before after bathroom roundhay
DESCRIPTION
If you live in Leeds and fitting a new bathroom or need expert bathroom installation advice, check out the best information on Bathroom Installation Leeds.TRANSCRIPT
Before & after bathroom, Roundhay
Before
We planned to update the bathroom with a modern suite (with a bigger shower enclosure) and
fully tiled walls and floors......
After
All the work was carried out by my multi disciplined team of tradesmen (see below)
Timescale
A job like this would normally take about 2 weeks for me and my team.
Cost
A job like this is likely to cost £6K including:
• Planning / designing the room
• ALL of the work from start to finish (see below)
• Project management as standard
• Waste disposal
• All necessary completion certificates
How we helped this customer (and could maybe help you)
Even when installing a bathroom such as this, many trades(men) are required:
Labourers / plumber to rip out the old suite / tiles etc
Plumber to fit pipework for the new en suite and position / fit suite items as required
Tiler to prepare & tile the walls & floor
Plasterer to prepare & skim the walls & ceiling ready to be painted
Painter to paint the newly skimmed ceiling with anti mould bathroom paint
Joiner to build the stud-work to create the shower enclosure
Electrician to fit the ceiling spotlights, underfloor heating, an extractor fan & an electric
radiator.
That's 7 separate trades for one bathroom! (though there is always some crossover between the
trades)
More importantly though, these trades all need someone (the lynchpin) in charge to plan & pull
the whole project together.
That's exactly what we do – project managed bathroom & en suite installations from start to
finish.