Page 1: BBU3900 Installation Guide-(V300R008)(PDF)

HUAWEI TECHNOLOGIES Co., Ltd.

BBU3900 V300R008Installation Guide

Issue: 08Part Number: 31504606Date: 2009-04-20

Page 2: BBU3900 Installation Guide-(V300R008)(PDF)

1

Contents

1. Installing the BBU in the APM30

2. Installing the BBU in the APM30H

3. Installing the BBU in the 19-Inch Rack

4. Installing the BBU in the TMC

5. Installing the BBU in the PS4890 Cabinet

6. Installing the BBU in the RRU3004 Rack

7. Installing the BBU on the Wall

8. Reference

9. Changes in the BBU3900 Installation Guide

7

13

15

17

20

23

27

31

40

Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved.

Page 3: BBU3900 Installation Guide-(V300R008)(PDF)

2

Safety InformationFollowing All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility of accidents.The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations.

When operating Huawei products and equipment, you must comply with safety precautions and special safety instructions related to corresponding equipment provided by Huawei. The safety precautions in the document are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of universal regulations for safety operations and safety codes on design, production, and equipment use.

Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations.

Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work.

Symbols

Safety of PersonnelThe high voltage power supply provides power for running the system. Direct contact with the high voltage

power supply or contact through damp objects may result in fatal danger.Non-standard and improper high voltage operations may result in fire and electric shock.In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel

tower and mast.Ground the device before powering on the device. Otherwise, the personnel and device are in danger.Power off the device before performing operations on the power supply equipment.High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna

on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down.

When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. When working at a height, be cautious about falling objects.

Device SafetyCheck the electrical connection of the device before operation and ensure that the device is reliably grounded.The static electricity generated by the human body may damage the electrostatic sensitive components on the

circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wriststrap or ESD gloves when performing the operation.

When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.

This symbol indicates that casualty or serious accident may occur if you ignore the safety instruction.

This symbol indicates that serious or major injury may occur if you ignore the safety instruction.

This symbol indicates that the operation may be easier if you pay attention to the safety instruction.

Page 4: BBU3900 Installation Guide-(V300R008)(PDF)

3

Installation Tools

Long measuring tape Cross screwdrivers (M3~M6) Straight screwdrivers (M3~M6)

Adjustable wrench Socket wrench Percussion drill

ESD wrist strap Vacuum cleaner Cable peeler

Torque wrench Marking pen Level bar

Claw hammer RJ-45 crimping pliers Multimeter

Power cable crimping pliers Wire cutter ESD gloves

Page 5: BBU3900 Installation Guide-(V300R008)(PDF)

4

In the APM30/APM30H

On the wall

In the 19-inch rack

Installation Scenarios

Page 6: BBU3900 Installation Guide-(V300R008)(PDF)

5

In the RRU3004 rack

In the PS4890 cabinet

In the TMC cabinet

Installation Scenarios

Page 7: BBU3900 Installation Guide-(V300R008)(PDF)

6

Installing the cabinet

Start

Installing the BBU case

Installing the BBU cables

Powering on the BBU

End

Installing the cables of cabinet

Installing the RRU module

Installing the RRU cables

Powering on the RRU

Installing the PGND cable(BBU on the wall)

Installing the power cable

Installing the CPRI optical cable

Installing the E1 cable or FE cable

Installing the monitoring signal cable(optional)

Installing the alarm cable(optional)

Installing the E1 or FE surge protection transfer

cable(optional)

Installation Procedure

Page 8: BBU3900 Installation Guide-(V300R008)(PDF)

7

Installing the BBU Casea

Installing the BBU Cablesb

External power supply

External alarm device

Monitoring signal cable

Alarm cable

E1cable

CPRI signal cable

E1 transfer cable

Power cable

Cable connections of the BBU

External monitoring device

Installing the BBU in the APM30

BBUM6 bolt

PDU

1. Install the mounting ears at both sides of the BBU reversely.

2. Slide the BBU case into the cabinet.

3. Check the DIP switches (see appendix).

FE cable

FE transfer cable

1、The FE cable is used for the IP transmission.

2、The E1 cable is used for the HDLC transmission.

Page 9: BBU3900 Installation Guide-(V300R008)(PDF)

8

Installing the BBU in the APM30

Winding pipe

Installing the BBU Cablesb

2. Install the CPRI optical cable. Connect one end of the optical cable to the CPRI0, CPRI1, or CPRI2 port on the GTMU panel of the BBU and the other end to the CPRI_W port on the RRU.

The TX port on the BBU is connected to the RX port on the RRU.

The RX port on the BBU is connected to the TX port on the RRU.

Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the power cable to the PWR port on the BBU.

1. Install power cable.

The power cable is to be made depending on field requirements.

Optical module

Puller

a. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port, and then turn outwards the puller on the optical module.

b. Insert one end of the CPRI optical cable into the optical module, and then lead the CPRI optical cable out of the cabinet along the right side of the cabinet.

c. Wrap the fiber tail with the winding pipe.

LOAD3

NEG(-)

RNT(+)

PWR

Page 10: BBU3900 Installation Guide-(V300R008)(PDF)

9

Installing the BBU in the APM30

b

4.3. Strip the jacket off the E1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer

4.4. Thread the E1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.

4.2. Fix the DB26 connector of the E1 cable to the OUTSIDE port on the UELP.

3. Install the E1 transfer cable.

4. Install the E1 cable.

E1 transfer cable

4.1. Cabling the E1 cable.

E1cable

Shielding layer of the E1 cable

(25mm)

Ensure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wires at one end of the E1 cable all at once.

Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU.

Grounding clip

Installing the BBU Cables

Page 11: BBU3900 Installation Guide-(V300R008)(PDF)

10

b

FE transfer cableFE cable

(25mm)

Shielding layer of the FE cable

Connect one end of the FE transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.

5. Install the FE transfer cable (FE transmission mode).

6. Install the FE cable (FE transmission).6.1. Connect one end of the FE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

6.2. Thread the FE cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.

Installing the BBU Cables

Installing the BBU in the APM30

7. Install the monitoring signal cable between the APMI and the BBU.7.1. Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU. 7.2. Cut off the RJ45 connector at the other end of the cable on site, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI.

Page 12: BBU3900 Installation Guide-(V300R008)(PDF)

11

8. Install the EMUA monitoring signal cable. (The EMUA is configured if there are external dry contacts or analog detection is required.)

8.1. If the MON0 port on the BBU is available, fix the RJ45 connector of the EMUA monitoring signal cable to the MON0 port on the UPEU and the DB9 connector to the corresponding port on the EMUA.

8.2. If the MON0 port on the BBU is unavailable, cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI. For the pin assignment, see Page 38 EMUA monitoring signal cable. Fix the DB9 connector to the corresponding port on the EMUA.

Installing the BBU Cablesb

Installing the BBU in the APM30

MON 0

Page 13: BBU3900 Installation Guide-(V300R008)(PDF)

12

9. Install the alarm cable. Connect one end of the alarm cable to the EXT-ALM port on the UPEU and the other end to the corresponding alarm device.

Checking the Power-On Status of the BBUc

Installing the BBU Cablesb

Installing the BBU in the APM30

The normal status of LED on theWMPT is as follows:• RUN LED: 1s ON, 1s OFF(blinking at 0.5 Hz)• ALM LED: OFF• ACT LED: ON

The normal status of LED on theUPEU is as follows:• RUN LED: ON

The normal status of LED on theUBFA is as follows:• STATE LED: Green1s ON, 1s OFF (blinking at 0.5 Hz)

The normal status of LED on theWBBP is as follows:• RUN LED: 1s ON, 1s OFF(blinking at 0.5 Hz)• ALM LED: OFF

a

Powering on the BBU3900

Start

End

Powering off theBBU3900

Clearing the fault

Checking whether all LEDs on theBBU are normal?

Yes

No

a

Page 14: BBU3900 Installation Guide-(V300R008)(PDF)

13

Installing the BBU in the APM30H

Installation PositionNo.

One end is connected to... The other end is connected to...

1

2

3

4 Monitoring signal cable

COM IN port on the HEUA MON1 port on the BBU

5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

BBU power cable LOAD3 terminal of the PDU PWR port on the BBU

E1 transfer cable E1/T1 port on the GTMU INSIDE port on the UELP

E1 cable OUTSIDE port on the UELP GEHUB or HUBBTS

Cable

a BBU Cable Connections

The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 7–12. The following figure shows the cable connections of the BBU. Page 14 shows how to install the monitoring signal cable between the HEUA and the BBU in the APM30H.

Page 15: BBU3900 Installation Guide-(V300R008)(PDF)

14

Installing the BBU in the APM30H

b Installing the Monitoring Signal Cable between the HEUA and the BBU

MON1COM IN

UPEU on the BBU

HEUA

Page 16: BBU3900 Installation Guide-(V300R008)(PDF)

15

b Installing the DCDU-03Bc

When the BBU3900 is installed in the 19-inch cabinet, no space is required on the left and right of the BBU3900.

Installing the BBU in the 19-Inch RackSpace Requirements (Unit: mm)a

Installing the BBU Case

Page 17: BBU3900 Installation Guide-(V300R008)(PDF)

16

(1) BBU power cable (2) Monitoring signal cable for the DCDU-03B

(3) PGND cable (4) CPRI optical cable

(5) E1 transfer cable (6) E1 cable (7) BBU alarm cable (8) RRU power cable

(9) External power cable

Installing the BBU Cablesd

Installing the BBU in the 19-Inch Rack

②Connect the BBU power cable to the LOAD8 terminal on the DCDU-03B.

⑧Connect the RRU power cable to one of the LOAD0 to LOAD5 terminals on the DCDU-03B.

Page 18: BBU3900 Installation Guide-(V300R008)(PDF)

17

Installing the BBU in the TMC

Installing the DCDU-03BaSlide the DCDU-03B into the TMC. Then, tighten the four M6 screws.

Installing the BBU CasebSlide the BBU into the TMC. Then, tighten the four M6 screws.

Page 19: BBU3900 Installation Guide-(V300R008)(PDF)

18

Installing the BBU in the TMC

Installing the BBU Cablesc

DCDU-03B input power cable

1. For details on how to install the TMC alarm cable, see Page 19.2. The DCDU-03B input power cable is connected to the external DC power supply system.3. For cable connections of the BBU, see Page 7.

Page 20: BBU3900 Installation Guide-(V300R008)(PDF)

19

Installing the BBU in the TMC

Checking the Power-On Status of the BBUdCheck the power-on status of the BBU. For details, see Page 12.

Installing the BBU Cablesc

Procedure for installing the TMC alarm cable: APMI panel

Door status sensor

b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals of the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT1+ and OUT1-alarm wiring terminals on the APMI.

d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals of the DCDU.

a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU.

Page 21: BBU3900 Installation Guide-(V300R008)(PDF)

20

Installing the BBU in the PS4890 Cabinet

Installing the DCDU-03Ba1. Slide the DCDU-03B into the PS4890 cabinet. Then, tighten the four M6 screws.

2. Install the DCDU-03B input power cable. Connect one end of the power cable in blue to the DC output terminal LOAD2(-) on the power subrack and the other end to the DC input terminal NEG(-) on the DCDU-03B . Connect one end of the power cable in black to the DC output terminal RTN(+) on the power subrack and the other end to the DC input terminal RTN(+) on the DCDU-03B.

Installing the BBU Case b

Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

DC output terminal on the power subrack

DC input terminal on the DCDU-03B

Page 22: BBU3900 Installation Guide-(V300R008)(PDF)

21

1. In addition to the BBU cables installed in the APM30, a monitoring signal cable between the PMU and the BBU needs to be installed when the BBU is installed in the PS4890 cabinet. The monitoring signal cable between the APMI and the BBU is not required. For details on how to install the monitoring signal cable between the PMU and the BBU, see Page 22.

2. For the cable connections of the BBU, see Page 7.

Cable connections of the BBU

Connect the BBU power cable to the DC output terminal LOAD6 of the DCDU-03B.

(1)CPRI optical cale (2)BBU power cable (3)E1 cable

(4) monitoring signal cable between the PMU and the BBU

5)BBU alarm cable

Installing the BBU in the PS4890 Cabinet

Installing the BBU Cablesc

Page 23: BBU3900 Installation Guide-(V300R008)(PDF)

22

Checking the Power-On Status of the BBU d

Check the power-on status of the BBU. For details, see Page 12.

Install the monitoring signal cable between the PMU and the BBU.Connect one end of the cable to the MON port on the BBU and the other end to the RS232/RS422 port on the PMU.

Monitoring signal cable between the PMU and the BBU

RS232/RS422 port

Installing the BBU in the PS4890 Cabinet

Installing the BBU Cablesc

Page 24: BBU3900 Installation Guide-(V300R008)(PDF)

23

Installing the BBU in the RRU3004 Rack

a Marking Anchor Points (Unit: mm)aDrilling Holes and Installing theExpansion Bolt Assemblyb

a installing the H-shaped Standc

Bolt M10x60Spring washer 12Flat washer 12

Expansion tube

Guiding slot

Guiding ribNut

Page 25: BBU3900 Installation Guide-(V300R008)(PDF)

24

Installing the BBU in the RRU3004 Rack

a Fixing the Lower Part of the RRU3004 Rackf Installing the Adapting Piecesg

a Removing the Washersd Fitting the Tabs on One Side of the RRU3004Rack into the Anchor Slots on the Stande

h Installing the BBU Case i Installing the DCDU-03B(–48 V Input Power)

Tightenthe screws

Installing the EPS30-4815AF (AC Input Power)

case 2

Page 26: BBU3900 Installation Guide-(V300R008)(PDF)

25

DCDU

–48 V input power

Installing the BBU Cablese

Installing the BBU in the RRU3004 Rack

Cable One End Is Connected to... The Other End Is Connected to...

(7) Equipotential cable of the subrack Grounding terminal of the RRU3004 rack Grounding terminal of the RRU3004 rack

(1) CPRI optical cable The end with the optical cable labels 2A and 2B is connected to CPRI ports 0 to 5 of the GTMU of the BBU.

The end with the optical cable labels 1A and 1B is connected to the CPRI_W port of the cabling cavity of the RRU.

(2) Grounding cable of the subrack Grounding terminal of the RRU3004 rack Grounding bar of the stand

(3) Power cable of the BBU PWR port of the BBU LOAD6 port of the DCDU

(4) E1 cable E1/T1 port of the BBU GEHUB or HUBBTS

(5) Power cable of the DCDU RTN (+) and NEG (-) terminals at the DC input end of the DCDU

External power supply system

(6) External PGND cable Grounding bar of the stand External general grounding bar

(8) Grounding cable of the DCDU Grounding terminal of the RRU3004 rack Grounding terminal of the DCDU

Page 27: BBU3900 Installation Guide-(V300R008)(PDF)

26

4815

Only two sunk screws are required.

Installing the BBU Cablese

Installing the BBU in the RRU3004 Rack

220 V input power

Cable One End Is Connected to... The Other End Is Connected to...

(7) E1 cable E1/T1 port of the BBU GEHUB or HUBBTS

(8) PGND cable of the 4815 Bolts for the mounting ears of the 4815 Grounding terminal of the RRU3004 rack

(9) Input power cable of the 4815 AC INPUT port of the 4815 Power supply equipment of the customer

(1) CPRI optical cable The end with the optical cable labels 2A and 2B is connected to CPRI ports 0 to 5 of the GTMU of the BBU.

The end with the optical cable labels 1A and 1B is connected to the CPRI_W port of the cabling cavity of the RRU.

(2) 4815 PGND cable (PGND cable of the RRU3004 rack)

Grounding terminal of the RRU3004 rack Grounding bar of the stand

(3 ) External PGND cable Grounding bar of the stand External general grounding bar

(4) BBU - 4815 PGND cable (equipotential cable of the rack)

Grounding terminal of the RRU3004 rack Grounding terminal of the RRU3004 rack

(5) Power cable of the BBU PWR port of the BBU LOAD1 port of the 4815

(6) 4815 - BBU monitoring signal cable

MON1 port of the BBU RS232/RS485 port of the 4815, close to the 232 side

The mounting ears need to be installed inan inverse manner during the installation

of the 4815.

Page 28: BBU3900 Installation Guide-(V300R008)(PDF)

27

BBU

DCDU-03B

a Space Requirements

A single BBU BBU+DCDU-03B

Installing the BBU on the Wall

a Installing the Mounting Ears for Wall Installationb

Mounting ears for wall installation

Mounting ears on the BBU case

The DCDU should be installed close to the BBU, but the distance between BBU and DCDU must be greater than 100 mm.

Use screws to join the mounting ears for wall installation and the mounting ears on the BBU case.

Page 29: BBU3900 Installation Guide-(V300R008)(PDF)

28

Installing the BBU on the Wall

a Installing the Expansion Boltsd

Place the BBU against the wall, and then use the marking pen to mark the anchor points.

ac Determining the Anchor Points on the Wall

e

Bolt M6×60Spring washer 6Flat washer 6

Expansion tube

Fixing the BBU Case on the Wall

Flat washer

Spring washer

BBU

wall

90°50~60

Page 30: BBU3900 Installation Guide-(V300R008)(PDF)

29

Installing the BBU on the Wall

f Installing the DCDU-03B Case

3. Install the expansion bolts.

55mm~60mm

20mm

4. Mount the DCDU-03C on the wall.

1. Turn the mounting ears on theDCDU-03C by 90 degrees.

2. Place the DCDU-03C against the wall, and then use the marking pen to mark the anchor points of the mounting ears forwall installation.

wall

Bolt M6×80NutSpring washer 10Flat washer 10Expansion tube

Page 31: BBU3900 Installation Guide-(V300R008)(PDF)

30

Installing the BBU Cablesg

Installing the BBU on the Wall

Checking the Power-On Status of the BBUgCheck the power-on status of the BBU. For details, see Page 12.

External transmission equipment

External monitoring equipment

External power equipment

External

grounding bar

External

grounding bar

Installation PositionSN

One End Connected to... The Other End Connected to...

5 BBU power cable PWR port on the BBU LOAD6 on the DCDU-03

6 DCDU power cable DC input port on the DCDU-03 External power equipment

1

2

3

4 Monitoring signal cable

MON/ALM port on the BBU External monitoring equipment

7 PGND cable Grounding bolt on the equipment External grounding bar

RRU power cable LOAD0 to LOAD5 on the DCDU-03 Power supply socket on the RRU

CPRI optical cable CPRI port on the BBU CPRI port on the RRU

E1 cable E1/T1 port on the GTMU GEHUB or HUBBTS

Cable

Page 32: BBU3900 Installation Guide-(V300R008)(PDF)

31

Reference

Cable Connector Connects to…

OT terminal (assembled on site) Grounding bolt of the BBU3900

DB25 male connector INSIDE port on the BBU3900 panel

DLC connector Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU

RJ45 connector the FE0 port at the INSIDE side on the UFLP or the FE0 port on the GTMU.

RJ45 connector the GFGUB (Abis interface board) or connected to the GFGUB through a routing device.

RJ45 connector the FE0 port on the GTMU.

RJ45 connector the FE0 port at the INSIDE side on the UFLP.

FE transfer cable

FE cable

CPRI optical cable

DLC connector Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU

RJ45 connector EXT-ALM0 port on the BBU3900 panelMonitoring signal cable for the DCDU-03B

RJ45 connector Alarm port on the DCDU-03B

RJ45 connector MON1 port on the BBU3900 panelMonitoring signal cable between the APMI and the BBU Bare wire (connected before delivery) TX-, TX+, RX-, and RX+ ports on the APMI in

the APM30 power cabinet

RJ45 connector EXT-ALM port on the BBU3900 panelBBU alarm cable

RJ45 connector Port on the external device

RJ45 connector RS232/RS422 port on the PMUMonitoring signal cable between the PMU and the BBU RJ45 connector MON port on the BBU

RJ45 connector MON port on the BBUTMC alarm cable

Three pairs of wires in different colors

TMC

E1 transfer cable

DB26 male connector E1/T1 port on the BBU3900 panel

PGND cable

OT terminal (assembled on site) Protection grounding bar

3V3 connector PWR port on the BBU3900 panelPower cable

OT terminal External power supply (5 A)

DB26 male connector Without the E1 transfer cable: E1/T1 port on the BBU3900 panel

With the E1 transfer cable: OUTSIDE port on the BBU3900 panel

E1 cable

Bare wire GEHUB or HUBBTS

Cable Lista

Page 33: BBU3900 Installation Guide-(V300R008)(PDF)

32

d

Cable Name Appearance

PGND cable

Monitoring signal cable for the DCDU-03B

FE cable

FE transfer cable

Power cable

CPRI optical cable

E1 cable

E1 transfer cable

Monitoring signal cable between the APMI and the BBU

BBU alarm cable

aReference

Appearance of the Cablesb

Page 34: BBU3900 Installation Guide-(V300R008)(PDF)

33

Reference

Setting the DIP Switchesc

Wear an ESD wrist strap during the operations on the boards to prevent damage to the boards.

Remove the GTMU and UELP from the BBU.

The UELP is optional. Please check the settings of the DIP switches according to the field conditions.

Page 35: BBU3900 Installation Guide-(V300R008)(PDF)

34

Reference

c Setting the DIP Switches

Settings of the DIP switches on the UELP

Settings of the DIP switches on the GTMU

Set the DIP switches of the BBU.

All the DIP bits of S2 on the GTMU are set to OFF by default in all modes.When four 75-ohm E1 links are faulty, all the DIP bits of S2 should be set to ON so that the faults are rectified.

75-ohm E1 Mode

120-ohm E1 Mode

T1 Mode

75-ohm E1 Mode

Other Modes

Page 36: BBU3900 Installation Guide-(V300R008)(PDF)

35

Reference

c Setting the DIP Switches

Settings of S4 and S5 on the GTMU

Reinstall the GTMU and the UELP.

DIP Switch Setting of DIP Bit

1 2 3 4

ON ON ON ON The E1 link can be bypassed.

OFF OFF OFF OFF The E1 link cannot be bypassed.

Miscellaneous Not available

Description

S 4

The E1 link of the Level 5 cascaded BTS can be bypassed

OFFOFFONOFF

The E1 link of the Level 4 cascaded BTS can be bypassed.

OFFOFFONON

The E1 link of the Level 3 cascaded BTS can be bypassed.

OFFONOFFOFF

The E1 link of the Level 2 cascaded BTS can be bypassed

OFFONOFFON

The E1 link of the Level 1 cascaded BTS can be bypassed.

OFFONONOFF

The E1 link can be bypassed.ONONONON

4321S 5

Description Setting of DIP BitDIP Switch

Page 37: BBU3900 Installation Guide-(V300R008)(PDF)

36

Reference

Pin of the DB26 Male Connector Wire Type Coaxial Series No. Label

X1.1 Tip RX1+

X1.2 Ring RX1-

X1.3 Tip RX2+

X1.4 Ring RX2-

X1.5 Tip RX3+

X1.6 Ring RX3-

X1.7 Tip RX4+

X1.8 Ring RX4-

X1.19 Tip TX1+

X1.20 Ring TX1-

X1.21 Tip TX2+

X1.22 Ring TX2-

X1.23 Tip TX3+

X1.24 Ring TX3-

X1.25 Tip TX4+

X1.26 Ring TX4-

8

6

4

2

7

5

3

1

Pin assignment for the BBU signal cablese75-ohm E1 cable

Engineering Specifications of the BBUd

–48 V DC and 24 V DCInput voltage

Typical configuration: 7 kg; full configuration: 11 kgWeight

86 mm (height) x 442 mm (width) x 310 mm (depth)Dimensions

SpecificationItem

Page 38: BBU3900 Installation Guide-(V300R008)(PDF)

37

Reference

Pin assignment for the BBU signal cablese120-ohm E1 cable

Pin of the DB26 Male Connector Wire Color Wire Type Label

X1.1 Blue RX1+

X1.2 White RX1-

X1.3 Orange RX2+

X1.4 White RX2-

X1.5 Green RX3+

X1.6 White RX3-

X1.7 Brown RX4+

X1.8 White RX4-

X1.19 Grey TX1+

X1.20 White TX1-

X1.21 Blue TX2+

X1.22 Red TX2-

X1.23 Orange TX3+

X1.24 Red TX3-

X1.25 Green TX4+

X1.26 Red TX4-Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Page 39: BBU3900 Installation Guide-(V300R008)(PDF)

38

Reference

Pin assignment for the BBU signal cablese

Pin of the RJ45 Connector

Wire Color Pins of X2, X3, X4, and X5

Wire Type Port on the APMI

X1.1 White X2 Twisted pair TX+

X1.2 Orange X3 Twisted pair TX-

X1.4 Blue X4 Twisted pair RX+

X1.5 White X5 Twisted pair RX-

Monitoring signal cable between the APMI and the BBU

Pin on the RJ45 Connector

Pin of the DB9Male Connector

Wire Color Wire Type Port on the APMI

X1.1 X2.3 White Twisted pair TX+

X1.2 X2.7 Orange Twisted pair TX-

X1.4 X2.2 Blue Twisted pair RX+

X1.5 X2.6 White Twisted pair RX-

EMUA monitoring signal cable

Page 40: BBU3900 Installation Guide-(V300R008)(PDF)

39

Reference

Pin assignment for the BBU signal cables BBUe

Pin of the RJ45 Connector

Pin of the RJ45 Connector

Wire Color Wire Type

X1.1 X2.1 White/orange

X1.2 X2.2 Orange

X1.3 X2.3 White/green

X1.6 X2.6 Green

X1.5 X2.5 White/blue

X1.4 X2.4 Blue

X1.7 X2.7 White/brown

X1.8 X2.8 Brown

Twisted pair

Twisted pair

Twisted pair

Twisted pair

BBU alarm cable

Page 41: BBU3900 Installation Guide-(V300R008)(PDF)

40

Changes in the BBU3900 Installation Guide

This describes the changes in the BBU3900 Installation Guide.08(2009-04-20)

This is the eighth commercial release.

Compared with V300R008 07 (2008-01-20), the scenarios of installing in the APM200E has been deleted.

Page 42: BBU3900 Installation Guide-(V300R008)(PDF)

HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang

Shenzhen 518129People’s Republic of China

www.huawei.com