Bedlingtonshire Community High School
Background
• PFI (Private Finance Initiative) School to be built by Miller Construction
• Government Funded• Supported by the Local Authority• School is designed and built for 820 students• Starting December 2014 and completion
March 2016.
Site Plan• The new school will be built on the green field
adjacent to Palace Road• Our current school will continue to be fully
used until the new building is ready• In March 2016 when the new school is
complete the children will move in after Easter• All the old school buildings will be demolished
and the land returned to playing fields
Site Layout
New School Facilities• 2 storey building• 22 General Classrooms• 7 Science Labs• 4 ICT Labs• Specialist Technology, Music and Art Rooms• New PE facilities• Dance Studio• 110 m2 Library
Ground Floor
First Floor
More Facilities
• 200m2 Dining area• Hall with Bleacher Seating for assemblies,
concerts, lectures• Social spaces for students all around the
building• Enhanced Sports areas.• Disabled Access• Dedicated SEN rooms and facilities
Community Sport
The new Sport facilities will be available to the local community after school. They include:• A Fitness / Cardio Room• Dance Studio• Community Room• 4 Court Sports Hall