bdz lots7 8_9_alternative
DESCRIPTION
DRAFT Alternative ProposalTRANSCRIPT
BDZ - SBLOG CENTRAL
PRECINCT
LOTS 8, 7 & 9
SCENARIO 1
If land owners
proceed with all
approved
developments
before subdivision
Lot 9
Lot 7
Lot 8
TPS 2 PROPOSED
CONSERVATION AREAS
Lot 9
Lot 7
Lot 8
EXISTING BUILDINGS
APPROVED BUILDINGS
TRACKS & DRIVEWAYS
FIREBREAKS ON FENCES
20m FIRE CLEARING
POTENTIAL
RESULT ?
LOSS OF VEGETATION & HABITAT
WITH EXTREME FRAGMENTATION
IN AREAS DEFINED AS
“DETAILED AREA PLAN”
(CONSERVATION)
AN ALTERNATIVE APPROACH COULD
PROTECT BIODIVERSITY & HABITAT
& CONSERVE FAR MORE EXISTING VEGETATION
CONSERVATION AREAS TO RESPECT EXISTING
STRUCTURES TO REDUCE FIRE RISK
CONSERVATION AREAS TO
RESPECT APPROVED DEVELOPMENT FOOTPRINTS
FUEL REDUCTION & PLANTING OF NATIVE
SUCCULENTS AROUND APPROVED DEVELOPMENTS
SWALE AREA PROTECTED BY P.O.S.
& EXPANDED SOUTH
P.O.S
AREA “X” LIMITED TO R5 DENSITY
BUILDING ENVELOPES WHERE JUSTIFIED
BY ACTUAL VEGETATION
P.O.S
AREA “X”
SCENARIO 1
ALTERNATIVE SCENARIO