Barnstable Public SchoolsIntegrated Preschool Presentation
Town Council MeetingNovember 20, 2014
Phases II and III
![Page 2: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/2.jpg)
Phase II and III Acceleration
Remove:2 Remaining Portable Trailers at Barnstable West Barnstable Elementary School
3 Remaining Portable Trailers at Hyannis West Elementary School
![Page 3: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/3.jpg)
Phase II and III Acceleration (cont.)
Project Design CostsAppropriation Order of $172,000 for Construction Modular Classrooms at BWB and Hyannis West Elementary Schools
![Page 4: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/4.jpg)
Rationale
Between 1979 and 1992:• Barnstable installed 19 portable
temporary classrooms as student enrollment increased during this period of time.
• This was a temporary measure until a more permanent solution could be determined.
![Page 5: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/5.jpg)
Current Status
Only 6 portable trailers remain• Five of the six trailers are used as educational
spaces• One trailer houses the administrative office for
the Early Learning Center
![Page 6: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/6.jpg)
Current Use of Trailers for Educational Instructional Spaces
West Barnstable (BWB) – identified as a long-term school facility (TAMS Report 2003) as it is the only north side school in Barnstable.– Two trailers are used for special education,
art, music and technology. – School library is located on stage in cafeteria.– Current and future needs require the existing
2 trailers be demolished and replaced with permanent modular classrooms of 3,920 sq. ft.
![Page 7: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/7.jpg)
7
![Page 8: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/8.jpg)
![Page 9: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/9.jpg)
![Page 10: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/10.jpg)
![Page 11: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/11.jpg)
![Page 12: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/12.jpg)
Current Use of Trailers for Educational Instructional Spaces (cont.)
Hyannis West Elementary School houses 3 trailers installed in 1992 totaling 3,456 sq. ft.• School programs are housed in areas not intended for academic use:
– Reading support is held in a former locker room and on the cafeteria stage
– Small group math instruction is held in a locker room– Occupational therapy, physical therapy and Gateway instruction are
in outdated temporary buildings – Space Assessment (TBA Architects, 2013) identifies Hyannis West
Elementary school as having only 89% of the required space needed to educate a population of 340
– Current and future needs require the existing temporary space be replaced with permanent modular classrooms totaling 5,040 sq. ft.
![Page 13: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/13.jpg)
13
![Page 14: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/14.jpg)
14
![Page 15: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/15.jpg)
![Page 16: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/16.jpg)
16
![Page 17: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/17.jpg)
17
![Page 18: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/18.jpg)
Impact of Removal of Trailers without Replacing Space
BWB Principal Mr. Frank Gigliotti
Hyannis West Principal Mrs. Kathi Amato
![Page 19: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/19.jpg)
Hyannis West Growth
![Page 20: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III](https://reader038.vdocuments.site/reader038/viewer/2022103122/56649cb95503460f94980e41/html5/thumbnails/20.jpg)
Preliminary Review of Space Requirements and Fiscal Impact
Appropriation Order Request of $172,000 for:–Design costs to replace 5 trailers over two
elementary school campuses totaling 8960 sq.ft.– Funding would be provided from the School
Department’s allocation of General Fund reserves, which has an available balance of $4.7 million