![Page 1: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/1.jpg)
Bentley promis•efor Rail and Signalling Electrical Schematics
![Page 2: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/2.jpg)
Business Issues
1. Deliver projects and designs quicker
2. Manage late changes
3. Provide accurate information for construction
4. Commissioning
5. Work with many different stakeholders
6. Create high quality records for long term maintenance
![Page 3: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/3.jpg)
What is promis•e
• promis●e is a MicroStation or AutoCAD based program that enables you to create “intelligent”electrical signal drawings and all supporting documentation and rack layouts
![Page 4: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/4.jpg)
What is it used for?
• Promis•e
– General electrical design
– Simple to use
– CAD independent
– Global usage in infrastructure, plant, building
• More than 50,000 users worldwide…
![Page 5: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/5.jpg)
SQL Server or Oracle Database
• The project database supports the following database management systems:
• By default the software installs SQL Server 2005 Express. You can use SQL Server Management Studio Express to perform administrative tasks.
• All projects are stored in one SQL / Oracle Database so users do not need administrative rights to create new projects.
Database
•SQL Server 2000
•SQL Server 2005 Express
•Oracle 9i / 10g
![Page 6: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/6.jpg)
Multi-User Environment
Oracle / SQL Database
Real Time Collaboration
Projects
Vendor Data
Cell Libraries
User 3User 1
User 2
![Page 7: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/7.jpg)
Design and Architecture
• The software is designed using 4 related APIs which communicate with one another and with the databases and CAD engines.
Database API
SQL/Oracle
![Page 8: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/8.jpg)
Catalogue Manager
![Page 9: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/9.jpg)
![Page 10: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/10.jpg)
![Page 11: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/11.jpg)
Signalling Specific Requirements
![Page 12: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/12.jpg)
Signalling Specific Requirements
•• Create new or modify existing Create new or modify existing interlockingsinterlockings
•• MultiMulti--user editing of user editing of interlockingsinterlockings
•• Rapid creation of wiring schematicsRapid creation of wiring schematics
•• Auto generation of wiring schedules and tablesAuto generation of wiring schedules and tables
•• Intelligent rules based connectionsIntelligent rules based connections
•• Schedules and tables linked to schematicsSchedules and tables linked to schematics
•• Creation of rack layouts linked to schematicsCreation of rack layouts linked to schematics
•• AutoAuto--Generation of plans and documentationGeneration of plans and documentation
![Page 13: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/13.jpg)
Typical Signalling Components
• Components– Relays and SSI
– Terminals and Fuses
– Power supplies
– Event recorders
• Connections– Internal wires
• Shielded
• Twisted pair
– External Cables
• Multi-core
• User Definable
![Page 14: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/14.jpg)
Workflow
![Page 15: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/15.jpg)
Crossing Gate Control Circuits
![Page 16: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/16.jpg)
Track Circuit
![Page 17: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/17.jpg)
Control Circuit
![Page 18: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/18.jpg)
Pin Assignments
![Page 19: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/19.jpg)
Rack and Board Layouts
• Place and edit rack components
• Synchronised to schematic wiring layout
• Multiple component representation
• Allows for multi-rack drawings
• Schematic and rack reconciliation
• Relays placed in rack are available in schematics
![Page 20: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/20.jpg)
Rack and Board Layouts
![Page 21: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/21.jpg)
Report Formats
Wire list
Bill of Materials
Field Cable List
Job Cost
PLC I/O
![Page 22: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/22.jpg)
Promis•e Key Benefits
• Concurrent users – accelerated delivery
• Rapid design – improved productivity
• Automated scheduling – accuracy
• Project based design – avoids duplication
• Electrical object rules – reduces errors
• Real time error checking – reduces checking cycles
• Fast change – reduces turn round time
• Automation – reduces impact of late changes
• Configure standards – compliance
![Page 23: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/23.jpg)
Solving Business Issues
1. Deliver projects and designs quicker
2. Manage late changes
3. Provide accurate information for construction
4. Commissioning
5. Work with many different stakeholders
6. Create high quality records for long term maintenance
![Page 24: Bentley Rail - Promis.e for Rail and Signalling Electrical ... · Signalling Specific Requirements • Create new or modify existing interlockings • Multi-user editing of interlockings](https://reader030.vdocuments.site/reader030/viewer/2022040902/5e73d422d4877f46b7418b12/html5/thumbnails/24.jpg)