bg qualifications prepared for combined properties 043015

38
Qualifications and Expertise 2015 457 minna street, suite 100, san francisco, ca 94103 www.buildgc.com build

Upload: andrea-beard

Post on 21-Jul-2016

215 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Qualifications and Expertise2015

457 minna street, suite 100, san francisco, ca 94103www.buildgc.com

build

BUILD GROUP

WE BUILD AWESOME PROJECTS WITH STAND-OUT PEOPLE.

TABLE OF CONTENTS

ABOUT BUILD GROUP 1

KEY TEAM MEMBERS 2

EXPERIENCE 3

REFERENCES 4

457 minna street, suite 100, san francisco, ca 94103www.buildgc.com

ABOUT BUILD GROUP

ABOUT BUILD GROUP

About Build Group We want to tell you who we are...

Company HistoryBuild Group is a general contractor focused on providing a high level of service to exclusive clientele. Highly selective about deploying their top tier staff, the owners have a deep understanding of their clients’ business and are committed to providing principal involvement on all projects. To them client relationships are everything, and are driven by trust and integrity. Consequently, Build Group clients depend on the company to act as an extension of their own organizations. While most general contractors are simply pricing plans, Build Group staff sources new real estate opportunities to figure out creative ways to make deals pencil.

Long time colleagues Ross Edwards, Eric Horn, Bob Hopper, Scott Brauninger, and Dave Williams came together in 2007 to form Build Group. Shortly thereafter, John Santori, Nathan Rundel and Jason Berry joined the team. Combined, the group has more than 233 years of construction experience and has played integral roles in some of the most prominent and complex buildings constructed in California and more importantly downtown San Francisco. Build Group was formed with a goal of working closely with clients and driving innovation within the industry. With that in mind, they created a flat company structure that minimizes middle management and allows the Principals to remain close to the project, while entrusting employees to own their work. Their willingness to roll up their sleeves and do work has cultivated a construction company full of true revolutionary builders.

ABOUT BUILD GROUP

In the beginning of 2010 Build Group acquired Fine Line Group, a high-end hospitality and seismic upgrade company with more than 30 years of construction experience. The company is known for evolving creative building methodologies and project delivery strategies that successfully manage and support our clients’ design and business goals. The acquisition brought personnel with experience in signature restaurant, hotel and flagship retail expertise.

Build Group’s fine interiors group has a wide-ranging repertoire of high-end interior projects that includes luxury brands such as Gucci, Christian Dior, John Varavatos and Anne Fontaine. The company has also built many signature restaurants including Hog Island Oyster Company, M.Y. China, Kokkari, McCormick & Kuleto’s and Posterio.

Build Group has grown consistently since its inception. Employee owned, the company now has more than 400 staff members. In 2015 alone, Build Group has been named a Largest Commercial Contractor in the Bay Area, Healthiest Employer, Fastest Growing Private Company, and a Best Place to Work in the Bay Area.

Beginning In a Down Economy

Starting Build Group in the down economy of 2007 was a risky endeavor. However the Principals’ ability to be lean and keep

business operation expenses minimal helped overcome the financial slump. The challenging financial times at the beginning taught the

Principals how to be frugal, innovative and creative. These three qualities continue to define the company today, setting us apart from

the competition.

frugalInnovativecreative

ABOUT BUILD GROUP

Pacific Structures ConcreteBuild Group also has a very unique resource called Pacific Structures. Formed in 2008, this concrete divison was created to better serve the needs of our clients by utilizing our firm’s extensive knowledge about concrete. The principals, management, and field operations staff possess hands-on, know-how through more than three decades of designing and building some of California’s most complex concrete structures. This substantial expertise means that the company leaders have what it takes to engage the entire project team, and to push to optimize the structure for cost, quality, and schedule.

At each stage of design, Pacific Structure’s concrete experts provide the benefit of their valuable input. They continually challenge and evaluate the structure, testing it against hundreds of other buildings in their database for key parameters and details. Each analysis is informed by professionals with years of experience partnering with the best structural engineers on the West Coast. Each recommendation made has been tested in the field for quality and constructability by seasoned Superintendents. Out of this crucible comes the right design for each project.

Once the design is optimized, Pacific Structure’s veteran field operations team attacks the schedule and details of the project on a day-by-day and pour-by-pour basis, ensuring that every aspect of the project is preplanned and outlined prior to the start of work. When construction starts, the team is executing their plan, striving for even greater improvement and innovation. When the inevitable unknowns come that can derail a project, the Pacific Structures team responds quickly and effectively to keep the project on track and protect the client’s investment. Pacific Structures was recently recognized as an award recipient in the 2013 ASCC Safety Awards Program for Zero Lost Time.

ABOUT BUILD GROUP

“What’s the evidence that people who are happy at work have it all? The happiest employees are 180% more energized than their

less content colleagues, 155% happier with their jobs, 150% happier with life, 108% more engaged and 50% more motivated. Most

staggeringly, they are 50% more productive too.”Vicki Salemi, Forbes Magazine

ABOUT BUILD GROUP

Core ValuesBUILD it Safe – BUILD it RightBUILD with ExpertsBUILD Smart and ScrappyBUILD with CharacterBUILD enduring Financial StrengthBUILD a Fun EnvironmentBUILD the highest Quality

BuildGroup’s CultureBuildGroup’s main focus is to create a highly-motivated team to deliver the highest quality construction possible. We have a diversified group that accepts individuals and works together to combine people’s strengths to form a strong team. As our number of projects and employees grow, management has maintained a tight hold on our founding values. All Principals continue to have a hands-on role in projects and consequently work very closely with every team. Employee feedback is always encouraged in order to help streamline and improve processes, eliminating errors and time.

Mission Statement

WE BUILD AWESOME PROJECTS WITH STAND OUT PEOPLE.

Employee LifeOur Principals truly want employees to enjoy their work, remain challenged, expand their knowledge of the industry, and BE HAPPY. We work hard but understand a healthy balance between work and life. Employee events including SF Giants games and other athletic games, lunch potlucks, happy hours, bring your dog on Fridays, athletic competition and parties create a fun team synergy. The Principals believe that time away from work is just as important as time at work and therefore strongly encourage employees to take vacation rather than saving them up. Build Group also has a robust health and wellness program called “Build a Better You” that endorses the Plus Three Network, an innovative wellness program that raises money for charitable donations while encouraging friendly competition among employees.

To accomplish our mission, we pay close attention to our relationships with four key groups of stakeholders: Clients, Employees, Trade Partners, and Community. We strive to build a company culture that exceeds expectations.

ABOUT BUILD GROUP

Recent PressCompany Awards2015 - San Francisco Business Times - Top 25 Best Places to work2015 - San Francisco Business Times - Best Bay Area Residential Project2015 - Profile Magazine Feature2015 - San Francisco Business Times Book of Lists Largest Commerical Contractors Largest Bay Area Construction Projects Healthiest Employers (100-400 Employees) Bay Area Fastest-Growing Private Companies Best Places to Work in the Bay Area

2014 – Inc. 500 Fastest Growing Private Companies2014 – SF Business Time’s 100 Fastest Growing Private Companies2014 - 19th Largest Commercial Contractor in the Bay Area2014 – SF Business Time’s Largest 100 Bay Area Private Companies2014 – SF Business Time’s Best Places to Work in the Bay Area, Medium Size Company2012 - 2014 – SF Business Time’s Healthiest Employers

Safety Awards2014 – CEA Excellence in Safety Award (Build Group) 2013 – ASCC Safety Award for Zero Lost Time Incidents (Pacific Structures)2013 – CEA Excellence in Safety Award (Build Group)

KEY TEAM MEMBERS

KEY TEAM MEMBERS

KEY TEAM MEMBERS

Key Team Members Meet a few of our incredible team members.

Collectively, our executive team has more than 193 years of experience in the construction industry throughout California. Resumes for a few of our key team members have been provided on the following page.

KEY TEAM MEMBERS

Principal Ross Edwards LEED@ AP

W Hotel & Residences Hollywood, CA Two 12 & 16-story concrete towers totaling 649,598 sf, three levels subterranean parking, LEED Silver certification

Clearview San Mateo, CA $19 million, three-story, 110,876 sf, warm shell, two-story lobby, 220,000 sf, five-story parking structure

Electronic Arts Campus Redwood Shores, CA 316,000 sf, four-story steel building, 9,500 sf auditorium, 232,500 sf, four-story parking structure

GSA Federal Office Building San Francisco, CA 450,000 sf, 18-story CIP office building

1800 Van Ness San Francisco, CA 162,127 sf, eight-story building, 98-unit luxury condominium building, two levels below-grade parking

2121 Third Street San Francisco, CA 117,198 sf, seven- and eight-story structural concrete building, 105 apartment units, one level below grade parking with car stackers

Archstone Parkside Emeryville, CA 203,859 sf, three-level wood frame mixed-use building, 166 apartments, 14 live/work units, one level at grade and one level below grade parking

240 3rd Street Los Altos, CA 53,000 sf, three-story mixed-use building, two levels subterranean parking

The Beacon San Francisco, CA Eight 7-16 story concrete towers totaling 750,000 sf, 595 apartment units, 440,000,000 sf parking structure and 1,500,000 sf commercial space

The Palms San Francisco, CA 550,000 sf, nine-story building, 300 units, three levels above grade parking

St. Regis Hotel & Residences San Francisco, CA 750,000 sf 42-story tower, 102 luxury condominiums, 269 guest rooms, four levels subterranean parking

The Infinity San Francisco, CA Four buildings totaling 1,025,305 sf, 654 units, five levels subterranean parking

Millenium Tower San Francisco, CA Two buildings totaling 933,306 sf, 60 & 11 stories, 416 units, five levels subterranean parking

One Rincon San Francisco, CA 64-story tower, 376 units, 14 townhomes

W Hotel San Francisco, CA 290,000 sf 32-story tower, 423 hotel rooms

SF MOMA Garage San Francisco, CA 155,000 sf concrete structure, 7.5 stories, 410 parking spaces, roof-top sculpture garden

Sutter Street Parking Garage San Francisco, CA 88,500 sf concrete structure, six levels above grade, one level below grade

Relevant Experience

A third generation California builder, Ross Edwards brings nearly 30 years of leadership in the construction industry and specialized expertise in structural concrete and steel. He founded Build Group with partner Eric Horn in 2007 with a vision of creating a unique culture and closely working with clients. As CEO, he constantly drives innovation and provides Principal level involvement on projects. His long list of complicated projects and his large repeat client base attests to his relentlessness about delivering superior quality.

Education / Credentials B.S. Civil Engineering,University of the Pacific

California General Engineering Contractors License Class A

LEED Accredited Professional

KEY TEAM MEMBERS

A top tier leader of the Bay Area building community, Eric Horn brings over 30 years of building expertise in the construction industry. In 2007, Eric co-founded Build Group with a mission of gathering a group of builders together that are committed to making real, innovative, and definable differences in the built environment. As COO, Eric directs construction activities for the company and oversees company operations to manage processes, profit, systems and workforce organization. He also leads the company’s marketing and entrepreneurial endeavors into new markets.

Education / Credentials B.S. Civil Engineering,California Polytechnical State University

LEED Accredited Professional

California General Building License -Class B

Principal Eric Horn LEED@ AP

Broadway 655 San Diego, CA 23-story commercial office building, two levels retail, 695,000 sf, three levels above grade, two levels below grade parking

Seahaus Condominiums La Jolla, CA Mixed-use 13 buildings, two to three stories, 236,000 sf, Residential & retail, one level below grade parking

Alma del Pueblo Santa Barbara, CA 97,692 sf mixed-use building, 37 condominiums, green roof garden and public market

Clearview San Mateo, CA $19 million, three-story, 110,876 sf, warm shell, two-story lobby, 220,000 sf, five-story parking structure

Oracle Corporate Headquarters Redwood City, CA Six buildings, 8-16 stories each, 1,554,000 sf, four concrete parking structures, five stories each

Electronic Arts Campus Redwood Shores, CA 316,000 sf, four-story steel building, 9,500 sf auditorium, 232,500 sf, four-story parking structure

Foundry Square San Francisco, CA Three buildings, 11 stories each, 1,294,468 sf, four total levels below grade parking

Lucas Film, Presidio San Francisco, CA Four buildings, four-stories each, 893,000 sf, three levels below grade parking, LEED Gold Certified

45 Lansing San Francisco, CA 39-story tower, 453,396 sf, 320 units, four levels subterranean parking

973 Market San Francisco, CA Nine-story building, 67 apartment units, 67,540 sf tenant improvement

Epiphany Hotel Palo Alto, CA 57,000 sf remodel, 86 luxurious hotel rooms and suites

Maxwell Parking Garage Berkeley, CA Two-level parking garage, 1.5 level subterranean parking, 440-546 parking space garage

VA Hospital Solar Canopy Installation Bay Pines, FL 1.6 MW on hospital campus

VA Hospital Solar Canopy Installation Martinez, CA 0.504 MW on hospital campus

East Side Union High School District Solar Canopy Installation San Jose, CA 7MW on 13 school campuses, 655 T structures, DSA Project

Camp Lejeune Solar Canopy Installation Lejeune, NC 1.3MW on two locations, 135 T structures, NAVFAC project

Foothill College Solar Canopy Installation, Phase I & II Los Altos, CA 2 MW on college campus, 216 T structures, 150,889 sf of elevated structures, DSA project

California Academy of Sciences, Golden Gate Park San Francisco, CA 409,178 sf, five-story museum, LEED Platinum Certified

Relevant Experience

KEY TEAM MEMBERS

Nathan Rundel is a well-rounded professional with over 16 years of experience working in commercial development and construction. He leads the Estimating and Preconstruction departments at Build Group to ensure projects begin successfully. With a thorough understanding of cost and schedule for all major building components and types, he is a strong conceptualizer who helps client’s nail down costs at project inception.

Education / Credentials M.S. Civil Engineering,Stanford University

B.S. Civil Engineering,Stanford University

Principal Nathan Rundel

Clearview San Mateo, CA $19 million, three-story, 110,876 sf, warm shell, two-story lobby, 220,000 sf, five-story parking structure

E*Trade San Francisco, CA 157,000 sf remodel of historic building, four-story office towers

Cisco System’s Site 3 Campus Three: two-story buildings totaling 313,650 sf on 13 acre site, tenant improvements include office space, engineering labs and a 7,000 sf cafeteria

O’Melveny & Meyers Menlo Park, CA 32,000 sf interior demolition and TI, 34 offices, four conference rooms, training center

SGI’s Crittenden Mountain View, CA Four: four-story office towers, 500,000 sf on 35-acre site, tenant improvements including offices & high-tech laboratories

Ellie Mae Dublin, CA 30,000 sf office tenant improvement

Bernal Corporate Plaza, Phase I & II Pleasanton, CA Two three-story office buildings, 220,000 sf

Globix Data Center Santa Clara, CA 61,000 sf super POP internet data center with climate control and dual FM200 dry fire-suppression systems

45 Lansing San Francisco, CA 39-story tower, 453,396 sf, 320 units, four levels subterranean parking

1800 Van Ness San Francisco, CA 162,127 sf, eight-story building, 98-unit luxury condominium building, two levels below grade parking

Archstone Parkside Emeryville, CA 203,859 sf, three-level wood frame mixed-use building, 166 apartments, 14 live/work units, one level at grade and one level below grade parking

Sutter Street Parking Garage San Francisco, CA 88,500 sf concrete structure, six levels above grade, one level below grade

240 3rd Street Los Altos, CA 53,000 sf, three-story mixed-use building, two levels subterranean parking

255 Berry Street San Francisco, CA 202,000 sf, seven-story building, 100 units

Broderick Place San Francisco, CA Four-story mixed-use building, 70 units

Renaissance Square San Francisco, CA Five-story mixed-use building, 139 units, two levels subterranean parking

Mission Bay 3 San Francisco, CA 16-story building, 260 units

Harborwalk Oakland, CA 4-story light gauge framed building, 81 units, 1 level subterranean parking

Relevant Experience

KEY TEAM MEMBERS

Principal John Santori

Bliss Spa at W HotelHollywood, CA5,000 sf build out of high-end spa on the 4th floor of new W Hotel including 12 spa treatment rooms, sauna, steam rooms and a retail area

Talbots, 26 storesWest Coast 12,000 sf, flagship store

Rizzoli’s Bookstore, 5 locationsPasadena, CA5,000 sf, new high-end flagship, $1.2 million

Betsy Johnson, Westfield Centre San Francisco, CA 1,100 sf tenant build out, signature retail project, creative re-use of existing elements, 8 weeks

Gucci San Francisco, CA16,000 sf, 4 levels, 40% of ground floor concrete was removed and replaced for ADA compliance

Gucci, Ala Moana Shopping Center Honolulu, HI 7,732 sf, flagship store

John Vavartos, Union Square San Francisco, CA 6,500 sf, 2-level flagship, $2 million

H & M, Sutter St., Union SquareSan Francisco, CA 18,000 sf, new high-end flagship, $2.5 million

H & M, Powell St., Union SquareSan Francisco, CA 40,000 sf, new high-end flagship, $4.5 million

Jimmy Choo San Francisco, CA2,300 sf tenant build-out, flagship store with high-end finishes

Tori Burch, Westfield CentreSan Francisco, CA1,381 sf tenant build-out, high-end finishes throughout

Villa Florence Hotel San Francisco, CA125,000 sf hotel remodel in historic building

Hyatt Regency EmbarcaderoSan Francisco, CARemodel of public areas, club rooms and suites

Ricky Hyatt RemodelPalo Alto, CA

Hyatt Regency RemodelOakland, CA

100 Grant Avenue San Francisco, CA117,000 sf

400 Sutter Street San Francisco, CA30,000 sf

Donatello Hotel, Union SquareSan Francisco, CA

Nespresso Union Square San Francisco, CA8,600 sf high-end retail tenant improvement

Burberry Brit, Westfield CentreSan Francisco, CAWood flooring, high-finish millwork, 12-week schedule, large format interior storefront

Rizzoli’s Bookstore Pasadena, CA5,000 sf retail build-out, stately columns, brass handrails, lush imported carpeting remaining faithful to early 1900’s building facade

Relevant Experience

John is a 30 year veteran with specialized expertise in high-end retail, signature restaurants and seismic upgrades. He helps lead Build Group Retail, Hospitality, Fine Interiors division, specializing in business development to assist clients in making deals pencil. John joined Build Group in 2007 through the acquisition of his company, Fine Line Group. He founded Fine Line Group in 1979 and grew the company to become a leading firm with unparalleled knowledge of Union Square and an uncompromising commitment to quality.

Education / Credentials B.S. Biochemistry,University of California, Berkeley

KEY TEAM MEMBERS

Director of Operations Mark Izdepski

Education / Credentials

BS IET Purdue University West Lafayette, Indiana Continual Education: OSHA Certified, Continuing Education with Insurance Carriers,

Tiffany & Co., Retail Stores San Diego, Rodeo, Topanga, Ala Moana - Waikiki, HI, Santa Barbara, Carmel, and 25 other locations

Cartier, Van Cleef & Arpels, Retail Stores Nationwide

Fendi, Retail Stores Las Vegas, NV

Armani Exchange, Retail Stores San Francisco, Pasadena, San Diego, San Jose, Nationwide

Giorgio Armani, Retail Stores Desert Hills, Miami, Manhasset, Nationwide

COACH, Retail Stores Nationwide

Lacoste, Retail Stores +60 stores Nationwide

Michael Kors, Retail Stores Denver, Miami, Nationwide

St John Knit, Retail Stores Nationwide

Versace, Retail Stores Las Vegas, NV Nationwide

Gucci, Retail Stores Two Rodeo Drive, CA San Francisco, Nationwide

Hermes Las Vegas, NV $8 million, in Bellagio Hotel, high-end jewelry retail store

Louis Vuitton Dallas, TX Las Vegas

Escada Rodeo Drive, CA Scottsdale, AZ, Nationwide

Yves Saint Laurent Houston, TX

Prada Desert Hills, CA South Coast Plaza, Costa Mesa, CA Beverly Center - Los Angeles, CA

Mikimoto Rodeo Drive, CA South Coast Plaza, Costa Mesa, CA Nationwide

Tory Burch San Francisco, CA San Diego, CA, Nationwide

Loro Piana Caesars - Las Vegas, Rodeo Drive, Bal Harbour Shops, Florida, Nationwide

Hugo Boss Nationwide

Kenneth Cole Nationwide

Kachina Point Retirement Center Sedona, AZ

Marriott, Host Hotels, Westin, Hyatt, Renaissance, Radisson National Hospitality Projects

Eagle Tile Plants, McDonald Douglas Apache Helicopter Facility, Gold Tech Industries, Palo Verde Nuclear Generator Station, America West Hanger Facility, Digital Electronics National Commercial / Industrial Projects

Relevant Experience

Mark is an experienced construction professional with over 30 years specializing in high-end retail, hospitality and restaurant construction. Mark is Director of Operations of Build Groups Fine Interiors division. He is responsible for leading Build Groups highly competent teams of construction professionals guaranteeing on time on budget projects for our many repeat clients. Other responsibilities include facilitating the companies Safety Program and Customer Service & Satisfaction initiatives.

EXPERIENCE

EXPERIENCE

Experience

The Principals of Build Group are construction experts responsible for building some of the largest and most complicated buildings and tenant improvements over the past 25 years. Sought after for their structural steel, concrete expertise, and fast-track interiors, they have solved complex design and construction problems with inventive solutions saving clients millions of dollars and setting records for speed to market. The success of these projects in large part was due to the significant role these individuals played during preconstruction.

Let’s show you our stuff.

EXPERIENCE

Parking Garages45 Lansing, San Francisco 4 levels below grade 300 stalls (with car stackers)Maxwell Field and Parking Garage, Berkeley 1.5 levels below grade, 1 level above 40,000 sf, 440 stallsUCSF Sutter Street Parking Garage 6 levels above grade, 1 level below2121 Third Street, San Francisco 1 level below grade 52 car parking (with car stackers)MOMA Garage, San Francisco* 8 levels above grade 158,000 sf, 403 stallsOracle Campus Parking Garage, Redwood City* 4 parking structures 4,500 stallsElectronic Arts Campus Parking Garage, San Francisco* 2 parking structuresLucasfilm Campus, San Francisco* 3 levels below grade 732,000 sf, 1,500 stallsThe Infinity, San Francisco* 5 levels below grade 316,000 sf, 659 stalls

Residential Buildings and Hotels• Alta Laguna, San Francisco• 25 Mason Street, San Francisco• Archstone Parkside, Emeryville• 1800 Van Ness, San Francisco• 973 Market, San Francisco• 45 Lansing, San Francisco• 2558 Mission, San Francisco• 35 Dolores, San Francisco• Alma del Pueblo, Santa Barbara• 2121 3rd Street, San Francisco• Woodside Road, Redwood City• Napa Riverfront, Napa• The Infinity, San Francisco*• Avalon Mission Bay Phase II, San Francisco*• LA Live Hotel & Residences, Los Angeles*• The Palms, San Francisco*• One Hawthorne, San Francisco*• One Rincon, San Francisco*• The Beacon, San Francisco*• 1650 Jackson, San Francisco*• St. Regis Hotel & Condominiums, San Francisco*• Legacy Apartments @ Hollywood & Vine,

Los Angeles*• Seahaus Condominiums, La Jolla*• UCSD HSGS Housing, La Jolla*• W Hotel & Residences, Hollywood*• Villa Florence Hotel, San Francisco*• Hotel Donatello, San Francisco*• Crown Plaza, San Francisco*• Pan Pacific Hotel, San Francisco*• Omni Hotel, San Francisco*• Courtyard by Marriott, Emeryville*• Hotel Vitale, San Francisco*• Intercontinental, San Francisco*• The Ritz Carlton, San Francisco*• Radisson Hotel, San Francisco*

Commercial Office• Clearview Office Park (current

project) • 3408 Hillview Office Park (current

project)• LucasFilm Campus• Oracle Corporate Headquarters• Foundry Square Offices• Broadway 655 Offices• O’Melveny & Meyers Offices• E*Trade• Cisco System’s Site Three

Campus• Ellie Mae Offices• Bernal Corporate Plaza, Phase

I & II• Globix Data Center• SGI’s Crittenden Campus• Electronic Arts• California Academy of Sciences• GSA Federal Office Building

• 1335 Market - Twitter• Westfield Bespoke Office &

Event Space (current project)• Anthem! Offices• Wells Fargo Private Investment

Group Offices• Dr. Olson, D.D.S. Offices• Mithun Offices• Atomica Corporation Offices• Brobeck, Phleger & Harrison

Offices• The Castling Group Offices• Innoventry Offices• Orrick, Herrington & Sutcliffe

Offices• Marten Clinic of Plastic Surgery

* Projects completed by Build Group principals.

EXPERIENCE

High-End RetailBuild Group has an extensive tenant build-out team. This division focuses solely on meeting the needs of tenant improvement clients, primarily on high-end retail spaces and restaurants. Below is a partial list of high-end retail clients we have the pleasure of working with.

EXPERIENCE

45 Lansingsan francisco, ca

OwnerCrescent Heights

ArchitectHKS Architects

Completion DateSeptember 2015

This 453,000 sf project includes a 39-story concrete tower on a tight urban space. Glass curtain wall exterior finish and high-end interior finishes throughout the 320 residential units. Four levels subterranean parking.

EXPERIENCE

1800 Van Nesssan francisco, ca

OwnerOyster Development

ArchitectKwan Hemni Architects

Completion DateMarch 2014

This project consists of a 162,127 sf, eight-story structure with 98 luxury condo units. The facility features modern one-and two-bedroom residences and three-bedroom townhouses in addition to a secluded park with a Bocce court and community BBQ. 12,000 cubic feet of dirt was excavated and removed to allow for a below-grade, two-level concrete parking structure.

Three sides of the property bordered city streets and the fourth side was adjacent to a building constructed on the property line. The site excavation went from property line to property line, leaving little laydown space. By carefully controlling project logistics, Build Group was able to overcome the challenges of working on such a tight site and keep within the original project schedule.

EXPERIENCE

Pine and Franklinsan francisco, ca

OwnerOyster Development

ArchitectKwan Hemni Architects

Completion DateAugust 2016

This $114 million, 356,000 sf project includes demolition of the existing structure and construction of two, 13-story residential towers. The new building integrates a historic facade and includes one level of below-grade parking with car stackers. The 262-unit building includes studios, 1 bedroom, and 2 bedroom units with a fitness center, rooftop terrace, atrium, and shared courtyard.

Located on a tight urban site in downtown San Francisco, the project team had to pay close attention to site logistics to avoid disruption to the adjacent buildings and businesses.

EXPERIENCE

Clearview Office Parksan mateo, ca

OwnerEmbarcadero Capital Partners, LLC

ArchitectKorth Sunseri Hagey Architects

Project Duration13 months

This $36.7 million project is demolishing an existing restaurant to accommodate a new, three-story, 110,876 sf office building. The new ‘warm shell’ will include a two-story lobby, rest rooms and interior finishes, rooftop HVAC equipment, and main ductwork for future tenants. This project is targeting LEED Silver.

The project also includes a precast, five-story, 220,000 sf parking structure that will house 655 stalls. The parking structure will be completed in 6 months.

OfficeBldg

ParkingStructure

EXPERIENCE

LucasFilm Campus*san francisco, ca

OwnerLucasFilm, Ltd.

ArchitectGensler, HKS

Completion DateJune 2011

The project includes three state of the art theatres, motion capture room, employee fitness center, and cafeteria and day care facility. The team’s involvement during design development resulted in a structural system utilizing which optimized all space requirements by the client. The team organized for an onsite concrete batch plant, which allowed them to place 1,700,000 gross sf of structure in just 8 months. The 17 acres park landscape and interior improvements were sequenced concurrently with the building schedule. The bulk of the interior space was conditioned and serviced through a raised access floor system that allowed for ultimate flexibility in space and programmatic churn while providing the best working environment.

*Project completed by Build Group team member while with previous employer

EXPERIENCE

Electronic Arts Corporate Headquarters*foster city, ca

OwnerElectronic Arts, Inc.

ArchitectsSOM (Building and Campus)Gensler (Interiors)

This 316,000 sf project included a 4-story steel building, a 9,500 sf auditorium and a 232,500 sf 4-story parking structure. The interior portion of the 2 building, phase 1 campus consisted of corporate office space, employee fitness center, cafeteria with commercial kitchen, client training center and central data facility to service the entire build out of the future 6 building campus. Despite approximately 2 months of building permit delays, the job was delivered on-time and on-budget with all critical design and construction criteria met. The project also included complex N+1 redundancy back up for mechanical and electrical systems that would allow the company to operate at a critical level in the event of power failure.

*Project completed by Build Group team member while with previous employer

EXPERIENCE

Oracle Headquarters*redwood city, ca

OwnerOracle Corporation

ArchitectGensler / Korth Sunseri Hagey / Laura Seccombe Design

Project Duration12 years

Over a 12-year period Build Group Principals worked the Oracle Corporate Headquarters. This 1,554,000 sf project included 6 buildings, 4 parking structures containing 4,500 stalls, and 42 acres of park lanscaping. The construction team’s input in the initial stage master design and land planning was critical in seeing this corporate headquarters become a reality.

During the 12 year construction period, onsite construction challenges included: working in and around an active corporate campus; the high demands of schedule dictated by the hiring trends of Oracle; and the integration of high-end finishes and cutting edge materials into each lobby and interior during the final phases of construction.

*Project completed by Build Group team member while with previous employer

EXPERIENCE

Epiphany Hotelpalo alto, ca

OwnerJoie de Vivre Hotels

ArchitectSteinberg Architects McCartan Interiors

Completion DateMarch 2014

The existing building was completely refurbished into a 57,000 sf hotel with lobby, work lounge, restaurant, bar, and 86 luxury hotel rooms and suites. Providing design-build and value engineering services, Build Group supplied invaluable assistance in the constructability of the remodel and helped to optimize the project.

The existing concrete structure originally built in the 1970’s had an unusual Post Tensioned (PT) matt slab requiring special care and sequencing procedures during the seismic retrofit. The team retrofitted the structure by installing a series of reinforced concrete walls, collector beams, and carbon fiber.

EXPERIENCE

Hotel Renoirsan francisco, ca

OwnerKOR Group

ArchitectHornberger & Worstell ArchitectsKelly Wearstler Interior Design

Completion DateSeptember 2015

The existing 83,300 sf historic building will be completely renovated into a high-end, 7-story boutique hotel with 135 rooms. The scope of work involves a large seismic package including new sheer walls in the building. The team will also install 52, 100-foot supporting micropiles underneath the building that will carefully avoid the influence zone of neighboring BART. Historic renovations include replacing transom windows across the top of the historic entrance, replacing the copper cornice at the top of the building, salvaging a fire tank on the roof, and repointing and patching brick exterior.

The ground floor will house two new restaurants and a bar. The basement will have a conference center, gym, and kitchen support space. A full-service kitchen rooftop bar will include 8-foot high glass wind walls around the edge of the building, new landscaping, patio seating, and sliding doors to the outside.

EXPERIENCE

M.Y. China, Signature Restaurantwestfield, san francisco, ca

OwnerM.Y. China

ArchitectBCV Architects

Duration23 weeks

This project included construction of a new signature restaurant at Westfield’s San Francisco Centre. Based on television chef Martin Yan’s recipes, M.Y. China offers a 181-seat, high-end, high-class, exhibition style eating experience. Custom eucalyptus woodwork, laser cut metal screens, and antique Chinese furnishings set the scene for a sophisticated meal.

The eye-catching centerpiece of the restaurants circular bar, is an antique 1,800 pound bell that was imported in from China.

EXPERIENCE

Hog Island Oyster Companysan francisco, ca

OwnerHog Island Oyster Company

ArchitectCCS Architecture

Duration12 weeks

Build Group, Inc. completed construction on the $1.2 million renovation of Hog Island Oyster Company’s restaurant space in the historic San Francisco Ferry Building.

At 3,800 sf, the facility’s new space was reconfigured to triple the existing restaurant and add 1,100 square feet of outdoor dining space. The new 130-seat restaurant features a full-service kitchen and bar, custom concrete bar counters, and reclaimed cypress millwork throughout. The ceiling, designed by CCS Architecture, was constructed to replicate the hull of a boat.

One of the toughest challenges on this job was coordinating the installation of the plumbing work. Since the Ferry Building is located on a pier, all plumbing work needed to be done by boat under the pier which required an extensive amount of coordination. In addition, work had to be completed in and around a fully-occupied building. Weekly meetings were held with the ferry building to constantly update them on our schedule. Any disruptive or noisy work was done off-hours to avoid any interference to the adjacent tenants.

EXPERIENCE

JINS, Flagshipunion square, san francisco, ca

OwnerJINS

ArchitectKwan Henmi Architects

Project Duration15 weeks

The 4,300 sf build-out includes various elements that represent the clients ‘fully-customized’ products. The store includes high-end case work, new facade, ardex polished concrete floors, and back of the house conference rooms and bathrooms.

The focal point of the store is the specialty showcase room that will be used to produce all products on-site. The room was built with epoxy flooring and is encased in glass.

EXPERIENCE

Nespresso, Flagshipunion square, san francisco, ca

OwnerNespresso

ArchitectGoring & Straja Architects

Duration19 weeks

The first signature Nespresso in San Francisco, this Union Square build-out features a modern design in a 100-year-old building. A complete structural rebuild of the first and second floors was constructed to make way for café and retail spaces. The team remained on a tight schedule while coordinating vendors from across the U.S. and Europe that completed high-end finishes. Architectural features include a floating staircase leading customers from the upper café area into the lower retail space.

EXPERIENCE

Kate Spade, Retail Storewestfield, san francisco, ca

OwnerKate Spade, NY

ArchitectFreebaim, Smith & Crane

Project Duration8 weeks

The 2,700 sf Kate Spade retail outlet is located in the Westfield San Francisco Centre Mall. The project included wall-to-wall demolition of the existing store in order to redesign with updated corporate aesthetics and branding. The updates include luxury, high-end brass finishes on all fixtures and fit-outs along with a detailed store front system.

EXPERIENCE

Club Monaco, Retail Storewestfield, san francisco, ca

OwnerClub Monaco

ArchitectAtelier Design, LLC

Project Duration22 weeks

Build Group provided the complete build-out of Club Monaco’s retail store in Union Square. Phase One involved the complete demolition of the existing 4,924 sf store. A portion of the Phase Two redesign work involved the high-end finishes, millwork, and hand-painted custom case work that the client is recognized for. Additionally, our team installed white oak wood floors that are a staple of this location. Build Group installed two, custom painted 12-foot-tall entrance doors, while upgrading the store’s facade.

REFERENCES

REFERENCES

References We work with some incredible clients.

Oz EricksonEmerald Fund415.777.1317

Michael McConeOyster Development Corp415.302.4135

Marc BabsinEmerald Fund415.489.1313

Chris PalermoCrescent Heights415.748.1779

Duane Carlson Carmel Properties408.983.1500

Levon NishkianNishkian Menninger415.541.9477

Joel RoosPacific Union415.929.6708