beam see minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam...

27
2 CHAPTER 3: Manual of watching over construction of safer housing ¿What is the watching result? GOOD BAD ¿HOW ARE THE STONES PLACED? 3.3.1. RUNNING FOUNDATIONS The concrete used for the foundations is named cyclopean concrete, which is composed of concrete and stones of regu- lar size. THEY ARE TOGETHER ¿HOW ARE THE STONES PLACED? 3.3 FOUNDATION WORKS YES, IT SHOULD Bad land Foundation Reinforced tie beam ¿IF THE LAND IS NOT STABLE, TIE BEAM SHOULD HAVE STEEL AS REINFORCEMENT? 60 cm 60 cm 80 cm 80 cm THEY ARE SEPARATED 3-A7-25

Upload: others

Post on 02-Jan-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

¿HOW ARE THE STONES PLACED?

3.3.1. RUNNING FOUNDATIONSTheconcreteused for the foundations isnamedcyclopeanconcrete,whichiscomposedofconcreteandstonesofregu-larsize.

THEY ARE TOGETHER

¿HOW ARE THE STONES

PLACED?

3.3 FOUNDATION WORKS

25

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

YES, IT SHOULD

Bad land

Foundation

Reinforced tie beam

See minimum requirements at the section 2.2a of the Poster

3.3.2 TIE BEAMTie beam could be built using steel reinforced (reinforced footing) in case you do not have a stable land or a simple footing without steel (without reinforcement) if you do not have a regular and good land.

¿IF THE LAND IS NOT STABLE, TIE BEAM SHOULD

HAVE STEEL AS REINFORCEMENT?

60 cm

60 cm

80 cm

80 cm

THEY ARE SEPARATED

3-A7-25

Page 2: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

STEELHOOKATTHEFOUNDATION

The steel in the foundation bottom should have a hook, never put the steel without a hook*

*See minimum requirements at the section 3.1 of the Poster

NO, IT HAS NOT

¿HAS THE COLUMN BASE A

HOOK?

¿WHAT IS THE DIMENSION OF

THE HOOK IN THE BASE?

IT IS OF 25 cm.

25 cm

3-A7-26

Page 3: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

YES, IT SHOULD

Bad land

Foundation

Reinforced tie beam

See minimum requirements at the section 2.2a of the Poster

3.3.2 TIE BEAMTie beam could be built using steel reinforced (reinforcedfooting) incaseyoudonothavea stable landora simplefootingwithoutsteel(withoutreinforcement)ifyoudonothavearegularandgoodland.

¿IF THE LAND IS NOT STABLE, TIE BEAM SHOULD

HAVE STEEL AS REINFORCEMENT?

3-A7-27

Page 4: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

¿IF THE LAND IS OF REGULAR OR GOOD QUALI-

TY, TIE BEAM SHOULD HAVE STEEL AS REINFORCEMENT?

SIMPLE TIE BEAM

FOUNDATION

EXAMPLEOFSIMPLETIEBEAM

GOOD LAND

See minimum requirements at the section 2.2a of the Poster

NO, IT SHOULD NOT

3-A7-28

Page 5: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

¿HOW DO YOU ELIMINATE THE EMPTIES AT THE

CONCRETE?

See minimum requirements at the section 1.1d of the Poster

AVOIDINGEMPTIESATTHECONCRETEMIXTURE

*CHUSEANDO WITH A ROOL UP AND

DOWN

* Chusear is the action of move using a rod inside the concrete to avoid emptiness at the concrete

3-A7-29

Page 6: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

ARE YOU SCRATCHING THE FOOTING BEFORE IT BECAME HARD TO

PUT THE BRICK?

3.4 MASONRY WORKS

34

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

VERIFY THE WALLVERTICALITY DURING THE CONSTRUCTION

¡YES! ¡NO!

VERIFICATION OF DISTANCES

3.50 m

13 cm

13 cm ¿WHATDIMENSION

SHOULD HAVE THE WALL

OF 13 cm. OF THICKNESS

BEWTEEN THE COLUMNS?

2.40 m

THEY SHOULD HAVE 3.5 M.

*See minimum requirements at the section 2.3 of the Poster

YES, I AM SCRATCHING IT

3-A7-30

Page 7: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

2�

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

The bricks must be wet to avoid that they absorb the water of the mortar and have good ad-herence

It is not recommended a mixture too softly*

¡NO! ¡YES!

Mortar mixture uniform and easy to work*

*See minimum requirements at the section 1.1b of the Poster

CORRECTMIXTUREANDBRICKSPREPARATION

PLASTIC

3-A7-31

Page 8: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

�0

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

CORRECTMIXINGANDWETBRICKS

Mortar easy to work for the settling of the bricks

3-A7-32

Page 9: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

�1

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

WHICH SEPARATION HAS THE JOINT OF THE VER-TICAL AND HORIZONTAL

MORTAR?

*See minimum requirements at the section 3.4 of the Poster

MAXIMUMTHICKNESSOFTHEJOINTFORTHESETTLINGOFTHEBRICKS

THE JOINT OF THE HORIZONTAL MORTAR HAS

1.5 cm.

THE JOINT OF THE VERTICAL

MORTAR HAS 1.5 cm.

3-A7-33

Page 10: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

�2

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

BY DAY I SHOULD BUILD A MAXIMUM HEIGHT OF

1.20 cm.

MAXIMUMHEIGHTTOBUILDBYDAY

WHICH IS THE APPROPIATE HEIGHT OF

THE WALL THAT YOU SHOULD BUILD BY DAY?

1.20 m

3-A7-34

Page 11: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

I PUT TWO STEEL FUSES EVERY 4 * BRICK LINES TO TIE IT WITH

THE COLUMN AND THEN I PROTECT THEM WITH A

MIXTURE OF CEMENT (LECHADA)

**PROTECT IT WITH A “LECHADA”

PLACEMENTOFFUSESFORFUTUREEXPANSIONS

Protect the rod using a mortar made of cement and water

* Hilada is a brick line joint with mortar

** Lechada is a mortar mad of cement and water

¿HOW DO YOU LEAVE THE FUSES?

13 cm

40 cm

*See minimum requirements at the section 3.2 of the Poster

4Bricks Lines

3-A7-35

Page 12: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

VERIFY THE WALLVERTICALITY DURING THE CONSTRUCTION

¡YES! ¡NO!

VERIFICATIONOFDISTANCES

3.50 m

13 cm

13 cm

¿WHAT DIMENSION

SHOULD HAVE THE WALL

OF 13 cm. OF THICKNESS

BEWTEEN THE COLUMNS?

2.40 m

THEY SHOULD HAVE 3.5 M.

*See minimum requirements at the section 2.3 of the Poster

3-A7-36

Page 13: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

NO,THEY ARE A LOT OF

DISTANCE BETWEEN THE STIRRUPS OF

THE COLUMNStirrups

*See minimum requirements at the section 2.2c of the Poster

Beforetostartthewallconstructionitisnecessarytoverifytheseparationofthestirrups

3.5 COLUMNS WORKS

36

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

The stirrups must have bent hooks to 45º and they must be placed as it is showed with a length of 7.5 cm.

7.5 cm

45

7.5 cm45

7.5 cm45

7.5 cm45

(d)

(c)

(b)

(a)

(a)

(b)

(c)(d)

THIS ISCORRECT

TIE BEAM

(FOUNDATION

0.15

0.05

0.10

Resto a

0.25 Stirrups

0.100.100.10

THE DISTANCEBETWEEN THE

STIRRUPS IS THECORRECT

YES, IT HAS

THE ADEQUATE DISTANCE

3-A7-37

Page 14: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

Thestirrupsmusthavebenthooksto45ºandtheymustbeplacedasitisshowedwithalengthof7.5cm.

7.5 cm

45

7.5 cm45

7.5 cm45

7.5 cm45

(d)

(c)

(b)

(a)

(a)

(b)

(c)(d)

3-A7-38

Page 15: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

¿WHAT CAN I DO TO AVOID THE EMPTINESS

AT THE COLUMN?

Whentheconcreteisemptiedinsidethecolumnitisnecessarytohittheformtoprovokethattheconcretedownstothebo-ttomanddonotleaveemptyspaces

THE FORMWORK SHOULD BE HIT SOFTLY AND MOVE WITH A ROD DURING THE

MIXTURE EMPTYING

*See minimum requirements at the section 1.1d of the Poster

3-A7-39

Page 16: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

Aftertoremovethewoodformworkandwhentheconcreteisdry,itisnecessarytowetthecolumnsurfaceduring7days,thisactionwillimprovetheresistanceanddurabilityoftheconcrete.

THE FIRST DAYS IT IS NECESSARY TO WET THE COLUMNS AND

BEAMS WITH WATER¿DO YOU HAVE TO WET THE

COLUMNS AND BEAMS?

3-A7-40

Page 17: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

IMPORTANTCHARACTERISTICSOFTHESTIRRUPSATTHECOLUMNS

As it is shown, the stirrups should have a hook of 7.5 cm. in a corner

It is shown the column with the separation according to the minimum requirement, steel stirrups of ¼” spaced 1 each 5 cm, 4 each 10 cm and the rest spaced each 25 cm.

See minimum requirements at the section 2.2c of the Poster

5 cm

10 cm

10 cm

10 cm

10 cm

25 cm

3-A7-41

Page 18: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

�0

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

Theringbeammustbepouredwithadensemixtureanditshouldbemovedusingarodinordertoavoidempties.Withthisactiontheconcreteisjointwithsteelrodsandthebrickwall

I AM MOVING THE

CONCRETE TO AVOID EMPTIES INSIDE IT¿WHAT ARE YOU

DOING?

See minimum requirements at the section 1.1d of the Poster

41

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

Do not forget to leave wire Nº 8 of 20 cm. of length al the ring beam to joint the canes and to have a stable roof.

FIXING THE CANES USING THE WIRES LEFT AT THE

RING BEAM

¿WHAT ARE YOU DOING?

Wires Nº 8

20 cm

3.6 WORKS AT THE RING BEAMS

3-A7-42

Page 19: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

�1

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

Do not forget to leave wire Nº 8 of 20 cm. of lengthaltheringbeamtojointthecanesandtohaveastableroof.

FIXING THE CANES USING THE WIRES LEFT AT THE

RING BEAM

¿WHAT ARE YOU DOING?

Wires Nº 8

20 cm

3-A7-43

Page 20: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

�2

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

CRUSHED CANES

GUAYAQUIL CANES

SUPPORTING WALL¿WHAT ARE YOU PUTTING ?

65 cm

TheGuayaquilcaneswillbespaceseach65cm.Thecrushedcaneshouldbefirmlyfixedoverthecanes,thenitisneces-sarytoputaplasticaswaterproofmaterial.Finallyovertheplasticputthemudwithstrawtoavoidfissuresattheroof.

I AM PUTTING THE CRUSHED CANES

OVER THEGUAYAQUIL CANE

3.7 WORKS AT THE ROOF

44

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

¿WHAT ARE YOU DOING?

PLACEMENT OF MUD CAKE + STRAW

I AM PUTTING THE MUD CAKE AND

STRAW TO AVOID FISSURES

3-A7-44

Page 21: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

ROOFWATERPROOFING

¿WHAT ARE YOU DOING?

I AM PUTTING A PLASTIC TO AVOID THE HUMIDITY

3-A7-45

Page 22: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

¿WHAT ARE YOU DOING?

PLACEMENTOFMUDCAKE+STRAW

I AM PUTTING THE MUD CAKE AND

STRAW TO AVOID FISSURES

3-A7-46

Page 23: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

ROOFWITHGUAYAQUILCANE

The roof of this house shows the Guayaquil cane, the crushed cane and the mud cake

This roof shows the Guayaquil canes and over it the crushed cane

3-A7-47

Page 24: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

WE PROTECT THE STEEL BARS USING A MIXTURE OF CEMENT

AND WATER

The column steels shouldbeplaced70 cmabove the ringbeamandtoavoidthecorrosionofthesesteelsitisnecessarytoprotectthemwithamixtureofcementandwater.

70 cm

¿HOW WE CAN PROTECT THE

EXPOSED STEEL BARS?

3-A7-48

Page 25: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

POURINGANDFLOORFLOATING

¿WHAT ARE YOU DOING?

The thickness of the floor will be of 10 cm.

*Frotachando, is the leveling of the concrete floor surface in a rudimentary way and using wooden ruler.

I AM * FROTACHANDO THE FLOOR

3.8 FINISHING WORKS

48

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

CLEANING OF THE HOUSE AT THE FINISH OF THE CONTRUCTION

¿WHAT ARE YOU DOING?

I AM CLEANING THE HOUSE

3-A7-49

Page 26: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

��

CH

AP

TE

R 3

: M

anua

l of

wat

chin

g ov

er c

onst

ruct

ion

of s

afer

hou

sing

¿What is the watching result?

GOOD BAD

CLEANINGOFTHEHOUSEATTHEFINISHOFTHECONTRUCTION

¿WHAT ARE YOU DOING?

I AM CLEANING THE HOUSE

3-A7-50

Page 27: beam See minimum requirements at the section …open_jicareport.jica.go.jp/pdf/11937067_12.pdfbeam See minimum requirements at the section 2.2a of the Poster 3.3.2 TIE BEAM Tie beam

3-A7-51