  • 7/26/2019 BAUER Ductile Piles

    1/8

    BAUER

    Ductile Pile

  • 7/26/2019 BAUER Ductile Piles

    2/8

    The BAUER Ductile Pile2

    The BAUER Ductile PileHow to do a simple, economic and safe foundation

    Skin friction piles(grouted)

    End-bearing piles

    (non grouted)

  • 7/26/2019 BAUER Ductile Piles

    3/8

    3The BAUER Ductile Pile

    is cut down at exactly the required length. The

    offcut is then reused as lead section for the

    next pile. The BDP is installed as end-bearing

    or as skin friction pile depending on the soil

    characteristics. With the driving times recorded

    during the driving process the soil bearing

    capacity of the different layers can be deter-

    mined. Thus, for each single pile an individual

    pile length can be specified depending on

    the local construction soil conditions.

    The BAUER Ductile Pile (BDP)is a simple,

    fast and highly effective deep foundation

    system. The industrially pre-fabricated

    piles made from high-strength ductile cast iron

    guarantee high quality and a safe foundation.

    To execute the foundation, the individual pile

    sections are joint together without using spe-

    cial tools to form a pile shaft of any length and

    vibrated into the soil by a high frequency hy-

    draulic impact hammer. After driving, the BDP

    Non load-bearing

    soil stratum

    Load-bearing

    soil stratum

    Rock

  • 7/26/2019 BAUER Ductile Piles

    4/8

    The BAUER Ductile Pile4

    Advantages of theBAUER Ductile Pile

    Simple

    simple site installation

    hardly any additional site traffic

    no finishing works on pile heads

    no drill spoil removal

    Economical

    low investment cost

    low requirements for work

    platform

    no cut-offs

    low wear and tear

    short construction period

    (up to 450 lin m/day)

    Safe

    soil bearing capacity secured

    directly (driving criteria)

    low level of vibrations

    more than 30 years of experience

    more than 5 Mio. lin m installed

    piles

    The BAUER Ductile Pile can be a beneficial alternative to

    The BAUER Ductile Pile (BDP) sets standards by using this pre-fabricated pile system the construction period can be

    reduced considerably compared to other similar foundation systems. Thus and due to the enormously lower expenditure

    for staff and site installation the Ductile Pile can be an economical alternative to conventional foundations. Eventually, the

    BDP-system in general optimizes the work process on site.

    stone columns

    GEWI-piles

    cast-in-situ driven piles

    bored piles

    pre-fabricated driven piles

    etc.

    Ductile Pile Bored Pile

    Time

    Staff

    Site Installation

  • 7/26/2019 BAUER Ductile Piles

    5/8

    5The BAUER Ductile Pile

    Load Bearing Capacities

    1)on request

    Stated inner bearing capacity expressed as design (factored) values (Nd). The outer bearing capacity depends on the

    local subsoil conditions. In order to determine the dimensions of the foundation, the lower one of the two results is relevant.

    non grouted

    (with concrete filling)

    grouted

    BDP type [mm] C20/25 C35/45 C20/25 C35/45

    118 x 5,0 1) 479 kN 570 kN 639 kN 730 kN

    118 x 7,5 709 kN 792 kN 869 kN 952 kN

    118 x 9,0 842 kN 920 kN 1.001 kN 1.080 kN

    170 x 7,5 1) 1.134 kN 1.323 kN 1.365 kN 1.554 kN

    170 x 9,0 1.335 kN 1.517 kN 1.566 kN 1.748 kN

    170 x 10,6 1.545 kN 1.719 kN 1.776 kN 1.950 kN

    170 x 12,5 1) 1.788 kN 1.954 kN 2.019 kN 2.185 kN

    Structural load test

  • 7/26/2019 BAUER Ductile Piles

    6/8

    The BAUER Ductile Pile6

    Areas of ApplicationBuilding construction

    Slope protection

    Bridge construction

    Uplift prevention

    Industrial building

    Silo foundation

    Soil nailing

    Refurbishment

  • 7/26/2019 BAUER Ductile Piles

    7/8

    7The BAUER Ductile Pile

    EmissionsDiagrammatic representation of typical equipment on site (standard data)

    Vibrations

    Air

    hammer

    Disk

    saw

    BAUER

    Ductile Pile

    Vibrating

    plate

    Heavy load

    vehicles

    Vibrations in accordance with DIN 4150-3:1999-02

    V

    ibration

    velocity

    Very sensible buildings

    (e.g. listed and/ordilapidated buildings)

    Sensible buildings

    (e.g. housing dwellings)

    Non-sensible buildings

    (e.g. commercial andindustrial buildings)

    Conclusion: The vibrations caused during the installation of the BAUER Ductile Pile are harmless for any kind of building.

    Noise

    level

    adm

    issible

    excessr

    ate

    BAUERDuctile Pile BAUER DuctilePile

  • 7/26/2019 BAUER Ductile Piles

    8/8

    905.

    020.2

    07/2012

    BAUER Spezialtiefbau GmbHBAUER - Strae 186529 Schrobenhausen, GermanyTel.: + 49 8252 97- 1030Fax: + 49 8252 [email protected]

    www.bauer.de