BANCROFT ELEMENTARY SCHOOL MODERNIZATION COMMUNITY MEETING
JANUARY 12, 2015
Eleva&ng the Quality of Life in the District
q Welcome & IntroducAons q BancroD Elementary School Project Overview q BancroD Elementary School Design q Next Steps & Project Schedule q Q&A
MEETING AGENEDA
CURRENT PROJECT SITE
18th S
treet
NW
Newton St. NW M
t Ple
asan
t St.
NW
Piney Branch Park
Community Garden
Playground
Community Garden
Play ground
Field
PROJECT OVERVIEW SIZE AND SCOPE
• Planned Enrollment: 556 Students
• Full Modernization of Existing Facility with 75,000 Square Feet addition
• Co-location of BRIYA
• Designed and phased to allow students to remain in current facility during construction DESIGN PRINCIPLES
• Respond to scale and character of Mount Pleasant
• Simplify and clarify circulation with a main “internal street” connecting all floor levels and all
public shared spaces
• Create age appropriate academic clusters - “Learning Communities”
• Bring views of the park into the school
• Maintain and enhance school garden and community garden
RESPONSE TO SCALE AND CHARACTER OF MT. PLEASANT
PHASING AND SITE APPROACH
-‐ Requires extensive portable swing space on exis@ng fields -‐ Loss of one courtyard.
-‐ Greater disrup@on to learning, since students have to move two @mes.
-‐ East & West facing classrooms.
-‐ Loss of field on site during construc@on.
-‐ No portable classrooms required. Students move once from exis@ng building to new.
-‐ Creates a third courtyard.
-‐ North and south facing classrooms.
-‐ New playfield oriented north south.
-‐ Places largest structures at center of site, away from residen@al streets.
Proposed Site Approach Feasibility Study Site Approach
Portables
ExisAng 1960 & 1970s Buildings
Mt. Pleasant St.
18th S
t.
Mt. Pleasant St.
18th S
t.
TWO BARS
8 AYERS SAINT GROSS
SHARED SPACES + CONNECTIONS
TWO "BARS"
STRATEGIES FOR TRANSFORMATION
LEARNING COURTS
SCHOOL IN THE PARK
SUN ORIENTATION
LEARNING COMMUNITIES
ORDER OF OPERATIONS
1 2
3 4
5 6
K-1 K-1
N
2-5 2-5
Multipurpose Hall(Gym and Assembly)
Learning Community (Academic Cluster)
Curiosity Center (Media Center)
Cafeteria
Nature Center
The Avenue
SOUTH FACING CLASSROOMS
8 AYERS SAINT GROSS
SHARED SPACES + CONNECTIONS
TWO "BARS"
STRATEGIES FOR TRANSFORMATION
LEARNING COURTS
SCHOOL IN THE PARK
SUN ORIENTATION
LEARNING COMMUNITIES
ORDER OF OPERATIONS
1 2
3 4
5 6
K-1 K-1
N
2-5 2-5
Multipurpose Hall(Gym and Assembly)
Learning Community (Academic Cluster)
Curiosity Center (Media Center)
Cafeteria
Nature Center
The Avenue
GRADE APPROPRIATE CLUSTERS AND COURTYARD
8 AYERS SAINT GROSS
SHARED SPACES + CONNECTIONS
TWO "BARS"
STRATEGIES FOR TRANSFORMATION
LEARNING COURTS
SCHOOL IN THE PARK
SUN ORIENTATION
LEARNING COMMUNITIES
ORDER OF OPERATIONS
1 2
3 4
5 6
K-1 K-1
N
2-5 2-5
Multipurpose Hall(Gym and Assembly)
Learning Community (Academic Cluster)
Curiosity Center (Media Center)
Cafeteria
Nature Center
The Avenue
MAIN STREET CONNECTS ALL LEVELS & SHARED SPACE
8 AYERS SAINT GROSS
SHARED SPACES + CONNECTIONS
TWO "BARS"
STRATEGIES FOR TRANSFORMATION
LEARNING COURTS
SCHOOL IN THE PARK
SUN ORIENTATION
LEARNING COMMUNITIES
ORDER OF OPERATIONS
1 2
3 4
5 6
K-1 K-1
N
2-5 2-5
Multipurpose Hall(Gym and Assembly)
Learning Community (Academic Cluster)
Curiosity Center (Media Center)
Cafeteria
Nature Center
The Avenue
ENGAGE THE PARK
8 AYERS SAINT GROSS
SHARED SPACES + CONNECTIONS
TWO "BARS"
STRATEGIES FOR TRANSFORMATION
LEARNING COURTS
SCHOOL IN THE PARK
SUN ORIENTATION
LEARNING COMMUNITIES
ORDER OF OPERATIONS
1 2
3 4
5 6
K-1 K-1
N
2-5 2-5
Multipurpose Hall(Gym and Assembly)
Learning Community (Academic Cluster)
Curiosity Center (Media Center)
Cafeteria
Nature Center
The Avenue
PROJECT SITE PLAN
COMMUNITY GARDEN
SCHOOL GARDEN
PROJECT AERIAL VIEW
PROPOSED PROJECT TIMELINE q Winter 2015 Advance Design
q Spring 2015 Procure Design Build Contractor & Community MeeAng
q Summer 2015 DemoliAon Site PreparaAon & Begin ConstrucAon of New AddiAon
q Summer 2016 RenovaAon of 1923-‐32 Buildings
q Summer 2017 New AddiAon complete. DemoliAon of 1960s and 1970s Buildings
q December 2017 Site CompleAon
December 2017 Summer 2017 Summer 2015-‐17
PROJECT NEIGHBORS GROUP
QUESTIONS & ANSWERS
CONTACT INFORMATION
Department of General Services (DGS) Darrell Pressley, DGS SIT Team Coordinator
[email protected] 202-‐997-‐9017
Thank you for your Ame!