¿What is the watching result?
GOOD BAD
¿HOW ARE THE STONES PLACED?
3.3.1. RUNNING FOUNDATIONSTheconcreteused for the foundations isnamedcyclopeanconcrete,whichiscomposedofconcreteandstonesofregu-larsize.
THEY ARE TOGETHER
¿HOW ARE THE STONES
PLACED?
3.3 FOUNDATION WORKS
25
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
YES, IT SHOULD
Bad land
Foundation
Reinforced tie beam
See minimum requirements at the section 2.2a of the Poster
3.3.2 TIE BEAMTie beam could be built using steel reinforced (reinforced footing) in case you do not have a stable land or a simple footing without steel (without reinforcement) if you do not have a regular and good land.
¿IF THE LAND IS NOT STABLE, TIE BEAM SHOULD
HAVE STEEL AS REINFORCEMENT?
60 cm
60 cm
80 cm
80 cm
THEY ARE SEPARATED
3-A7-25
2�
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
STEELHOOKATTHEFOUNDATION
The steel in the foundation bottom should have a hook, never put the steel without a hook*
*See minimum requirements at the section 3.1 of the Poster
NO, IT HAS NOT
¿HAS THE COLUMN BASE A
HOOK?
¿WHAT IS THE DIMENSION OF
THE HOOK IN THE BASE?
IT IS OF 25 cm.
25 cm
3-A7-26
2�
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
YES, IT SHOULD
Bad land
Foundation
Reinforced tie beam
See minimum requirements at the section 2.2a of the Poster
3.3.2 TIE BEAMTie beam could be built using steel reinforced (reinforcedfooting) incaseyoudonothavea stable landora simplefootingwithoutsteel(withoutreinforcement)ifyoudonothavearegularandgoodland.
¿IF THE LAND IS NOT STABLE, TIE BEAM SHOULD
HAVE STEEL AS REINFORCEMENT?
3-A7-27
2�
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
¿IF THE LAND IS OF REGULAR OR GOOD QUALI-
TY, TIE BEAM SHOULD HAVE STEEL AS REINFORCEMENT?
SIMPLE TIE BEAM
FOUNDATION
EXAMPLEOFSIMPLETIEBEAM
GOOD LAND
See minimum requirements at the section 2.2a of the Poster
NO, IT SHOULD NOT
3-A7-28
2�
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
¿HOW DO YOU ELIMINATE THE EMPTIES AT THE
CONCRETE?
See minimum requirements at the section 1.1d of the Poster
AVOIDINGEMPTIESATTHECONCRETEMIXTURE
*CHUSEANDO WITH A ROOL UP AND
DOWN
* Chusear is the action of move using a rod inside the concrete to avoid emptiness at the concrete
3-A7-29
2�
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
ARE YOU SCRATCHING THE FOOTING BEFORE IT BECAME HARD TO
PUT THE BRICK?
3.4 MASONRY WORKS
34
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
VERIFY THE WALLVERTICALITY DURING THE CONSTRUCTION
¡YES! ¡NO!
VERIFICATION OF DISTANCES
3.50 m
13 cm
13 cm ¿WHATDIMENSION
SHOULD HAVE THE WALL
OF 13 cm. OF THICKNESS
BEWTEEN THE COLUMNS?
2.40 m
THEY SHOULD HAVE 3.5 M.
*See minimum requirements at the section 2.3 of the Poster
YES, I AM SCRATCHING IT
3-A7-30
2�
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
The bricks must be wet to avoid that they absorb the water of the mortar and have good ad-herence
It is not recommended a mixture too softly*
¡NO! ¡YES!
Mortar mixture uniform and easy to work*
*See minimum requirements at the section 1.1b of the Poster
CORRECTMIXTUREANDBRICKSPREPARATION
PLASTIC
3-A7-31
�0
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
CORRECTMIXINGANDWETBRICKS
Mortar easy to work for the settling of the bricks
3-A7-32
�1
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
WHICH SEPARATION HAS THE JOINT OF THE VER-TICAL AND HORIZONTAL
MORTAR?
*See minimum requirements at the section 3.4 of the Poster
MAXIMUMTHICKNESSOFTHEJOINTFORTHESETTLINGOFTHEBRICKS
THE JOINT OF THE HORIZONTAL MORTAR HAS
1.5 cm.
THE JOINT OF THE VERTICAL
MORTAR HAS 1.5 cm.
3-A7-33
�2
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
BY DAY I SHOULD BUILD A MAXIMUM HEIGHT OF
1.20 cm.
MAXIMUMHEIGHTTOBUILDBYDAY
WHICH IS THE APPROPIATE HEIGHT OF
THE WALL THAT YOU SHOULD BUILD BY DAY?
1.20 m
3-A7-34
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
I PUT TWO STEEL FUSES EVERY 4 * BRICK LINES TO TIE IT WITH
THE COLUMN AND THEN I PROTECT THEM WITH A
MIXTURE OF CEMENT (LECHADA)
**PROTECT IT WITH A “LECHADA”
PLACEMENTOFFUSESFORFUTUREEXPANSIONS
Protect the rod using a mortar made of cement and water
* Hilada is a brick line joint with mortar
** Lechada is a mortar mad of cement and water
¿HOW DO YOU LEAVE THE FUSES?
13 cm
40 cm
*See minimum requirements at the section 3.2 of the Poster
4Bricks Lines
3-A7-35
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
VERIFY THE WALLVERTICALITY DURING THE CONSTRUCTION
¡YES! ¡NO!
VERIFICATIONOFDISTANCES
3.50 m
13 cm
13 cm
¿WHAT DIMENSION
SHOULD HAVE THE WALL
OF 13 cm. OF THICKNESS
BEWTEEN THE COLUMNS?
2.40 m
THEY SHOULD HAVE 3.5 M.
*See minimum requirements at the section 2.3 of the Poster
3-A7-36
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
NO,THEY ARE A LOT OF
DISTANCE BETWEEN THE STIRRUPS OF
THE COLUMNStirrups
*See minimum requirements at the section 2.2c of the Poster
Beforetostartthewallconstructionitisnecessarytoverifytheseparationofthestirrups
3.5 COLUMNS WORKS
36
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
The stirrups must have bent hooks to 45º and they must be placed as it is showed with a length of 7.5 cm.
7.5 cm
45
7.5 cm45
7.5 cm45
7.5 cm45
(d)
(c)
(b)
(a)
(a)
(b)
(c)(d)
THIS ISCORRECT
TIE BEAM
(FOUNDATION
0.15
0.05
0.10
Resto a
0.25 Stirrups
0.100.100.10
THE DISTANCEBETWEEN THE
STIRRUPS IS THECORRECT
YES, IT HAS
THE ADEQUATE DISTANCE
3-A7-37
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
Thestirrupsmusthavebenthooksto45ºandtheymustbeplacedasitisshowedwithalengthof7.5cm.
7.5 cm
45
7.5 cm45
7.5 cm45
7.5 cm45
(d)
(c)
(b)
(a)
(a)
(b)
(c)(d)
3-A7-38
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
¿WHAT CAN I DO TO AVOID THE EMPTINESS
AT THE COLUMN?
Whentheconcreteisemptiedinsidethecolumnitisnecessarytohittheformtoprovokethattheconcretedownstothebo-ttomanddonotleaveemptyspaces
THE FORMWORK SHOULD BE HIT SOFTLY AND MOVE WITH A ROD DURING THE
MIXTURE EMPTYING
*See minimum requirements at the section 1.1d of the Poster
3-A7-39
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
Aftertoremovethewoodformworkandwhentheconcreteisdry,itisnecessarytowetthecolumnsurfaceduring7days,thisactionwillimprovetheresistanceanddurabilityoftheconcrete.
THE FIRST DAYS IT IS NECESSARY TO WET THE COLUMNS AND
BEAMS WITH WATER¿DO YOU HAVE TO WET THE
COLUMNS AND BEAMS?
3-A7-40
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
IMPORTANTCHARACTERISTICSOFTHESTIRRUPSATTHECOLUMNS
As it is shown, the stirrups should have a hook of 7.5 cm. in a corner
It is shown the column with the separation according to the minimum requirement, steel stirrups of ¼” spaced 1 each 5 cm, 4 each 10 cm and the rest spaced each 25 cm.
See minimum requirements at the section 2.2c of the Poster
5 cm
10 cm
10 cm
10 cm
10 cm
25 cm
3-A7-41
�0
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
Theringbeammustbepouredwithadensemixtureanditshouldbemovedusingarodinordertoavoidempties.Withthisactiontheconcreteisjointwithsteelrodsandthebrickwall
I AM MOVING THE
CONCRETE TO AVOID EMPTIES INSIDE IT¿WHAT ARE YOU
DOING?
See minimum requirements at the section 1.1d of the Poster
41
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
Do not forget to leave wire Nº 8 of 20 cm. of length al the ring beam to joint the canes and to have a stable roof.
FIXING THE CANES USING THE WIRES LEFT AT THE
RING BEAM
¿WHAT ARE YOU DOING?
Wires Nº 8
20 cm
3.6 WORKS AT THE RING BEAMS
3-A7-42
�1
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
Do not forget to leave wire Nº 8 of 20 cm. of lengthaltheringbeamtojointthecanesandtohaveastableroof.
FIXING THE CANES USING THE WIRES LEFT AT THE
RING BEAM
¿WHAT ARE YOU DOING?
Wires Nº 8
20 cm
3-A7-43
�2
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
CRUSHED CANES
GUAYAQUIL CANES
SUPPORTING WALL¿WHAT ARE YOU PUTTING ?
65 cm
TheGuayaquilcaneswillbespaceseach65cm.Thecrushedcaneshouldbefirmlyfixedoverthecanes,thenitisneces-sarytoputaplasticaswaterproofmaterial.Finallyovertheplasticputthemudwithstrawtoavoidfissuresattheroof.
I AM PUTTING THE CRUSHED CANES
OVER THEGUAYAQUIL CANE
3.7 WORKS AT THE ROOF
44
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
¿WHAT ARE YOU DOING?
PLACEMENT OF MUD CAKE + STRAW
I AM PUTTING THE MUD CAKE AND
STRAW TO AVOID FISSURES
3-A7-44
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
ROOFWATERPROOFING
¿WHAT ARE YOU DOING?
I AM PUTTING A PLASTIC TO AVOID THE HUMIDITY
3-A7-45
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
¿WHAT ARE YOU DOING?
PLACEMENTOFMUDCAKE+STRAW
I AM PUTTING THE MUD CAKE AND
STRAW TO AVOID FISSURES
3-A7-46
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
ROOFWITHGUAYAQUILCANE
The roof of this house shows the Guayaquil cane, the crushed cane and the mud cake
This roof shows the Guayaquil canes and over it the crushed cane
3-A7-47
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
WE PROTECT THE STEEL BARS USING A MIXTURE OF CEMENT
AND WATER
The column steels shouldbeplaced70 cmabove the ringbeamandtoavoidthecorrosionofthesesteelsitisnecessarytoprotectthemwithamixtureofcementandwater.
70 cm
¿HOW WE CAN PROTECT THE
EXPOSED STEEL BARS?
3-A7-48
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
POURINGANDFLOORFLOATING
¿WHAT ARE YOU DOING?
The thickness of the floor will be of 10 cm.
*Frotachando, is the leveling of the concrete floor surface in a rudimentary way and using wooden ruler.
I AM * FROTACHANDO THE FLOOR
3.8 FINISHING WORKS
48
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
CLEANING OF THE HOUSE AT THE FINISH OF THE CONTRUCTION
¿WHAT ARE YOU DOING?
I AM CLEANING THE HOUSE
3-A7-49
��
CH
AP
TE
R 3
: M
anua
l of
wat
chin
g ov
er c
onst
ruct
ion
of s
afer
hou
sing
¿What is the watching result?
GOOD BAD
CLEANINGOFTHEHOUSEATTHEFINISHOFTHECONTRUCTION
¿WHAT ARE YOU DOING?
I AM CLEANING THE HOUSE
3-A7-50
3-A7-51