BACK UP DATA / CALCULATION SHEET NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOL DAN SKET GAMBAR a(m3) b(m3) c(m3) (m) 1 Pek. Galian Pondasi Pintu Klep 2.90 3.00 2.10 6.98 86.51 NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOL DAN SKET GAMBAR a(m3) b(m3) (m) 2 Pek. Pasangan Baatu Kali Pondasi 0.80 0.70 1.5 1.68 A B C A B

Upload: jilli-anzur

Post on 20-Dec-2015

31 views

Category:

Documents


1 download

DESCRIPTION

vrvrvr

TRANSCRIPT

Page 1: Back Up Data

BACK UP DATA / CALCULATION SHEETNO ITEM PEKERJAAN VOLUME PANJANG

T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) c(m3) (m)

1 Pek. Galian Pondasi Pintu Klep2.90 3.00 2.10 6.98 86.51

NO ITEM PEKERJAAN VOLUME PANJANGT0TAL VOL

DAN SKET GAMBAR a(m3) b(m3) (m)

2 Pek. Pasangan Baatu Kali Pondasi0.80 0.70 1.5 1.68

A

B

C

A

B

Page 2: Back Up Data

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) C(m3) (m)

3 Pek. Pasangan Batu Kali Dinding0.40 0.60 0.90 1.5 1.35

NO ITEM PEKERJAAN VOLUME PANJANGT0TAL VOL

DAN SKET GAMBAR a(m3) b(m3) (m)

4 Pek. Pasangan Batu Kali Pondasi Sayap0.35 0.50 6.4 2.24

A

C

B

A

B

Page 3: Back Up Data

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) C(m3) (m)

5 Pek. Pasangan Batu Kali Sayap0.30 0.35 0.90 6.4 3.74

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) (m)

6 Pek. Beton Cor lantai1.00 0.20 6.4 2.56

A

C

B

AB

Page 4: Back Up Data

VOLUME TOTAL 21.57

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) (m)

7 Pek. Pasangan Batu Kali Dinding Timbunan0.30 0.20 25 3.00

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) (m)

8 Pek. Pasangan Batu Kali Pondasi Sayap0.20 0.70 25 7.00

Page 5: Back Up Data

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) (m)

9 Pek. Beton Cor lantai Atas1.50 0.10 22.00 6.60

AB

Page 6: Back Up Data

NO ITEM PEKERJAAN VOLUME PANJANG T0TAL VOLDAN SKET GAMBAR a(m3) b(m3) c(m3) (m)

10 Pek. Galian Tanah Normalisasi0.80 0.51 0.60 725.00 569.85

A

B

C

DIPERIKSA OLEH ;ASISTEN TEKNIK

RUDY MAWANSYAH, STNIP : 19750707 200604 1 008

DI TELITI OLEH ;KONSULTAN SUPERVISI

CV. ABDY KRIASY KONSULTAN

Ir. AMRINCHIEP INSFECTOR

DITELITI OLEH ;PENGAWAS LAPANGAN

TUAHTA BANGUNNIP : 19740610 200801 1 002

DI BUAT OLEHCV. MANIK MULIA

ADISON GINTING, SEDIREKTUR

DIPERIKSA OLEH ;PEJABAT PELAKSANA TEKNIS

KEGIATAN

JAPAIRNIP : 19591211 198011 1 001

DIKETAHUI OLEH ;KUASA PENGGUNA ANGGARAN

( KPA)

TUKIRIN, BENIP : 19591211 198011 1 001

Page 7: Back Up Data

DI BUAT OLEHCV. MANIK MULIA

ADISON GINTING, SEDIREKTUR

DIPERIKSA OLEH ;PEJABAT PELAKSANA TEKNIS

KEGIATAN

JAPAIRNIP : 19591211 198011 1 001

DIKETAHUI OLEH ;KUASA PENGGUNA ANGGARAN

( KPA)

TUKIRIN, BENIP : 19591211 198011 1 001

Page 8: Back Up Data

BACK UP DATA / CALCULATION SHEET