www.energy.gov/EM 1 Idaho Cleanup Project (ICP) Solid Waste Management December 4, 2013 Ben Roberts Federal Project Director for Solid Waste Disposition Nolan Jensen Federal Project Director for Soil and Water Remediation

Upload: ngothu

Post on 02-Jan-2017

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Ben Roberts Nolan Jensen

www.energy.gov/EM 1

Idaho Cleanup Project (ICP) Solid Waste Management

December 4, 2013

Ben Roberts Federal Project Director for Solid Waste Disposition

Nolan Jensen Federal Project Director for Soil and Water Remediation

Page 2: Ben Roberts Nolan Jensen

www.energy.gov/EM 2

Agenda

• Background/Requirements Drivers

• Overview of Scope Elements

Page 3: Ben Roberts Nolan Jensen

www.energy.gov/EM 3

3

Site Map

Page 4: Ben Roberts Nolan Jensen

www.energy.gov/EM 4

Regulatory Drivers

4

Idaho Settlement Agreement • All Legacy TRU waste subject to Idaho Settlement Agreement removed from

Idaho by 12/31/2018 RCRA Site Treatment Plan • Provides framework for mixed waste management at INL Site including

Calcine

CERCLA Federal Facility Agreement/Consent Order • Governs environmental restoration activities • Sub-surface Disposal Area (SDA) • Idaho CERCLA Disposal Facility

General Compliance Drivers

• Laws, Regulations, DOE Orders

• Permits

• Records of Decision

Page 5: Ben Roberts Nolan Jensen

www.energy.gov/EM 5

Idaho CERCLA Disposal Facility

LLW/MLLW & TRU storage

RH-TRU Processing

RH-TRU processing, Characterization, & shipping

Page 6: Ben Roberts Nolan Jensen

www.energy.gov/EM 6

Subsurface Disposal Area Accelerated Retrieval Project (ARP)

AMWTP

Sludge Repackaging Project

CERCLA

RCRA

RH-LLW disposal

Page 7: Ben Roberts Nolan Jensen

www.energy.gov/EM 7

Elements of Scope

2. Solid Waste Management

• CH-TRU • Complete shipment of AMWTP (above ground TRU & primary MLLW) by 12/31/18

(1st qtr. 2019)

• Market AMWTP capabilities for use on off-site waste

• RCRA Closure of AMWTP facilities by 2024

• Accelerated Retrieval Project (ARP) • Construct ARP IX Exhumation Enclosure

• Design and Construction (2016 – 2018)

• Complete exhumation (ARP VIII and IX by 2023) – Ship by 2024

• RH-TRU • Continue to operate RH-TRU program through 2024 (CPP-659 & CPP-666)

• Ship remaining Settlement Agreement waste by 12/31/2018

• Coordinate RH-TRU processing among EM, NE, NR

• May require identification of new waste streams to support ongoing mission

Page 8: Ben Roberts Nolan Jensen

www.energy.gov/EM 8

Elements of Scope

2. Solid Waste Management (continued)

• LLW/MLLW • Process waste as generated from EM operations

• Operate Idaho CERCLA Disposal Facility (ICDF)

• Close RH-LLW Disposal Facility at RWMC • Cease disposal of NRF RH-LLW Waste by 2020 (Operations at full cost recovery from NR)

• Complete DOE Order 435 closure process by 2023

• Disposition IWTU and PEW secondary system rinse and decontamination liquids after SBW processing complete

• Disposition U-233 waste to Waste Control Specialists

• Waste Characterization (Exhumed Buried Waste) • CH-TRU

• MLLW

Page 9: Ben Roberts Nolan Jensen

www.energy.gov/EM 9

• Interdependencies and Interfaces

• ARP (exhumed buried waste), and RH-TRU utilize the CCP Contractor for TRU waste characterization and certification.

• AMWTP, ARP, and RH-TRU utilize WIPP shipping assets.

Page 10: Ben Roberts Nolan Jensen

www.energy.gov/EM 10

2

1

4

3 3 3 3

4

4

5

4

6

•Treatment - 1

• Retrieval - 2

• Storage - 3

• Characterization - 4

• Payload - 5

• Shipping - 6

3

3

Advanced Mixed Waste Treatment Project (AMWTP)

1

1

3

Page 11: Ben Roberts Nolan Jensen

www.energy.gov/EM 11

AMWTP Waste Retrieval

Degraded Box.

Page 12: Ben Roberts Nolan Jensen

www.energy.gov/EM 12

AMWTP Waste Retrieval

Degraded Drums.

Page 13: Ben Roberts Nolan Jensen

www.energy.gov/EM 13

AMWTP Treatment Facility

13

Top Left: AMWTP Treatment Facility.

Bottom Left: Boxline waste processing

trough and Brokk

Bottom Right: A Brokk manipulator

processing boxed waste

Page 14: Ben Roberts Nolan Jensen

www.energy.gov/EM 14

AMWTP Characterization and Supercompactor

The real-time radiography x-ray of a drum. Supercompactor Glovebox.

Supercompactor

Page 15: Ben Roberts Nolan Jensen

www.energy.gov/EM 15

AMWTP Waste Storage

100 Gallon Product Drums

55-Gallon Drums Ten Drum Overpacks

Standard Waste Boxes

Waste Boxes and MacroPacks

Page 16: Ben Roberts Nolan Jensen

www.energy.gov/EM 16

AMWTP Loading and Shipping

Top Left: Workers load a TRUPACT II

container.

Bottom Left: Loaded TRUPACTs ready for

shipment to WIPP

Top Right: Loaded Macropacks ready for

shipment to NNSS

Page 17: Ben Roberts Nolan Jensen

www.energy.gov/EM 17

LLW/MLLW & RH-TRU Storage

RH-TRU Processing

RH-TRU Processing, Characterization, & Shipping

Remote Handled Transuranic Waste Project (RH-TRU)

Page 18: Ben Roberts Nolan Jensen

www.energy.gov/EM 18

RH-TRU Waste Retrieval/Transport

Truck Loaded with Facility Transfer Container

Page 19: Ben Roberts Nolan Jensen

www.energy.gov/EM 19

RH-TRU Waste Repackaging

Prohibited Item Removal from Waste

Container Cutting Product Drum Removal

Waste Removal from Container

Page 20: Ben Roberts Nolan Jensen

www.energy.gov/EM 20

RH-TRU Characterization and Shipping 20

RH-72B Loading

Impact Limiter Installation Loaded RH-72B

Characterization

Page 21: Ben Roberts Nolan Jensen

www.energy.gov/EM 21

ARP VIII

ARP Steel Frame being Erected

Buried Waste Accelerated Retrieval Project

Page 22: Ben Roberts Nolan Jensen

www.energy.gov/EM 22

Maintenance in Air Lock

Page 23: Ben Roberts Nolan Jensen

www.energy.gov/EM 23

Exhumation in ARP VII

Drum Packaging Station

Close Circuit TV Room

Page 24: Ben Roberts Nolan Jensen

www.energy.gov/EM 24

Waste Sorting in Drum Packaging Station Glove Box

Drum Packaging

Page 25: Ben Roberts Nolan Jensen

www.energy.gov/EM 25

ARP Area

(acres)

Acres Complete 9/23/2013

Acres Remaining 9/23/2013

Anticipated by

10/1/2015 Status

ARP I 0.5 0.5 0 0 Waste exhumation complete and retrieval enclosure demolished

ARP II 0.34 0.34 0 0 Waste exhumation complete and retrieval enclosure in standby awaiting retrieval from ARP III waste transfer vestibule

ARP III 0.43 0.38 .05 0 Retrieval enclosure in standby awaiting retrieval of 0.05 acres from area obstructed by a waste transfer vestibule

ARP IV 0.79 0.79 0 0 Waste exhumation complete and retrieval enclosure in standby

awaiting demolition

ARP V 0.55 0.55 0 0 Waste exhumation complete and retrieval enclosure in use for

repackaging sludge waste from the Advanced Mixed Waste

Treatment Project

ARP VI 0.4 0.4 0 0 Waste exhumation complete and retrieval enclosure demolished

ARP VII 0.27 0.15 .12 0 Retrieval enclosure in standby awaiting retrieval of remaining 0.12 acres by September 2015

ARP VIII 1.72 0 1.72 <1.38 Retrieval enclosure construction complete March 2013

ARP IX 0.69 0 .69 .69 Retrieval enclosure design and construction in the future

Total 5.69 3.11 2.58 <2.07

Status of Accelerated Retrieval Project (ARP)

Page 26: Ben Roberts Nolan Jensen

www.energy.gov/EM 26

Sludge Repackaging Project in ARP V

Sludge drum handling

Excavator emptying a drum

Page 27: Ben Roberts Nolan Jensen

www.energy.gov/EM 27

Organic Contamination in the Vadose Zone (OCVZ)

One of three functioning vapor extraction units

Inside Vapor Extraction Unit

Vapor Sampling

Page 28: Ben Roberts Nolan Jensen

www.energy.gov/EM 28

Idaho CERCLA Disposal Facility (ICDF)

Page 29: Ben Roberts Nolan Jensen

www.energy.gov/EM 29

Grouting Waste

Hot Cell Disposal

ICDF continued

Page 30: Ben Roberts Nolan Jensen

www.energy.gov/EM 30

RH-LLW Disposal