GED3(Gaseous Effluent Discharge reporting system v3)

Bernhard WarrRadiation Protection SpecialistDEAL, GE Healthcare

2 /GE Title or job number /

26/11/2009

• Business started in the 1940s by Dr William Grove.

• Primarily making luminous dials.

• 50s & 60s, primarily involved in Ra-226 business, waste products Ra-226 & Rn-222.

• 70s & early 80s, primarily involved in QSA source business, calibration & test sources, life sciences work involving H-3, C-14, significant quantities of Am-241 from AmBe neutron sources, also of Cs-137.

• Late 80s & 90s, increasing quantities but reducing variety of life sciences & medical isotope manufacture, primarily S-35, I-125, I-131, Sr-90, Mo-99/Tc-99m, Se-75, Tl-201, Ga-67.

• 2000s, introduction of F-18 manufacturing.

A bit about The Grove Centre(Amersham plc, Amersham Intl, Nycomed Amersham, The Radiochemical centre)

3 /GE Title or job number /

26/11/2009

• Based at the Grove Centre in Amersham.

• Provide Dosimetry to GEHC sites at Amersham, Harwell, Cardiff, Slough & Hammersmith.

• Run Gaseous Effluent Discharge programs required by EA Authorisation under RSA93 at The Grove Centre and Harwell.

• Run Environmental Monitoring program at The Grove Centre.

• Run Workplace Air Sampling (WAS) and Personal Air Sampling (PAS)programs at The Grove Centre.

• Provide public dose assessment services to all GEHC facilities in the UK.

A bit about DEAL (Dosimetry & Environmental Assessments Laboratory)

4 /GE Title or job number /

26/11/2009

RW/RW/18

Rn-222

I-125

I-131

Se-75

H-3

All other Alpha

All other Beta > 0.4MeV

All other radionuclides

Old Authorisation (RW/RW/18)

(April 1992-April 2004)

BE9241

Rn-222

I-125

I-131

Se-75

H-3

All other Alpha

All other Beta > 0.4MeV

All other radionuclides

Other noble gases (Xe & Kr)

S-35

New Authorisation

(April 2004-)

Amersham plc

ALL DISCHARGES

The Grove Centre

DECOM & POCO OPERATIONS

Plus

Indicate on monthly report

when greater than 50% of the discharge value

is made up of measurements

below the MDL

Include fraction of D&P limits, fraction of operations limits & fraction of total limits. (D&P + operations ≠ total)

Why develop a new system?

5 /GE Title or job number /

26/11/2009

March 2008 discharge return

6 /GE Title or job number /

26/11/2009

GED3 - Benefits

GED 2.5 (Old System):

• Approximately 7000 pieces of data checking per month

• No sample managementfunctionality

• Single user MS Excel spreadsheet

• Separate systems for GC & Harwell

• Validated to GxP standard after production

GED3:

• Approximately 150 pieces of data checking per month

• Sample tracking from deployment to reporting stage

• Web based multi-user system with varying permissions and in-built reporting tools

• One single system with site level access

• Designed, validated and tested to GxP standard

• As future-proof as we can be

7 /GE Title or job number /

26/11/2009

The development process

• Choice of offshore or in-house development models.

• Offshore development chosen for business reasons.

• Developed with GxP validation in mind, ie robust change control, division of administrative/technical duties.

• Produced URS (User requirement Specification)

– FRS (Functional Requirement Specification)– Prototype

– UAT (User Acceptance Testing)– Iterative testing

– PQ (Performance Qualification) prior to the move to validated TGC data-centre– Parallel Run (3 months)

– Acceptance into service

8 /GE /

26/11/2009

Automatic sample counters

(Tennelec)

TGC Particulate measurements

Work Area Samples (WAS)

Personal Air Samples (PAS)

DRKS2

PAS Report

WAS Report

GED Report (TGC)

Harwell Particulate Measurements

GED Report (HIBC)

SpreadsheetF-18

Manual entry

Y-spec, Radon, H-3, S-35

Harwell C-14, H-3 & Radon measurements

How does it work?

9 /GE Title or job number /

26/11/2009

1000 cts

Data can be:

- Rejected (deleted)

- Referred (by email)

- Edited

- Advanced

100 cts

1000 cts

Trust Level 2 – Reportable DataTrust Level Null

Trust Level 1 Validation

User 1

User 2

1200 Bq

850cts

� 9500 Bq

Trust Level 1

Trust Level 2 Validation

Admin

Only an Administrator can change data in

Trust Level 2

The ‘Trust-Level’ process

10 /GE Title or job number /

26/11/2009

To the system itself

11 /GE Title or job number /

26/11/2009

Lessons learnt & questions raised?

• In-house development may be more expensive, but is definitely easier!

• What is the right validation standard to apply? GxP? S-OX?

• Build in as much future-proofing as you can.

• Never assume that your requirements have been interpreted correctly.

• A system is as only as good as it’s testers (test, test and test again).

• Can any system ever be 100% perfect?

• Should regulators assume that this is possible?

12 /GE Title or job number /

26/11/2009

Thanks for listening…

…any questions?