benchmark lag plumbing modeling gwcc demo
TRANSCRIPT
Submitted By :
London Infotech Inc.
Client Name:
Project Name:
Contents :
Gateway Community College
New Haven, Connecticut.
Value: 200,000,000.00
Scope of Work
Project approach
Project Scheduling & Deliverables
Current Status
Progress Images
PMP - RFI / FYI
Next set of tasks
Date: 03.19.2010
Construction Coordination Services
GC: Dimeo ConstructionSub: Mechanical Plumbing & Heating
• 2D to 3D Design Conversion
• Shop Drawings For Construction
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
2
Scope of Work
Scope Boundary
We have linked the Structure CAD model to Origin in Revit. The
Plumbing model in Revit gets perfectly linked to the structure
model when linked “Origin to Origin”.
Shared Co-ordinates
Since the plumbing model gets linked with structure through
Origin, shared co-ordinates have not been published.
Project Origin
Project Levels
Project levels are taken from the Architectural Sections
downloaded from the Dimeo FTP site.
Note: Annotation and Sheet Layout were removed from the scope
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
3
Project Schedule, Deliverables & Status
Project Schedule – LII Calendar
We will be sending all Revit, Navisworks & CAD files for
Plumbing at each deliverable time. (9th,16th & 19th March).
Current Status as on 2010.03.15
5th Feb, Project Startup
19th March, Final Submission
13th Feb, First Floor Co-ordination
16th Feb, Second Floor Co-ordination
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Lower Level - North
First Floor - South
First Floor - North
Seconf Floor - South
Seconf Floor - North
Third Floor - South
Third Floor - North
Fourth Floor - South
Fourth Floor - North
Lower Roof - South
Lower Roof - North
Upper Roof - South
Upper Roof - North
Plumbing
Plumbing
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
4
Extracts from completed scope
Modifications as per co-ordination drawings
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
5
Extracts from completed scope
Modifications as per co-ordination drawings
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
6
Extracts from completed scope
Entire Model Created in Autodesk Revit MEP- Complete Material List and Database Available
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
7
Extracts from completed scope
Project Origin- Piping Network Created Inside Structural Steel Model and Clashed Against Other Trades Pre-Construction
Notes
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
8
Extracts from completed scope
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
9
Extracts from completed scope
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
10
Extracts from completed scope
Notes
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
11
Extracts from completed scope
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
12
Extracts from completed scope
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
13
Extracts from completed scope
Project Submittal ReportBenchmark Line & Grade Inc – Gateway Community College
14