Addendum No. 1
TO: PROPOSED BIDDERS
PROJECT: ERBR-30(02) PARKERS LAKE BRIDGE, JACKSON COUNTY
DATE: NOVEMBER. 13, 2020
1. Contract time is being correctly noted as 300 Calendar days. (In lieu of 300 working
days). Some contract documents were inadvertently released with the cover referencing a
working day period. All references to contract time requirements shall be changed
accordingly.
2. Revisions made for quantities and pay items for erosion control work. Corrections made
in corresponding sheet tables and project summary tables for Rip-rap, Topsoil, Seeding,
Oil Absorbent Boom, and removed Turbidity Barrier items. Revisions noted on the
following sheets:
• Sheet 2A
• Sheet 2F
• Sheet 2G
3. Revised bid proposal sheets are being issued for the quantity and pay item changes.
Please replace the following sheets in the contract documents. (Use attached proposal
sheets marked ‘revised per addendum’.
4. Add Specification section 907-234-G, for Oil Absorbent Boom.
5. For purposes of construction under this contract, it is recognized that construction
materials may need to be brought in from either direction of the project. Being the
existing bridge crossing for the Pascagoula River (Roy Cumbest Bridge, Structure #SA
30-043) is currently posted, contractors may request and receive approval for use of this
structure and the westerly section of Wade Vancleave Road, as a designated haul route
for delivery of materials under this project. Loads may not exceed the maximum weight
of 80,000 lbs. Use of this route may be subject to change, pending construction of work
for bridge #SA 30-043 (being issued under a separate contract) and/or other condition
factors for the bridge itself.
Page 2 of 2
Please place this Addendum on the inside cover of your Contract Documents. Bids will not be
accepted without this Addenda being attached to your documents
Sign and date below, and return a copy of this sheet to our office immediately by email to
____________________________________
Bob Diamond, P.E.
Acknowledgement of receiving Addendum No. 1, ERBR-30(02) PARKERS LAKE BRIDGE REPLACEMENT PROJECT, is made by:
Received by: _________________________
Company: _________________________
Signed: _________________________
Date: _________________________
Ref. No. Pay Item No. Work Description
Roadway Items1 S-200-A MOBILIZATION 1 LS
2 S-201-A CLEARING AND GRUBBING 1 LS
3 S-202-B REMOVAL OF EXISTING BRIDGE (STA. 20+88.53) 1 UNIT
4 S-202-D REMOVAL OF ASPHALT PAVING (ALL DEPTHS) 4761 SQ
5 S-203-A UNCLASSIFIED EXCAVATION (FM) 1238 CY
6 S-203-E BORROW EXCAVATION (CONTRACTOR FURNISHED) (LVM) (CLASS 7) 59590 CY
7 S-240-A GEOGRID TYPE III (TRIAXIAL TYPE - TX160 OR EQUAL) 5858 SQ
8 S-304-C CRUSHED STONE (SIZE 610) (LVM) 3501 CY
9 S-403-A HOT MIX ASPHALT, ST, 9.5 MM 517 TON
10 S-403-A HOT MIX ASPHALT, ST, 12.5 MM 1123 TON
11 S-406-A COLD MILLING OF BITUMINOUS PAYEMENT, ALL DEPTHS 367 SY
12 S-606-B GUARDRAIL, "W" BEAM 275 LF
13 S-606-D GUARDRAIL, BRIDGE END SECTION, TYPE "I" THRIE BEAM 4 EA
14 S-606-E GUARDRAIL, TERMINAL END SECTION 4 EA
15 S-617-A RIGHT-OF-WAY MARKERS (TYPE I) 10 EA
16 S-618-A MAINTENANCE OF TRAFFIC 1 LS
17 S-618-B ADDITIONAL CONSTRUCTION SIGNS 0 SF 10.00 0.00
18 S-619-E 4" WIDE TEMPORARY TRAFFIC STRIPE (CONTINUOUS YELLOW) 3698 LF
19 S-619-E 4" WIDE TEMPORARY TRAFFIC STRIPE (CONTINUOUS WHITE) 3524 LF
20 S-619-E 4" WIDE TEMPORARY TRAFFIC STRIPE ( WHITE DETAIL) 126 LF
21 S-620-C 4" WIDE COLD PLASTIC EDGE STRIPE (CONTINUOUS WHITE) 0.21 MI
22 S-620-E-1 4" WIDE COLD PLASTIC EDGE STRIPE (CONTINUOUS YELLOW) 1104 LF
UnitApprox. Quantity
***SPECIAL NOTICE TO BIDDERS***BIDS WILL NOT BE CONSIDERED UNLESS BOTH UNIT PRICES AND ITEM TOTALS ARE ENTERED
For the construction of: BRIDGE REPLACEMENT AND APPROACH ROADWAY on 0.45 mile(s) of county road known as Wade-Vancleave Road in JACKSON
County, Mississippi under JACKSON COUNTY ERBR-30(02)
SECTION 902 PROPOSAL
PAGE 1
I (We) agree to complete the entire project within _300_ calendar days.
PROJECT NO: ERBR-30(02)
JACKSON COUNTY, MISSISSIPPI
Unit Price Item Total
REVISED PER ADDENDUM #1
Ref. No. Pay Item No. Work Description
ROADWAY ITEMS CONTINUED
23 S-621-C 4" WIDE THERMOPLASTIC EDGE STRIPE (CONTINUOUS WHITE)(60
MILS)0.67 MI
24 S-621-E-14" WIDE THERMOPLASTIC TRAFFIC STRIPE (CONTINOUS YELLOW)
(90 MILS)3698 LF
25 S-621-H-1 THERMOPLASTIC LEGEND (WHITE)(120 MILS) 126 LF
26 S-627-J TWO-WAY CLEAR REFLECTIVE HIGH PERFORMANCE RAISED MARKERS 60 EA
27 S-627-L TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKE 10 EA
28 S-630-BREFLECTORIZED TRAFFIC REGULATROY SIGN (ENCAPSULATED
LENS)2
EA
29 S-630-CREFLECTORIZED TRAFFIC OBJECT MARKER(ENCAPSULATED LENS)
TYPE 34 EA
30 S-631-A FLOWABLE FILL 240 CY
31 S-815-EGEOTEXTILE UNDER BRIDGE END TREATMENT, TYPE V, A.O.S. 0.21 -
0.43372 SY
EROSION CONTROL ITEMS32 S-211-B TOPSOIL FOR SLOPE TREATMENT (CONTR FURNISHED) (LVM) 1982 CY
33 901-S-212-A AGRICULTURAL LIMESTONE 6.2 TON
34 S-212-B COMMERCIAL FERTILIZER (13-13-13) 3.1 TON
35 S-212-F AMMONIM NITRATE 0.80 TON
36 S-214-A SEEDING 3.1 ACRE
37 S-215-A VEGETATIVE MATERIALS FOR MULCH 6.2 TON
38 S-226-A SOLID SODDING 2500 SY
39 S-227-A EXCELSIOR BLANKET 15910 SY
40 S-233-A TEMPORARY SILT FENCE (TYPE I)(AOS 0.15-0.84) 2878 LF
41 907-237-A WATTLE 20" 740 LF
42 907-234-G 5" OIL ABSORBENT BOOM * 578 LF
BIDS WILL NOT BE CONSIDERED UNLESS BOTH UNIT PRICES AND ITEM TOTALS ARE ENTERED
***SPECIAL NOTICE TO BIDDERS***
PAGE 2SECTION 902 PROPOSAL
Subtotal Roadway Items =
Unit Price Item TotalUnit
Subtotal Erosion Control Items =
Approx. Quantity
PROJECT NO: ERBR-30(02)
JACKSON COUNTY, MISSISSIPPI
REVISED PER ADDENDUM #1
Ref. No. Pay Item No. Work Description
BRIDGE ITEMS
43 901-S-803-I PDA TEST PILE 4 EA
44 S-803-B CONVENTIONAL STATIC PILE LOAD TEST 2 EA
45 S-803-C 14" PRESTRESSED CONCRETE PILING 1275 LF
46 S-803-C 18" PRESTRESSED CONCRETE PILING 1885 LF
47 S-803-F 18" PRE-FORMED PILE HOLE 540 LF
48 S-803-F 24" PRE-FORMED PILE HOLE 420 LF
49 901-S-803-J PILE RESTRIKE 4 EA
50 S-803-K DRILLED SHAFT, 72" DIAMETER 816 LF
51 S--803-M TRIAL SHAFT 72" DIAMETER 134 EA
52 S-803-N EXPLORATION 120 LF
53 S-803-O TEMPORARY CASING, 72" DIAMETER 450 LF
54 S-804-A BRIDGE CONCRETE, CLASS AA 850.7 CY
55 S-804-C 110' PRESTRESSED CONCRETE BEAM, TYPE 1+2 3842 LF
56 S-805-A REINFORCEMENT 150724 LBS
57 S-813-A CONCRETE RAILING 1100.00 LF
58 S-815-A LOOSE RIPRAP, 300 LB. 1614.0 TON
59 S-815-E GEOTEXTILE UNDER RIPRAP, TYPE V,A.O.S. 0.21-0.43 2619 SQ
Total Bid =
PAGE 3
Subtotal Bridge Items =
***SPECIAL NOTICE TO BIDDERS***
BIDS WILL NOT BE CONSIDERED UNLESS BOTH UNIT PRICES AND ITEM TOTALS ARE ENTERED
SECTION 902 PROPOSAL
Unit PriceUnitApprox. Quantity Item Total
PROJECT NO: ERBR-30(02)
JACKSON COUNTY, MISSISSIPPI
REVISED PER ADDENDUM #1
MISSISSIPPI DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION NO. 907-234-G CODE: (SP) DATE: 2/2019 SUBJECT: Oil Boom Section 234, Silt Fence, of the 2017 edition of the Mississippi Standard Specifications for Road and Bridge Construction is hereby amended as follows. 907-234.01- Description. Delete the first paragraph of Subsection 234.01 on page 180 and substitute the following: This work consists of furnishing and maintaining a containment oil boom for the purpose of containment of an oil spill to reduce the possibility of polluting shorelines and other resources, and recovery to the environment in accordance with the requirements shown on the plans, directed by the Engineer and these specifications. Oil Boom measured and paid as temporary shall be removed when no longer needed or permanent devices are installed. Delete the first sentence of the second paragraph of Subsection 234.01 on page 181 and substitute the following: It is understood that measurement and payment for oil boom will be made when a pay item is included in the proposal. 907-234.02-Materials. After the first paragraph of Subsection 234.02 on page 181, add the following: The oil absorbent boom shall be a 5” floating type boom for use in fast moving waters. The boom shall have rope running the length of the boom withstanding up to 400 lbs. loads. The boom must remain floating even if saturated. The boom must absorb and retain oils and oil based liquids, including diesel, without absorbing water.
1. 5” PIG Oil-Only Spaghetti Boom or approved equal.
907-234.03.3-Maintenance and Removal. At the end of the first paragraph of Subsection 234.03.2 on page 182, add the following: Unless otherwise directed, oil boom shall be maintained in accordance with the manufacturer’s recommended installation procedures for the duration of construction activities to which oily pollutants may originate. Upon completion of these activities, boom shall be removed and disposed of in accordance with applicable pollutant disposal procedures (if pollutants are present). 907-234-G 5” Oil Absorbent Boom Per LF
OO
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
OO
O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O OO
O
200.
00' E
XIST
ING
RIG
HT-
OF-
WAY
21+83.3164.64'
21+60.71-134.68'
TEMPORARY CONSTRUCTION EASEMENT
EXISTING RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
200'
EXI
STIN
G R
IGH
T-O
F-W
AY
WETLANDS
WETLANDS
WETLANDS
WETLANDS
CP4
22.6
5'
100'
MIS
SISS
IPPI
POW
ER C
OMPA
NY
RIG
HT-O
F-W
AY
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
EXISTINGSPUR DIKE
DATE:
DR. BY
CHECKED
SCALE
10/16/19
TARRIN
BOB
N.T.S.
89 L.F. OF 5" OILABSORBENT BOOM
86 L.F. OF 5" OILABSORBENT BOOM
1,159 L.F. OFSILT FENCE
882 L.F. OFSILT FENCE
20" WATTLES20 L.F.
REVISED
COMPLETED
10/21/2020
REVISED PERADDENDUM 1 11/13/2020
OO
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O
O O O O O O O O O O O OO
OO O O O O
OO
OO
OO O O
OO
OO
OO
OO
O
24" PINE
24" OAK
24" OAK
24" OAK
24" OAK
36" OAK
24" OAK
12" DOG
WOOD
36" LIVE
OAK
24" LIVE
OAK36" LIVE
OAK
36" LIVE
OAK
36" LIVE
OAK 36" LIVE
OAK
54" LIVE
OAK
30" OAK
48" OAK
42" OAK
42" OAK
36" OAK
30" GUM
12"
MAGNOLIA
36" LIVE
OAK36" TW
IN
OAK
30" OAK
30" OAK30" OAK36" PINE
48" OAK
36" LIVEOAK
TO REMAIN
24" OAK
10" OAK
18" OAK
24" OAK
PROPOSED RIGHT-OF-WAY EASEMENT
TEMPORARY CONSTRUCTION EASEMENT
PROPOSED RIGHT-OF-WAY EASEMENT
80' E
XIST
ING
RIG
HT-
OF-
WAY
TEMPORARY CONSTRUCTION EASEMENT
PROPOSED RIGHT-OF-WAY EASEMENT
PROPOSED RIGHT-OF-WAY EASEMENT
PRO
POSE
DAS
PHAL
TTU
RN
OU
T
OVERLAY EXISTINGGRAVEL AREA W/3"
LIMESTONE TO EASEMENTLINE
1930 S.Y.
PROPOSED GRAVELPARKING AREA 3"
LIMESTONE1800 S.Y.
WETLANDS
WETLANDS
WETLANDS
WET
LAND
S
WETLANDS
CP1
EXISTING 440' BRIDGE TO BE REMOVED
CONSTRUCTION LIMITS
CONSTRUCTION LIMITSCONSTRUCTION LIMITS
CONSTRUCTION LIMITS
ASPHALT DRIVEWAY244 S.Y.
ASPHALTDRIVEWAY TO BEREMOVED 212 S.Y.
DATE:
DR. BY
CHECKED
SCALE
10/16/19
TARRIN
BOB
N.T.S.
585 L.F. OFSILT FENCE
220 L.F. OF 5" OILABSORBENT BOOM
183 L.F. OF 5" OILABSORBENT BOOM
520 L.F. OFSILT FENCE
20" WATTLES20 L.F.
REVISED
COMPLETED
11/13/2020
REVISED PERADDENDUM 1 11/13/2020