contractor, for such type of items, rate will be taken from Jharkhand

Schedule of rates 2014 Published for building works(without any escalation). If the rate is not

available in JSR 2014, the rate will be taken from Delhi Schedule of rates 2014 (without any

escalation).and bill will be paid as per actual measurement of the work.

31.2 No escalation in rate, due to any reason, after award of work, shall be permitted in this

contract throughout its validity period.

32. Variations

32.1 All Variations shall be included in updated Programmes produced by the Contractor

33. Cash Flow Forecasts

33.1 When the Programme is updated, the contractor is to provide the engineer In-charge with an

updated cash flow forecast

34. Payment Certificates

34.1 The Contractor shall submit to the Engineer In-charge monthly statements of the estimated

value of the work completed less the cumulative amount certified previously.

34.2 The Engineer In-charge shall check the Contractor’s monthly statement within 14 days and

certify the amount to be paid to the Contractor.

34.3 The value of work executed shall be determined by the Engineer In-charge.

34.4 The value of work executed shall comprise the value of the quantities of the items in the Bill

of Quantities completed

34.5 The value of work executed shall include the valuation of Variations.

34.6 The Engineer may exclude any item certified in a previous certificate or reduce the proportion

of any item previously certified in any certificate in the light of later information.

35. Payments

35.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries

in terms of contract and taxes at source, as applicable under the law. The Employer shall pay

the Contractor the amounts certified by the Engineer In-charge through Running bills.

35.2 Items of the Works for which no rate or price has been entered in will not be paid for by the

Employer and shall be deemed covered by other rates and prices in the Contract.

Page 44: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 34 of 62 Signature of contractor with seal

36. Tax

36.1 The rates quoted by the Contractor shall be deemed to be inclusive of the sales and other taxes

that the Contractor will have to pay for the performance of this Contract. The Employee will

perform such duties in regard to the deduction of such taxes at source as per applicable law.

37. Currencies

37.1 All payments shall be made in Indian Rupees.

38. Retention

38.1. The Employer shall retain from each payment due to the Contractor the proportion stated in

the Contract Data until Completion of the whole of the Works.

38.2 On Completion of the whole of the Works half the total amount retained is repaid to the

Contractor and half when the Defects Liability Period has passed and the Engineer In-charge

has certified that all Defects notified by the Engineer to the Contractor before the end of this

period have been corrected.

38.3 On completion of the whole works, the contractor may substitute retention money with an “on

demand” Bank guarantee.

39. Liquidated Damages

39.1 The Contractor shall pay liquidated damages to the Employer at the rate stated in the Contract

data for each day that the Completion Date is later than the Intended Completion Date (for the

whole of the works or the milestones as stated in the contract data). The total amount of

liquidated damages shall not exceed the amount defined in the Contract Data. The Employer

may deduct liquidated damages from payments due to the Contractor. Payment of liquidated

damages does not affect the Contractor’s liabilities.

39.2 If the Intended Completion date is extended after liquidated damages have been paid, the

Engineer In-charge shall correct any over payment of liquidated damages by the Contractor

by adjusting the next payment certificate. The Contractor shall be paid interest on the over

payment calculated from the date of payment to the date of repayment at the rates specified in

Sub Clause 35.1.

39.3 If the Contractor fails to comply with the time for completion as stipulated in the tender, then

the contractor shall pay to the employer the relevant sum stated in the Contract Data as

Liquidated damages for such default and not as penalty for everyday or part of day which

shall elapse between relevant time for completion and the date stated in the taking over

certificate of the whole of the works on the relevant section, subject to the limit stated in the

contract data. The employer may, without prejudice to any other method of recovery deduct

the amount of such damages from any monies due or to become due to the contractor. The

payment or deduction of such damages shall not relieve the contractor from his obligation to

complete the works on form any other of his obligations and liabilities under the contract

40. Advance Payment

40.1 The Employer shall make advance payment to the Contractor of the amounts stated in the

Contract Data by the date stated in the Contract Data, against provision by the Contractor of

an Unconditional Bank Guarantee in a form and by a bank acceptable to the employer in

amounts and currencies equal to the advance payment. The guarantee shall remain effective

until the advance payment has been repaid, but the amount of guarantee shall be

progressively reduced by the amounts repaid by the Contractor. Interest will not be charged

on the advance payment.

40.2 The Contractor is to use the advance payment only to pay for Equipment, Plant and

Page 45: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 35 of 62 Signature of contractor with seal

Mobilization expenses required specifically for execution of the works. The Contractor shall

demonstrates that advance payment has been used in this way by supplying copies of

invoices or other documents.

40.3 The advance payment shall be repaid by deducting proportionate amounts from payments

otherwise due to the Contractor, following the schedule of completed percentages of the

Works on a payment basis. No account shall be taken of the advance payment or its

repayment in assessing valuations of work done, Variations, price adjustments, or

Liquidated Damages.

41. Securities

41.1 The Performance Security (including additional security for unbalanced bids) shall be

provided to the Employer no later than the date specified in the Letter of Acceptance and shall

be issued in an amount and form and by a bank or surety acceptable to the Employer, and

denominated in Indian Rupees. The Performance Security shall be valid until a date 28 days

from the date of expiry of Defects Liability Period and the additional security for unbalanced

bids shall be valid until a date 28 days from the date of issue of the certificate of completion

42. Cost of Repairs

42.1. Loss or damage to the Works or Materials to be incorporated in the Works between the Start

Date and the end of the defects Correction periods shall be remedied by the

Contractor at the Contractor’s cost if the loss or damage arises from the Contractor’s acts or

omissions.

E. FINISHING THE CONTRACT

43. Completion

43.1 The Contractor shall request the Engineer In-charge to issue a Certificate of Completion of

the Works and the Engineer will do so upon deciding that the Work is completed.

44. Taking Over

44.1 The Engineer In-charge shall take over the Site and the Works within seven days of the

issuing a certificate of Completion.

45. Final Account

45.1 The Contractor shall supply to the Engineer In-charge a detailed account of the total amount

that the Contractor considers payable under the contract before the end of the Defects

Liability Period. The Engineer In-charge shall issue a Defect Liability Certificate and certify

any final payment that is due to the Contractor within 56 days of receiving the Contractor’s

account if it is correct and complete. If it is not, the Engineer In-charge shall issue within 56

days a schedule that states the scope of the corrections or additions that are necessary. If the

Final Account is still unsatisfactory after it has been resubmitted, the Engineer In-charge shall

decide on the amount payable to the Contractor and issue a payment certificate, within 56

days of receiving the Contractor’s revised account

46. Termination

46.1 The Employer or the Contractor may terminate the Contract if the other party causes a

fundamental breach of the Contract.

46.2 Fundamental breaches of Contract include, but shall not be limited to the following:

(a) the Contractor stops work for 28 days when no stoppage of work is shown on the

current Programme and the stoppage has not been authorized by the Engineer In-

charge;

Page 46: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 36 of 62 Signature of contractor with seal

(b) the Engineer In-charge instructs the Contractor to delay the progress of the Works

and the instruction is not withdrawn within 28 days;

(c) the Employer or the Contractor is made bankrupt or goes into liquidation other than

for a reconstruction or amalgamation;

(d) a payment certified by the Engineer In-charge is not paid to the Contractor within 56

days of the date of the Engineer’s certificate;

(e) the Engineer gives Notice that failure to correct a particular Defect is a fundamental

breach of Contract and the Contractor fails to correct it within a reasonable period of

time determined by the Engineer.

(f) the Contractor does not maintain a security which is required;

(g) the Contractor has delayed the completion of works by the number of days for which

the maximum amount of liquidated damages can be paid as defined in the Contract

data; and

(h) If the Contractor, in the judgment of the Employer has engaged in corrupt or

fraudulent practices in competing for or in executing the Contract.

For the purpose of this paragraph: “corrupt practice” means the offering, giving,

receiving or soliciting of anything of value to influence the action of a public official in

the procurement process or in contract execution. “Fraudulent practice” means a

misrepresentation of facts in order to influence a procurement process or the execution

of a contract to the detriment of the Borrower, and includes collusive practice among

Bidders (prior to or after bid submission) designed to establish bid prices at

artificial non- competitive levels and to deprive the Borrower of the benefits of

free and open competition.”

46.3 When either party to the Contract gives notice of a breach of contract to the Engineer In-charge for a cause other than those listed under Sub Clause 46.2. above, the Engineer In-charge shall decide whether the breach is fundamental or not.

46.4 Not withstanding the above, the Employer may terminate the Contract for convenience.

46.5 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and secure and leave the Site as soon as reasonably possible.

47. Payment upon Termination

47.1 If the Contract is terminated because of a fundamental breach of Contract by the Contractor,

the Engineer In-charge shall issue a certificate for the value of the work done less advance

payments received up to the date of the issue of the certificate, less other recoveries due in

terms of the contract, less taxes due to be deducted at source as per applicable law and less

the percentage to apply to the work not completed as indicated in the Contract Data.

Additional Liquidated Damages shall not apply. If the total amount due to the Employer

exceeds any payment due to the Contractor shall be a debt payable to the Employer.

47.2 If the Contract is terminated at the Employer’s convenience or because of a fundamental

Breach of Contract by the Employer, the Engineer In-charge shall issue a certificate for the

value of the work done, the cost of balance by the contractor and available at site, the

reasonable cost of removal of Equipment, a repatriation of the Contractor’s personnel

employed solely on the Works, and the Contractor’s costs of protecting and securing the

Works and less advance payments received due in terms of the contract and less taxes due to

be deducted at source as per applicable law.

48. Property 48.1 All materials on the Site, Plant, Equipment, Temporary Works and Works are deemed to be

Page 47: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 37 of 62 Signature of contractor with seal

the property of the Employer, if the Contract is terminated because of a Contractor’s default.

49. Release from Performance

49.1 If the Contract is frustrated by the outbreak of war or by any other event entirely outside the

control of either the Employer or the Contractor the Engineer shall certify that the Contract

has been frustrated. The Contractor shall make the Site safe and stop work as quickly as

possible after receiving this certificate and shall be paid for all work carried out before

receiving it and for any work carried out afterwards to which commitment was made.

F. SPECIAL CONDITIONS OF CONTRACT

50. LABOUR

50.1 The Contractor shall, unless otherwise provided in the Contract, make his own

arrangements for the engagement of all staff and labour, local or other, and for their payment,

housing, feeding and transport. The Contractor shall, if required by the Engineer, deliver to

the Engineer a return in detail, in such form and at such intervals as the Engineer may

prescribe, showing the staff and the numbers of the several classes of labour from time to time

employed by the Contractor on the Site and such other information as the Engineer may

require.

50.2 COMPLIANCE WITH LABOUR REGULATIONS

During continuance of the contract, the Contractor and his sub-contractors shall abide at all

times by all existing labour enactments and rules made there under, regulations, notifications

and bye laws of the State or Central Government or local authority and any other labour law

(including rules), regulations, bye laws that may be passed or notification that may be issued

under any labour law in future either by the State or the Central Government or the local

authority. Salient features of some of the major laws that are applicable to construction

industry are given below. The Contractor shall keep the Employer indemnified in case any

action is taken against the Employer by the competent authority on account of contravention

of any of the provisions of any Act or rules made there under, regulations or notifications

including amendments. If the Employer is caused to pay or reimburse, such amounts as may

be necessary to cause or observe, or for non-observance of the provisions stipulated in the

notifications/byelaws/Acts/Rules/regulations including amendments, if any, on the part of the

Contractor, the Engineer/Employer shall have the right to deduct any money due to the

Contractor including his amount of performance security. The Employer/Engineer shall also

have right to recover from the Contractor any sum required or estimated to be required for

making good the loss or damage suffered by the Employer. The employees of the Contractor and the Sub-Contractor in no case shall be treated as the employees of the Employer at any point of time.

51. SETTLEMENT OF DISPUTES

51.1 Engineer In-charge’s decision

If a dispute of any kind whatsoever arise between the Engineer In-charge and the contractor in

connection with, or arising out of, the contract or execution of the works, whether during the

execution of the works or after their completion and whether before or after repudiation or

other termination of the contract, including any dispute as to any opinion, instruction,

determination, certificate or valuation of the Engineer In-charge, the matter in dispute shall, in

first place, be referred in writing to the Works Committee, Birla Institute of Technology,

Mesra, Ranchi ( henceforth called Committee) through its Member Secretary, with a copy to

the Engineer In-charge. Such reference shall state that it is made pursuant to this clause. Not

Page 48: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 38 of 62 Signature of contractor with seal

later than sixty after the day on which the reference received, the works committee shall give

notice of his decision to Engineer In-charge and the contractor. Such decision shall state that

it is made pursuant to this clause.

Unless the contract has already been repudiated or terminated, the contractor shall, in every

case, continue to proceed with the work with all due diligence and the contractor and the

Engineer In-charge shall give effect forthwith to every such decision of the committee unless

and until the same shall be revised, as hereinafter provided in an amicable settlement or an

arbitral award.

If either the Engineer In-charge or the contractor be dissatisfied with any decision of the

committee or if the committee fails to give notice of its decision on or before the sixtieth day

after the day on which reference was received by the committee, then, either the Engineer In-

charge or the contractor may, on or before forty fifth day after the day on which the said

period of Sixty days expired, as the case may be give notice to the other party, with a copy of

information to the Committee of his intention to commence arbitration as hereinafter

provided, as to the matter of dispute. Such notice shall establish the entitlement of the party

giving the same to commence arbitration, as hereinafter provided, as to such dispute and,

subject to Sub-clause 52.4, no arbitration in respect thereof may be commenced unless such

notice is given

If the committee has given notice of his decision as to a matter in dispute to the client and the

contractor and no notice of intention to commence arbitration as to such dispute has been

given by either the Engineer In-charge or the contractor on or before the forty fifth day after

the day on which the parties received notice as to such decision from the committee, the said

decision shall become final and binding upon the Engineer In-charge and the contractor.

51.2 Conciliation

Where notice of intention to commence arbitration as to dispute has been given in accordance

with sub clause 52.1, arbitration of such dispute shall not be commenced unless, the parties

have explored the possibility of conciliation as per the provisions of Part III of the Arbitration

and Conciliation Act, 1996. When such conciliation has failed, the parties shall adopt the

following procedure of arbitration

51.3 Arbitration

51.3.1 Any dispute and differences relating to the meaning of the specifications, designs,

drawings and instructions herein before mentioned and as to the quality of

workmanship or material used in the work or as to any other question, claim, right

matter or thing whatsoever in any way arising out of or relating to the contract,

designs, drawings, specifications, estimates, instructions, or these conditions or

otherwise concerning the works or the execution or failure to execute the same

whether arising during the progress of the work or after the completion or

abandonment thereof in respect of which:

(a) The decision, if any, of th engineer has not become final and binding pursuant

to sub clause 52.1 and

(b) Conciliation has not been reached as per the provisions of clause 52.2

Shall be referred to the Sole Arbitration of a person appointed by The Birla Institute

of Technology from the panel of Arbitrators. Such Arbitrators shall be appointed

within 30 days of the receipt of letter of invocation of Arbitration duly satisfying

Page 49: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 39 of 62 Signature of contractor with seal

the requirements of this clause.

51.3.2 If the Arbitrator so appointed resign his appointment, is unable or unwilling to act

due to any reason whatsoever, or dies, the employer, may appoint a new Arbitrator

in accordance with these terms and conditions of the contract, to act in his place and

the new Arbitrator so appointed may proceed from the stage at which it was left by

his predecessor.

52.3.3 It is a term of the contract that the party invoking the Arbitration shall specify the

dispute/ differences or questions to be referred to the arbitrator under this clause

together with the amounts claimed in respect of each dispute.

51.3.4 The Arbitrator may proceed with the arbitration ex-parte, if either party, in spite of a

notice from the Arbitrator, fails to take part in the proceedings

51.3.5 The work under the contract shall continue, if required, during the Arbitration

proceedings.

51.3.6 The Arbitrator shall make speaking Award and give reasons for his decision in

respect of each dispute/ claim along with the sums awarded separately on each

individual item of dispute or differences or claims. The Arbitrator shall make

separate award on each reference made to him.

51.3.7 The award of the Arbitrator shall be final, conclusive and binding on both the

parties.

51.3.8 Subject to aforesaid, the provisions of the Arbitration & Conciliation Act, 1996 or

any statutory modifications or re-enactment thereof and the Rules made there under

and for the time being in force shall apply to the arbitration proceedings and

Arbitrator shall publish his award accordingly.

51.4 Failure to comply with Works Committee Decision

Where neither the Employer nor the Contractor has given notice to commence arbitration of a

dispute within the period stated in Sub-Clause 52.1 and the related decision has become final

and binding either party may, if the other party fails to comply with such decision, and

without prejudice to any other rights it may have, refer the failure to arbitration in accordance

with sub-clause 52.3 as if the conditions specified in clauses 52.3 (a) and (b) had been

satisfied with respect to such dispute. The provisions of sub-clause 52.1 shall not apply to any

such reference.

Page 50: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 40 of 62 Signature of contractor with seal

SECTION 4

CONTRACT DATA

CONTRACT DATA

Page 51: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 41 of 62 Signature of contractor with seal

Clause Reference With respect to section 3

1. The Employer is

Name : Birla Institute of Technology, Mesra,

Address: Birla Institute of Technology, Mesra,

Ranchi – 835215, Jharkhand, India

Name of Employer’s Representative: Registrar, B I T , Mesra, Ranchi.

2. The Engineer In-charge is: Project In-charge, B I T, Mesra, Deoghar Campus.

3. The Defects Liability Period is 365 days from the date of completion. 4. The Start Date shall be same as the day for the date of issue of the Notice to proceed with the work.

5. The Intended Completion Date for the whole of the Works is 12 months from the date of the notice

to proceed with the work, with the following milestones:

Milestone dates:

Physical works to be completed. Period from the start date

Milestone 1

completion of structure work of Institute Building: 03 months

Milestone 2 Completion of Finishing including sanitary and electrification work of academic block : next 04

months

Milestone 3

Handing over of Academic block : Next 01 months (Total 08 Months)

6. The Site is located at Birla Institute of Technology, Deoghar Campus, Po. – Jasidih, Deoghar-

814142 .

7. The name and identification number of the Contract is: Institute Building, BIT/Deoghar/T/01

8. The work consists of Remaining works of Institute building. The work shall inter alia ,include the

following, as specified or as directed

(A) BUILDING WORKS

Site clearance; setting-out and layout of Building including all aspects of quality assurance of various components of the works; rectification of the defects in the completed works during the Defects Liability Period; submission of "As-built" drawings and any other related documents; and other item of work as may be required to be carried out for completing the works in accordance with the drawings and provisions of the contract to ensure safety.

(B) Other Items

Any other items as required to fulfill all contractual obligations as per the Bid documents

9. The following documents also form part of the Contract:

10. The law which applies to the Contract is the law of Union of India

11. The language of the Contract documents is English

12. The period for submission of the programme for approval of Engineer In-charge shall be 21 days

from the issue of Letter of Acceptance.

13. The period between programme updates shall be 60 days.

14. The amount to be withheld for late submission of an updated programme shall be Rs. Two Lacs.

15. The currency of the Contract is Indian Rupees.

16. The Schedule of Key Personnel

Page 52: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 42 of 62 Signature of contractor with seal

17. The Site Possession Dates shall be immediately after issuing of contract document.

18. The proportion of payments retained (retention money) shall be 10% from each bill subject to a

maximum of 8% of final contract price. It includes performance security equal to 2% of contract

price. Further bid security will be adjusted against performance security.

19. Amount of liquidated damages for delay in completion of work 1% of initial contract price per

week of delay.

20. Maximum limit of liquidated damages for delay in completion of work. 10% of initial contract

price rounded off to nearest thousand.

21. The amount of advance payment is mobilization advance: 10% of initial contract amount (on

submission of unconditional Bank Guarantee (to be drawn before the end of 20% of Contract

period). The contractor may furnish four bank guarantees of 2.5% each, valid for full period.

22. Repayment of advance payment for mobilization and equipment: The advance loan shall be repaid

@ 20% deductions from the Running bills certified by the Engineer In-charge under the Contract.

Loan shall be completely repaid prior to the expiry of the original time for completion

23. The percentage to apply to the value of the work not completed representing the Employer's

additional cost for completing the Works shall be 20 per cent.

24. Materials supplied by the Employer, if any, will be deducted from the bill at the rate of actual cost

incurred over that material.

25. Cement for all works in the contract, will be supplied by the Employer and same will be deducted

from running bill as per actual cost incurred.

26. Steel for reinforcement for all works in the contract will be supplied by the Employer and same will

be deducted from running bill as per actual cost incurred.

27. After completion of the work or on determination/ termination of the contract, the theoretical

quantity of cement to be used in work shall be calculated on the basis of statement showing

quantity of cement to be used in different items of work provided in current Schedule for the

purpose printed by CPWD. In case any item is executed for which the standard contents for the

consumption of cement are not available in the above mentioned statement or cannot be derived

from this statement, the same shall be calculated on the basis of standard formula to be laid down

by the Engineer In-charge. Over this theoretical quantity of cement shall be allowed a variation

upto ±2%. The difference in the quantity actually issued to the contractor and the theoretical

quantity including authorised variation if not returned by the contractor, shall be recovered at twice

the issue rate, without prejudice to the provision of other conditions regarding return of material

governing the contract. In the event of its beings discovered that the quantity of cement which is

less than the quantity ascertained as herein before provided (allowing variation on minus side as

stipulated above) the cost of quantity of cement not so used, shall be recovered from the contractor

on the basis of stipulated issue rates and cartage to site.

28. The contractor shall provide himself with requisite quantity and quality of water for carrying out

the works at his own, However, if the contractor is permitted to make his own arrangement to draw

water from a well, hand‐pump, or natural river or pond of the Employer, no charges will be made

for the water drawn from the same, but the contractor will make good any damage done to the

installations and ensure that the quality of water used in the work is conforming to BIS codes and

provide for any treatment at his own cost.

29. The contractor shall be allowed to construct temporary wells in Employer's land for taking water

for construction purpose only after he has permission of the Employer in writing. No charges shall

be recovered from the contractor on this account but the contractor shall be required to provide

necessary safety arrangement to avoid any accident or damage to adjacent buildings, roads and

service lines. He shall be responsible for any accident or damage caused due to construction and

subsequent maintenance of the wells and shall restore the ground to its original condition after the

wells are dismantled on completion of the work.

30. The Employer on no account shall be responsible for the expenses incurred by the contractor for

hired ground or water obtained from elsewhere.

Page 53: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 43 of 62 Signature of contractor with seal

31. Subject to availability the Employer may supply power at only one point from where the Contractor

shall make his own arrangement for distribution including provision of electric meters, switches,

fuses etc. at his own cost. These shall be in the custody of the Employer. If there is any hindrance

caused to other works the contractor shall reroute or remove such temporary lines without any extra

cost. Such temporary lines shall be removed after the completion of work. The cost of power

consumed by the contractor shall be payable to the employer at rates fixed by the Employer, which

would be deducted from the running account bills. However the Employer does not guarantee the

supply of power and no compensation for any failure or short supply of power shall be entertained.

Page 54: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 44 of 62 Signature of contractor with seal

SECTION 5

FORM OF BID

FORM OF BID

Description of the Works:

A. Completion of Remaining works of Institute building at BITEC, Deoghar.

Page 55: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 45 of 62 Signature of contractor with seal

BID

To : Birla Institute of Technology, Mesra

Address : Birla Institute of Technology, Mesra

Po. – B.I.T, Mesra

Ranchi – 835215

Jharkhand (India)

1 We offer to execute the Works described above and remedy any defects therein in conformity with

the conditions of Contract, specification, drawings, Bill of Quantities and Addenda for the sum(s) of

_______________________________________________________________________

_______________________________________________________________________

____________________________________________________________________ )

2 We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably possible

after the receipt of the notice to commence, and to complete the whole of the Works comprised in

the Contract within the time stated in the document.

3 We agree to abide by this Bid for the period of * ______ days from the date fixed for receiving the

same, and it shall remain binding upon us and may be accepted at any time before the expiration of

that period.

4 Unless and until a formal Agreement is prepared and executed this Bid, together with your written

acceptance thereof, shall constitute a binding contract between us.

5 We understand that you are not bound to accept the lowest or any tender you may receive

Dated this _____________ day of _______________________ 2015

Signature _____________________________ in the capacity of __________

duly authorized to sign bids for and on behalf of ________________________

(in block capitals or typed)

Address

Witness

__________________________________________________________________

__________________________________________________________________

Address

Page 56: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 46 of 62 Signature of contractor with seal

______________________________________________________________________

_____________________________________________________________________

Occupation

_________________________________________________________________

__________________________________________________________________

Page 57: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 47 of 62 Signature of contractor with seal

SECTION 6

SECURITIES AND OTHER FORMS

BID SECURITY (BANK GUARANTEE )

WHEREAS, _______________________ [name of Bidder] (hereinafter called "the

Bidder") has submitted his Bid dated ________________ [date] for the construction of _____

Page 58: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 48 of 62 Signature of contractor with seal

_____________ [name of Contract hereinafter called "the Bid"].

KNOW ALL PEOPLE by these presents that We ____________________________________

[name of Bank] of __________________________ [name of country] having our

registered office at __________________________ (hereinafter called "the

Bank") are bound unto __________________________ [name of Employer’s

Representative] (hereinafter

called "the Employer’s Representative") in the sum of _____________ * for which payment

well and truly to be made to the said Employer’s Representative the Bank itself, his

successors and assigns by these presents.

SEALED with the Common Seal of the said Bank this _________ day of _________ ,

20__ THE CONDITIONS of this obligation are:

(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity specified in the Form of Bid;

OR (2) If the Bidder having been notified to the acceptance of his bid by the Employer during the

period of Bid Validity:

(a) fails or refuses to execute the Form of Agreement in accordance with the Instructions to

Bidders, if required; or

(b) fails or refuses to furnish the Performance Security, in accordance with the Instructions to

Bidders; or

(c) does not accept the correction of the Bid Price pursuant to Clause 27.

We undertake to pay to the Employer up to the above amount upon receipt of his first written

demand, without the Employer having to substantiate his demand, provided that in his demand

the Employer will note that the amount claimed by him is due to him owing to the occurrence of

one or any of the three conditions, specifying the occurred condition or conditions.

This Guarantee will remain in force up to and including the date ______________ ** days

after the deadline for submission of Bids as such deadline is stated in the Instructions to Bidders

or as it may be extended by the Employer, notice of which extension(s) to the Bank is hereby

waived. Any demand in respect of this guarantee should reach the Bank not later than the above

date.

DATE SIGNATURE ______________

WITNESS _________________________ SEAL _____________________________

________________________________________________________________________

Page 59: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 49 of 62 Signature of contractor with seal

[Signature, name and address]

* The Bidder should insert the amount of the guarantee in words and figures denominated in Indian

Rupees. This figure should be the same as shown in Clause 16.1 of the Instructions to Bidders.

** 45 days after the end of the validity period of the Bid. Date should be inserted by the Employer before

the Bidding documents are issued

PERFORMANCE BANK GUARANTEE

To

Registrar,

Birla institute of Technology, Mesra,

Page 60: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 50 of 62 Signature of contractor with seal

Ranchi-835215, Jharkhand (India)

WHEREAS ______ , ______________________ [name and address of Contractor] (hereafter called

"the Contractor") has undertaken, in pursuance of Contract No. __________ dated ___________ to

execute __________________________ [name of Contract and brief description of Works]

(hereinafter called "the Contract").

AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish

you with a Bank Guarantee by a recognized bank for the sum specified therein as security for

compliance with his obligation in accordance with the Contract;

AND WHEREAS we have agreed to give the Contractor such a Bank Guarantee: NOW THEREFORE

we hereby affirm that we are the Guarantor and responsible to you on behalf of the Contractor, up to a

total of__________________________ [amount of guarantee]* _______________________ (in

words), such sum being payable in the types and proportions of currencies in which the Contract Price

is payable, and we undertake to pay you, upon your first written demand and without cavil or

argument, any sum or sums within the limits of ____________________________ [amount of

guarantee] as aforesaid without your needing to prove or to show grounds or reasons for your demand

for the sum specified therein.

We hereby waive the necessity of your demanding the said debt from the contractor before presenting

us with the demand.

We further agree that no change or addition to or other modification of the terms of the Contract or of

the Works to be performed there under or of any of the Contract documents which may be made

between your and the Contractor shall in any way release us from any liability under this guarantee,

and we hereby waive notice of any such change, addition or modification. This guarantee shall be valid

until 28 days from the date of expiry of the Defect Liability Period.

Signature and Seal of the guarantor _____________________

Name of Bank _____________________________________

Address _________________________________________

Date _________________________________________

___________________________________________________________________________

*An amount shall be inserted by the Guarantor, representing the percentage the Contract Price specified in the Contract including additional security for unbalanced Bids, if any and denominated in Indian Rupees.

BANK GUARANTEE FOR ADVANCE PAYMENT

To

Registrar,

Birla institute of Technology, Mesra,

Ranchi-835215, Jharkhand (India)

Page 61: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 51 of 62 Signature of contractor with seal

______________________________________________[name of Contractor]

Gentlemen:

In accordance with the provisions of the Conditions of Contract, sub-clause ("Advance

Payment") of the above-mentioned Contract, [name and address of Contractor] (herein after

called "the Contractor") shall deposit with [name of Employer’s Representative] a bank

guarantee to guarantee his proper and faithful performance under the said Clause of the Contract

in an amount of_________________________ [amount of Guarantee]*

___________________________________ [in words].

We, the ___________________________ [bank of financial institution], as instructed by the Contractor, agree unconditionally and irrevocably to guarantee as primary obligator and not as Surety merely, the payment to _________ [name of Employer’s Representative] on his first demand without whatsoever right of obligation on our part and without his first claim to the Contractor, in the amount not exceeding ___ ______________________ [amount of guarantee]*_________________________________ [in words].

We further agree that no change or addition to or other modification of the terms of the

Contractor or Works to be performed there under or of any of the Contract documents which

may be made between_________________________[name of Employer’s Representative] and

the Contractor, shall in any way release us from any liability under this guarantee, and we

hereby waive notice of any such change, addition or modification.

This guarantee shall remain valid and in full effect from the date of the advance payment under the

Contract until _________________________[name of Employer’s Representative] receives full

repayment of the same amount from the Contractor.

Yours truly,

Signature and Seal : ______________________________________

Name of Bank / Financial Institution : ________________________

Address; _______________________________

Date:

_________________________________________________________________

*An amount shall be inserted by the Bank or Financial Institution representing the

amount of the Advance Payment, and denominated in Indian Rupees.

Letter of Acceptance (BIT Letter Pad)

______________________________ (Date)

To

___________________________________ (Name and address of the Contractor)

Page 62: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 52 of 62 Signature of contractor with seal

___________________________________

___________________________________

Dear Sirs,

This is to notify you that your Bid dated _______________ for execution of the

______________________________________ (name of the contract and identification

number, as given in the Instructions to Bidders) for the Contract Price of Rupees

_____________________________ ( _____________________ ) (amount in words and

figures), as corrected and modified in accordance with the Instructions to Bidders1 is hereby

accepted by our agency.

You are hereby requested to furnish Performance Security, in the form detailed in Para 32.1 of

ITB for an amount equivalent to Rs. ___________________ within 21 days of the receipt of this

letter of acceptance and sign the contract, failing which action as stated in Para 32.3 of ITB will

be taken.

Yours faithfully,

Authorized Signature Registrar, BIT, Mesra

Issue of Notice to proceed with the work ( BIT Letter Pad )

__________________________ (Date)

To

_____________________________________ (Name and address of the Contractor)

Page 63: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 53 of 62 Signature of contractor with seal

_____________________________________

_____________________________________

Dear Sirs,

Pursuant to your furnishing the requisite security as stipulated in ITB Clause 32.1 and signing

of the Contract for the construction of

___________________________________________________________________________

___________________________________________________________________________

at a Bid Price of Rs.__________________________________________________________.

You are hereby instructed to proceed with the execution of the said works in accordance with

the contract documents.

Yours faithfully,

(Signature, name and title of BIT Representative)

Agreement Form

Agreement

This agreement, made the ____________ day of ________________ between

Birla Institute of Technology, Mesra, Ranchi- 835215, Jharkhand (India) [hereinafter called "the

Employer] and ___________________________________________________________

Page 64: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 54 of 62 Signature of contractor with seal

(name and address of contractor) hereinafter called "the Contractor" of the other part.

Whereas the Employer is desirous that the Contractor execute

(name and identification number of Contract) (hereinafter called "the Works") and the

Employer has accepted the Bid by the Contractor for the execution and completion of such

Works and the remedying of any defects there in, at a cost of Rs. ________________

NOW THIS AGREEMENT WITNESSETH as follows:

1. In this Agreement, words and expression shall have the same meanings as are respectively

assigned to them in the conditions of contract hereinafter referred to and they shall be

deemed to form and be read and construed as part of this Agreement.

2. In consideration of the payments to be made by the Employer to the Contractor as

hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and

complete the Works and remedy any defects therein in conformity in all aspects with the

provisions of the contract.

3. The Employer hereby covenants to pay the Contractor in consideration of the execution

and completion of the Works and the remedying the defects wherein Contract Price or

such other sum as may become payable under the provisions of the Contract at the times

and in the manner prescribed by the Contract.

4. The following documents shall be deemed to form and be ready and construed as part of

this Agreement viz.

i. Letter of Acceptance

ii. Notice to proceed with the works;

iii. Contractor's Bid

iv. Condition of Contract: General and Special

v. Contract Data

vi. Additional condition

vii. Drawings

viii. Bill of Quantities and

ix. Any other documents listed in the Contract Data as forming part of the Contract.

In witnessed whereof the parties there to have caused this Agreement to be executed the day

and year first before written.

The Common Seal of _____________________________________was hereunto affixed in the presence of :

Signed, Sealed and Delivered by the said __________________________________

___________________________________________________________________ in the

presence of:

Binding Signature of BIT Representative __________________________

Page 65: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 55 of 62 Signature of contractor with seal

Binding Signature of Contractor ______________________________________

UNDERTAKING

I the undersigned do hereby undertake that our firm M/s__________________

___________________________________ agree to abide by this bid for a period ____________ days for

the date fixed for receiving the same and it shall be binding on us and may be accepted at any time before

the expiration of that period.

Page 66: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 56 of 62 Signature of contractor with seal

_________________________________________

(Signed by Contractor/an Authorized Officer)

__________________

Title of Officer

_______________-

Name of Firm

_________________ DATE

Page 67: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 57 of 62 Signature of contractor with seal

SECTION 7

TECHNICAL SPECIFICATIONS &

BILL OF QUANTITIES

TECHNICAL SPECIFICATIONS

1. For all work in the contract will be governed by CPWD specifications 2009 Vol. I and Vol. II published by Director general of works, CPWD, Government of India, in conjunction with Bill of quantity.

2. All work will be done as per design/ drawings provided by Engineer In-charge. 3. The make of some items are given as below, any other items will be used for the work after

duly approval by the Engineer In-charge:

Page 68: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 58 of 62 Signature of contractor with seal

Sl.No. ITEMS APPROVED MAKES

1 Cement ACC/ Lafarge/ Ultratech (Supplied by the Employer)

2 Steel (TMT/ TOR) TATA Tiscon/ Sail (Supplied by the Employer)

3 Paneled doors Made to order with seasoned wood as per design

4 Flush doors Century make.

5 Ply of all thickness Century make

6 P.V.C doors Syntex, or, Rajshree Make

7 Aluminium doors & windows Jindal,or saint-gobian make

8 External paint Apex ultima of Asian make

9 Glazing Modi float/ saint -gobian,

10 European pattern water closet Parryware, make

11 Flat black urinal in white china clay Parryware, make

12 White vitreous china wash basin Parryware, make

13 P.V.C.Cistern Parryware, make t

14 G.I.Pipe Tata B" class (Medium)

15 G.I. Pipe Fitting Sun or 555Brand (ISI)

16 Rain water pipe Supreme,make

17 Anti-corrosive Paint Asian paint

18 Water proofing compound Sika/ Cico or equivalent

19 Glazed Ceramic tiles Orient make

20 Non skid Ceramic tiles Orient make

21 Aluminium fitting Allans Bharat or equivalent

22 Iron bolt hinges Moujee or equivalent

23 Aluminium bolt hinges Allans, Bharat or equivalent

24 Aluminium 'D' type handle Allans, Bharat or equivalent

25 Aluminium floor door stopper Allans, Bharat or equivalent

26 Black Japan paint Asian or ICI make

27 Distemper Tractor acrylic distemper of Asian make

28 Synthetic enamel paint Asian make

29 Door closure Everite, Garnish or equivalent

30 Locks Godrej Locks

31 Electric wire Havells, Polycab, finolex, L & T or equivalent

32 DB/ MCB Havells, Anchor/ MKS, L&T or equivalent

33. Switches Anchor or equivalent

34 Water supply fittongs Essco/ Cera make

35 Any other items As approved by Engineer In-charge

BILL OF QUANTITIES

Preamble

1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, Conditions of

Contract, Technical Specifications and Drawings.

2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide

Page 69: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 59 of 62 Signature of contractor with seal

a common basis for bidding. The basis of payment will be the actual quantities of work ordered and

carried out, as measured by the Contractor and verified by the Engineer In-charge and valued at the

rates and prices tendered in the priced Bill of Quantities, where applicable, and otherwise at such

rates and prices as the Engineer In-charge may fix within the terms of the Contract.

3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it is otherwise

provided under the Contract, include all constructional plant, labour, supervision, materials,

erection, maintenance, insurance, profit, taxes and duties, together with all general risks, liabilities

and obligations set out or implied in the Contract.

4. The rates and prices shall be quoted entirely in Indian Currency.

5. General directions and descriptions of work and materials are not necessarily repeated or

summarized in the Bill of Quantities. References to the relevant sections of the contract

documentation shall be made before entering rates or prices against each item in the Bill of

Quantities.

6. The method of measurement of completed work for payment shall be in accordance with the

specification for Building Works published by CPWD, Government of India.

7. Rates quoted by the contractor shall include sales tax, duties, octroi, toll tax, realties and all other

taxes in respect of this contract and the Employer shall not entertain any claim whatsoever in this

respect. Tendered rates are inclusive of all taxes levies payable under the respective statutes.

However pursuant to the Constitution (Forty Sixth Amendment) Act; 1982 if any further tax or levy

is imposed by Statutes, after the date of receipt of tenders and the contractor there upon necessarily

and properly pays such taxes/ levie the contractor shall be reimbursed the amount as per the rules on

producing proof of payment so made provided such payments, if any, is not in the opinion of the

Employer (whose decision shall be final and binding) attributable to delay in execution of work

within the control of the contractor.

BILL OF QUANTITIES

Tender Inviting Authority: Birla Institute of Technology, Mesra, Ranchi

Name of Work: For Completion of Remaining works of Institute building, Deoghar Campus

Contract No: BIT/Deoghar/T/01 dated 01/09/2015 Bidder Name :

Page 70: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 60 of 62 Signature of contractor with seal

SCHEDULE OF WORKS

Sl. No. Description of

work

Quantity Unit Rate to be entered by the

bidder (Rs.)

Amount

(Rs.)

Figure Words

1

2

3

TOTAL (Rs.) ( in Figure)

TOTAL (Rs.) ( Words)

Enclosed as ANNEXURE I of bidding document and may be downloaded from website

www.bitmesra.ac.in

BOQ Enclosed as :

1. Institute building - Annexure A

Page 71: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar

BIRLA INSTITUTE OF TECNOLOGY

Page 61 of 62 Signature of contractor with seal

SECTION 8

DRAWINGS

(Enclosed as Annexure B)

Page 72: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar
Page 73: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar
Page 74: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar
Page 75: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar
Page 76: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar
Page 77: BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS · BIDDING DOCUMENT PROCUREMENT OF CIVIL WORKS CONSTRUCTION OF A. For completion of Remaining works of Institute building at B.I.T., Deoghar