RAPS-1&2 PIDS Page No. 1 of 64 PIDS Pre-Qualification The intended item is complete integrated system which requires Design, Supply, erection, installation, commissioning (including testing, demonstration) and documentation. Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order of Perimeter Protection System / Perimeter Intruder Detection System / Digital Video Management based surveillance system in Power station, Airport, DAE, NPCIL, during last Five years and they have to provide one set of supported documents viz. purchase order copy as proof along with quotation for qualification. Failing to meet PQ will lead to disqualification. Other Pre-Qualification Criteria. S. No. Criteria Type Mandatory Eligibility Criteria Documentary Evidence 1 Tenderer’s Credentials The bidder should be registered as a company in India as per Company Act 1956 along with GST Particulars. Copy of the certificate of incorporation issued by registrar of the Companies & full address of Registered office along with GST Details 2 Tenderer’s Credentials The bidder should not have been debarred/ Blacklisted for corrupt and/or Fraudulent practices by any Govt. of India/ State Govt. of India/ PSU within India Self-declaration by the Tenderer/ Bidder on its Letterhead

Upload: others

Post on 29-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 1 of 64 PIDS Pre-Qualification

The intended item is complete integrated system which requires Design, Supply, erection, installation, commissioning (including testing, demonstration) and documentation. Hence supplier shall meet the following pre-qualification criterion.

Bidder should have executed minimum one order of Perimeter Protection System / Perimeter Intruder Detection System / Digital Video Management based surveillance system in Power station, Airport, DAE, NPCIL, during last Five years and they have to provide one set of supported documents viz. purchase order copy as proof along with quotation for qualification. Failing to meet PQ will lead to disqualification. Other Pre-Qualification Criteria. S. No. Criteria Type Mandatory Eligibility Criteria Documentary Evidence

1 Tenderer’s Credentials

The bidder should be registered as a company in India as per Company Act 1956 along with GST Particulars.

Copy of the certificate of incorporation issued by registrar of the Companies & full address of Registered office along with GST Details

2 Tenderer’s Credentials

The bidder should not have been debarred/ Blacklisted for corrupt and/or Fraudulent practices by any Govt. of India/ State Govt. of India/ PSU within India

Self-declaration by the Tenderer/ Bidder on its Letterhead

Page 2: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 2 of 64

Instructions to bidders

Bidders are requested participate pre bid query to clarify their doubts. Site visit permitted after prior permission and approval from Maintenance Superintendent, RAPS-1&2.

Bidders must read the complete specifications document carefully and understand all the

requirements fully before quoting.

They shall fill the compliance to the specifications mentioning word “Complied” in the column

marked as Bidders response. Deviation if any shall be mentioned with reasons. Partly complete

quotations and quotations submitted without filling compliance requirement will be rejected in

Part-I tender evaluation.

Quotations will be rejected if they do not satisfy the complete requirement. Examples 1) Quoting

for part of items, 2) Only quoting for supply of items, 3) Quotations incomplete in any part.

Bidders shall ensure that all equipment’s, instruments, computer, networking, hardware and

software supplied are currently in market and not outdated versions.

RR site ambient outdoor temperature from 4 Deg C to 50 Dec C. Supplier shall consider this

along with metal temperature for all outdoor equipment.

Page 3: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 3 of 64

NUCLEAR POWER CORPORATION OF INDIA LTD

(A Government of India Enterprise)

TECHNICAL SPECIFICATION

ON

PERIMETER INTRUDER DETECTION SYSTEM

For Rajasthan Atomic Power Station -1&2

Ref. USI No. 61900

Page 4: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 4 of 64

TABLE OF CONTENTS

Sr. No. TITLE Page No 1.0 INTRODUCTION 6 1.1 Purpose 6 1.2 Scope 6 1.3 Definitions 6 2.0 APPLICABLE STANDARDS , SPECIFICATION AND DRAWINGS 7 2.1 Applicable Standards And Specification 7 2.2 Drawings 8 3.0 MATERIAL, PROCESSES, WORKMANSHIP AND PRACTICES 8 3.1 Material and Processes 8 3.2 Workmanship 9 3.3 Practices 9 4.0 GENERAL CONDITIONS FOR SUPPLIER & MANUFACTURER 9 5.0 GENERAL REQUIREMENTS 10 5.1 Environmental requirements 10 5.2 Input Power Supply to the Equipment 10 5.3 Insulation Resistance 11 5.4 Grounding 11 5.5 Components 12 5.6 Terminations 12 5.7 Painting 12 5.8 Non-Disclosure Agreement 12 5.9 Safety Requirements 12

5.10 Fault Tolerance Requirements (Single Failure Criterion) 12 5.11 Security Requirements 12 5.12 Self-Diagnostics Requirements 13 5.13 On-line Testability Requirements 13 5.14 Off-line Testability Requirements 13 5.15 Reliability Requirements 13 5.16 Availability Requirements 13 5.17 Maintainability Requirements 14 5.18 Physical & Layout Requirements 14 6.0 SYSTEM REQUIREMENTS 14 6.1 General 14 6.2 CCTV System 15 6.3 Hardware and Miscellaneous Items 30 6.4 Cables & conduits 31 6.5 LAN 31 7.0 DOCUMENTS 39 7.1 General 39 7.2 Operation & Maintenance Manual 39 7.3 Inspection History Document 39

Page 5: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 5 of 64 35Sr. No. TITLE Page No 8.0 INSPECTION AND TESTING 40 8.1 General 40 8.2 Tests at factory 40 8.3 Functional test 40 8.4 Burn-in test 41 8.5 Insulation test 41 9.0 INSTALLATION & COMMISSIONING 41 9.1 Installation 41 9.2 Commissioning of Physical protection system 44 9.3 Test Run 45 10.0 Spares 45 11.0 Training 45 12.0 Guarantee 46 13.0 Identification 46 14.0 Packing and shipment 46 15.0 OVERALL GENERAL REQUIREMENT 47 Annexure-1 BILL OF QUANTITIES (BOQ) 48 Annexure-2 TECHNICAL DATA TO BE FURNISHED WITH PROPOSAL with

Questionnaire to the bidders 51

Annexure-3 BOQ: Field work items for PIDS system 59 Annexure-4 QUALITY ASSURANCE PLAN(QAP) 60 Annexure-5 Abbreviations 63 Annexure-6 Photographe Diagram of Plant Boundary 63 Annexure- 7 Representative layout –Not actual , Not all components shown 64

Page 6: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 6 of 64 1.0 INTRODUCTION

1.1 Purpose The purpose of this document is to specify the requirements for design, engineering, manufacture, testing, supply, delivery to site, testing at site, installation, commissioning at site, training to site personnel, documentation requirement and guarantee of Perimeter Intruder Detection System (PIDS) for RAPS-1&2 Power Station.

1.2 Scope

PIDS is common system for both the units. This document serves as the basis for carrying out the following:

a) Supply of various components (including sensors, cameras and field modules) & assembling the modules & panels.

b) Supply of licensed software related to the components c) Supply of associated peripherals, cables, conduits and its accessories. d) Supply of panels, fixtures, JBs and GUs. e) Supply of test equipment. f) Supply of 10 % of Modules, components and peripherals etc. as spares. g) Inspection and tests to meet the requirements of NPCIL set forth in this specification. h) Preparation of drawings like GA, BM, schematics, wiring diagrams & nameplate details etc. i) Mounting and wiring of associated sub modules/ servers and panels in consoles. j) Laying of various types of cables in rigid G.I / SS conduit / in indoor areas & inside cable

trenches and rigid HDPE pipes in outdoor areas for connecting various types of sensors with JBs.

k) Installation of sensors/ cameras/ field modules in the field. l) Wiring termination of cables at JB’s, Panels, sensors and other field modules. m) Carry out modifications in the system matching with final design drawings if any at site. n) Loading of software and configuring the servers, PCs, Modules etc. o) Commissioning of the system at RAPS 1&2 site. i.e. electronic and software p) Setting the system software as per field requirement and configuration of alarm, map etc as

required by station. q) Training the Plant staff and CISF for operation and maintenance of system r) Preparing the finalized installation and wiring drawings

1.3 Definitions

Channel (Instrumentation) An arrangement of interconnected components within a system that initiates output(s). Common Cause Failure The failure of a number of devices or components to perform their functions, as a result of a single specific event or cause. Diversity The presence of two or more different components or systems to perform an identified function, where the different components or systems have different attributes, so as to reduce the possibility of common cause failure.

Page 7: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 7 of 64 Fail Safe Design A concept in which, if a system or a component fails, then plant/component/system will pass into a safe state without the requirement to initiate any operator action. Functional Isolation Prevention of influences from the mode of operation or failure of one circuit or system on another. Independence The ability of equipment, channel or a system to perform its function irrespective of the normal or abnormal functioning of any other equipment, channel or system. Independence is achieved by functional isolation and physical separation. Physical Separation A means of ensuring independence of equipment through separation by geometry (distance, orientation etc.), appropriate barriers or a combination of both. Redundancy Provision of alternative structures, systems, components of identical attributes, so that anyone can perform the required function, regardless of the state of operation or failure of the other. Reliability The probability that a structure, system, component or facility will perform its intended (specified) function satisfactorily for a specified period under specified conditions. Quality Assurance Planned and systematic actions necessary to provide adequate confidence that an item or a facility will perform satisfactorily in service as per design specifications. System Safety Analysis Analysis, of design of computer based systems, consisting of Confirmation of Safety Function implementation, Failure Analysis, CCF analysis. Software Quality The composite characteristics of software that determine the degree to which the software in use will meet the expectations of the user. Single Failure A random failure, which results in the loss of capability of a component to perform its intended safety function. Consequential failures resulting from a single random occurrence are considered to be part of the single failure. 2.0 APPLICABLESTANDARDS, SPECIFICATIONS AND DRAWINGS 2.1 Applicable standards & NPCIL specifications

The following standards are to be followed in conjunction with this specification. However, in view of the large number of designs existing for PPS, suppliers not complying with the following standards and / or the design requirements given elsewhere in these specifications may send quotation specifying clearly which of the design requirements / standards specified are not complied. However, such bids will be accepted only if the systems offered meet minimum functional requirements and conform to reliability and availability standards specified elsewhere in this document.

Page 8: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 8 of 64 Applicable standards 1. IAEA INFCIRC/225/Rev 5 for the Physical Protection Of Nuclear Materials & Nuclear Facilities 2. IS 9000 Part III & V for Basic environmental testing procedure for electrical and electronic items 3. IS-5 for Colors for ready mixed paints & enamels. 4. IS-13947 for Low voltage switchgear. Applicable NPCIL specifications 1. PC-E-709: NPCIL Engineering Standard on Instrumentation & control system grounding. 2. PC-E-710: NPCIL Technical Specification for Electromagnetic compatibility qualification of C &

I Equipment 3. PC-E-188: NPCIL Technical Specification for Switch Mode Power Supplies (SMPS) 4. PB-E-165: NPCIL Technical Specification for HRPVC insulated FRLS PVC sheathed unarmored

cables. 5. PC-E-347: NPCIL Technical Specification on Junction boxes. 6. PP-E-2061: NPCIL’s Technical Specification for requirements of components for instrumentation

items. Note: In the event that certain requirements of the above specifications conflict with the requirements of this specification, the latter shall govern.

The standards, specification / data sheets of all major items, including the bought out items, required for manufacture of the system shall be submitted by the supplier within one month of the receipt of this specification and on acceptance of the same by the Purchaser, they shall form part of requirements of this specification.

2.2 Drawings The methodology of the system will be explained in this document. It is the responsibility of the supplier to work out the complete design and prepare detailed drawings and submit the same along with his offer. The drawings pertaining to fabrication, engineering and installation can be sought by purchaser while evaluating vendor offer. All the drawings & documents prepared by successful bidder will become the property of the purchaser and he shall not disclose the details to any person/ agency without the written approval of purchaser. See non-disclosure agreement in sec.5.8. 3.0 MATERIALS, PROCESSES, WORKMANSHIP AND PRACTICES 3.1Materials and Processes Materials, processes and standard parts that are required for the fulfillment of this specification, shall be of very good quality and in accordance with the high grade practice pertinent to the manufacture of this type of equipment. Suitable care shall be taken in design, procurement & manufacture of the equipment. All electrical & electronic components used shall be standard components readily available in the market from multiple vendors. The components shall be in the list of current products and recommended by the manufacturer for current design. All components used shall be “type approved” or shall have gone through a satisfactory quality assurance test program.

Page 9: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 9 of 64 The electrical, electronic components and the integrated circuits to be used for the system shall conform to any national or international standards such as IS/JSS/CECC/BS/DEF/DIN/VDE/US-MIL. The components procured shall be along with batch certificates for compliance with the applicable standard. The material employed shall be fire retardant, fungus and corrosion resistant. NPCIL’s technical specification No. PP-E-2061, Rev.1 for requirements of components for instrumentation items shall be followed. 3.2 Workmanship The workmanship shall be in accordance with the high grade practice to ensure satisfactory operation and service life of 25 years in accordance with the provisions of this specification. The units mounted in the control panels, shall be modular in design with adequate test points for easy maintenance and troubleshooting purpose. 3.3 Practices The components shall be sufficiently de-rated for long life and component arrangement shall allow proper heat dissipation avoiding hot spots. Adequate test point shall be provided for trouble shooting purpose. The software shall be of modular design. The supplier shall provide detailed documentation on system software and application software for long term maintenance of software. Uniform hardware and software modules shall be used wherever possible to minimize the number of types of modules. 4.0 GENERAL CONDITIONS FOR SUPPLIER & MANUFACTURER a) The Supplier & Manufacturer of PPS equipment shall have experienced staff available for

planning, engineering, commissioning and maintaining the PPS system.

b) The Supplier & Manufacturer of PIDS equipment shall have at least five years of experience in the design, manufacturing, installation, commissioning and maintenance of PERIMETER INTRUDER DETECTION SYSTEM equipment and shall have a successful record of installation & commissioning of PPS in various types of premises/plants. The supplier shall provide a record of above along with the offer.

c) Other documents required along with the offer are;

i. Relevant documents such as system write up, system block diagram, technical data sheets, brochures, approval certificates and installation, commissioning and maintenance guidelines of the offered system.

ii. A point to point compliance with respect to all the points of this specification indicating

details of deviations if any.

iii. In case deviations require modifications in the bill of quantities (BOQ) given in the Annexure-1, the BOQ shall be updated with the justification & approval of the Purchaser shall be obtained.

d) The Purchaser or his designated representative shall have the right to conduct quality surveillance

of the proposed equipment on the manufacturer’s and/or his sub-contractor premises. e) Drawings dealing with overall dimensions, cutouts, general layouts, controls, field wiring

diagrams etc. shall be sent for purchaser’s approval before manufacture.

Page 10: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 10 of 64

5.0GENERAL REQUIREMENTS

The PIDS equipment shall preferably be procured from reputed manufacturers. 5.1 Environmental requirements The PIDS sensors & detectors shall be suitable for continuous operation & storage at the ambient conditions as specified below: 5.1.1 Climatic conditions

The climatic conditions shall be as follows: Storage Temperature: 0 to 50° C, R.H. up to 95% Non-condensing For controlled environment:- Normal Temperature: 8 to 40 ° C, R.H. up to 90% Non-condensing For uncontrolled environment Normal Temperature: 5 to 50 ° C, R.H. up to 90% Non-condensing or as specifically mentioned against an equipment. Occasional Temperature: 5 to 55 ° C, R.H. up to 95% Non-condensing 5.1.2 EMI/RFI conditions

Suitable design features shall be incorporated to provide immunity against EMI/RFI and line transients as per NPCIL standard PC-E-710. EMC/EMI immunity Test Certificates of Equipment’s shall be submitted 5.2 Input Power Supply to the Equipment

Two feeders each comprising of single Phase, A.C. power supply of the following specifications will be made available at one location as input to the UPS Voltage RMS Value : 240Volts Steady state variation : 10% Transient variation : 20% (for 1sec)

Frequency Frequency : 50Hz Steady state variation : 5% Transient variation : 10% (for 1sec)

Supplier shall make arrangements to test the functioning of UPS under steady state & transient variations.

1. The single phase 240 V 50 Hz output from UPS (direct output or through bypass (Manual with

Auto during inverter failure) input when UPS is taken for maintenance) shall be used as AC power supply input to the various subsystems & cameras of PPS. The output shall be distributed into a no. of feeders of required capacity in such a manner that each loop/ circuit of a subsystem is fed from separate MCBs/ MCCBs. The distribution cabinets/ JBs containing the various MCBs for various feeders shall be made available at CAS control room. The Distribution Cabinets/ JBs shall be so

Page 11: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 11 of 64 designed with two levels of MCBs, first level for the entire subsystem and the next level for individual loop/ circuit of subsystem. The first level should contain one RCCB to protect system against ground fault. Field RCCB shall be rated to trip at 30 mA and CAS room RCCB rated trip at 300 mA. MCBs/ MCCBs shall meet requirements as per IS-13947 for Low voltage switchgear. The distribution cabinet/ JB shall have adequate spare feeders of various sizes.

2. AC to DC Converter/Adopter / DC to DC converters required if any for subsystem of Perimeter Intruder Detection System shall be mounted in the field near the equipment inside a general unit. Adopters supplied must be with cables for input (240V) and output (DC). Plug Mounted adopters will be rejected.

3. 240 VAC, single phase, 50 Hz supply shall be made available for PCs/ servers, monitors, printers from the power supply to consoles fed from distribution cabinet. The same power supply shall also fed to lighting, receptacle and instrument cooling fans mounted in the CAS console.

4. Supplier shall make arrangements to test the system functioning under steady state &transient variations.

5. Supplier shall have the responsibility to calculate the 240 V AC power (Watt’s & VAR’s) requirements for the equipment and advise the purchaser well in advance for making the necessary provisions.

6. The system shall perform satisfactorily at specified upper and lower limits of required power supply. The system shall operate satisfactorily for 30% dip in power supply voltage for duration of 200 msec.

7. When AC power is restored after failure, all the PPS& its PCs/ servers shall start automatically without the intervention of the operator with the entire database stored in the system.

5.2.1 Uninterruptible Power Supply (UPS)

One number of 15 KVA (minimum) freely standing un-interruptible power supply system with one hour of battery backup shall be supplied to give 240 VAC single phase 50 Hz power supply. It shall consist of rectifier, inverter and all the control and protective elements to accept to two feeders each of the 1 phase 240VAC as inputs. Out of the two, one input will be used as main input and other input shall be connected to the bypass input of UPS.

In addition the UPS shall be capable of boost charging the standby batteries. The UPS will be located in a separate room which is at a cable distance of 25 Meter from the distribution cabinet. Sealed maintenance free batteries for a backup of one hour shall be provided for normal load. If UPS is operating on battery an audio visual alarm shall be generated on the UPS to that effect. Potential free contact to be provided and wired to 6 point Annunciator. UPS shall be of the reliability level of MTBF greater than 50,000 hrs. (proof with certification required). UPS shall be burn in tested for 168 hrs. and test report of 8 hourly observation submitted. 5.3 Insulation Resistance The insulation resistance between all terminals and chassis of Console and junction boxes shall be more than 100 Mega ohms at 500VDC.

5.4 Grounding Grounding bus, permanently connected to the cabinet body (CAS console), shall be provided at the bottom. All non-conducting metallic parts shall be connected to this bus and the bus shall be connected to station grounding system. The grounding methods shall be as per NPCIL specification no. PC-E-709.

Page 12: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 12 of 64 5.5 Components

All components used shall be of high quality. They shall conform to latest issue of relevant Indian or recognized International standards. (Refer section 4.1 to 4.3). All connectors shall provide good contact and eliminate possibility of plugging in wrong direction. Connectors shall be MIL, Euro or similar military/ industrial standard types. Bought out items shall conform to international standards with test certificates. 5.6 Terminations

Elemex / Connectwell / Phoenix contact make or other standard terminal strips with sufficient strength to withstand subsequent maintenance shall be used for termination of field wires (1.5mm2 wire size). For interconnection between various sub-units as well as for external field connections, the terminals shall be properly identified. All the wiring at terminations should be provided with printed sleeves containing the from/to identification details. The external connections terminals shall be segregated from the internal inter- unit connection terminals. AC & DC voltage terminals shall be suitably segregated and A.C./ D.C high voltage terminals shall be protected. 10% spare terminals shall be provided in each terminal strip.

5.7Painting The structural steel and GU’s/panels shall be painted with the lacquer or baked enamel paints according to procedures approved by the Purchaser.

The finish colour shall be as follows:

i) Steel structural (all surfaces) light grey Shade no. 631 of IS-5. ii) Internal surfaces of panels – white.

5.8 Non-Disclosure Agreement After the award of contract, the successful bidder shall enter into a non-disclosure agreement with the purchaser as per the standard format provided by the purchaser. The bidder shall not disclose the details, the arrangement, locations and the type of systems deployed in the Nuclear Power plant to any person/ agency without the written permission of the purchaser. Failure to adhere to this clause will be liable for prosecution in the Indian court of law. 5.9 Safety Requirements The potential free contact outputs provided by PPS shall be designed for fail-safe feature i.e. their relays shall de-energize during alarm conditions and ‘NO’ type contacts shall be used. 5.10Fault Tolerance Requirements (Single failure criterion) It shall be ensured that single failure in any subsystem shall not affect total system functionality. The subsystem shall continue to carry out all the major functions even with a single failure of say network links, communication devices to the extent possible. Power and signal shall be of two circuits having ring arrangement. The design and wiring shall ensure 50 % equipment’s throughout fencing route will function even under failure of one entire loop 5.11Security Requirements A high level of security shall be achieved through the use of passwords. The system shall have user classification such as super user (administrator), supervisor and operators etc. The super user/ administrator shall have access to all menus, and other users to selected menus. Specified security

Page 13: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 13 of 64 requirements shall take into account requirements of access to computer system (access to hardware/software) and ensure access shall be granted, as per needs of the person at different levels viz. operator, supervisor, and maintenance personnel etc. through secure means such as hardware key interlocks and / or passwords. The system shall keep a log of the identity of the users. Log containing user name, login/logout date/time, changes made in the database etc. shall be provided. 5.12Self-diagnostics Requirements The system shall have extensive on line & off line self-diagnostic features to meet the reliability and availability requirements. Self-diagnostic shall be provided for modules, cards/bins, CPU modules, Server PC, software modules, LAN links/devices, sensors and other links at every scan period. Card/modules shall have fault detection features and shall detect faults in processor, memories, supply voltage, invalid signals, communication modules/links, wrong mounting position etc. In case of any fault or disturbance, appropriate messages on server PC display and/or indications shall be provided. These shall be annunciated on Six Point Annunciator and replicated on the other console located in plant control room. The failure mode of modules shall be well defined and these shall fail in a safe mode. If a module fails, output relays shall go to de-energized state. All failures within PPS shall be logged. 5.13 On-line Testability Requirements

The on line diagnostics shall continuously monitor the correct functioning of all the field sensors, modules, cards, healthiness of LAN/loop wiring, etc. and the control panel shall report all the troubles for quick and easy rectification. 5.14 Off-line Testability Requirements Off line diagnostics shall help in finding the faulty module in the PPS. These shall also be used for testing any device/ sensor/ module where communication, alarm generation function etc. shall be testable from console. 5.15 Reliability Requirements The system shall operate reliably under all conditions. The following approaches, among others, may be used to improve reliability of the system.

Use of components of high reliability Use of de-rated components Adequate provision for heat dissipation Redundancy Use of diagnostics Safety features Conformance to international standards for Software and Hardware quality assurance plans etc.

5.16 Availability Requirements To increase availability of the system to the plant, the system shall be designed to be fault tolerant in nature at all levels except at the common I/O level. Faults in the cards/sub-system shall be localized so as not to affect other part of the system. Concepts such as redundancy with hot-repair and on-line diagnostics shall be followed.

Page 14: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 14 of 64 5.17 Maintainability Requirement 5.17.1 Hardware Maintainability

The diagnostics specified in section 5.12 shall quickly identify and indicate the hardware associated with fault. The hardware shall be modular and easily replaceable. Module shall be easily accessible. All hardware modules and its location shall be identifiable. All PCBs shall be provided with replaceable jumpers/switch pack so that same can be easily reconfigured. A test system consisting of suitable hardware, software and peripherals shall be supplied along with the system for testing and repairing of any faulty hardware modules in the system. The test system shall quickly identify the fault to the component level that repair work can be carried out. It shall be possible to replace/rectify a faulty I/O in power on condition wherever applicable. Adequate fault detection and annunciation mechanism shall be provided to reduce the mean time to repair. 5.17.2 Software Maintainability

All the application/embedded software shall be documented and supplied. The software structure shall be modular for ease of trouble shooting and future modification whenever required. 5.18 Physical& Layout Requirements a) The PPS shall be designed with standard bins/modules to facilitate easy maintenance and system

expansion. b) The terminal strips shall be provided for 1.5 mm2or required size of field cables and relay output

terminations at the back of panel. c) The PC’s& monitors of CCTV shall be housed in CAS console. The supplier shall ensure all

necessary equipment can be housed inside the CAS console, if not it shall be clearly specified in the quotation. The supply of housing for CAS console is in the scope of this specification.

d) The external connection terminals shall be segregated from the internal inter- unit connection terminals.

e) AC & DC voltage terminals shall be suitably segregated and A.C. terminals shall be protected. f) CAS Console & Control center console General Arrangement drawing shall be submitted to meet

the requirements mentioned in section 6.0 g) A sample overview layout map is attached in last page of this document for reference only h) A sample overall system arrangement is attached purely for reference and not actual.

6.0 SYSTEM REQUIREMENTS

6.1 General

Computerized integrated Perimeter Intruder Detection System (PIDS) utilizing video analytics of IP based CCTV Surveillance (CCTVS) shall effectively carryout the functions of deterrence, detection& assessment. The PIDS shall be integrated by software through computers/ servers. These servers and other equipment shall be housed inside an operator console, called ‘CAS Console’. The CAS console will be installed in the Central Alarm Station (CAS) building. The CAS Room shall house one No. of 42 (±2) inch LED/LCD monitors (24 x7 Operations) to display the videos of areas covered by the CCTV cameras and to annunciate alarm in PIDS. Another console called as Control Center Console (CCC) to be installed in the Plant control room at a cable distance of about200 meters from CAS, shall also house necessary client PCs. A 42(±2) -inch color LCD monitor (24 x7 Operations) will also be installed in the Plant control room to display the areas covered by the CCTV cameras and annunciate

Page 15: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 15 of 64 alarm of PIDS. PIDS shall also provide facility for logging of all events, acquisition and annunciation of all alarms, storing of databases of all events, menu driven services to access all databases, configuration control and online monitoring.

The PIDS shall be Modular in form and allow for up-gradation and expansion. Online reconfiguration of the system shall be mostly possible through system software without hardware modifications. A high level of system security shall be achieved through the use of passwords. The system shall also accept user classification i.e. user-1(admin) shall have access to all menus, and other users to selected menus. The main features of the PIDS shall be: a. Real time acquisition and annunciation of intrusion alarms. Audio-visual and textual

annunciation of alarm on graphical map plan of facility with actual location of the alarm. The textual alarm information with real time of occurrence of the alarm, acknowledgement and reset time shall be displayed on an alarm window on the server. All the alarm events shall also be stored in the alarm 4database and a very easy to use menu driven man machine interface shall be provided for analysis of alarms and to obtain report in desirable format.

b. Standard alarm color codes flashing red for alarm condition, steady red for acknowledged alarm and steady green for normal condition.

c. Automatic homing of a camera in case of an alarm. d. The PIDS shall provide contact outputs in case of alarm which will be used to give audio –visual

alarm on a separate audio visual Annunciator located in CAS and repeat this annunciation in CCC console.

6.2 CCTV System

The System shall be IP based CCTV System. Professional Industrial grade cameras only are only acceptable. Preferred makes are PELCO, BOSCH, AXIS, SONY, MOBOTIX. Other makes cameras are not acceptable. The objective shall be to provide high degree of electronic surveillance system of the entire premises. The purpose is to monitor the entire area for unwanted, untoward incidents. It is also essential to have recorded images of all cameras to be stored at least for 3 months. Strategically placed video surveillance cameras help to enhance security by providing motion based / continuous monitoring of all parts of premises. In order to achieve these objectives, IP cameras, related software, cabling, server & storage equipment required to form a complete coordinated system ready for operation shall be supplied. 6.2.1 CCTV system shall be used for intruder detection as well as for alarm assessment of perimeter

of the plant. 6.2.2 CCTVS shall consist of the following: -

a) Fixed color cameras (without Pan, Tilt and zooming facility) installed all along the perimeter of the operating island to view the entire perimeter for any intrusion in outdoor areas. These cameras shall be equipped with edge based video analytic capability. Video analytic(VA) capability shall be intelligent to adapt difficult conditions in lighting or environment such as rain, clouds and leaves blowing in the wind. The background shall be continuously learned by the software. Features such as tamper detection that generates alarms on camera hooding/ masking, blinding, defocusing and repositioning shall be present as a standard feature of video analytic capability. Camera shall have Image stabilization to ensure detection even with shaky video when cameras mounted on poles for simple vibrations.

Page 16: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 16 of 64 The following tasks shall be possible:

i. Abandoned Object: Detects objects placed within a defined zone and triggers an alarm if the object remains in the zone unattended.

ii. Intrusion Detection: Detects and tracks objects that enter a scene and then triggers an alarm when the objects enter a user-defined zone.

iii. Camera Sabotage: Detects contrast changes in the field of view. An alarm is triggered if the lens is obstructed by spray paint, a cloth, or a lens cap. Any unauthorized repositioning of the camera also triggers an alarm.

iv. Wrong Direction: Generates an alarm in a high traffic area when a person or object moves in a specified direction.

v. Loitering Detection: Identifies when people or vehicles remain in a defined zone too long.

vi. Object Counting: Counts the number of objects that cross a defined line. vii. Object Removal: Triggers an alarm if an object is removed from a user-defined zone.

viii. Stopped Vehicle: Detects vehicles stopped near a sensitive area longer than the user-defined time allows.

At a time up to 2 of the rules shall be simultaneously usable as per camera position.

b) Auto dome color cameras, with pan, tilt and zoom facility shall be installed at various locations on the perimeter for general surveillance of outdoor areas. Outdoor dome cameras shall meet the requirements mentioned in section 6.2.4. All outdoor cameras (both auto dome & fixed) shall be IP-66 rated and shall have inbuilt heater, fan & blower facility. Note:-Outdoor Atmospheric temperature in RR site varies from 4 deg C to 50 deg C (55 deg)

c) Fixed cameras outdoor shall meet the requirements as mentioned in section 6.2.4

d) Camera Housing for both outdoor fixed cameras shall meet the requirements mentioned in

section 6.2.4.

e) Other requirements of CCTV shall be as follows:- 1. It shall be possible to display any camera output on any LCD monitors in the CAS console

and on any LCD monitors in the CC console. 2. In case of alarm, the corresponding cameras shall automatically home in the intrusion area

along with recording of the videos by the DVMS. These video images shall be automatically displayed on the monitor in CAS console. The required accessories shall be supplied for the same.

3. It shall be possible for operators at CAS console and CC console to select and control any cameras in a random sequence and view the video on any monitor. It shall be possible for the operator to view the videos of cameras in a predetermined sequence which shall be programmable at site.

4. The System shall also display the camera identification number, location of the camera, time and date.

5. The cameras & its accessories such as JBs / mounts etc. which will be used in outdoor areas shall be capable of withstanding the adverse weather conditions. The cameras or its housings shall not get corroded. Supplier shall confirm material (SS or Al) used.

6.2.3 Digital Video Management (DVMS) System: A total of 95 cameras are to be deployed initially in the plant whereas the capacity of system shall be of 200 cameras to take care of future addition and existing indoor cameras. Other makes cameras are not acceptable.

Page 17: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 17 of 64 The outdoor fixed Camera (80 nos.) and Auto Dome Camera (15 nos.) shall be connected to outdoor LAN. All the outdoor cameras shall therefore be connected on a common LAN using FO LAN network and the videos shall be recorded on alarm due to VA for outdoor fixed and on motion detection for indoor fixed with selectable pre and post alarm recording up to 1920 X 1080 resolution (5 minutes. -adjustable) System shall be capable of accepting existing Indoor Analog CCTV system though DVRs and cameras through separate encoders in future (Encoder is not in the scope this tender). There shall be at least 2 nos. of servers one for recording & one for video analytics (Tenderer need to be calculate the storage capacity and the quantity of Servers according to system requirement. Purchaser may decide to keep the servers at a different location. The bidder shall configure the required amount of servers to meet the functional requirement. System shall also maintain the centralized primary management, configuration and user database. Vendor may provide additional server for the same if offered system does not allow loading these functionalities on same server. All the machines used for above functionalities shall be off the shelf 19” rack mount industrial grade servers from reputed manufacturers and the proposed solution shall not require proprietary computer, server and network or storage hardware.

System Components shall typically be:

a) Servers and workstations b) RAID 5 Storage c) Software- Recording and Video analytics software

SOFTWARE: Featured Specification for Digital Video Monitoring, Recording & Management:

Sr.No Description Compliance

Yes/No Reference Document

1 General The Video Management System shall be a fully distributed solution, designed for limitless multi-site and multiple server installations requiring 24/7 surveillance with support for devices from different vendors. The Video Management System shall offer centralized management of all devices, servers and users and must empower a flexible rule-based system driven by schedules and events.

DVMS shall already support IP cameras from at least fifty (50) major vendors. Bidders shall clearly list in their proposal the brands and models already integrated into DVMS.

To ensure openness, DVMS and cameras may or may not be from the same manufacturer.

DVMS shall support installation and ability to run on virtualized windows servers

DVMS manufacturer shall provide their SDK (or any other integration means) libraries and documentation to ensure a seamless integration with any other system

DVMS shall be open to any standard storage technologies integration.

Page 18: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 18 of 64 DVMS shall be open to any video wall system integration. DVMS shall have the possibility to integrate external Video Analytics systems.

The DVMS system shall be a scalable client – server architecture built using well known operating systems

The DVMS system shall enable recording to be done at the aggregation sites and shall allow the local Control center to import selected video’s on demand.

Aggregation site types shall be categorized according to function and size as per the table below.

To facilitate the DVMS system architecture, the BIDDER shall ensure that sufficient capacity is designed into the data communications & telecommunications infrastructure to deliver the required functionality, along with the ability to allocate and reserve resources (including bandwidth).

The DVMS data communications and telecommunications network shall use a suitable transport medium and associated cabling and data transmission infrastructure that will support real-time video display of cameras at the nominated operations centers. The type of transmission network shall be determined by the BIDDER.

The DVMS system shall be compatible to single and multiple processor servers. The server processor & hardware shall be optimized in all cases.

The DVMS system shall cluster the processing & memory load across several machines. The failure of any one server in the solution shall not cause a failure in the entire system.

The DVMS system device drivers shall be stored separately to the central core application to ensure any instability in 3rd party SDKs do not affect the core application.

The DVMS management server shall be able to intelligently scan an IP network for new devices (cameras or servers) along with automatic model detection.

Network infrastructure and installation are the responsibility of the Bidder. Network components both active and required for the successful implementation of the video surveillance detailed in this tender shall be provided by the Bidder. The network infrastructure shall meet the streaming requirement of the project without any bottlenecks. The network infrastructure shall support UDP multicast, UDP unicast and TCP transmission.

The DVMS system shall provide an integrated secure, scalable and easily accessible software-based solution for the management of the existing & future physical security infrastructure

The DVMS system shall provide a powerful and efficient management interface for all the security systems across all monitored sites.

Page 19: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 19 of 64 The Digital Video Management System shall be a fully distributed solution, designed for limitless multi-site and multiple server installations requiring 24/7 surveillance with support for devices from different vendors. The Video Management System shall offer centralized management of all devices, servers and users and must empower a flexible rule-based system driven by schedules and events.

The Video Management System shall contain recording servers used for recording video feeds and for communicating with cameras and other devices. The recording servers shall process the recordings and playback the video streams.

The management server shall allow access to a system manager from where the administrator can configure and manage all servers, cameras and users.

The system shall allow the management server to be installed on multiple servers within a cluster of servers ensuring that another server in the cluster automatically takes over in case the first server fails.

The Video Management System shall support installation and ability to run on virtualized Windows® servers.

The Video Management System shall allow an unlimited number of cameras to be connected to each recording server and an unlimited number of recording servers to be connected to each management server across multiple sites, if required.

The Video Management System shall support a versatile rule system including scheduled or event-driven actions with numerous options including support to time profiles.

The Video Management System shall support Microsoft Windows 7 (Business/Enterprise/Ultimate), Microsoft Windows Server 2008 R2, Microsoft Windows Server 2012 R2,Microsoft Windows 8.1(Professional/Enterprise) and Microsoft Windows 10 (Professional/Enterprise) with the latest patches and service packs installed. The system must use DirectX and .NET Framework.

The Video Management System shall include automatic camera discovery.

The Video Management System shall support archiving for optimizing recorded data storage through unique data storage solutions by combining performance and scalability with cost efficient long-term video storage.

The Video Management System shall incorporate fully integrated matrix functionality for distributed viewing of any camera in the system from any computer with the client viewer.

The Video Management System shall incorporate intuitive map functions allowing for multilayered map environment. The map functionality shall allow for the interactive control of the complete surveillance system, at-a-glance overview of system integrity, and seamless drag-and-drop integration

The Video Management System shall support full two-way audio between clients and remote devices. Two-way audio

Page 20: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 20 of 64 integration shall support the following features and functions:

The Video Management System software shall provide fast evidence export by exporting in video to various formats, including video from multiple cameras in encrypted native database format with an included viewer.

The Video Management System shall show full awareness of the system through audit logs and shows user activity through comprehensive logs.

The Video Management System shall include support for a frame work data module designed to integrate multiple third party Video Content Analysis (VCA) solutions seamlessly into client viewer environments.

The Video Management System shall include a Software Development Kit (SDK) that offers important capabilities for integrating the Video Management System with third party software and applications.

The Video Management System shall include a stand-alone viewer application to be included with video exported from the client viewer application. The viewer application shall allow recipients of the video to browse and playback the exported video without installing separate software on their computers.

The Video Management System shall include support for Active Directory to allow users to be added to the system. Use of Active Directory requires that a server running Active Directory, acting as a domain controller, to be available on the network.

The Video Management System shall be designed to support each component on the same computer for efficiency in smaller systems, or each component on separate systems for large system deployments.

Edge Storage Edge storage shall secure that when a lost or broken connection is back up, the data stored on the camera’s internal storage shall be retrieved and stored in the media database. Edge storage shall secure that after recovery from a malfunction it shall be possible to play back and view the video, and audio recorded by the device, while the malfunction persisted

2 Bookmarking A bookmarking feature shall be included in the Video Management System, allowing the client viewer users to mark incidents on live and/or playback video streams.

3 Optimized Video Archiving Administrators shall be able to select a storage container for each device and move a device from one storage container to another, or move all recordings inclusive archives to the new storage container, or delete them all.

Administrators shall be provided with an overview of the defined storage containers, their archives with path, and free and used space on the drives for each device, including the used

Page 21: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 21 of 64 storage space in the recording database, and in archives.

4 Multi-streaming Support The recording server must accept, display and record individual streams of video from each camera that supports it, for example, display a stream in H.264 format and record another stream in MPEG4 format. The intent of this functionality shall be providing independent streams of video from the camera to the server with different resolution, encoding and frame rate.

Multi-streaming support shall allow the system to be configured with H.264 with a high frame rate for live viewing and shall allow the system to be configured with high resolution H.264 at low frame rates for recording and playback.

The system shall allow recorded video to be recorded at 8fps. 5 SNMP Support

The system shall act as an SNMP agent which can generate an SNMP trap as a result of rule activation in addition to other existing rule actions.

The system shall be able to utilize Microsoft Windows SNMP Service for triggering of SNMP traps.

6 NAT Firewall Support The system shall support port forwarding, which must allow clients from outside of a Network Address Translation (NAT) firewall to connect to recording servers without using a VPN.

Each recording server shall be mapped to a specific port and this port must be forwarded through the firewall to the recording server’s internal IP address.

7 Management Server Redundancy The management server shall provide a resilient system solution based on Windows Server Clustering, to secure maximum uptime.

8 Alarms Support The alarm support shall allow for continuous monitoring of the operational status and event-triggered alarms from servers, cameras and other devices.

The alarm support shall provide a real-time overview of alarm status, or technical problems, while allowing for immediate visual verification and troubleshooting.

9 Matrix Functionality The system shall include an integrated matrix solution for distributing video to any computer with the client viewer installed. A computer on which the matrix-triggered images can be shown must be known as a matrix recipient.

The client viewer shall provide remote users with a comprehensive suite of features:

It shall be possible to view live video from cameras on the surveillance system from 1 to 100 per view.

It shall be possible to playback recordings from cameras on the surveillance system, with a selection of advanced navigation

Page 22: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 22 of 64 tools, including an intuitive timeline browser.

It shall be possible to create and switch between an unlimited number of views, each able to display video from up to 100 cameras from multiple servers at a time. The system shall allow views to be created which are only accessible to the user, or to groups of users based on 37 different layouts optimized for 4:3, 4:3 Portrait, 16:9 and 16:9 Portrait display ratios.

It shall be possible to access views of cameras on any PC with a client viewer application installed.

It shall be possible to use multiple screens as well as floating windows for displaying different views simultaneously.

It shall be possible to quickly substituting one, or more of a view’s cameras with other cameras.

It shall be possible to view images from several cameras in sequence in a single camera position in a view – a so called carousel.

It shall be possible to view video from selected cameras in greater magnification and/or higher quality in a designated hotspot.

It shall be possible to receive and send video through the matrix functionality.

It shall be possible to include HTML pages and static images (for example, maps, or photos) in views.

It shall be possible to control PTZ cameras. It shall be possible to use digital zoom on live as well as recorded video.

It shall be possible to activate manually triggered events. It shall be possible to activate external outputs (e. g. lights and sirens).

It shall be possible to use sound notifications for attracting attention to detected motion.

It shall be possible to get quick overview of sequences with detected motion.

It shall be possible to get quick overviews of alerts. It shall be possible to quickly search selected areas of video recording for motion.

It shall be possible to skip gaps during playback of recordings. It shall be possible to configure and use several different joysticks.

It shall be possible to print images, with optional comments. It shall be possible to copy images for subsequent pasting into word processors, email, etc.

It shall be possible to export recording (for example, for use as evidence) in AVI, JPEG and database formats.

It shall be possible to use pre-configured as well as customizable keyboard shortcuts to speed up common actions.

It shall be possible to insert overlay buttons, for example, for activation of speakers, events, outputs, movement of cameras

Page 23: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 23 of 64 etc.

It shall be possible to use a sequence function that lists thumbnail images representing recorded sequences from an individual camera or all cameras in a view.

It shall be possible to use a forced playback mode allowing the user to playback recorded video from inside the ‘live’ mode while viewing ‘live’ video.

The client viewer shall support the use of 3-axis USB joysticks for control of pan, tilt, zoom and auxiliary camera functions.

The client viewer shall support the use of multimedia control devices, which are capable of emulating keystrokes, for the efficient review of recorded video.

The client viewer shall support the use of keyboard shortcuts for control of standard features. It shall allow the user to program numerical keyboard shortcuts for camera views. The shortcut number shall be displayed with the view description in the live and playback displays. The shortcut shall allow the user to change views with 2 to 3 keyboard entries.

The client viewer shall support GPU based video decoding to improve video rendering performance and up to 75% reduction in CPU load of the workstation running Client software. The use of GPU based video rendering shall also make client ready for 4K/UHD camera technology.

The operator shall have the ability to use digital zoom where the zooming is performed in the image only on any number of cameras simultaneously. This functionality shall be the default for fixed cameras. The use of digital zoom shall have no affect on recording, or other users.

10

Map Functions Built-in map function in the client viewer shall provide an intuitive overview of the system and shall offer integrated access to all system components.

Map function shall be able to use standard graphical file formats including: jpg, gif, png, tif, etc.

It shall be possible to use any number of layered maps, and it shall be possible to easily drag-and-drop and point-and-click definition of cameras, servers, microphones, speakers, I/O devices, hot-zones, and PTZ camera presets.

Hot zones shall be allowed for intuitive navigation between different map levels.

Map function shall support instant camera preview when moving the mouse pointer over a specific camera.

Map function shall support central overview of the surveillance system via an alarm list containing alarm indicators of high, medium or low prioritized alarms. Furthermore the alarms shall be categorized by the following states; new, in progress, on hold, or closed. Alarms must be possible to acknowledge by

Page 24: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 24 of 64 right-clicking elements on maps.

11 Remote Client Viewer The web-based remote client viewer shall offer live view of up to 16 cameras, including PTZ control with joystick, fisheye (360 degrees) cameras and event/output activation. The playback function shall give the user concurrent playback of up to 16 recorded videos with date, alert sequence, or time searching.

The web-based remote client viewer shall offer quick overviews of sequences with detected motion.

The web-based remote client viewer shall be able to generate and export evidence in AVI (movie clip) and JPG (still image) formats.

The system shall support the use of separate networks, VLANs, or switches for connecting the cameras to the recording servers providing physical network separation from the clients, and facilitate the use of static IP addresses for the devices.

The system shall support H.264, MPEG-4 (Part 2), MPEG-4 ASP, MxPEG, and MJPEG compression formats for all analog cameras connected to encoders, and all IP cameras connected to the system.

The system shall support dual-streaming cameras and shall cover the following compression formats: H.264, MPEG-4 (Part 2) and MJPEG.

The recording server shall utilize high performance ISCSI, SCSI, SAS and SSD disk drives for online recording storage and shall allow the use of lower cost SATA drives for the RAID arrays for online archive storage. Use of online archiving shall ensure that data always is readily available.

The system shall allow the frame rate, bit rate and resolution of each camera to be configured independently for recording. The system shall allow the user to configure groups of cameras with the same frame rate, bit rate and resolution for efficient set-up of multiple cameras simultaneously.

The recording server(s) shall have the ability to support multiple Network Interface Cards (NIC) and shall support connection to the cameras on a network separate from the client viewer, management server and system manager.

The recording server shall have the ability to accept the full frame rate supplied by the cameras, while recording a lower frame rate yet still shall make the higher frame rate available to the clients for live viewing.

Page 25: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 25 of 64 Hardware The minimum requirement. Higher versions are acceptable if suitable

1 High Configuration Server with storage S.N Features Required Parameters(Minimum) Compliance

1 Processor Up to two, 12-core Intel® Xeon® Processor E5-2650 v4 (30M Cache, 2.20 GHz). Or Higher

2 Number of processors (Std/Max) 1/2, 1 required

3 Cache(Minimum) 30 M or as available with processor

4 Memory 64 GB, 24 Slots (UDIMM/RDIMM/LRDIMM/DDR4/HyperCloud DIMM) 2400MHz or Higher

5 Disk Drive bays (Minimum hot-swappable)

8 3.5 inch hot-swap Serial Attached SCSI (SAS)/Serial ATA (SATA) HDDs or Higher

6 Required Storage capacity (Minimum)

128 TB usable storage with 8 TB 3.5” NL SAS HDDs. (Tenderer need to calculate storage as per requirement)

7 Network interface Integrated 2 ports, plus 2 ports optional 1GBPS Gigabit Ethernet

8 Power supply (std/max) Dual Power supply 750W AC Hot Swappable

9 RAID Support Integrated 12 Gbps hardware RAID-0, -1, -10 with optional RAID-5, -50, -6, -60, 2 GB flash-backed cache /battery-backed cache.

10 Operating systems supported Windows Server 2012 R2, Red Hat Enterprise Linux®, SUSE Linux Enterprise Server, Vmware ESX and ESXi 4.0, Sun Solaris 10

11 Licensed Operating System Required

Windows Server 2016 or Higher Version (Latest Version)

12 Monitor, Keyboard and Optical mouse, Optical Drive

22" LCD monitor, Keyboard. Mouse, Optical Drive Required

13 Ports 4 USB 2.0 or Higher, 1 VGA Port 14 PCI Expansion Slots Upto 6 Slots 15 Form Factor Mount Mode 2U Rack Mounting 16 Approved Makes Dell/Lenovo/HP

2 Workstation Configuration S.N Features Required Parameters(Minimum) Compliance

1 Processor 8th Generation Intel® Core i7 7700 Processor or Higher

2 Chipset Intel® C236 3 RAM 16 GB DDR4 RAM 2400MHz or Higher 4 HDD 2 TB 7200 RPM SATA Hard Disk

5 Display Graphics Card

NVIDIA GeForce GT 710 or Higher (Multiport, Dual Link DVI-D, HDMI, VGA Port with Standard Display Connectors , WHQL Certified Graphics Card with onboard 2GB RAM)

Page 26: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 26 of 64

6 Optical Drive DVD-ROM/DVD Recordable 7 Network RJ45, 10/100/1000 MBPS Gigabit Ethernet Port

8 Sound Card Integrated Onboard Sound Card with Front & Back Panel Mic and Speaker Output

9 Monitor 22” Wide LED Colour Monitor with all accessories, Power Cords, VGA & HDMI Cable

10 Ports 6 USB Ports (2 On Front 4 Back Panel of PC), VGA Port

11 Raid 0,1,5,10

12 Keyboard & Mouse USB Optical scroll mouse and Key board, Power Cable

13 OS - License Copy Genuine Windows 10 Professional 64 Bit With Recovery CD/Download/Soft Copy or Higher

14 Cabinet Back Colour Tower Cabinet with SMPS Power supply

15 Make Preferred LENOVO/DELL/HP The vendor shall provide the required computers for the DVMS client and servers. These computers shall be of the most current state of the art technology available at the time of supply and as minimum shall be better than the minimum requirements specified above meeting the technical & functional requirements.

Page 27: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 27 of 64

6.2.4 Technical specifications for CCTV items Preferred makes are PELCO/ BOSCH/ AXIS / SONY/ MOBOTIX. Other non-industrial grade / Commercial use grade camera are not acceptable.

Minimum Mandatory requirements for Color IP based High resolution PTZ Speed dome cameras for Outdoor are as follows: Color IP based High resolution PTZ Speed dome cameras should be 30X, 2Mpx High speed PTZ Dome Camera. Sr. No Specification Parameter Compliance

1 Image sensor 1/2.8-inch CMOS Sensor 2 Resolution 1920 X 1080 3 Frame per Second 60 FPS 4 Dynamic Range 120 dB or better 5 Signal to Noise Ratio >50 dB 6 Minimum Illumination Color 0.1 lux ; Mono 0.00 lux with IR 7 IR Illumination 150 Meter or better

8 Lens 4.5 ± 1 mm (wide) ~ 135.0± 30 mm mm (tele)

9 Optical Zoom 30X 10 11 12 Iris Control Auto iris

13 Back Light Compensation Yes

14 Electronic Image Stabilization yes

15 Active Noise Filtering Yes 16 Presets 32 preset or more 17 Window Blanks 4

18 Pan & Tilt Speed Up to 300° per second/Up to 145° per second

19 Vertical Tilt +15° to –90° degrees 20 Video Streams Up to 3 simultaneous streams 21 Audio Input Desirable- Line /microphone

22 Supported Protocols

TCP/IP, UDP/IP (Unicast, Multicast IGMP), UPnP, DNS, DHCP, RTP, RTSP, NTP, IPv4, IPv6, SNMP v2c/v3, QoS, HTTP, HTTPS, SSH, SSL, SMTP, FTP, and 802.1x (EAP)

23 Local Storage Up to 2TB storage card

24 Analytics Motion Detection and Camera Sabotage

25 Pan Movement 360° continuous pan rotation 26 Alarms Up to 2 X inputs and 2 X relay output 27 Input Power 240 V Ac with suitable adopter 28 Operating Humidity 0 to 90% RH (condensing) 29 Operating temperature minus 40 to + 60 Deg C

Page 28: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 28 of 64

30 Environmental Protection

Ingress for Water & Dust - IP66 or higher

31 Certificates CE & FCC & UL cUL

32 ONVIF Compliant ONVIF Profile S and Profile G conformant

Mandatory requirements for Color IP based High resolution IR Bullet / Box Type Fixed Cameras for Outdoor are as follows:

Color IP based High resolution 3 Mega Pixel Fixed IR BULLET / BOX Type Camera Specifications Sr. No Camera Characteristics Minimum Specifications Compliance Yes/No

1 Image sensor 1/2.8" Progressive scan CMOS sensor with WDR.,Pi-iRIS

2 Resolution 2048 X 1536 or better 3 Mega Pixel 3 Mega Pixel ; 2048 X 1536 4 Lens Must-Varifocal (Range ~ 8-20 mm)

5 Minimum Illumination Colour (500ms)- 0.005 Lux , Black & White(500ms) - 0.001 Lux

6 IR Illumination Inbuilt / External 40mtr range IR illuminator

7 Signal to Noise Ratio >60dB 8 Compression H.265, H.264 Main/High, MJPEG 9 Wide Dynamic Range 130db or more 10 H FOV 36.5° ~ 15° 11 Day/Night Camera Auto day/night configuration. 12 Frame per Second 60 FPS

13 Stream Configuration Independently configurable primary and secondary streams plus service stream

14 Shutter speed 1/20,000 sec (or faster) to 2 sec 15 Tamper detection ON/OFF

16 Analytics

Abandoned Object, Adaptive Motion Detection, Camera Sabotage, Directional Motion, Loitering Detection, Object Counting, Object Removal, Stopped Vehicle.

17 Audio Bidirectional 18 Streaming Up to three simultaneous streams.

19 Web interface Camera should have web interface to configure and control.

20 Text superimposing Super imposing the title and date & time on the video.

21 Alarm input One alarm input & output. 22 Edge Storage Provision for 128 GB SD Card.

23 Ethernet, Network protocols

TCP/IP, UDP/IP (Unicast, Multicast IGMP), UPnP, DNS, DHCP, RTP, RTSP, NTP, IPv4, IPv6, SNMP v2c/v3, QoS, HTTP, HTTPS,

Page 29: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 29 of 64

SSH, SSL, SMTP, FTP, 802.1x (EAP), and NTCIP 1205, IGMP, TLS/TTLS

24 Discovery interface OEM interface to detect the cameras automatically and configure network settings.

25 Power requirement PoE and Local power supply for camera, Heater and Blower as per manufacturer standard.

26 Environmental Protection Ingress for Water & Dust - IP66 or higher built in Heater & Type 4x

27 Shock and Vibration IEC/EN 60068-2-6 & IEC/EN 60068-2-27

28 Vandal Proof Certification IK10 or higher 29 Operating Temperature Minus 40 C to 50 C Degrees. 30 Operating Humidity 5 to 95% RH non-condensing.

31 Regulatory Approvals • CE,FCC,UL/cUL,ROHS • ONVIF Profile S and Profile G conformant, Q & T Conformant

Vendor shall clearly specify the lens proposed for fixed cameras. However, they shall be of vari-focal type with sufficient range to meet functional requirements. Composite video output from each camera is an optional feature. Analog cameras with encoders will not be accepted. Note: Safety structure / protection to provide protection against monkeys through barbed wire structure is required for Camera’s Poles / Towers. Tenderer need ensure clear camera visibility by suitable methods during field execution. Mandatory requirements for Outdoor housing camera lens assembly with heater / blower / sunshield / 4 PIN 240V AC are as follows: SL.No. FEATURE REQUIRED PARAMETERS

1 Camera Housing IP66, NEMA-4x 2 Rear connector type 4 pin(power), BNC & RJ 45 for video 3 Operating temperature

(with fixed lens) External: -40oC to +50oC

4 Power Supply 240V AC, 50/60 Hz 5 Accessories Heater, blower & sunshield 6 Guard provision Guard to provide protection against monkeys through

barbed wire structure Cameras shall be suitable for mounting on poles. Required accessories shall be quoted & supplied.

Page 30: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 30 of 64

Mandatory requirements for 42(±2) “High Resolution LCD/LED Display Unit Composite Video Input with 24 x 7 Operation capacity are as follows: SL.No. FEATURE REQUIRED PARAMETERS COMPLIANCE 1 Screen Size 42 (±2) “ inches diagonal 2 Resolution(H/V) 1920 X 1080 Pixels or better 3 Progressive Scan Yes 4 Network Port RJ45 (x1), 10 BASE-T/100 BASE-TX 5 Video In HDMI, Composite 6 Contrast Ratio Max. 10,000:1 7 Sub Pixel Control Preferred 8 Video Noise Reduction Preferred 9 HDMI Input 2 HDMI ports (Must)

10 Composite Video Input AV-RCA phono type (1 rear, 1 Side/Front)-Must

11 Power Supply AC 240 V, 50/60Hz (Direct or with adopter-shall be supplied)

6.3 Hardware and Miscellaneous items 6.3.1 JB’s AND GU’s Supply of JB’s and General Units (GU’s)(for housing any field module) shall meet requirements specified in NPCIL technical specification No. PC-E-347. However for GU’s size may vary depending upon the enclosures. For GU’s and JBs in built mechanical locks shall be provided. GU’s shall be suitable for wall mounting type and the degree of protection provided by enclosures shall be IP-65as per IS-13947 for outdoor JB’s and GU’s & IP-52 as per IS-13947 for indoor JB’s and GU’s. Tests as mentioned as per the above specifications (except seismic tests) are applicable JB’s and GU’s. 6.3.2 Fixtures for outdoor cameras. Suitable fixtures for installation of outdoor cameras shall be fabricated & supplied. Each camera shall be installed on a fixture fixed on the ground such that it is at an elevation of four meter from the floor level. For this the length of the fixture shall be 6 meter out of which 1.5meter shall be below ground and 4.5 meter shall be above ground. The fixture shall be rigid and the arrangement shall not cause vibrations in it due to wind etc. and shall last for operational life of 20 years. The fixture can be fabricated from 4mm thick MS sheet rolled in the form of a tube of 104mm (ID) with suitable base. The fixtures shall be designed accordingly ( i.e size of MS plate, thick bases & tube depth inside the ground & above floor level etc.). Some of these fixtures shall have provision for anchoring since it may not be possible to fix it by digging a pit. The bidder shall submit the design of these fixtures along with the offer. Barbered guards need to be provided to avoid animals disturbing the camera.

6.3.3 Consoles Two consoles, one central computer console called CAS console and the other Plant control room console called CCC console shall be supplied. However, the grounding & shielding requirements inside the console shall meet the requirements of PC-E-315 for operator information console and PC-E-763 for electromagnetic shielded cabinet. A) CAS Console shall accommodate the following :

1. Two nos. of 22 inch LCD monitor for PC and a PC with keyboards 2. Server & PC s as required and other items required for display & viewing videos. 1 no. of 40 inch video LCD monitor shall be installed separately.

3.Console shall be standard/manufactured , Compact (Less than 6’Wx2’Dx8’H) B) Control Room Console shall accommodate the following :

1. 1 no 22 inch LCD monitor for PC & PC with keyboard

Page 31: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 31 of 64

2. PC’s as required and other items required for display & viewing videos. 3. Console shall be Very Compact (Less than 4’Wx 2’D x8’H)

1 no. of 40 inch LCD video monitor shall be installed separately.

The above is the minimum configuration and the bidder shall clearly specify the exact quantities of various items needed to meet the functional requirements. The painting & other tests required shall be as per specification PC-E-315/ PC-E-763.

6.3.4 Audio — visual Annunciator An audio–visual Annunciator with the following specification shall be supplied which is to be mounted near the CAS console. This Annunciator shall be capable of accepting 6 inputs (potential free contacts).As soon any of the inputs changes state the inbuilt hooter shall sound and an appropriate window (visual indicator) shall light giving an appropriate description (the details of window description would be provided during detailed engineering).The sound shall be audible even at a distance of 10 meters from the hooter. An acknowledge facility for hooter also shall be provided, along with visual indication to show that an alarm has been acknowledged. Reset facility for six point Annunciator shall also be provided, when the input returns to normal. The Annunciator shall have test facility also. Every new input changing its state shall cause the hooter to sound again & its corresponding window to light up. This Annunciator shall also be in built in CC console and these annunciations shall be repeated there.

6.4 Cables & conduits The supplier shall carry out all inter module wiring inside the console/ panel and termination between panel terminals and units/modules and all the cabling and termination required between panels and between panel & field devices. All the cables proposed & quoted by the bidder for meeting the functional requirements shall be FRLS sheathed cables meeting the requirements of NPCIL’s SpecificationPB-E-165. The insulation & conductor size shall be so chosen that it meets the functional requirement. The cables used for power supply can be cored cables ( i.e untwisted) and it is preferred to have EPR insulation here also. The conductor sizes to be used shall be 1.5 Sq.mm and 2.5 Sq.mm where longer distances are involved. In general armored cables are to be used for outdoor areas and unarmored cables for indoor areas. In outdoor areas the cables are to be laid in underground conduits/pipes to be installed & supplied by the bidder. The conduits shall meet the BIS requirements. The supplier shall supply the required cables and the general purpose cables if in the system as per the NPCIL technical specification PB-E-165: NPCIL Technical specification for HRPVC insulated FRLS PVC sheathed unarmored cables. The connectors shall also be supplied for this purpose (internal wiring).All the field cable entries to the CAS console and CC console shall be from the bottom. Terminal shall be specified and supplied by the supplier. Supplier shall supply mating connectors for all equipment/devices. The internal wiring at the panels if carried-out by loose wires shall be by PTFE wires (Teflon wires) as per the NPCIL technical specification no PC-E-239. 6.5 LAN Redundant network scheme shall be used for communication between PPS nodes. As already stated, all the cameras shall be IP based and they shall be connected in a fiber optic based LAN which will be used for PIDS only. The total length of Perimeter will be 1.5 Km & 3 Km of LAN will be required to meet the redundancy requirement of LAN. The FO LAN shall comprise of a core switch with L3 capacity in High Availability / Short distance High Availability to which 2 nos. of layer 3 distribution switches are connected. The distribution switches in turn shall be connected to layer-2 outdoor node switch. The network shall be conceived to achieve a bandwidth of 1 GBPS. The core switch, edge/ distribution switches and indoor switches will be located indoor and controlled atmosphere will be provided if

Page 32: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 32 of 64

required. All equipment needed for establishing the FO LAN shall be supplied by the bidder. The supplier shall engineer the scheme and same shall be submitted along with his offer. The successful bidder shall demonstrate the full bandwidth capability of the FO LAN established at site by means of suitable tests approved by purchaser. The detailed specification of the LAN switches, FO cable and accessories are given in the table below: Specifications for LAN (PIDS) – ALL SWITCHES OF SAME MAKE ARE REQUIRED. Core switch (Managed Switch) S.No Specifications Compliance

1 Port Density L3 Switch with a) 24x1G SFP/T Ports loaded with suitable modules of equivalent make. b) 4x1G/10G SFP+ Slots

2 Switching Capacity

Should support switching fabric of 288Gbps or more

Forwarding rate

Should support min forwarding rate of 214 mpps

3 Hardware redundancy & Resiliency

Two or more Switches in stack should be capable to operate as one logical L3 Virtual switch with synchronization of L3 & L2 protocols for higher availability with stacking bandwidth of min 40Gpbs per switch expandable to 160Gbps. Switch should be supplied with required stacking cables

Core Switch will be equipped with two core switches in HA mode which should operate as logical one L3 Switch

The connected servers or switches should be dual homed to core switches using standard LACP for automatic load balancing and high availability

Should equipped with internal redundant power supplies Should support Unidirectional Link Detection (UDLD) or equivalent to detect unidirectional links caused by incorrect fibre optic wiring or port faults and disable on fibre optics interfaces

Should support ITU-T G.8032 for sub 50ms ring protection/Equivalent with seamless integration with industrial grade switches

4 Layer 2 Features

Support 802.1D, 802.1S, 802.1w, Rate limiting Support 802.1X Security standards Support 802.1Q VLAN encapsulation, IGMP v1,v2 and v3 snooping, MLD snooping Support up to 4096 VLANs Support IGMP Snooping and IGMP Querying Should support STP, RSTP, MSTP

Page 33: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 33 of 64

5 Layer 3 Features

Should support Static routing, Support RIP for IPv4 and RIPng for IPv6 Support OSPFv2 for IPv4 & OSPFv3 for IPv6 Support BGP for IPv4 & IPv6 Support PIM for IPv4 SM, DM and SSM, PIMv6-SM, IEEE 802.3az Support VRRP for IPv4 & VRRPv3 for IPv6 Support IPV4 & IPV6 dual stack

6 VLAN Should Support 802.1Q Tagged VLAN, port based VLANs and Private VLAN Should Support IEEE 802.1v VLAN classification by protocol and port Should Support IEEE 802.1ad Provider bridges (VLAN stacking, Q-in-Q) Should Support dynamic VLAN Registration or equivalent Should Support VLAN trunking or equivalent, IEEE802.1ac

7 Management Switch needs to have a console port for management via a console terminal or PC Must have support SNMP V1, V2 and V3 Should support 4 groups of RMON. Should have accessibility using Telnet, SSH, Console access, easier software upgrade through network using TFTP etc. Configuration management through CLI, GUI based software utility or using web interface, USB interface for configuration backup Support SNMPv6, Telnetv6 and SSHv6, DHCPv6 relay, DHCPv6 client, NTPv6 client and server, Support NTP/SNTP Support SDN openflow v1.3 from day-1 and simplified network management features such as auto backup, auto upgrade, auto-provisioning and auto recovery with easy centralized management solutions

8 Security Should support ACLs, VLAN ACL's Support DHCP snooping, IP source guard and Dynamic ARP Inspection (DAI), Support MAC address filtering and MAC address lock-down, Support Tri-authentication: MAC-based, web-based and IEEE 802.1x, Support DHCPv4 (server, relay and client Support sflow, Port mirroring

9 Environment Operating Temperature- 0-50C

10 Seamless Integration

For Seamless Integration and Interoperability all the switches and SFP Modules should be from the same make.

11 OEM Compliances:

The proposed model should not be End of Sale and End of Life and the latest datasheet of the proposed model should be available on the OEM's Global website. OEM should be part of Gartner Magic Quadrant for Wired and Wireless from past three years

Page 34: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 34 of 64

Distribution switch (Managed-Switch) S.No Parameters Specifications Compliance 1 Port Density Switch should have minimum

24x 1G SFP & 4x1G/10G SFP+

2

Switching Capacity

Should support switching fabric of 128 Gbps or more

Forwarding rate

Should support min forwarding rate of 95Mpps

3 Hardware redundancy & Resiliency

Two or more Switches in stack should be capable to operate as one logical L3 Virtual switch with synchronization of L3 & L2 protocols for higher availability Switch should be supplied with required stacking cables

Switch should be equipped with internal RPS Should support Unidirectional Link Detection (UDLD) or equivalent to detect unidirectional links caused by incorrect fibre optic wiring or port faults and disable on fibre optics interfaces

Should support ITU-T G.8032 for sub 50ms ring protection/Equivalent

4 Layer 2 Features

Support 802.1D, 802.1S, 802.1w, Rate limiting Support 802.1X Security standards Support 802.1Q VLAN encapsulation, IGMP v1,v2 and v3 snooping, MLD snooping Support up to 4096 VLANs Support IGMP Snooping and IGMP Querying Should support STP, RSTP, MSTP

5 Layer 3 Features

Should support Static routing, shall be scalable to support following features: Support RIP for IPv4 and RIPng for IPv6 Support OSPFv2 for IPv4 & OSPFv3 for IPv6 Support BGP for IPv4 & IPv6 Support PIM for IPv4 SM, DM and SSM, PIMv6-SM, IEEE 802.3az Support VRRP for IPv4 & VRRPv3 for IPv6 Support IPV4 & IPV6 dual stack

6 VLAN Should Support 802.1Q Tagged VLAN, port based VLANs and Private VLAN Should Support IEEE 802.1v VLAN classification by protocol and port Should Support IEEE 802.1ad Provider bridges (VLAN stacking, Q-in-Q) Should Support dynamic VLAN Registration or equivalent Should Support VLAN trunking or equivalent

Page 35: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 35 of 64

7 Management Switch needs to have a console port for management via a console terminal or PC , SNMP V1, V2 and V3 Should support 4 groups of RMON Should have accessibility using Telnet, SSH, Console access, easier software upgrade through network using TFTP etc. Configuration management through CLI, GUI using web interface, USB interface Support SNMPv6, Telnetv6 and SSHv6, DHCPv6 relay, DHCPv6 client, NTPv6 client and server, Support NTP/SNTP Support SDN openflow v1.3 from day-1

8 Security Should support ACLs, VLAN ACL's Support DHCP snooping, IP source guard and Dynamic ARP Inspection (DAI), Support MAC address filtering and MAC address lock-down, Support Tri-authentication: MAC-based, web-based and IEEE 802.1x, Support DHCPv4 (server, relay and client Support sflow, Port mirroring

Industrial Grade Switch 8 Port POE (Managed-Switch) S.No Specifications Compliance 1 Port Density 8x1G Base-T PoE+ and 4x1G SFP Ports PoE Support Should support PoE+ with PoE budget of 240w 2 Switching

Capacity Should support switching fabric of 24Gbps or more

Forwarding rate

Should support min forwarding rate of 17 Mpps

3 Hardware redundancy & Resiliency

Should support Loop protection & loop detection

Should support 9KB jumbo packets Should support Unidirectional Link Detection (UDLD) or equivalent to detect unidirectional links caused by incorrect fiber optic wiring or port faults and disable on fiber optics interfaces

Should support ITU-T G.8032 for sub 50ms ring protection/Equivalent

4 Layer 2 Features

Support 802.1D, 802.1S, 802.1w, Rate limiting Support 802.1X Security standards Support 802.1Q VLAN encapsulation, IGMP v1,v2 and v3 snooping, MLD snooping,4096 active VLANs Support IGMP Snooping and IGMP Querying, STP, RSTP, MSTP

5 Layer 3 Features

Should support Static routing, shall be scalable to support following features: 1) RIP for IPv4 and RIPng for IPv6 2) OSPFv2 for IPv4 & OSPFv3 for IPv6 3) BGP for IPv4 & IPv6 4) PIM for IPv4 SM, DM and SSM, PIMv6-SM, IEEE 802.3az

Page 36: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 36 of 64

5) VRRP for IPv4 & VRRPv3 for IPv6

6 VLAN Should Support 802.1Q Tagged VLAN, port based VLANs and Private VLAN Should Support IEEE 802.1v VLAN classification by protocol and port Should Support IEEE 802.1ad Provider bridges (VLAN stacking, Q-in-Q) Should Support VLAN trunking or equivalent, IEEE802.1ac

7 Management Switch needs to have a console port for management Must have support SNMP V1, V2 and V3 Should have accessibility using Telnet, SSH, Console access, easier software upgrade through network using TFTP etc. Configuration management through CLI, GUI based software utility or using web interface, USB interface for configuration backup Support SNMPv6, Telnetv6 and SSHv6, DHCPv6 relay, DHCPv6 client,

8 Security Should support ACLs Support DHCP snooping, IP source guard and Dynamic ARP Inspection (DAI), Support Tri-authentication: MAC-based, web-based and IEEE 802.1x,Support DHCPv4 (server, relay and client Support sflow, Port mirroring, RSPAN

9 Certifications EN 50022, EN 60715, EN55024, EN55032 Class A, EN60068-2-27 EN60068-2-31, NEMA TS2, EN/IEC/UL 60950-1, IP 30 rating

10 Environment Operating Temperature: -10 to 75C with installation inside a sealed enclosure Should be DC powered and supplied with required AC/DC power adapter

Network Management System Software (NMS) S.No. Technical Specifications Compliance 1. Intuitive single-pane-of-glass interface 2. Centralized network and device management 3. Simplified VLAN creation and management 4. Should support for automated services include firmware upgrades,

backup, recovery and provisioning.

5. Should support for automatically-created device topology maps 6. Should support for SNMP plugin for broad device/3rd party device

support

7. Should scalable and support for managing and monitoring other network device as well such as network wireless access points, firewalls, routers and so on with automation feature for firmware upgradation, backup, recovery and provisioning.

8 Auto-discover and manage a wide range of devices with the Simple

Page 37: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 37 of 64

Network Management Protocol (SNMP) 9 Should support for real-time monitoring and measurement of network

status and performance

10 Real-time traffic monitoring across all links with protocol use through the networks

11 Support to monitoring and managing all the network elements with respect to their operational status and performance

12 Should support for network monitoring with automated notifications and alerts for pro-active management.

13 Provide failure alarm information 14 Provide network availability on a real-time basis 15 Provide network utilization on a real-time basis

16 Should provide report on network availability, utilization and performance on demand and periodically based

17 Should provide the license for supporting of 120 devices from day 1 of installation

Cables & Connectors S.No. Specifications 1. CAT-6 cable - All outdoor cabling by armored UTP Cat-6 cable. Internal connections

shall be with STP 2. 12 core single mode 9/125, optimized for 1310 nm, Outside plant (OSP) direct buried

type, attenuation 0.4 dB/kilometer, Low water peak (LWP) , fiber optic cable (Armoured) Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT

3. Patch cords LC to FC Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT

4. LIU 24 ports –FC, single mode (Loaded) Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT

5. LIU 12 ports-FC, single mode (Loaded) Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT

6. CAT-6 Connectors The bidder shall consider the following points: (i) 6 core single mode FO cable is to be used. It is preferred if FRLS sheathed cables are provided for

fiber optic cables also. This LAN is independent of other LANs in the station. LAN network shall be established for PIDS.

(ii) RING topology for Networking Perimeter and STAR Topology used for others (iii) It is sufficient if LAN connectivity through Copper cable is provided by all cameras. They need

not have provision for FO connectivity. (iv) CAT-6 cable can be used from camera to nearest switch/ node up to a max of 70 m distance. (v) The field nodes/ switches shall not be loaded fully i.e. an eight node switch can be used for

maximum 6 cameras leaving 2 cameras for future addition or a four node switch can have 3 cameras maximum.

(vi) All nodes/ switches used in outdoor environment shall meet the stringent requirements of operating temperature exceeding 50deg C. Additional housing with forced cooling/ natural cooling arrangement which shall be sufficient to remove the heat generated may also be considered to enable the operation of switch in outdoor environment.

(vii) Power to the cameras & network switches shall be through a dedicated 2/ 3 core cable of adequate size (to be specified by the bidder). Power over Ethernet is not preferred and the same shall not be offered.

Page 38: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 38 of 64

The network shall have the following minimum features in addition to requirements specified above:

a. Standard protocols shall be used for LAN & proprietary protocol shall not be used. The network shall have guaranteed access under all operating conditions.

b. The bandwidth shall be sufficient to meet the responses of the system even during data inrush for the plant under the worst case scenario with alarm bursts. It shall be possible to upgrade network capacity.

c. The design shall be such as to minimize interruption of signals. It shall ensure that a single failure anywhere in the media shall cause no more than a single message to be disrupted and that message shall automatically be retransmitted. In case of failure of one network the changeover to the redundant network shall be automatic and completely bump less and the same shall be suitably alarmed /logged.

d. Any failure or physical removal of any node connected to the data highway shall not result in loss of any communication function to and from any other node.

e. Software shall monitor the healthiness of redundant networks continuously. Built-in diagnostics shall be provided for easy fault detection. Network Diagnostic software as a minimum shall include the following: Monitoring of the network medium including the traffic. Monitoring of the communication through the network for timing and protocol. Communication

error detection and correction facility shall be provided at all levels of communication. Maintenance of communication in the presence of faulty nodes and addition/deletion of nodes etc.

f. The network shall be secured and protected against virus attack. The network shall not be part of any type of general purpose network including intranet and internet.

g. The design and installation of the data highways shall take care of the environmental conditions and hazardous area classification as applicable to similar services.

h. All network components of LAN and Human Machine Interface system shall be compatible to the LAN without degrading LAN performance.

i. The redundant buses (LAN) shall be physically separate. j. Isolation shall be provided at both transmitting and receiving ends and Redundant link shall be

provided wherever applicable.

NOTE: The bidder shall clearly specify & quote for any additional equipment/ cable/ modules as per the required quantities in order to meet the functional requirements of the system. In case it is noticed that some material (equipment/module/ software etc.) not offered/quoted initially, but is required for complete functionality then such material shall be offered along with spares at no extra cost to purchaser. Also the successful bidder cannot change the make & model no. of the equipment once accepted unless the item becomes obsolete at the time of Purchase order.

Page 39: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 39 of 64

7.0 DOCUMENTS 7.1 General

All the system drawings such as general arrangement, overall dimensions, cut-out dimension drawings, schematics, elementary wiring diagram, details and bill of material terminal loops etc. along with drawings list shall be submitted to the Purchaser for approval prior to fabrication.

Supplier shall provide their detailed Quality Assurance Plan (Q.A.P.) mentioning the steps they follow to ensure quality of the product for items fabricated at their works and for bought out items. The Q.A.P. shall be prepared to ensure that all the tests on components/equipment of the system and final assembled system are included for quality assurance. The same has to be submitted for purchaser’s approval and approved Q.A.P. shall be followed to ensure the quality of the product.

A typical Quality Assurance Plan is given for reference as Annexure-‘2’.

The Equipment Test Procedure (E.T.P.) in detail covering all the functional requirements of this specification shall be prepared mentioning the step-wise inspection and test procedures. The test procedure also shall be submitted to the purchaser for approval prior to the commencement of testing.

The Supplier shall also submit one set of as built drawings in reproducible format in soft (Auto-cad version in addition to PDF) form in CDs to the purchaser.

7.2 Operation & Maintenance Manual

The Supplier shall prepare manufactured system operating and maintenance manual and offer one copy of the draft manual for purchaser’s review & comments which shall be taken care in the revised version of the manual. The manual shall include the following: a) System technical description The system technical description shall be given in detail with reference to drawings. The working of all modules / units circuits shall be described. The system description shall be specific to the equipment furnished and not of a general nature. It shall consists of data of the equipment, adjustment, calibrations, complete instructions of installation, commissioning, working & operation of the equipment, parts catalogues and data sheets and drawings. The instructions for assembly and installation shall show the identification part number of the dismantled apparatus or equipment. b) Operating Instruction The system operation instructions shall be descriptive and in detail. Step by step operating instructions shall be given for operation of the system. Various adjustments, calibrations shall be clearly defined and mentioned. c) Maintenance instructions Trouble shooting methods, routine and periodic maintenance, test equipment’s to be used, test points with test voltages and pattern/wave shapes shall be covered. d) Manufacturer catalogues for the equipment/components procured from other sources.

Five copies of the manufacturers operating and maintenance manual and one softcopy in CD (word & PDF) shall be supplied to the purchaser. 7.3 Inspection History Document

The supplier shall supply 5 copies of “Inspection History Document” to purchaser prior to dispatch of material to site. The History Document shall consist of following:-

Page 40: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 40 of 64

1) P. O. Copy 2) Specification, Approved QAP 3) NPCIL approved test procedures, test reports and test certificates 4) Minutes of meeting and Design Concession Request if any. 5) Shipping reference, Certificate of Compliance 6) Any other P.O. related documentation 8.0 INSPECTION AND TESTING 8.1 General The purchaser or his authorized representative shall have access to the supplier’s premises at all reasonable times to the extent necessary to assess compliance with the provisions of this specification.

The Physical protection equipment shall be carefully examined to determine their conformance with reference to material and workmanship, finish, marking, dimensions and to assess its conformance with other requirements stated or reasonably implied and not covered by any specific test. All the constituent units of Physical protection equipment supplied to the provisions of this specification shall be subjected to visual, dimensional and functional inspection and testing as per approved QAP to the satisfaction of purchaser. 8.2 Tests at the Factory (For manufactured item)

i) The supplier shall subject all the electrical and electronic components to inward inspection to check their conformance with the relevant specification and standards prior to assembly and wiring as per QAP.

ii) Inspection of fabricated items such as GU’s, JB’s etc. shall be carried out to ensure conformity with the relevant fabrication drawings.

iii) Electrical wiring shall be inspected and continuity checked to ensure conformity with the relevant wiring diagrams.

iv) The assembled panel shall be inspected to ensure that they conform to the relevant drawings. v) All the electric & electronic modules shall be tested to ensure proper functioning of all controls,

outputs as per relevant specifications. vi) In case of brought out items test certificates shall be submitted. However basic tests, physical

dimension, Insulation, Continuity, etc. must be done. QAP shall be submitted for all items and QA shipping clearance to be obtained before delivery.

8.3 Functional Test 8.3.1 Functional tests shall be carried out (on 100 % of the supply quantity) as per approved test

procedures for all subsystems including sensors & detectors. For general purpose items such as UPS with batteries, JB’s, cables tests as specified in the relevant referred specification shall be carried out as applicable.

8.3.2 Integration test: The Physical protection equipment including various sub units such as CCTVS & PIDS shall be completely wired and interconnected with field cable simulated and the necessary software and basic servers/ workstations for the purpose of functional tests in accordance with this specification. For this purpose at least two sets of equipment of each subsystem shall be interconnected & the complete operation sequence checked. For this the supplier shall submit a detailed system integration test procedure to the purchaser for his approval prior to this test.

Page 41: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 41 of 64

Software tests at the Factory Software tests shall be carried out at the factory to check the functional requirements.

8.4 Test Reports Copies of the inspection and test reports, signed by authorized representative of the supplier shall be submitted to Purchaser. 8.5 Inward Inspection at Site After obtaining shipping release from purchaser’s authorized representative, equipment shall be packed properly and transported to the site. As this process may cause some damage to the equipment, they shall be checked and inspected for physical damage and quantity. 9.0 INSTALLATION &COMMISSIONING

9.1 Installation

a. All the subsystems and other equipment such as consoles, servers, workstations, UPS etc. shall be installed and commissioned as mentioned below.

b. Drawings issued by purchaser are to be refereed for installation of equipment. The cable

terminations on Consoles and JBs shall be done as per the WDs and TLs prepared by Vendor & approved by purchaser. Only the field termination shall be carried out at site. All intra panel terminations shall be carried out by the supplier in his premises prior to shipment based on the WDs and TLs prepared by Vendor & approved by purchaser. If for any reason, the panels are shipped without intra panel wiring being carried out, the same shall be carried out while installation of PIDS equipment s is being carried out. Vendor shall coordinate with the engineer in-charge at site, and follow his instructions while executing this job

c. Supplier shall be responsible for installation and commissioning of PIDS. Supplier shall ensure

that trained & qualified personnel are involved in the installation & commissioning of PIDS. Supplier shall have to depute his team of engineers along with technicians to site until completion of installation & commissioning.

d. Personnel engaged in the installation & commissioning work at site will have to follow the security procedures controlling entry and movement. During commissioning at Purchaser’s premises, supplier or his representative will have to ensure that all safety regulations (both industrial safety and radiological safety) in force are strictly followed. In such matters, Purchaser’s instructions wherever given will be binding.

e. Laying of all types of cables on cable trays as per the route defined in the cable schedule drawing of the purchaser is in the scope of supplier. The Supplier/vender after satisfying the healthiness of the cable shall terminate the cables at either end as per the approved TLs. Since the cable tray may not be available very near /close to the sensor location, the portion of the cable from cable tray exit point to the sensor location shall be laid either in 25 mm hot dipped GI conduit (for a single cable) or on a light perforated channel/ slotted angle if more than one cable is involved. In certain cases flexible conduit may also be required for routing the cables up to sensors/ field module. The vendor shall take necessary instructions from the engineer-in-charge at site. The vendor shall follow the standard installation procedure for cable laying inside the conduit/ light perforated channel.

f. All outdoor PTZ dome cameras& outdoor fixed cameras shall be installed on their stands/ poles, The GU/ JB for these cameras shall be fixed on the poles at a height 1.5 M above the floor level. For this suitable provision shall be made on these stands and poles for mounting of JB’s/ GU’s/ cameras.

Page 42: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 42 of 64

g. At certain locations, it may not be possible to dig a pit due to site constraints. At these locations the poles for cameras shall be anchored after reducing the height of these fixtures and welding a base plate for fixing the anchor bolts such that the height of these structures is 1.5 meter and 4.5 meter respectively above floor level. For this the vendor shall take necessary instructions from engineer- in- charge.

h. The cables for power, FO network and other cables shall be laid inside the GI/HDPE Pipes buried underground near the perimeter. At certain locations, where underground pipes cannot be laid, these cables shall be laid on the ground surface inside a GI conduit/ pipe. The making of the trench for GI/HDPE Pipes is in the scope of supplier. For this the vendor shall take necessary instructions from engineer- in- charge. Expected no of 7 mentioned in BOQ, Variation by one ot two as per filed requirement .

i. Openings in the conduit/pipe will be required at regular intervals to facilitate cable entry. The cable which comes out of the pipe shall be laid inside GI conduit laid on floor until the fixtures. Flexible conduit shall be used for routing the cable from GI conduit on floor to the opening in the fixture. The cables for cameras detector shall be routed inside the fixtures.

j. One pole shall be used for installation of one fixed camera or PTZ camera. The camera poles etc. are to be fixed as per approved GA drawing made by supplier after field survey.

k. CAT-6 cable shall be used for the camera to the nearest node switch of the LAN. The CAT-6 cable from the camera shall be laid in flexible conduit/ rigid GI conduit. The CAT-6 cable distance between the camera and the node switch shall not exceed 70 meter otherwise a separate switch shall be used. Each node switch can be loaded to a maximum of 80% of its capacity. The node switches shall be interconnected with each other by FO LAN. All the cores of FO cables shall be terminated on the node switch. All standard practices and precautions that are usually followed for installation and commissioning of fiber optic cables shall be followed. The splicing and termination of FO cables shall be carried out by personnel who are experienced and trained to carry out this activity.

l. The node switches, layer-2 and layer-3 switches required for establishing the FO LAN shall be as installed in their locations. These housing shall be installed on the camera pole at an accessible height.

m. Before connecting the cameras to the FO LAN the bandwidth capacity of the LAN shall be established.

n. The UPS and its batteries and consoles are to be installed at their designated locations as per their standard practices

o. The power distribution cabinet/ JB’s shall be installed at a height of 1.5 M from floor level at their designated locations.

p. The termination of cable on the various types of cameras and field modules shall be carried out by the vendor as per the wiring diagram prepared by him and approved by purchaser.

q. The tag numbers of field modules as given in drawings shall be painted near the sensors for easy identification (40 mm Height characters).

r. All EP’s and wall openings after cable laying shall be sealed as per standard procedure. The EP’s sealing procedure will be made available to the vender at site by engineer-in-charge.

s. Any changes made in approved drawings while installation due to site constraints shall be suitably marked up and “As Built” revision shall be done in such cases.

Page 43: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 43 of 64

t. The installation shall be carried out by installers with the necessary training and experience.

Installers shall have the appropriate tools and test equipment necessary to install the CCTV system and other systems correctly. Where measuring equipment is used, the equipment must be of a standard necessary to provide the required precision and accuracy to install and test the system.

u. Prior to commencing work all relevant health and safety requirements shall be considered. These will vary with the nature of the premises and may involve special installation equipment when working in hazardous areas.

v. Electrical installation methods shall comply with current national and site regulations and the electrical installation shall be carried out by technicians who are qualified to the appropriate level.

w. An inspection of the system shall be carried out and documented on completion of the installation of the PIDS system to confirm that the system has been installed in accordance with the system Design proposal. Any deviations shall be recorded for inclusion in the final document.

x. The system shall be installed and commissioned in accordance with the manufacturer’s recommended procedures as defined in the product’s installation and setup guides. Prior to installation, the installer shall have completed a manufacturer’s training program and be certified by the manufacturer. Alternatively, the installer shall be required to have the manufacturer, or their designate, provide qualified technical support for installation and commissioning. Acceptance tests shall be performed in accordance with standard procedures available from the manufacturer.

y. The drain wires of the both incoming & outgoing paired cables if used for the signal cables shall be terminated on the earthing studs provided on the Gus. The continuity of the drain wire shall be maintained throughout the loop including in the JBs/ GU’s. The continuity of the drain wire shall be ensured even for those sensors where the Gus are not used .The drain wire shall be connected finally to the safety ground provided in the CAS console / CC console at the starting of the loop i.e. from address 1. The drain wire shall not be looped back i.e. it shall be terminated at the last sensor. (Refer Engineering Standard on Instrumentation and Control System Grounding, PC-E-709).

z. PRECAUTIONS

i. Handling of instrument shall be done in such a way that it is protected from water, dust and mechanical damages.

ii. After installation proper protection shall be envisaged and implemented. iii. Wires shall be terminated in the sensors using lugs. Continuity shall be checked after

crimping the lug. iv. Cameras shall be checked for its proper functioning using test set or other applicable

meters before installing them in the respective location. No camera/ field module shall be installed in the field without testing the same.

v. For assigning IP address to the necessary equipment of CCTV, the vendor shall obtain necessary instructions from engineer-in-charge.

vi. Dust caps supplied along with the sensors/ field module shall be put during commissioning stage to avoid ingress of dust etc.

Page 44: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 44 of 64

9.2 COMMISSIONING OF PHYSICAL PROTECTION SYSTEM After establishing the LAN connectivity and other appropriate connectivity of all field modules/cameras with CAS console and interconnectivity of all CAS console with CC console with display units and other equipment such as six point Annunciator the commissioning activity shall commence. It is presumed that the PIDS vender at his works prior to shipment has configured all the equipment with the relevant database of the system as per the drawings to the extent possible. If due to any reason this is not done then he shall carry out this activity at site parallel when the installation of equipment is being carried out by him.

The following checks are to be carried out prior to commissioning and sensors in field.

(i) Components mounted on the entire CAS console, GU’s, JB’s etc shall be checked as per

applicable GA drawings.

(ii) Tagging details shall be verified with applicable documents.

(iii) Panels/enclosure grounding is checked for their rigid support, proper continuity to ground and cable glands.

(iv) Cable terminations at consoles, JBs and cameras are checked as per TLs.

(v) The wiring for panels/JBs & field devices shall be checked as per WDs.

(vi) IR of panels/equipment is checked to meet system design requirements.

(vii) Address setting, alignment and functional checking of field devices.

(viii) Operation of Power supply units and voltage regulation are checked as per specification.

(ix) Transfer of loads to back up power supply is checked on failure of main power supply, wherever applicable.

(x) Alarm functions shall be simulated & verified.

(xi) Calibration for all the sensors shall be verified to meet system design requirements.

Commissioning of PPS equipment involves the following steps: (i) Checking the functioning of each and every field module/cameras (for field of view) connected

to CAS console and checking the actuation of actual outputs (video displays, alarm maps, Annunciator) and displays at CC console i.e. the status of each cameras/ field modules in various states (normal, alarm, fault) shall be checked at both these locations. Checking of alarms including those generated from VA on outdoor fixed cameras.

(ii) Checking of live, recorded image quality and storage time provided in DVMS.

(iii) Integrated functional test is carried to verify all the operational logics, indications, annunciations, displays & recording to meet system design intent.

(iv) Demonstrating the various features of the system illustrated in the instruction manual. Some of

the typical functions but not complete to be demonstrated include:

Page 45: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 45 of 64

a) Diagnostics of the system (features provided in CAS console and CC console) and HMI provisions.

b) The generation, storage, uploading and downloading of database of PIDS. c) Operation of the system in the degraded mode.

(v) Generation of commissioning document and handing over of the system to O&M personnel

after successful test run. 9.3Test run The test run shall be at least for one month, during which the reliable operation of the system has to be established. Test run will continue till the requirement of specifications is achieved. During this test run the supplier shall be responsible for the maintenance and repair of the equipment and training of the operation. After successful completion of the commissioning and test run the system shall be handed over to the operation staff. 10.0SPARES The spares to be supplied under the contract unless otherwise specified shall be on the following basis: This is specially for all items, hardware, boards which are assembled inside panels / units and all accessories supplied. ( Eg. spare PCB for Annunciator)

a. 10% of the modules, sub-assemblies and units used in the system with at least one unit. Spares

will be required for items such as Adopters, AC-DC converters . PCB assemblies etc. b. 10% of the loose components such as relay, resistors, capacitors, transistors, etc. if any used on

systems with at least one component of each type. c. 10% of hardware items like connectors, switches, etc. used on the equipment with at least one of

each type. A list of spares proposed to be supplied by the supplier on the above basis shall be submitted by the supplier to NPCIL for approval. For certain items for which spares are already considered is mentioned in BOQ, the spares for the same need not be offered. Any item not listed initially in the offer, but is found out to be required for the functioning of the system shall be supplied along with spare at no extra cost. Supplier shall ensure that the quantity of spares included will be adequate for satisfactory operation of the system for at least 10 years. Afterwards the vendor can supply the spares which are backward compatible with the supplied system. The vendor shall also suggest the actions that can be taken to address the issues of up-gradation and backward compatibility of spares NPCIL has the option to order these spares. 11.0 TRAINING The supplier shall provide training to purchaser’s persons regarding operation and maintenance of the system at their works free of cost. Supplier shall provide all materials and documents for training. For efficient operation and maintenance of System at plant site, training shall also be imparted to site engineers during testing, installation and commissioning at site on 1) Installation, commissioning operation and maintenance aspects 2) Design aspects, system architecture design of software and hardware. 3) Functional operation of software and hardware. 4) Interpretation of various diagnostics of software& hardware. 5) Trouble shooting

Page 46: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 46 of 64

Vendor shall provide training manuals before the start of the training. The training program shall emphasize on all relevant CBS Human interface. The training shall be conducted on prototype of the system so that user can able to understand actual Hardware and Software. 12.0 GUARANTEE The Equipment shall be guaranteed against defects arising due to design, fault, material, workmanship, poor packing, and damage during transportation, handling, storage etc. and for trouble free operation for a period of one year from the date of satisfactory commissioning of the system. During this period all the faulty units shall be replaced/repaired free of cost at site by the supplier. 13.0 IDENTIFICATION Proper identification i.e. name of the system, model, sr. no., tag number & manufacturers name shall be provided on the console. A nameplate for the console shall be provided on top of panel. The character height shall be such that, it can be easily readable from a distance of two meters. The exact engraving details will be given at the time of detailed engineering. 14.0 PACKING AND SHIPMENT The supplier shall arrange packing of the instruments as per IRCA regulations in respect of consignments sent by rail. In respect of dispatches by road, the supplier shall arrange such packing as would safeguard the consignment against all rigors of road transport. All accessories and components shall be packed in packages limited to the sizes and weights that are admissible under the prevailing rail and road limitations. The instruments shall be so packed and protected as not to suffer deterioration, damage or breakage and shall be protected to prevent entrance of dirt and moisture during transit and storage. Each package shall be properly labeled and tagged indicating the type of quality of material it contains its dimensions, weight as well as the order number (Requisition No.). All hardware, spares, etc. shall be specially packed and clearly marked indicating the intended use. After receipt of material at site and during installation & commissioning if it is found out that the equipment/ sensor/ module has suffered damage due to transfer or storage on account of improper packing or while transfer from stores, the supplier shall replace such equipment/ modules/ sensors at no extra cost to purchaser.

Generally no shipment shall be made with deficiency. However, because of urgency or some other unavoidable reasons, shipment with deficiency can be made only after obtaining the approval of Site/NPCIL. In such cases the supplier shall clear the deficiencies at site at no extra cost and within the agreed schedule. The supplier shall also conduct free of cost fresh tests on the equipment if required to ensure the integrated system performance. Also the supplier shall maintain a list of all such deficiencies, accepted date of clearing and reference for clearance. The supplier shall update this list every month and issue it to all concerned for the sake of record and speedy clearance of such deficiencies. This option for shipment with deficiency shall be exercised without any prejudice to the agreed commercial ‘Terms & Conditions’ of the order.

Each package shall be marked with “fragile and electronic item, handle with care”. The packages shall be clearly and legibly marked with suitable permanent manner with the following information.

a) Description of item and its serial number. b) The Purchase Order No. c) The number of pieces in the shipment.

In addition, the name and addresses of supplier and consignee shall be marked.

Page 47: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 47 of 64

15.0 OVER ALL GENERAL REQUIREMENT Supplier must be capable of design after site evaluation , supply of materials including items which

are not listed ( accessories, support and all miscellaneous items required for the system) , erection, installation, software design , test, supply and installation, software configuration to suit requirement , commissioning of system , documentation and training to operate the system. Supplier must satisfy the requirement. Supplier must submit quotations including all the above requirements clearly stated. Part quotation of items or only supply of few items or all items or any other incomplete quotations not satisfying above requirement will be summarily rejected.

Supplier must ensure that the computer, networking, hardware and software supplied are currently in market and not outdated versions.

RAPS 1 & 2 Outdoor Ambient temperatures vary from 4 Deg C to 50 Dec C . Supplier shall consider this along with metal temperature for all outdoor equipment

Suppliers must fill the compliance sheet not leaving any blank answer . They shall fill details of deviation if any and incomplete compliance sheet will be a disqualification .

All supplied items should be of reputed makes only. All supplied software shall be installed /configured/validated/run without any internet connection . All supplied software shall have unlimited validity with free up-dates if any for life time For installation and commissioning, M/s NPCIL will provide electricity only at one point, drinking

water at Canteen and chargeable canteen facility as per M/s NPCIL rules and regulation. Bidder has to bring all accessories, tools, electric boards, drill machines , equipment’s and transportation like truck / pick-up / tempo for the material / man-power movement. All safety rules as per M/S NPCIL to be followed. Bidder has to provide safety shoes and safety helmet to his employees while working in RR site.

Page 48: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 48 of 64

ANNEXURE-1 (BILL OF QUANTITIES FOR RAPS-1&2) Detailed BOQ shall be submitted by the bidder along with the offer. If anything supplier feels required should be added in the list. Bidders responsible for supplying free of cost any item which is required for completing the project. All Line items are along with Accessories Sl.

No. DESCRIPTION Actual Quantity required Spare Total

Quantity

A CCTV SYSTEM(MAKE PELCO/ BOSCH/ DVTEL/ AXIS)

1 Out Door Fixed color Day /Night Camera with 1/3” Auto Iris Vari-Focal Lens & outdoor housing 80 10 90

2 Outdoor Auto Dome PTZ Camera Day/Night version (wall mounted) 15 5 20

3 42 (±2) “ LCD/LED Video Monitor 2 1 3

4

CCTV Servers, client workstations, NVRs with license of 200 cameras comprising of Following minimum no of servers 1. CCTV Recording server 2. CCTV fail over recording server 3.Video analytics server 4. Digital Video Management system (DVMS) server 5. Fail over DVMS Server 6. Client work station (2 Nos)

1 set 1 set

5 4.5 meter. Tower for Outdoor Camera, Camera Poles with JB for DC PSU, Terminations 95 15 110

6 GUs for outdoor network switch 30 5 35

7 Hardware, JB , and Accessories for CCTV As per field required

B CONSOLES, UPS, JBs, ETC. 1 CAS Control Console 1 1 2 Control Center Console (Control room) 1 1 3 UPS (15 KVA) 1 Hr. Battery Back up 1 1 4 Junction Boxes (as per size required ) 50 50 C CABLES & CONDUITS 1 3 Core 1.5 Sq.mm Armored Power Cable 4Km 1 Km 5 Km 2 10 pair 1 sq mm sheathed signal cable 2 Km 0 2 Km 3 Inter connecting wires 1.5 sq mm single strand PVC 1100 V 2 Km 1 km 3 km 4 Any other cable required for the job As required 5 25 mm diameter GI conduit 4Km 1 Km 5 Km 6 PVC Flexible Conduit (with reinforced wire) 5 km 1 km 6 km 7 2” GI Pipes 2.5 Km 1.5Km 4 Km

8 Glands sizes of 3 core, 10 pair, and other cables(all sizes combined) Standard Brass Chrome plated 800 200 1000

D Network Components

1

Core switch (Managed Switch) Layer-3 Chassis based, 3 slot chassis, 2 switching fabrics with built in SFP slots (12 nos. in each Fabric),1 no. of 10/100/1000 Mbps, I/O card having 24 ports, 2 vacant slots for future expansion, power supplies 2 nos., built-in fan assembly, 6 Nos. of 1000 Mbps LX modules MAKE –HP/ CISCO/ JUNIPER// ALLIED TELESIS/MOXA

1 - 1

Page 49: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 49 of 64

Sl. No. DESCRIPTION Actual

Quantity required Spare Total Quantity

2

Edge / Distribution switch (Managed-Switch) Layer-3, 19” rack mountable switches, 24 Nos. of 100/1000 SFP ports with 8 nos. 10/100/1000 Mbps combo ports, RPS- rack power supply- 1 nos., 16 Nos. 1000 Mbps LX modules MAKE –HP/ CISCO/ JUNIPER// ALLIED TELESIS/MOXA

1 - 1

3 27U, 19” 800mm depth rack along , Power distribution, hardware and with cooling fans in fan tray .MAKE NETRACK / RITTAL

2 - 2

4.

Outdoor industrial grade (managed switch) with power supply, layer 2 comprising of 10/100 Mbps 7 ports, one 10/100/1000 Mbps port and SFP ports 2 Nos., 2 nos. of 1000 LX modules. Switch along with its modules and power supply shall withstand temperature of 60Deg C. MAKE –MOXA / ALLIED TELESIS / CISCO

30 Nos. 5 35 Nos.

5.

Indoor switch (managed switch) layer 3, 19 “rack mountable type, 24 Nos. of 100/1000 SFP ports with 4 nos. 10/100/1000 Mbps combo ports,4 nos. of 100 Mbps LX modules. Rack mounted with power supply. MAKE –HP/ CISCO/ JUNIPER/ ALLIED TELESIS/MOXA

1Nos. 1

6. CAT-6 cable- Armored UTP 3 Km 1 Km 4 Km 7. CAT-6 cable- un-armored STP 3 km 1 Km 4 Km

8.

12 core single mode 9/125 , optimized for 1310 nm, Outside plant (OSP) direct buried type, attenuation 0.4 dB/kilometer, Low water peak (LWP) , fiber optic cable (Armored) Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT/FINOLEX/POLYCAB

2Km 0.5Km 2.5 Km

9. Patch cords LC to SC Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT/DLINK/MOLEX 30 Nos. 30nos.

10. Patch cords SC to SC Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT/DLINK/MOLEX 30 Nos. 30nos.

11. Patch cords LC to LC Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT/DLINK/MOLEX 10 Nos. 10nos.

12. LIU 24 ports –SC, single mode Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT/DLINK/MOLEX 4 Nos. 4 nos.

13. LIU 12 ports-SC, single mode Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT/DLINK/MOLEX 12Nos. 12 nos.

14. Pigtails-SC Preferred make : TYCO/ AMP/SYSTIMAX/PANDUIT 150 Nos. 150 nos. 15 CAT-6 Connectors 300 Nos. 300 Nos. 16 9 U, 19” 400 mm depth 8 no 2no. 10 Nos.

17 15 U, 19” ,400 mm depth rack 1 Nos. 1 Nos.

18 Intelligent management center- Network management software loaded on a PC for 100 node license. 1 set 1 set

19 6 point Annunciator 2 No 2 No 20 Hardware lock for network port 500 No 0 500 no E Test Equipment a) Portable View Finder — For field adjustment 2 0 2 b) 100MHz Oscilloscope -Digital 1 0 1 c) 3 1/2 Digit Multi-meter -Fluke 2 0 2 d) OFP tester 1 set 0 1 set e) CAT 6 cable tester 1 set 0 1 set

Page 50: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 50 of 64

Sl. No. DESCRIPTION Actual

Quantity required Spare Total Quantity

f)Any other essential Test instrument as recommended by bidder 1 set 0 1 set

F Recommended spares Loose components & Modules used in the system 1Set 1Set G DOCUMENTATION a. Operating Manual 5 sets + 1 softcopy 5 sets b. Maintenance Manual 5 sets + 1 softcopy 5 sets c. Service and Installation Manual 5 sets + 1 softcopy 5 sets d. As built system architecture 5 sets + 1 softcopy 5 sets e. Electrical and Electronics and wiring drawing 5 sets + 1 softcopy 5 sets f. Test reports 5 sets + 1 softcopy 5 sets

Page 51: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 51 of 64

ANNEXURE-2 TECHNICAL DATA TO BE FURNISHED WITH PROPOSAL The following information shall be furnished along with the quotation: 1) The bidder shall supply relevant documents such as write up, operating principles, operating features

diagnostic & functional priorities of various subsystems of PERIMETER INTRUDER DETECTION SYSTEM, block diagram, technical data sheets, brochures, approval certificates, installation, commissioning and maintenance guidelines of the offered system. Bidder shall also submit duly filled questionnaire.THESE DOCUMENTS ARE MANDATORY FOR CONSIDERATION OF THE OFFER.

2) Wiring scheme & block diagram of PERIMETER INTRUDER DETECTION SYSTEM. 3) Various Computer software modules/ packages used with PPS. Describe briefly design & test

procedure of the software. 4) A point-to-point compliance with respect to all the points of this specification shall be sent along with

the quotation, indicating details of deviations if any. In case, deviations require modification in the bill of materials, it should be brought to the notice with justification. IN ABSENCE OF THESE, THE OFFER WILL NOT BE CONSIDERED FOR EVALUATION.

1.0 Please give following details of the sub-units:

CAS Console (Attach catalog, if any) Sl. No. Description Response /Details 1 Make, Model no. 2. Overall dimension L x B x H (mm) (if not exact give approx) 3 GA of CAS console attached? 4 Net weight (Approximate) 5

Layout of various sub-units with suitable drawings (Floor anchoring details also)

6 List of standby units, if any. 7 Field termination details & no. of field terminals provided. 8 Provision for outputs contacts for six point Annunciator. 9 Provision for two 22 inch LCD monitors? 10 Networking of various subsystems? 11.0 Power supply, silence/ mute, switches, LED/ LCD display

indications on Console

12.0 Provision in the CAS console to control and monitor the PTZ camera and from the operator workstation.

13.0 Provision in the CAS console to search recorded videos in the surveillance system, by date and time.

14.0 Provision to store minimum 3 month of recorded video with 5 minutes pre-event and up to 5 minutes of post-event for all alerts

15.0 Are diagnostic functions available CAS console? 16.0 Provision in the CAS console to display map of facility with

camera location and from the operator workstation.

17.0 Limitations, if any

Page 52: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 52 of 64

CC Console (attach catalog, if any)

Sl. No. Description Response /Details 1 Make, Model no. 2. Overall dimension L x B x H (mm) 3 GA of CC console attached? YES/ NO 4 Net weight 5

Layout of various sub-units with suitable drawings (Floor anchoring details also)

6 List of standby units, if any. 7 Field termination details & no. of field terminals provided. 8 Provision for one 22 inch LCD monitor? 9 Provision for client workstation with access to CCTV server? 10 Power supply, silence/ mute, switches, LED/ LCD display

indications on Console

11.0 Provision in the CC console to check health of software, hardware, and sensors and report on weak/fail event?

12.0 Provision in the CC console to control the PTZ camera and from the operator workstation.

13.0 Provision in the CC console to search recorded videos in the surveillance system, by Date and time.

14.0 Limitations, if any CCTV System Sl. No. Description Response /Details 1 IP based 2 Interlocked facility with PIDS for automatic homing in case

alarm.

3 Provision of inbuilt heater, Fan & blower facility for all outdoor auto dome & fixed cameras?

4 Specify the degree of protection for outdoor applications? 5 Provision of LAN connectivity in all cameras? 6 Specify Bandwidth of LAN network required for 100 cameras? 7 Power Cable to the cameras & network switches separate or

through Power Over Ethernet (POE)?

8 Provision to display any camera output on any LCD monitor in the CAS console & CC console?

9 Provision for operators at CAS and CC consoles to view the videos of cameras in a predetermined sequence which shall be programmable at site?

10 Provision in CCTVS to display the camera identification number, location of the camera, time and date.

11.0 Provision to record the videos from all the cameras , store the same for 3 months, retrieve & analyze the recorded video later on by date/time or by camera location or in chronological order.

12.0 Provision to send selected recorded video signals through Ethernet to two locations such that, they can see video on demand either on a PC monitor or on a separate monitor.

13.0 Whether the cameras & its accessories such as JB’s mounts etc. used in outdoor areas is capable of withstanding the adverse weather conditions? Details to be provided.

14.0 Digital Video Management (DVMS) System

Page 53: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 53 of 64

15.1 Bidder to confirm provision to connect 200 cameras in total. 15.2 No. of servers to carry out the primary recording of the all

cameras

15.3 Provision of allowing the recording, live monitoring, playback of archived video and data simultaneously.

15.4 Provision to provide file export tool for export the native video format with all video protections (e.g. watermark, encryption) and the ability to play this video on a standard computer.

15.5 Hard ware & Software provision to accept third party IP cameras and encoders.

15.6 Facility to assign the priority level to different alarms. 15.7 Provision to take the backup of the configuration database and

restoring the same if required

15.8 Facility for easy and user friendly menus for camera configurations. It must allow the copy and paste the settings from one camera to other to save the user efforts

15.9 Provision in the Software to monitor the desktop of any networked computer.

16.0 Cameras Specification (Required for each type of camera) 16.1 Type (Make and Model) 16.2 Environmental and operating conditions 16.3 Approvals 16.4 Imaging Device 16.5 Compression 16.6 Image Resolution 16.7 Video Motion Detection/ Video Analytics 16.8 Zoom 16.9 Focus distance/ Lens details 16.10 SENSITIVITY 16.11 IRIS 16.12 Back light control 16.13 Signal to Noise Ratio 16.14 White Balance Auto 16.15 Color to B/W conversion 16.16 Outputs 16.17 Network Ethernet System details 16.18 Simultaneous Access 16.19 Pan Movement 16.20 Tilt Movement 16.21 Pan Speed 16.22 Tilt Speed 16.23 Preset 16.24 Power Supply 16.25 Self-temperature control 16.26 Operating temperature 16.27 Relative humidity 16.28 Capability Mount (Brackets given) 16.29 Min. Illumination 16.30 Signal to Noise 16.31 External audio input & output

Page 54: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 54 of 64

16.32 Enclosure- Vandal proof 16.33 Potential free contacts for tampering , changing the orientation

etc.

17.0 Outdoor housing & camera lens assembly 17.1 IP rating of camera Housing 17.2 Rear connector 17.3 Rear connector type 17.4 Weight 17.5 Operating temperature (with fixed lens) 17.6 Power Supply 17.7 Size 17.8 Mounting 17.9 Accessories 19.0 40 or 42 “ High Resolution LCD/LED Monitor 19.1 Screen Size 19.2 Resolution(H/V) 19.3 Progressive Scan 19.4 Network Port? 19.5 Color System 19.6 Displayable Colors 19.7 Contrast Ratio 19.8 Sub Pixel Control 19.9 Video Noise Reduction 19.10 No. of HDMI inputs 19.11 Composite Video Input 19.12 Monitor Out 19.13 Power Supply

5) AC-DC and DC-DC converter if used for CAS Console, CC Console and in GUs.

i. Brief description of AC-DC /DC-DC converter, Type no. make and model. ii. No. of converters iii. Rating of converter (Voltage and current ) iv. Capacity of each converter v. No load/Full load regulation

6) Uninterruptible Power Supply &Maintenance free batteries. Sl. No. Description Response /Details 1 Make & model no.? 2 Rating 3 Operating Voltage & frequency? 4 Specify Physical dimension and spec 5 Backup at full load? 6 Provision to accept two feeders each of the 1 phase 240VAC as

inputs?

7 Are sealed maintenance free batteries provided? 8 Efficiency? % 9 Controls and protections? 10 Alarms? 11 Construction? 12 Tropicalisation 13 Accessories provided with UPS?

Page 55: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 55 of 64

14 Provided detailed specifications & catalog of the system. 15 Applicable Standards, Specifications & drawings? 16 Limitations, if any. 7) JB’s, GU’s, stands, poles for cameras (to be prepared for all type of fixtures) Sl. No. Description Response /Details 1 Overall dimension L x B x H (mm) 2 GA /drawing of fixtures attached? 3 Net weight 4 Requirements specified in PC-E-347 followed? 5 Terminal strips? 6 Mounting Type? 7 Degree of protection for indoor & outdoor applications? 8 Nameplate or make model details 9 Details of MCB/ RCCB /ELCB used 10 Limitations, if any. 8) 6- point Annunciator Sl. No. Description Response /Details 1 Overall dimension L x B x H (mm) 2 GA /drawing of fixtures attached? 3 Net weight? 4 Mounting Type? 5 Provision for 6 inputs potential free contacts? 6 Provision of hooter to sound & its corresponding window to light

for every new input changing its state. i.e. Dynamic audio visual annunciation possible?

7 Sound intensity? dB 8 Provision for reset, acknowledge, silence, beeper, test etc.? 9 Limitations, if any. 9) Field cables& accessories recommended Sl. No. Description Response /Details 1 Specify the Power cable for outdoor areas. Do these cables meet

NPCIL specification PC-E-165?

2 Specify the other types of cables required cable for outdoor areas. Do these cables meet NPCIL specification PC-E-165?

3 Do the FO cable & CAT -6 cable have FRLS sheath and armoring for use in outdoor area?

4 Do the internal wiring of the consoles and GUs meet requirements as per the NPCIL specification PC-E-239?

5 Are Glands meeting requirements as per BIS? 6 Briefly describe the LAN accessories & other items, if required. 7 Please provide details of node switch, layer-2 and layer -3

switches & the LAN scheme.

8 Whether cooling arrangement is provided in CAS console, CC console and Gus for having node switch used in outdoor areas?

9 Also provide the following for each type of cable used. 1. Type of cable 2. Insulation Class

Page 56: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 56 of 64

3. Conductor size 4. Whether screened/Shielded 5. Sheathed?

10) Total power requirement at 240 V AC (Approximately) PERIMETER INTRUDER DETECTION SYSTEM

(1) (2) (3) CAS Console CC console GUs

a Normal operation Load in KW

b Max Load in KW

11) DOCUMENTATION (Refer Section 7.0)

Sr no Description i) Agreeable to furnish all documents as per section 7.0 YES/NO ii) Agreeable to give training as per section 11.0 YES/NO iii) Agreeable to Install and commission the system as per specification YES/NO iv) Agreeable to warrantee and guarantee as per section 12.0 YES/NO v) Agreeable to execute scope of job & BOQ as per Annexure- 1 YES/NO vi) Quotations offered as per Annexure- 1 and whether spares for the

system are offered? YES/NO

12) List of the items which the supplier is not able to furnish and needs purchaser’s help in procurement

shall be listed separately.

13) Standard inspection and quality control procedures

a) Brief details shall be furnished b) Agreeable to do all the tests as per section 8.0. — Yes/No c) Details of type tests proposed to be conducted on various sub-units of the equipment.

14) Whether the bidder is aware and understands the significance of the Non-Disclosure Agreement

clause mentioned in section 5.8 of this specification. Yes/No. 15) Whether the bidder has experience of 5 years in planning, engineering, commissioning and

maintaining the PPS equipment? The bidder shall give the list of PERIMETER INTRUDER DETECTION SYSTEM equipment operating under similar conditions which he has supplied similar to that offered.

16) A point to point compliance with respect to all the points of this specification indicating details

of deviations if any is to be submitted. In case deviations require modifications in the bill of quantities (BOQ) given in the Annexure-1, the BOQ shall be updated with the justification & approval of the Purchaser shall be obtained. Whether this has been done?

17) Drawings dealing with overall dimensions, cutouts, general layouts, controls, field wiring diagrams

etc. shall be sent for purchaser’s approval before manufacture.

Page 57: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 57 of 64

Questionnaire to the bidders

Sr. No.

Specification’s Point no.

Technical requirement Remark Bidder may provide additional information.

1 Scope Bidder is ready to give undertaking for design, construction, manufacture, assembly, inspection, testing, packing, forwarding, and delivery to site, handling and storage of equipment at site, testing at site, installation & commissioning at site, documentation requirement including guarantee for PERIMETER INTRUDER DETECTION SYSTEM equipment.

Yes

No

2 Applicable Standards & Specifications

Bidder is aware of the requirements of PERIMETER INTRUDER DETECTION SYSTEM applicable standards/ specifications.

Yes

No (Give details for deviations, if any)

3 Applicable NPCIL Specifications

Whether Bidder has taken care of grounding & shielding requirements to reduce the effect of EMI/EMC in the system offered.

Yes

No (Give details for deviations, if any)

4 Material process & workmanship

Bidder is ready to adhere to strict NPCIL’s QA requirements on indigenous & imported components, Inspection, De-rating, Terminations, mounting, painting & workmanship.(refer QAP samples given QA will be applicable as per. Standard or manufactured item )

Yes

No (Give details for deviations, if any)

5 Material & processes

Whether bidder has understood the NPCIL QA policies & sub-contracting jobs/ bought out items?

Yes

No 6 Input power supply Whether bidder has understood the implication of using 240 V AC

power supply as input to PERIMETER INTRUDER DETECTION SYSTEM and its implications?

Yes

No 7 Environmental &

Operating Conditions

Whether PERIMETER INTRUDER DETECTION SYSTEM offered is rated for continuous operation at ambient conditions as stated in the Technical specification?

Yes

No 8 Manufactures

drawing. Whether bidder has enclosed system write up along with block diagram, GA’s a point-to-point compliance with respect to all the points of this specification, highlighted deviations etc. & attached these along with quotation?

Yes

No

9 System Requirement

Whether the Bidder has understood the input & output requirement, interfaces with sub systems as per technical specification and ready to provide the same? Give details.

Yes

No Give details in case of any deviations.

10 System Requirement

Whether the Inputs have essential protection for over voltage, reverse polarity, power supply etc.?(w.r.t internal panel wiring and component rating )

Yes

No Give details in case of any deviations.

11 System Requirement

Whether the Bidder has provided Console & six point indications, functional requirements, performance requirements, priorities & controls as per technical specification?

Yes

No Give details in case of any deviations.

12 System Requirement

Whether the Bidder has understood the requirements of integration of all the subsystems of PPS?

Yes

No Give details in case of any deviations

13 Documentation Is the bidder agreeable to provide documentation as below. A) Preparation of Quality Assurance plan. (Refer Samples) B) Equipment Test procedure

Yes

No

Page 58: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 58 of 64

C) Preparation of Test Reports D) Preparation of Drawings ( General Arrangement [GA] &

Bill of Material [BM], Detail Drawings [DD], I/O Schedule, Schematic diagrams (PCB wise), Wiring Diagram [WD] in NPCIL format and Reproducible etc.

E) Preparation of operation & maintenance manual. F) History docket.

Give details in case of any deviations.

14 Inspection, Tests & Reports

Whether the Bidder has understood the testing requirements? Preparation of Equipment Test procedure for following tests :

A) Routine tests B) Functional Test C) Tests on Power supply D) 100 hr Burn-in-Test E) Type tests (Transient Immunity test, Climatic test etc.)

Yes

No Give details in case of any deviations.

15 Spares & Accessories

Whether the Bidder has quoted 10% component & 10% assembled PCBsas spares. 10% of the modules, sub-assemblies and units used in the system with at least one unit. Spares will be required for items such as DC-DC converters, AC to DC converters etc. (This is Specific PCBs, Modules etc used inside supplied assemblies. It includes adopters, I/O cards, alarm PCB etc) Does not require for of whole units like camera etc.Give details.

Yes

No Give details in case of any deviations.

16 Identification Whether the Bidder is agreeable for packaging & shipment as per Technical Specification.

Yes

No Give details in case of any deviations.

17 Overall General requirement

Whether the Bidder understood the NPCIL standards/ overall requirements and ready to execute as per NPCIL standards

Yes

No

Page 59: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 59 of 64

Annexure-3 BOQ: Field work items for PIDS system (Approx)

Sr.N DESCRIPTION Actual Quantity Required Spare Total

Quantity UoM

1 Making trench in soft rock (900 mm depth X 500 mm width ) and normalization after laying of IG conduit & cables 1300 0 1300 Mtrs

2 Making trench in hard soil (600 mm depth X 300 mm width ) and normalization after laying of IG conduit & cables 100 0 100 Mtrs

3 Cable laying on existing tray/trench/conduit/HDPE pipe per Mtr. per cable. 2000 0 2000 Mtrs

4 Installation of PVC flexible conduit (with reinforced wire) in soft rock/hard rock/wall. 300 0 300 Mtrs

5 Erection of 6 mtrs pole by making RCC foundation 15 0 15 No

6 Erection of 4.5 mtrs pole by making RCC foundation 80 0 80 Nos 7 Road crossings –Cutting and hume pipe installation 7 0 7 Nos 8 Making Earthing Pits and installation of main Earthing 3 0 3 Nos

9 Fixing of fixed camera with housing including mount and necessary fixing hardware with proper cable management. 80 0 80 No

10 Fixing of PTZ camera with housing hardware including mount and necessary fixing hardware with proper cable management.

15 0 15 No.

11 Installation of outdoor industrial switch . 30 0 30 Nos. 12 Installation of core switch. 1 0 1 No 13 Installation of distribution switch. 1 0 1 Nos. 14 Fixing of Junction Box for outdoor network switch. 30 0 30 Nos. 15 Installation testing and commissioning of PIDS system. 1 0 1 Set.

16 Installation, testing and commissioning of FO network system. 1 0 1 Set.

17 Integration testing of PIDS and CCTV and FO network along with configuration of network switch. 1 0 1 Set.

18 Termination of power cable terminal inside junction Boxes both small and big (no of JBs given) 120 0 120 No.

19 Installation, of server console. 1 0 1 No. 20 Installation, of CAS console. 1 0 1 No. 21 Fixing of 42’’ monitors. 2 0 2 No. 22 Splicing. 240 0 240 No. 23 Installation, of UPS 1 0 1 No.

24 Training to site O&M personnel on PIDS/CCTV/FO network (Three day) hands on training on the installed system and thru mock-up.

1 0 1 Set.

Page 60: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 60 of 64

ANNEXURE —4

SAMPLE QUALITY ASSURANCE PLAN (QAP) Sl. No 1

Components 2

Characteristics 3

Type of Check . 4

Classification 5

Quantum of Check 6

Reference Document 7

Acceptance Norms 8

Format of Records 9

AGENCY REMARKS 11

P W 10

V

1.0 INWARD INSPECTION 1.1 Indigenous

components MCCS, fuses, sockets, switches, cables, terminal blocks, connectors and other hardware

i) Marking & rating

ii) Acceptance

test

Physical Electrical

MA MA

100% Samples as per relevant Standard

Mfr’sdrgs./ data sheet Relevant Standard

As per Mfr’sdrgs./ data sheets As per relevant JSS

Internal quality control (IQC) record IQC Records

2 2

2 2

1 1

Where appropriate Standard is not available equivalent standards shall be checked

1.3 a) Mechanical hardware or parts consoles, 3Mtr tower,mounts,JB’s, GU’s etc.

b) Nuts, screws,

washers, studs, etc.

1. Acceptance test 2. Routine test 3. Visual test 4. Dimensional 5. Alignment a. Acceptance test b. Visual test

Visual Visual

MA MA

Sample Sample

Approved Drawings & manufacturer’s Data Sheet

Approved Drawings & manufacturer’s Data Sheet

IQC Record 2 2 2 3

1 1 1 2

Verification of internal procedures by Purchaser

1.4 Assembly of mechanical hardware

1. Visual 2. Dimension 3. Marking 4. Workmanship 5. Finish

Visual Measurement Visual Visual Visual

MA MA MA MA MA

100% 100% 100% 100% 100%

Applicable manufacturing drawings

Applicable manufacturing drawings

IQC records 2 2 1

Page 61: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 61 of 64

ANNEXURE – IV (Contd)

SAMPLE QUALITY ASSURANCE PLAN (QAP)

Sl. No 1

Components 2

Characteristics 3

Type of Check 4

Classification 5

Quantum of Check 6

Reference Document 7

Acceptance Norms 8

Format of Records 9

AGENCY REMARKS 11

P W 10

V

2.0 FINAL INSPECTION OF ASSEMBLE D UNITS (CCTVcameras servers etc.)

2.1 Routine and acceptance test

i) Completeness ii) Insulation iii) D.C. Power

supply units iv) Functional v) 100 hours Burn-in

test

Physical, overall dimension GA, BM

I.R. test H. V. test A.C. Variation Line & load regulation, ripple AC ON/OFF Auto restart All functions & diagnostics Functional check before & after Burn-in period

MA

100%

Specs & approved mfr’sdrg. As per approved test procedure

As per specs & approved mfrsdrg. As per approved test procedure --do—

IQC Records

2 2 2 2 2 2 2 2

2 2 1 1 2 2 1 1

1 1 1 1 1 1 1 1

Page 62: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 62 of 64

ANNEXURE – III (Contd)

SAMPLE QUALITY ASSURANCE PLAN (QAP)

Sl. No 1

Components 2

Characteristics 3

Type of Check 4

Classification 5

Quantum of Check 6

Reference Document 7

Acceptance Norms 8

Format of Records 9

AGENCY REMARKS 11

P W 10

V

3.0 INTEGRATED SYSTEM TESTING Complete with

all subsystems, servers, software’s, Few Nos. of field devices such as different types of cameras, etc.

As approved test procedure Functional & Electrical diagnostics

MA 100% Approved test procedure

Approved test procedure

T.C. & I.R. 2 1 2

LEGENDS:MA-MajorIR- Insulation Resistance P-Performed byW-Witnessed byV-Verified by 1. NPCIL 2. Manufacturer 3. Third Party

Page 63: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 63 of 63

Annexure-5-List of Abbreviations Abbreviation Meaning BOM Bill of Material BOQ Bill of Quantity CAS Central Alarm Station CC Control Console DD Design Drawing ED Electrical Drawing (wiring diagram) FO Fiber Optic GA General Arrangement Drawing GU General unit JB Junction Box RAPS Rajasthan Atomic Power Station QAP Quality Assurance Plan WD Wiring diagram

Annexure- 6- Photographe Diagram of Plant Boundary

Not to Scale The estimated length of Terrain is about 1.5 Km. Hence to loops of CCTV Wiring is considered.

Page 64: Bidder should have executed minimum one order of Perimeter ... · Hence supplier shall meet the following pre-qualification criterion. Bidder should have executed minimum one order

RAPS-1&2 PIDS Page No. 64 of 63

Annexure-7- Representative layout –Not actual , Not all components shown