bgcr mandarin seller slides
TRANSCRIPT
-
8/3/2019 BGCR Mandarin Seller Slides
1/49
-
8/3/2019 BGCR Mandarin Seller Slides
2/49
Location
-
8/3/2019 BGCR Mandarin Seller Slides
3/49
Vicinity Map
-
8/3/2019 BGCR Mandarin Seller Slides
4/49
Beyond/Met Master plan
-
8/3/2019 BGCR Mandarin Seller Slides
5/49
Bay Garden Community
Total Land Area of almost 3.5 hectares Total of 14 towers Approx. 1,800 total residential units Over 2,000 parking slots 62% Open Space
-
8/3/2019 BGCR Mandarin Seller Slides
6/49
Bay Garden Club and Residences
Land area 7,677 sqmsNo. of towers 3Residential units 489
Banyan 130 Royal Palm 171 Mandarin 188Parking slots 428Parking to Resi ratio 88%
BanyanTree
Royal Palm
Mandarin
-
8/3/2019 BGCR Mandarin Seller Slides
7/49
ProjectHighlights
-
8/3/2019 BGCR Mandarin Seller Slides
8/49
The Club
-
8/3/2019 BGCR Mandarin Seller Slides
9/49
The Club
-
8/3/2019 BGCR Mandarin Seller Slides
10/49
Bringing the outside environment to the inside
Resort-inspired design
Encourages the combination of living, working andenjoyment of residents and visitors
A country club in the City
The Club Clubhouse & Daycare by Gettys Group Chicago
Experts in hotel and resorts design, development,
procurement & consultancy
Projects include The Drake Hotel in Chicago,Peninsula Hotel in New York, PGA National Spa &Resort in Florida
Concept for BGCR:
-
8/3/2019 BGCR Mandarin Seller Slides
11/49
The Club Clubhouse by Gettys Group Chicago
Ceiling detail Patternatfeaturewall
Decorative panels
Feature wallinspiration
Lighting inspirationCarpet patterninspiration
-
8/3/2019 BGCR Mandarin Seller Slides
12/49
The Club Daycare/Video Game Room by Gettys GroupChicagoFurniture inspiration Storage
ideas Floor
pattern
Video room inspiration
Color inspiration
Writing wall
-
8/3/2019 BGCR Mandarin Seller Slides
13/49
Retail shops @ GF
-
8/3/2019 BGCR Mandarin Seller Slides
14/49
BGCR Rotunda
-
8/3/2019 BGCR Mandarin Seller Slides
15/49
BGCR Banyan lobby by Gettys Group Chicago
-
8/3/2019 BGCR Mandarin Seller Slides
16/49
BGCR Banyan lobby by Gettys Group Chicago
Reception desk inspiration Seating inspiration Accessories
Feature wall Paneling inspiration
Ceilinginspiration
Accessories
-
8/3/2019 BGCR Mandarin Seller Slides
17/49
Mandarin
Tower
-
8/3/2019 BGCR Mandarin Seller Slides
18/49
ound Floor - Commercial/Lobby/Parking
1st Floor to 2nd Floor - Parking
th Floor to 18th Floor 1BR, 2BR and3BR units
No 4TH, 13th & 14thMktg flrs
Floor Amenity Deck/Residential units
th Floor to 20th Floor Bi-level PH units
Structural Mix
-
8/3/2019 BGCR Mandarin Seller Slides
19/49
Unit Mix
-
8/3/2019 BGCR Mandarin Seller Slides
20/49
Floor Plan & UnitLayout
-
8/3/2019 BGCR Mandarin Seller Slides
21/49
-
8/3/2019 BGCR Mandarin Seller Slides
22/49
-
8/3/2019 BGCR Mandarin Seller Slides
23/49
-
8/3/2019 BGCR Mandarin Seller Slides
24/49
-
8/3/2019 BGCR Mandarin Seller Slides
25/49
Executive 1BR 38 sqmsUnits B, G, K, N
Unit layout
-
8/3/2019 BGCR Mandarin Seller Slides
26/49
Executive 1BR corner 46 sqmsUnit I
Unit layout
-
8/3/2019 BGCR Mandarin Seller Slides
27/49
2BR 65 sqmsUnits J & O
Unit layout
-
8/3/2019 BGCR Mandarin Seller Slides
28/49
3BR 84 sqmsUnit A
Unit layout
-
8/3/2019 BGCR Mandarin Seller Slides
29/49
darin Tower Specifica
T f E t
-
8/3/2019 BGCR Mandarin Seller Slides
30/49
Team of Experts
-
8/3/2019 BGCR Mandarin Seller Slides
31/49
- Faade is inspired by the pattern of motion;
modern and simple in form to project energy,
dynamism and vibrance
-All units with a balcony, accessed from the Living(except Exec 1BR cor); Exec 1BR cor, 2BR and3BR units with additional balcony at MBR
- Exec 1BR units have a dining nook
Highlights
-
8/3/2019 BGCR Mandarin Seller Slides
32/49
Unit Deliverables
Floor Wall Ceiling Others
Living & Dining Laminated wood Painted cement
plaster/Painted drywall
partition
Painted gypsum
board/Painted rubbed
concrete
Dining nook for Executive 1BR
Bedroom Laminated wood Painted cement
plaster/Painted drywall
partition
Painted gypsum
board/Painted rubbed
concrete
Modular laminated closets
Kitchen Ceramic tiles Painted cement plaster Painted gypsum board Modular laminated for base
and overhead cabinets
Rangehood
Toilet & Bath(except Service T&B)
Ceramic tiles Painted cementplaster/Ceramic tiles
Painted moisture-resistantgypsum board
Shower enclosureCountertop lavatory at 2BR and
MBR of 3BR, Pedestal lavatory
for 1BR
Multi-point water heater
Mechanical vent
Service T&B (3BR) Ceramic tiles Painted cement
plaster/Ceramic tiles
Painted moisture-resistant
gypsum boardUtility (2BR & 3BR) Colored cement Painted cement plaster Painted rubbed concrete
Balcony Ceramic tiles Painted rubbed concrete
Provisions Provision for telephone lines
Provision for cable TV
Provision for WACU and split-type ACU
Fixtures Audio visual entry phone for all units
-
8/3/2019 BGCR Mandarin Seller Slides
33/49
Fire Detection Alarm system
Automatic Fire Suppression System
Stand-by power generator
100% back-up for common areas
10-15% back up for residential units
Sewage Treatment Plant
Building Facilities and Services
-
8/3/2019 BGCR Mandarin Seller Slides
34/49
2 Passenger + 1 Passenger/ServiceElevators
Elevator key card access
Closed-circuit TV monitoring at eachfloor and elevator cars
Pressurized Fire Escape stairs
Garbage Chute
Centralized Mail Room for individual
mail boxes and keys
Building Facilities and Services
-
8/3/2019 BGCR Mandarin Seller Slides
35/49
Grand Porte Cochere
Main lobby with reception counter andlounge area
24-hour security
Building administration/security office
2 levels of podium parking
Building Facilities and Services
-
8/3/2019 BGCR Mandarin Seller Slides
36/49
ProjectUpdates
Project Milestones
-
8/3/2019 BGCR Mandarin Seller Slides
37/49
Project Milestones
Target start of Construction 1Q 2013 Estimate Turnover/Delivery Date 1Q 2015
-
8/3/2019 BGCR Mandarin Seller Slides
38/49
Banyan Tower 73% completed
View from Metrobank Ave. View from Road 2
Construction Updates
C t ti U d t
-
8/3/2019 BGCR Mandarin Seller Slides
39/49
Unit 5M
Living
Bedroom
T&B
Kitchen
Construction Updates
-
8/3/2019 BGCR Mandarin Seller Slides
40/49
Installation of Table form at 5FTower 2
Tower 2Podium- 60%completed
Construction Updates
-
8/3/2019 BGCR Mandarin Seller Slides
41/49
Ranges and Payment
Price Ranges
-
8/3/2019 BGCR Mandarin Seller Slides
42/49
Price Ranges
3% introductory discount for the first 30 buyers
Payment Terms
-
8/3/2019 BGCR Mandarin Seller Slides
43/49
Payment Terms
C2 - 100 in 30 days 15%
C1 - 50 / 50 (48) 7.5%
B330 / 70 13%
A1 10 / 15 (48) / 75 2%A2 20 / 15 (48) / 65 4%
A3 5 (14) / 5.5 (14) / 10 (20) / 79.5 -
Discount on SRP
Sample Computation Executive 1BR (unit only)
-
8/3/2019 BGCR Mandarin Seller Slides
44/49
Sample Computation Executive 1BR (unit only)
Sample Computation Executive 1BR cor (unit only)
-
8/3/2019 BGCR Mandarin Seller Slides
45/49
Sample Computation Executive 1BR cor (unit only)
Sample Computation 2BR (unit only)
-
8/3/2019 BGCR Mandarin Seller Slides
46/49
Sample Computation 2BR (unit only)
Sample Computation 3BR (unit only)
-
8/3/2019 BGCR Mandarin Seller Slides
47/49
Sample Computation 3BR (unit only)
BGCR vs Other projects
-
8/3/2019 BGCR Mandarin Seller Slides
48/49
BGCR vs Other projects
-
8/3/2019 BGCR Mandarin Seller Slides
49/49