barbara inderwiesche kuali coeus administrator office of research kuali coeus update qram november...

12
Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Upload: thomasina-alexander

Post on 26-Dec-2015

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Barbara Inderwiesche

Kuali Coeus Administrator

Office of Research

Kuali Coeus UpdateQRAM November 2013

Page 2: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Updates• All departments are now live

• SPA no longer accepting AA Form

• Websites updated to reflect this• AA Form no longer posted

• Replacing documents while in workflow (tonight’s turnover)

Page 3: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

• Budget Versions / Parameters:• Unrecovered F&A Field has been removed• Enter total costs cost shared• Award synopsis will no longer breakout direct

& F&A cost shared - total

Page 4: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

• Proposal Number implementation• Proposal Development Document – document of record• Award synopses will reference this proposal number• A Proposal Number lookup will be added in SNAP

Page 5: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Barbara’s Maternity Leave

• December 1, 2013 through March 3, 2013

• No system enhancements during this period

• No formal hands on training

• Immediate help requests only – via email

Page 6: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013
Page 7: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Reminders• Editing a Complete / Final budget

– On the Budget Versions tab, on the Status menu, change the status to “Incomplete”. Click SAVE. Click Open.

• Verify F&A Rate Type

Page 8: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

• Attachments – where they go and why we care• Attach *ONE* proposal package in Abstracts & Attachments tab • Personnel Attachments panel is not in use• Attach Program Announcement / solicitation / instructions under

Internal Attachments.

Page 9: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

• Proposal tab – Organization Location panel: • FOR UCI LOCATIONS, use the lookup to search for building

name• Congressional District is now auto-populated based on the code

• Enter free text for *off-site locations only*

Page 10: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

• Changes to workflow and access – contact your Departmental Security Administrator (DSA)

• Use MISC SPONSOR code 009850 as a placeholder

• Refrain from replying to KC-Admin-donotreply email notifications

• When in doubt, check the Route Log first, then SPA.

• On Proposal Tab, Document Overview panel, utilize “Explanation” field.

More tips…

Submit early!!

Page 11: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Training Opportunity • Hands on training session

• Thursday, November 14, 2013

• 9:00AM - 11:15AM

• AIRB 1020

• Space is available! • Register in the UC Learning Center • Search for “COEUS”

Page 12: Barbara Inderwiesche Kuali Coeus Administrator Office of Research Kuali Coeus Update QRAM November 2013

Contacts• Subscribe to [email protected]

• Barbara Inderwiesche, Kuali Coeus Administrator– [email protected]– (949) 824-4789

• Nancy Lewis, Director, Sponsored Projects– [email protected]– (949) 824-2897