7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 1/26
PwC
PwC India BI PracticeSelect Case Study*June 2006
*Leading Beverage Company in India
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 2/26
Agenda
PwC Engagement SummaryPwC ApproachProject Key FindingsPwC Recommendations
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 3/26
Section one
PwC Engagement SummaryPwC ApproachProject Key FindingsPwC Recommendations
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 4/26
Slide 4PricewaterhouseCoopersFebruary 2006
CPM Development Cycle
R e s o u r c
e s
Time
CPM Prototype
Subject AreaCPM
Enterprise CPM
Enhancements andMaintenance
CPM Feasibility &Planning
The PricewaterhouseCoopers methodology is built on an Iterative approach, which
stresses rapid development and successive modification of pilot applications using
teams of End Users and Information Technology specialists.
Iterative Methodology for Corporate Performance ManagementSection one
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 5/26
Slide 5Select Case StudyPricewaterhouseCoopers
February 2006
PwC Engagement SummarySection one
Yes
• Which functions to start with?• The best-fit technical architecture
• The phased implementation roadmap
• The TCO
• Why not now?• What are the enabling steps?
• When will be the right time?
Not Now
Should companyimplement theCPM Now ?
• Organizationinformation needs
• Systematicavailability of structured data
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 6/26
Section one
PwC Engagement SummaryPwC ApproachProject Key FindingsPwC Recommendations
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 7/26
Slide 7Select Case StudyPricewaterhouseCoopers
February 2006
Approach Used for the CPM Strategy
Benchmarked
MIS against PwC
maturity model.
Identified user
needs.
Defined draft KPIs
and evaluated source
system readiness.
Evaluated
technology options.
14 options.
Recommended top 2
technology
architecture options.
Concluded on
readiness for the
CPM
Evaluated TCOs
14 options.
Section two
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 8/26
Section one
PwC Engagement SummaryPwC ApproachProject Key FindingsPwC Recommendations
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 9/26
Slide 9Select Case StudyPricewaterhouseCoopers
February 2006
Approach Used for the CPM Strategy
Benchmarked
MIS against PwC
maturity model.
Identified user
needs.
Defined draft KPIs
and evaluated source
system readiness.
Evaluated
technology options.
14 options.
Recommended top 2
technology
architecture options.
Concluded on
readiness for CPM
Evaluated TCOs
14 options.
Section two
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 10/26
Slide 10Select Case StudyPricewaterhouseCoopers
February 2006
Level ISpreadsheet
reporting , no RDBMS
DisciplinedProcess
Level IIPartial spreadsheet
remedy & control
Standard, consistent processautomated and fully supported by IT
Level IIIComplete spreadsheet
remedy & control
Predictable process centredaround a Data Warehouse
Level IVEnterprise BusinessIntelligence reporting
Process extended beyondthe corporate boundaries
Level VInternal/ ExternalInformation Integration
Source: Study of reports and interviews across Unitsand Functions. Scores from PwC template.
Benchmark against PwC Maturity Model
Overall score of Company isclose to III
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 11/26
Slide 11Select Case StudyPricewaterhouseCoopers
February 2006
The Function-wise view
Section three
S c o r e
0
P r i m a r y S a l e s
S e c o n d a r y
S a l e s
M a r k e t i n g
P r o d u c t i o n
F i n a n c e
H R
1
2
3
4
5
Source: Study of reports and interviews across units and Functions.Scores from PwC template.
Good practice score
Company organizationalscore
X
3.75
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 12/26
Slide 12Select Case StudyPricewaterhouseCoopers
February 2006
Approach Used for the CPM Strategy
Benchmarked
MIS against PwC
maturity model.
Identified user
needs.
Defined draft KPIs
and evaluated source
system readiness.
Evaluated
technology options.
14 options.
Recommended top 2
technology
architecture options.
Concluded on
readiness for CPM
Evaluated TCOs
14 options.
Section two
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 13/26
Slide 13Select Case StudyPricewaterhouseCoopers
February 2006
Data & ProcessDefinition
Operational Usage
Business Usage
Central RepositoryData Feed fromMultiple Systems
End User Interface
Business DataDictionary
StandardizationStandardization
Linking Financial and NonLinking Financial and Non --Financial PerspectivesFinancial Perspectives
Faster and Easier Access to InformationFaster and Easier Access to Information
Alerts & Exception ReportsAlerts & Exception Reports
Trends / What if Analysis
Key Requirements : Business Users
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 14/26
Slide 14Select Case StudyPricewaterhouseCoopers
February 2006
A DW-based Performance Management solution as an Answer
END-USER FACEBACK-END FACE
SAP
ScndrySales
MRData
HRData
Others
SourceSystems
D a
t a Q u a
l i t y
F i r e w a
l l
D a
t a I n t e g r a t i o n
P r o c e s s
D a
t a I n t e g r a t i o n
P r o c e s s
ETL Process (Extraction,Transformation, Loading)
DimensionalData Store
DW Engine
E n
t e r p r i s e
D a s
h b o a r d
A d - h o c
A n a l y s
i s
C a n n e
d
R e p o r t s
OLAP (OnlineAnalytical Processing)
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 15/26
Slide 15Select Case StudyPricewaterhouseCoopers
February 2006
Function-wise expression of need for improvement
S c o r e
0
3.82
S a l e s
M a r k e t i n g
F i n a n c e
P r o d u c t i o n
H R
1
2
3
4
5
4.08 4.013.67
4.00
Cut-off score for CPM need
3.5
Section three
Source: Interviews across Units and Functions.Scores from PwC template.
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 16/26
Slide 16Select Case StudyPricewaterhouseCoopers
February 2006
Approach Used for the CPM Strategy
Benchmarked
MIS against PwC
maturity model.
Identified user
needs.
Defined draft KPIs
and evaluated source
system readiness.
Evaluated
technology options.
14 options.
Recommended top 2
technology
architecture options.
Concluded on
readiness for a Data
Warehouse
Evaluated TCOs
14 options.
Section two
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 17/26
Slide 17Select Case StudyPricewaterhouseCoopers
February 2006
Linking Performance Management to Business Processes
ManageCustomer CreditExposure
ProcessOrders
ReleaseOrders for Despatch
Manage &Track Orders
ManageReturns &Exchanges
ManageCollections
Top 5 ObjectivesMaximize toplineMinimize stock-
outsImprovedistributor management
Ensure productavailability as per market demand
Improve servicetime
KPIs linked to Objectives• Gross realization
(Rev per case)
• Net realization(GR – Tax –D&A)
• Forecastaccuracy
• Productionschedulecompliance
• Total freight costper case
• One-way glassreturns(Empties)
• Network days of supply
• Demand at risk
• Order to servicetime
• Invoice time togate-out time
Data SourceData Source• SAP SD
• SAP SD & Excel
• SAP SD
• Excel
• SAP SD
• SAP SD
• SAP SD
• SAP SD
• SAP SD
• SAP SD
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 18/26
Slide 18Select Case StudyPricewaterhouseCoopers
February 2006
Readiness of the source systems
LJLJLMarketing
JKJKLProduction
LLJKJHR
JJJKJFinance
LLLJKSecondarySales
Data
Quality
Data Entry
Time LagStandardizationData Entry
Control
JJJJJPrimary Sales
Usage and
CoverageFunctions
J Ready for DW K Partially ready for DW L Unready for DW
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 19/26
Slide 19Select Case StudyPricewaterhouseCoopers
February 2006
Approach Used for the CPM Strategy
Benchmarked
MIS against PwC
maturity model.
Identified user
needs.
Defined draft KPIs
and evaluated source
system readiness.
Evaluated
technology options.
14 options.
Recommended top 2
technology
architecture options.
Concluded on
readiness for CPM
Evaluated TCOs
14 options.
Section two
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 20/26
Slide 20Select Case StudyPricewaterhouseCoopers
February 2006
4.1 4.07
3.53.1
2.3
2.8
1
2
3
4
5
P r i m a r y
S a l e s
F i n a n c e
M a r k e t i n g
O p e r a t i o n s
S e c o n d a r y
S a l e s H
R
Function Readiness is based on
• Source System Readiness
• Metrics Needed from CPM
Function-wise Readiness
Need VS. Readiness
3.82 4.01 4.083.67 3.82 4
1
2
3
4
5
P r i m a r y
S a l e s
F i n a n c e
M a r k e t i n g
O p e a t i o n s
S e c o n d a r y
S a l e s H
R
Need expressed through the
interviews with the end-users
Function-wise Need for Improvement
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 21/26
Slide 21Select Case StudyPricewaterhouseCoopers
February 2006
Opportunity Matrix
0
20
40
60
80
100
0 20 40 60 80 100
Function-wise Readiness for CPM
F u n c
t i o n - w
i s e N e e
d f o r
C P M
Need vs. Readiness Matrix
These functions needimprovements in the source
systems for effectiveimplementation of DW.
Can be ignored for the timebeing.
These functions are the quick-wins to start the DataWarehousing journey
Lower cost of delivery can bethe only justification to makethese functions adapt to the
DW
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 22/26
Slide 22Select Case StudyPricewaterhouseCoopers
February 2006
Need VS. Readiness
3.82 4.01 4.083.67 3.82 4
1
2
3
4
5
P r i m a r y
S a l e s
F i n a n c e
M a r k e t i n g
O p e a t i o n s
S e c o n d a r y
S a l e s H
R
Need expressed through the
interviews with the end-users
Function-wise Need for Improvement
4.1 4.07
3.3
2.8
21.8
1
2
3
4
5
P r i m a r y
S a l e s
F i n a n c e
M a r k e t i n g
O p e r a t i o n s
S e c o n d a r y
S a l e s H
R
Function Readiness is based on
• Source System Readiness
• Metrics Needed from CPM
Function-wise Readiness
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 23/26
Slide 23Select Case StudyPricewaterhouseCoopers
February 2006
0
20
40
60
80
100
0 10 20 30 40 50 60 70 80 90 100
Function-wise Readiness for CPM
F u n c
t i o n - w
i s e
N e e
d f o r
C P M
The Opportunity Matrix
Function #1 Function #2 Function #4Function #3 Function #5 Function #6
Section three
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 24/26
Slide 24Select Case StudyPricewaterhouseCoopers
February 2006
Approach Used for the CPM Strategy
Benchmarked
MIS against PwC
maturity model.
Identified user
needs.
Defined draft KPIs
and evaluated source
system readiness.
Evaluated
technology options.
14 options.
Recommended top 2
technology
architecture options.
Concluded on
readiness for CPM
Evaluated TCOs
14 options.
Section two
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 25/26
Slide 25Select Case StudyPricewaterhouseCoopers
February 2006
The Evaluation Methodology
Short-listed tools for each layer 1
Arrived at 14 probable combinations2
Evaluated tools in each layer usingPwC template and company weights3
Went through vendor presentations4
Eliminated 8 out of 14 options5
Compared TCO and fitment of top 6options6
Recommended final 2 options7
7/30/2019 Beverage Company Case StudyV02
http://slidepdf.com/reader/full/beverage-company-case-studyv02 26/26
© 2006 PricewaterhouseCoopers. All rights reserved. “PricewaterhouseCoopers” refers to the networkof member firms of PricewaterhouseCoopers International Limited, each of which is a separate and independentlegal entity. *connectedthinking is a trademark of PricewaterhouseCoopers LLP (US). PwC
Thank you