bank atm software project
DESCRIPTION
Bank ATM Software ProjectTRANSCRIPT
![Page 1: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/1.jpg)
Software Project Management Plan for a Bank ATM Software
Project
Pasculescu Mihaela, an IV, CTI
![Page 2: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/2.jpg)
Brief description (1)
• The purpose of the project:– analyze the requirements of design – implement and maintain the software for both
the central bank server and the ATM client machines according to the requirements specified by the client
![Page 3: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/3.jpg)
Brief description (2)
• The objectives of the project are:– complete the project by the project due date– complete the project within budget– fulfill all stated requirements, as in the
Software Requirements Specification:• central bank customer database modifications• interface with central bank computerized
accounting system• customer ATM transactions• customer ATM statement
![Page 4: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/4.jpg)
Human Resources
• Project Manager• Software Architect 1
(Lead)• Programmer 1 (Lead)• Verification Engineer 2• Requirements Analyst 2• Verification Engineer• Configuration Manager 1• Quality Analyst 1• Software Architect 2• Consultant 1
• Consultant 2• Requirements Analyst 1
(Lead)• Database Engineer 1• Software Designer 1• Verification Engineer
(Lead)• Validation Engineer 1• Technical Writer 1• Training Specialist 1• Programmer 2• Installation Specialist 1
![Page 5: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/5.jpg)
Material Resources
• Computer software purchase• Printing Services• Computer time for object code generation
Budget Summary
• The project has a budget of $3,000,000• Once the software product is delivered, annual
maintenance costs should be no larger than $100,000.
![Page 6: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/6.jpg)
Constraints
• Budget- $3,000,000 (25% of total $12,000,000 budget; software
portion only)• Time
- almost one year- once the software product is installed on the ATM machines,
it will take 30 days for the Bank to install the physical ATM machines in their permanent locations
• Stuff- two outside consultants from Bank will be required to assist in
the requirements and detail design phases of the project• Maintenance
- the software will have to be designed such that maintenance expenses do not exceed $100,000 per year (software maintenance portion of the total $600,000 budget)
![Page 7: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/7.jpg)
Project steps• Software Lifecycle Model Process• Project Initiation• Project Monitoring & Control• Configuration Management• Software Quality Management• System Allocation• Requirements• Design• Verification & Validation• Documentation development• Training• Implementation• Installation• Operation & Support• Maintenance
![Page 8: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/8.jpg)
Software Lifecycle Model Process
![Page 9: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/9.jpg)
Project Initiation
![Page 10: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/10.jpg)
Project Monitoring & Control
![Page 11: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/11.jpg)
Configuration Management
![Page 12: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/12.jpg)
Software Quality Management
![Page 13: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/13.jpg)
System Allocation
![Page 14: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/14.jpg)
Requirements
![Page 15: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/15.jpg)
Design
![Page 16: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/16.jpg)
Verification & Validation
![Page 17: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/17.jpg)
Documentation development
![Page 18: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/18.jpg)
Training
![Page 19: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/19.jpg)
Implementation
![Page 20: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/20.jpg)
Installation
![Page 21: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/21.jpg)
Operation & Support
![Page 22: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/22.jpg)
Maintenance
![Page 23: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/23.jpg)
Gantt (1)
![Page 24: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/24.jpg)
Gantt (2)
![Page 25: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/25.jpg)
Gantt (3)
![Page 26: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/26.jpg)
Conclusions (1)
• OpenProj is a free, open-source project management solution. OpenProj is ideal for desktop project management and supports opening Microsoft or Primavera files.
• The activities of a project manager are diverse and complex. Where the planning and control of a project are concerned, the use of software can be practical.
![Page 27: Bank ATM Software Project](https://reader031.vdocuments.site/reader031/viewer/2022012405/54608f9cb1af9f16598b5469/html5/thumbnails/27.jpg)
Conclusions (2)
• If a tool is evaluated according to individual requirements and introduced carefully, a particular project or a project-oriented organization can be influenced in a positive way.
• A project manager can, with the help of an appropriate tool, prepare a project strategy more deliberately, and can carry out the project more efficiently and with higher quality.