1 9 th World Seminar on Seismic Isolation, Energy Dissipation and Active Vibration Control of Structures, Kobe, Japan, June 13-16, 2005 BASE ISOLATION AND STRUCTURAL CONFIGURATION THE NEW EMERGENCY MANAGEMENT CENTRE IN UMBRIA Alberto Parducci 1 , Sandro Costantini 2 , Alfredo Marimpietri 3 , Marco Mezzi 1 , Roberto Radicchia 3 , G. Tommesani 1 University of Perugia-GLIS-TEKNO IN, 2 Regione Umbria, 3 TEKNO IN S.r.l. ABSTRACT This paper illustrates the design criteria that guided the architectural and structural designs of the base isolated buildings of the new Emergency Management Centre of Foligno (Umbria). A special attention was paid to the architectural shapes and structural configurations. They have been selected in order to maximize the effectiveness of the seismic protection that can be achieved through the Base Isolation approach. The high potentiality of the Base Isolation option is also illustrated showing its capacity to solve the design problems that arose when, at the end of a first structural design phase, the new Italian seismic code attributed Foligno to a higher level of seismic risk. The construction works of the buildings are now in progress. 1. INTRODUCTION The local Government of the Umbria Region have financed the design and construction of the new building complex of the "Emergency Management Centre", located in a wide area neighbouring of Foligno. The Centre will be the operative basis of the national "Seismic Management Service" for the activities in Central Italy. The buildings will be provided with Base Isolation systems. The building complex extends in a large area of about 35 hectares. A technical staff of the Umbria Region planned the arrangement of this area, including in it the following building sections (Figure 1): (1) Central operative building (the dome building); (2) Administration; (3) Training and meeting hall; (4) Fireman barracks (quarters and parking); (5) Red Cross (provisional quarters and storehouse); (6) Car-park; (7) Corps of foresters; (8) Service centre; (9) Protection of the cultural values; (10) Storehouse; (11) Water provision.

Upload: others

Post on 03-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

1

9th World Seminar on Seismic Isolation, Energy Dissipation and Active Vibration Control of Structures, Kobe, Japan, June 13-16, 2005

BASE ISOLATION AND STRUCTURAL CONFIGURATION THE NEW EMERGENCY MANAGEMENT CENTRE IN UMBRIA

Alberto Parducci1, Sandro Costantini2, Alfredo Marimpietri3, Marco Mezzi1, Roberto Radicchia3, G. Tommesani

1University of Perugia-GLIS-TEKNO IN, 2Regione Umbria, 3TEKNO IN S.r.l.

ABSTRACT This paper illustrates the design criteria that guided the architectural and structural designs of the base isolated buildings of the new Emergency Management Centre of Foligno (Umbria). A special attention was paid to the architectural shapes and structural configurations. They have been selected in order to maximize the effectiveness of the seismic protection that can be achieved through the Base Isolation approach. The high potentiality of the Base Isolation option is also illustrated showing its capacity to solve the design problems that arose when, at the end of a first structural design phase, the new Italian seismic code attributed Foligno to a higher level of seismic risk. The construction works of the buildings are now in progress.

1. INTRODUCTION

The local Government of the Umbria Region have financed the design and construction of the new building complex of the "Emergency Management Centre", located in a wide area neighbouring of Foligno. The Centre will be the operative basis of the national "Seismic Management Service" for the activities in Central Italy. The buildings will be provided with Base Isolation systems.

The building complex extends in a large area of about 35 hectares. A technical staff of the Umbria Region planned the arrangement of this area, including in it the following building sections (Figure 1):

(1) Central operative building (the dome building); (2) Administration; (3) Training and meeting hall; (4) Fireman barracks (quarters and parking); (5) Red Cross (provisional quarters and storehouse); (6) Car-park; (7) Corps of foresters; (8) Service centre; (9) Protection of the cultural values; (10) Storehouse; (11) Water provision.

2

The buildings from (1) to (9) and their complementary units have been designed providing them with Base Isolation systems. Only the buildings (10) and (11) have fixed-base structure, because they had been built before the decision to enhance the seismic protection of the Centre by the Base Isolation option.

Figure 1 General view of the Emergency Management Centre In the Foligno town The construction of the building (4) has been completed, The construction works of the buildings (1), (2), (3), (7) and (8) are in progress. The structural designs of the buildings (5) and (6) have been completed; their construction will start at the end of the present year. 2. DESCRIPTION OF THE MAIN BUILDINGS The most significant structural characteristics of the main buildings of the Centre are illustrated in the following points. Particular attention is paid to emphasize the performances that can be achieved by an appropriate use of the Base Isolation approach. 2.1. The dome building of the operative centre The dome building (1) is the operative heart of the Centre. The shape of this structure represents a typical sample of a favourable arrangement that improve the Base Isolation

(1)

(4)

(9)

(5) (6) (8)

(10)

(11)

(2)

(3)

(7)

3

performance. The shape of the building has been conceived to enhance the compactness of the structure and to achieve the optimum criteria for the distributions of masses and stiffness have been applied. The structural configuration is a circular false-dome with a diameter of 31 meters. A set of 10 reinforced concrete semi-arches, supported by 10 boundary HDRB isolators Ø=1000 mm, are the main structural elements. The radial semi-arches stand from a peripheral ring situated at the first floor and sustain, at their top, a suspended prestressed cylindrical core containing lifts and stairs (Figure 2). A rigid peripheral shell system connects this ring to the rubber isolators situated at the base of the building, upon the soil. Three levels of floor slabs join the arches to the central core to form a compact boxed structure. Since the central core is a suspended element, the whole structure is supported only by 10 peripheral isolators, so that the torsion stiffness is maximized. This unusual but consistent configuration has made also possible to satisfy the architectural requirement to leave an open pedestrian first storey, avoiding the use of the "pilotis" scheme, too dangerous in a seismic zone.

The structure has been designed to overcome without damage the "maximum credible earthquake", that was defined as the event having an average return period of about 1000 years. The final design parameters are shown in Table 1. Although a severe seismic demand

- 0 .7 0

- 0.3 0

- 0 .3 0

- 0.3 0

- 0.3 0

- 0.3 0

ISOLATORE SISMICO

SEZIONE VERTICALE DI UN APPOGGIO

SEZIONE ORIZZONTALEDI UN APPOGGIO CON

PIANTA GENERALE DEGLI APPOGGI

SEZIONE LONGITUDINALE

ISOLATORE SISMICO

- 0 .7 0

- 0.3 0

- 0 .3 0

- 0.3 0

- 0.3 0

- 0.3 0

ISOLATORE SISMICO

SEZIONE VERTICALE DI UN APPOGGIO

SEZIONE ORIZZONTALEDI UN APPOGGIO CON

PIANTA GENERALE DEGLI APPOGGI

SEZIONE LONGITUDINALE

ISOLATORE SISMICO

- 0 .7 0

- 0.3 0

- 0 .3 0

- 0.3 0

- 0.3 0

- 0.3 0

ISOLATORE SISMICO

SEZIONE VERTICALE DI UN APPOGGIO

SEZIONE ORIZZONTALEDI UN APPOGGIO CON

PIANTA GENERALE DEGLI APPOGGI

SEZIONE LONGITUDINALE

ISOLATORE SISMICO

Figure 2 General layout of the dome building and surrounding structures.

4

was assumed, high values of the Capacity/Demand ratios have been reached for all the structural elements, because the architectural needs have conditioned the dimensioning of the main structural elements more than the results of the numerical calculations, while the minimum reinforcement ratios required by the design codes have been complied with.

In order to emphasize the design flexibility that can be achieved using the Base Isolation

approach, it is to underline that a first set of the executive structural drawings, together with those of the buildings (2) and (3), had been carried out considering a seismic area 2 and assuming the recommended basic value of PGA=0.25g, corresponding to a return period R=475 year. In addition a safety factor γI=1.4, required by the particular use of the building, was also applied to enhance the seismic return period to R�1000 years.

Table 1 Seismic isolation data of the dome building (final design)

INPUT DATA

PGA (peak ground acceleration) 0.49g

η-reduction factor for 10% dissipating capacity of the isolation devices 0.816

Response acceleration at the isolated period 0.182g

RESPONSE OF THE BASE-ISOLATED STRUCTURE

Lateral isolated period for lateral displacements of 200÷405 mm 2.62 s

Maximum design displacement of the isolation devices 405 mm

q-reduction factor for the required ultimate resistance of the structure 1.38

Minimum C/D ratio of the structural elements at the ULS 2.01

To exemplify the following problem we can refer to the dome building, where the isolation system in this design phase consisted of 10 HDRB Ø=800 mm, medium stiff rubber compound (shear modulus G=0.8 N/mm2), which generated a natural period of 2.1 seconds. The design had been performed before the new Italian code (Ordinanza 3274/03) was issued,

Figure 3 Rendering of the dome building.

5

using provisional restrictive recommendations. When this design phase was entirely concluded, the new Italian code was edited. More advanced design procedures have been defined, but the seismic intensity of the Foligno's area was revised and the site was classified at the higher level 1. Therefore, also the structural design had to be revised, taking into account the new final value of 0.49g required for the PGA corresponding to the same return period of about 1000 years and the same building destination (γI=1.4).

Thanks to the design flexibility of the Base Isolation approach, since a well designed base isolated structure oscillates like a rigid body above the isolating interface, it was possible to modify only the isolation system to make the same designed structure consistent with the new seismic requirements. Larger, higher and more flexible devices were designed (10 HDRB Ø=1000 mm, G=0.4 N/mm2) in order to increase the natural period from 2.1 to 2.62 seconds. In this way, the same previous shear demand at the base of the building was kept. Consequently, the maximum horizontal displacement that the isolators should undergo grew from 281 to 405 mm, but this made possible to preserve the previous structural project. This result also means that it is possible to design the base isolation systems more with reference to the actual resistance of the upper structure, than to the intensity of the seismic input. Then the common idea that the structure is designed to oppose a given seismic input can be inverted in a suitably way. This is an important aspect of the seismic design that enhance the interest for the Base Isolation approach when to be used in the retrofitting design of existent buildings.

2.2. The two buildings around the dome The building (2) is a simple two storey structure made by radial reinforced concrete walls and stiff elements in the transverse direction. The building (3) consists of two different elements: a three storey office and an adjacent conference hall (Figure 4). Owing to their different structural systems and dimensions, they are characterized by different lateral performances under the seismic actions. In order to reduce the structural gap between them, they have been designed upon the same ground floor slab which is supported by a single isolation system. So, the dimension of the structural gap does not depend on the deformations of the isolation devices.

SEZIONE VERTICALEZONA UFFICI

PIANTA QUOTA ISOLATORI

SEZIONE VERTICALESALA CONFERENZE

Figure 4 Plant and transverse sections of the two sections of the building (3).

6

The buildings (2) and (3) are connected at the first floor level by a light telescopic flyover (Figure 2) which makes the large relative deformations possible.

2.3. The fireman barracks This is the first building, among those provided with a Base Isolation system, which has been completed (Figure 5). The shape and architectural configuration were previously defined when the Umbria Region decided to provide the buildings of the "Emergency Management Centre" with Base Isolation protection systems. It was designed by the architects of the Ministry. The morphology and distribution reproduce the same typology of other similar constructions which include in the same element both quarters, meeting rooms and parking.

The building is shaped as a long rectangular element, about 72 m long and 17 m large.

Nearly 2/3 of the length contains the lodgings and meeting rooms of the firemen; in the other section there is the parking-place of the cars which are used for the help interventions (Figure 6). In the architectural design a planar modular net with large dimensions (7.20x7.20 m) had been assumed. The weight of these cars is very high (16 kN/m2). Therefore, it was not a suitable solution to isolate the pavement of the parking, because this arrangement should require a floor structure subjected to unusual stresses, instead of pavement resting on the soil.

Since the challenge consisted on the respect of the architectural morphology, the option of two separate structural sections was avoided. On the other hand, the architectural design included the continuous structure of a large triangular reinforced concrete roof element. Then, it was possible to assign it the task of a rigid structural element along all the longitudinal dimension of the building. This element forms an effective transverse connection between the two sections of the building in which the position of the isolation/bearing devices is different. In the first section the devices are placed in the usual position, under the floor of the lodging area; on the contrary, they have been placed at the bottom of the columns of the parking section (Figure 6).

Figure 5 View of the firemen barracks during the construction.

7

2.4. Other buildings The Red Cross building (5) includes an office block and a warehouse. The architectural and structural designs have been completed. The construction works will start in this year. The Figure 9 shows the transverse section and the location of the devices which isolate the prestressed concrete ceiling.

Figure 9 Transverse section of the Red Cross building ACKNOWLEDGEMENTS A special thanks is given to all the technicians who worked for the design and carrying out of the buildings illustrated in this paper. The seismic design of all the base isolated structures of the new Emergency Management Centre of Foligno was committed to A. Parducci who worked with the collaboration of A. Marimpietri, M. Mezzi and R. Radicchia of the TEKNO IN S.r.l. Society of Rome. G. Tommesani carried out the

Figure 6 Longitudinal section of the barracks an a view of the isolators in the parking block.

8

architectural design of the buildings of the dome group. The structural design of the dome building was revised by S. Naaseh of the Forell/Elsesser. The general management for the construction of all the Centre and the urban arrangement of the area has being carried out by the Regione Umbria (a special thank is given to co-ordination work made by S. Costantini). The Superintendent's Office for the Public Works of Perugia managed the construction works of the firemen barracks. REFERENCES

Arnold C., Reitherman R. (1982) Building Configuration and Seismic Design. John Wiley & Sons - New York, 1982.

Arnold C. (1989) Architectural Considerations. Seismic Design Handbook, F. Naeim editor. Von Nostrand, New York, 1889.

Mezzi. M., Parducci A., Verducci P. (2004). Architectural and Structural Configurations of Buildings with Innovative Aseismic Systems. 13th World Conference on Earthquake Engineering, Vancouver, B.C., Canada, August 2004 (paper 1318).

Naeim F., Kelly J. M. (1999) Design of Seismic Isolated Structures. John Wiley & Sons. New York, 1999.

Parducci A. (1985) Impiego di Apparecchiature Dissipative Speciali per la Riduzione della Risposta Sismica. "Edilizia e Infrastrutture", Preliminary Report, Convegno C.T.E., Perugia, November 1985 (in Italian).

Parducci A., Medeot R. (1985) Special Dissipating Devices for Reducing the Seismic Response of Structures. Pacific Conference on Earthquake Engineering, Wairakei (New Zealand), August 1987.

Parducci A. (1999) Seismic Isolation: Why, Where, When: Option for Ordinary Isolated Buildings. International Post-Smirt Conference Seminar on Isolation, Energy Dissipation and Control of Vibration of Structures - Cheju (Korea), August 23÷25, 1999.

Parducci A. (2001) Seismic Isolation and Architectural Configuration, Specialty Conference on "The Conceptual Approach to Structural Design" - Singapore - August 29-30, 2001.

Skinner R. I., Robinson W. H., McVerry G H. (1993) An Introduction to Seismic Isolation. DSIR Physical Sciences, Wellington (New Zealand) - John Wiley & Sons, 1993.