Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August 2011. Topics. The CDM process Baseline and additionality. The CDM. Rules based mechanism Complex regulatory structures Many actors participating Transparency of processes Time consuming. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Baseline and Additionality in the CDM

Dr. Oscar Coto

II National CDM Workshop

Belize

August 2011

Page 2: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Topics

1. The CDM process

2. Baseline and additionality

Page 3: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

The CDM

• Rules based mechanism

• Complex regulatory structures

• Many actors participating

• Transparency of processes

• Time consuming

Page 4: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Principles of the CDM

• Consistency• Transparency• Impartiality• Independence• Confidentiality

Page 6: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Overview of the CDM project cycle

Page 7: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

The Project Design Document

Page 8: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

A few important concepts

• Baseline scenario

• Baseline methodology

• Crediting period

• Additionality

Page 9: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Baseline in the CDM

Page 10: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

A CDM project must use an approved baseline methodology

Joergen will follow up on these !

Page 11: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

A CDM project is additional …

If GHG emissions are reduced below those that would have ocurred in the absence of the registered project activity

PPs have to write explanation on how and why the project is additional and therefore not the baseline scenario in accordance to selected baseline methodology

There are tools and approaches available for the demonstration of additionality

Page 12: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Additionality

Page 13: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Tool for determination of

additionality in the CDM

Small scale projects should use barrier

analysis

Projects under 5 MW can use expedite

process

Page 14: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Additionality for renewables under 5 MW

Page 15: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

Validation and additionality

Page 16: Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August  2011

So …

• Be prepared

• Follow through

• Be patient