basement flooding protection program summary ward 1 ......basement flooding protection program...

25
# # # Basement Flooding Protection Program Summary Ward 1 - Etobicoke North Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018 Completed Environmental Assessment (EA) Study Area Ongoing Environmental Assessment (EA) Study Area Future Environmental Assessment (EA) Study Area Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018 Study Areas in Ward Status of EA Studies EA Study Progress in Ward 11 Completed (2012) 41 Underway (Began in 2015) 35 Completed (2018) 39 Completed (2018) 48 EA to Begin in 2019 51 EA to Begin in 2019 36 Underway (Began in 2015) Basement Flooding Protection Program Implementation Summary - to end of 2018 Project Implementation Progress Project Highlights Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018 Program Participation Program Expenditures $ 1.36 M $ 1.10 M Subsidized by City Cost to Property Owners 1144 9110 Properties with FPD Properties without FPD 24% 25% 50% $ 6.1 M, 11% $ 44.0 M, 75% $ 8.4 M, 14% Design Process Initiated Planned for Design Initiation Deferred (>$32,000 per benefitting property) Constructed Under Construction TOTAL $ 58.5 M Study is Underway Area Studied Area to be Studied 1.1 km of storm sewer upgrades installed

Upload: others

Post on 31-Jul-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 1 - Etobicoke North

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

11 Completed (2012)

41 Underway (Began in 2015)

35 Completed (2018)39 Completed (2018)48 EA to Begin in 201951 EA to Begin in 201936 Underway (Began in 2015)

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 1.36 M $ 1.10 M

Subsidized by City Cost to Property Owners

1144 9110

Properties with FPD Properties without FPD

24%

25%

50%

$ 6.1 M, 11%

$ 44.0 M, 75%

$ 8.4 M, 14%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$ 58.5 M

Study isUnderway

Area Studied

Area to be Studied

• 1.1 km of storm sewer upgrades installed

Page 2: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Underway (Began in 2015)

Basement Flooding Protection Program Summary

Ward 2 - Etobicoke Centre

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

8 Completed (2012)9 Completed (2012)10 Completed (2012)7 Completed (2012)35 Completed (2018)

50 EA to Begin in 2019EA to Begin in 201948

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

EA to Begin in 2019

38

54

Underway (Began in 2015)

EA to Begin in 201951

Underway (Began in 2015)36

41

$ 5.61 M $ 4.63 M

Subsidized by City Cost to Property Owners

4714 15380

Properties with FPD Properties without FPD

22%

50%

28%

$ 12.4 M, 5%

$ 20.9 M, 8%

$ 226.7 M, 87%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$ 260.0 M

• 3.0 km of storm sewer upgrades installed

• 3.2 km of sanitarysewer upgrades installed

Page 3: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 3 - Etobicoke-Lakeshore

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

49 EA to Begin in 201951 EA to Begin in 201953 EA to Begin in 201954 EA to Begin in 201938 Underway (Began in 2015)

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 3.94 M $ 3.24 M

Subsidized by City Cost to Property Owners

3281 17325

Properties with FPD Properties without FPD

8%

92%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward

Page 4: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 4 - Parkdale-High Park

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

4 Completed (2014)

62 EA to Begin in 2019

5 Completed (2014)51 EA to Begin in 201944 EA to Begin in 201949 EA to Begin in 201942 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 2.99 M $ 2.55 M

Subsidized by City Cost to Property Owners

2518 8362

Properties with FPD Properties without FPD

7%

93%

$ 1.7 M, 100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$1.7M

Study isUnderway

Area Studied

Area to be Studied

Page 5: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 5 - York South-Weston

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

45 Underway (Began in 2017)

31646

Completed (2011)Completed (2012)Completed (2014)Completed (2014)

51 EA to Begin in 201944 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 1.86 M $ 1.58 M

Subsidized by City Cost to Property Owners

1535 14027

Properties with FPD Properties without FPD

54.1%

30%

16%

$ 37.1 M, 12%

$ 175.1 M, 56%

$ 49.8 M, 16%

$ 52.2 M, 16%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$314.3M

• Maple Leaf Park,Gracefield Park and Rustic Park Stormwater Ponds

• 4.8 km of stormsewers and 1.4 km of sanitary sewers upgraded

Page 6: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 6 - York Centre

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

EA to Begin in 201958

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

28 Completed (2008)14 Completed (2009)16 Completed (2012)15 Completed (2014)19 Completed (2014)24 Completed (2016)

66

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

65 EA to Begin in 2019Underway (Began in 2017)45

EA to Begin in 2019

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 2.16 M $ 1.78 M

Subsidized by City Cost to Property Owners

1801 12251

Properties with FPD Properties without FPD

44%

10%

47%

$ 16.3 M, 6%

$ 96.0 M, 37%

$ 15.2 M, 6%

$ 135.1 M, 51%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$262.6M

• 2.8 km of storm sewer upgrades installed

• 100 m of sanitarysewer upgrades installed

Page 7: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Completed (2014)Completed (2010)

Completed (2014)EA to Begin in 2019EA to Begin in 2019

1215135161

Basement Flooding Protection Program Summary

Ward 7 - Humber River-Black Creek

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

Completed (2009)14

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Underway (Began in 2017)45

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.69 M $ 0.52 M

Subsidized by City Cost to Property Owners

568 12498

Properties with FPD Properties without FPD

39%

21%

40%

$ 53.9 M, 46%

$ 8.4 M, 7%

$ 28.3 M, 24%

$ 26.6 M, 23%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$ 117.2 M

Study isUnderway

Area Studied

Area to be Studied

• 10.5 km of storm sewer upgrades installed

• 2.8 km of sanitarysewer upgrades installed

Page 8: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Underway (Began in 2015)

Basement Flooding Protection Program Summary

Ward 8 - Eglinton-Lawrence

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Completed (2018)

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

3 Completed (2011)16 Completed (2012)17 Completed (2014)18 Completed (2014)37

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

58 EA to Begin in 2019

40

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 3.73 M $ 3.09 M

Subsidized by City Cost to Property Owners

3111 16013

Properties with FPD Properties without FPD

51%41%

8%

TOTAL$ 444.2 M

Study isUnderway

Area Studied

Area to be Studied

• 1.1 km of storm sewer upgrades installed

• 600 m of sanitarysewer upgrades installed

$ 9.4 M, 2%

$ 11.5 M, 3%

$ 97.8 M, 22%

$ 49.8 M, 11%

$ 275.7 M, 62%Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Page 9: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 9 - Davenport

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

3 Completed (2011)37 Completed (2018)42 EA to Begin in 201944 EA to Begin in 201962 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 2.59 M $ 2.19 M

Subsidized by City Cost to Property Owners

2150 12656

Properties with FPD Properties without FPD

15%

85%

$ 15.5 M

$ 52.3 MDesign Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$ 67.9M

Study isUnderway

Area Studied

Area to be Studied

• Charles Caccia Park Combined Sewer Overflow Tank

• 1. 0 km of storm sewer upgradesinstalled

• 200 m of combined sewer upgrades installed

Page 10: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

42 EA to Begin in 201944

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

62 EA to Begin in 2019

EA to Begin in 2019

Basement Flooding Protection Program Summary

Ward 10 - Spadina-Fort York

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.45 M $ 0.40 M

Subsidized by City Cost to Property Owners

379 3498

Properties with FPD Properties without FPD

100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward

Page 11: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 11 - University-Rosedale

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

444246

EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 2.00 M $ 1.64 M

Subsidized by City Cost to Property Owners

1680 9558

Properties with FPD Properties without FPD

100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward

Page 12: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 12 - Toronto-St. Paul's

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

3 Completed (2011)44 EA to Begin in 201937 Completed (2018)40 Underway (Began in 2017)

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 2.50 M $ 2.08 M

Subsidized by City Cost to Property Owners

2091 10752

Properties with FPD Properties without FPD

24%

34%

42%

$ 52.3 M, 20%

$ 210.7 M, 80%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$ 263.0 M

Page 13: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 13 - Toronto Centre

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

44 EA to Begin in 201942 EA to Begin in 201962 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.29 M $ 0.22 M

Subsidized by City Cost to Property Owners

229 3170

Properties with FPD Properties without FPD

100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward

Page 14: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 14 - Toronto-Danforth

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

32 Completed (2012)62 EA to Begin in 201946 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 4.43 M $ 3.64 M

Subsidized by City Cost to Property Owners

3648 17563

Properties with FPD Properties without FPD

48%52%

$ 2.0 M, 15%

$ 11.6 M, 85%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$ 13.6 M

• 150 m of storm sewer upgradesinstalled

Page 15: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

58 EA to Begin in 2019

Underway (Began in 2015)

Basement Flooding Protection Program Summary

Ward 15 - Don Valley West

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

21 Completed (2016)46 EA to Begin in 201944 EA to Begin in 2019

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

2 Completed (2015)

40

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

20 Underway ( Began in 2012)

55 EA to Begin in 2019

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 2.34 M $ 2.00 M

Subsidized by City Cost to Property Owners

1995 14811

Properties with FPD Properties without FPD

18%

43%

39%

$ 13.1 M, 20%

$ 51.9 M, 80% Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$ 65.0 M

Study isUnderway

Area Studied

Area to be Studied

Page 16: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 16 - Don Valley East

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

30 Completed (2008)

EA to Begin in 2019

22 Completed (2014)23 Completed (2016)21 Completed (2016)

47 EA to Begin in 201955 EA to Begin in 2019

43 Underway (Began in 2017)Basement Flooding Protection Program Implementation Summary - to end of 2018

Project Implementation Progress Project Highlights

58

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.82 M $ 0.69 M

Subsidized by City Cost to Property Owners

695 8213

Properties with FPD Properties without FPD

37%

6%

57%

$ 47.0 M, 34%$ 92.2 M, 66%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$139.2 M

Study isUnderway

Area Studied

Area to be Studied

Page 17: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 17 - Don Valley North

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

29 Completed (2008)30 Completed (2008)17 Completed (2014)28 Completed (2008)55 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.63 M $ 0.50 M

Subsidized by City Cost to Property Owners

513 14715

Properties with FPD Properties without FPD

91%

9%

$ 34.5 M, 13%

$ 8.9 M, 3%

$ 223.0 M, 84%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

TOTAL$ 266.4 M

Study isUnderway

Area Studied

Area to be Studied

• Muirhead Park Stormwater Pond

• Old Sheppard Stormwater Storage Tank

• 6.2 km of storm sewers upgradesinstalled

• 1.2 km of sanitary sewer upgrades installed

Page 18: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 18 - Willowdale

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

28 Completed (2008)

43 Underway (Began in 2017)

18 Completed (2014)26 Completed (2016)25 Completed (2016)27 Completed (2017)58 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 1.28 M $ 1.09 M

Subsidized by City Cost to Property Owners

1083 14271

Properties with FPD Properties without FPD

93%

1% 6%

$ 50.7 M, 29%

$ 26.6 M, 16%

$ 95.5 M, 55%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$172.9M

• Moore Park Stormwater Pond

• 11.7 km of stormsewer upgrades installed

• 150 m of sanitary sewer upgrades installed

Page 19: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

55 EA to Begin in 2019

1 Completed (2014)46 EA to Begin in 201947 EA to Begin in 2019

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

32 Completed (2012)

Basement Flooding Protection Program Summary

Ward 19 - Beaches-East York

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

$ 0.89 M $ 0.67 M

Subsidized by City Cost to Property Owners

506 4645

Properties with FPD Properties without FPD

59%

41%

$ 22.35 M, 71%

$ 2.68 M, 8%

$ 6.55 M, 21%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$31.6M

Page 20: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

34 Underway (Began in 2015)

47 EA to Begin in 201952 EA to Begin in 201959 EA to Begin in 2019

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

33 Completed (2011)

Basement Flooding Protection Program Summary

Ward 20 - Scarborough Southwest

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

$ 0.42 M $ 0.31 M

Subsidized by City Cost to Property Owners

242 2681

Properties with FPD Properties without FPD

24%

48%

28%

$ 6.40 M, 65%

$ 3.50 M, 35%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$9.9M

Page 21: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

3047

Completed (2008)EA to Begin in 2019

Basement Flooding Protection Program Summary

Ward 21 - Scarborough Centre

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

52 EA to Begin in 2019

60 EA to Begin in 201934 Underway (Began in 2015)

59 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 1.02 M $ 0.83 M

Subsidized by City Cost to Property Owners

861 16695

Properties with FPD Properties without FPD

25%

1%

75%

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$24.7M

$ 24.7 M, 100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Page 22: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

30 Completed (2008)

Basement Flooding Protection Program Summary

Ward 22 - Scarborough-Agincourt

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

31 Completed (2011)

59 EA to Begin in 201960 EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.29 M $ 0.24 M

Subsidized by City Cost to Property Owners

233 15131

Properties with FPD Properties without FPD

74%

26%

$ 12.1 M, 54%

$ 10.4 M, 46%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

TOTAL$22.4M

• 1.7 km of storm sewer upgrades installed

• 300 m of sanitarysewer upgrades installed

Page 23: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 23 - Scarborough North

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

59 EA to Begin in 201960 EA to Begin in 201963 EA to Begin in 201964 EA to Begin in 2019

0

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.16 M $ 0.13 M

Subsidized by City Cost to Property Owners

126 17665

Properties with FPD Properties without FPD

100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward

Page 24: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 24 - Scarborough-Guildwood

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

605957

EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.57 M $ 0.49 M

Subsidized by City Cost to Property Owners

483 14871

Properties with FPD Properties without FPD

100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward

Page 25: Basement Flooding Protection Program Summary Ward 1 ......Basement Flooding Protection Program Summary Ward 7 - Humber River-Black Creek Properties With Installed Flooding Protection

###

Basement Flooding Protection Program Summary

Ward 25 - Scarborough-Rouge Park

Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018

Completed Environmental Assessment (EA) Study Area

Ongoing Environmental Assessment (EA) Study Area

Future Environmental Assessment (EA) Study Area

Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018

Study Areas in Ward Status of EA Studies EA Study Progress in Ward

67 EA to Begin in 2019

5657596364

EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019

Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights

Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures

$ 0.48 M $ 0.41 M

Subsidized by City Cost to Property Owners

406 21452

Properties with FPD Properties without FPD

100%

Design Process Initiated

Planned for Design Initiation

Deferred (>$32,000 per benefitting property)

Constructed

Under Construction

Study isUnderway

Area Studied

Area to be Studied

Implementation will proceed followingcompletion of the next Environmental

Assessment Study in this ward