PROJECT : 3X800 MW PVUNL PATRATU TPP PHASE-1
PACKAGE : D.M. PLANT
ENQUIRY NO : E-6105/2018 Dated. 18.01.2019
SUBJECT : PRE- BID CLARIFICATION AND DUE DATE EXTENSION
Type of Corrigendum
Technical Corrigendum - Commercial Corrigendum -
In reference to the above mentioned tender enquiry for D.M. PLANT package Please note the following:
1. Pre-Bid replies as per attachment below.
2. Due Date has been extended from 11.02.2019 to 26.02.2018 till 02:00 PM. Bid Opening shall be done at 03:00 PM on the due date.
All the other terms and conditions of the tender enquiry shall remain unchanged. All the bidders are requested to quote accordingly.
Yours faithfully,
For and on behalf of BHEL
Vinit Kumar Verma Dy. Manager
AMENDMENT TO TECHNICAL SPECIFICATION FOR
DEMINERALIZATION PLANT (DM PLANT) 3X800 MW PATRATU STPP EXT.PH-I
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 AMENDMENT NO # 1 REV. NO. 00 DATE: 7-Feb-19
Page 1 of 5
The following modifications with respect to Technical Specification for DEMINERALIZATION PLANT (DM PLANT), BHEL’s Technical specification no PE-TS-434-163A-A001 shall apply. Bidder to note that existing clauses/page numbers as appearing in the specification stands deleted and clauses/page numbers as mentioned in “Modified to” column shall be applicable and complied by the bidder. MODIFIED CLAUSES/PAGE NUMBERS. Sl
no.
Vol.
No. Section/
Description Clause no Page no Existing Modified to
1. IIB SECTION – A/ INTENT OF SPECIFICATION
1.2 4 of 890
The contractor shall be responsible for providing all material, equipment & services, which are required to fulfil the intent of ensuring operability, maintainability, reliability and complete safety of the complete work covered under this specification, irrespective of whether it has been specifically listed herein or not. Omission of specific reference to any component / accessory necessary for proper performance of the equipment shall not relieve them of the responsibility of providing such facilities to complete the supply, erection and commissioning of Condensate Polishing Units along with pre filters and two numbers external regeneration system within quoted price.
The contractor shall be responsible for providing all material, equipment & services, which are required to fulfil the intent of ensuring operability, maintainability, reliability and complete safety of the complete work covered under this specification, irrespective of whether it has been specifically listed herein or not. Omission of specific reference to any component / accessory necessary for proper performance of the equipment shall not relieve them of the responsibility of providing such facilities to complete the supply, erection and commissioning of DEMINERALIZATION PLANT (DM PLANT) within quoted price.
2. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
3.0 (62) 27 of 890 Mandatory spares as per Annexure-V enclosed in Section C1.
Mandatory spares as per Annexure-V enclosed in Section C1.Bidder to consider all applicable spares, in case any spares is not applicable the relevant equivalent spares shall be provided by bidder within quoted price.
3. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
3.0 (68) 27 of 890 Wrapping, coating and protection of the entire buried pipe shall be as per IS 10221 or AWWA C 203-93.
Wrapping, coating and protection of the entire buried pipe shall be as per IS 10221 or AWWA C 203-93. Bidder to consider 10% of the total piping length as buried pipe.
4. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
3.0 (70) 27 of 890
Six (6) sets of safety equipment [(Personal Protection Equipment (PPE)] comprising PVC protection suits with hoods, rubber boots, face visors and thick PVC gauntlets shall also be provided by the bidder. Two (2) number safety shower units and adequate nos. of eye fountains to protect against any chemical hazard shall also be provided by the bidder. For Details of Safety equipments refer Data Sheet-A.
Bidder to consider minimum safety equipment required for safe operation of DM Plant. Two (2) number safety shower units and adequate nos. of eye fountains to protect against any chemical hazard shall also be provided by the bidder
5. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
4.0 (3) 27 of 890 Min 400 meter DM plant feed piping from filtered water reservoir to DM plant.
Min 450 meter DM plant feed piping from filtered water reservoir to DM plant.
1 of 11
AMENDMENT TO TECHNICAL SPECIFICATION FOR
DEMINERALIZATION PLANT (DM PLANT) 3X800 MW PATRATU STPP EXT.PH-I
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 AMENDMENT NO # 1 REV. NO. 00 DATE: 7-Feb-19
Page 2 of 5
6. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
4.0 (6) 27 of 890 Min 250 meter from Mixed bed vessel outlet to DM Plant Lab for sampling.
Min 380 meter from Mixed bed vessel outlet to DM Plant Lab for sampling.
7. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
4.0 (7) 27 of 890 Min 1500 meter piping from N.Pit to ash handling plant & central monitoring basin.
Min 560 meter piping from N.Pit to central monitoring basin in ETP area.
8. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
10.0-3) (EXCLUSIONS) 31 of 890 3 ) All chemicals. 3 ) All chemicals Except Chemicals Required for cleaning & Backwashing of Post MB UF Streams.
9. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
15.0 (24) 31 of 890
Service water shall be available near DM plant/ system building/ area at approximately 1.5 to 2.0 Kg/ Cm2. Hence, bidder to take care for cooling/ lubrication of the pumps being supplied by the bidder under this technical specification. If service water pressure requirement is more than available pressure, bidder to consider two (2) nos. cooling pump for package.
Stands Deleted.
10. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
15.0 (ADDITIONAL
REQUIREMENT) 32 of 890 New clause added.
32 ).The height of DM water storage tank, to be considered as approx. 16 metre.
11. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
15.0 (ADDITIONAL
REQUIREMENT) 32 of 890 New clause added.
33 ).The Chemicals Required for cleaning & Backwashing of Post MB UF Streams. for 6 month operation shall be in the scope of bidder.
12. IIB SECTION – C1/ SPECIFIC TECHNICAL REQUIRMENT-MECHANICAL
15.0 (ADDITIONAL
REQUIREMENT) 32 of 890 New clause added.
34 ).Bidder to note that for deriving the inlet water quality (To DM plant) from the raw water analysis the following continuous dosing rates shall be considered & the raw water analysis to be modified accordingly (Turbidity to be considered as 5 NTU for clarified water) while designing the DM plant. Alum as Al2(SO4)3 -70ppm on 100% Basis, Lime as Ca(OH)2 -30ppm on 100% Basis , Coagulant aid - 2ppm on 100% Basis, PAC- 25-40 ppm on 100% Basis Chlorine Di Oxide - 2 ppm. Note- The above dosing rate may subject to minor variation during detail engineering stage. However the design of UF shall be based on colloidal silica value given in raw water analysis.
13. IIB SECTION – C1/ ANNEXURE-V 5 281 of 890 Page No. 281 of 890 Refer Enclosed “ANNEXURE-A”
14. IIB SECTION – C1/ ANNEXURE-V 6 282 of 890 Page No. 282 of 890 Refer Enclosed “ANNEXURE-B”
15. IIB SECTION – C1/ ANNEXURE-V 12 287 of 890 Page No. 287 of 890 Refer Enclosed “ANNEXURE-C”
16. IIB SECTION – C1/ ANNEXURE-V 5 288 of 890 Page No. 288 of 890 Refer Enclosed “ANNEXURE-D”
17. IIB SECTION – C1/ ANNEXURE-V Part-C 289 of 890 10. DM makeup pump motor
11. Boiler fill pumps motor
Stands Deleted.
2 of 11
AMENDMENT TO TECHNICAL SPECIFICATION FOR
DEMINERALIZATION PLANT (DM PLANT) 3X800 MW PATRATU STPP EXT.PH-I
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 AMENDMENT NO # 1 REV. NO. 00 DATE: 7-Feb-19
Page 3 of 5
12. Condensate Transfer pumps motor
18. IIB SECTION – C1/ DRAWINGS
P&I DIAGRAM FOR
DEMINERALIZATION
PLANT (DM PLANT)
290 of 890 P&I DIAGRAM FOR DEMINERALIZATION PLANT (DM PLANT) (PE-DG-405-163A-A001)-REV-00
P&I DIAGRAM FOR DEMINERALIZATION PLANT (DM PLANT) (PE-DG-405-163A-A001)-REV-01
19. IIB SECTION – C1/ DATASHEET-A 2.15 293 of 890 Minimum Water Level- By Bidder Minimum Shaft Length of Pump- 4.5 m. minimum. Minor changes, if any shall be communicated during detail engineering.
20. IIB SECTION – C1/ DATASHEET-A 10.3 297 of 890
Bulk Storage Tank
ACID ALAKLI
Numbers required
As specified As specified
Bulk Storage Tank
ACID ALAKLI
Numbers Required (Min).
Three (3) Two (2)
21. IIB SECTION – C1/ DATASHEET-A 10.5 297 of 890
Bulk Storage Tank
ACID ALAKLI
Capacity (Each tank)
To store 30 days requirement of acid for regeneration of all operating DM stream & N-pit neutralization + 175.0 CUM for CPU regeneration + 5% overall margin.
To store 30 days requirement of alkali (100%) for regeneration of all operating DM stream & N-pit neutralization + 75.0 cum for CPU regeneration + 5% overall margin.
Bulk Storage Tank
ACID ALAKLI
Capacity (Each tank)
To store 30 days requirement of acid for regeneration of all operating DM stream, & N-pit neutralization + 110.0 CUM for CPU regeneration + 5% overall margin.
To store 30 days requirement of alkali for regeneration of all operating DM stream & N-pit neutralization + 40.0 cum for CPU regeneration + 5% overall margin.
22. IIB SECTION – C1/ DATASHEET-A 14.4 298 of 890
Effective capacity- 150% of waste effluent from one regeneration of complete stream of cation,anoin,MB and CPU service vessels.(DM + CPU). CPU waste to be considered minimum 350 cum per regeneration. No. of compartments: 2 Free board : 350 mm Accessories : Panel mounted pH indicator cum recorder on pump discharge recirculation header
Effective capacity- (Each Section) 150% of waste effluent from one regeneration of complete stream of cation, anion, MB and CPU service vessels.(DM + CPU). CPU waste to be considered minimum 200 cum per regeneration. No. of compartments: 2
23. IIB SECTION – C1/ DATASHEET-A 19.2 299 of 890 Design Standard (for diameter,length & thickness)- As per BS: 2594. However, dished ends shall be of Torispherical type
Design Standard- IS 803
24. IIB SECTION – C1/ DATASHEET-A 19.3 299 of 890 Number of units per DM stream- One (1) Number of units - One (1)
25. IIB SECTION – C1/ DATASHEET-A 19.4 299 of 890 Useful (Effective) Capacity (minimum)- 1 Hr storage Capacity of Both UF stream to match with net output
Effective Capacity (minimum)- 1 Hr storage Capacity of Both UF stream to match with grass output of both UF
3 of 11
AMENDMENT TO TECHNICAL SPECIFICATION FOR
DEMINERALIZATION PLANT (DM PLANT) 3X800 MW PATRATU STPP EXT.PH-I
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 AMENDMENT NO # 1 REV. NO. 00 DATE: 7-Feb-19
Page 4 of 5
(Post UF) of 160 cum/hr each UF stream + Water required for backwashing of UF membrane Chemical preparation requirements Plus 5% margin over the above total requirements. (Not less than 350 cum/hr.)
stream. (Not less than 350 cum/hr.)
26. IIB SECTION – C1/ DATASHEET-A 22.3 300 of 890 Each Capacity (net) in cu.m/hr-To Suit the net DM Plant output (Post UF) per stream of160 cum/hr
Each Capacity (net) in cum/hr- Capacity of each UF stream to match with gross capacity of Net output of 160 cum/hr + Water required for back washing & flushing (as required) of UF membranes & Chemical preparation requirements. (Not less than 160 Cum/hr.)
27. IIB SECTION – C1/ DATASHEET-A 23.1 300 of 890 Quantity-2 Nos. (1W+1S) Quantity-2 Nos. (1W+1S) UF Backwash Pumps, 2 Nos. (1W+1S) UF Fast Flush Pumps,
28. IIB SECTION – C1/ DATASHEET-A 23.6 300 of 890 Type of Pump-Horizontal Centrifugal with VFD Type of Pump-Horizontal Centrifugal
29. IIB SECTION – C3/SPECIFIC TECHNICAL REQUIRMENT-C&I
19.02.00 432 of 890 Residual Chlorine Analyser Stands Deleted.
30. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
14.00.00-B. A)
713 of 890 Bulk Storage Tanks Stands Deleted.
31. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
25.00.00 – C. e) 764 of 890
For UF and RO Plant application, stainless steel piping (SS-304) shall be used for the high pressure piping and the industrial grade CPVC as per ASTM F441 CPVC 4120 Sch. 80 piping shall be used for low pressure areas.
Stands Deleted.
32. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
2.00.00-A)-j) 626 of 890 Three (3) numbers of DM water storage tanks with all accessories.
Stands Deleted.
33. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
2.00.00-A)-m to y) 627 of 890 Page No. 282 of 890 Refer Enclosed “ANNEXURE-E”
34. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
D. 4) 641 of 890
A. ULTRAFILTRATION (UF) SYSTEM (For ION Exchange DM Plant)- a) UF skids (2x100%) (Pressurized type), Simplex strainers (2x100%) (1W+1S) for each stream, UF backwash pumps (2x100%) (1W+1S) along with flushing tanks and pumps, CEB & CIP systems, UF Feed water storage tanks (2), UF permeate transfer pumps (3x100%) (2W+1S) etc.
Stands Deleted.
35. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
5.01.00-2 (a) 665 of 890
Bulk acid storage tank (HCl-30-33% Conc.): Minimum three (3) numbers to hold one (1) month requirement of acid for regeneration of all operating DM streams operated at its rated capacity, with specified service cycle, regeneration period and using guaranteed chemical
Bulk acid storage tank (HCl-30-33% Conc.): Minimum three (3) numbers, Each Tank To store 30 days requirement of acid for regeneration of all operating DM stream & N-pit neutralization + 110.0 CUM for CPU regeneration + 5% overall margin.
4 of 11
AMENDMENT TO TECHNICAL SPECIFICATION FOR
DEMINERALIZATION PLANT (DM PLANT) 3X800 MW PATRATU STPP EXT.PH-I
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 AMENDMENT NO # 1 REV. NO. 00 DATE: 7-Feb-19
Page 5 of 5
consumption plus any other requirements as envisaged by the contractor to be met throughthese tanks.
36. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
5.01.00-2 (b) 665 & 666 of
890
Bulk Alkali storage tank (NaOH 48% Conc.): Minimum two (2) numbers to hold one (1) month requirement of alkali required for regeneration of all operating DM streams operated at its rated capacity, with specified service cycle, regeneration period and using guaranteed chemical consumption plus any other requirements as envisaged by the contractor to be met through these tanks.
Bulk Alkali storage tank (NaOH 48% Conc.): Minimum two (2) numbers,Each tank To store 30 days requirement of alkali for regeneration of all operating DM stream & N-pit neutralization + 40.0 cum for CPU regeneration + 5% overall margin.
37. IIB
SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
5.03.00 668 of 890
SURFACE FLOW RATE FOR ION–EXCHANGERS The following shall be maximum surface flow rates for the various Ion-Exchangers at the design capacity. i) Cation unit – 35 m3/hr/m2 (for both weak and strong Cation) ii) Anion unit – 35 m3/hr/m2 (for both weak and strong Anion) iii) Mixed bed unit – 40 m3/hr/m2 1) In case the contractor offers both weak and strong Ion-exchange units (for Cation and/or Anion unit), the surface flow rate for the strong ion exchange unit(s) only may be increased as indicated below, if contractor has adequate experience of designing Demineralisation plants of such higher surface flow rate . Maximum surface flow rate:- i) Strong Cation unit – 40 m3/hr/m2. ii) Strong Anion unit – 40 m3/hr/m2.
SURFACE FLOW RATE FOR ION–EXCHANGERS The following shall be maximum surface flow rates for the various Ion- Exchangers at the design capacity. i) Cation unit – 35 m3/hr/m2 (for both weak and strong Cation) ii) Anion unit – 35 m3/hr/m2 (for both weak and strong Anion) iii) Mixed bed unit – 40 m3/hr/m2.
38. IIB SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
17.00.00-A 719 of 890 ULTRAFILTRATION UNIT (POST MB UF OF ION EXCHANGE BASED DM PLANT)
Stands Deleted.
39. IIB SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
17.00.00-B 720 of 890 BASKET STRAINER Stands Deleted.
40. IIB SECTION – D/GENERAL TECHNICAL REQUIREMENT OF WATER TREATMENT SYSTEM/PLANT (CONT.)
17.00.00-E 721 of 890 UF FILTRATE CUM BACKWASH WATER PUMPS Stands Deleted.
5 of 11
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 VOLUME II-B SECTION-C1
3X800 MW PATRATU STPP EXT.PH-I
REV. NO. 00 DATE:
TITLE: TECHNICAL SPECIFICATION FOR DEMINERALIZATION PLANT (DM PLANT)
SPECIFICATION NO.: PE-TS-434-163A-A001 REV 00 281 of 890
6 of 11
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 VOLUME II-B SECTION-C1
3X800 MW PATRATU STPP EXT.PH-I
REV. NO. 00 DATE:
TITLE: TECHNICAL SPECIFICATION FOR DEMINERALIZATION PLANT (DM PLANT)
SPECIFICATION NO.: PE-TS-434-163A-A001 REV 00 282 of 890
7 of 11
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 VOLUME II-B SECTION-C1
3X800 MW PATRATU STPP EXT.PH-I
REV. NO. 00 DATE:
TITLE: TECHNICAL SPECIFICATION FOR DEMINERALIZATION PLANT (DM PLANT)
SPECIFICATION NO.: PE-TS-434-163A-A001 REV 00 287 of 890
8 of 11
BHEL DOCUMENTS NO.: PE-TS-434-163A-A001 VOLUME II-B SECTION-C1
3X800 MW PATRATU STPP EXT.PH-I
REV. NO. 00 DATE:
TITLE: TECHNICAL SPECIFICATION FOR DEMINERALIZATION PLANT (DM PLANT)
SPECIFICATION NO.: PE-TS-434-163A-A001 REV 00 288 of 890
9 of 11
CLAUSE NO. SCOPE OF SUPPLY & SERVICES
EPC PACKAGE FOR PATRATU SUPER THERMAL POWER
STATION EXPANSION PHASE -I (3X800 MW)
TECHNICAL SPECIFICATIONSSECTION-VI, PART-A
BID DOC.NO. CS-9585-001-2
SUB SECTION- IIA-09WATER TREATMENT
PLANT
PAGE10 OF 18
m) Backwash water from AC filters, rinse waste water and fast/final rinse waste water of Ion-Exchangers units shall be connected to the backwash sump and same shall be led into the inlet channel of PT-DM clarifier of Water Pretreatment Plant. UF back wash water shall also be led to this back wash pit.
n) First fill of filter media for AC filters.
o) First fill of resins for all Ion Exchange units.
p) 25 NB Stainless steel DM water line from Mixed Bed headers to DM plant lab.
q) Interconnecting piping, valves, fittings and accessories including Pre Cast RCC pipes at road crossing as required.
r) Supply and application of final painting to all the equipment, piping & accessories.
s) All approach ladders and operation/maintenance platforms, handrails as required for various equipment, valves and instruments, support trestles, bridges, brackets, bolts, nuts, clamps etc. for the associated piping.
t) Suitable MS Epoxy Painted elevated Access Platform to be provided for internal inspection of all the AC Filters and Ion Exchanger vessels.
u) Required numbers of DM water makeup pumps and drives & associated valves and piping etc.
v) Required numbers of Boiler Fill pumps and drives & associated Valves and piping etc.
w) Required numbers of condensate transfer pumps and drives & associated Valves and piping etc.
x) Brine Solution Preparation Tank and Brine transfer pumps, piping and valves.
y) Provision of hot water supply to the ACF units from the hot water tank shall be made for rejuvenation of activated carbon and the DM regeneration pumps to be sized considering above requirement in addition to required for regeneration.
SPECIFICATION NO.: PE-TS-434-163A-A001 REV 00 627 of 890
10 of 11
MIXED BEDSWEAK BASE ANIONDEGASSER TOWERSACTIVATED CARBON FILTERS STRONG ACID CATIONMB AIR BLOWERS
STRONG BASE ANION
FILTERED WATER O/H TANK
AC FILTER (ALKALI)
ALKALI MEASURING
BULK ACID STORAGE
BULK ALKALI STORAGE
TANK
2x100 % ACID UNLOADING /
TRANSFER PUMPS
BULK ALKALI STORAGE
BULK ACID STORAGE
TANK
TANK
TANK
TANK
ACID MEASURING
TANK
ACID MEASURING
TANK
AC
ID
D
OS
IN
G E
JE
CT
OR
S
ALKALI MEASURING
TANK
AL
KA
LI D
OS
IN
G E
JE
CT
OR
S
DEGASSED WATER TANK
ALKALI PREPARATION TANK
(FOR ALKALI FLAKES )
ALKALI MEASURING
TANK
BRINE SOLUTION
PREPARATION TANK
BRINE SOLUTION
TRANSFER PUMP
DOSING PUMPS
CLEANING TANK
UF CHEMICAL
UF CHEMICAL CLEANING
DOSING SYSTEM.
DOSING PUMP
ACID
DOSING SYSTEM.
DOSING TANK
DOSING PUMP
ALKALI
DOSING SYSTEM.
HYPO
DOSING TANK
DOSING TANK
ACID MEASURING
TANK
LIME DOSING
TANK
FILTERED WATER RESERVOIR
(BHEL'S SCOPE)
DEGASSED
AIR BLOWERS
WEAK ACID CATION
2x100 % ALKALI UNLOADING /
TRANSFER PUMPS
DM REGENERATION
PUMPS (2X100%)
DOSING TANK
DOSING TANK DOSING TANK
SAFETY SHOWER WITH EYE WASH
(2 NOs.)
TITLE
PROJECT
OWNER
(A GOVERNMENT OF INDIA ENTERPRISE)
NTPC DRAWING NO.
DEGASSED WATER TANK
DEGASSED
AIR BLOWERS
HOT WATER TANK
DOSING PUMP
DEGASSED
WATER PUMPS
TO
CMB
FROM
O/H TANK
BULK ACID STORAGE
TANK
ALKALI TRANSFER
CUM RECIRCULATION PUMPS
UF MEMBRANE
UF FEED
PUMPS (3X100%)
UF BACKWASH
PUMPS (2X100%)
UF FAST FLUSH
PUMPS (2X100%)
UF FEED WATER
STORAGE TANK
11 of 11
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (D
MP-
3X80
0 M
W P
ATR
ATU
STP
P EX
T. P
H-I)
Sr.
No.
Vo
lum
e Se
ctio
n C
laus
e N
o.
Page
N
o.
Spec
ifica
tion
Req
uire
men
t C
larif
icat
ion
Rea
son
for C
larif
icat
ion
/B
idde
r’s A
ssum
ptio
n B
HEL
REP
LY
Mec
hani
cal C
larif
icat
ion
1.
IIB
C1
4.0
27
Pipi
ng:
4) M
in 2
50 m
eter
DM
wat
er p
ipin
g fro
m U
F ou
tlet t
o D
M
Wat
er s
tora
ge ta
nk.
Plea
se p
rovi
de th
e he
ight
of D
M
wat
er s
tora
ge ta
nk.
DM
wat
er s
tora
ge ta
nks
are
in
BHEL
sco
pe.
Ref
er A
men
edm
ent-1
.
2.
IIB
C1
Anne
xure
-V
281
Man
dato
ry S
pare
s:
5) V
alve
s (D
M &
CPU
)
Man
dato
ry s
pare
s fo
r CPU
are
not
ap
plic
able
. Ple
ase
conf
irm.
CPU
is n
ot p
art o
f DM
sch
eme.
R
efer
Am
ened
men
t-1.
3.
IIB
C1
Anne
xure
-V
282
Man
dato
ry S
pare
s:
6) H
oriz
onta
l Cen
trifu
gal P
umps
- A
cid
, Alk
ali U
nloa
ding
Pu
mp,
Br
ine
trans
fer
pum
ps,
Alka
li tra
nsfe
r cu
m
re-
circ
ulat
ion
Pum
ps, D
ilutio
n w
ater
pum
ps
Man
dato
ry s
pare
s fo
r Dilu
tion
wat
er p
umps
are
not
app
licab
le.
Plea
se c
onfir
m.
Dilu
tion
wat
er p
umps
are
not
par
t of
DM
sch
eme.
R
efer
Am
ened
men
t-1.
4.
IIB
C1
Anne
xure
-V
287
Man
dato
ry S
pare
s:
12)
Verti
cal w
et p
it pu
mps
: Was
te s
ervi
ce w
ater
tran
sfer
pu
mps
, Coa
l dec
ante
d w
ater
, DM
Pla
nt fe
ed p
umps
Man
dato
ry s
pare
s fo
r Was
te
serv
ice
wat
er tr
ansf
er p
umps
and
C
oal d
ecan
ted
wat
er a
re n
ot
appl
icab
le. P
leas
e co
nfirm
.
Was
te s
ervi
ce w
ater
tran
sfer
pu
mps
and
Coa
l dec
ante
d w
ater
ar
e no
t par
t of D
M s
chem
e.
Ref
er A
men
edm
ent-1
.
5.
IIB
C1
Anne
xure
-V
288
Man
dato
ry S
pare
s:
5)
Verti
cal
sum
p pu
mps
: Sl
udge
D
ispo
sal
Pum
ps,
Back
was
h w
ater
pum
ps (F
ilter
s)
Man
dato
ry s
pare
s fo
r Slu
dge
Dis
posa
l Pum
ps a
nd B
ackw
ash
wat
er p
umps
(Filt
ers)
are
not
ap
plic
able
. Ple
ase
conf
irm.
Slud
ge D
ispo
sal P
umps
and
Ba
ckw
ash
wat
er p
umps
(Filt
ers)
ar
e no
t par
t of D
M s
chem
e.
Ref
er A
men
edm
ent-1
.
6.
IIB
C1
Anne
xure
-V
289
Man
dato
ry S
pare
s:
7.
DM
mak
eup
pum
p m
otor
8.
Boile
r fill
pum
ps m
otor
9.
Con
dens
ate
Tran
sfer
pum
ps m
otor
Man
dato
ry s
pare
s fo
r DM
mak
eup
pum
p m
otor
, Boi
ler f
ill p
umps
m
otor
and
Con
dens
ate
Tran
sfer
pu
mps
mot
or a
re n
ot a
pplic
able
. Pl
ease
con
firm
.
DM
m
akeu
p pu
mp,
Bo
iler
fill
pum
ps a
nd C
onde
nsat
e Tr
ansf
er
pum
ps
are
not
part
of
DM
sc
hem
e.
Ref
er A
men
edm
ent-1
.
10.
IIB
C1
Anne
xure
-V
280
MAN
DA
TOR
Y S
PAR
ES F
OR
DM
PLA
NT
For
Man
dato
ry
Spar
es,
only
ap
plic
able
sp
ares
fo
r eq
uipm
ent
bein
g su
pplie
d fo
r D
M
Pack
age
shal
l be
su
pplie
d.
All
dupl
icat
e de
scrip
tions
, if
any
in t
he li
st s
hall
be d
elet
ed fr
om s
cope
of s
uppl
y.
M/s
BH
EL to
acc
ord
acce
ptan
ce.
Spec
ifica
tion
requ
irem
ent i
s cl
ear
in th
is re
gard
.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
1 of
10
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (D
MP-
3X80
0 M
W P
ATR
ATU
STP
P EX
T. P
H-I)
Sr.
No.
Vo
lum
e Se
ctio
n C
laus
e N
o.
Page
N
o.
Spec
ifica
tion
Req
uire
men
t C
larif
icat
ion
Rea
son
for C
larif
icat
ion
/B
idde
r’s A
ssum
ptio
n B
HEL
REP
LY
11.
IIB
C1
Anne
xure
–A
29
3 D
ata
shee
t of F
ilter
wat
er p
ump:
Min
imum
wat
er le
vel –
by
bidd
er
For
the
sele
ctio
n of
pu
mp
shaf
t le
ngth
, we
requ
est t
o pr
ovid
e in
vert
leve
l an
d FG
L of
Fi
ltere
d w
ater
re
serv
oir.
As fi
ltere
d w
ater
rese
rvoi
r is
part
of G
ravi
ty fi
lter c
over
ed u
nder
pr
e-tre
atm
ent p
lant
pac
kage
, in
vert
leve
l of s
ump
and
FGL
to
be c
onfir
med
by
Clie
nt.
Plea
se c
onsi
der 4
.5 m
as
shaf
t le
ngth
. Min
or c
hang
es, i
f any
sh
all b
e co
mm
unic
ated
dur
ing
deta
il en
gine
erin
g.
12.
IIB
C1
Anne
xure
–A
29
7 10
. Bul
k St
orag
e Ta
nk
Acid
-
Cap
acity
(Ea
ch t
ank)
- To
sto
re 3
0 da
ys r
equi
rem
ent
of
acid
for
reg
ener
atio
n of
all
oper
atin
g D
M s
tream
& N
-pit
neut
raliz
atio
n +
175.
0 C
UM
for
CPU
reg
ener
atio
n +
5%
over
all m
argi
n.
Alka
li-
Cap
acity
(Ea
ch t
ank)
- To
sto
re 3
0 da
ys r
equi
rem
ent
of
alka
li (1
00%
) for
rege
nera
tion
of a
ll op
erat
ing
DM
stre
am
& N
-pit
neut
raliz
atio
n +
75.0
cum
for C
PU re
gene
ratio
n +
5% o
vera
ll m
argi
n.
Plea
se c
larif
y th
at w
heth
er c
apac
ity
of A
cid
stor
age
tank
/Alk
ali s
tora
ge
tank
of
30 d
ays
requ
irem
ent
to b
e pr
ovid
ed fo
r eac
h ta
nk o
r com
bine
d to
geth
er o
f thr
ee n
os. t
anks
.
Con
tradi
ctor
y in
spe
cific
atio
n.
Ref
er A
men
edm
ent-1
.
IIB
D
2) o
f 5.0
1.00
66
5 a)
Bul
k ac
id s
tora
ge ta
nk (H
Cl-3
0-33
% C
onc.
): M
inim
um
thre
e (3
) nu
mbe
rs to
hol
d on
e (1
) m
onth
req
uire
men
t of
aci
d fo
r re
gene
ratio
n of
all
oper
atin
g D
M s
tream
s op
erat
ed a
t its
rat
ed c
apac
ity,
with
spe
cifie
d se
rvic
e cy
cle,
re
gene
ratio
n pe
riod
and
usin
g gu
aran
teed
ch
emic
al c
onsu
mpt
ion
plus
any
oth
er re
quire
men
ts a
s en
visa
ged
by th
e co
ntra
ctor
to b
e m
et th
roug
h th
ese
tank
s.
b) B
ulk
Alka
li st
orag
e ta
nk (N
aOH
48%
Con
c.):
Min
imum
tw
o (2
) num
bers
to h
old
one
(1) m
onth
requ
irem
ent o
f al
kali
requ
ired
for
rege
nera
tion
of a
ll op
erat
ing
DM
st
ream
s op
erat
ed a
t its
rate
d ca
paci
ty…
….
13.
IIB
C1
Anne
xure
–A
29
9 19
. UF
Feed
Wat
er S
tora
ge T
ank
19.1
Typ
e- V
ertic
al c
ylin
dric
al a
tmos
pher
ic
19.2
Des
ign
Stan
dard
(for
dia
met
er, l
engt
h &
thic
knes
s) -
As p
er B
S: 2
594.
How
ever
, di
shed
end
s sh
all
be o
f To
risph
eric
al ty
pe
Plea
se c
larif
y th
e D
esig
n st
anda
rd
appl
icab
le
for
UF
Feed
W
ater
St
orag
e Ta
nk.
Con
tradi
ctor
y in
spe
cific
atio
n.
Ref
er A
men
edm
ent-1
.
IIB
D
16.0
0.00
71
8 1)
Ty
pe- V
ertic
al c
ylin
dric
al a
tmos
pher
ic
2)
Des
ign
Stan
dard
- IS:
803
2 of
10
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (D
MP-
3X80
0 M
W P
ATR
ATU
STP
P EX
T. P
H-I)
Sr.
No.
Vo
lum
e Se
ctio
n C
laus
e N
o.
Page
N
o.
Spec
ifica
tion
Req
uire
men
t C
larif
icat
ion
Rea
son
for C
larif
icat
ion
/B
idde
r’s A
ssum
ptio
n B
HEL
REP
LY
14.
IIB
C1
Anne
xure
–A
29
9 19
. UF
Feed
Wat
er S
tora
ge T
ank
1.4
Use
ful (
Effe
ctiv
e) C
apac
ity (m
inim
um)-
1 H
r sto
rage
Cap
acity
of B
oth
UF
stre
am to
mat
ch w
ith n
et
outp
ut (
Post
UF)
of1
60 c
um/h
r ea
ch U
F st
ream
+ W
ater
re
quire
d fo
r ba
ckw
ashi
ng o
f U
F m
embr
ane
Che
mic
al
prep
arat
ion
requ
irem
ents
Plu
s 5%
mar
gin
over
the
abov
e to
tal r
equi
rem
ents
. (N
ot le
ss th
an 3
50 c
um/h
r.)
As p
er te
nder
, wor
king
stre
am o
f UF
is o
ne n
o. o
f 160
m3/
hr n
et o
utpu
t. W
ith
cons
ider
ing
1 hr
st
orag
e,
capa
city
of U
F Fe
ed W
ater
sto
rage
ta
nk is
not
mat
ched
with
350
cum
/hr
as s
peci
fied
in d
ata
shee
t. Pl
ease
ch
eck
and
clar
ify th
e sa
me.
UF
stea
ms-
2x1
00%
Sp
ecifi
catio
n re
quire
men
t is
clea
r in
this
rega
rd.
The
min
imum
cap
acity
of U
F fe
ed w
ater
sto
rage
tank
sha
ll be
35
0 cu
m.
15.
IIB
C1
Anne
xure
–A
30
0 20
. UF
feed
pum
ps
Num
bers
Req
uire
d- T
hree
(3),
(2 w
orki
ng +
1 s
tand
-by)
.
Cap
acity
(eac
h)- T
o Su
it th
e ne
t DM
Pla
nt o
utpu
t (P
ost U
F)
per s
tream
of 1
60 c
um/h
r
Plea
se c
larif
y th
e w
orki
ng a
nd
stan
d by
phi
loso
phy
of U
F st
ream
s i.e
. bot
h U
F st
ream
s ar
e w
orki
ng o
r on
e w
orki
ng +
one
sta
nd b
y.
UF
stea
ms-
2x1
00%
Sp
ecifi
catio
n re
quire
men
t is
clea
r in
this
rega
rd.
The
UF
feed
pum
ps s
hall
be 3
N
os. (
2W+1
S). e
ach
pum
p sh
all
be s
ized
for m
eetin
g U
F st
ream
(n
et O
utpu
t) of
160
cum
/hr m
in.
16.
IIB
C1
Anne
xure
–A
30
0 22
. UF
Skid
s
Each
Cap
acity
(ne
t) in
cu.
m/h
r- T
o Su
it th
e ne
t DM
Pla
nt
outp
ut (P
ost U
F) p
er s
tream
of 1
60 c
um/h
r
Plea
se c
larif
y th
e re
quire
men
t of
“Plu
s 5%
mar
gin
over
the
abov
e to
tal r
equi
rem
ents
”, sh
all b
e co
nsid
ered
by
bidd
er o
r not
.
Con
tradi
ctor
y in
spe
cific
atio
n.
Ref
er A
men
edm
ent-1
.
IIB
D
17.0
0.00
71
9 4)
U
F Tr
eate
d (F
iltra
te) F
low
:
Cap
acity
of e
ach
UF
Trai
ns to
mat
ch w
ith g
ross
cap
acity
of
Net
out
put
of
160
cum
/hr
+ W
ater
req
uire
d fo
r ba
ck
was
hing
of
U
F m
embr
ane
Che
mic
al
prep
arat
ion
requ
irem
ents
Pl
us
5%
mar
gin
over
th
e ab
ove
tota
l re
quire
men
ts. (
Not
less
than
160
Cu.
m/h
r.)
17.
IIB
C1
Anne
xure
–A
30
0 U
F B
ACKW
ASH
/ FE
ED
FLU
SH P
UM
PS:
Ty
pe o
f Pum
p H
oriz
onta
l Cen
trifu
gal w
ith V
FD
VFD
ope
ratio
n of
UF
back
was
h pu
mp
shal
l be
prov
ided
sub
ject
to
reco
mm
enda
tion
of U
F m
embr
ane
man
ufac
ture
rs. P
leas
e co
nfirm
.
Supp
ly o
f VFD
for U
F ba
ckw
ash
pum
p R
efer
Am
ened
men
t-1.
3 of
10
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (D
MP-
3X80
0 M
W P
ATR
ATU
STP
P EX
T. P
H-I)
Sr.
No.
Vo
lum
e Se
ctio
n C
laus
e N
o.
Page
N
o.
Spec
ifica
tion
Req
uire
men
t C
larif
icat
ion
Rea
son
for C
larif
icat
ion
/B
idde
r’s A
ssum
ptio
n B
HEL
REP
LY
18.
IIB
C1
Anne
xure
–A
30
0,
301
UF
CIP
Tan
k an
d U
F cl
eani
ng p
umps
U
F C
IP T
ank
and
UF
clea
ning
pu
mps
sha
ll be
pro
vide
d su
bjec
t to
reco
mm
enda
tion
of U
F m
embr
ane
man
ufac
ture
rs. P
leas
e co
nfirm
.
UF
Back
was
h an
d cl
eani
ng
oper
atio
n ph
iloso
phy
to b
e fo
llow
ed a
s pe
r UF
man
ufac
ture
re
com
men
datio
n.
Spec
ifica
tion
requ
irem
ent i
s cl
ear
in th
is re
gard
.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
19.
IIB
D
A) 2
5.00
.00
751
26) F
ront
al P
ipin
g of
UF
Skid
s - S
S 30
4 Pl
ease
cla
rify
the
pipi
ng M
OC
of
UF
skid
- CPV
C o
r SS3
04.
Con
tradi
ctor
y in
spe
cific
atio
n.
Ref
er A
men
edm
ent-1
.
IIB
D
C) 2
5.00
.00
764
e) F
or U
F an
d R
O P
lant
app
licat
ion,
sta
inle
ss s
teel
pip
ing
(SS-
304)
sha
ll be
use
d fo
r th
e hi
gh p
ress
ure
pipi
ng a
nd
the
indu
stria
l gra
de C
PV
C a
s pe
r AS
TM F
441
CP
VC
412
0 Sc
h. 8
0 pi
ping
sha
ll be
use
d fo
r low
pre
ssur
e ar
eas.
20.
IIB
D
A)
Of
2.00
.00
626
j) Th
ree
(3)
num
bers
of D
M w
ater
sto
rage
tan
ks w
ith a
ll ac
cess
orie
s.
Ple
ase
conf
irm th
at D
M w
ater
st
orag
e ta
nks
alon
g w
ith
asso
ciat
ed in
stru
men
ts &
ac
cess
orie
s ar
e no
t in
Bidd
er’s
sc
ope.
Tend
er P
&D
sho
ws
that
DM
w
ater
sto
rage
tank
s ar
e in
M/s
BH
EL s
cope
.
Ref
er A
men
edm
ent-1
.
21.
IIB
D
A)
Of
2.00
.00
627
q) In
terc
onne
ctin
g pi
ping
, val
ves,
fitti
ngs
and
acce
ssor
ies
incl
udin
g Pr
e C
ast
RC
C
pipe
s at
ro
ad
cros
sing
as
re
quire
d.
Supp
ly o
f Pre
Cas
t RC
C p
ipes
sh
all b
e C
lient
’s s
cope
. Ple
ase
conf
irm.
Civ
il w
orks
are
in c
lient
’s s
cope
. Sp
ecifi
catio
n re
quire
men
t is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
22.
IIB
D
A)
Of
2.00
.00
627
u) R
equi
red
num
bers
of
DM
wat
er m
akeu
p pu
mps
and
dr
ives
& a
ssoc
iate
d va
lves
and
pip
ing
etc.
v) R
equi
red
num
bers
of
Boile
r Fi
ll pu
mps
and
driv
es &
as
soci
ated
Val
ves
and
pipi
ng e
tc.
w)
Req
uire
d nu
mbe
rs o
f con
dens
ate
trans
fer
pum
ps a
nd
driv
es &
ass
ocia
ted
Valv
es a
nd p
ipin
g et
c.
DM
wat
er m
akeu
p pu
mps
, Boi
ler
Fill
pum
ps, c
onde
nsat
e tra
nsfe
r pu
mps
are
not
in B
idde
r’s s
cope
. Pl
ease
con
firm
.
DM
wat
er m
akeu
p pu
mps
, Boi
ler
Fill
pum
ps, c
onde
nsat
e tra
nsfe
r pu
mps
are
not
sho
wn
in T
ende
r P
&ID
s.
Ref
er A
men
edm
ent-1
.
23.
IIB
D
D) o
f 2.0
0.00
64
1 A.
ULT
RA
FILT
RAT
ION
(UF)
SYS
TEM
a) U
F sk
ids
(2x5
0%) (
Pres
suriz
ed ty
pe),
Sim
plex
stra
iner
s (2
x100
%) (
1W+1
S) fo
r eac
h st
ream
, UF
back
was
h pu
mps
(2
x100
%) (
1W+1
S) a
long
with
flus
hing
tank
s an
d pu
mps
, C
EB
& C
IP s
yste
ms,
Flus
hing
tank
s an
d pu
mps
, CE
B &
CIP
sys
tem
s sh
all b
e pr
ovid
ed
subj
ect t
o re
com
men
datio
n of
UF
mem
bran
e m
anuf
actu
rers
. Ple
ase
conf
irm.
UF
Flus
hing
, CE
B an
d cl
eani
ng
oper
atio
n ph
iloso
phy
to b
e fo
llow
ed a
s pe
r UF
man
ufac
ture
re
com
men
datio
n.
Ref
er A
men
edm
ent-1
.
4 of
10
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (D
MP-
3X80
0 M
W P
ATR
ATU
STP
P EX
T. P
H-I)
Sr.
No.
Vo
lum
e Se
ctio
n C
laus
e N
o.
Page
N
o.
Spec
ifica
tion
Req
uire
men
t C
larif
icat
ion
Rea
son
for C
larif
icat
ion
/B
idde
r’s A
ssum
ptio
n B
HEL
REP
LY
24.
IIB
D
D) o
f 2.0
0.00
64
1 A.
ULT
RA
FILT
RAT
ION
(UF)
SYS
TEM
UF
perm
eate
w
ater
st
orag
e ta
nks
(2),
UF
perm
eate
tra
nsfe
r pum
ps (3
x50%
) (2W
+1S)
etc
.
Plea
se c
larif
y th
e qu
antit
y of
UF
Feed
wat
er s
tora
ge ta
nk a
nd
supp
ly o
f UF
perm
eate
tran
sfer
pu
mps
.
UF
perm
eate
sto
rage
tank
is o
ne
no. a
s pe
r dat
a sh
eet o
f UF
Feed
W
ater
Sto
rage
Tan
k of
An
nexu
re-A
, pag
e 29
9.
Scop
e of
UF
perm
eate
tran
sfer
pu
mps
are
not
spe
cifie
d in
tend
er
clau
se n
o.3.
00 o
f sco
pe o
f su
pply
and
the
sam
e ar
e no
t sh
own
in T
ende
r P&I
D.
Ref
er A
men
edm
ent-1
.
25.
IIB
D
D) o
f 2.0
0.00
64
2 g)
Tw
o (2
) (2
x100
%)
(1W
+1S)
num
bers
of
back
was
h di
spos
al p
umps
sha
ll be
pro
vide
d. T
wo
(2)
num
bers
air
blow
ers
(2x1
00%
) (1W
+1S)
for t
he a
ir ag
itatio
n sy
stem
of
the
filte
r bac
kwas
h pi
t sha
ll be
pro
vide
d.
Plea
se c
larif
y th
e sc
ope
of A
ir bl
ower
s fo
r air
agita
tion
syst
em fo
r Fi
lter b
ackw
ash
pit.
Air b
low
ers
for a
ir ag
itatio
n sy
stem
for F
ilter
bac
kwas
h pi
t ar
e no
t env
isag
ed in
tend
er
clau
se n
o.3.
00 o
f sco
pe o
f su
pply
and
the
sam
e ar
e no
t sh
own
in T
ende
r P&I
D
Ref
er P
&I D
IAG
RAM
FO
R
DEM
INER
ALIZ
ATIO
N P
LAN
T (D
M P
LAN
T) (P
E-D
G-4
05-1
63A-
A001
)-R
EV-
01 e
nclo
sed
with
Am
ened
men
t-1.
26.
IIB
C1
68) o
f 3.0
27
W
rapp
ing,
coa
ting
and
prot
ectio
n of
the
entir
e bu
ried
pipe
sh
all b
e as
per
IS 1
0221
or A
WW
A C
203
-93.
Pl
ease
cla
rify
the
pipi
ng w
hich
are
to
be
laid
und
ergr
ound
. Kin
dly
also
pr
ovid
e its
rout
ing.
R
efer
Am
ened
men
t-1.
27.
IIB
C1
Tend
er P
&ID
29
0 It
is s
how
n th
at U
F ba
ckw
ash
to b
e do
ne b
y us
ing
UF
feed
w
ater
. As
pe
r st
anda
rd
prac
tice,
U
F pe
rmea
te w
ater
to
be u
sed
for
UF
back
was
h.
Plea
se
rech
eck
and
clar
ify th
e sa
me.
Ref
er P
&I D
IAG
RAM
FO
R
DEM
INER
ALIZ
ATIO
N P
LAN
T (D
M P
LAN
T) (P
E-D
G-4
05-1
63A-
A001
)-R
EV-
01 e
nclo
sed
with
Am
ened
men
t-1. 5
of 1
0
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (P
TP-3
X800
MW
PA
TRA
TU S
TPP
EXT.
PH
-I)
SR.
NO
. VO
LUM
E SE
CTI
ON
C
LAU
SE N
O.
PAG
E N
O.
SPEC
IFIC
ATI
ON
REQ
UIR
EMEN
T C
LAR
IFIC
ATI
ON
B
HEL
REP
LY
1E- 61
0520
18TE
CH
NIC
AL
SPEC
IFIC
ATIO
N
RAW
WAT
ER
ANAL
YSIS
N
ote
# 2
16 o
f 890
Al
um a
s Al
2 (S
O4)
3 -
70 p
pm o
n 10
0% b
asis
, P
AC 2
5 - 4
0 pp
m o
n 10
0% b
asis
Purp
ose
of A
lum
& P
AC d
osin
g is
sa
me.
Hen
ce
bidd
er
sugg
est
to
cons
ider
ei
ther
Al
um
or
PAC
do
sing
sys
tem
.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Bidd
er t
o no
te t
hat
prov
isio
n ha
s be
en g
iven
for
bot
h P
AC
&
alum
dos
ing.
Bid
der t
o ta
ke
care
sui
tabl
y.
2E- 61
0520
18TE
CH
NIC
AL
SPEC
IFIC
ATIO
N
SCO
PE O
F SU
PPL
Y (M
ECH
ANIC
AL)
3.
0 sN
.70
27 o
f 890
Six
(6)
sets
of
sa
fety
eq
uipm
ent
[(Per
sona
l Pr
otec
tion
Equi
pmen
t (P
PE)
] co
mpr
isin
g PV
C
prot
ectio
n su
its w
ith h
oods
, ru
bber
boo
ts,
face
vi
sors
and
thi
ck P
VC g
aunt
lets
sha
ll al
so b
e pr
ovid
ed
by
the
bidd
er.
Two
(2)
num
ber
safe
ty s
how
er u
nits
and
ade
quat
e no
s. o
f ey
e fo
unta
ins
to p
rote
ct a
gain
st a
ny c
hem
ical
haz
ard
shal
l al
so
bepr
ovid
ed b
y th
e bi
dder
. Fo
r D
etai
ls o
f Sa
fety
eq
uipm
ents
refe
r Dat
a Sh
eet-A
.
As th
e 41
5 V
MC
C p
anel
is
bein
g pr
ovid
ed b
y BH
EL .
Hen
ce
supp
ly o
f the
se s
afet
y eq
uipm
ent a
re e
xclu
ded.
Bidd
er t
o co
nsid
er m
inim
um
safe
ty e
quip
men
t req
uire
d fo
r sa
fe o
pera
tion
of D
M P
lant
.
3E- 61
0520
18TE
CH
NIC
AL
SPEC
IFIC
ATIO
N
ADD
ITIO
NAL
R
EQ
UIR
EM
EN
T 15
. 24
31 o
f 890
Bi
dder
to c
onsi
der
two
(2)
nos.
coo
ling
pum
p fo
r pa
ckag
e Bi
dder
re
ques
t to
co
nfirm
ed
capa
city
of c
oolin
g pu
mp.
Ref
er A
men
dmen
t-1
4E- 61
0520
18TE
CH
NIC
AL
SPEC
IFIC
ATIO
N
GU
ARAN
TEE
UN
DER
C
ATE
GO
RY
–III
A.4
267
of 8
90
Turb
idity
in th
e ef
fluen
t wat
er s
hall
be le
ss th
an
0.5
NTU
Tu
rbid
ity a
t the
out
let o
f AC
F w
ill
be 1
.0 N
TU.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
5S
PEC
IFIC
ATIO
N N
O.:
PE-
TS-4
34-1
63A
-A0
01 R
EV
00
C&
I spe
cific
atio
n 12
3
52 o
f 890
Al
l th
e tra
nsm
itter
s su
pplie
d by
Bid
der
shal
l be
ra
ck m
ount
ed.
We
prop
osed
th
at
nece
ssar
y su
ppor
ts (
mou
ntin
g br
acke
t etc
) sh
all c
onsi
der
for
all t
rans
mitt
ers
inst
ead
of ra
ck s
uppo
rt.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n. 6
of 1
0
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (P
TP-3
X800
MW
PA
TRA
TU S
TPP
EXT.
PH
-I)
SR.
NO
. VO
LUM
E SE
CTI
ON
C
LAU
SE N
O.
PAG
E N
O.
SPEC
IFIC
ATI
ON
REQ
UIR
EMEN
T C
LAR
IFIC
ATI
ON
B
HEL
REP
LY
6S
PEC
IFIC
ATIO
N N
O.:
PE-
TS-4
34-1
63A
-A0
01 R
EV
01
C&
I spe
cific
atio
n 29
35
4 of
890
R
edud
ancy
of s
enso
rs a
re in
Bid
der s
cope
. Pl
ease
cl
arify
w
heat
her
it is
re
quire
d or
no
t fo
r pr
oces
s ap
plic
atio
n fo
r all
trans
mitt
ers.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
7S
PEC
IFIC
ATIO
N N
O.:
PE-
TS-4
34-1
63A
-A0
01 R
EV
01
Tech
nica
l re
quire
men
ts
2.01
.1 S
l No
241
1 of
890
S
PEC
IFIC
ATIO
N
FOR
EL
ECTR
ON
IC
TRAN
SMIT
TER
FO
R
PRES
SUR
E,
DIF
F PR
ESS
. DP
FLO
W &
LEV
EL- A
ccur
racy
spa
n
We
have
co
nsid
ered
ac
cura
cy
span
up
to
+/
-0.5
%
calib
rate
d sp
an.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
8S
PEC
IFIC
ATIO
N N
O.:
PE-
TS-4
34-1
63A
-A0
01 R
EV
01
TEC
HN
ICA
L S
PEC
IFIC
ATIO
NS,
se
c-vi
, par
t b
2.04
.00
415
of 8
90
Han
d he
ld c
alib
rato
r W
e ha
ve c
onsi
dere
d 1
No
hand
he
ld
calib
rato
r fo
r al
l ty
pe
of
trans
mitt
ers.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
9S
PEC
IFIC
ATIO
N N
O.:
PE-
TS-4
34-1
63A
-A0
01 R
EV
01
TEC
HN
ICA
L S
PEC
IFIC
ATIO
NS,
se
c-vi
, par
t b
13
429
of 8
90
Type
of r
otam
eter
W
e ha
ve p
ropo
sed
glas
s ty
pe
rota
met
er i
nste
ad o
f m
etal
tub
e ro
tam
eter
.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
10
E- 6105
2018
TEC
HN
ICA
L SP
ECIF
ICAT
ION
-
15.0
0.00
43
0 of
890
PR
OC
ESS
AC
TUAT
ED S
WIT
CH
ES
Con
tact
Rat
ing
shal
l be
1/5
A,
250
V AC
as
read
ily a
vaila
ble
whi
ch s
hall
be o
pera
tive
on 2
4 V
D
C a
nd th
at w
ill b
e as
per
OEM
st
anda
rd.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
11
SP
ECIF
ICAT
ION
NO
.: P
E-TS
-434
-163
A-
A001
RE
V 01
TEC
HN
ICA
L S
PEC
IFIC
ATIO
NS,
se
c-vi
, par
t b
19.0
3 43
2 of
890
C
hlor
ine
anal
yzer
-ele
ctro
de M
OC
W
e ha
ve
cons
ider
ed
MO
C
of
elec
trode
of
C
hlor
ine
anal
yzer
sh
all b
e co
pper
.
Ref
er A
men
dmen
t-1.
7 of
10
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (P
TP-3
X800
MW
PA
TRA
TU S
TPP
EXT.
PH
-I)
SR.
NO
. VO
LUM
E SE
CTI
ON
C
LAU
SE N
O.
PAG
E N
O.
SPEC
IFIC
ATI
ON
REQ
UIR
EMEN
T C
LAR
IFIC
ATI
ON
B
HEL
REP
LY
12
SP
ECIF
ICAT
ION
NO
.: P
E-TS
-434
-163
A-
A001
RE
V 01
TEC
HN
ICA
L S
PEC
IFIC
ATIO
NS,
se
c-vi
, par
t b
3.01
43
4 of
890
S
PE
CIF
ICA
TIO
N O
F A
NA
LYS
ER
S
We
prop
ose
that
man
ufac
ture
rs
stan
dard
dr
ivin
g lo
ad
of
impe
danc
e sh
all p
rovi
de in
stea
d of
driv
ing
load
of
impe
danc
e of
50
0Ohm
s m
inim
um
of
all
appl
icab
le
anal
yzer
s fo
r th
is
pack
age.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
13
E- 6105
2018
TEC
HN
ICA
L SP
ECIF
ICAT
ION
TRAI
NIN
G O
F EM
PLO
YER
'S
PER
SON
NEL
28
.00.
00
547
of 8
90
TRAI
NIN
G O
F E
MPL
OYE
R'S
PER
SO
NN
EL
Bidd
er w
ill p
rovi
de tr
aini
ng a
t site
on
ly.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
14
E- 6105
2018
TEC
HN
ICA
L SP
ECIF
ICAT
ION
SUR
FAC
E FL
OW
R
ATE
FO
R IO
N–
EXC
HA
NG
ER
S
5.03
.00
668
of 8
90
i) C
atio
n un
it –
35 m
3/hr
/m2
(for b
oth
wea
k an
d st
rong
Cat
ion)
ii)
Ani
on u
nit –
35
m3
/hr/m
2 (fo
r bot
h w
eak
and
stro
ng A
nion
)
& Max
imum
sur
face
flow
rate
:- i)
Stro
ng C
atio
n un
it –
40 m
3/hr
/m2.
ii)
Stro
ng A
nion
uni
t – 4
0 m
3/hr
/m2
Ther
e is
m
ism
atch
va
lues
fo
r su
rface
flo
w
rate
s.
Bidd
er re
ques
t to
conf
irm s
urfa
ce
flow
rate
for S
AC
& S
BA.
Ref
er A
men
dmen
t-1.
15
SP
ECIF
ICAT
ION
NO
.: P
E-TS
-434
-163
A-
A001
RE
V 01
Acid
& a
lkal
i tan
k- L
evel
tran
smitt
er a
pplic
atio
n W
e ha
ve c
onsi
dere
d ul
traso
nic
LT fo
r aci
d/al
kali
tank
app
licat
ion.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
16
GST
rela
ted
Cor
rigen
dum
to G
CC
R
ev 0
6
9.0
Term
s of
pa
ymen
t 10
9.3.
1 Pa
ymen
t of
ba
sic
pric
e of
m
ater
ials
su
pplie
d, a
s pe
r app
rove
d bi
lling
sch
edul
e, a
long
w
ith fr
eigh
t, ta
xes
and
dutie
s (a
s ap
plic
able
), sh
all
be p
aid
agai
nst r
ecei
pt o
f mat
eria
l at s
ite o
n pr
o-ra
ta
basi
s.
15%
of
ba
sic
pric
e of
m
ater
ials
su
pplie
d w
ill b
e re
tain
ed a
s se
curit
y de
posi
t whi
ch
will
be
rele
ased
on
pro
–rat
a ba
sis
as d
etai
ls
belo
w:
a) 5
% w
ill b
e re
leas
ed o
n pr
o-ra
ta b
asis
afte
r su
bmis
sion
of M
ater
ial R
ecei
pt C
ertif
icat
e (M
RC
) fro
m p
roje
ct s
ite e
ngin
eer
of o
wne
r/pur
chas
er.
Col
lect
ion
of M
ater
ial
Rec
eipt
Cer
tific
ate
from
si
te/o
wne
r an
d its
sub
mis
sion
for
cla
imin
g th
e
For
Supp
ly
– 30
% A
dvan
ce a
gain
st P
ro-fo
rma
Invo
ice.
60
% A
gain
st P
ro-fo
rma
Invo
ice
alon
g w
ith
100%
Ta
xes
and
Dut
ies
prio
r di
spat
ch o
f mat
eria
l. 10
%
agai
nst
succ
essf
ul
com
mis
sion
ing
and
subm
issi
on
of P
BG
for
equ
ival
ent
amou
nt
valid
upt
o de
fect
liab
ility
per
iod.
8 of
10
Bid
ders
are
requ
este
dto
follo
wte
nder
docu
men
tson
ly.
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (P
TP-3
X800
MW
PA
TRA
TU S
TPP
EXT.
PH
-I)
SR.
NO
. VO
LUM
E SE
CTI
ON
C
LAU
SE N
O.
PAG
E N
O.
SPEC
IFIC
ATI
ON
REQ
UIR
EMEN
T C
LAR
IFIC
ATI
ON
B
HEL
REP
LY
paym
ent
shal
l be
th
e re
spon
sibi
lity
of
the
Selle
r/Con
tract
or.
b) 1
0% w
ill b
e re
leas
ed a
fter
i) su
bmis
sion
of a
ll fin
al d
ocum
ents
as
per
Tech
nica
l Spe
cific
atio
ns
and
ii) s
ucce
ssfu
l co
mpl
etio
n of
Per
form
ance
G
uara
ntee
(P
G)/
Dem
onst
ratio
n Te
st
and
hand
ing
over
of t
he s
yste
m/ p
acka
ge, i
f app
licab
le, a
s pe
r O
rder
/ Con
tract
17
GST
rela
ted
Cor
rigen
dum
to G
CC
R
ev 0
6
9.4
EREC
TIO
N
&C
OM
MIS
SIO
NIN
G
PAY
MEN
T
11
9.4.
1 Ei
ghty
per
cent
(80
%)
paym
ent
on p
rora
ta
basi
s fo
r th
e w
ork
com
plet
ed,
as p
er p
prov
ed
billi
ng
sche
dule
, sh
all
be
rele
ased
by
Site
au
thor
ities
/ R
egio
n on
su
bmis
sion
of
pr
otoc
ols,
dul
y si
gned
by
BHE
L Si
te/
Ow
ner.
9.4.
2 Te
n pe
rcen
t (10
%) o
f the
tota
l val
ue s
hall
be
rele
ased
by
Si
te
auth
oriti
es/
Reg
ion
on
succ
essf
ul
com
mis
sion
ing
of
the
com
plet
esy
stem
/ pa
ckag
e.9.
4.3
Ten
perc
ent (
10%
) of t
he to
tal v
alue
sha
ll be
re
leas
ed
by
Site
au
thor
ities
/ R
egio
n on
su
cces
sful
co
mpl
etio
n of
PG
/ D
emon
stra
tion
test
(s)
and
hand
ing
over
sys
tem
/ pac
kage
to th
e O
wne
r, as
app
licab
le.
For
Erec
tion
& C
omm
issi
onin
g –
20%
M
obili
zatio
n ad
vanc
e.70
%
pro-
rata
ba
sis
agai
nst
erec
tion
wor
k.10
% a
gain
st c
omm
issi
onin
g an
d ha
ndov
er o
f pla
nt.
PG
(BO
P) to
Rep
ly.
18
GST
rela
ted
Cor
rigen
dum
to G
CC
R
ev 0
6
9.6
11
9.6
Vend
ors
shal
l sub
mit
docu
men
ts fo
r pay
men
t di
rect
ly to
BH
EL. P
aym
ent w
ill b
e re
leas
ed w
ithin
60
day
s af
ter
rece
ipt o
f com
plet
e do
cum
ents
as
per
orde
r/con
tract
(45
day
s fo
r ve
ndor
s qu
alifi
ed
and
regi
ster
ed a
s M
icro
or S
mal
l as
per M
SMED
Ac
t).
Diff
eren
tial P
aym
ents
app
licab
le
for
Supp
ly -
With
in 3
0 da
ys f
or
Non
MSE
ven
dors
PG
(BO
P) to
Rep
ly.
19
GST
rela
ted
Cor
rigen
dum
to G
CC
R
ev 0
6
Cla
use
16.0
of G
CTC
- Li
quid
ated
da
mag
es
15
Purc
hase
r re
serv
es th
e rig
ht to
rec
over
from
the
Selle
r/ C
ontra
ctor
, as
agre
ed li
quid
ated
dam
ages
an
d no
t by
way
of
pena
lty,
a su
m e
quiv
alen
t to
ha
lf (½
) pe
rcen
t plu
s ap
plic
able
GST
of t
he to
tal
cont
ract
pric
e pe
r wee
k or
par
t the
reof
, sub
ject
to
a m
axim
um
of
ten
(10)
pe
rcen
t of
th
e to
tal
cont
ract
pric
e e
xclu
ding
ele
men
ts o
f tax
es, d
utie
s an
d fre
ight
, if t
he S
elle
r/ C
ontra
ctor
fails
to d
eliv
er
any
part
of t
he o
rder
ed s
tore
s w
ithin
the
per
iod
stip
ulat
ed i
n th
e O
rder
/ C
ontra
ct.
For
Turn
key
pack
ages
(Su
pply
and
E&C
in v
endo
r’s s
cope
), Li
quid
ated
Dam
ages
sha
ll be
levi
ed o
n th
e to
tal
cont
ract
val
ue o
f bo
th u
pply
and
E&C
ord
ers
(exc
ludi
ng
taxe
s,
dutie
s an
d fre
ight
) if
E&C
om
plet
ion
of th
e pa
ckag
e is
del
ayed
bey
ond
the
cont
ract
ual c
ompl
etio
n da
te o
r ext
ensi
on th
ereo
f. Li
quid
ated
Dam
ages
will
not
be
with
held
fro
m
supp
ly p
aym
ent.
LD f
or d
elay
in
deliv
ery
sole
ly
attri
buta
ble
to th
e Su
pplie
r will
be
0.1
% p
er w
eek
of u
ndel
iver
ed
porti
on o
n a
pro
rata
bas
is t
o m
axim
um 5
% o
f C
ontra
ct v
alue
. G
ST C
harg
es s
hall
not a
pply
on
LD c
harg
es, i
f app
licab
le.
PG
(BO
P) to
Rep
ly.
20
Form
ats
91
BAN
K G
UAR
ANTE
B
G to
be
subm
itted
in th
e fo
rmat
issu
ed b
y BH
EL.
Bank
Gua
rant
ee f
orm
ats
to b
e m
utul
ly a
gree
d up
on
PG
(BO
P) to
Rep
ly.
9 of
10
Bid
ders
are
requ
este
dto
follo
wte
nder
docu
men
tson
ly.
Bid
ders
are
requ
este
dto
follo
wte
nder
docu
men
tson
ly.
Bid
ders
are
requ
este
dto
follo
wte
nder
docu
men
tson
l y.
Bid
ders
are
requ
este
dto
follo
wte
nder
docu
men
tson
ly.
BH
EL's
Rep
lies
Dtd
.07.
02.2
019
to P
re-B
id Q
uerie
s (P
TP-3
X800
MW
PA
TRA
TU S
TPP
EXT.
PH
-I)
SR.
NO
. VO
LUM
E SE
CTI
ON
C
LAU
SE N
O.
PAG
E N
O.
SPEC
IFIC
ATI
ON
REQ
UIR
EMEN
T C
LAR
IFIC
ATI
ON
B
HEL
REP
LY
E (B
G)
FOR
P
ERFO
RM
AN
CE
S
ECU
RIT
Y
21
PE-
TS-4
34-1
63A
-A0
01
Scop
e Ta
ble
for
Wat
er T
reat
emen
t pl
ant
Sr.N
o 3
307
of 8
90
Pow
er
cabl
es,
cont
rol
cabl
es
and
scre
ened
co
ntro
l ca
bles
for
a)
both
en
d eq
uipm
ent
in
BHEL
’s
scop
eb)
bo
th
end
equi
pmen
t in
ve
ndor
’s
scop
ec)
one
end
equ
ipm
ent i
n ve
ndor
’s s
cope
A. W
W u
nder
stan
d th
at a
ll po
wer
ca
ble
supp
ly
in
BHEL
sc
ope.
B
. Pl
ease
cal
rify
the
sup
ply
of
Inst
rum
ent
Cab
le
:-(i)
Fro
m I
nstru
men
t to
JB
and
(ii) F
rom
JB
to D
CS/
PLC
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
22
PE-
TS-4
34-1
63A
-A0
02
Scop
e Ta
ble
for
Wat
er T
reat
emen
t pl
ant
Sr.N
o 6b
30
7 of
890
10
0/ 5
0 m
m c
able
tra
ys/
Con
duits
/ G
alva
nise
d st
eel
cabl
e tro
ughs
for l
ocal
cab
ling
(i) W
W u
nder
stan
d th
at s
uppl
y of
ca
ble
tray
is fo
r bra
nch
cabl
es i.
e fro
m
inst
rum
ent
to
near
est
Junc
tion
box.
Fu
rther
Tr
ay
estim
atio
n an
d su
pply
sha
ll be
in
BHEL
sc
ope.
(ii) C
able
try
shal
l be
of G
I 2 m
m
thic
k w
ith
65
mic
ron
coat
ing.
Plea
se c
onfir
m.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n.
23
PE-
TS-4
34-1
63A
-A0
01
Man
dato
ry s
pare
s S
o N
o 7.
(ii
i) &
(iv)
285
of 3
90
Silic
a an
a so
dium
ana
lyze
r W
e sh
all
prov
ide
only
che
mic
al
reag
ent f
or 1
2 m
onth
s.
Spec
ifica
tion
requ
irem
ent
is
clea
r in
this
rega
rd.
Plea
se
follo
w
tech
nica
l sp
ecifi
catio
n. 10 o
f 10