ADDENDUM NUMBER __2__
DATE: December 8, 2916 BID NAME: NEW SCHOOL CONSTRUCTION LANSDOWNE ELEMENTARY
SCHOOL DEMOLITION OF LANSDOWNE ELEMENTARY SCHOOL
BID NUMBER: MBU-516-17 DUE DATE: NO CHANGE DUE TIME: NO CHANGE PUBLIC OPENING: NO CHANGE TOTAL PAGES: Seventy-Eight [78 (to include corrected form of Proposal Pages
and 44 sketches)] The following revisions and responses to questions are made to the original bid document. This addendum forms a part of the Contract Documents and modifies the Original Bidding Documents accordingly and as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid “Addenda” form. GENERAL:
1.1 Attachments: 1.1.1 See list of sketches at end
SPECIFICATIONS:
2.1.
SECTION 01 22 00 UNIT PRICES DELETE Specification Section 01 22 00 in its entirety and REPLACE with attached Specification Section 01 22 00.
2.2. SECTION 05 58 13 COLUMN COVERS
REVISE Part 1.1.A to “ Decorative column covers for exposed columns in Cafeteria (B128), Media C100 and Collaborative Learning C143.”
2.3. SECTION 09 30 00 TILING
REVISE Part 3.5.A to “A. Freezer/Cooler and Kitchen Quarry Tile – Thickset with Reinforcement and Waterproofing. Install by conventional bed TCA Handbook Method F121.
2.4. SECTION 09 65 00 RESILIENT FLOORING
REVISE Part 2.1.A.6.c.1 to “Provide 4-color pattern in Corridors, Dining,
Media, Lobby, Vestibules, and rooms A100, A101, A102, A122,
A124, A125, C130, C143, C231, C239 and Stair 4.”
REVISE Part 2.1.A.6.c.2 to “Provide 2-color pattern in classrooms. This includes, but is not limited to rooms designated as classroom, kindergarten, pre-kindergarten, ECL, ESOL, Remedial Reading, Special Education, Maker Space, Digital Learning, Art, Instrumental Music, and Vocal Music.
2.5. SECTION 11 62 42 PLATFORM CURTAINS
REVISE Part 2.2.A to “ A. House Curtain, Video Production Room Curtain, and Masking Drapery.”
REVISE Part 2.2.A.1. to “House Curtain and Video Production Room
Curtain”
REVISE Part 2.2.A.3 to “Masking Drapery: Teaser, Borders, and Travelers”
REVISE Part 2.2.A.3.a. to “Material: 100 percent IFR Polyester velour, 25-26 oz. per linear yard based on a 54” width.”
REVISE Part 2.2.A.3.b. to “Color: As selected by architect.”
REVISE Part 2.3. F.1 to “The front curtain and video production room
curtain shall be 25-26 oz. polyester velour with IFR polyester lining.”
REVISE Part 2.3.C.8. to “Pleated-Fullness: Approximately 60%; curtain
shall overlap 3 feet.” ADD Part 2.3.H.2 Pleated-Fullness: Approximately 60%
2.6. SECTION 22 05 19 METERS AND GAGES FOR PLUMBING PIPING
22 05 19 – 1&2 2.01.A DELETE 1. AMETEK; U.S. Gage, 2. Ashcroft; Dresser Instrument, 3.
Miljoco Corporation, 4. Taco, Inc., and 5. H.O. Trerice Co. ADD 1. Dwyer Instruments, and 2. Palmer Wahl
2.7. SECTION 22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 19 – 2 2.01.A DELETE 2. Hammond Valve Co., 3. Lunkenheimer Co., 6. Stockham Valve & Fittings, and 7. Walworth Co. ADD 2. Apollo, and 3. Centerline
2.8. SECTION 22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 19 – 2 2.01.B DELETE 4. Stockham Valve & Fittings, and 5. Victaulic Company of
America, 6. Walworth Co., and 7. Watts Regulator Co. ADD 4. Centerline, and 5. Crane
2.9. SECTION 22 11 23 DOMESTIC WATER PUMPS
22 11 23 – 2 2.01.B DELETE 3. Deming, Crane Pumps and Systems, 4. Patterson Pump Co.,
and 6. Paco Pumps; Grundfos Group
2.10. SECTION 23 05 06 CURBS AND FLASHINGS FOR HVAC PIPING AND
EQUIPMENT
23 05 06 – 2 2.10.B.4 REVISE “Acoustical lining: ASTM C 1071, Type II, rigid fiberglass,…”
2.11. SECTION 23 05 06 CURBS AND FLASHINGS FOR HVAC PIPING AND
EQUIPMENT
23 05 06 – 4 3.20.C DELETE “with a 6-inch (150-mm) wide wood frame the thickness of the roof
insulation,” 2.12. SECTION 23 05 19 METERS AND GAGES FOR HVAC PIPING
23 05 19 – 1 2.01.A DELETE 1. AMETEK; U.S. Gage, 2. Ashcroft; Dresser Instrument, 3.
Miljoco Corporation, 4. Taco, Inc., and 5. H.O. Trerice Co. ADD 1. Dwyer Instruments, and 2. Palmer Wahl
2.13. SECTION 23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING
23 05 23 – 2 2.01.A DELETE 4. Stockham Valve & Fittings, and 5. Victaulic Company of America, 6. Walworth Co., and 7. Watts Regulator Co. ADD 4. Centerline, and 5. Crane
2.14. SECTION 23 21 23 HVAC PUMPS
23 21 23 – 3 2.01.B DELETE 2. Aurora Pumps, 4. Paco Pumps; Grudfos Group, and 5. Patterson Pump
2.15. SECTION 23 34 00 HVAC FANS
21 34 00 – 3 2.34.A
DELETE 2. Jennco Fan, and 7. Aerovent, a Twin City Fan Company 2.16. SECTION 23 72 00 ENERGY RECOVERY AND DEDICATED OUTDOOR AIR
UNITS
23 72 00 – 4 2.01.A.1 DELETE d. Xetex, and e. Venmar ADD d. Petra
2.17. SECTION 23 72 00 ENERGY RECOVERY AND DEDICATED OUTDOOR AIR
UNITS
23 72 00 – 8 2.27.B ADD 8. Provide vibration isolation as specified in Section 23 05 48
Vibration Control Supports for HVAC. 2.18. SECTION 23 81 27 DUCTLESS SPLIT SYSTEM UNITS
23 81 27 - 2 2.01.A. DELETE 2. Sanyo and 4. Panasonic ADD 2. Carrier, 4. Hitachi, 5. Johnson Controls, 6. LG, 7. Samsung, and
8. Trane 2.19. SECTION 23 81 28 VARIABLE-REFRIGERANT-VOLUME MULTIZONE
SYSTEM
23 81 28 - 2 2.01.A. ADD 4. Carrier, 5. Hitachi, 6. Johnson Controls, 7. LG, 8. Samsung, and
9. Toshiba 2.20. SECTION 23 82 38 ELECTRIC RESISTANCE TERMINAL UNITS
23 82 38 – 2 2.36.A.1
DELETE b. General Electric Co. and 3. Vulcan Radiator Corp.
ADD b. Brasch, 3. Daikin, 4. Qmark, 5. Sterling, 6. Trane 2.21. SECTION 23 82 38 ELECTRIC RESISTANCE TERMINAL UNITS
23 82 38 – 2 2.37.A.1 DELETE b. General Electric Co. and 3. Vulcan Radiator Corp. ADD b. Brasch, 3. Daikin, 4. Qmark, 5. Sterling, 6. Trane
2.22. SECTION 271500 DATA VOICE & VIDEO SYSTEMS
REVISE Spec section 271500, part 2.7 to read as follows: “Provide all rough-in and provisions for wall mounted interactive projector installation, provide projector high drop mounted on the wall adjacent to the projector wall bracket. In some cases you will
have the projector high drop mounted in the ceiling just above the wall mounted interactive projector. Provide a double gang plate with a 1” grommet (2) 1 ½” conduits stubbed to accessible ceiling space) from the wall projector to accessible ceiling space for cables provided by the owner.”
2.23. SECTION 275123 INTEGRATED TELECOMMUNICATIONS SYSTEMS
REVISE The first sentence of specification section 275123-2.1.A to read as follows: “Only Manufacturer’s system by Rauland-Borg Telecenter , Telecor II or Dukane Starcall shall be submitted provided that every operational function contained herein is provided.(Bogen is not an acceptable manufacturer to BCPS)”
REVISE Specification section 275123-2.3.A.1 to read as follows: “The system shall be integrated with the BCPS supplied VoIP System allowing any phone on the system, if so desired, to page and conduct hands-free open voice intercom with any speaker in the system, and handset to handset with any administrative control console and classroom VoIP telephone”
REVISE Specification section 275123-2.3.B to read as follows: The Contractor shall provide outlets for all BCPS furnished VoIP Classroom telephone handsets.
REVISE Specification section 275123-2.4.A.2 to read as follows: “Staff/Classroom VoIP Telephone: Shall be furnished by BCPS”
REVISE Specification section 275123-2.11 to read as follows:
“Provide wireless clock system by Sapling. Provide 12” wireless analog battery operated clocks found in instructional spaces and classrooms and mounted opposite of the teaching wall. Provide 24 volt digital wireless clocks in all corridors, gym, café, media center, kitchen and offices. The wireless clocks shall receive signal from the master clock wirelessly but to receive power, cabling shall be provided by the contractor. Provide wireless master clock controller on the wall in the MDF room Provide GPS roof mounted antenna and cabling and grounding to provide time signal to clock controller in MDF. Provide digital clocks in the gym with wireguard.”
2.24. SECTION 275200 LOCAL SOUND SYSTEMS
REVISE Specification section 275200-2.1 and 2.2 outdated model numbers with current model numbers as follows:
Old: Shure SLX series wireless mic system
New: BLX24R/SM58 wireless handheld microphone system with rack mount kit
Old: TOA & Peavey microphone mixer New: Peavey SMR821A mic/line mixer Old: Denon & Tascam cd changer New: Tascam CD200BT cd player w/ ipod dock & Bluetooth Old: Rane, DBX & Shure DSP
New: Biamp TesiraForte AI dsp processor w/ TEC-1 dsp controller
2.25. SECTION 281300 ACCESS CONTROL SYSTEM
REPLACE Spec section 281300 Access Control System, replace in its entirety with the attached section 281300.
2.26. SECTION 282300 VIDEO SURVEILLANCE SYSTEM.
REPLACE Spec section 282300 Video Surveillance System Replace in its
entirety with the attached section 282300.
2.27. SECTION 31 23 00 EXCAVATING AND FILLING
REVISE First sentence of part 3.14.B.1 to “Provide 4 inches of drainage fill
below all slabs.”
DRAWINGS CIVIL
3.1. SHEET C-1.1, SITE AND GRADING PLAN – PHASE 1 ADD: Concrete Wall starting/ending coordinates at Bio #2.
Start Wall – N 576,894.79, E 1,409,805.31 End Wall – N 576,759.74, E 1,409,836.49
3.2. SHEET C-2.1, PAVING, STRIPING AND SIGNAGE PLAN
REVISE: Detail callout for soccer field to “Detail 5 on Sheet C-1.6. DELETE: Versa Lok Wall callouts at Bio #2. ADD: Concrete Wall callout at Bio #2.
3.3. SHEET C-7.1, FINAL STORMWATER MANAGEMENT PLAN ADD: Concrete Wall starting/ending coordinates at Bio #2.
Start Wall – N 576,894.79, E 1,409,805.31 End Wall – N 576,759.74, E 1,409,836.49
3.4. SHEET C-7.4, FINAL STORMWATER MANAGEMENT DETAILS
ADD: Section B-B and profile. See attached sketch SK-19 and 19A.
3.5. SHEET C-8.1, LANDSCAPE PLAN
REVISE: Weave chainlink fence size to 2” for Soft Play and 1” for SWM Facilities on all Chainlink Fence Details.
3.6. SHEET C-8.2, LANDSCAPE NOTES AND DETAILS
REVISE: Weave chainlink fence size to 2” on all Chainlink Fence Details.
3.7. SHEET C-10.1, PUBLIC WATER PLAN REVISE: Bill of Materials. See attached sketch SK-20.
3.8. SHEET C-10.2, PUBLIC SANITARY SEWER AND RIGHT-OF-WAY PLAN
ADD: Sewer callouts in the Vicinity Map. See attached sketch SK-21. REVISE: (by others) callout to (private) on the Proposed 8” Sanitary Sewer
Connection Plan. See attached sketch SK-21A.
3.9. SHEET C-10.3, PUBLIC STORM DRAIN PLAN - 1 REVISE: Storm drain design data. See attached sketch SK-C-22.
3.10. SHEET C-10.4, PUBLIC STORM DRAIN PLAN – 2 REVISE: Manhole Schedule. See attached sketch SK-C-23. ADD: Manhole 18 label. See attached sketch SK-C-23A. REVISE: Pipe Q, V, S on the profile. See attached sketches SK-C-23A to
23D. ADD: Pipe slope to connecting storm drain pipes on the profile. See
attached sketch SK-C-23A to 23D.
3.11. SHEET C-10.5, PUBLIC STORM DRAIN PLAN – 3 REVISE: Inlet Schedule. See attached sketch SK-C-24. DELETE: Manhole Schedule. See attached sketch SK-C-24. REVISE: Storm Drain profiles. See attached sketch SK-C-24A to 24C. REVISE: Storm Drain layout. See attached sketch SK-C-24D.
ARCHITECTURAL:
4.1. SHEET A-1.1B, PARTIAL FIRST FLOOR PLAN, AREA B ADD Enclose exposed pipe column in room B131 with 1’-4” x 1’-4”
CMU chase. ADD Add wall tag, with A3 designation, to west wall of chase at the
south end of the operable partition between rooms B128 and B129.
ADD Reference for J15/A-5.6 SIM to column at lines 2’ and G’ near door B133 and column at lines R and 11 at east end of Frame 3.
4.2. SHEET A-1.1C, PARTIAL FIRST FLOOR PLAN, AREA C
ADD Reference for J15/A-5.6 SIM to column at lines 17 and P.
REVISE Walls and lockers at on line C.1’ on west side of stair no.2 and
wall at window at south wall of room C144 per attached sketch
SK-A-2.1.
REVISE Lockers at C107 per attached sketch SK-A-2.1.
REVISE Wall at window at south wall of room C127 , per attached sketch
SK-A-2.2.
ADD Section reference A18/A-4.5 @ CW8 and stair 4 landing.
4.3. SHEET A-1.2C, PARTIAL SECOND FLOOR PLAN, AREA C
ADD Section reference A18/A-4.5 @ CW8 and stair 4 landing.
ADD Section reference J11/A-4.6 @ wall between north side of stair 1
and Vestibule C10.
REVISE Walls and lockers at on line C.1’ on west side of stair no.2 and
wall at window at south wall of room C240 per attached sketch
SK-A-2.3.
REVISE Walls and lockers on line on east side of stair no. 3 and wall at
window at south wall of room C230, per attached sketch SK-A-2.6.
ADD Gypsum board surround at columns on line 22 per attached
sketch SK-A-2.7.
ADD Dimensions per attached sketch SK-A-2.4 and SK-A-2.5.
ADD Lockers at locations indicated in attached sketch SK-A-2.8
4.4. SHEET A-3.1, FINISH SCHEDULE
ADD Note 17 Provide Chromakey green paint finish on east, west and
south walls.
REVISE Numbered Remarks Note 6 to “6. Provide porcelain tile to 8’-0”
a.f.f. w/spctg above. Top row of tile to be bullnose”
REVISE Wall finish CT to “PT Porcelain Tile
REVISE Tile wall finish and base for rooms B117 and C137 to “PT.”
4.5. SHEET A-3.2, DOOR SCHEDULE
REVISE HM frame type for doors E008, E011, E012, E013 to 42.
REVISE HM frame type for doors A106 and A123 to 22.
ADD “Note 25 Provide integrated metal door assembly.” To Notes for
remarks column.
ADD Note 25 to notes for remarks column at doors C10, C12, C20 and
C22.
REVISE All exterior storefront doors to door type FG2.
4.6. SHEET A-3.6, FRAME ELEVATIONS – INTERIOR
ADD Dimensions to frame 20 per attached sketch SK-A-2.9.
4.7. SHEET A-3.7, FRAME ELEVATIONS – INTERIOR
ADD HM frame designation 42 to undesignated frame to the right of HM
frame 41.
4.8. SHEET A-4.3, WALL SECTIONS
ADD Batt insulation to fill stud cavity at exterior wall types 2.1, 7.1, 7.2,
and 9.1.
4.9. SHEET A-4.5, WALL SECTIONS
ADD Wall section A18/A-4.5 per attached sketches SK-A-2.10 and
SK-A-2.11.
4.10. SHEET A-4.6, WALL SECTIONS
ADD Reference F5/A-1.4 to sill of door to green roof wall section in
A14/A-4.6.
ADD Wall section J11/A-4.6 per attached sketch SK-A-2.12.
4.11. SHEET A-4.11, WALL SECTIONS
REVISE Section A18/A-4.11, per attached sketch SK-A-2.13.
4.12. SHEET A-4.13 WALL SECTIONS
ADD Reference F13/A-1.5 on high eave of clerestory that faces east.
4.13. SHEET A-5.1 ENLARGED TOILET PLANS
REVISE Toilet room elevations D3, D7, E4 to include cove base and
bullnose at top row of tiles.
4.14. SHEET A-6.6 INTERIOR ELEVATIONS
ADD Note: “Provide wall tile as indicated and at all corridor walls with a gyp
board finish. Provide bullnose tile at top row of tile at locations where tile
is not full height.”
4.15. SHEET A-7.1B PARTIAL FIRST FLOOR REFLECTED CEILING PLAN, AREA B
DELETE Note “Legs” from north side of Platform B127.
REVISE Pipe grid shown at Platform B127 to 4’-0” x 4’-0” centers.
4.16. SHEET A-7.1.C. PARTIAL FIRST FLOOR REFLECTED CEILING PLAN, AREA
C
REVISE Note at curtain at room C107 to “Curtain width to be 60% of track length. See spec.”
4.17. SHEET A-9.1B PARTIAL FIRST FLOOR FURNITURE PLAN, AREA B
ADD Two additional floor sleeves a northern side court. Locate similar
to southern side court.
ADD Note, pointing to west wall of room B130. “Provide 9 mat hooks on
West wall of B130.”
4.18. SHEET A-9.2C, PARTIAL FIRST FLOOR FURNITURE PLAN, AREA C
ADD Lockers per attached sketch SK-A-2.X
4.19. SHEET A-9.1C, PARTIAL SECOND FLOOR FURNITURE PLAN, AREA C
REVISE Lockers at C107 per attached sketch.
STRUCTURAL:
5.1. SHEET S-1.1A, FOUNDATION AND SLAB ON GRADE PLAN - AREA A
REVISE Column 11.2-D.2 from C1 to C8 and concrete pier from P1 to P2.
5.2. SHEET S-1.1B, FOUNDATION AND SLAB ON GRADE PLAN - AREA B
DELETE Wall footing WF5 per attached sketch SK-S-1.
ADD Wall footing WF4 for 8" chase wall around gridline 10-11.1-N.
5.3. SHEET S-1.1C, FOUNDATION AND SLAB ON GRADE PLAN - AREA C
DELETE Unassigned section marks between gridlines 7.8'-9'-B'-C'.
REVISE Section D/S4.1 to section E/S4.1 between gridlines C.1'-B.6'-15'.
ADD Section mark L/S4.1 between gridlines 12.1'-14'-C.1' and gridlines
24-26-P.1.
REVISE Column 12-D.2 from C1 to C8 and concrete pier from P1 to P2.
REVISE Column 3.1'-F' from C1 to C8 and concrete pier from P1 to P2.
REVISE Column opposite the door at F' from C1 to C8 and concrete pier
from P1 to P2.
REVISE Column 12-C.2 from C1 to C8 and concrete pier from P1 to P2.
5.4. SHEET S-1.2A, 2ND FLOOR AND LOW ROOF FRAMING PLAN - AREA A
ADD Section mark J/S5.6 between gridlines 11-12-E.
ADD Note 8 in lintel schedule," Provide 5"x5"x3/8" brick angle for
openings less than 6'-0" with metal stud back up wall unless noted
otherwise."
5.5. SHEET S-1.2B, 2ND FLOOR AND LOW ROOF FRAMING PLAN - AREA B
DELETE Unassigned section marks between gridlines 7-9.2-P.8.
REVISE Direction for section F/S5.4 turned 180 degrees between gridlines
6.2-P.8.
REVISE Direction for section L/S5.2 turned 180 degrees between gridlines
2-3.9-H.8-H.1.
REVISE Section L/S5.3 to section C/S5.3 between gridlines 11-K-N.
REVISE Direction for section D/S5.3 turned 180 degrees between gridlines
H.1-7-8.
REVISE HSS10"x6"x1/2" and HSS 8"x6"x1/2" on gridline F'-13 to show top
of beam elevation as 8'-3".
5.6. SHEET S-1.2C, 2ND FLOOR AND LOW ROOF FRAMING PLAN - AREA C
DELETE Unassigned section marks between gridlines 7'-9'-B'-C.1'.
DELETE Unassigned section marks between gridlines 12.1'-14'-D.2'.
REVISE Direction for section K/S5.4 turned 180 degrees between gridlines
E'-4'-5' and add "SIM" to the section.
REVISE Direction for section G/S5.4 turned 180 degrees between gridlines
9'-10'-A.2'.
5.7. SHEET S-1.3A, HIGH ROOF FRAMING PLAN - AREA A
ADD Section mark F/S5.3 between gridline D.2-C.2-11.2.
5.8. SHEET S-1.3B, HIGH ROOF FRAMING PLAN - AREA B
REVISE CMU wall between gridlines P.8-7-9.2 to metal stud wall.
DELETE Unassigned section marks between gridlines P.8-7-9.2.
REVISE Section mark F/S5.3 between gridline 11-D.2-H.1 to K/S-5.6.
5.9. SHEET S-1.3C, HIGH ROOF FRAMING PLAN - AREA C
DELETE Section G/S5.2 similar between gridlines 13-Q-T.
ADD Section mark G/S5.2 similar between gridlines F'-3.1'-13 for
canopy.
ADD Section mark H/S5.6 similar at low roof between gridlines 14-M.2-
L for skylight.
REVISE Direction for section F/S5.3 turned 180 degrees and "similar"
added between gridlines 22-P-M and 22-C'-E'.
REVISE Direction for section F/S5.2 turned 180 degrees between gridlines
21-22-T and 26-28-T.
ADD Top of steel for W18x35 at gridlines D.2-12.1'-14' and gridlines M-
24.1-25.9 as 29'-1".
ADD Top of steel for W21x44 at gridlines P.1-22-24 as 28'-7".
REVISE Section mark F/S5.3 to K/S5.5 similar around gridline 14'-D.2'-C.1'
and M-P-25.9.
5.10. SHEET S-5.1, SECTIONS
REVISE Section G/S5.1 per attached sketch SK-S-2.
5.11. SHEET S-5.2, SECTIONS
REVISE Section A/S5.2 per attached sketch SK-S-3.
5.12. SHEET S-5.3, SECTIONS
REVISE Section J/S5.3, to show the distance of 5"x5"x5/16" continuous
angle from bottom track to be 1'-4".
REVISE Section H/S5.3 per attached sketch SK-S-4.
REVISE Section F/S5.3 to show brick veneer with 8"x8"x1/2" continuous
angle cut and trim as required at similar. The 600S162-54 studs at
16" o.c. to read, "600 S162-54 studs at 16" o.c. with top and
bottom track. C6x8.2 at 4'-0" o.c. with 600S162-54 stud infill at 16"
o.c. at similar. 1/4" weld for angle to channel is provided at top of
angle. 3/16" weld is provided on both sides of angles to channel.
1/2" steel plate is provided and note, "Refer to detail J/S5.3 for
C6x10.5 to 1/2" steel plate at similar."
5.13. SHEET S-5.4, SECTIONS
REVISE Section A/S5.4 to show CMU wall extending past the high roof
and the 12"x3"x5/16" bent plate to 5"x3"x1/4" bent plate
continuous.
REVISE Section J/S5.4 per attached sketch SK-S-5.
REVISE Section K/S5.4 per attached sketch SK-S-6.
REVISE In section L/S5.4, dimension 7" max to read 8-3/4".
5.14. SHEET S-5.5, SECTIONS
REVISE Section G/S5.5 per attached sketch SK-S-7.
REVISE Section K/S5.5 per attached sketch SK-S-8.
REVISE Section M/S5.5, CMU wall to end below roof deck and the bent
plate from 4"x4"x5/16" to 15.5"x4"x3/8". Roof deck extends over
the top of CMU wall.
5.15. SHEET S-5.6, SECTIONS
REVISE Section G/S5.6 per attached sketch SK-S-9.
REVISE Section H/S5.6 per attached sketch SK-S-10.
ADD Section J/S5.6 per attached sketch SK-S-11.
ADD Section K/S5.6 per attached sketch SK-S-12.
MECHANICAL:
6.1. SHEET M1.1B, PARTIAL FIRST FLOOR PLAN – AREA B- HVAC
REVISE: Duct between the manual volume damper and the supply register
over Platform B127 from 8-inch diameter to 10-inch diameter acoustically
lined.
6.2. SHEET M-5.3, DETAILS AND DIAGRAMS
REVISE: Note as indicated on sketches SK-M-1 and SK-M-2.
ELECTRICAL:
7.1. SHEET EL -1.1A, FIRST FLOOR PLAN – AREA A – LIGHTING
ADD: Designations to lighting fixtures in corridor C11 as follows:
a. 6” x 4’ linear fixtures: Type B2
b. 6” x 6’ linear fixtures: Type B3
c. 6” round downlights: Type J
7.2. SHEET EP1.1B, FIRST FLOOR PLAN – AREA B - POWER
ADD: Electrical connections for projection screen as indicated on sketch SK-E-
15.
TELECOMM:
8.1 SHEET T-5.4, DETAILS – TELECOM VIDEO ENTRY SYSTEM DIAGRAM ADD: Add the following note to VIDEO ENTRY SYSTEM DIAGRAM : Provide complete video entry system by Aiphone AX series. Video Entry system shall include central exchange unit (AX-084C), power supplies, door release adaptors, flush mount door stations (AX-DVF) , desktop video entry master
stations (AX-8MV-W) and stands, cabling, and all required equipment and products for a complete and operational system.
CLARIFICATIONS: (1) QUESTION: I wanted to clarify – will the owner (i.e. BCPS) be hiring an
independent inspection agency for structural steel testing, concrete testing, soils testing etc. at Lansdowne Elementary School or will that fall under the general contractor?
RESPONSE: BCPS will independently select and hire a testing agency.
(2) QUESTION: Assuming the former, will your team issue a separate RFP for
testing & inspection services?
RESPONSE: A separate RFP for testing services will not be generated for this project.
(3) CLARIFICATION: While reviewing the specifications for this Project, I noted what I
believe to be errors, and one omission.
On Pgs. 763-764 of Spec Volume II, the following is inconsistent with the current BCPS system. The sections are:
2.5 Software 2.6 Video Network Server and Network Video Recorder 2.7 Video Network Switch
Also typically included under one of the Security subsections is a statement that this work must be performed by one of the current BCPS on call security Contractors. It appears this statement was omitted. I have included as an attachment the list of current on call Vendors.
RESPONSE: Refer to updated Video Surveillance Spec section 282300 issued as part of this addendum for software and switch requirements. Provide one (1) Interlogix TruVision TVN-2132-P-16T network video recorder.
(4) CLARIFICATION: There is no indications on any of the prints to cover the parking lot
lights with locations and and types?
RESPONSE: Please see sheet ME-0.1. (5) CLARIFICATION: On print E1.1C in corridor C11 there are several fixtures without a
type indication?
RESPONSE: Please see addendum no. 2 for fixture types.
(6) QUESTION: 275123 page 8 2.4 CLASSROOM EQUIPMENT and page 8.2.5
ADMINISTRATIVE OFFICE EQUIPMENT. These sections reference Staff /classroom Telephone handsets to be provided by the Contractor and references Electronic Key Telephone equipment. To be provided by owner. Question isn’t Baltimore County providing a VOIP telephone system? Also are they providing the staff/classroom and admin phones for this system?
RESPONSE: BCPS to provide VoIP telephone handsets in each classroom (7) QUESTION: INTERACTIVE WHITEBOARD PROVISIONS DETAIL
Question Bid set drawing T-0.1 shows the interactive white board provision detail are we to provide a local classroom sound system
For this application? RESPONSE: There are no integral audio speakers for the interactive white
board. (8) QUESTION: The issued specification section provides a singular path for one
manufacturer, thus excluding others. Specifically, the specifications lists performance requirements without designation of whether the fireproofing must be a durable cementitious (wet mix) material or a friable inorganic mineral fiber (dry mix) material. Cementitious (wet mix) materials are offered by all major manufacturers while mineral fiber (dry mix) is only offered by one manufacturer. Will friable, easily damaged, 100% inorganic dry-mix fireproofing materials that prompted tougher building code requirements be allowed? If so, will a warranty still be required per the specification and will allowances be made for increased patching costs?
RESPONSE: A dry mix type fireproofing is permitted provided it meets specified performance requirements. The specified warranty would still be required for the dry mix type. Additional allowances for patching will not be allowed.
(9) REQUEST: Energy Recovery Unit - We respectfully request that Petra be
considered an acceptable alternate. Petra may provide significant value to the County by meeting or exceeding project requirements at a reduced cost.
RESPONSE: Per BCPS, Petra has been added. (10) REQUEST: Dedicated Outside Air System - We respectfully request that Petra
be considered an acceptable alternate. Petra may provide significant value to the County by meeting or exceeding project requirements at a reduced cost.
RESPONSE: Per BCPS, Petra has been added. (11) REQUEST: Rooftop Water Source Heat Pump: We respectfully request that
Petra be considered an acceptable alternate. Petra may provide significant value to the County by meeting or exceeding project requirements at a reduced cost.
RESPONSE: Per BCPS, Petra has been added.
(12) REQUEST: Water Cooled Variable Refrigerant Flow Systems- We respectfully request that Samsung be considered an acceptable alternate. Samsung may provide significant value to the County by meeting or exceeding project requirements at a reduced cost.
RESPONSE: Per BCPS, Samsung has been added. (13) REQUEST: Vertical Water Source Heat Pumps - We respectfully request that
Omega be considered an acceptable alternate. Omega may provide significant value to the County by meeting or exceeding project requirements at a reduced cost.
RESPNSE: Per BCPS, Omega is not an acceptable alternate. (14) REQUEST: Ductless Split Systems - We respectfully request that Samsung be
considered an acceptable alternate. Samsung may provide significant value to the County by meeting or exceeding project requirements at a reduced cost.
RESPONSE: Per BCPS, Samsung has been added. (15) QUESTION: We’re interested in quoting the Lansdowne Elementary School
project to furnish and deliver the green roof system. Do you know whether substitutes to the basis of design are currently being accepted? We believe we could bring some cost savings to your project and would like the opportunity to bid.
RESPONSE: Substitutions are not permitted during the bid phase, per 01 60 00, Part 3.1.A. Substitutions will be considered after
Bids per 01 60 00, Part 3.1.B.-G.
(16) QUESTION: We’re interested in quoting the Lansdowne Elementary School project to furnish and deliver the green roof system. Do you know whether substitutes to the basis of design are currently being accepted? We believe we could bring some cost savings to your project and would like the opportunity to bid.
RESPONSE: Substitutions are not permitted during the bid phase, per 01 60 00, Part 3.1.A. Substitutions will be considered after
Bids per 01 60 00, Part 3.1.B.-G. (17) CLARIFICATION: Metal column covers spec 055813 do not appear to have any plan
details to show the intended design nor to indicate which columns receive the treatment. The only indication we have found is the interior elevations at the Dining and Media Center which call out metal column covers. Please provide column details or which columns will receive the column wraps.
RESPONSE: Column covers are to be provided for exposed columns in rooms B128, C100 and C143. Location will be clarified in the specifications in Addendum no. 2.
(18) QUESTION: Specification Section 116142, Article 2.4, Paragraph B1.a lists
ADC Type 283-R for the Main Curtain. Based on the curtain size, the specified track manufacturer Automatic Devices Company recommends using their Track Model 170 Track in lieu of that specified which is more than adequate for the application. Is this acceptable?
RESPONSE: Track Model 170 is not acceptable. Provide track as specified.
(19) QUESTION: Specification Section 116142, Article 2.5, Paragraph “C” states
that the individual pipe battens in each to be located on 4 foot centers. Drawings A-7.1B depict dashed lines above the Platform B127 that appear to represent the pipe grid system, which is on 3 foot centers.
RESPONSE: Pipe grid is to be on 4 foot centers, per note on A-7.1B. Graphic representation of grid on A-7.1B will be revised in Addendum no. 2.
(20) QUESTION: What is the desired width of the curtain in Room C107 – Video
Production Studio?
RESPONSE: Width of curtain to be 60% of track length. Width will be clarified in Addendum no. 2.
(21) QUESTION: Specification Section 116142, Article 2.3, Paragraph “F” is entitled
Front Curtain and Video Production Assembly. Sub-Paragraph 1 states that the Front Curtains shall be 23 ounces cotton with a denim lining. Is the curtain for the Video Production Room fabricated with the same material?
RESPONSE: The curtain for the Video Production Room is to be fabricated with the same material as the Front Curtain. Material will be clarified in Addendum no. 2.
(22) QUESTION: Specification Section 116142, Paragraph A.1.a and A.2.a states
that the House Curtain Fabrics are IFR Polyester Velour 25-26 oz per linear yard and the lining is IFR polyester. Article 2.3, Paragraph “F” entitled Front Curtain and Video Production Assemble, sub-paragraph 1 state that the Front Curtains shall be 23 ounces cotton with a denim lining. Are we to provide cotton or polyester?
RESPONSE: Provide materials per Part 2.2. Materials will be clarified in Addendum no. 2.
(23) QUESTION: Specification Section 116142, Article 2.4 “E.3” states to shop paint
completed pipe battens with a good quality primer. While we can provide painted battens, the painted surface may chip with the adding or removing of equipment over time. Therefore, we recommend black iron pipe, finished with a clear lacquer finish that is more durable than a painted surface. Is this acceptable?
RESPONSE: Per Part 2.4. E.1, the battens are to be from 1 ½” o.d. black
iron pipe. Provide shop primer per Part 2.4. E.3. (24) QUESTION: Is it permissible to install the curtains tracks on the Platform B127
directly to the underside of the pipe grid or do the tracks have to be independently supported from the overhead structure?
RESPONSE: Support tracks independently from the overhead structure (25) QUESTION: Specification Section 116142, Article 2.2, Paragraph “A.3” lists
legs, borders, and travelers as being fabricated from 22oz. IFR black fabric. Article 2.3, Paragraph “G” suggests that the Teasers and Borders get fabricated from the same type of material as the Main Curtain. What type of fabric is required?
RESPONSE: Teaser and borders are to fabricated from the same type of material as the Main Curtain. Material will be clarified in Addendum no. 2.
(26) QUESTION: In accordance with Specification Section 116142, Article 2.3,
Paragraph “H” the cyclorama curtain gets fabricated from seamless white muslin. Does this curtain receive any fullness?
RESPONSE: Provide 60% fullness for the cyclorama curtain. Fullness will be clarified in Addendum no. 2.
(27) QUESTION: Is Tesco Library Furniture an acceptable substitution for the
Library Stack System, Specification Section 115123? Tesco has provided modular wood-library shelving in both oak and maple veneer finish on many school projects throughout Maryland and surrounding areas.
RESPONSE: Substitutions are not permitted during the bid phase, per 01 60 00, Part 3.1.A. Substitutions will be considered after
Bids per 01 60 00, Part 3.1.B.-G. (28) QUESTION: Are we to assume Waiting Rooms A100 / A122 / A124 &
Secretary Areas A101-A102 receive 4-color VCT pattern?
RESPONSE: 4-color VCT pattern to be provided in A100, A101, A102, A122, A124, A125, and Stair 4. Spaces to receive 4 color pattern will be clarified in Addendum no. 2.
(29) CLARIFICATION: Please clarify ALL rooms that are to be considered "Classrooms"
to receive 2-color VCT patterns.
RESPONSE: All rooms designated as classroom, kindergarten, pre-kindergarten, ECL, ESOL, Remedial Reading, Special Education, Maker Space, Digital Learning, Instrumental Music, and Vocal Music are considered classrooms. Spaces to receive 2-color pattern will be clarified in Addendum no. 2.
(30) QUESTION: Collaborative Learning Rooms C130 / C143 / C231 & C239 have
no breakpoints from adjoining Corridors. Are we to assume these areas receive 4-color VCT pattern?
RESPONSE: Collaborative Learning areas will receive 4-color VCT pattern. Pattern in collaborative learning areas will be clarified in Addendum no. 2.
(31) CLARIFICATION: Spec section 09 65 00 states Alternate 10 is found in Contract
Documents and/or drawings. Drawing A8.1, listed as "Alternates" does not show Alternate 10. Please provide all rooms to be considered in Alternate 10.
RESPONSE: Alternates are listed in Specification Section 01 23 00 Alternate Bids. Please see finish schedule for rooms to be included in Alternate 10.
(32) CLARIFICATION: Please provide dimensions for frame type 20 on A-3.6
RESPONSE: Please see Addendum no. 2 for sketch with dimensions.
(33) QUESTION: There is no label on the last frame type on A-3.7. Is this used
anywhere?
RESPONSE: Last frame is HM 42, which is located at doors E013, E012, and E008. Locations will be clarified in Addendum no. 2.
(34) CLARIFICATION: Doors E008, E011, E012, E013 are assigned frame type 23 but
this is a borrowed light frame. Please clarify.
RESPONSE: E008, E011, E012, E013 are to receive HM frame 42. Please see Addendum no. 2.
(35) CLARIFICATION: Openings A106 and A123 are drawn with a sidelight, but are
scheduled to have a 3 sided frame. Please clarify.
RESPONSE: Openings A106 and A123 are to have HM frame 22. Please see Addendum no. 2.
(36) QUESTION: Is frame type 14 used?
RESPONSE: Door B128 has frame type 14. (37) CLARIFICATION: Please clarify which doors, if any have an STC rating. Note 12 on
the door schedule is not used.
RESPONSE: A sound rated door system is not part of the scope of work.
(38) CLARIFICATION: Please clarify which doors are the Integrated Metal Door Assemblies in spec section 081713.
RESPONSE: Doors C 10, C12, C20 and C22 have integrated metal door assemblies. Please see Addendum no. 2.
(39) CLARIFICATION: Reference Instruction to bidders Section 02000-3 paragraph 7.0
Time of Completion. This paragraph indicates a start date on March 2017 and a finish date of August 1, 2018. Drawings C-0.4A and C-0.4B indicate phasing with different dates. Please confirm Phasing and completion dates. Also please provide narrative for phasing.
RESPONSE: Substantial completion is needed by August 1, 2018. (40) CLARIFICATION: Reference Instruction to bidders Section 02000-3 paragraph 7.0
Time of Completion. This paragraph indicates a start date on March 2017 and a finish date of August 1, 2018. Drawings C-0.4A and C-0.4B indicate phasing with different dates. Please confirm Phasing and completion dates. Also please provide narrative for phasing.
RESPONSE: Substantial completion is needed by August 1, 2018. (41) QUESTION: Section 084313 2.3.D.6 lists a requirement for insect screens at
operable vents. Are screens to be provided for all operable vents, or only those in kitchen and cafeteria areas?
RESPONSE: Spec does not limit location of screens. Insect screens are required at all operable vents.
(42) QUESTION: Section 084413 1.2.B notes that the system is not allowed to be
fabricated at the installer's shop and must be done at the factory (manufacturer). Does this only apply to the curtain wall on the project, or storefront as well?
RESPONSE: This requirement is indicated in 08 44 13. It is not in 08 43 13. (43) QUESTION: Section 084413 notes both color anodized and 2605 painted
finishes. Should the color anodized finish be used since that is what is specified for storefront?
RESPONSE: Curtain wall is to be clear anodized. (44) QUESTION: Many of the storefront doors are shown as type HG which is a half
flush door. Some of the specified storefront manufacturers, including the basis of design, do not manufacture doors of this type. They only produce standard full lite storefront doors. Is it acceptable to quote full lite doors on this project, or two lite doors with a mid-rail?
RESPONSE: HG or FG2 doors are acceptable. (45) QUESTION: Door type FG2 is shown with a 12" top rail, but specified in
084313 2.3.C.2 as 4". Which is to be used, 4" is more standard?
RESPONSE: Proceed per specification section 08 43 13.
(46) QUESTION: Specification Section 312300, Part 3.14B, indicates drainage fill under the building slab to be minimum of 12” thick. On Drawing S1.1A, note 1, indicates 4” of washed gravel under the building slab. Is the 12” thick drainage layer in lieu of 4” washed gravel or in addition to the 4” washed gravel?
RESPONSE: Provide 4” washed gravel under the building slab. Reference to 12” of drainage layer will be deleted in Addendum. no. 2.
(47) QUESTION: Specification Section 313213.16, Part 1.1B, indicates to include 5,000 SY of cement soiling. Is this in addition to 5,000 SY that is part of the unit pricing to be provided and included in the bid? If so, will 5,000 SY mentioned in the aforementioned specification section be governed by the unit price for addition/credit for unused quantities?
RESPONSE: Provide 5,000 ST of cement soiling. Amount indicated in 31 23 12.16, Part 1.1.B is not addition to the amount to be included in the bid.
(48) CLARIFICATION: Please provide a specification section for the soft surface
playground area as none is provided. RESPONSE:
(49) QUESTION: Is playground equipment in our scope of work? There are specification section and drawings provided.
RESPONSE: Soft surface playground area is not in the scope of work.
(50) CLARIFICATION: Specification Section 05 12 00 “Structural Steel Framing” Section 1.2 “Reference Standards” includes the AISC requirement. Please
verify that AISC is a requirement.
RESPONSE: AISC is a requirement per specification section 05 12 00 – 1.3C.
(51) CLARIFICATION: Per Specification Section 230506 – Curbs and Flashing for HVAC
Piping and Equipment, Part 3.20C, calls for HVAC equipment curbs to be attached to roof construction with a 6-inch wide wood frame the thickness of the roof insulation. However, when you refer to detail 8/M-5.03 it shows equipment curbs sitting directly on the roof deck. Furthermore, detail 10/M-5.03 shows (1) layer of wood blocking. Please advise which is correct.
RESPONSE: Detail 10 is the typical roof curb detail. Refer to architectural drawings for associated roofing. The other details are meant to address other items and the curb portions are illustrative. The specifications have been changed in Addendum #2.
(52) CLARIFICATION: Please clarify the extent of Corridor tile. There is no mention of tile
on the finish schedule. Is the intent to have wainscot on all walls without lockers in corridors, or only the areas shown on elevations an A 6.6. Please define the meaning of ELA’s in the specs referring to Corridor tile.
RESPONSE: Provide tile as indicated on A-6.6, and at all locations in
corridors with gyp. board wall finish. Please see addendum no. 2
(53) QUESTION: Toilet elevations do not show base or bullnose on walls requiring
tile. Is the intent to have the wall tile field run off the floor on these walls and have cove base on all other walls? Also, is bullnose desired on top of the 7’ wainscot on the tiled walls?
RESPONSE: Bullnose is desired on the top of the 7’ wainscot – Per 09 30 00, Part 2.2.A.1.a. Provide cove base at all walls, per finish schedule. Please see Addendum no. 2
(54) CLARIFICATION: Please confirm dimensions for frame type 20 on A-3.6.
RESPONSE: Please see Addendum no. 2 for sketch with dimensions. (55) CLARIFICATION: There is not a label on the last frame type on A-3.7. Is this frame
type used anywhere?
RESPONSE: Last frame is HM 42, which is located at doors E013, E012, and E008. Locations will be clarified in Addendum no. 2.
(56) CLARIFICATION: Doors E008, E011, E012, and E013 are assigned frame type 23
but this Is a borrowed light frame. Please clarify.
RESPONSE: E008, E011, E012, E013 are to receive HM frame 42. Please see Addendum no. 2.
(57) CLARIFICATION: Please clarify if frame type 14 is used.
RESPONSE: Door B128 has frame type 14. (58) CLARIFICATION: Please clarify which doors, if any, have an STC rating. Note 12 on
the door schedule is not used.
RESPONSE: A sound rated door system is not part of the scope of work.
(59) CLARIFICATION: Please clarify which doors are the Integrated Metal Door Assemblies in Specification Section 081713.
RESPONSE: Doors C 10, C12, C20 and C22 have integrated metal door assemblies. Please see Addendum no. 2.
(60) QUESTION: Section 116623, paragraph 2.4.B. specifies safety mat hooks but
none are shown on the drawings. Will safety mat hooks need to be provided for this project? If so, how many and at what locations?
RESPONSE: Provide 9 mat hooks at room B130. Please see Addendum no. 2
(61) QUESTION: Specification Section 27 51 23 - Integrated Telecommunications
System 2.1 Acceptable Manufacturers, A. lists Telecor 21, Rauland-Borg Telecenter 21, or Bogen 2100 as the only acceptable manufacturers for the project. Baltimore County Public Schools has listed Dukane as an approved manufacturer for School Intercom System Equipment & Electronic Parts, meets the entirety of the specification requirements and, has been installed in several Baltimore County Schools: Vincent Farm ES, Parkville HS, Milford Mill Academy, Hampton ES and Deer Park MS. Please consider adding Dukane to the list of approved manufacturers for the Integrated Telecommunications System.
RESPONSE: The Dukane Starcall is an acceptable manufacturer for intercom/public address.
(62) CLARIFICATION: Based on drawing C-0.4A phasing and the sequence of
construction described on C-6.11 the building construction is scheduled to start July 1, 2017 and be complete by August 1 2018 (13 month duration). If the project started March 2017 as indicated in the specifications and based on the sequence of construction on C-6.11 this would make the building pad available also on or about July 1 2017. Based on our experience a project of this size (98,000 sqft), with the LEED Requirements and Enhanced Commissioning and the sequence of construction established on C-6.11 this should be 16-18 month construction duration after the building pad has been established. We request that you consider a December 1st completion of the new building allowing the students and staff to move into the new building in January 2018 after the winter break. If the duration remains as is we may elect to not bid this project. Please advise.
RESPONSE: The new school building shall be completed by August 2018. (63) CLARIFICATION: Drawing A-7.1B depicts the cyclorama curtain encompassing the
platform area. Another note on the drawing suggests leg curtains but the arrow is pointing to the cyclorama curtain. Consequently, are these the same curtains? If legs are desired please advise the length of and whether they get mounted to tracks or in a fixed position.
RESPONSE: Legs are not required. Note will be deleted from A-7.1B in Addendum no. 2
(64) CLARIFICATION: Based on drawing C-0.4A phasing and the sequence of
construction described on C-6.11 the building construction is scheduled to start July 1, 2017 and be complete by August 1 2018 (13 month duration). If the project started March 2017 as indicated in the specifications and based on the sequence of construction on C-6.11 this would make the building pad available also on or about July 1 2017. Through our experience a project of this size (98,000 sqft), with the LEED Requirements and Enhanced Commissioning and the sequence of construction established on C-6.11 this should be 16-18 month construction duration after the building pad has been established. We request that you consider
a December 1st completion of the new building allowing the students and staff to move into the new building in January 2018 after the winter break. If the duration remains as is we may elect to not bid this project. Please advise.
RESPONSE: The new school building shall be completed by August 2018. (65) CLARIFICATION: On drawing C-1.4 details 1, 2, 3, 6, 11, 14 all of the details say 2”
chain link wire. On drawing C-8.2 details 1, 2, 3, 4 it says 1” chain link wire for the same details. Please clarify if the wire is to be 1” or 2”.
RESPONSE: Chainlink wiring at SWM facilities shall be 1-inch. Chainlink wiring at all other locations shall be 2-inch. Please see Addendum no. 2.
(66) CLARIFICATION: Please confirm Quarry Tile installation is to be thinset installation
at all areas except the freezers/coolers which will require a thick mortar bed. There is a note on Drawing S1-1.B showing a 2 ½ depression which conflicts with the walk-in cooler detail on K 102, and the associated specifications.
RESPONSE: K 102 and S-1.1B show a 6” recess for the walk-in freezer and cooler. Quarry Tile to be thickset. Please see Addendum no. 2.
(67) QUESTION: Drawing A-9.1B shows (4) total floor sleeves. Can it be confirmed
no additional sleeves are necessary at the other side court location?
RESPONSE: Provide floor sleeves at both side courts, for a total of 6 sleeves. Please see Addendum no. 2.
(68) CLARIFICATION: Drawing E-1.1C on the North side in Corridor C11. Need
specification Types for fixtures in this area.
RESPONSE: Fixture types are provided in Addendum no. 2. (69) QUESTION: Drawing T-1.1A through T-1.2C shows dotted lines throughout the
corridors. Is this Cable Tray or some other designation?
RESPONSE: The dashed lines are drawing match lines (70) QUESTION: Will you provide Riser Diagram Drawings for Plumbing Systems:
Stormwater, Sanitary / Vent and Domestic Water, this is standard for plumbing design? Please clarify.
RESPONSE: Riser Diagrams are provided for the major plumbing items. A complete riser diagram for the entire system will not be provided.
(71) CLARIFICATION: Please provide complete Riser Diagram drawings for Plumbing
Systems: Stormwater, Sanitary/Vent (complete)and Domestic Water. Not sure why these weren't included in the bid documents. This is standard operating procedure for plumbing design.
RESPONSE: Riser Diagrams are provided for the major plumbing items. A complete riser diagram for the entire system will not be provided.
(72) CLARIFICATION: Drawing C-2.1 indicates “soccer Field” with Detail 2/C1.6 ‘
associated with it. Is this supposed to be Detail 5/C1.6?
RESPONSE: Riser Diagrams are provided for the major plumbing items. A complete riser diagram for the entire system will not be provided.
(73) CLARIFICATION: We cannot locate the concrete retaining wall shown on Drawing S-
3.1, Detail P. Please clarify where this retaining wall occurs.
RESPONSE: Limits of the wall are shown on the civil plans. Starting and ending coordinates have been added in the callouts.
(74) CLARIFICATION: It seems like there is conflicting information regarding the retaining wall at Bioretention Pond #2. Drawing C-7.1 states concrete retaining wall but Drawing C-2.1 states versa-lok wall with no specifications or details provided. Please clarify which is correct. Also, please indicate location, length and height of the retaining at BioPond #2 since it is not clear on the drawings.
RESPONSE: The retaining wall is concrete. Versa-Lok does not apply. See structural drawings for retaining wall details.
(75) CLARIFICATION: Please refer to details D10, F10, and J10/A-3.9 and please also
refer to the attached Exhibit 1 indicating proposed modifications to
these details to accommodate the rain-screen panel design.
Specifically addressed is the window wall installation where the
system is spanning the rain-screen wall cavity.
RESPONSE: Provide details per contract documents.
(76) CLARIFICATION: Please note that we have indicated and air/vapor barrier the
covers the entire CMU wall and the sheathing behind the panel
system. If the insulation as shown and specified in section 072127
“Enclosed Cavity Foamed Insulation” acts as the air/vapor barrier,
please disregard that note on the proposed details.
RESPONSE: Enclosed Cavity Foamed Insulation is the air/vapor barrier.
(77) CLARIFICATION: Please note that we propose a continuous galvanized angle be installed at the entire perimeter of the window wall openings to transfer the air seal, water line of the system to the primary sealant joint of the storefront system. Blueskin (or other compatible self-adhering membrane) is shown stripped in over the perimeter angle. This will allow the sealant joint to have continuity around the entire perimeter.
RESPONSE: Provide details per contract documents.
(78) CLARIFICATION: Please note the detail also indicates a “cant strip” inserted on top of the angle and under the transition silicone membrane which provides a clear space for window anchorage without the risk of penetrating any flashing or air vapor barrier.
RESPONSE: Install details per contract documents.
(79) CLARIFICATION: Please also see the attached supporting Technical Bulletin TB-07- 03 “Single Skin Profile Wall Applications Utilized as Rain-screens” as prepared by the specified panel manufacturer, Centria.
RESPONSE: Provide details per contract documents.
(80) CLARIFICATION: Please note that this modification definitely has a cost impact on the project. If this modification is acceptable, please incorporate into the bid documents. Otherwise, we will bid as currently detailed.
RESPONSE: Provide details per the contract documents.
(81) CLARIFICATION: Detail A14/A-3.9 will require a transition silicone membrane to be applied over the perimeter angle for proper weathering similar to
the discussion in item 4. Please indicate if this should be required.
RESPONSE: Provide Detail A14/A-3.9 per the contract documents.
(82) CLARIFICATION: On drawing A3.1, note 6 states that the wall tile is to extend to a height of 7’0 but elevations on drawing A5.1 indicates an 8’0 height. Which is correct? Are we to terminate with a tile? Or is there a trim that we should include at the top of the wainscot?
RESPONSE: Tile goes to 8’-0”, with bullnose tile at top. Please see Addendum no. 2.
(83) CLARIFICATION: On drawing A5.1, elevations show full tiles starting at the floor but
typical note 5 on drawing A3.1 states that the base tile is to be flush with wall tile. Please confirm if a base tile is required at wall tile.
RESPONSE: Provide cover base and bullnose at top row of tile. Please see Addendum no. 2.
(84) CLARIFICATION: On drawing A5.1 detail 13 states that the school will provide
graphics that are to be installed over sinks but elevations do not indicate this detail. Please confirm the height and width at which these tiles are to be installed.
RESPONSE: Note 5 has been deleted in Addendum no. 2.
(85) CLARIFICATION: Drawing K102 shows quarry tile in the color to be installed using “2 layers of wire mesh fabric”. Are we to include the installation of
the tile using a wire reinforced mud bed? Or will a concrete subfloor be provided for us to install using a thin set method?
RESPONSE:
(86) CLARIFICATION: On drawing A3.3, there is a detail of a marble threshold at the transition from quarry tile but the door schedule does not indicate use. Please confirm the transition product desired.
RESPONSE: Please see response to question 66.
(87) CLARIFICATION: On drawing A3.1, note 4 indicates that the shower floor is to
receive tile and typical note 1 on drawing A5.1 indicates that tile is to be sloped to any drains. The floor tile specified is 12x24. The only way to slope the floor with a large tile is to cut the pitch into the tile. Can you confirm that you want the specified floor tile in the shower? Is it acceptable at all drains for the tile to be cut to create the pitch? If not, please clarify how the pitch should be created.
RESPONSE: The tiles shall be cut to fit the slope.
(88) CLARIFICATION: On drawing A3.1, the finish schedule does not indicate wall tile in the corridors but elevations on drawing A6.6 shows wall tile. Please confirm that the elevations are correct.
RESPONSE: Please see response to question 52.
(89) CLARIFICATION: Typically toilet rooms call for porcelain wall tile at the wet wall. However, room C137 and B117 calls for ceramic tile. Please confirm the correct tile for these locations.
RESPONSE: B117 and C137 to be porcelain wall tile. Please see Addendum no. 2.
(90) CLARIFICATION: At the group toilets on the 2nd floor, all walls are scheduled to
receive the porcelain tile wainscot but all first floor toilets call for wall tile on the wet wall only. Please confirm that this is correct for A128, A129, B100, and B101.
RESPONSE: Proceed per the contract documents with tile locations in group toilets.
(91) CLARIFICATION: At the 2nd floor toilets, please provide the point and means of
transition between ceramic and VCT as there is no doors to delineate.
RESPONSE:
(92) CLARIFICATION: Typical stairwells call for VCT on the floor but details do not indicate our finishes on the stairs. Are we to include VCT on the intermediate landings?
RESPONSE: Transition location is called out on A-5.1.
(93) CLARIFICATION: Drawing A-6.6 at Diagram H15 it shows Hollow Metal Frame #8, however on page A-1.1 C it does not show Hollow Metal Frame #8. Please clarify if there is a Hollow Metal Frame #8.
RESPONSE: Plan is cut below frame HM 8, so it does not show on plan. Provide per A-6.6.
(94) CLARIFICATION: Please provide Riser Diagram drawings for Plumbing Systems:
Storm water, Sanitary/Vent (complete) and Domestic Water.
RESPONSE: Riser Diagrams are provided for the major plumbing items. A complete riser diagram for the entire system will not be provided.
(95) QUESTION: Will the Demo Classification be waived for the General
Contractors. The Demo Sub Contractor usually carries the Demo Prequalification under their name and the General Contractor usually only covers the New Construction Prequalification.
RESPONSE: The General Contractor shall be pre-qualified BCDPW Classification “I”, BUILDINGS, Category 1, New Building Construction. Demolition sub-contractors shall be pre-qualified Classification “I” BUILDINGS, Category 7, DEMOLITION.
(96) CLARIFICATION: We noted that the subject project has come back out for bid. But it is again listed as requiring certification in category 1-New Building Construction and category 7-Demolition. As we explained before, a General Contractor would not be qualified under the demolition code, and would subcontract that work to a qualified demolition contractor. Likewise, a demolition contractor could not build a new school. Please confirm that BCPS intends to keep these requirements. We believe this will severely limit competition on this project. A suggestion would be to require the demolition subcontractor to be qualified under category 7 by BCPS.
RESPONSE: The General Contractor shall be pre-qualified BCDPW Classification “I”, BUILDINGS, Category 1, New Building Construction. Demolition sub-contractors shall be pre-qualified Classification “I” BUILDINGS, Category 7, DEMOLITION.
(97) QUESTION: Will BCPS hire the agency to provide the construction testing and inspection services for the referenced project or will that be the responsibility of the general contractor?
RESPONSE: BCPS will hire an independent agency for construction testing and inspection services.
(98) QUESTION: I wanted to submit a formal question in regards to the bid date for
Victory Villa and Lansdowne Elementary. With the addendum that was issued for Victory Villa yesterday they are both now bidding on 12/15 at 1pm and 2pm. With these being due on the same day it is going to be very difficult for us to bid both projects and I’m sure it will be difficult for the other GC’s as well. Was your intention to have both projects bidding on the same day? We have never really seen this done especially by the same
owner. We feel that Lansdowne should now be pushed a week in order to have enough time to properly review everything and to allow us to submit bids for both projects.
RESPONSE: The bid date for Lansdowne Elementary School will remain. The bid date for Victory Villa Elementary School will be revised.
(99) QUESTION: Note Victory Villa’s bid date has been changed to December 15, 2016. Please advise if you plan on changing Lansdowne’s Bid Date.
RESPONSE: The bid date for Lansdowne Elementary School will remain.
The bid date for Victory Villa Elementary School will be revised.
(100) QUESTION: Will BCPS be moving the bid due date back due to the fact that Victory Villa, a project of similar size and scope, will be bidding at the same time now as Landsdowne?
RESPONSE: The bid date for Lansdowne Elementary School will remain.
The bid date for Victory Villa Elementary School will be revised.
(101) CLARIFICATION: Note Victory Villa’s bid date has been changed to December 15, 2016. Please advise if you plan on changing Lansdowne’s Bid Date.
RESPONSE: Lansdowne Elementary School’s bid date will remain. Victory
Villa Elementary School’s bid date will be revised. (102) QUESTION: Who is responsible for providing independent testing/inspection
services (steel, concrete, compaction, etc.), BCPS or the contractor?
RESPONSE: BCPS is responsible for providing independent testing/inspection services (steel, concrete, compaction, etc.)
(103) QUESTION: Who is responsible for providing commissioning agent services, BCPS or the contractor?
RESPONSE: Commissioning agent services are not in the contractor’s scope of work.
(104) CLARIFICATION: Please confirm that the completion date for the new building is August of 2018 and the existing building demolition along with the associated site work is to follow the phasing plan shown on Drawings C0.4B.
RESPONSE: The completion date for the new building is August of 2018. The existing building demolition and its associated site work will follow the phasing plan shown on Drawing sheet C0.4B.
(105) QUESTION: I just left you a voicemail, but wanted to follow up here. My firm,
Engineering Consulting Services (ECS), would like to provide pricing for structural steel testing, concrete testing, soils testing
etc. for the new Lansdowne Elementary School project. I understand that Baltimore County Public Schools will be hiring for those services directly, but I haven’t seen anything come out on eMaryland Marketplace requesting pricing. Will you be sending out a separate RFP at a later date? Any insight you can offer would be greatly appreciated!
RESPONSE: A separate RFP for testing services will not be generated for this project. BCPS will independently select and hire a testing agency.
(106) QUESTION: Can the AISC Certification for Steel Fabricators and erectors be
waived? This limits sub-contractors from pricing the project.
RESPONSE: For Fabricator who are not AISC, refer to specification section 05 12 00 – 1.4E.3. Steel Erectors need to be AISC certified per specification.
(107) QUESTION: Who pays for the building permit? In Supplemental Condition
008000-1 it calls out that the Owner pays for the building permit and we are in charge of the rest. But in Spec section 008900 Permits, applications and fees it states the Contractor is to pay for all permits.
RESPONSE: The Owner will pay for the building permit. Any other required permits, applications or fees will be the responsibility of the Contractor.
(108) QUESTION: Will there be a site Visit?
RESPONSE: Site visits are to be arranged and coordinated with the Building Operations Supervisor. Visits may occur before 8:00 AM or after 4:00 PM.
(109) QUESTION: Will BCPS issue a bid form for the construction testing and
inspection services or should the testing agencies submit their own bid form/proposal?
RESPONSE: BCPS will not issue a bid form for the construction testing and inspecting services. BCPS will hire an independent inspection and testing agency for this project.
(110) QUESTION: Will there be a walk-thru/site visit at Lansdowne ES?
RESPONSE: Site visits are to be arranged and coordinated with the Building Operations Supervisor. Visits may occur before 8:00 AM or after 4:00 PM.
CLARIFICATION: Section 00400: FORM OF PROPOSAL paragraph 2.4 Unit
Price has been reduced from 59 to 37 line items. A corrected page 7 of 20 from the specification solicitation and a corrected pages 7 & 8 of 10 form the 00400 Form of Proposal – Price Proposal [excerpt] are attached for your submission.
LIST OF SKETCHES:
CIVIL SKETCHES:
SK-C-19 thru SK-C-24D
ARCHITECTURAL SKETCHES:
SK-A-2.1 thru SK-A-2.13
STRUCTURAL SKETCHES
SK-S-1 thru SK-S-11
MECHANICAL SKETCHES
SK-M-1 and SK-M-2
ELECTRICAL SKETCHES
SK-E-15
END OF ADDENDUM
Melvin E. Burley
Melvin E. Burley, C.P.M., CPPO, CPPB Purchasing Agent – Office of Purchasing Bid file
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
SCALE: 1"=20' HORIZ.
147.00
144.25
143.75
3" OF MULCH
30" OF PLANTING MEDIA
6" OF PEA GRAVEL
143.00142.75
146.75
60.0'
PO
NDIN
G
TE
MP
OR
AR
Y
ES
Dv E
LE
V.
= 14
8.0
0
12" OF #57 STONE
20.0'
147.00
PO
NDIN
G
TE
MP
OR
AR
Y
WS
EL = 14
9.0
0
2:1
MA
X 2:1
MA
X
143.00
6" DRAIN @ INV.
PROFILE SECTION B-B
BIORETENTION FACILITY #3
1"=2' VERT.
FILTER FABRIC
WITH CLASS C
WRAP SIDES ONLY
SK - C - 19B
2
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
N 04°
12'16" E 8
29.17'
30
" D
SCALE: 1" = 20'
PLAN
A
BIO #3
6" PERF. 6" P
ER
F.
6" P
ER
F.
FENCE W/ MOW TABLE
PROP. 4' HIGH CHAIN LINK
1
I
C.O.
152
153
153
30
" D
154
152
147155
6" PERF.
150
APPROVED EQUIVALENT
STD. D-3.05A OR
W/ SLOTTED GRATE BC
'Y-1' INLET BC STD. D-2.22A
B
B
SK - C - 19A
2
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
QUANTITY DESCRIPTION SIZE
1 VAULT (B.C. ST'D. 847.01) * COMPLETE IN PLACE
8"
*SHALL BE BID LUMP SUM INCLUDING 8" F.M. METER AND ALL
PIPING APPURTENANCES WITHIN VAULT, COMPLETE IN PLACE.
8"
8"1
BILL OF MATERIALS
1
BCMD -24,603
N 576506
BCMD -24,252
N 576506
NAD 83/11 NAD 83/11
19 L.F. D.I.P. W/ RESTRAINED JOINTS (SEE GEN. NOTE 17)
AL
MA R
OA
D
8"VALVE & VAULT
8"SLEEVE & SPACER
6.
5.
4.
3.
2.
1.
INFORMATION AND BCPS PROVIDED DOCUMENTS.
SURVEY INFORMATION WAS SUPPLEMENTED WITH BALTIMORE COUNTY AS-BUILT
USED FOR DESIGN UNTIL FIELD VERIFIED.
PROPERTY LINES SHOWN HEREON ARE FOR REFERENCE ONLY AND SHOULD NOT BE
INFORMATION.
POSITIONED ACCORDING TO MONUMENTS, FENCE LINES AND TOPOGRAPHIC
SHOWN HEREON WERE COMPILED FROM DEEDS AND PLATS OF RECORD AND
A BOUNDARY SURVEY WAS NOT COMPLETED. THE PROPERTY LINES AND DIMENSIONS
DISTANCES TO GROUND DISTANCES IS 1.00004821
COMBINED SCALE & ELEVATION FACTOR TO CONVERT MARYLAND STATE PLANE GRID
ELEVATION = 104.95'ELEVATION = 170.12'
EASTING = 1,411,067.70EASTING = 1,410,828.12
NORTHING = 575,589.45NORTHING = 576,096.86
BRASS CAPBRASS DISK
"AZ-180""GIS-180"
PUBLISHED COORDINATES:
COUNTY SURVEY CONTROL STATIONS "AZ-180" AND "GIS-180" WITH THE FOLLOWING
ELEVATIONS ARE NAVD88 DATUM ESTALISHED BY RTK GPS SURVEY FROM BALTIMORE
COORDINATES SHOWN ARE MARYLAND STATE PLANE NAD83/2011 DATUM AND
COMPLETED 2/12/2016.
AERIAL CONTROL AND FIELD CHECK SURVEY BY MERCADO CONSULTANTS, INC.
FOR 1"=30' MAPPING SCALE WITH ONE FOOT CONTOUR INTERVAL.
PURCELLVILLE, VA 20132, FORM AERIAL PHOTOGRAPHY DATED 12/24/2015. COMPILED
AERIAL TOPOGRAPHIC MAPPING BY VIRGINIA RESOURCE MAPPING, 210 N 21ST STREET,
(HR
W 6
3-16
4-1, 6
3-16
4-2)
CAP
2
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
GIS-180
SCALE: 1"= 500'
VICINITY MAP
LA
NS
DO
WNE R
D
LANSDOWNE RD
GAYLAWN DR
ZIO
N R
D
RD
BR
UN
SWIC
K
WAY
OAK LEAF
R
D
TIO
NE
ST
A
AV
EB
RY
AN
T
AVEELIZABETH
AVE
HAZEL
AVELAVERN
SITE
AV
ES
AR
AT
OG
A
AL
MA R
D
SC
HO
OL
EL
EM
EN
TA
RY
LA
NS
DO
WN
E P
AR
KHIL
LC
RE
ST
GE
HB A
VE
MARDO AVE
FERN W
AY
GR
EEN
35567
EX. SMH
31002
EX. SMH
73103
SMH
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
160
155
150
150
145
LP #7116
HBX HBX
(DWG #60-702)
EX. 18" RCP
(DWG #60-702)
EX. 24" RCP
18"
RC
P
15"
8"
VC
P (D
WG 65-780)
RCP
15"
RC
P
(D
WG 65-780)
8"
VC
P
#65-0869)
(D
WG
EX.
8"
W
SD
SS
W
SD
SD
W
W
W
SS
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
149
152 149
WV
146
8"
W
8" S
AN
SCALE: 1" = 50'
SEWER CONNECTION PLAN
PROPOSED 8" SANITARY
NAD 83/11
N 577,150
NA
D 8
3/11
E 1,4
09,780
NA
D 8
3/11
E 1,4
09,780
NAD 83/11
N 577,350
NA
D 8
3/11
E 1,4
09,4
50
NAD 83/11
N 577,350
NA
D83/11
LANSDOWNE ROAD
35567
EX. SMH
E 1,409,667.90
N 577,204.26
80'
R/W
8"
W
BYPASS
METER W/
PROP. 8" FM
73103
SMH
AV
E
BR
YA
NT
EX. SIDEWALK
EX. C&G
EX. C&G
EX. SIDEWALK
178.03°
(PRIVATE)
PROP. 8" S
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
LOCATION
FROM TO"AREA"
ACRES
SUB TOTAL"C" "CA"
S
CA DRAININLET TOTAL (c.f.s.)
"Q" PIPE N=0.014
SLOPEREMARKS
SIZE VEL LGTH
UNLESS NOTED
10 YEAR DESIGN
STORM DRAIN DESIGN DATA
"I"TIME CONC. MIN.
5.0 5.0 6.7
6.19
6.36
5.0 - 5.0 6.7
0.04
0.2
7.1 0.2
7.3 0.1
M-4M-3
0.4
A-1
6.196.7 30" 6.360.24
M-19M-4
6.190.4 88.7'0.2430"
1
M-3
M-1
21"3.09 0.04 7.17
M-2
M-2 A-1 3.015.08
3.096.75.0 30" 5.960.01
M-19I-2 0.46
30" 0.24 47.5'6.36
2.01 15" 5.660.11
3.09
1.441EX. I-1
1EX. I-1 1.44 0.460.32
M-1
EX. I-1A
1.44 5.0
5.08 3.01 6.7
A-1 5.08 3.01 7.1 0.2
J 0.65 0.30 5.0 5.0- 6.7
M-19 M-5 A-J 5.54 3.31 7.3 0.1 7.4 6.02 30" 0.27 6.45 76.3' 0.2
0.1
16.06.286.4 24" 6.500.58A-IM-2I-1 3.64 0.26.22.55 0.3
I-4B
I-4A I-4
I-4
I-3B
1.07
K2
2-K2
2-L
2.21
3.2
5.0 5.0
5.8
15"
15"
15"
15"
12"
20 YR.
0.10 5.0 0.72 0.05
0.3 5.3 6.61
7.36.7
0.17 4.83 0.5
2.97
0.060.440.07
0.52
5.05
0.1 5.9 6.43 3.34 0.31 5.2 0.5
5.9 0.5 6.4 6.280.72 0.57 5.58 0.1
-
EX. M-1 2 - 5.0 6.7 4.29 80'
I-4B .015 5.0 5.0 6.7 2.31
I-4B I-4A 2.5
I-4A K1 0.39 0.2 0.08 5.0 - 5.0 6.7 0.52
2-K1 1.89 0.46 5.3 6.46 0.25 0.1
0.32 0.2
I-4
L 0.99 0.2 0.200.22
5.0 - 5.0 7.36.7 1.46 20 YR.
4.52
0.85 0.24 5.0 8.21
2-K 1.5 0.38 5.0
5.8
0.283I-4BI-22 - 5.0 6.7 1.61 15" 0.07 148' 0.3
21" 0.04 7.17
M-5 M-8 8.93 30"4.07 7.4 0.2 7.6 5.98 6.620.35A-M 0.4144'
M-8 M-9
M-8
A-O 9.37
5.0 5.14
30"
6.68
7.6 0.4 8.0
1.94
4.36 0.46 6.77 0.3
I-5 N+O 0.44 0.29 0.14 15" 0.10 7.25 0.285.4'
127.4'5.9
I-6 M-9 0.86 5.5 5.6 6.520.59 3.85 0.41 6.13 0.1P-S 0.1 15" 32.1'
30"8.0 0.3 8.34.95 5.81 6.850.57 0.228.8 62.0'M-9 M-10 A-S
M-10 16.4 16.6 4.56.35 28.6 0.56 8.52
4.98 30"1.4 0.3 16.4 6.3 0.00 5.7416.1M-13 0.2M-10 T-Z
EX M-2 A-Z 0.2 30"
0.46
0.46 -
0.1
-
6.4 0.3 18.63 152.6'
18.63
100.0'
60.3'
17.7'
35.5'
18.63
49.0'
19.93
0.107 0.3
K 0.20 0.03 -
156'
0.5 35.5'
I-3 144'
I-3
I-3 39.0'
2-M 3.29 6.4 15"
6.70.02
0.74 0.1 6.5 6.25 4.63 0.60 5.60 0.4
0.09
I-3B M-5
I-3B M 0.20.02 5.0 - 5.0 7.3 0.13 20 YR.
1.570.0015"6.75.05.0I-3A 0.95
139.5'
M5 M1 0.1 0.2 0.02 - 0.134 89.5'
24.34
25.72
10.23
55'
15.2 48.1'
NO. TYPE
MANHOLE SCHEDULESIZE INV. OUT TOP ELEV.
M-1
M-2
M-3
M-4
M-5
M-8
M-10
M-9
REMARKS
D-3.02A
D-3.02A
D-3.02A
D-3.02A
D-3.02A
D-3.02A
48"
48"
48"
48"
96"
48"
48"
M-19 D-3.02A48"
PRECAST TYPE C MH
PRECAST TYPE C MH
PRECAST TYPE C MH
PRECAST TYPE C MH
PRECAST TYPE C MH
PRECAST TYPE C MH
STD. JUNCTION BOX 10' x 10'
PRECAST TYPE C MH
D-3.02A
SHA STD. NO. MD 386.11
PRECAST TYPE C MH
149.00
141.90
140.88
140.25
139.31
138.40
137.50
137.04
135.48
156.68
155.63
151.60
152.41
154.30
153.45
152.19
142.00
153.30
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
150
155
155
155
155
150
145
155
150
145
140
135
130
130
135
140
125
CONC FLUME
8"
RC
P (D
AT
R)
30"
RCP (D
WG 63-3
48)
18"
RC
P (D
AT
R)
SD
8
MH
10
MH
NA
D 8
3/11
E 1,4
09,950
NAD 83/11
N 577,150
NAD 83/11
N 576,850
NA
D 8
3/11
E 1,4
09,950
9
MH
M-2
EX.
10"
D
18" D
E 1409735.09N 577058.77
E 1409794.28N 577051.28
E 1409608.74N 577075.35
30" D
30" D
RO
AD
LANSD
OW
NE EX. C&G
6.
5.
4.
3.
2.
1.
INFORMATION AND BCPS PROVIDED DOCUMENTS.
SURVEY INFORMATION WAS SUPPLEMENTED WITH BALTIMORE COUNTY AS-BUILT
USED FOR DESIGN UNTIL FIELD VERIFIED.
PROPERTY LINES SHOWN HEREON ARE FOR REFERENCE ONLY AND SHOULD NOT BE
INFORMATION.
POSITIONED ACCORDING TO MONUMENTS, FENCE LINES AND TOPOGRAPHIC
SHOWN HEREON WERE COMPILED FROM DEEDS AND PLATS OF RECORD AND
A BOUNDARY SURVEY WAS NOT COMPLETED. THE PROPERTY LINES AND DIMENSIONS
DISTANCES TO GROUND DISTANCES IS 1.00004821
COMBINED SCALE & ELEVATION FACTOR TO CONVERT MARYLAND STATE PLANE GRID
ELEVATION = 104.95'ELEVATION = 170.12'
EASTING = 1,411,067.70EASTING = 1,410,828.12
NORTHING = 575,589.45NORTHING = 576,096.86
BRASS CAPBRASS DISK
"AZ-180""GIS-180"
PUBLISHED COORDINATES:
COUNTY SURVEY CONTROL STATIONS "AZ-180" AND "GIS-180" WITH THE FOLLOWING
ELEVATIONS ARE NAVD88 DATUM ESTALISHED BY RTK GPS SURVEY FROM BALTIMORE
COORDINATES SHOWN ARE MARYLAND STATE PLANE NAD83/2011 DATUM AND
COMPLETED 2/12/2016.
AERIAL CONTROL AND FIELD CHECK SURVEY BY MERCADO CONSULTANTS, INC.
FOR 1"=30' MAPPING SCALE WITH ONE FOOT CONTOUR INTERVAL.
PURCELLVILLE, VA 20132, FORM AERIAL PHOTOGRAPHY DATED 12/24/2015. COMPILED
AERIAL TOPOGRAPHIC MAPPING BY VIRGINIA RESOURCE MAPPING, 210 N 21ST STREET,
EX. 20' S
D E
SM
T
M-10
M-19
E 1409686.98N 577016.36
18
MH
15" D
PRIV
AT
E
15" D
PRIV
AT
E
76°47'60"
98°12'0"
EL
EM
EN
TA
RY S
CH
OO
L
PR
OP
OS
ED L
ANS
DO
WN
E
F.F.
EL
EV.
= 15
5.0
D&U ESMT #1
PROP. 20'
BIO #2
BIO #1
8"
W
8"
W
6"
W
GE
N.
T
DD
153
153
151
8"
W
FH
154
153
152
148
152149
WV
WV
WV
148
152
150
146
145
143
148
150
8" W
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
RIGHT-OF-WAY CERTIFICATION
EXISTING ROAD RIGHTS-OF-WAY, AND WHERE SHOWN ON THE PLANS.
9. FULL TRENCH COMPACTION IS REQUIRED FOR A MINIMUM DISTANCE OF 20 FEET ON EACH SIDE OF ALL CROSSINGS, WITHIN ALL
TURF AREAS, AND EXISTING GRADE ALONG EXISTING PAVEMENT.
8. UNLESS OTHERWISE NOTED, THE BID LINE FOR EXCAVATION SHALL BE SUB-GRADE UNDER PROPOSED ROADS, ESTABLISHED GRADE UNDER
DIRECTED BY THE ENGINEER IN THE FIELD.
7. WHERE TWO FEET (2') CLEARANCE CANNOT BE OBTAINED BETWEEN PIPES AND STRUCTURES, SAND BACKFILL SHALL BE PLACED AS
UTILITIES SHALL BE FULLY PROTECTED FROM DAMAGE OR INTERRUPTION.
6. THE CONTRACTOR SHALL USE EXTREME CAUTION DURING EXCAVATION AND/OR INSTALLATION OF ALL WORK SHOWN ON THESE PLANS. ALL
5. THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES.
4. THE CONTRACTOR SHALL NOTIFY MISS UTILITY AT (800) 257-7777 AT LEAST 72 HOURS PRIOR TO STARTING EXCAVATION.
CONSTRUCTION (FEBRUARY 2000, AS AMENDED).
3. ALL CONSTRUCTION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH BALTIMORE COUNTY STANDARD SPECIFICATIONS AND DETAILS FOR
CONSERVATION DISTRICT PERMIT NUMBER 191 - COUNTY - 15.
2. ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH BALTIMORE COUNTY SOIL
BID FOR MAINTENANCE AND REPAIR OF SEDIMENT CONTROL DEVICES.
BEFORE LEAVING THE WORK SITE. THE COST OF PERFORMING THE WORK, INCLUDING MATERIALS, SHALL BE PAID FOR BY A LUMP SUM
AS PART OF THE CONTRACT DOCUMENTS. AT THE END OF EACH DAY, ALL SUCH DISTURBED DEVICES SHALL BE REPAIRED OR REPLACED
DISTURBED DURING THE COURSE OF CONSTRUCTION UNDER THIS CONTRACT, AND AS SHOWN ON THE APPROVED SEDIMENT CONTROL PLAN
1. THE CONTRACTOR SHALL MAINTAIN, REPAIR, AND/OR REPLACE ANY EXISTING SEDIMENT CONTROL DEVICES ENCOUNTERED AND
WILL BE DONE AS PART OF THIS CONTRACT.
16. NO FIELD CONNECTIONS WILL BE MADE AT JOINTS OF EXISTING PIPES. ANY ADJUSTMENTS MADE NECESSARY TO ACCOMPLISH THIS
CONTRACT.
15. CONTRACTOR TO EXCAVATE FOR LOCATIONS AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO STARTING ANY WORK UNDER THIS
TO PROCEED WILL BE ISSUED.
14. THE DEVELOPER WILL ACCOMPLISH ALL GRADING WITHIN EASEMENT AREAS WHERE UTILITIES ARE TO BE INSTALLED BEFORE NOTICE
13. THE DEVELOPER WILL PLACE ROADS TO SUBGRADE FOR THE FULL WIDTH OF THE RIGHT- OF-WAY BEFORE INSTALLATION OF UTILITIES.
12. TRENCH REPAIR SHALL BE AS PER STANDARD DETAIL R-38.
C E
XIS
T.
L
AL
MA R
D
COMPLIANCE, DRAFTING SECTION MANUAL DATED JANUARY, 1997.)
COMPLIANCE WITH BALTIMORE COUNTY, DEPARTMENT OF PERMITS, APPROVALS AND INSPECTIONS, REAL ESTATE
64-339-4, 64-339-5) RECORDED IN THE LAND RECORDS OF BALTIMORE COUNTY, WHICH PLATS WERE PREPARED IN
OF LANSDOWNE ELEMENTARY SCHOOL (L.3712 F.203), ALMA ROAD (HRW 63-164-1, 63-164-2), AND LANSDOWNE ROAD (HRW
HEREON CONFORM IN ALL MATERIAL RESPECTS TO THE RIGHT(S) OF WAY AND EASEMENT(S) SHOWN ON THE RECORD PLAT
IN MY PROFESSIONAL OPINION, THIS PLAN IS SEALED AND CERTIFIED THAT THE RIGHT(S) OF WAY AND EASEMENT(S) SHOWN
@ 0.74%
130
135
140
145
150
125
3
MH
2
MH
1
MH
3.00%
DRAIN @
EX. 21" RCCP
2.00%
DRAIN @
CL IV
30" RCCP
0.60%
DRAIN @
CL IV
30" RCCP
147.8
0
150.3
2
S = 0.04%
V = 7.17 fps
Q = 3.09 cfs
S = 0.04 %
V = 7.17 fps
Q = 3.09 cfs
S = 0.01 %
V = 5.96 fps
Q = 3.09 cfs
10 YR. HGL
155
160
165
0+8
8.2
0+0
0
TOP EL. 151.60
0+0
0
1+52.6
TOP EL. 155.63
TOP EL. 156.68
0+6
0.3
0+0
0
0+16.0
141.90
150.7
5
149.0
0
INV.=142.00
24" D (SW)
140.9
8
140.8
8
SEE DETAIL 12 SHEET C-1.5
TO BE SLABBED OVER
3.00%
DRAIN @
EX. 21" RCCP
S = 0.24 %
V = 6.36 fps
Q = 18.63 cfs
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
(FEB. 2016)
@ 2.00%@ 0.50%
@ 1.10% @ 4.10%
8
MH
5
MH
19
MH
4
MH
0.60%
DRAIN @
CL IV
30" RCCP
0.60%
DRAIN @
CL IV
30" RCCP
0.60%
DRAIN @
CL IV
30" RCCP
0.60%
DRAIN @
CL IV
30" RCCP
0.60%
DRAIN @
CL IV
30" RCCP
S = 0.27%
V = 6.45 fps
Q = 19.3 cfs
INV.=139.40
18" D (NW)
1+2
7.4
0+0
0
TOP EL. 153.45
1+4
3.9
0+0
0
TOP EL. 154.30
TOP EL. 153.30
0+76.3
0+0
0
0+4
7.5
0+0
0
TOP EL. 152.41TOP EL. 151.60
8"
W
4"
W
8"
W
10" H
DP
E
8" S
AN
140.3
5
140.2
5
139. 9
7
139.8
7
138.4
5
138.3
5
139. 4
1
139.3
1
GROUND
EX.
GRADE
PROP.
INV.=139.75
15" D (NE)
144.30
INV.=
(SW)
15" D
INV.=144.55
15" D (NW)
S = 0.24 %
V = 6.36 fps
Q = 18.63 cfs
S = 0.24 %
V = 6.36 fps
Q = 18.63 cfs
S = 0.35 %
V = 6.62 cfs
Q = 24.34 cfs
S = 0.46 %
V = 6.77 fps
Q = 25.72 cfs
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
C E
XIS
T.
L
LA
NS
DO
WN
E R
D
ROAD
LANSDOWNE
80' R.O.W.
EXISTING
AND NAVD 1988 VERTICAL DATUM.
COORDINATE SYSTEM NAD 83/2011 HORIZONTAL
DESIGN AND DRAWING BASED ON MARYLAND
DEVELOPER/OWNER OF THIS PROPERTY AS A CONDITION OF APPROVAL OF THESE PLANS.THE FOLLOWING RIGHTS OF WAY ARE TO BE CONVEYED TO BALTIMORE COUNTY BY THE
TYPE OF CONVEYANCE
DEDICATION TABLE
DRAINAGE & UTILITY EASEMENT
DRAINAGE & UTILITY EASEMENT 0.27 ACRES
@ 1.55%
@ 1.00%
130
135
140
145
150
125
10
MH
9
MH
0.60%
DRAIN @
CL IV
30" RCCP
DRAIN @ 1.00%
EX. 30" RCCP
M-2
EX.
0.60%
DRAIN @
CL IV
30" RCCP
S = 0.56 %
V = 8.52 fps
Q = 28.6 cfs
155
160
165
135.5
5
INV.=136.10
EX. 24" D (NW) 0
+0
0
TOP EL. 140.85
0+0
0
1+4
8.1
0+6
2.0
0+0
0
TOP EL. 152.19
TOP EL. 153.45
137.10
10" H
DP
E
137.6
0
137.5
0
137.0
4
INV.=137.04
EX. 30" D (NE)
TOP EL. 143.68
INV.=141.75
15" D (SE)
INV.=135.48
EX. 30" D (SE)
S = 0.46 %
V = 6.77 fps
Q = 25.72 cfs
S = 0.57 %
V = 6.85 fps
Q = 28.80 cfs
NO. TYPE INV. OUT TOP ELEV.
1-22
REMARKS
D-2.19A4.52
3.34
148.75
148.50
141.50
143.10
1-3
1-4
INLET SCHEDULEQ
DOUBLE 'S' COMBINATION
1-3B 4.63 140.90 157.40
1.61 156.74152.00
1-4A
1-4B
2.97
2.50
143.60
145.50
149.10
151.50
DOUBLE 'S' INLET
DOUBLE 'S' INLET
DOUBLE 'S' INLET
DOUBLE 'S' INLET
DOUBLE 'S' INLET
D-2.19A
D-2.19A
D-2.19A
D-2.19A
D-2.20
NO. TYPE INV. OUT TOP ELEV.
1-22
REMARKS
D-2.19A4.52
3.34
148.75
148.50
141.50
143.10
1-3
1-4
INLET SCHEDULEQ
DOUBLE 'S' COMBINATION
1-3B 4.63 140.90 157.40
1.61 156.74152.00
1-4A
1-4B
2.97
2.50
143.60
145.50
149.10
151.50
DOUBLE 'S' INLET
DOUBLE 'S' INLET
DOUBLE 'S' INLET
DOUBLE 'S' INLET
DOUBLE 'S' INLET
D-2.19A
D-2.19A
D-2.19A
D-2.19A
D-2.20
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
RIGHT-OF-WAY CERTIFICATION
EXISTING ROAD RIGHTS-OF-WAY, AND WHERE SHOWN ON THE PLANS.
9. FULL TRENCH COMPACTION IS REQUIRED FOR A MINIMUM DISTANCE OF 20 FEET ON EACH SIDE OF ALL CROSSINGS, WITHIN ALL
TURF AREAS, AND EXISTING GRADE ALONG EXISTING PAVEMENT.
8. UNLESS OTHERWISE NOTED, THE BID LINE FOR EXCAVATION SHALL BE SUB-GRADE UNDER PROPOSED ROADS, ESTABLISHED GRADE UNDER
DIRECTED BY THE ENGINEER IN THE FIELD.
7. WHERE TWO FEET (2') CLEARANCE CANNOT BE OBTAINED BETWEEN PIPES AND STRUCTURES, SAND BACKFILL SHALL BE PLACED AS
UTILITIES SHALL BE FULLY PROTECTED FROM DAMAGE OR INTERRUPTION.
6. THE CONTRACTOR SHALL USE EXTREME CAUTION DURING EXCAVATION AND/OR INSTALLATION OF ALL WORK SHOWN ON THESE PLANS. ALL
5. THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES.
4. THE CONTRACTOR SHALL NOTIFY MISS UTILITY AT (800) 257-7777 AT LEAST 72 HOURS PRIOR TO STARTING EXCAVATION.
CONSTRUCTION (FEBRUARY 2000, AS AMENDED).
3. ALL CONSTRUCTION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH BALTIMORE COUNTY STANDARD SPECIFICATIONS AND DETAILS FOR
CONSERVATION DISTRICT PERMIT NUMBER 191 - COUNTY - 15.
2. ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH BALTIMORE COUNTY SOIL
BID FOR MAINTENANCE AND REPAIR OF SEDIMENT CONTROL DEVICES.
BEFORE LEAVING THE WORK SITE. THE COST OF PERFORMING THE WORK, INCLUDING MATERIALS, SHALL BE PAID FOR BY A LUMP SUM
AS PART OF THE CONTRACT DOCUMENTS. AT THE END OF EACH DAY, ALL SUCH DISTURBED DEVICES SHALL BE REPAIRED OR REPLACED
DISTURBED DURING THE COURSE OF CONSTRUCTION UNDER THIS CONTRACT, AND AS SHOWN ON THE APPROVED SEDIMENT CONTROL PLAN
1. THE CONTRACTOR SHALL MAINTAIN, REPAIR, AND/OR REPLACE ANY EXISTING SEDIMENT CONTROL DEVICES ENCOUNTERED AND
NAD 83/11
N 576,800
WILL BE DONE AS PART OF THIS CONTRACT.
16. NO FIELD CONNECTIONS WILL BE MADE AT JOINTS OF EXISTING PIPES. ANY ADJUSTMENTS MADE NECESSARY TO ACCOMPLISH THIS
CONTRACT.
15. CONTRACTOR TO EXCAVATE FOR LOCATIONS AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO STARTING ANY WORK UNDER THIS
TO PROCEED WILL BE ISSUED.
14. THE DEVELOPER WILL ACCOMPLISH ALL GRADING WITHIN EASEMENT AREAS WHERE UTILITIES ARE TO BE INSTALLED BEFORE NOTICE
13. THE DEVELOPER WILL PLACE ROADS TO SUBGRADE FOR THE FULL WIDTH OF THE RIGHT- OF-WAY BEFORE INSTALLATION OF UTILITIES.
12. TRENCH REPAIR SHALL BE AS PER STANDARD DETAIL R-38.
120
130
135
125
140
145
150
155
160
165
130
135
125
140
145
150
155
160
165
120
60' R.O.W.
EXISTING
ROAD
ALMA
PERMITS, APPROVALS AND INSPECTIONS, REAL ESTATE COMPLIANCE, DRAFTING SECTION MANUAL DATED JANUARY, 1997.)
RECORDS OF BALTIMORE COUNTY, WHICH PLAT WAS PREPARED IN COMPLIANCE WITH BALTIMORE COUNTY, DEPARTMENT OF
OF LANSDOWNE ELEMENTARY SCHOOL (L.3712 F.203) AND ALMA ROAD (HRW 63-164-1, 63-164-2) RECORDED IN THE LAND
HEREON CONFORM IN ALL MATERIAL RESPECTS TO THE RIGHT(S) OF WAY AND EASEMENT(S) SHOWN ON THE RECORD PLAT
IN MY PROFESSIONAL OPINION, THIS PLAN IS SEALED AND CERTIFIED THAT THE RIGHT(S) OF WAY AND EASEMENT(S) SHOWN
(FEB. 2016)
130
135
140
145
150
155
160
125
120
4B
I
22
I
10 YR HGL
S = 0.07 %
V = 6.84 fps
Q = 1.61 cfs
0+0
0
1+48.1
TOP EL. 156.74 TOP EL. 151.50
INV.=145.46
15" D (NE)
146.0
0
152.0
0
4.05%
DRAIN @
CL IV
15" RCCP
GROUND
EXISTING
INV.=145.70
EX. 12" D (SW)
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
C E
XIS
T.
L
60' R.O.W.
EXISTING
ROAD
ALMA
AL
MA R
D
EASEMENT EAST OF ALMA ROAD
@ 4.05%
(FEB. 2016)
8"
W
4
ITOP EL. 148.50
1+4
3.9
7
4A
ITOP EL. 149.10
0+3
5.4
9
0+0
0
4B
ITOP EL. 151.50
0+0
0
1+56.0
7
TOP EL. 157.59
0+0
0
0+8
0.0
M-1
EX.
DRAIN @ 1.93%
EX. 12" RCCP
145.4
6
143.7
0
147.2
4
145.7
0
143.10
143.2
0
143.6
0
1.15%
DRAIN @
CL IV
15" RCCP
1.13%
DRAIN @
CL IV
15" RCCP
S = 0.05 %
V = 4.26 fps
Q = 0.72 cfs
S = 0.17 %
V = 4.91 fps
Q = 2.50 cfs
S = 0.25 %
V = 5.10 fps
Q = 2.97 cfs
S = 0.31 %
V = 5.09 fps
Q = 3.34 cfs
INV.=146.00
15" D (SE)
GROUND
EX.
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
GRAPHIC SCALE
AND NAVD 1988 VERTICAL DATUM.
COORDINATE SYSTEM NAD 83/2011 HORIZONTAL
DESIGN AND DRAWING BASED ON MARYLAND
@ 0.50%
130
135
140
145
150
155
160
165
125
5
MTOP EL. 154.30
TOP EL. 157.40
0+0
0
1+3
9.5
3
3
I
0+3
9.0
1
0+0
0
TOP EL. 148.75
0+0
0
8"
W
140.9
0
139.4
0
141.0
0
141.50
141.6
0
GRADE
PROP.
10 YR. HGL
1.04%
DRAIN @
CL IV
15" RCCP
1.28%
DRAIN @
CL IV
15" RCCP
1.08%
DRAIN @
CL IV
15" RCCP
S = 0.31 %
V = 5.09 fps
Q = 3.34 cfs
S = 0.57 %
V = 5.92 fps
Q = 4.52 cfs
S = 0.60 %
V = 5.56 fps
Q = 4.63 cfs
INV.=139.41
30" D (SW)
INV.=139.31
30" D (NE)
3B
I
INV.=144.55
15" D (NW)
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
SCALE:
DATE
Calverton, MD 20705
Suite 600
11720 Beltsville Drive
www.grimmandparker.com
LANSDOWNE ELEMENTARY SCHOOLREVISION TO DRAWING N.T.S. 12/08/16
ADDENDUM #
2
SK-C-XX
160
155
150
155
150
150
160
160
150
155
160
155
12"
RCP (D
AT
R)
21" RCP (DWG 63
-348)
10" RCP
12" R
CP
15"
RCP
18"
PV
C
12"
RCP (D
ATR)
(D
AT
R)
(DATR)
12"
RCP (D
ATR)
8"
WA
TE
R (D
WG #63-34
7)
21" RCP
#92-0027)
(DWG
W
SD
W
SD
MB #
1
8"
W
160
150
152
152
15115
2
153
155
156
154
152
153
152
154
156
155
152
153
153
154
153
154
155 15
3
149
152
154
155
FH
151
WV
153
SCALE: 1" = 50'
PLAN VIEW
EXISTING ROAD RIGHTS-OF-WAY, AND WHERE SHOWN ON THE PLANS.
9. FULL TRENCH COMPACTION IS REQUIRED FOR A MINIMUM DISTANCE OF 20 FEET ON EACH SIDE OF ALL CROSSINGS, WITHIN ALL
TURF AREAS, AND EXISTING GRADE ALONG EXISTING PAVEMENT.
8. UNLESS OTHERWISE NOTED, THE BID LINE FOR EXCAVATION SHALL BE SUB-GRADE UNDER PROPOSED ROADS, ESTABLISHED GRADE UNDER
DIRECTED BY THE ENGINEER IN THE FIELD.
7. WHERE TWO FEET (2') CLEARANCE CANNOT BE OBTAINED BETWEEN PIPES AND STRUCTURES, SAND BACKFILL SHALL BE PLACED AS
UTILITIES SHALL BE FULLY PROTECTED FROM DAMAGE OR INTERRUPTION.
6. THE CONTRACTOR SHALL USE EXTREME CAUTION DURING EXCAVATION AND/OR INSTALLATION OF ALL WORK SHOWN ON THESE PLANS. ALL
5. THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES.
4. THE CONTRACTOR SHALL NOTIFY MISS UTILITY AT (800) 257-7777 AT LEAST 72 HOURS PRIOR TO STARTING EXCAVATION.
CONSTRUCTION (FEBRUARY 2000, AS AMENDED).
3. ALL CONSTRUCTION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH BALTIMORE COUNTY STANDARD SPECIFICATIONS AND DETAILS FOR
CONSERVATION DISTRICT PERMIT NUMBER 191 - COUNTY - 15.
2. ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH BALTIMORE COUNTY SOIL
BID FOR MAINTENANCE AND REPAIR OF SEDIMENT CONTROL DEVICES.
BEFORE LEAVING THE WORK SITE. THE COST OF PERFORMING THE WORK, INCLUDING MATERIALS, SHALL BE PAID FOR BY A LUMP SUM
AS PART OF THE CONTRACT DOCUMENTS. AT THE END OF EACH DAY, ALL SUCH DISTURBED DEVICES SHALL BE REPAIRED OR REPLACED
DISTURBED DURING THE COURSE OF CONSTRUCTION UNDER THIS CONTRACT, AND AS SHOWN ON THE APPROVED SEDIMENT CONTROL PLAN
1. THE CONTRACTOR SHALL MAINTAIN, REPAIR, AND/OR REPLACE ANY EXISTING SEDIMENT CONTROL DEVICES ENCOUNTERED AND
STORM DRAIN STANDARD NOTES
NA
D 8
3/11
E 1,4
09,0
00
NA
D 8
3/0
7
NAD 83/11
N 577,200
I-1
EX.
30" D30"
D
15" D
AL
MA R
OA
D
E 1409410.76
N 577168.38
FERN WAYGREEN
WAYOAK LEAF
30"
D
E 1409136.38
N 576923.0122
I
60' R/W
3
I4
I
E 1409232.74N 577202.264A
I
E 1409197.02
N 577199.55
4B
I
E 1409178.04N 577044.51
15" D
15" D15" D
15" D
15" D
30"
D
21" D
#92-0027)
18"
RC
P (D
WG
#92-0027)
(D
WG
15"
RC
P
EX.
SID
EW
AL
K
EX.
C&
G
EX.
C&
G
EX.
SID
EW
AL
K
E 1409375.20N 577181.59
AND PROFILE#2016-1933) FOR PLAN SEE SHEET 1 OF 3 (DWG
155
160
165
60' R.O.W.
EXISTING
ROAD
ALMA
TO BE SLABBED.
E 1409102.89
N 577017.36MH-1
EX.
EX. 20' SD ESMT
3B
I
3A
I
E 1409380.06N 577043.46
PRIVATE 15" D
D&U ESMT #1PROP. 20'
D&
U E
SM
T #2
PR
OP. 20'
D&
U E
SM
T #2
PR
OP.
20'
PROP. 20' D&U ESMT #2
22
I TOP EL. 156.74
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"
STAIR
ST2
ST2A
TIVEG
E029
CW4
A-5.7
H18SIMTYP.
X1
RECESSED LOCKERS w/ TRIM,CONT. GYP. BD. WALL ABOVE
2
ADD
CLASSROOM
C144
40'
4' -
0"6 '
- 0"
' - 9
"2 '
- 0"
26' -
5 1
/8"
X2
SF4
SF11
2
ADD
CORRIDOR
C14
C106
8' -
0"
"
A3
A3
A3
5' -
4"
SLEEVES 18" AFF FOR TVA/V CABLES
5' - 4"
14' - 4"
3' - 4"
2
ADD
A17/A-1.1C SCALE: 1/8"=1'-0' 12/08/16
ADD. NO. 2
SK-A-2.1
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.1C SCALE: 1/8"=1'-0'
T
37' -
8"
4' -
0"6'
- 0"
1' -
9"26
' - 5
1/8
"
X2
SF11
A18
A-4.11
1' - 1 1/2"
6' -
0"2'
- 8
3/4"
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C SCALE: 1/8"=1'-0'
STAIR
ST2
CW
ST2B
2' - 10 3/4"
RECESSED LOCKERS w/ TRIM,CONT. GYP. BD. WALL ABOVE
X1
2
ADD
0
1' - 1 1/2"1'
- 9"
2 ' -
0"
26' -
5 1
/8"
4 ' -
0"6 '
- 0"
9'
SF11
6 ' -
0"2 '
- 8
3/4"
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.3
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C SCALE: 1/8"=1'-0'
12' - 10 5/8"
9' - 4"
10' - 9"
9' - 4"
10' - 9"
A6A-2.1
A4A-2.1
SF39
5 ' -
7 1/
4"
7 ' -
7 1/
4"
2
ADD
10 7
/8"
12' -
0"
0' -
0"
3 ' -
8"
CW4
SF16
12' - 3 3/4"
12' - 0"
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.4
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C SCALE: 1/8"=1'-0'
STAIR
ST3
5' -
3 5/
8"
CW5
A-5.2
E17
A4
A-4.12
CW6 12' - 3 3/4" 12' - 0"
2
ADD
CLA
GRADE LEVEL
1' - 2" 14' - 3" 15' - 2"
10' - 9"
- 4" 10' - 9" 9' - 4"
X2
D12A-2.3
D11A-2.3
SF39
5' -
3 1/
4"
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.5
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C SCALE: 1/8"=1'-0'
C229
STAIR
ST3
C228
ST3B
C227 6
12
15' - 0" 17' - 10" 1' - 4" 10
RECESSED LOCKERS w/ TRIM,CONT. GYP. BD. WALL ABOVEX1
2
ADD
T
10' - 0" 9' - 4"
1' -
9"1/
8"
4' -
0"6'
- 0"
SF11
SF7
A18
A-4.11
2' -
8 3/
4"6'
- 0"
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.6
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C SCALE: 1/8"=1'-0'
5"
9' -
8"5/
8"
SF14
A18
A-4.12
D7
A-4.
5' - 0"
1' - 4"
2' -
0"
2
ADD
9' -
8"5'
- 4"
SF14
1' -
2"
1' - 2"
2
ADD
5' -
4"8'
- 8"
SF8
2"1'
- 2" 1' - 2"
2
ADD
22
SF14
1' - 9"
1' -
9"
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.7
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C SCALE: 1/8"=1'-0'
MECH.
C213
14.8
C213 C211
C210
14' - 11"
3' - 4"
10' - 7 1/8"
2
ADD
2
ADD
19.9
TOILET
C233C238C233
C258
COLL
A-5.1
D15
UNISEX TOILET
C258
8 ' -
0"
7' - 3"
20' -
8 7 4' -
12' -
7 1
/2"
3' -
8"
1' - 2"
2
ADD
2
ADD
C232
K1
A-5.1
H15
BEHAVIORSPECIALIST
OFFICE
C257
TYP.
C257 1' - 2"
1' -
6 7/
8"13
' - 4
1/1
6"6'
- 8"
- 0" 10' - 4 3/8" 4 7/8" 1' - 2"
8' -
7 15
/16"
3' -
8"
2
ADD
2
ADD
12/08/16
ADD. NO. 2
SK-A-2.8
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLH17/ A-5.5 11/29/16 SK-A-1.4
ADD. NO. 1
SCALE: 1 1/2" = 1'-0"A17/A-1.2C 12/08/16
ADD. NO. 2
SK-A-2.9SCALE: 1/4"=1'-0'
LOOR0' - 0"
J2A-3.3
SECOND FLOOR14' - 8"
J4A-3.3
J2A
-3.3
20
H2
A-3
.3
G-5
G-5G-5
G-58' -
8"
2"2'
- 9"
2"2'
- 9"
2"2'
- 8"
6' - 0"
2"2' - 9"2"2' - 9"2"
2
ADD
DATE
11720 Beltsville DriveSuite 600
Calverton, MD 20705
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLA1/ A-4.6 11/29/16 SK-A-1.3
ADD. NO. 1SCALE: 3/4" = 1'-0"A18/A-4.5
SCALE: 3/4"=1'-0'
FIRST FLOOR0' - 0"
5 3/4"1' - 3 1/4"
8' - 5 1/2" LANDING
4"1' - 3 1/4"4"
A-3.9
A18SIM
CW8
9"
STAIR
ST4CURTINWALL DEFLECTION ANCHOR
STEEL TUBE, BELOW LANDING- SEE STRUCT.
161718
A
B
C
D
E
F
3/4" = 1'-0"A18WALL SECTION - MAIN CORRIDOR / STAIR 4
DATE
12/08/16ADD. NO. 2
SK-A-2.10
DATE
11720 Beltsville DriveSuite 600
Calverton, MD 20705
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLA1/ A-4.6 11/29/16 SK-A-1.3
ADD. NO. 1SCALE: 3/4" = 1'-0"A18/A-4.5
SCALE: 3/4"=1'-0'DATE
12/08/16ADD. NO. 2
SK-A-2.11
32' - 0"
27' -
F'
5 3/4"11 1/2"
32' - 0" T.O.STUD
26' - 0" HEAD
9.1
A-3.9
D18SIM
2
ADD
G
H
J
K
L
M
DATE
11720 Beltsville DriveSuite 600
Calverton, MD 20705
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLA1/ A-4.6 11/29/16 SK-A-1.3
ADD. NO. 1SCALE: 3/4" = 1'-0"J11/A-4.6
SCALE: 3/4"=1'-0'DATE
12/08/16ADD. NO. 2
SK-A-2.12
ACOUSTIC
7.2
34' - 0" T.O.STUD
24' - 8"
29' - 4"
A3
5678
3/4" = 1'-0"J11MAIN VESTIBULE AT STAIR ST1
2
ADD
DATE
11720 Beltsville DriveSuite 600
Calverton, MD 20705
www.grimmandparker.com
SCALE:LANSDOWNE ELEMENTARY SCHOOLA1/ A-4.6 11/29/16 SK-A-1.3
ADD. NO. 1SCALE: 3/4" = 1'-0"A18/A-4.11
SCALE: 3/4"=1'-0'DATE
12/08/16ADD. NO. 2
SK-A-2.13
SECOND FLOOR14' - 8"
EXTERIOR WALL CONSITING OF:4" NOM. BRICK11/2" AIR SPACE2-1/2" FOAMED-IN-PLACE POLYURETHANE INSULATION8" NOM. CMU
SCHEDULED ACOUSTICALPANEL CEILING
REINFORCED CONCRETE SLAB ONSTEEL DECK - SEE STRUCT.
A-3.9
F3SIM
A-3.9
J3SIM
1.1
11' - 4"
17' - 4"
SLAB EDGE DETAIL PERUL# FW-D-0036, TYP.
PRE-FINISHED METAL EDGE TRIM
2
ADD
STEEL DECK ON STEEL JOIST & BEAMS- SEE STRUCT.
SCHEDULED ACOUSTICALPANEL CEILING
SF11
A-3.9
J3SIM
26' - 0"
D3
A-3.9
2
ADD
3/8" FULL DEPTHSTIFFENER
VENEER, SEEARCHITECTURALDRAWINGS
8"x6"x1/2" CONTINUOUSANGLE (LLH)
7
WELD DECK TO ANGLE
600S162-54 METALSTUDS AT 16"o.c.
BOX BEAM BY STUDMANUFACTURER
3/16" 3"AT12"
ANGLE TOBEAM
1' - 2 3/8"
ADD2
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO G/S-5.1 12/08/2016 SK-S-2
12 CMU WITH #5 AT 24"o.c.
4"x4"x3/8" CONTINUOUS ANGLE
3/16"AT EACH JOIST
3"x3"x1/4" ANGLE KICKERAT EACH JOIST TO TOPCHORD PANEL POINT
1/4" STIFFENER ATEACH JOIST
3/8" BOTTOM PLATE
5"x5"x1/2"x0'-8" LONGANGLE AT EACH JOISTS
3/16"
6"x1/2"DIA. HEADEDSTUD AT 16"o.c.BETWEEN JOISTS
GROUT 2 COURSESSOLID ABOVE BEAM
BRIDGE PLATE
ADD2
BRIDGE PLATE
1 172
0 B
e lts
ville
Driv
eS
uite
600
Cal
vert
on,
MD
20 7
05
DATE
ww
w.g
rimm
andp
arke
r.co
m
ADD .
NO
.2LA
NSD O
WNE
ELE
MEN
TAR Y
SCH
OO
LSC
ALE :
3/4
" = 1
'-0"
REV I
SIO
N T O
A/S
-5. 2
1 2/0
8/20
1 6SK
-S-3
3/16"
AFTER DLAPPLIED
3/16" 4"AT12"
AT EACHJOISTS
ERECTION BOLTS
3/16"
AT EACHJOISTS
C12x20.7 CONTINUOUS
1/4"C6 TO C12
NOTE:WALL NOT SHOWN FOR CLARITY.
3/16"
6"x6"x5/16" ANGLE TO TOPCHORD PANEL POINT OFADJACENT JOIST
C6x10.5 AT 4'-0"o.c. AND AT2'-0"o.c. AT STAKING AREA
C10x25 CONTINUOUS
HANGER ROD ANDPLATE BY PARTITIONSUPPLIER
1' - 6
"
6"x6"x5/16" ANGLE
3/16"
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 3/4" = 1'-0"REVISION TO H/S-5.3 12/08/2016 SK-S-5
3/16" 3"AT12"
SEE DETAIL H/S-3.2 FORPARTS NOT SHOWN
5"x5"x5/16"CONTINUOUS ANGLE
5 3/4"
12 GAGE TOP ANDBOTTOM TRACK
C6x8.2 AT 4'-0"o.c. INFILLWITH 600S162-43 METALSTUDS AT 16”o.c.
8”x6”x1/2” CONTINUOUSANGLE (LLH)
WELD DECK TO ANGLE
3/16"AT EACH BEAM
CONNECTION BT STUDMANUFACTURER
3/16"TYP.
1/4"
CONNECTION BT STUDMANUFACTURER
3"x3"x1/4" ANGLE KICKERAT EACH BEAM
1/2" STEEL PLATE
REFER TO J/S-5.3 FORC6x8.2 CONNECTION TO1/2" PLATE
ADD2
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO J/S-5.4 12/08/2016 SK-S-4
SEE H/S-3.2 FOR SLABPERIMETER INFORMATION
800S162-43 STUD AT 16"o.c.WITH TOP AND BOTTOMTRACK
3/8" FULL DEPTHSTIFFENER PLATE
8" CMU
d
3"x3"x1/4" ANGLEKICKER AT EACH BEAMWHEN d = 6" OR MORE
1/4" 1"
1 1/2"
6"x8"x3/8"x1'-0" LONGANGLE AT 48"o.c.
(2)-5/8"DIA. HILTIKWIK BOLT AT 8"o.c.(4" EMBEDMENT)
GROUT TOP 2COURSES SOLID
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO K/S-5.4 12/08/2016 SK-S-6
3/16" 3"AT12"
10 3/8"
ATTACH STUDS TOANGLE WITH VERTICALSLIDE CLIP CONNECTIONAT EACH STUD TO ALLOWFOR 1/2" DEFLECTION
VENEER, SEEARCHITECTURALDRAWINGS
10"x3"x5/16" CONTINUOUSANGLE (LLH)
600S162-54 STUD AT16"o.c.
600T162-54 CONTINUOUSTOP AND BOOTOM
TOP OF STEELVARIES, SEE PLAN
ROOF DECK, SEE PLAN
1' - 2 5/8"2"x2"x1/4" ANGLEAT THIRD POINTS
ARCHITECTURAL
SEE
METAL STUDS ANDCONNECTION BY METALSTUD MANUFACTURER
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO G/S-5.5 12/08/2016 SK-S-7
5 3/4"
600S162-54 METAL STUDSAT 16”o.c. WITH TOP ANDBOTTOM TRACK
CONNECTION BT STUDMANUFACTURER
3/16"
AT EACHJOIST
15 1/2"x4"x5/16"CONTINUOUS BENT PLATE
12 GAGE BOTTOM PLATE
LATERAL CONNECTION BYCURTAINWALLMANUFACTURER TO ALLOWFOR 1/2” STRUCTURALDEFLECTION
CURTAINWALL
2"x2"x1/4" ANGLEAT EACH JOISTS
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO K/S-5.5 12/08/2016 SK-S-8
C8x11.5
3/8" FULL DEPTHSHEAR PLATE
5"
600S162-43AT 16"o.c.
12 GAGE BOTTOMTRACK
REFER ARCH.DRAWINGS
CURTAINWALL, SEEARCHITECTURAL DRAWINGS
LATERAL CONNECTION BYCURTAINWALL MANUFACTURERTO ALOOW FOR 1/2"STRUCTURAL DEFLECTION
C8x11.5 AT EACH BEAM
4"x4"x1/4"CONTINUOUS ANGLE ADD
2
CONNECTION BY STUDMANUFACTURER
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO G/S-5.6 12/08/2016 SK-S-9
5 3/4"
12 GAGE TOP ANDBOTTOM TRACK
C6x8.2 AT 4'-0"o.c. INFILLWITH 600S162-43 METALSTUDS AT 16”o.c.
6”x4”x3/8” CONTINUOUSANGLE
WELD DECK TO ANGLE
3/16"AT EACH BEAM
CONNECTIONBY STUDMANUFACTURER
12 GAGE ANGLE BY STUDMANUFACTURER
1/2" STEEL PLATE
REFER TO J/S-5.3 FORC6x8.2 CONNECTION TO1/2" PLATE
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"REVISION TO H/S-5.6 12/08/2016 SK-S-10
CONNECTION TO METAL STUDSTO ANGLE STUD MANUFACTURER
C6x10.5 AT 4'-0"o.c.WITH 600S162-54STUD INFILL AT 16"o.c.
LATERAL CONNECTION BYCURTAINWALL MANUFACTURERTO ALOOW FOR 1/2"STRUCTURAL DEFLECTION
CURTAINWALL, SEEARCHITECTURAL DRAWINGS
4" LIGHT GAGE METAL STUDKICKER AT EACH STUD BYSTUD MANUFACTURER
5"x5"x5/16" CONTINUOUSANGLE BETWEEN BEAMS
9"x5"x1/2" CONTINUOUS ANGLE
3/16" 4"AT12"
3/8"FULL DEPTHSHEAR PLATE
9 1/2"12 GAGE TOP ANDBOTTOM TRACK
1/4"
1/2" STEEL PLATE ATEACH CHANNEL
1/4"
1/4"
CURTAINWALL, SEEARCHITECTURAL DRAWINGS
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"ADDED SECTION J/S-5.6 12/08/2016 SK-S-11
3/16"TYP.
2"x2"x1/4" ANGLE KICKERAT 6'-0"o.c. TO TOPCHORD PANEL POINT OFADJACENT JOISTS
9 3/4"
SEE J/S-3.2 FOR CMUTIE-BACK INFORMATION
8" CMU12" CMU AT SIMILAR
10"x4"x3/8"x1'-0" LONGANGLE AT 4'-0"o.c.
ADD2
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
ADD. NO.2LANSDOWNE ELEMENTARY SCHOOLSCALE: 1" = 1'-0"ADDED SECTION K/S-5.6 12/08/2016 SK-S-12
1'
2'
PLATFORMB127
R1B- 11
ADA LIFTB137
4
DIMMER PANEL DP
REARPROJECTORAT 96"
J
PROJECTOR SCREENPOWER120V
R1B- 62
18PROJECTOR SCREENCONTROL 17
2
ADD
SPECIFIC NOTES:
PROVIDE 3 #12 + #12G-3/4"C FROM PROJECTOR SCREEN TOPROJECTOR CONTROL SWITCH.
INSTALL MANUFACTURER PROVIDED CONTROL SWITCH INSINGLE GANG OUTLET BOX AT 48" AF.
17
182
ADD
11720 Beltsville DriveSuite 600
Calverton, MD 20705
DATE
www.grimmandparker.com
SCALE: As indicated
ADDLANSDOWNE ELEMENTARY SCHOOLJ11, K3 / E-2.1B 12/08/16 SK-E-15
Solicitation Number MBU-516-17
Creating A Culture of Deliberate Excellence Page 7 of 20 An Affirmative Action Employer
2.4 Unit Prices
Unit prices are for both extra Work and credits. This list of unit prices will be submitted with the Bid in duplicate and shall become a part of the Contract upon its award. Unit prices listed below are applicable to all work in this project involving extra materials/services performed by the General Contractor or his subcontractors and/or credits to the Owner for materials/services deleted from the project. Unit price includes all overhead and profit for the Subcontractor. General Contractor mark-up is to be applied per Article 7 of General Conditions. Prices as stated shall remain in effect through the end of the Contract warranty period. The undersigned acknowledges the unit price values as part of this bid proposal and agrees to add or delete items for the unit prices identified when directed to do so by the Owner.
1. Riprap Class 1 - $75.00 per Ton 2. Earth Excavation Onsite (machine) $6.00 per cubic yard 3. Earth Excavation Onsite (hand) $90.00 per cubic yard 4. Trench Excavation Onsite $15.00 per cubic yard 5. Contaminated Soil (excavate, legally dispose) $650.00 per cubic yard 6. MSHA #2 or #57 stone at trench areas $45.00 per cubic yard 7. CR-6 or CR-1 at trench areas $42.00 per cubic yard 8. MSHA #2 or #57 stone in open areas $42.00 per cubic yard 9. CR-6 or CR-1 in open areas $40.00 per cubic yard 10. Imported Screened Topsoil $50.00 per cubic yard 11. Sodding $5.00 per square yard 12. Permanent Seeding and Mulch $2.25 per square yard 13. Temporary Seeding and Straw $1.50 per square yard 14. Mirafi 500x (furnish and install) $2.75 per square yard 15. Stabilization Fabric (furnish and install) $2.00 per square yard 16. Stabilization Fabric and Filter Cloth (furnish and install) $40.00 per square yard 17. Super Silt Fence (furnish, install, maintain, remove) $12.00 per linear foot 18. Silt Fence (furnish, install, maintain, remove) $4.50 per linear foot 19. Trench Rock (remove and dispose) $350.00 per cubic yard 20. Open Rock (remove, haul, legally dispose) $200.00 per cubic yard 21. Existing sidewalk and spoil (remove, legally dispose, replace)
$8.50 per square foot 22. Existing Curb and Gutter (saw cut, legally dispose, replace)
$25.00 per linear foot 23. Saw-cut and remove damaged paving $50.00 per square yard 24. Concrete Slab $0.85 per square foot 25. 4” CMU wall $10.00 per square foot 26. 6” CMU wall $11.00 per square foot 27. 8” CMU wall $14.00 per square foot 28. 12” CMU wall $11.95 per square foot 29. Tooth single doorframe (furnish and install) $800.00 per opening 30. Tooth double doorframe (furnish and install) $900.00 per opening 31. Receptacle $240.00 per location 32. Data Outlet $255.00 per location 33. Concrete Sidewalk $5.50 per square foot 34. Heavy Duty Bituminous Paving $45.00 per square yard 35. Imported fill material $37.00 per cubic yard 36. Removal of unsuitable material $30.00 per cubic yard 37. Reinforced concrete footing $325.00 per cubic yard
(Signature of Bidder) (Date)
Solicitation Number MBU-516-17
Creating A Culture of Deliberate Excellence Page 8 of 20 An Affirmative Action Employer
2.5 Project Construction Schedule and Liquidated Damages
The undersigned agrees to complete Work in strict accordance with the Contract Documents and be substantially complete by not later than the date specified within Section 00200 of the Instructions to Bidders. The Owner may retain the sums as stated in “Liquidated Damages for Failure to Complete on Time,” of Section 00200 instruction to Bidders.
2.6 MBE Submittals
The Bidder shall include minority business enterprise material as provided herein with their proposal. Bidders failing to submit the minority business enterprise material as provided herein, including the “Attachment A: Certified Minority Business Enterprises Utilization and Fair Solicitation Affidavit” and “Attachment B: MBE Participation Schedule” may result in the bid being determined non-responsive.
2.7 Bid Bond
Bidder must include Bid Bond in the form specified within the solicitation.
2.8 Pre-Qualifications Certificate
Bidders must include a copy of their Pre-Qualifications Certificate as issued by the BCDPW
2.9 Addenda
Receipt of Addenda to the Drawings and Specifications shall be acknowledged on the ADDENDA form within this Form of Proposal.
2.10 Contract
If the undersigned receives written notice of award of the Contract, at his designated address, within one-hundred twenty (120) calendar days after bid opening (or later if bid has not been withdrawn), the undersigned agrees to execute and deliver a Contract and Bonds in accordance with the bid as accepted, within ten (10) business days from receipt of the Contract, or forfeit the amount of the Bid Bond.
(Signature of Bidder) (Date)
Solicitation Number MBU-516-17
MBU-516-17 NEW SCHOOL CONSTRUCTION-LANSDOWNE ELEMENTARY SCHOOL & DEMOLITION OF LANSDOWNE ELEMENTARY SCHOOL
Form of Proposal / Price Proposal - Page 7 of 10
2.4 Unit Prices
Unit prices are for both extra Work and credits. This list of unit prices will be submitted with the Bid in duplicate and shall become a part of the Contract upon its award. Unit prices listed below are applicable to all work in this project involving extra materials/services performed by the General Contractor or his subcontractors and/or credits to the Owner for materials/services deleted from the project. Unit price includes all overhead and profit for the Subcontractor. General Contractor mark-up is to be applied per Article 7 of General Conditions. Prices as stated shall remain in effect through the end of the Contract warranty period. The undersigned acknowledges the unit price values as part of this bid proposal and agrees to add or delete items for the unit prices identified when directed to do so by the Owner.
1. Riprap Class 1 - $75.00 per Ton 2. Earth Excavation Onsite (machine) $6.00 per cubic yard 3. Earth Excavation Onsite (hand) $90.00 per cubic yard 4. Trench Excavation Onsite $15.00 per cubic yard 5. Contaminated Soil (excavate, legally dispose) $650.00 per cubic yard 6. MSHA #2 or #57 stone at trench areas $45.00 per cubic yard 7. CR-6 or CR-1 at trench areas $42.00 per cubic yard 8. MSHA #2 or #57 stone in open areas $42.00 per cubic yard 9. CR-6 or CR-1 in open areas $40.00 per cubic yard 10. Imported Screened Topsoil $50.00 per cubic yard 11. Sodding $5.00 per square yard 12. Permanent Seeding and Mulch $2.25 per square yard 13. Temporary Seeding and Straw $1.50 per square yard 14. Mirafi 500x (furnish and install) $2.75 per square yard 15. Stabilization Fabric (furnish and install) $2.00 per square yard 16. Stabilization Fabric and Filter Cloth (furnish and install) $40.00 per square yard 17. Super Silt Fence (furnish, install, maintain, remove) $12.00 per linear foot 18. Silt Fence (furnish, install, maintain, remove) $4.50 per linear foot 19. Trench Rock (remove and dispose) $350.00 per cubic yard 20. Open Rock (remove, haul, legally dispose) $200.00 per cubic yard 21. Existing sidewalk and spoil (remove, legally dispose, replace)
$8.50 per square foot 22. Existing Curb and Gutter (saw cut, legally dispose, replace)
$25.00 per linear foot 23. Saw-cut and remove damaged paving $50.00 per square yard 24. Concrete Slab $0.85 per square foot 25. 4” CMU wall $10.00 per square foot 26. 6” CMU wall $11.00 per square foot 27. 8” CMU wall $14.00 per square foot 28. 12” CMU wall $11.95 per square foot 29. Tooth single doorframe (furnish and install) $800.00 per opening 30. Tooth double doorframe (furnish and install) $900.00 per opening 31. Receptacle $240.00 per location 32. Data Outlet $255.00 per location 33. Concrete Sidewalk $5.50 per square foot 34. Heavy Duty Bituminous Paving $45.00 per square yard 35. Imported fill material $37.00 per cubic yard 36. Removal of unsuitable material $30.00 per cubic yard 37. Reinforced concrete footing $325.00 per cubic yard
(Signature of Bidder) (Date)
Solicitation Number MBU-516-17
MBU-516-17 NEW SCHOOL CONSTRUCTION-LANSDOWNE ELEMENTARY SCHOOL & DEMOLITION OF LANSDOWNE ELEMENTARY SCHOOL
Form of Proposal / Price Proposal - Page 8 of 10
2.5 Project Construction Schedule and Liquidated Damages
The undersigned agrees to complete Work in strict accordance with the Contract Documents and be substantially complete by not later than the date specified within Section 00200 of the Instructions to Bidders. The Owner may retain the sums as stated in “Liquidated Damages for Failure to Complete on Time,” of Section 00200 instruction to Bidders.
2.6 MBE Submittals
The Bidder shall include minority business enterprise material as provided herein with their proposal. Bidders failing to submit the minority business enterprise material as provided herein, including the “Attachment A: Certified Minority Business Enterprises Utilization and Fair Solicitation Affidavit” and “Attachment B: MBE Participation Schedule” may result in the bid being determined non-responsive.
2.7 Bid Bond
Bidder must include Bid Bond in the form specified within the solicitation.
2.8 Pre-Qualifications Certificate
Bidders must include a copy of their Pre-Qualifications Certificate as issued by the BCDPW
2.9 Addenda
Receipt of Addenda to the Drawings and Specifications shall be acknowledged on the ADDENDA form within this Form of Proposal.
2.10 Contract
If the undersigned receives written notice of award of the Contract, at his designated address, within one-hundred twenty (120) calendar days after bid opening (or later if bid has not been withdrawn), the undersigned agrees to execute and deliver a Contract and Bonds in accordance with the bid as accepted, within ten (10) business days from receipt of the Contract, or forfeit the amount of the Bid Bond.
(Signature of Bidder) (Date)