bec, (fabrication division) one of the leading heavy ...assembly of stacker barge un-loader parts of...

22

Upload: others

Post on 20-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • BEC, (Fabrication Division) one of the leading Heavy Engineering manufacturing unitbased in Urla, is a fully automated State-of-the art fabrication shop with highlysophisticated CNC machines installed for structural steel fabrication focusing on HeavyEngineering Fabrication with major emphasis on Wind Mill Towers, Thermal Power PlantPressure parts components, columns etc. Unit includes high tech EOT cranes, mobilecranes and gantry cranes for handling. We have full-fledged design and R&D team andfacilities, to meet 100% Quality and Customer Satisfaction and delivery in time.

    We provides a one-stop solution for various heavy engineering components / equipments,fabrication requirements, machining requirements for wind turbine parts, duly ready to usecomponents for the manufacturing of turbines of various capacities.

    BEC has followed stringent commitment in doing things the right way. The mission isevident through our fabrication services where we commit to high quality fabrication,products and customer service.

    We continuously innovate and induct the latest technologies in our plant and factory todeliver cutting edge solutions of matchless quality that stand the test of time.

  • Capacity:

    12000 MT Per Annum

    Capacity:

    18000 MT Per Annum

    Max. Weight: 50 Ton Single

    piece

    105200 Sq.

    Mtr

    Heavy

    Fabrication

    16184 Sq.

    Mtr

    Machine

    Shop

    56656 Sq.

    Mttr

    Foundry

    Shop

    Total Area

    • Established in 1960, Bhilai Engineering Corporation Limited serves Railways, Mining, Steel Plants, PowerPlants, General Engineering, Shipping & Marine for their requirements of Steel, Alloy steel and Manganesesteel castings.

    • The company was set up with an objective of manufacturing high quality ferrous castings, heavyfabrication and to provide machining assistance to their valued customers using the latest State of Arttechnology. Our products are built to stringent International standards, and have been received withdistinction and acclaim by all users, both in the International and Domestic market. Company is managedby a team of highly technical professionals. It is no wonder the company has withstood the test of time forthe last 52 years, given the dynamic nature of the economy with a focused vision.

    • Our Foundry is a single manufacturing facility in India with complimentary light fabrication and machineshops.

    • The Steel Foundry consists of following divisions, namely: -

  • Fabrication Shop Includes:

    CNC Machine & Pug Cutting Machines

    SAW Machines

    Column & Boom Welding Machine

    Plate Bending , Drilling & Grinding Machines

    Grit blasting facility

    Painting Booth with Humidity Control facility.

    Metalizing Facility.

    Fabrication Shop is well equipped with various types of plate cutting machines, Plate welding machines, Plate

    Bending Machines, Painting Booth, Grit Blasting Booth & Metalizing Booth.

    CNC Machine (Messer & ProArc -- 3500 mm wide, 40000 mm Length and maximum thickness 220 mm).

    Corimpex Machine (Advance Welding Technology – For Beam welding – Maxi. Width Flange 1000 mm,

    Maximum Height 2000mm, Plate thickness 63 mm that is about 1000 Kg per meter) .

    Column Boom Welding Machines (to handle circumferential welding up to 4500 mm dia Shells).

    Plate Bending Machine (56 mm thick & 2500 mm wide plate).

    Painting Booth is 32 meters long x 6 meter width x 8 meters height – 2 Booths

    Grit Blasting Booth is 32 meters long x 6 meter width x 8 meters height & 22 x 4.5 x 5

    Metalizing Booth is 32 meters long x 6 meter width x 8 meters height

    Closed Sheds – 3 Sheds ( 13 x 12 x 325 meters, 15 x 10 x 300 meters, 24 x 12 x 325 meter)

    Open Bay for Large fabrication with 2 gantry Cranes of 25 Ton Each: 24 x 12 x 300 Meters

  • Railway

    Mining

    Power

    Shipping

    Steel

    Material Handling

    Serving Core Sectors as Steel, Railways,

    Power, Shipping, Mines & Infrastructure

    sectors with global Presence through TOT,

    Collaboration & Exports of Heavy

    Engineering Products.

    Our Technical Capability to deliver critical

    & fully finished components in the following

    Sectors:

    Capital Equipment

    Heavy Machines

    Technological Structures

  • Our in-house facility includesfabrication shop, blasting booth,

    paint booth, testing labs with alladvance measuring and testinginstruments. Our Quality AssuranceDepartment is well equipped withmodern testing facilities to controlright from raw material to finishedstage components.

    Facility Includes :• Radiography Lab• Ultrasonic Testing• Metallurgy Lab• Easy Laser• Paint Lab

    • Pneumatic & Hydraulic Testing

    High quality performance is maintained at every

    stage of fabrication and welding. The division's

    Quality Assurance system meets or exceeds our

    Accreditations listed.

  • BEC is equipped with Heavy Fabrication, Machine & Assembly

    shops and offers complete technological & metallurgical

    equipment.

    BEC’s goal is to provide solutions in Wind Mill Tubular Tower,

    Heavy Fabrication, using the best technology the world has to

    offer. But we are proud of much more than just the products we

    make.

    The equipments supplied from the division are pre-assembled

    with drives, trial tested & match marks are provided for ease of

    erection at site.

    We specialize in the welding of all types of metal alloys in

    addition to quality welding of complex parts where precision is

    critical.

    Fabrication services are staffed by skilled craftsmen equipped

    with the latest equipments to be able to produce premium

    quality products. Our dedication to quality and prompt services

    is unbeatable and this is why our customers are 100 % pacified

    in knowing that they are receiving the best solutions at

    unmatched prices.

    We promise continuous monitoring to ensure practices are

    efficient, economical, and effective and up to the latest

    standards. Timely project completion and that too within the

    agreed budget.

  • “Box” Columns for Boiler Structures -BHEL

    “+” Columns for Boiler Structures -BHEL

    Wind Mill TowersColumn Boom Welding Machine

    Advanced Welding Technology (Core Impex)

    Tower Bay Shop

    Machining in Toss MachineCNC Messar Cutting MachineAdvanced CNC Milling Machine

    Plate Bending

    Machine

  • BEC shops are approved by BHEL, Enercon, Sandvik, Metso &

    SIEMENS for the manufacture of fabricated parts & Assemblies. Our

    offerings includes: Fabricated items for Electrical Parts,

    Infrastructure, Material Handling Equipments and their assemblies.

    It includes:

    Boiler & Turbine Structures: Primary & Secondary

    Buck Stays

    Wind Boxes

    Wind Mill Towers for Wind power

    Radial Gates for the Hydel Power

    Cyclones

    Silos, Hoppers, Bunkers

    Chimneys & Stacks

    Towers in finished condition coming out of 32 MT Paint Booth

    Box Columns

    Generator End Shield

    Stator Frame

  • BHEL Project-Unit-High Pressure

    Boiler Plant Wanakbori

    Items-Plus Column Top Piece

    BHEL Project-Unit-High Pressure

    Boiler Plant Tiruchirapalli

    Items- Plus Column Base Piece

    BHEL Project-

    Unit-High

    Pressure Boiler

    Plant Wanakbori

    Items- Plus

    Column Base

    Piece

    BHEL Project-Unit-High

    Pressure Boiler Plant

    Wanakbori

    Items-Plus Column Top

    Piece (Sr)

  • L & T Project Architects-Edifice Consultants Pvt Ltd Mumbai

    Items- Canopy Structure (Rafter)

    NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Trestle

    NMDC Project-3.0 Mtpa Integrated Plant NagarnarNMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Box For Boiler Mounting

  • NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Column

    NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- PEC-Duct

    NMDC Project-3.0 Mtpa Integrated Plant Nagarnar. Items- PEC-Duct NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

  • NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Column

    NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Dust Cyclone- Ø 2800

    NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Dust Cyclone- Ø 2800

    NMDC Project-3.0 Mtpa Integrated Plant Nagarnar

    Items- Trestle

  • WIND WORLD: Project-E53-11 Mtr Concrete Tower Steel Section

    Items- Wind Mill TowerWIND WORLD Project-E53-11 Mtr Concrete Tower Steel Section

    Items- Wind Mill Tower

    WIND WORLD: Project-E53-11 Mtr Concrete Tower Steel

    Section

    Items- Wind Mill Tower

    WIND WORLD: Project-E53-11 Mtr Concrete Tower Steel

    Section

    Items- Wind Mill Tower

    The accuracies in the tower depend on highly skilled technicians. The straightness for 11 m is ±5 mm, the flatness of top flange .2mm and bottom flange .5mm. mm.

    In-house handling and

    movement of tower sections

    ready for dispatch with an

    approved packing system.

  • Project-E53-11 Mtr Concrete Tower Steel Section

    Items- Wind Mill Tower

  • Assembly of Stacker

    Barge Un-LoaderParts of Barrel Reclaimer

    Partially assembled Barrel Reclaimer

    Robust structure and construction to handle sticky material.

  • Fabricated Pipes for CDCP

    Bucket Wheel for NLC

    Shop trail assembly of Ship Unloader

    Flange for Barrel Reclaimer

  • 8

    1

    3

    4

    57

    2

    Stage – I

    Raw Material &

    Consumables

    inspection

    Stage - II

    Marking, Cutting,

    Bending, Fit-up

    inspection

    Stage –III

    Weld visual & NDT

    inspection

    Stage –IV

    Dimension check

    using various

    measuring instruments

    for individual or final

    assembly

    All products manufactured are thoroughly inspected, tried & tested for quality, efficiency and reliability. Our in-house testing laboratories are equipped with advanced and sensitive testing equipment controlled

    by experienced engineers, infatuated with quality. The scope of Quality Control begins with incoming material and components and persists until the finished product is tested & rolled out.

    Stage –V

    Visual, Blasting & painting

    inspection

    Stage –VI

    Packing Inspection &

    Despatch Release Note

    6

    Raw material &

    Consumables -

    Chemical

    Composition

    Mechanical : .UTS ( 40 Ton &

    60 Tons) Impact at sub zero

    temperature, Hardness ( BHN /

    Rockwell)

    Qualified NDT personnel –

    ASNT/ISNT Level – II

    NDT: UT, RT (IR – 192 & X – Ray ),

    LPT, MPT

    WELDING: WPS, PQR

    PROCESS :Kerosene Leak test

    Stress Reliving, Optical level Checking &

    Laser Test for Flange Flatness

    BLASTING : Dust contamination Test,

    Blotter Test & Surface Profile

    PAINT : Adhesive test,

    Pin Hole Test &

    Dry Film Thickness

  • Some Of Our Clients

  • “Desire is the key to motivation, but it's

    determination and commitment to an

    unrelenting pursuit of your goal - a commitment

    to excellence - that will enable you to attain the

    success you seek."

  • Neera Gupta

    Corporate Office

    Bhilai Engineering Corporation Limited

    BEC House, 13 – Masjid Moth DDA Commercial Complex,

    New Delhi – 110048 (India)

    Tel: +91 9810205022

    Email: [email protected]

    Web: www.bec-group.com/foundry

    Atul Agarwal

    Dy. General Manager-Marketing

    Bhilai Engineering Corporation –Foundry Division

    Hathkhoj Village, Industrial Area, Bhilai – 490026

    Dist, Durg, Chhattisgarh, India

    Handy No: 0091 702 414 4484

    Tel: +91 98930 96841

    Fax No.: 0091 788 4252622

    Email: [email protected]

    Website: www.bec-group.com/foundry

    mailto:[email protected]://www.bec-group.com/foundryhttp://www.bec-group.com/foundry

  • Would like to extend gratitude and thanks

    to all for viewing this presentation.

    BEC has long made it a priority to reduce its environmental impact. At our facilities, we are constantly seeking

    new ways to recycle and reduce energy consumption.