basement car park - steelpilinggroup.org · rate of pile installation. the flexibility of the...

2
Steel Piling Group | Case Study www.steelpilinggroup.org | © Copyright 2018 Wembley, London | 2008 Page 1 of 2 Client John Sisk and Sons Contractor Fussey Piling Limited Location Wembley, London Scope Permanent sheet piled retaining wall with heights up to 4.0m Piles Arcelor Mittal PU18-1mm, PU22-1mm and PU28-1mm in lengths 7.0m long to 12.0m in Grade S355GP Ground Conditions Made Ground over London Clay Value £550k approx. Completion Date 2008 Basement Car Park Wembley, London Maritime | Highway | Rail | Buildings | Sustainability | Specialist Work

Upload: lamnga

Post on 01-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Steel Piling Group | Case Study

www.steelpilinggroup.org | © Copyright 2018Wembley, London | 2008 Page 1 of 2

Client John Sisk and Sons

Contractor Fussey Piling Limited

Location Wembley, London

Scope Permanent sheet piled retaining wall with heights up to 4.0m

Piles Arcelor Mittal PU18-1mm, PU22-1mm and PU28-1mm in lengths 7.0m long to 12.0m in Grade S355GP

Ground Conditions Made Ground over London Clay

Value £550k approx.

Completion Date 2008

Basement Car ParkWembley, London

Maritime | Highway | Rail | Buildings | Sustainability | Specialist Work

www.steelpilinggroup.org | © Copyright 2018

Basement Car ParkWembley, London

Fussey Piling were engaged by John Sisk to design and install a 288m run of steel sheet piling for a basement car park, close to Wembley Stadium. Steel sheet piling was identified as the most economical solution as it could be used as both the temporary and permanent works.

First, the sheet piles were driven using a “Silent & Vibration-Free” Kowan WP150 StillWorker, assisted by water jetting to improve the rate of pile installation. The flexibility of the attendant Sennebogen crawler crane allowed suitable piling platforms to be formed across the sloping site.

Fussey Piling returned to site to install temporary propping and weld the sheet pile clutches, providing a waterproof wall which was painted to the architect’s specification.

Wembley, London | 2008 Page 2 of 2

Layer Depth (m BGL)

Soil Description

Top Base

1 0.0 0.0 to 4.0m Made Ground

2 0.0 to 4.0m Not Proven

London Clay