建堂設計小組建堂設計小組進度簡報進度簡報
Building Design Building Design CommitteeCommittee
Progress ReportProgress Report
07/18/201007/18/2010
![Page 2: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/2.jpg)
Progress Made進度
Modified Floor Plan調整了隔間Developed Brand New Building Exterior Plan重新設計了外型Concluded Schematic Design完成初步設計
![Page 3: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/3.jpg)
Site Plan 地面圖
New Parking新停車場
New Bldg新堂 Morrison Hall
馬禮遜堂
Taylor Hall戴德生堂
![Page 4: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/4.jpg)
Modified Floor Plan 隔間圖
5 Large Class Rooms五間大教室
Baptistery浸池
Sanctuary 敬拜廳 640 seats
Foyer 前廳
![Page 5: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/5.jpg)
High Roof Perspective 高挑屋頂
![Page 6: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/6.jpg)
Southeast Façade 東面外牆及入口
![Page 7: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/7.jpg)
Entrance Eye Level 進口遮蓬
![Page 8: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/8.jpg)
South Roof perspective 鳥瞰圖
![Page 9: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/9.jpg)
North Entrance Close Up 西北面及入口
![Page 10: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/10.jpg)
Road Map下一步
Programming/Master Planning (complete)
Schematic Design (complete)
Design Development 細部設計Contract Document
Bid and Award
Construction
![Page 11: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/11.jpg)
Design Development 細部設計Finalizing Floor and Elevation PlansPreparing Detail DesignsSelecting Materials建築內外細節設計材料設備裝潢等Civil Plans - Parking, Utility, Drainage…Structural PlansMechanical, Electrical, Plumbing Plans Landscaping Plans土木結構水電空調庭院設計等
![Page 12: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/12.jpg)
New Contract with SGA新的合同
Include all A/E services from detail design to construction completionTo be executed in phasesCovered under $250k raised funds合約包括所有逐步設計及監工直到建築完成 費用於 25 萬內
![Page 13: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/13.jpg)
Budget Control Measures節省經費
Prepare West Parking Lot Design In-House 新停車場自行設計Provide Engineering Assistance to Consultants 提供其它設計援助Perform Certain Construction Admin. Tasks 幫助施工監督管理
![Page 14: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/14.jpg)
Schedule Projection時間表
Design 設計 : 08/2010 - 04/2011
Permit 執照 : 05/2011 - 10/2011
Contract Doc 規範 : 09/2011 - 11/2011
Bid/Award 招標 : 12/2011 - 02/2012
Construction 施工 : 03/2012 - 08/2013
1.5 year preparation一年半籌備1.5 year construction 一年半施工
![Page 15: Bdc progress report 2010 07 18 final](https://reader035.vdocuments.site/reader035/viewer/2022062405/55849e85d8b42a33688b4e9c/html5/thumbnails/15.jpg)
Build Up the Church Together
同心建造Check out the plans in Taylor, Morrison & ACC web site 瞭解設計Feedbacks and Comments 提供建議Prayers 禱告扶持