bidar 24 x 7 certificate 25-01-14
DESCRIPTION
24x7 bidar water supplyTRANSCRIPT
Consultancy Services for preparation of DPR for underpass including partial Clove leaf at Hero Honda Chowk in
Asian Development Bank Assisted North Karnataka Urban Sector Investment Programme
Approval / Sanction Certificate Detailed Project Report
(including plans & estimates)
Part ADivision: Gulbarga
Contract Title:
Sector / Component: Water supply improvement works
Implementing Agency: Urban Local Body BidarName of the Program Consultant: M/s. Haskoning DHV Consulting Private LimitedPart B
I) Consultants Certification:
The above detailed project report as been prepared after detailed investigation and reviewed in accordance with established procedure / framework / norms as well as ToR and contents for such a project and submitted for further processing. It is certified that the plan and estimate of the above work has been prepared and reviewed technically & financially and the estimated cost works out to Rs. One Hundred and Three Crores and Twenty Nine Lakhs only based on the CSR of PWD/NH/ KUWSDB or / and market rate and (Twenty Nine Crores and Forty Lakhs Only for Civil Works and Rs. Seventy Three Crores and Eighty Nine Lakhs for O&M for Five years.Signature :Date :
Name :
Title: Team Leader, (M/s. Haskoning DHV Consulting Pvt. Ltd. Gulbarga)
II) Implementing Agencys Acceptance:The above detailed project report has been examined with respect to our requirements of the sector, town and accepted in total.
Signature:Date:Signature:Date:
Name:Name:
Title: Executive Engineer / AEETitle: Commissioner / Chief OfficerIA: (NKUSIP, Bidar)IA: (City Municipal council, Bidar)III.Divisional Office, KUIDFC,Gulbarga:
The above concept report has been verified in accordance with the established procedure, scope of work as per ToR and recommended for approval.
Signature:Date:Signature:Date:
Name:Name:
Dy.Project DirectorExecutive Engineer
NKUSIP, Badepur Stage I, Block INKUSIP KUIDFC,Veerendra Patil LayoutCMC (Cell)Sedam Road, Gulbarga BidarIV.Regional Office, KUIDFC, Hubli Dharwad:
The above Detailed Project Report has been verified in acceptable form. Hence, approval has been accorded.
Signature:
Date:
Name:
Chief Engineer
KUIDFC, RO Office
2nd Floor, B-Block
IT Park, Near Old Bus Stand
Hubli- 580029
Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for Providing 24 X 7 Water supply in BidarDoc. No. :Rev. No. :Pages :Months issued:
CHECK LIST
Prepared by
(Signature with name)Checked by
(Signature with name)Approved by
(Signature with name)
Design EngineerDeputy Team Leader Team Leader
Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Detailed Project Report for Providing 24 X 7 Water supply in Bidar1) Face Sheet:-Enclosed
2) Abstract Sheet:- Enclosed
3) Detail Project Report:- Enclosed
4) Measurement Sheet:- Enclosed
5) Rate Analysis :- Enclosed
6) Certificates :- Working Area Certificate: - Enclosed
Scrutiny certificate at Division office:- EnclosedCopy of ULB Resolutions - EnclosedDrawings:-
Schematic Drawing of Bidar Water Supply Enclosed
Network Analysis drawings Enclosed
Good for Construction Drawings - enclosed
Team Leader
Programme Consultant
M/s. Haskoning DHV
Consulting Pvt. Ltd.
GulbargaAssistant Executive Engineer
NKUSIP Cell
BidarExecutive Engineer,
NKUSIP KUIDFC,
CMC (Cell),
Bidar
Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Providing 24 X 7 Water supply in BidarFACE SHEET
NKUSIP Division
:Gulbarga
NKUSIP Cell
:BidarHead of Account:Detailed Project Report for Providing 24 X 7 Water supply in BidarEstimate framed in the Office of the NKUSIP Division Gulbarga for the probable cost that will be incurred in carrying out the work of Providing 24 X 7 water supply in Bidar.Estimated Cost
:Rs.103.29 Crores
Civil Works Rs. 29.40 CroresO&M Five Years 73.89 Crores
Estimate Prepared By
:M/s Haskoning DHV Consulting Pvt. Ltd.
Estimate Checked by
:Mr. Lakshmi Kumar A, Team Leader Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for Providing 24 X 7 Water supply in BidarWORKING AREA CERTIFICATE
This is to certify that
1. The working area for Proposed 24 X 7 Water supply for Bidar City is clear of encroachments.
2. There are no requirements of shifting of utilities such as over head telephone cables and Electrical lines
Team Leader
Programme Consultant.
M/s Haskoning DHV Consulting Pvt. Ltd.,
Package No.- III
Gulbarga
NKUSIP Cell Engineer
Asst Executive Engineer
BidarULB Engineer
Asst. Executive Engineer
CMC, BidarMunicipal Commissioner,
CMC, Bidar
Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for Providing 24 X 7 Water supply in BidarSCRUITINY CERTIFICATE
Certified that the estimate for the proposed work is duly scrutinized in this office with reference to current S.R. of KUWS&DB/PWD/Electrical/KPTCL and for the rates which are not found in the S.R. the lowest quotation rates obtained from market and approved are adopted.
Team Leader
Programme Consultant
M/s Haskoning DHV Consulting Pvt. Ltd
Package No.-III
GulbargaAssistant Executive Engineer
NKUSIP Cell
BidarExecutive Engineer,
NKUSIP KUIDFC,
CMC (Cell)Bidar
Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for Providing 24 X 7 Water supply in BidarCERTIFICATE
There are no major deviations / violation from the NKUSIP design parameters There is no overlap with the NKUSIP works.
C.S.S
M/s. Haskoning DHV Consulting Pvt. Ltd.
BidarAssistant Executive Engineer
NKUSIP Cell
BidarTeam Leader
Programme Consultant
M/s Haskoning DHV Consulting Pvt. Ltd
Package.-III
GulbargaExecutive Engineer,
NKUSIP KUIDFC,
CMC (Cell)Bidar
Consultancy Service for NKUSIP under ADB assisted Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Detailed Project Report for Providing 24 X 7 Water supply in Bidar PROJECT CONSULTANT CERTIFICATE
Certified that the Provided designs, Plans, Estimates and other Provisions provided in the DPR are adequate
a) To Provide continuous Water supply with a minimum of 7 m residual pressure at consumer end.b) Zoning and sub-zoning provide is adequate to isolate the minimum possible connections being affected.c) It will be possible to measure the performance of the operator with reference to Performance Targets.Design EngineerProgramme Consultant
M/s Haskoning DHV Consulting Pvt. Ltd
Package.-III
GulbargaDeputy Team Leader
Programme Consultant
M/s Haskoning DHV Consulting Pvt. Ltd
Package.-III
GulbargaTeam Leader
Programme Consultant
M/s Haskoning DHV Consulting Pvt. Ltd
Package.-III
Gulbarga
ix of ix