barnard trace - green country lid competitionlidcompetition.okstate.edu/howell_site_3.pdf ·...

27
Barnard Trace Urban Residential Redevelopment Jeff Dalton, AIA

Upload: others

Post on 10-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Barnard Trace

Urban Residential Redevelopment

Jeff Dalton, AIA

Page 2: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Goals

At least 18 homes that match look and feel of surrounding Historic Districts

Barnard Trace

Development

Similar lot widths / sizes Housing style Alignment

Page 3: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Goals

Avoid lots on lower level - Reduce road / utilities

- Increase marketability

- Provide open space

Preserve ALL existing WPA walls and stairways / entryways use as assets

Preserve existing street trees and iconic gum tree / seating

Page 4: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Goals

Reduce imperviousness to maximum reasonable extent

Shared Driveways

Hammerhead

turnaround 25%

imperviousness vs.

40 ft. radius cul-

de-sac

Shorter / narrower streets

14’

Page 5: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Goals

LID stormwater controls in common areas

Easier maintenance Greater visibility

Pervious street

Pervious sidewalk

Reduce Peak Flows and Filter Runoff

Pervious

Pavement Bioretention Cells Bioswales

Page 6: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Site Plan

1

3

2

40%

open space

3

Page 7: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Site Plan

Page 8: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Site Plan

Page 9: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Cluster Development (72% are 45’ x 100’ lots)

Code Challenge

No structures over Utility Easement

Page 10: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Barnard Trace Code Challenges (lots)

18 lots

RS-3

RS-5

(proposed) Yorktown Conv. Design LID Design

Min. Lot Width (ft) 60 30 40 50 45

Min. Lot Area (sq. ft.) 6,900 3,750 4,000 6,800 4,500

Page 11: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Code Opportunities

Planned Unit Developments (PUD)

“greater flexibility to…preserve meaningful open space”

“assuring compatibility with adjoining…properties.”

Utica Midtown Corridor

Small Area Plan

“Support open space…in the

redevelopment

of the Barnard…site”. p. 240

Adopted 1/10/14

Page 12: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Additional Code Challenges

Illegal material

Cannot replace

detention or

fee-in-lieu No streets under 26’

Illegal

turnaround

RS-3 requires 25 foot front yard

RS-3 requires 20 foot rear yard

Pervious street

Our design can be easily altered to meet codes, if necessary

Page 13: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

17th Street looking south

Historic Neighborhood

NTS

17th Place looking north

Approved in Swan Lake

Historic District

Page 14: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Park – Central

Community Garden / Rainwater Silo

Tree and Entryway

Bioretention cell Bioswale

Page 15: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Park - Eastern

Bio-

retention

All WPA Walls preserved

Park Benches

Dry Streambed

Picnic Tables

Pervious

Trails

Playground

Arch Entry

Monument

Flagpole

Lawn

Page 16: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Open Space Plan - Park

Land Legacy to develop and manage open

space:

• Raise funds

• Develop

• Manage / maintain (or find someone who

will)

Strong candidate:

• No other open space in neighborhood

• Historic significance

• Fund-raising potential

Benefits to developer:

• Tax savings (about $160,000)

• Reduce development cost

• No maintenance plans

1.6 acres preserved (40% of development) Chapman Green in downtown Tulsa

A Land Legacy Park

Land Legacy Pocket Park on Archer

Page 17: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Public Acceptance

Keep all WPA walls & stairs

Honor the historic school site

Look and feel of community

Preserve trees

40% as community park open space

Page 18: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Bu

sy S

tre

et (2

) (

15

% r

ed

uctio

n)

$1

36

,00

0

Ne

ar

Bu

sy S

tre

et (2

) (5

% r

ed

uctio

n)

$1

52

,00

0

Typical Neighborhood

(14)

$1,120,000

Near Park (4)

10-20%

premium

$368,000

Adjacent to Village

Green (14)

25% premium

$1,400,000

Ta

x S

avin

gs (

Pa

rk)

$1

60

,00

0

$0 $500,000 $1,000,000 $1,500,000 $2,000,000

Typical Marketability

LID Marketability

Marketability Comparison

Based on $80,000 average lot value (conservative).

Property purchased for $1,005,000 + $450,000 conventional development = $1,455.000 (vs. $1,408,000

marketability)

$520,000

benefit! $176,000 for

2 extra lots

Page 19: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Stormwater Design water flow

direction Water recaptured from street!

Page 20: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Over $100,000 saved (25%)

$0 $100,000 $200,000 $300,000 $400,000 $500,000

Typical Development

LID Construction Cost

Construction Cost Comparison

Typical Concrete

Pervious Pavement

Sanitary Sewer Line

Sanitary Man Holes

Water Line

Bio Retention

General Landscaping

Typical Sidewalk

Earthwork

Bioretention

Page 21: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Storm Flow Reduction

Pre-Development: Current site condition.

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.00

20% Storm 10% Storm 2% Storm 1 % Storm

Pe

ak F

low

(C

FS

)

Storm Event

Grassland Development Pre-Development Typical Development Peak Flow Low Impact Development Peak Flow

Page 22: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Cause of Impairment Cause of Impairment Group State TMDL Development Status

Dissolved Oxygen Organic Enrichment/Oxygen Depletion TMDL needed

Escherichia Coli (E. Coli) Pathogens TMDL needed

Fish Bioassessments Cause Unknown - Impaired Biota TMDL needed

Barnard

Trace

Crow Creek

Excessive algae –

elevated Nutrients

Fertilizers, pet waste, hot runoff from impervious surfaces

Page 23: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

0%

100%

200%

Impervious Area (AC) TSS Nitrogen Phosporous Metals Pathogens

Po

llutio

n C

ha

ng

e

(% o

f E

xis

tin

g)

Pollution Reduction

Typical Development Low Impact Development

Also, cooler temperature runoff from the LID development:

- 57% less paved area (less heating) - Runoff filtered into ground (cooling)

Page 24: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Low maintenance native plants:

• Remove pollutants

• Withstand periods of wet

• Tolerate dry periods

Grasses

• Prevent erosion

• Winter interest

Shrubs and perennials

• Seasonal color

• Attract native insects

Sedges, Rushes, and Grasses

Plants for Bioretention

Perennials

Shrubs

Page 25: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

1.6 acres taken out of homeowner management:

• Native plants with low nutrient and water needs.

• Buffalo grass turf

– drought-tolerant

– very low nutrient needs

Stormwater Quality – Landscape Plan

Page 26: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Further reduce inputs :

• Signage and sales package flyers

nutrients & pet waste

• Pet waste stations

nutrients & pathogens

Stormwater Quality - Education

Page 27: Barnard Trace - Green Country LID Competitionlidcompetition.okstate.edu/Howell_Site_3.pdf · Barnard Trace Code Challenges (lots) 18 lots RS-3 RS-5 (proposed) Yorktown Conv. Design

Treated stormwater

Up to $800,000 in increased profit for developer!

Community Rich history Historic look and feel

Reduced peak runoff