bangalore traffic solution - pdf version

Upload: dasgv

Post on 30-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    1/22

    Bangalore's traffic messThe solution

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    2/22

    54365865449674% increase

    201020072005200019951990

    198

    51980Year

    Road space needs to double every 5 years.

    Not logical.

    Traffic population will rise 90 % between 2005 and 2010.

    The current strategyWiden roads to keep pace with increasing traffic

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    3/22

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    4/22

    Bangalore 2015 ?

    Road widening to keep pace with vehicle

    population has never worked anywhere

    worldwide.

    Traffic simply increases to occupy the

    increased road space. Congestionremains, commute time, pollution and

    accidents increase.

    This is a picture of congestion in 20-lane

    road in Los Angeles, USA.

    LA smog in background.

    Pic. courtesy Transfuture.net

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    5/22

    Our present strategy - dog chasing its

    own tail

    Road space will never catch up with vehicle population.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    6/22

    The solutions

    Replace private transport with public transport.

    This is the only solution that will work in the long term.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    7/22

    The Metro is not a solution

    Only people living andworking within 2 km. of the

    Metro (the blue band in thepicture) will use it.

    Only 5 % of Bangalore'spopulation will be able touse the Metro.The rest willstill have to depend on

    private transport.

    By the time the Metro isready, Bangalore's vehiclepopulation will be 50 Lakh.

    Average traffic speed will be6 kmph. (12 kmph. now)Accidents, pollution,temperature will be muchhigher.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    8/22

    Bangalore

    London

    Paris

    Metro densities

    Bangalore's Metro must reach the density ofmetros in cities like London or Paris before

    the whole city can use it.

    London, Paris, New York, Madrid all took

    more than 100 years to achieve this density.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    9/22

    Bangalore vs. London

    The comparison

    London's population is the same as Bangalore's.

    London : 400 km. of track length, 270 stations.Bangalore : 33 km. of track length, 35 stations - 3 years (?) from now.

    London : Carries 42 Lakh passengers a day.Bangalore : Will carry 5 Lakh passengers a day.

    London : Has 11 lines

    Bangalore : Will have 2 lines in 2011 (?)

    London : Started in 1863, took 116 years (till 1979) to evolve to this stage.Bangalore : Starts in 2011 (?).

    Passengers per day : Bangalore is estimated as 10 Lakh per day, but we can assume 5 Lakh going by Delhi, Kolkata

    metro's ratio of actual vs. planned traffic (50 %).

    We think that the Metro is a solution for Bangalore because it works well in cities like

    London, Paris and New York.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    10/22

    The Metro is not a solution

    The whole city can use the Metro only when there is a station within 1 km. ofwherever you are in the city.

    This will require a line length of 400 km.It will take 50 more years, at (an optimistic) 30 km. every 5 years.It will cost Rs. 100000 Cr. at Rs. 9000 Cr. for 35 km.

    It will be 60 to 100 years before the Metro has city-wide coverage.

    Most of us reading this will not be alive then,but will have to suffer the continuous construction activities.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    11/22

    There are 150 vehicles on this flyover.

    Carrying 150 people.

    During rush hour (people going to, from work)

    Each bike carries 1 person

    Each car carries 1 person

    Each bus carries 75 people

    The bus is the solution

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    12/22

    There are 75 vehicles between each pairof red lines, carrying 75 people (because

    there is only 1 person in each car or

    bike)

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    13/22

    If we get each group of 75 people outof their private vehicles and into

    buses,

    This is what happens.

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    14/22

    Road space used by a person in a bus is:

    3 % of that in a car

    5 % of that on a 2-wheeler

    Congestion Congestion?

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    15/22

    38 Lakh people in 5000 buses occupy

    this much road space (0.5 %)

    The logic already works in BangaloreBeautifully

    BMTC has 5000 buses, carries 38 Lakh people every day.

    0.2 % of vehicle population carries 50 % of the human population.

    Proportionately

    32 Lakh people in private vehiclesoccupy this much road space

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    16/22

    Bus-based systems are used worldwide

    Some cities with bus-based systems

    India- Delhi, Ahmedabad, Indore, PunePeru- LimaUSA - Chicago, Las Vegas, Los Angeles, Miami, Boston, Charlotte, Cleveland, Eugene, Hartford,Honolulu, San Juan, Santa Clara, Alameda, San Pablo, Louisville, Montgomery, PittsburghBrazil- Curitiba, Sao Paulo, Goiania, Proto Allegre

    Ecuador- QuitoColombia- BogotaIndonesia JakartaUK- Bradford, LeedsAustralia- Adelaide, BrisbaneCanada - Ottawa, VancouverChina- Kunming, Fuzhou, Huangzhou, Wuhan, Shanghai, Beijing, Shenyang, Chengdu

    Bus-based mass transport systems have been in existence for the past 30 years.

    They are preferred because of their low cost and low deployment time, in countries as

    economically diverse as Indonesia (comparable to India) and Canada (far wealthier than

    India).

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    17/22

    Improved bus system : Rs. 3000 Cr.Expenditure on 10000 more buses of various classes + improved shelters, signage, etc.

    - Ordinary bus costs Rs. 12 Lakh, Suvarna (air suspension, no AC) : Rs. 16 Lakh

    - Marco Polo : Rs. 55 Lakh

    Time required : 1 year.

    Road widening for planned 400 km. : Rs. 4000 Cr.Usefulness : Zero

    Destruction of city : Total

    Cost of destruction of homes, businesses, culture, heritage : ?

    Metro 33 km. to carry 5 % of Bangalore's population : Rs. 9000 Cr.6936 Cr. estimate in April 2005. BMRC announced 2000 Cr. escalation in Nov. 2008.

    Metro 350 km. for whole of Bangalore : Rs. 100,000 Cr.Assumes 20 % underground, same mix as now.

    Will take 50-60 years to build.

    London has 400 km. with 270 stations. Its size and population are same as Bangalore's.

    The economicsCosts of various options before us

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    18/22

    Road widening is definitely not the solutionIt will worsen all our problems : Vehicle population, pollution, temperature rise,

    accidents, destruction of homes and businesses, destruction of grenery.

    The Metro is too long term, and too expensiveIt will take 60 to 100 years to cover the whole of Bangalore

    It will cost Rs. 100000 Cr.

    The best solutionThe bus for long commutes + Cycling and walking for

    short commutesCan be implemented in Rs. 3000 Cr.

    In 1-2 years.

    In sum

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    19/22

    ReduceNo. of vehicles by 75 %

    Commute time by 30 %

    Pollution by 80 %

    Govt. expenditure on roads by 90 %

    IncreaseSpending on Water supply, Medicare, Education, Power

    Spending on rest of Karnataka

    Without destroying BangaloreWith a bus system we can achieve this

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    20/22

    Which lifestyle do we want?

    Private transport has given us this

    1

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    21/22

    Bus+ cycling+walking

    can give us this

    2

  • 8/14/2019 Bangalore Traffic Solution - PDF version

    22/22

    If you want to work towards solving the problem,

    contact

    Vinay Sreenivasa

    [email protected]

    OR

    Roshni [email protected]