bid award - ncsheriffs.org
TRANSCRIPT
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4700, Aries, Cargo Van (No Chassis), CV-1
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $146,205.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4701, Aries, High Cube (No Chassis), HC-1
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $177,165.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4702, Aries, Mobile Pathfinder, MPF-1
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $71,680.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4703, Aries, Trailblazer Cube, TBC-1
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $99,670.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4704, Aries, Trailer, T-1
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $102,540.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4705, CUES, 541 Mini 115` 1" camera Full System, 10/C541NTSC1-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,242.70 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4706, CUES, 541 Mini 115` 1" camera Full System with 550 command module, 10/C541NTSC1-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,693.12 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4707, CUES, 541 Mini 115` 2" camera Full System, 10/C541NTSC2-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,223.12 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4708, CUES, 541 Mini 115` 2" camera Full System with 550 command module, 10/C541NTSC2-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $9,673.54 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4709, CUES, 541 Plumbers 100` 1" camera Full System, 10/C541NTSC1-PL30-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $6,329.03 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4710, CUES, 541 Plumbers 100` 1" camera Full System with 550 command module, 10/C541NTSC1-PL30-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,779.44 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4711, CUES, 541 Plumbers 200` 1" camera Full System , 10/C541NTSC1-PL30-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,328.24 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4712, CUES, 541 Plumbers 200` 1" camera Full System with 550 command module, 10/C541NTSC2-PL60-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,778.66 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4713, CUES, 542 STD 200` 1" camera Full System, 10/C542NTSC1-60-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,837.72 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4714, CUES, 542 STD 200` 1" camera Full System with 550 command module, 10/C542NTSC1-60-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $9,288.14 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4715, CUES, 542 STD 200` 2" camera Full System, 10/C542NTSC2-60-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,800.28 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4716, CUES, 542 STD 200` 2" camera Full System with 550 command module, 10/C542NTSC2-60-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $10,250.70 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4717, CUES, 542 STD 400` 1" camera Full System, 10/C542NTSC1-120-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,913.08 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4718, CUES, 542 STD 400` 1" camera Full System with 550 command module, 10/C542NTSC1-120-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $10,363.50 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4719, CUES, 542 STD 400` 2" camera Full System, 10/C542NTSC2-120-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $9,332.32 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4720, CUES, 542 STD 400` 2" camera Full System with 550 command module, 10/C542NTSC2-120-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $10,782.74 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4721, CUES, 543 500` 1" camera Full System, 10/C543NTSC1-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $13,670.42 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4722, CUES, 543 500` 1" camera Full System with 550 command module, 10/C543NTSC1-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $15,120.84 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4723, CUES, 543 500` 2" camera Full System, 10/C543NTSC2-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $14,234.42 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4724, CUES, 543 500` 2" camera Full System with 550 command module, 10/C543NTSC2-550-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $15,647.24 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4725, CUES, Base Station Portable Mainline Inspection System, QB350
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $84,459.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4726, CUES, C550 MINI MAINLINE - HUNTER Large Basic PKG, 10/C550-HLBP
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $62,862.14 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4727, CUES, C550 MINI MAINLINE - HUNTER Large Deluxe PKG, 10/C550-HDP
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $89,099.78 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4728, CUES, C550 MINI MAINLINE - HUNTER Large Standard PKG, 10/C550-HLSP
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $73,962.02 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4729, CUES, C550 MINI MAINLINE - HUNTER Platnium PKG, 10/C550-HPP
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $102,794.64 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4730, CUES, C550 MINI MAINLINE - HUNTER Small Basic PKG, 10/C550-HSBP
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $57,771.46 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4731, CUES, C550 MINI MAINLINE - HUNTER Small Standard PKG, 10/C550-HSSP
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $62,258.08 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4732, CUES, C550 MINI MAINLINE - Large Basic PKG, 10/C550-BASIC-P356-PKG-EE
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $44,867.14 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4733, CUES, C550 MINI MAINLINE - Large Deluxe PKG, 10 C550-DEL-D-PKG-EE
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $71,004.78 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4734, CUES, C550 MINI MAINLINE - Large Standard PKG, 10/C550-STD-P356-PKG-EE
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $55,867.02 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4735, CUES, C550 MINI MAINLINE - Platnium PKG, 10/C550-PLAT-D-PKG-EE
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $84,699.64 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4736, CUES, C550 MINI MAINLINE - Small Basic PKG, 10/C550-BASIC-P354-PKG
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $39,676.46 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4737, CUES, C550 MINI MAINLINE - Small Standard PKG, 10/C550-STD-P354-PKG
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $44,162.14 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4738, CUES, Cargo Van Mounted Mainline Camera System, CVMMCS
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $173,038.02 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4739, CUES, Dual Reel system - 100` PL 200` 542 1" & 2" CAM, 10/C540NTSC-30-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $12,019.78 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4740, CUES, Dual Reel system - 115` and 200` 542 1" & 2" CAM, 10/C540NTSC-35-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $12,314.94 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4741, CUES, Dual Reel system - 115` and 200` 542 2" & 2" CAM, 10/C540NTSC2-35-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $13,598.04 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4742, CUES, Dual Reel system - 115` and 400` 542 1" & 2" CAM, 10/C540NTSC-35-120-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $13,414.74 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4743, CUES, Dual Reel system - 115` and 400` 542 2" & 2" CAM, 10/C540NTSC2-35-120-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $14,697.84 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4744, CUES, Dual Reel system - 200` PL 200` 542 1" & 2" CAM, 10/C540NTSC-60-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $12,279.22 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4745, CUES, E450-DRW Cutaway Mounted Mainline Camera System , E450CMMCS
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $182,270.70 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4746, CUES, Grout Trailer Mounted Grout Tag Along to TV Unit, GTMGTATVU
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $146,875.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4747, CUES, K2 Portable Mainline Inspection System, K2Dolly
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $64,234.90 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4748, CUES, MARK3 Portable Mainline Inspection System, MK950
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $79,257.04 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4749, CUES, MP+ Portable Lateral and Mainline Push Camera, CH377
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $11,703.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4750, CUES, QZ3 Quick Zoom Pole Camera, QE910
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $16,677.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4751, CUES, Sprinter Van Mounted Mainline Camera System, SVMMCS
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $181,061.86 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4752, CUES, SV Step Van Mounted Mainline Camera System, SVMMCS
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $196,857.62 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4753, CUES, Trailer Mounted Mainline Inspection System, TMMIS
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $126,996.82 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4754, CUES, 541 Mini 115` 1" camera / No Command Module, 10/541NTSC1-35-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $4,592.84 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4755, CUES, 541 Mini 115` 2" camera / No Command Module, 10/541NTSC2-35-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,878.76 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4756, CUES, 541 Plumbers 100` 1" camera / No Command Module, 10/541NTSC1-PL30-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $4,441.50 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4757, CUES, 541 Plumbers 200` 1" camera / No Command Module, 10/541NTSC1-PL60-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $4,700.94 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4758, CUES, 542 STD 200` 1" camera / No Command Module, 10/542NTSC1-60-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,066.60 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4759, CUES, 542 STD 200` 2" camera / No Command Module, 10/542NTSC2-60-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,827.06 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4760, CUES, 542 STD 400` 1" camera / No Command Module, 10/542NTSC1-120-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,372.10 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4761, CUES, 542 STD 400` 2" camera / No Command Module, 10/542NTSC2-120-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $6,392.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4762, CUES, 543 500` 1" camera / No Command Module, 10/543NTSC1-150-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $9,257.12 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4763, CUES, 543 500` 2" camera/ No Command Module, 10/542NTSC2-150-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $10,631.40 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4764, Deep Trekker, Catalog Discount, DT340 Series
Description: Catalog discount on manufacturer`s base models for Deep Trekker DT340 Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Carolina Industrial Equipment, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4765, Deep Trekker, Crawler System, 300
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Carolina Industrial Equipment, Inc. $79,283.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4766, Deep Trekker, MAG , DT640
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Carolina Industrial Equipment, Inc. $17,875.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4767, Deep Trekker, Mini, DT320
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Carolina Industrial Equipment, Inc. $31,100.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4768, Envirosight, Catalog Discount, Cleverscan Series
Description: Catalog discount on manufacturer`s base models for Envirosight Cleverscan Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4769, Envirosight, Catalog Discount, Jetscan Series
Description: Catalog discount on manufacturer`s base models for Envirosight Jetscan Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4770, Envirosight, Catalog Discount, Quickview Series
Description: Catalog discount on manufacturer`s base models for Envirosight Quickview Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4771, Envirosight, Catalog Discount, RovverX Series
Description: Catalog discount on manufacturer`s base models for Envirosight RovverX Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4772, Envirosight, Catalog Discount, SAT II Lateral Launch Series
Description: Catalog discount on manufacturer`s base models for Envirosight SAT II Lateral Launch Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4773, Envirosight, Catalog Discount, Verisight Pro Series
Description: Catalog discount on manufacturer`s base models for Envirosight Verisight Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4781, IBAK, Catalog Discount
Description: Catalog discount on manufacturer`s base models for IBAK Premium Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Jet-Vac Equipment Company, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4782, Pearpoint, 541 Mini 115` 1" camera / No Command Module, 10/541NTSC1-35-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $4,592.84 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4783, Pearpoint, 541 Mini 115` 1" camera Full System, 10/P541NTSC1-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,242.70 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4784, Pearpoint, 541 Mini 115` 2" camera / No Command Module, 10/541NTSC2-35-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,878.76 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4785, Pearpoint, 541 Mini 115` 2" camera Full System, 10/P541NTSC2-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,223.12 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4786, Pearpoint, 541 Plumbers 100` 1" camera / No Command Module, 10/541NTSC1-PL30-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $4,441.50 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4787, Pearpoint, 541 Plumbers 100` 1" camera Full System, 10/P541NTSC1-PL30-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $6,329.03 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4788, Pearpoint, 541 Plumbers 200` 1" camera / No Command Module, 10/541NTSC1-PL60-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $4,700.94 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4789, Pearpoint, 541 Plumbers 200` 1" camera Full System , 10/P541NTSC1-PL60-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,328.24 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4790, Pearpoint, 542 STD 200` 1" camera / No Command Module, 10/542NTSC1-60-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,066.60 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4791, Pearpoint, 542 STD 200` 1" camera Full System, 10/P542NTSC1-60-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $7,837.72 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4792, Pearpoint, 542 STD 200` 2" camera / No Command Module, 10/542NTSC2-60-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,872.06 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4793, Pearpoint, 542 STD 200` 2" camera Full System, 10/P542NTSC2-60-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,800.28 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4794, Pearpoint, 542 STD 400` 1" camera / No Command Module, 10/542NTSC1-120-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $5,372.10 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4795, Pearpoint, 542 STD 400` 1" camera Full System, 10/P542NTSC1-120-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $8,913.08 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4796, Pearpoint, 542 STD 400` 2" camera Full System, 10/P542NTSC2-120-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $9,332.32 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4797, Pearpoint, 542 STD 400` 2" camera / No Command Module, 10/542NTSC2-120-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $6,392.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4798, Pearpoint, 543 500` 1" camera / No Command Module, 10/543NTSC1-150-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $9,257.12 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4799, Pearpoint, 543 500` 1" camera Full System, 10/P543NTSC1-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $13,670.42 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4800, Pearpoint, 543 500` 2" camera Full System, 10/P543NTSC2-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $14,234.42 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4801, Pearpoint, 543 500` 2" camera/ No Command Module, 10/542NTSC2-150-ADD
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $10,631.40 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4802, Pearpoint, Dual Reel system - 100` PL 200` 542 1" & 2" CAM, 10/P540NTSC-30-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $12,019.78 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4803, Pearpoint, Dual Reel system - 115` and 200` 542 1" & 2" CAM, 10/P540NTSC-35-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $12,314.94 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4804, Pearpoint, Dual Reel system - 115` and 200` 542 2" & 2" CAM, 10/P540NTSC2-35-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $13,598.04 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4805, Pearpoint, Dual Reel system - 115` and 400` 542 1" & 2" CAM, 10/P540NTSC-35-120-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $13,414.74 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4806, Pearpoint, Dual Reel system - 115` and 400` 542 2" & 2" CAM, 10/P540NTSC2-35-120-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $14,697.84 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4807, Pearpoint, Dual Reel system - 200` PL 200` 542 1" & 2" CAM, 10/P540NTSC-60-60-D-US
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide CUES $12,279.22 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4808, Proteus, Catalog Discount, Lateral Launch Series
Description: Catalog discount on manufacturer`s base models for Proteus Lateral Launch Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide AQUIP, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4809, Proteus, Catalog Discount, Lite Series
Description: Catalog discount on manufacturer`s base models for Proteus Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide AQUIP, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4810, Proteus, Catalog Discount, Mainline Series
Description: Catalog discount on manufacturer`s base models for Proteus Mainline Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide AQUIP, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4811, Proteus, Catalog Discount, SoloPro Push Camera Series
Description: Catalog discount on manufacturer`s base models for Proteus SoloPro Push Camera Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide AQUIP, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4812, Rausch USA, Catalog Discount, Eco Star Series
Description: Catalog discount on manufacturer`s base models for Rausch USA Eco Star Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Southern Vac $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4813, Rausch USA, Catalog Discount, MiniCam Series
Description: Catalog discount on manufacturer`s base models for Rausch USA MiniCam Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Southern Vac $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4814, Rausch USA, Catalog Discount, MiniCord Series
Description: Catalog discount on manufacturer`s base models for Rausch USA MiniCord Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Southern Vac $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4815, Rausch USA, Catalog Discount, Mobile Pro Series
Description: Catalog discount on manufacturer`s base models for Rausch USA Mobile Pro Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Southern Vac $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4816, Rausch USA, Catalog Discount, Quicklock Series
Description: Catalog discount on manufacturer`s base models for Rausch USA Quicklock Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Southern Vac $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4817, Ridgid, Catalog Discount, Camera Reel Series
Description: Catalog discount on manufacturer`s base models for Ridgid Camera Reel Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Jet-Vac Equipment Company, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4818, Ridgid, Catalog Discount, Locating Receiver Series
Description: Catalog discount on manufacturer`s base models for Ridgid Locating Receiver Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Jet-Vac Equipment Company, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4819, Ridgid, Catalog Discount, Transmitters Series
Description: Catalog discount on manufacturer`s base models for Ridgid Transmitters Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Jet-Vac Equipment Company, LLC $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4820, Vivax, VCAM-6, VC-6
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $10,900.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4821, Vivax, VCAM-MX MINI, VCM
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $7,100.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4822, Wincan, Catalog Discount, VX Software Series
Description: Catalog discount on manufacturer`s base models for Wincan VX Software Series Underground Pipeline Inspection Equipment
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Infrastructure Solutions Group, Inc. $0.00 6.00% Build Options
Bid Award
Contract: 22-06-0426, Heavy Equipment
Group: Underground Pipeline Inspection Equipment
Item: 4823, Zistos, Zoom Pole Cam, HDVI-5AR-MC16-3.5ZS
Description: Manufacturer`s standard base unit specifications and current model year for the model/model number listed. The required minimum 6%discount off MSRP is to be included in the listed base price field. The percentage field displayed is the discount that will be taken off of MSRP for allapplicable options.
Model Upgrade/Downgrade:
Zone Vendor Price Percent: Build File Options File
Statewide Rodders and Jets Supply Co $17,970.00 6.00% Build Options