Page 1: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

BELENE NUCLEAR POWER PLANT

March 1, 2013

Page 2: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Introduction

o Electricity Generation – 45 710 GWh

• Total Carbon Free – 52.72%

� Nuclear Power – 44.61%

• Imported Coal and Gas Fired – 18.97%

Electricity Production in 2006

Page 3: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Power Supply and DemandIntroduction

Page 4: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

System Adequacy

South Eastern UCTE block:

� The remaining capacity of the block is low and reliability is not ensured over 2006 on to 2015.

� Margins are 3 GW below ARM for summer load and 1 GW below for winter peak in 2008

� The situation will be worsened if expected investments are not realised. (only 1.5 GW are planned to be commissioned from 2006 to 2010)

Introduction

Page 5: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Romania + Bulgaria block:

• Generation capacity is decreasing slowly from 2006 to 2010 but adequacy is achieved for this period.

• ARM is just met in summer 2010

• In 2015 the NGC remains at the same level as 2006 : additional investments up to 2 GW are needed to meet the ARM.

Introduction

Page 6: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

In 18 European countries

o there are approx. 200 NPP with an installed net capacity of roughly 170 000 MW

In Bulgaria

o Kozloduy NPP - 6 units with installed capacity of 3760 MW

• U1&2 shutdown in 2002

• U3&4 shutdown in 2006

• U5&6 in operation

• Total 141 reactor-years operational

experience

o Belene NPP – 2 units under construction with installed capacity of 2000 MW

Nuclear Energy in the European Energy MixIntroduction

Page 7: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

1950 2010 1990 1970 2030 2050

Fusion

Generation IV (future concepts on paper)

Generation III (EPR, EPP, SWR 1000, ABWR, AES 92, AP1000, ACR 1000)

Generation II (PWR, BWR, RBMK, AGR, Candu, FBR)

Generation I

All NPPs in operation

Nuclear New Build R&D Status

Only few NPPs still in

operation

Nuclear Technology in Continuous DevelopmentIntroduction

Page 8: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Notification under Euratom Treaty Investment Project

o Article 105:

• The agreement for construction of Belene NPP between NEK and Atomstroyexport JSC was signed in November 2006 as a Turn Key EPC Contract

• The Agreement has been sent under article 105 of Euratom Treaty to the EC before the end of January 2007

o Article 41:

• Communication of an investment project under Article 41 Euratom Treaty: The construction of a new nuclear power plant “Belene” provided on 23 February 2007

• Additional information requested

• The supplementary information by answering the questions provided

• To help the preparation of the Commission Point of View a meeting was organized on 6 July 2007 with the possibility to present the Belene project

Page 9: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Investment Project: Summary of the Q/A process

Question/Answer sequence: � First set of questions received on 26 April 2007

� All answered on 23 May 2007

� Second set (of 5) questions received on June 22, 2007

� Third set (of 2) questions received on June 26, 2007

Grouping of the questions: � Financing aspects 15 questions � Decommissioning plans 12 questions � Radwaste generation/treatment 12 questions � Fuel type and supply 9 questions � Installation/systems features 9 questions � Owner/Supplier/Subcontractors 8 questions � Licensing process 7 questions

Notification under Euratom Treaty

Page 10: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Fuel Supply Contracts

o Main Task: • To ensure security of nuclear supplies to all users in the Community

o Instrument: • Common supply policy based on equal access of Utilities to source of supply

o Powers: • Exclusive right to conclude contracts for the supply of nuclear materials

o Conclusion of the Supply Contracts: • When there is transfer of ownership • Applies to all supply contracts from Inside and Outside the Community • Have to be concluded by ESA to be valid under Community law

o Notification of contracts as an exception to their conclusion: • When the material is to return to the principal

o Before the submission to the ESA: • Parties negotiate the supply contracts without ESA participation • Parties always submit the draft contracts to ESA for advice

o If the ESA agrees with the contract: • ESA concludes the contract by co-signing the 3 originals • ESA returns 2 originals to the parties

Notification under Euratom Treaty

Page 11: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Project Status Decision Making Process

o Decision to Re-activate BNPP December 2002

o Decision in principle April 2004

o Final Decision April 2005

Page 12: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Public Procurement Order

o NEK decision for Public Procurement Order 10 May 2005

o Announcement of Public procurement order 11 May 2005

o Applications submittal 27 June 2005 • JSC ASE • Skoda Alliance

o Pre-qualification of candidates 19 July 2005 • JSC ASE • Skoda Alliance

o Bids submittal 1 Feb 2006 • 62 000 pages of offer documentation

o Review and Clarification 1 Feb / 26 July 2006 • 1580 written questions submitted to the two Candidates • 1840 negotiation positions agreed

o Bids Evaluation 26 July / 29 Oct 2006 • Evaluation Report in nine volumes, more than 3 500 pages

Project Status

Page 13: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Project Objectives

o Belene NPP design is based on proven and advanced features

o Evolutionary approach has been carefully selected:

� it is considered as the best approach for large power plants

� it allows to benefit fully from operating experience

� it minimizes the risk for investors and operators

o Belene NPP safety is at the highest level

o Belene NPP benefits from large operating experience

feedback and comprehensive R&D program

o Belene NPP provides efficient and friendly operating and maintenance conditions

o Belene NPP is designed to achieve high efficiency, high availability and low operating

costs

Project Status

Page 14: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Bid Invitation Specification

o Basic Safety Principles for Nuclear Power Plants, INSAG-12, 1999

o Quality Assurance for Safety in Nuclear Power Plants and Other

Nuclear Installations, 50-C/SG-Q, 2001

o European Utility Requirements for LWRs

• General Requirements

• Nuclear Island Requirements

• Power Generation Plant Requirements

o FIDIC Silver book

Project Status

Page 15: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Scope of Supply and Services

o Base option • NPP as a whole • Fuel Supply and SF Management

o Alternative options • Nuclear Island • Turbine Island • Fuel supply and SF Management

o Approach • Completion or • Green Field

Fuel Supply

Spent Fuel

Turbine IslandNuclear Island

Balance Of Plant

I&C

Project Status

Page 16: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Criteria for Limited Impact

No Emergency Protection Action beyond 800 m No Long Term Action beyond 800 m

Limited economic impact No Delayed Action beyond 3 km

o Release Targets for Design Basis Category 3 and 4 Conditions • no action beyond 800 m • limited economic impact

o Criteria for Limited Impact for Design Extended Conditions • no Emergency Protection Action beyond 800 m • no Delayed Action beyond 3 km • no Long Term Action beyond 800 m • limited economic impact

Project Status

Page 17: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Economic Bid Evaluationo IAEA Methodology o IAEA Software – BidEval 3.0: • IAEA Account system:

� Capital Investment Costs

� O&M Costs

� Fuel Costs

� Decommissioning Cost

� Radioactive Waste Management Costs

� Financial and other Costs

• Levelized electricity cost

Project Status

Page 18: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Highlights of Evaluation V 466 Evolutionary Design vs V 320 Serial Design

0 50 100 150

V 320

V 466

%

Annual Electricity Production

0 50 100 150

V 320

V 466

%

Annual Uranium Consumption

0 50 100 150

V 320

V 466

%

Annual Spent Fuel Generation

0 50 100 150

V 320

V 466

%

Current Levelized Electricity Cost

Project Status

Page 19: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Early Large Release Frequency

0 50 100 150

V 320

V 466

%

-99.95%

V 320 Serial Design V 466 Evolutionary Design

Reactor Protection System 1x100% 1x200%

Fast Boron Injection System 0 4x25%

Safety Protection Systems including

DG+UPS+I&C+HVAC+SW

3x100% 4x100%

Passive ECCS 4x50% 4x50%+4x33%

Passive Heat Removal System 0 4x33%

Melted Core Retention and Cooling System 0 1x100%

Project Status Highlights of Evaluation V 466 Evolutionary Design

vs V 320 Serial Design Core Damage Frequency

0 50 100 150

V 320

V 466

%

-98.5%

Page 20: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Sensitivity Analysis V 466 Evolutionary Design

90,9

111,1

100,0

80

85

90

95

100

105

110

115

-15% -10% -5% 0% 5% 10% 15%

Average Load Factor

100,0

100,4

99,6

80

85

90

95

100

105

-15% -10% -5% 0% 5% 10% 15%

Escalation Rate

103,2

100,0

96,9

80

85

90

95

100

105

-15% -10% -5% 0% 5% 10% 15%

Discount Rate

102,2

100,097,9

80

85

90

95

100

105

-15% -10% -5% 0% 5% 10% 15%

Interest

Project Status

Page 21: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Public Procurement Order

o Contractor of NPP Belene Selected 30 Oct 2006

• JSC Atomstroyexport as Main Contractor

• Areva NP and Siemens as Main Foreign Subcontractor

o Agreement between NEK and ASE signed 29 Nov 2006

Project Status

Page 22: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

General Data

Reactor type PWR

Plant supplier ASE, AREVA NP

Reactor thermal power 3012 MW

Electric output 1049 MW

Net efficiency 35 %

Capacity factor 90 %

Design Life Time 60 years

Project Status

Page 23: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment

Reactor type PWR Russian Design

VVER 1000/V 466

Reactor thermal power 3012 MW

Service Life 60 years

Loops 4

Core inlet temperature 289 C

Core outlet temperature 321 C

Coolant pressure 15.7 MPa

Direct Safety Injection in RPV

Emergency Steam-Gas

Removal System

Project Status

Page 24: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment: Core

FA Type Advansed with

bow resistant skeleton

FA Number 163

FR Number 312

Fuel material UO2

- Average enrichment 4.361% UO2

- Integrated burnable absorber 5% Gd2O3

Skeleton material

- SG and GT Zr Alloy

FP burn up 66.6 MWd/kg U

FR burn up 61.2 MWd/kg U

Average FA burn up 55.0 MWd/kg U

Project Status

Page 25: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment: Steam GeneratorsSG Type Horizontal Heat transfer capacity 4x753 MW Mass of water 4x63 t Steam flow 4x408 kg/s Steam pressure 6.72 MPa Steam moisture 0.2% Feedwater temperature 220 C Fast acting steam dump valve 4x250kg/s Main Steam Safety valves 4x2x258 kg/s

ggg pppMain Steam Safety valves

Project Status

Page 26: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment: Pressurizer

Pressure 15.7 MPa Temperature 346 C Volume 79 m3

Water volume 55 m3

Steam volume 24 m3

PSVs 3 PSV flow (steam/water) 55/222 kg/s PSV Lift-up set points 18,1/18,6 MPa

Project Status

Page 27: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment

Turbine K-1000-60/3000

Type HP+4xLP

Speed 3000 rev/min

Bypass 8*125 kg/s (62% of nom. power)

Generator TVV-1000-2UZ

Rated output 1111 MVA

Voltage 24 kV

Frequency 50 Hz

Project Status

Page 28: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment: Electrical Systems

Main Transformers 2x630 MVA

Voltage 24/400 kV

Auxiliary Transformers 2x63 MVA

Voltage 24/6.3 kV

Start up Transformers 2x63 MVA

Voltage 110/6.3 kV

Emergency DG 4x6.3 MW

Additional DG 2x6 MW

Project Status

Page 29: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Equipment: I&C Systems

Hierarchical structure of safety I&C

Hierarchical structure of normal operation condition I&C

Project Status

Page 30: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Operating and Maintenance

� Large operating margin and outstanding flexibility to accommodate the various

needs of the utilities:

� Cycle Length 12 to 24 months

� Average outage time for maintenance and refueling below 20 days (refueling

outage 14 days)

� Operator friendly man-machine interface

� Simplified maintenance (4 trains, digital I&C,….)

� Preventive Maintenance of the 4 train systems during power operation: SIS/RHRS,

EFWS, Emergency Diesel Generators (EDGs), Component Cooling Water System

(CCWS), Essential Service Water System (ESWS)

� Enhanced radiological protection

� Less waste and effluents

Project Status

Page 31: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Safety FeaturesProject Status

Page 32: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Safety Objectives – A two fold strategy:

1. Enhancement of the prevention level of the defense in depth safety concept, particularly to reduce significantly severe accident probability

2. Mitigation of severe accidents consequences up to and including core meltdown accidents

Safety FeaturesProject Status

Page 33: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Original VVER Design Safety Features

In Containment Passive ECCS

(4x50 m3)

Direct Safety Injection into RPV

SIS suction line directly linked to IRWST

Accident Steam-Gas Removal System

Lower core elevation relative to the cold leg cross over piping

Larger SG and Pressurizer volume

Large water source in the IRWST, draining by gravity into the corium retention area

Project Status

Page 34: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Main Safety SystemsProject Status

Double Containment with

Ventilation and Filtration

Passive Heat Removal System

ECCS - Water Reserves inside the

Containment (1910 m3)

IRWST – 750 m3

ECCS I – 4x50 m3

ECCS II – 8x120 m3

SG Emergency Cooling and Blow

down System

Fast Boron Injection System

Melted Core Catcher

Page 35: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Containment Structure

Primary Containment:

- pre-stressed reinforced concrete

- leak tight metal liner

Secondary Containment:

- reinforced concrete

- leak tight metal liner

DBA and BDBA Conditions:

- Pressure – 0.5 MPa

- Temperatire – 210 C

- Radiation – 0.277 Gy/h

- Volume H2 Concentration – 1.5%

Project Status

Page 36: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Severe Accident Management Systems

Passive Heat Removal System - Natural recirculation driven

- Capacity 4x33%

Project Status

Page 37: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Severe Accident Management Systems

Corium retention and cooling area

Capacity 1x100%

Strategy:

- prevention of basemat concrete erosion

- maintain containment integrity

Measures:

- core catcher on basis of a melt retention

concept

- water cooling from top and bottom

Result:

- stabilization of melt on defined area

- solidification of core melt within 3 to 5 days

Project Status

Page 38: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Severe Accident Management Systems

Hydrogen Mitigation System

- 154 Catalytic recombiners

- Maximum hydrogen concentration in the long term –

0.56%

- Local peak hydrogen concentration in any time in dry

air condition – 1.8%

- Local peak hydrogen concentration in any time if

partial inertisation by steam exist – 0.7%

Project Status

Page 39: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Severe Accident Management Systems

Passive Leak Purification System

- Convection driven

- Purification Efficiency

- Aerosols – 99.9%

- Molecular Iodine – 99.9%

- Organic Iodine – 99.0%

- Leak Purification Flow – up to 500 kg/h

Project Status

Page 40: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Basic DiagramProject Status

Page 41: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Protection against External Hazards

UCA

4

UCB

3 2

1

UJA UKC

UKA

Reactor building, Fuel building, Safety Systems Building,

Main Control Room, Remote Shut down Building - protected

against the impact by design

The DG Building 1, 2 and 3, 4 - protected against the impact

by separation

Reinforced Concrete Protection

Protection by separation

Standard Protection

Project Status

Page 42: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Licensing Status

o Pre-project Phase

• Data Gathering 2002-2003

• Feasibility Study 2003-2004

• Environmental Impact Assessment 2003-2004

• EIA Approval November 2004

• Public Hearings 2004-2005

o Site Selection Phase

• Site Selection Application August 2004

• Site Selection Permit December 2004

• Site Selection Phase 2004-2006

• Site Approval Order December 2006

o Design Phase

• Design Application October 2005

• Design Permit May 2007

• Design Phase 2007-

Project Status

Page 43: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Design Certification

o VVER AES 92 Design has successfully passed all the steps of the analysis of

compliance vs European Utility Requirements for LWR Plants for 1998-2006

o VVER AES 92 Design was certified in April 2007

Project Status

Page 44: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

2004 2005 2006 2007 2008 2009 2010 2012 2013 2014 2015

Project Schedule

Site Selection

Contractor Selection

Design

Site Preparation

Construction

Commissioning

Project Status

Page 45: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Financing of Engineering and Construction Phases

Public Procurement Award Procedure for

Engineering Phase Financing EUR 250M Feb 2007

Syndicated Loan Agreement signed May 2007

Syndication July 2007

Public Procurement Award Procedure for

A Lead Structuring and Arranging Bank July 2007

Process in two phases:

- structuring

- arranging

Next steps:

Document submission Sep 2007

Appointment/Signing Nov 2007

Financial Closure July 2008

Project Status

Page 46: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

lnvitation of Expresions of lnterest for Strategic

Investor for the Belene Project May 2007

EOI Submittal June 2007

Expressed Interest:

7 Utilities

2 Electricity trading companies

1 Base load electricity consumer

Next steps:

Short list July 2007

Non-disclosure agreement July 2007

Information memorandum July 2007

Negotiations Sep 2007

Appointment/Signing Dec 2007

Financing of Engineering and Construction PhasesProject Status

Page 47: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

11.7.2007

31.1.2008

15.7.2008

23.1.2007

2.5.2007

11.7.200721.5.2007

31.12.2007 15.11.2007

10.10.2006

8.4.2007

5.10.2007

2.4.2008

29.9.2008

Engineering Phase

Financing

Partner Choice

Financial Closure

EndStartSigning

Financing of Engineering and Construction PhasesProject Status

Page 48: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Other Aspects

Non Active and VLLW

Low and Intermediate Level Waste

High Level Waste

Processing Processing Decay on site storage

Activity control

Free releaseMeasurement

Land Fill Interim on site storage

National Repository

Page 49: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Radioactive Waste Processing

HLW sorting and fragmentation

ILW combustible sorting and burningpressed sorting and pressingmetals sorting and fragmentation

packaging

LLW combustible sorting and burningpressed sorting and pressingmetals sorting and fragmentation

Total volume of processed LLW 46 m3/a per Unit or 0.005 ccm/kWh

Other Aspects

Page 50: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

RW Storage and Disposal Facilities

� Existing RW Processing and Storage Facilities � at Kozloduy Site for LLRW and ILRW operational and decommissioning wastes from NPP

� At Novi Han Site for other nuclear application

� National RW Strategy approved by the Government in 2004

� Near Surface Disposal Facility for LLRW and ILRW in 2015

� National RW Disposal Facility

� Conceptual Design Phase 2006-2007

� Site Selection 2006-2008

� Environmental Impact Assessment Report 2007-2008

� Design and Construction Phase 2009-2014

� Planned Commissioning in 2015

� Future RW Processing and Storage Facilities

� at Belene Site for LLW and ILW operational and decommissioning wastes from NPP

Other Aspects

Page 51: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

RW Management and Decommissioning Funds

0

200

400

600

800

1000

1200

MBGN

RWMF 5 33 59 93 118 141 160 180 190DF 1 67 169 297 454 569 683 824 864

1999 2000 2001 2002 2003 2004 2005 2006 2007

RW Management Fund and Decommissioning Fund established in 1995

Real functioning of the Funds started in 1999 after approval of the

corresponding Regulations

National Electric Company and later Kozloduy NPP started payments since 1999

Total Nuclear Funds Amount – 1 054 MBGN till May 2007

Other Aspects

Page 52: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

The Decommissioning Fund shall be: o Adequate

o Available when the time comes

o Used exclusively for the purpose for which it has been established

o Managed in the transparent manner

Approach used: o NPV (Decommissioning Costs)=NPV (Fund income)

� ���

��

���

���

�� DLTtt

tttt

mi

i

TDLTtt

Ttttt

D

r

tEr

tFi

C0

00

20

100

)1(

)()1(

)(

)(

1)(

Decommissioning Fund

�� ���

��

���

���

��

DLTtt

tttt

Dmi

i

TDLTtt

Ttttt

r

tEC

r

tFi 0

00

20

100

)1(

)(.

)1(

)()(

1)(

Other Aspects

Page 53: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Operation and Decommissioning

TPSE TSE TD&D t0 DLT

T2

Cost Groups/Stages

Operation ……….....

Pre-decommissioning Activities ………….......

Facility Shutdown Activities ………………………

Equipment/Material Procurement ………….......

Defueling ……………………………………………….........

Site Security, Surveillance and Maintenance …….......

Dismantling Activities ……………………………………………………………………

Waste Processing, Storage and Disposal ………………………………………………..

Site Restoration, Cleanup and Landscaping ……………………………………………….

Project Management, Engineering and Site Support

Other Aspects

Page 54: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

The Nuclear Fuel Cycle

o Experience in the Fuel Cycle Activities • QC during Fabrication

• Operation

• Interim SF Storage

• SF Transport

o SF Management Strategy • Short term � SF storage in the in-containment

spent fuel pools

• Medium and Long term � Return the SF for reprocessing in

the country of origin

� Interim SF storage in DSFSF at the

site is foreseen also.

Other Aspects

Page 55: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Spent Fuel Management

0,1

1

10

100

1000

10000

10 100 1000 10000 100000 1000000

Years

Pu

ACT

FP

U 94-96%

Pu 1%

FP 3-5% ACT 0.1%

Reprocessing

Other Aspects

Page 56: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

Public Acceptance

Nuclear power ensures lower and more stable energy prices

69 7279

0%

20%

40%

60%

80%

100%

2002 2004 2006

AgainstUncertainFavour

National Support

97,2%

2,3% 0,5%

Favour Against Uncertain

Local Support in 2004

Other Aspects

Page 57: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

NGOs Claims against Belene Project

o ����������� ��������-8/ 2004 on the Environmental Impact Assessment Report of Belene NPP

• The three-������������� ����������������� �� ������� ����� ��������������� ����!""���������03/20/2006 rejected as ungrounded the claims

• The five-������������� ����������������� �� ������� ��������� ���#�$���������'";�<;�''>����������� �� � ��������� ����!"";�'?'@?�''X������ ���������� �� �����������"@�!;�''<���� ���Supreme Administrative Court remains in force. The Judgment is final and subject to no appeal.

o ����������� ����������������������������� �������������������

construction of a nuclear power plant on Belene site

• The three-������������� ����������������� �� ������� ������ ��������������� ���$><����������18.05.2006 rejects as ungrounded the claims

• The five-������������� ����������������� �� ������� ��������� ���""X$"����������@;"";�''X����������� �� � ��������� ���$><�;"#?'<?�''X������ ���������� �� �����������$><��;�''<���� ���Supreme Administrative Court , Section V, remains in force. The Judgment is final and subject to no appeal.

o All judgments of the Supreme Administrative Court of Bulgaria are published on

http://www.sac.government.bg

Other Aspects

Page 58: BELENE NUCLEAR POWER PLANT - Risk Engeneering NUCLEAR POWER PLANT March 1, 2013 . Introduction o Electricity Generation – 45 710 GWh • Total Carbon Free – 52.72% Nuclear Power

CONCLUSIONS

VVER-1000/V466: an innovative reactor born from proven technology

VVER-1000/V466: successfully passed all the steps of analysis of compliance with EUR requirements for generation III reactors

VVER-1000/V466: built-in capability to increase power output, allowing further improvement of economics