baastel macro results framework assessment appendix final · 2018-04-27 · afesd arab fund for...

63
www.baastel.com Creating a Macro Results Framework for the Middle East and North Africa Transition Fund “Feasibility Assessment” Final Report Appendix Submitted by: Le Groupeconseil baastel ltée Requested by: The World Bank June, 2014

Upload: others

Post on 18-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

www.baastel.com 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Creating a Macro Results Framework for the Middle East and North Africa 

Transition Fund “Feasibility Assessment” 

 Final Report 

Appendix  

Submitted by:   Le Groupe‐conseil baastel ltée 

Requested by:   The World Bank 

 

June, 2014 

 

Page 2: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

www.baastel.com 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Le Groupe‐conseil baastel ltée 

85 Victoria Street  

Gatineau (Québec) Canada, J8X 2A3 

Tel: +(1) 819‐595‐1421  

Fax: +(1) 819‐595‐8586 

www.baastel.com 

Contact: [email protected] 

Page 3: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

TABLE OF CONTENTS Acronyms ............................................................................................................................... iii 

1.  Introduction ................................................................................................................ 1 

2.  Overview of M&E Practices across the ISAs .................................................................... 1 

2.1.  African Development Bank ............................................................................................ 1 

2.2.  European Bank for Reconstruction and Development ...................................................... 2 

2.3.  European Investment Bank ............................................................................................ 2 

2.4.  International Finance Corporation .................................................................................. 3 

2.5.  Islamic Development Bank ............................................................................................ 3 

2.6.  Organisation for Economic Co‐operation and Development .............................................. 4 

2.7.  World Bank .................................................................................................................. 4 

2.8.  Others ......................................................................................................................... 5 

3.  Case Studies .................................................................................................................5 

3.1.  The Global Environment Facility ..................................................................................... 5 

3.2.  Global Agriculture and Food Security Program ............................................................... 12 

3.3.  Neighbourhood Investment Facility............................................................................... 17 

3.4.  Conclusion................................................................................................................... 20 

4.  Options ..................................................................................................................... 21 

4.1.  Option A1 “Enhanced” Status Quo ................................................................................ 21 

4.2.  Option B1 – Revise and Use the DFID‐based Logic Model ................................................ 27 

4.3.  Option B2 – Developing Project Cluster/Nesting Model ................................................... 31 

4.4.  Option B3 – Reporting Against a MENA Transition Fund Theory of Change – “Hybrid” Option

  37 

4.5.  Others ........................................................................................................................ 41 

Annex 1. Methodology ........................................................................................................... 42 

Annex 2. Glossary ..................................................................................................................46 

Annex 3. List of Documents Reviewed .................................................................................... 48 

Annex 4. List of Persons Met/Interviewed ................................................................................ 52 

Annex 5. Addendum .............................................................................................................. 55 

 

Page 4: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

ii 

 

   

Page 5: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

iii 

 

ACRONYMS 

Acronym  Definition 

€  Euros 

$  Dollars 

ADB  Asian Development Bank   

AfDB  African Development Bank 

AFESD  Arab Fund for Economic and Social Development 

AMF  Arab Monetary Fund 

AS  Advisory Services (IFC) 

CAREC  Central Asia Regional Economic Cooperation 

CEO  Chief Executive Officer 

CPPR  Country Portfolio Performance Reviews 

CSI  Core Sector Indicator (AfDB) 

CSO  Civil Society Organization 

CU    Coordination Unit 

DAC  Development Assistance Committee (OECD) 

DFATD  Department of Foreign Affairs, Trade and Development (Canada) 

DFID  Department for International Development (UK) 

DIME  Development Impact Evaluation Initiative 

DOTS  Development Outcome Tracking System 

EBRD  European Bank for Reconstruction and Development 

EC  European Commission 

EIB  European Investment Bank 

ENP  European Neighbourhood Policy 

ENPI  European Neighbourhood and Partnership Instrument 

EO  Evaluation Office (GEF) 

EU  European Union 

EvD  Evaluation Department (EBRD) 

ESIAF  Economic and Social Impact Assessment Framework (EIB) 

FAO  Food and Agriculture Organization 

FIG  Finance Institutions Group (NIF) 

GAFSP  Global Agriculture and Food Security Program 

GDPRD  Global Donor Platform for Rural Development 

GEF  Global Environment Facility 

GPB  Global Program Branch 

HS  Highly Satisfactory  

HU  Highly Unsatisfactory  

ICR  Implementation Completion and Results Report  

IDB  Inter‐American Development Bank 

IE  Impact Evaluation 

IEG  Independent Evaluation Group (WB) 

IFAD  International Fund for Agricultural Development 

IFC  International Finance Corporation 

IFI  International Financial Institutions 

IMF  International Monetary Fund 

Page 6: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

iv 

 

IS  Investment Services (IFC) 

ISA  Implementation Support Agency 

IsDB  Islamic Development Bank 

ISR  Implementation Status Report 

KPI  Key Performance Indicator 

M&E  Monitoring and Evaluation 

MDG  Millennium Development Goals 

MENA  Middle East and North Africa 

MOPAN  Multilateral Organisation Performance Assessment Network 

MS  Moderately Satisfactory 

MU  Moderately Unsatisfactory 

NGO  Nongovernmental Organization 

NIF  Neighbourhood Investment Facility 

OCE  Office of the Chief Economist 

OECD  Organization for Economic Cooperation and Development 

OPEC  Organization of the Petroleum Exporting Countries 

OPS  Overall Performance Studies (GEF) 

PAR  Project Appraisal Reports 

PCR  Project Completion Reports 

PDO  Project Development Objective 

PIR  Project/Program Implementation Report  

PISR  Project Implementation Support Report  

ReM  Results Measurement Framework (EIB) 

ROtl  Review of Outcomes to Impacts (GEF) 

RRS  Results Reporting System (AfDB) 

S  Satisfactory 

SC  Steering Committee 

STAP  Scientific and Technical Advisory Panel 

TC  Transition Country 

TIMS  Transition Impact Monitoring System 

U  Unsatisfactory 

UK  United Kingdom 

UNDP  United Nations Development Programme 

UNEP  United Nations Environment Programme 

USA  United States of America 

WB  World Bank 

WFP  World Food Programme 

 

 

Page 7: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

1. INTRODUCTION his document  represents  the Appendix  to  the  Final Report  of  the  Feasibility Assessment  on Creating  a 

Macro Results Framework (herein referred to as “Macro Framework” for brevity)   for the Middle East and 

North Africa  (MENA) Transition  Fund  (also  referred  to  as  “the  Fund”). This  document  presents  a more 

complete  discussion  on  key  aspects  important  for  understanding  the  context  and making  an  informed 

decision on the feasibility of developing a Macro Framework for the Fund. In brief, the purpose of this document is 

to provide the Steering Committee (SC) members with further details on the following aspects of the completed 

Feasibility Assessment:  

1. Overview of Monitoring  and Evaluation  (M&E) Practices  across  the  Implementation Support Agencies 

(ISAs); 

2. Case Studies of Practices in Funds with Similarities to the MENA Transition Fund; 

3. Options  for  the Way  Forward,  in  particular  a  detailed  discussion  of  Variations  on  Creating  a Macro 

Framework for the Fund.    

 

2. OVERVIEW OF M&E PRACTICES ACROSS 

THE ISAS his  overview  of  data  collection  and M&E  practices  across  the  different  ISAs  could  be  useful  (e.g.  as  a 

baseline) for the next consultancy if the decision is taken to develop a Macro Framework for the Fund. As 

important partners  involved  in project M&E under the Fund, the development of a Macro Framework for 

the Fund should take into account, to the extent possible, the particular systems of the ISAs involved and 

their internal procedures and capabilities. 

2.1. African Development Bank 

In recent years, the African Development Bank (AfDB) has been making noticeable efforts to better focus project 

supervision on  results,  for example with  the  introduction of  the new  supervision  report  format and  supervision 

assessment,  and  by  entrusting  sector  departments  with  the  responsibility  to  proactively  track  Core  Sector 

Indicators (CSIs). The Bank introduced guidelines and a results‐oriented format in 2008. A new automated Results 

Reporting System  (RRS)  is expected  to be  launched  in 2014. This  system will  link expected  results  (as per  the 

logical frameworks  in Project Appraisal Reports (PAR)) to progress toward results (as documented  in supervision 

reports) and  results achieved  (as  reported  in Project Completion Reports  (PCR)). Thus, AfDB  is moving  forward 

with more rigorous procedures and M&E systems that will track results internally. However, and as noted in AfDB’s 

Management  Response  to  the  2011  Multilateral  Organisation  Performance  Assessment  Network  (MOPAN) 

assessment on organizational performance, “many of  these  reforms will  take some  time before  they  fully yield 

T

T

Page 8: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

their  results”.1 Some deficiencies  in  terms of monitoring and  reporting on key  results have  to do with  reporting 

that is focused on “processes” rather than “change”.  

As confirmed through interviews held with representatives of AfDB, in reporting data for the Fund activities, AfDB 

simply transfers information collected by its field staff through the Bank’s internal instrument for project reporting 

(i.e. supervision reports and PCR) to the standard Progress Report requested by the Fund Coordination Unit (CU), 

which is considered efficient as this way the Progress Report does not constitute an additional reporting burden. 

2.2. European Bank for Reconstruction and Development 

At  the  European  Bank  for  Reconstruction  and Development  (EBRD),  the  transition  impact  of  every  project  is 

planned for as part of the process of choosing, preparing and appraising projects,  in addition to an  independent 

Evaluation Department  (EvD) which  closes  the  cycle. All  projects  are  scrutinized  by  the  credit  department  to 

ensure sound banking principles and by the Office of the Chief Economist (OCE) on their development/transition 

impact. The EBRD’s policy requires 100% compliance and the control systems do not allow for diverting from this 

policy. Each project document  specifies benchmarks  for  “transition  impact” outcomes  that are monitored over 

time during project implementation. EBRD policy requires annual or bi‐annual reviews of existing projects through 

the preparation of monitoring reports, which assess developments  in a project’s transition  impact, environment 

and financial performance. EBRD’s efforts to measure the wider development impact of its transition activities are 

noteworthy. To assess the transition impact of its operations, the EBRD has developed a framework that captures 

and monitors key transition aspects from the project design stage through to project closure. The OCE monitors 

projects under  the Transition  Impact Monitoring System  (TIMS). The TIMS also  records assessments of  risks  to 

transition in each project, and how these risks change over the project’s life.2 

As  stated  above,  EBRD  has  very  strict  procedures  that  all  projects must  abide  by. Hence,  the  reporting  done 

against  the  project  results  framework  imposed  by  the  Fund  reflects  EBRD  procedures/standards, which  are  in 

general deemed both sufficient and relevant for the kind of activities financed by the Fund.  

2.3. European Investment Bank  

To further strengthen its assessment, measurement and reporting on the results and impacts of its operations, the 

European  Investment Bank  (EIB)  launched  in 2012 a new Results Measurement  framework  (ReM)  to  replace  its 

Economic and Social  Impact Assessment  framework  (ESIAF). One  intention with  this new ReM  framework  is  to 

harmonize,  to  the  extent  possible,  results  indicators  with  other  International  Financial  Institutions  (IFIs)  and 

thereby simplify client reporting requirements for co‐financed operations.3  

The EIB’s ReM rests on three pillars: 

Pillar  1:  An  assessment  of  a  project’s  consistency  with  EIB  mandate  objectives  and  its 

contribution  to  European  Union  (EU)  priorities  and  country  development  objectives,  going 

beyond a focus on eligibility alone.

                                                                          1 AfDB. (n.d.). MOPAN Management Response (Draft 23 November). 2 EBRD. (2010). Transition Impact. [online]. 

3 EIB. (2013).Measuring development results. The EIB Results Measurement (ReM) framework.  

Page 9: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

Pillar  2:  A  series  of  sector‐specific  standardized  indicators  to  capture  a  project’s  economic, 

social, environmental and institutional outcomes. It continues to measure project quality and its 

ability to achieve the expected results.

Pillar  3: An  assessment of  the EIB  additionality over market  alternatives  in  terms of  financial 

product, technical, structuring and sector contribution and standards and assurance.4

As noted above under Pillar 2, EIB uses standardized core  indicators  for  the M&E of  its entire portfolio and  for 

different sectors. It is expected that EIB will make use of these standardized core indicators to report for the Fund 

activities and will appreciate the flexibility offered to conduct “business‐as‐usual”. 

2.4. International Finance Corporation 

The  International Finance Corporation  (IFC) has a Development Outcome Tracking System  (DOTS)  to  track  the 

development results of all its active operations continuously throughout their project lives. For investment services 

(IS)  projects,  the  overall  development  outcome  rating  is  a  synthesis  of  four  performance  categories  that  are 

informed by the  indicators agreed with the client: financial performance, economic performance, environmental 

and  social  performance  and  private  sector  development  impact.  For  advisory  services  (AS),  the  overall 

development  outcome  rating  is  a  synthesis  of  the  overall  strategic  relevance,  effectiveness  (as measured  by 

project outputs, outcomes, and  impacts), and efficiency of  the services. At project completion,  intended  results 

are compared with achieved  results. Some  results—medium‐term outcomes and  longer‐term  impacts—may be 

unknown at project completion but can be examined post‐completion.  

Each  IFC  industry  department  has  identified  a menu  of  standard,  sector‐specific  indicators  that  capture  the 

sector’s typical development impacts. In addition, IFC has some wide corporate indicators that are mandatory for 

tracking particular impacts related to environmental & social improvements and corporate governance issues. By 

standardizing  indicators,  IFC  is  able  to  compare  performance  and  aggregate  developmental  reach  by  industry 

department and across  the corporation as a whole  for a particular  time  frame.5 At  the outset of a project,  IFC's 

staff  members  identify  standardized  indicators  with  baselines  and  targets.  They  track  progress  throughout 

implementation and until project closure. This systematic tracking allows IFC to monitor projects, learn from what 

does  and  does  not  work,  and  improve  performance.  The  system  facilitates  data‐aggregation,  comparison, 

analysis, and reporting on key output, outcome and  impact  indicators and efficiency of the services. To meet  its 

monitoring obligations,  the  IFC  requires  companies  to  submit  regular  reports on  financial as well as  social and 

environmental performance, and  information on  factors that might materially affect the enterprise.  In addition, 

IFC monitors progress through  it corporate scorecard and reports once a year on the development results of  its 

interventions in an Annual Report.  

2.5. Islamic Development Bank 

Evidence  collected  during  interviews  suggests  that  there  are  various  types/levels  of monitoring  at  the  Islamic 

Development Bank (IsBD). The IsDB has a monitoring tool at the portfolio level which looks like a dashboard of all 

projects under  implementation. To report on project progress  IsDB possesses a Project  Implementation Support 

Report (PISR). The PISR highlights the challenges/issues the projects are facing in their implementation. The IsDB 

                                                                          4 Idem.  

5 5 IFC. (2014). IFC Development Results and Impact. [online]. 

Page 10: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

also sporadically conducts Country Portfolio Performance Reviews (CPPRs). The report that is generated goes to 

the President directly, requesting guidance, changes and approval, and even in some cases termination of projects 

that are not up to par. IsDB can also count on a “results unit” internally to look at all the PISR submitted. Data from 

the  different  performance  review  tools  are  entered  directly  into  database  software  that  produces  automated 

reports  as  needed. These many  layers  of monitoring  and  reporting  are  particularly  evident  for  IsDB  project  in 

Yemen “Preparation and Implementation Support Project for the Special Industrial Zone Project in Hodeida”. For 

this project, the project  implementation team has to report at the Transition Country  (TC) ministry  level, to the 

IsDB every quarter, and to the Fund twice a year. 

Initiatives  taken  in  recent years  to  strengthen project monitoring and  reporting and direct  it  towards expected 

outcomes include enhancing the IsDB’s field presence, increasing supervision budgets, and designing a supervision 

report  format  that  includes a  focus on  results.  Information collected during  interviews alluded  that at  the  IsDB, 

results‐based  logical  frameworks are mandatory  in all projects and  that  core  indicators are mainstreamed  into 

these results‐based logical frameworks. Data collected suggests that the IsDB reports on its own key performance 

indicators  (KPIs)  in  the  Progress  Report  submitted  to  the  Fund.  The  KPIs  are  collected  through  supervision 

undertaken by the implementation unit at the project level.  

2.6. Organisation for Economic Co‐operation and Development 

The Organisation for Economic Co‐operation and Development  (OECD)  is generally known for being a forum  in 

which  governments  can work  together  to  share  experiences  and  seek  solutions  to  common  problems. OECD 

usually provides analyses and recommendations on a variety of subjects and matters and  is  less thought of as a 

“direct implementer” of projects in developing countries. Maybe it is for this reason, that OECD has comparatively 

fewer demanding rules  in terms of M&E vis‐a‐vis the other  ISAs  involved with the Fund, which are for the most 

part quite used to dealing with such projects and tracking performance rigorously. Based on discussions held with 

OECD  representatives,  the  organization  shows  great  flexibility with  regards  to  the method  and  template  for 

project  progress  reporting. Thus,  for  the  interventions  funded  by  the  Fund,  the OECD  uses  only  the Progress 

Report template provided in Fund Operations Manual (p.37) and this reporting imposes no major burden on them.  

2.7. World Bank 

Generally speaking, the designs of the World Bank (WB) operational activities incorporate a framework for M&E. 

During  the project  life,  the Bank monitors  and  evaluates  its own  contribution  to  results using  this  framework. 

Project teams compile information and data regularly in Implementation Status Reports (ISRs) and when projects 

are  complete, project  teams  are  also  required  to  complete  an  Implementation Completion  and Results Report 

(ICR). The  latter document  includes  for example  results achieved, problems encountered,  and  lessons  learned. 

These  are  later  reviewed  by  the  Independent  Evaluation  Group  (IEG).  In  brief,  the WB  requires  performance 

reporting on a regular basis for all projects, and institutional procedures and systems are well in place to ensure the 

tracking of progress and achievements of projects supported.  

Page 11: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

2.8. Others 

M&E  systems  and  procedures  of  the  following  ISAs  were  not  looked  at  for  this  assessment  in‐depth  as  the 

representatives did not respond to the request to participate: 

Arab Fund for Economic and Social Development (AFESD) 

Arab Monetary Fund (AMF) 

International Monetary Fund (IMF)6 

Organization of the Petroleum Exporting Countries (OPEC) Fund for International Development 

 

3. CASE STUDIES he  case  study  will  describe,  for  each  fund,  the  structure  of  the  logic  model:  the  results  chain  from 

outputs/activities to outcomes and  impacts, related theory of change and results aggregation strategies. 

This  section  will  also  describe  the  organization  of  the  monitoring  and  reporting  function:  the 

implementation  arrangements by which  results are  collected  as well  as  roles  and  responsibilities of  the 

various organizations involved in the funds/case studies. 

3.1. The Global Environment Facility 

The Global Environment Facility (GEF) is a financial mechanism for international cooperation, established in 1991, 

based  on  partnerships,  that  provides  new  and  additional  grant  and  concessional  funding  to meet  the  agreed 

incremental  costs  of  measures  to  achieve  agreed  global  environmental  benefits  ‐‐  in  six  focal  areas7 ‐‐  in 

developing countries and countries with economies in transition8. The GEF is a partnership involving 183 member 

countries, 10 agencies (the WB, United Nations Development Programme (UNDP), United Nations Environment 

Programme (UNEP), the regional development banks, Food and Agriculture Organization (FAO), the International 

Fund  for  Agricultural  Development  (IFAD),  and  the  United  Nations  Industrial  Development  Organization), 

recipient countries, nongovernmental organizations (NGO), and the private sector. 

GEF’s  governance  architecture  is  set  out  in  the  Instrument  for  the  Establishment  of  the  Restructured  Global 

Environmental Facility and consists of an Assembly, a Council,  the Secretariat,  the  Implementing and Executing 

agencies and  the Scientific and Technical Advisory Panel  (STAP). The Assembly and Council are  the governing 

bodies empowered to take decision. The others, while an integral part of governance, have only an advisory role. 

As  financial  mechanism  for  four  international  environmental  Conventions  (Biodiversity,  Climate  Change, 

Persistent Organic Pollutants, and Combating Desertification) the GEF helps fund initiatives that assist developing 

                                                                          6 It should be noted that representatives from the IMF said they were keen to participate in the assessment, but had nothing of direct relevance to share at the time of the data collection. 7These areas are: biological diversity, climate change mitigation and adaptation, international waters, land degradation, ozone layer depletion, and persistent organic pollutants, with sustainable forest management cross‐cutting relevant focal areas. 8 GEF. (2013). GEF Website. Investing in our Planet. [online]. 

T

Page 12: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

countries  in  meeting  the  obligations  of  the  Conventions.  GEF  also  collaborates  closely  with  other  treaties, 

protocols and agreements9.  

3.1.1. Overview of the GEF Results Framework 

The following presents an overview of the GEF results framework, referring to its logic model and theory of change 

as well as  the  results aggregation strategy,  the  role of evaluations, and  finally,  the  roles and  responsibilities  for 

M&E between GEF partners. 

Logic Model and Theory of Change 

GEF developed  in 2012, 21 years after  the  inception of GEF, a  fund  level  theory of change  (please see Figure 1 

below). The general framework theory of change seems to be meant to capture lessons learned. 

Figure 1. General Framework for GEF Theory of Change10

 

Aggregation and Reporting 

GEF, monitoring take place on three levels:  

1. Project  and  program  level:  progress  toward  results,  including  outcomes,  implementation  issues,  and 

portfolio‐wide  trends  is  based  on  information  submitted  by  the GEF Agencies  through  the  project  or 

program implementation reports (PIR) and focal area tracking tools;   

2. Portfolio level: The aggregation of findings across the portfolio of projects and programs can be done by 

focal area,  type,  theme, or  issue. Portfolio monitoring  tools are  intended  to  roll up  indicators  from  the 

                                                                          9 Pérez del Castillo, Carlos (GEF). (2009) OPS4 Technical Document # 5: Governance of the GEF. 

10 GEF EO. (2012). Annual Thematic Evaluations Report (2012).  

Page 13: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

individual project  level to the portfolio  level and track overall portfolio performance  in focal areas. Each 

focal area has developed  its own tracking tool to meet  its unique needs, which brings uniformity.  It  is a 

requirement of the GEF that the implementing agencies fill these tracking tools to report to the GEF; 

3. National and global  level: mainly of global environmental  status,  stress,  trends, and benefits, based on 

independent data gathering and analysis by national bureaus of statistics and/or international bodies and 

organizations; these monitoring exercises occur mostly between replenishment periods when reassessing 

and redesigning indicators for country allocations under any GEF system for allocation of resources, and 

overall when formulating the focal area strategies.11 

In brief, there is no single, overarching macro framework per se for GEF. GEF results are organized using what can 

be called a  “Project Portfolio” approach composed of  results  frameworks  for each  “focal” area of work against 

which each project in that focal area has to report.12  This is a key element of GEF’s results aggregation process. As 

stated,  aggregation  at  the  project  and  portfolio  level  of  the GEF  requires  the  completion  of  a  PIR. However, 

reporting of results at this  level  is based on a narrative and a self‐evaluation using a standard set of categories, 

much like the ratings in the standard Progress Report for the MENA Transition Fund, except that the rating for the 

GEF range from Highly Satisfactory (HS) to Highly Unsatisfactory (HU). Table 1 below is an excerpt from a PIR. 

Table 1. Excerpt from GEF PIR13 

OVERALL RATING OF IMPLEMENTATION PROGRESS  PREVIOUS RATING 

NEW RATING 

U  MS 

Outputs and Outcomes 

Component 1: Most of the products established to achieve the outcomes of this component have been executed according to plan. However, there are significant delays in the demarcation of the Marine Protected Area, currently just 20% of the area has been demarcated while the project life is already almost 50% complete. Also, the Government has issued a law to consolidate the protected areas management category of the national system. If this regulation is approved, the outputs related with the Integrated Management Plan updating and demarcation could be affected.  In conclusion, four (4) of the twelve (12) outputs planned for the component show delays in their implementation.  

The  consequences  to  such  a  broad‐based,  generalized,  subjective  approach  to  results  aggregation  is  that  the 

discussion on results achievement at the fund level is limited. Given the self‐evaluative nature of the ratings, there 

is also a risk that the results quoted above could be due to bias. Secondly, the narrative approach to performance 

reporting may contribute to the perception by key informants that GEF imposes a reporting burden on projects. 

In addition, GEF has developed performance tracking tools14 per work or focal area as follow:  

Biodiversity Tracking Tool; 

GEF International Waters Tracking Tool; 

GEF Climate Change Mitigation Tracking Tool; 

GEF Climate Change Adaptation Tracking Tool; 

GEF Persistent Organic Pollutants Tracking Tool; 

GEF Land Degradation Tracking Tool; 

GEF Sustainable Forest Management/REDD Tracking Tool. 

                                                                          11 GEF. (2010). M&E Policy. 

12 For more details, please see GEF. (2010). Focal Area Framework and LDCF/SCCF Framework. Excerpts from GEF‐5 Programming 

Document at the Sixth Meeting for the Fifth Replenishment of the GEF Trust Fund, April 7, 2010. 13  Inter‐American Development Bank (IDB). (2012). Project Implementation Report (PIR) FY2012. 

14 For more details on these tracking tools, please refer to GEF Website: http://www.thegef.org/gef/tracking_tools. 

Page 14: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

These tracking tools can be conceptualized as a results framework per area of work or focal area. The results that 

are tracked are both “hard”  indicators such as, “Landscape/seascape area directly covered by the project  (ha)”15 

and the standardization and quantification of “soft” indicators related to institutional reform, see excerpt below.16 

The main  benefit  of  basing  fund‐level  aggregation  on  focal  area  results  is  that  reporting  at  higher  levels  is 

facilitated.  

Evaluation 

The GEF fund  is typical of OECD Development Assistance Committee (DAC)‐based17 evaluation standards where 

performance and evaluation  reporting  take place at every  level  (project, country, and agency)18. Established 23 

years ago, the scope and reach of the GEF means that it is possible to report frequently and reliably on results up 

to impact level. Reflecting its longevity and resourcing, the GEF Evaluation Office (EO) publishes annual results at 

the  fund  and  country  levels,  as  well  as  by  theme19.  The  EO  has  three  key  functions  which  permits  the 

dissemination of M&E standards fund‐wide: the setting of minimum standards; quality‐control and oversight on 

the design of M&E systems at the program and project levels; as well as the sharing of evaluation evidence20. 

Roles and Responsibilities for M&E 

M&E  are  a  shared  responsibility  in  the  GEF.  The  GEF  Council  provides  the  overall  framework,  starting  with 

agreement on objectives and corporate and focal area results frameworks. The GEF Secretariat proposes to the 

Council how these objectives and results should be monitored, and the GEF EO proposes to the Council how these 

should be evaluated. Emerging environmental and development trends, and GEF results and performance within 

the context of these trends, are reported on  in the overall performance study prepared by the GEF EO as one of 

the key documents of the fund replenishment process. Based on this information, the GEF Council makes strategic 

and policy‐level decisions. The GEF Agencies and their partners execute project, program, and portfolio M&E. The 

GEF STAP provides advice on  indicators, targets, and evaluation approaches. The GEF EO collaborates with the 

independent  evaluation  units  of  the  GEF  Agencies  to  enhance  collective  capacity  to  fulfill  evaluation  needs 

effectively and efficiently.21   

Consistent with the decentralized organization of the GEF, implementing agencies are expected to use their 

own M&E systems. Each GEF Agency has its own system of governance and rules and regulations governing the 

implementation of activities, as well as the M&E of these activities. However, the GEF Council can decide on which 

partners  it  collaborates with  and  can  require minimum  standards  and minimum  procedures  to  be  applied  in 

activities that it funds.22   

The decentralized roles and responsibilities for M&E are counter‐balanced by an independent GEF EO that reports 

directly to the GEF Council. In addition, the M&E Office has a separate budget and its own program of work, both 

to be approved by the Council.23 Roles and responsibilities for M&E at the GEF are summarized in Error! Reference 

source not found. and graphical form in Figure 2 below. 

                                                                          15 GEF. (2011). GEF‐5 Tracking Tool for Biodiversity Focal Area.  

16 Idem. 

17 GEF. (2010). GEF M&E Policy.  

18 Binnendijk, Annette. (2000). Results Based Management in the Development Co‐operation Agencies: a Review of Experience.  

19 GEF. EO. (2013). Independent Evaluation Office Website. [online]. 

20 GEF. EO. (2013). Independent Evaluation Office Website. [online]. 

21 GEF. (2010). GEF M&E Policy. 

22 Idem. 

23 De Crombrugghe, Dominique, et al. (2009) Peer Review: the Evaluation Function of the Global Environment Facility (GEF), Final 

Report. 

Page 15: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

Table 2. Key Roles and Responsibilities of GEF Partners in M&E25 

Partner  Key Roles and Responsibilities in M&E 

GEF Council  Policy making on M&E Oversight of M&E functions Enabling environment for M&E 

GEF EO  Independent GEF evaluation Oversight of project and program evaluations Oversight of  the  relevance, performance, and overall quality of monitoring systems Set minimum requirements for GEF M&E Evaluative knowledge sharing and dissemination 

GEF Secretariat  Set results frameworks at focal area and corporate levels GEF portfolio monitoring across Agencies and focal areas Report on and incorporate lessons from portfolio monitoring Review of GEF M&E requirements in project and program proposals Coordinate partnership knowledge management activities 

Agency  GEF operational units 

Monitor the Agency GEF portfolio Report Agency’s project, program, and portfolio progress, results,  learning, and lessons Ensure monitoring at the project and program levels Adaptive management of project and program implementation Systematically involve national partners and share project M&E information at the national level 

Agency  evaluation units 

Project, program, and/or corporate Agency independent evaluations Mainstream GEF into relevant Agency evaluations 

STAP  Advice on scientific/technical matters in M&E Support to scientific and technical indicators Support knowledge management and information sharing 

GEF  operational focal points 

Collaborate on M&E at project, program, and portfolio levels 

Others  (NGOs and civil  society organizations (CSOs),  private sector, community members) 

Participate in monitoring activities and mechanisms Provide views and perceptions to evaluations 

                                                                          24 Volonte, Claudio. (GEF EO). (2011). The GEF M&E Policy. PPT Presentation. 

25 GEF. (2010). GEF M&E Policy. 

Figure 2. Flow Chart of M&E Reporting in the GEF 

24 

Page 16: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

10 

 

Another counter‐balance to the shared responsibility for M&E at the GEF is strong knowledge management of the 

M&E  function  at  fund‐level.  As  per  its mandate,  the  EO  publishes  guidelines  on M&E  in  the  form  of  policy 

documents26.  In addition  to policy  statements on M&E,  the EO also produces  technical guidelines and  specific 

tools27. A good example of the relatively high‐quality advice given on M&E is the Review of Outcomes to Impacts 

(ROtI) methodology document28, which also  reflects  the predictable shift away  from monitoring  to evaluation29 

(i.e. a focus on outcomes and impacts), given the longevity of GEF. Another key aspect of EO activity is the role of 

facilitator in the exchange of M&E perspectives within the GEF “family” (i.e. consultants, implementing agencies, 

national  recipients,  and  so  on).  The  GEF  EO  has  sponsored  such  events  as  an  Evaluators’  Summit  and  an 

International Conference  on Evaluation, Environment  and Sustainable development.30 The  key  consequence  of 

these knowledge management activities, widely disseminated digitally,  is  the possibility  to aggregate  results at 

the fund level.  

3.1.2. Strengths, Weaknesses and Opportunities  for 

the MENA Transition Fund 

Each of the funds discussed in this case study section have strengths and weaknesses in terms of learning lessons 

for  the potential development of a Macro Framework  for  the MENA Transition Fund. However, each  fund also 

have “checks and balances” to offset the weaknesses of their respective approaches. 

The weakness of GEF  is  its performance reporting at project  level which seems to yield a  limited amount  in the 

form of aggregated results. The “check and balance” against this is the development of what is effectively a “layer” 

of results frameworks per area of work or focal area and by developing, ex ante, results categorizations for a fund‐

level  theory  of  change.  Yet,  perhaps  because  of  the  narrative  format  of  the  PIR,  this  particular  tool  and  the 

tracking tools are at the same time perceived as imposing a reporting burden on projects.  

In terms of strengths, fund‐level governance of M&E at GEF is strong with reporting lines for M&E going directly to 

the GEF Council. The appetite for the production of (self‐described) “cutting‐edge” M&E knowledge at fund‐level 

is also  strong. The  “check and balance” against a central approach  to  the M&E  function  is a  strong knowledge 

management function that widely distributes M&E publications produced at the fund‐level.  In terms of value for 

money,  a  “top‐down”,  central  approach where  evaluation  knowledge  is  produced  at  the  fund‐level  can mean 

increased  administrative  costs  at  the  fund  level.  Value  for money  is  questionable with  respect  to  an  ex‐ante 

approach to results aggregation. This process requires primary research. 

There are many aspects of the M&E regime at GEF which can be adopted by the MENA Transition Fund, albeit 

within a solid understanding of the key differences. The following are a few points to consider: 

The MENA Transition Fund could continue with its “devolved” M&E function at the project level, 

but put more   emphasis on building sustainability and capacity for M&E on the part of ISAs and 

TCs. Strengthening  the M&E  capacity of  line ministries  in TCs will  indirectly  strengthen  fund‐

level reporting while improving capacity; 

                                                                          26 GEF. EO. (2013). Independent Evaluation Office Website. [online]. 

27 Please see, for example, GEF. (2011) GEF‐5 Tracking Tool for Biodiversity Focal Area. 

28 GEF EO. (2009). The RoTI Handbook: Towards enhancing the impacts of environmental projects, Methodological Paper #2.  

29 De Crombrugghe, Dominique, et al.  (2009). Peer Review:  the Evaluation Function of  the Global Environment Facility  (GEF), 

Final Report. 30 Idem. 

Page 17: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

11 

 

Careful  planning  of  the  project‐level  performance  reporting  regime  to  avoid  costly  “re‐

engineering” of Fund‐level aggregated results; 

Adopting a “layered” results framework approach to facilitate aggregation of the diverse type of 

projects funded; 

GEF produces M&E research on  impacts (and other topics)  in addition to report on  information 

coming from the projects only. These additional pieces are not currently necessary for the MENA 

Transition Fund. Keeping  things  simpler and more  focused at  this early  stage  could allow  the 

MENA Transition Fund to keep costs at a more manageable level compared to GEF. 

Notwithstanding  the  greater  sectoral  breadth  that  the MENA  Transition  Fund  covers,  there  are  lessons  to  be 

consider: for example, there is a decentralized approach to M&E at the GEF that is offset by: an independent M&E 

function at the fund level; the distribution of high‐quality M&E guidance regarding policy and technical issues; as 

well as a focus on knowledge management.  

The approach to aggregation of results with respect to developing a theory of change could also be instructive for 

the MENA Transition Fund. “Aggregation” is the classification of project results identified as important to bringing 

about the desired impact(s). The development of a theory of change for a focal area is a combination of inductive 

(“bottom up”) and deductive (“top down”) reasoning. It is inductive in that the results frameworks for projects in a 

focal area are analyzed and a properly‐designed  theory of change  is developed  for each.  It  is deductive  in  that, 

using  some  taxonomy,  an  internationally‐accepted  standard  for  that  focal  area  is  preferred,  intended  project 

results are then categorized, based on projects’ theory of change. GEF provides many valuable technical insights 

on  the  development  of  an  aggregation method  using  both  inductive  and  deductive  reasoning. However,  the 

“downside” of an  inductive approach as developed by the GEF  is that projects’ results frameworks and theory of 

change  have  to  be  analyzed  and,  depending  on  analysis  findings,  redesigned  retrospectively. The  approach  is 

therefore time/cost  intensive, most  likely requiring primary research.   Also, compared to MENA Transition Fund, 

GEF  has  a  critical mass  of  completed  projects  from  which  to  draw  conclusions  about  project  commonalities 

through an impact analysis.   

There  are  other  factors  which militate  against  wholesale  adoption  of  the  GEF M&E  approach  by  the MENA 

Transition Fund. Since 2003, GEF has focused on the measurement of  impacts and  lessons  learned. This  is to be 

expected, given the longevity of and resources channeled through the GEF. However, the MENA Transition Fund is 

on  the other  end of  the  spectrum.  It  is  a  facility barely out of  the  inception  stage, with  a  fraction of  funds  in 

operations compared to GEF. In other words, the focus of the MENA Transition Fund would be on results “lower” 

down  the  results chain: activities; outputs and outcomes.  In  this,  the GEF has  relatively  little guidance  to offer, 

except that  implementing agencies should use their own systems and that the GEF only has a quality assurance 

and  standards‐setting  role with  respect  to  these. Moreover,  the  functions  created  by  the  GEF  took  years  to 

develop,  are  costly  to maintain  and were  set  up  for  a much  larger  fund with  a  long  term  horizon.  Thus,  the 

strategies and methodologies used by the GEF would need to be carefully adapted for potential consideration in 

the context of the MENA Transition Fund in particular as the latter could not bear a comparability cost footprint. 

   

Page 18: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

12 

 

3.2. Global Agriculture and Food Security Program 

The  Global  Agriculture  and  Food  Security  Program  (GAFSP)  is  a  multilateral  mechanism  to  assist  in  the 

implementation  of  pledges  made  by  the  G20  in  Pittsburgh  in  September  2009.  The  GAFSP  is  a  financial 

intermediary  fund  (FIF) under external governance, established by  the WB Group  to support  inclusive, strategic 

and country‐led agriculture and food security investment plans in poor countries. GAFSP makes funding available 

for  countries  that  exhibit  both  need  and  significant  readiness  to  use  funds well  for  increased  long‐term  food 

security. To date, Australia, the Bill & Melinda Gates Foundation, Canada, Ireland, Japan, the Netherlands, South 

Korea, Spain, United Kingdom  (UK), and the United States of America  (USA) have contributed resources to the 

GAFSP.  These  ten  donors  have  pledged  a  total  of US$  equivalent  1.4  billion  to  the  Public  and  Private  Sector 

Windows.  The  resources  received  from  the  donors  as  of  December  31,  2013  amounted  to  approximately  US 

equivalent $1.2 billion. Eligible  countries must demonstrate  a high  level of need  and  submit  a  comprehensive, 

technically  sound  project  proposal  along with  their  national  agricultural  investment  plans. GAFSP  (public  and 

private  sector  windows)  has  allocated  funds  for  the  following  countries:  Bangladesh,  Burkina  Faso,  Burundi, 

Cambodia, Cote d’Ivoire, Ethiopia, Haiti, Honduras,  the Gambia, Kenya, Kyrgyz Republic, Liberia, Malawi, Mali, 

Mongolia, Nepal, Nicaragua, Niger, Pakistan, Rwanda, Senegal, Sierra Leone, Tajikistan, Tanzania, Togo, Uganda, 

Vanuatu, Yemen, and Zambia. Each GAFSP grant focuses on filling a specific need for the nation’s food security 

and agricultural growth.  

In terms of governance, GAFSP is similar if not identical to that of the MENA Transition Fund. In GAFSP, the WB 

plays  three  roles:  (1) Trustee  (to carry out  fiduciary  responsibilities as  set out  in  the Trust Fund Administration 

Agreement),  (2) CU  (a  small  team  to  support  the GAFSP SC  and Technical Advisory Committee  and  facilitate 

communications between the SC and the other partners of GAFSP), and (3) potential Supervising Entity of GAFSP 

funded projects,  if selected by the SC.  IFC, the WB’s private sector arm, manages the Private Sector Window of 

GAFSP. Allocations are determined by a SC composed of a balance of representatives  from donor and recipient 

countries,  CSOs,  and multilateral  organizations,  following  advice  from  a  technical  committee  of  independent 

experts. 31  

3.2.1. Overview of GAFSP Results Framework 

The following is a discussion of the GAFSP results framework, referring to its logic model and theory of change as 

well  as  the  results  aggregation  strategy.  The  section  also  looks  at  the  role  of  evaluation  and  the  roles  and 

responsibilities of the different partners involved. 

Logic Model and Theory of Change 

Figure 3 below  is a depiction of  the GAFSP’s objectives and areas of  intervention which shows  the  intervention 

logic and how the fund expects to deliver results (i.e. theory of change). 

                                                                          31 GASFP. (2011). GAFSP Website. [online]. 

Page 19: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

13 

 

Figure 3. GAFSP Logic Model and Theory of Change32

 

Aggregation and Reporting 

The aggregation strategy for the GAFSP includes the development of common indicators to enable monitoring of 

results across projects: “Each GAFSP financed project will select from the menu of core indicators (…) at least one 

output or intermediary outcome indicator for the results areas of focus of the GASFP project. These indicators will 

be  included  in  the  respective  project  results  frameworks.  This  will  allow  for  aggregation  of  results  across 

projects.”33 An excerpt of the “menu” of indicators appears in Table 3 below.   

   

                                                                          32 GAFSP. (2013). GAFSP Annual Report. 

33 GAFSP. (2011) Monitoring and Evaluation Plan. 

Page 20: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

14 

 

Table 3. Sample of “Menu” Approach to the Fund‐level Results, GAFSP34 

Results Area Menu  of  Common  Project  Level  Progress  Indicators  (Output  and Intermediate Outcomes) 

Higher‐yielding technologies adopted 

Technology generated 

1. Number of collaborative research or extension sub‐projects implemented 2. Number of client days of training to raise agricultural productivity provided to scientists,  extension  agents,  agro‐dealers,  farmers,  community members  etc (disaggregated by gender) 3. Number of client days of extension services provided to farmers, community members etc (disaggregated by gender) 4. Number of farmers who have adopted the technology being promoted 5.  Number  of  additional  hectares  which  have  adopted  the  technology  being promoted 

In developing these core indicators for the GAFSP, the CU leveraged on the work of others to diminish the burden 

of this task. They reviewed the IDA core sector indicators and core indicators listed in the publication by the Global 

Donor Platform for Rural Development, FAO, and the World Bank (GDPRD/FAO/World Bank 2008). The selection 

of core indicators was a participatory process. An earlier draft was circulated to the Supervising Entities and their 

comments have been incorporated before moving forward. GAFSP document mention that these indicators were 

selected using the following principles: 

1. “The  indicators  are  deliberately  set  at  the  output  and  intermediate  outcome  levels  and  have  been 

selected in order to have parsimonious but wide applicability to GAFSP‐funded interventions. 

2. The  indicators do not provide an added burden  for  individual project M&E  frameworks,  rather provide 

indicators that would be included anyway, but in a form that is readily comparable across different GAFSP 

projects.”35 

There are two noteworthy aspects of the example above. First,  it  is the specificity of the results  indicator to the 

GAFSP  component  or  area  of work, which  is,  possible,  to  a  certain  extent,  because  of  the  sectoral  focus  on 

agriculture of the GAFSP. Secondly, given that it may take many years of project operation before it is possible to 

report  on  progress made  on  higher‐level  results  and  the  associated  indicators, GAFSP  focuses  on  aggregated 

results reporting at the output and intermediate outcome level. 

 Evaluation 

GAFSP  SC  selected  the WB's Development  Impact  Evaluation  Initiative  (DIME)  to  implement  in‐depth  impact 

evaluations  for  certain  GAFSP  Public  Sector Window  projects.  DIME  is  a  global  program  hosted  in  the WB's 

Development  Research Group.  Its  purpose  is  to  increase  the  use  of  impact  evaluation  (IE)  in  the  design  and 

implementation of public policy and increase institutional capacity and motivation for evidence‐based policy. The 

GAFSP M&E Plan notes  that  all GAFSP projects will undergo  an  independent  evaluation  as well  as  an  IE. The 

following table outlines the IE policy for the GAFSP. 

   

                                                                          34 Idem. 

35 Idem. 

Page 21: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

15 

 

Table 4. Impact Evaluation Policy for GAFSP36 

Type of IEs  Target  Indicative Cost  Implementation  Funding 

In‐depth  IEs (experimental  or quasi‐experimental IE) 

Approximately  10‐30%  of  all  GAFSP projects  selected according  to  lesson‐learning priorities 

$800,000 for each IE  CU  to  centrally contract  a  specialized organization  to  carry out all in‐depth IEs 

To  be  funded separately by the SC 

Rapid  IEs  (non‐experimental IE) 

All  GAFSP  projects (except  for  those  that have  been  chosen  to carry out  the  in‐depth IEs) 

$50,000 for each IE  Each  project  to contract  a  specialized organization  to  carry out its rapid IE 

To  be  funded  from each  GAFSP‐awarded Grant amount 

Roles and Responsibilities for M&E 

Similar  to  the  GEF  and  to  the  MENA  Transition  Fund,  GAFSP  delegates  project  implementation  to  the 

“supervising  entity”. As  a matter  of  fact, GAFSP  has  to  a  great  extent  “pushed” M&E  capacity  down  to  the 

national  government  level,  and  provided  support  for  this  explicitly  in  the  design  of  the  program.  Supervising 

agencies  are  to  use  their  own  systems  to  conduct  project‐level  supervision. This  combined with  strengthened 

national government capacity of M&E systems means increased donor coordination at the country level for fund‐

level results management. As a counterbalance, each supervising entity that receives funding under GAFSP have 

to report on progress and results for all activities to the GAFSP CU at the WB, which then consolidate reporting 

and  submit as an annual  implementation  results  report  to  the GAFSP SC, with  copy  to  the Technical Advisory 

Committee.37   

The potential weakness of this approach has to do with  “The accuracy of all reporting is the responsibility of the 

originating  supervising  entity,  and  not  the GAFSP  CU, whose  role  is  consolidation  and  not  quality  control  of 

individual contributions.”38, which is similar to the role of the MENA Transition Fund CU. However, an off‐setting 

factor  is an explicit mention of M&E as a specific (therefore, presumably fundable) component of GAFSP, under 

Technical  Assistance,  Institution‐Building,  and  Capacity  Development.39 In  addition,  as mentioned  above,  the 

evaluation function is delegated to the DIME. 

Below  is  a  summary  table  describing  the  roles  and  responsibilities  for M&E  between  the  GAFSP  supervising 

entities; CU, SC, and the DIME. 

Table 5. Roles and Responsibilities for M&E, GAFSP 

Partner  Key Roles and Responsibilities in M&E (not exhaustive) 

Supervising  Entities  for  the  Public Sector Window (Asian Development Bank  (ADB), AfDB, FAO,  IDB,  IFAD, WB, World Food Programme (WFP) 

Follow their own guidelines on project M&E during all phases of the project cycle  Projects under implementation: Submits supervising entity’s own progress report (or a disclosable version) every 6 months  Projects under preparation: Submits a brief progress update with updated milestone dates every 6 months  Completes geographic information form  Submits supervising entity’s own completion report (or a disclosable version)  Submits  supervising  entity’s  own  independent  evaluation  report  (or  a  disclosable version)  Submits  rapid  IE  report  (if  the  project  is  not  selected  for  an  in‐depth  impact 

                                                                          36 Idem. 

37 GAFSP. (2009) Framework Document for a Global Agriculture and Food Security Program (GAFSP). 

38 Idem. 

39 Idem. 

Page 22: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

16 

 

Partner  Key Roles and Responsibilities in M&E (not exhaustive) 

evaluation) 

Supervising  Entity  for  the  Private Sector Window (IFC) 

Follows its own guidelines on project M&E during all phases of the project cycle  To develop M&E Plan for the Private Sector Window including any policy on IEs  Submits program level annual development impact indicators based on IFC’s DOTS to CU for onward transmission to the SC 

CU  Prepares template TOR for rapid IEs  Contracts  specialized  organization  to  geo‐code  submitted  geographic  information and carry out mapping of GAFSP projects  Contracts specialized organization to carry out in‐depth IEs Submits GAFSP annual progress report to the SC  Discloses  relevant M&E  documents  on  the GAFSP website  (including  updating  the progress of GAFSP core indicators every six months)  Carry  out  other  dissemination  activities  such  as  organize  global  and  regional workshops and liaise with relevant organizations 

SC  Reviews  annual  progress  report  and  provides  overall  guidance  on  project implementation 

DIME  Responsible for IEs 

3.2.2. Strengths, Weaknesses and Opportunities  for 

the MENA Transition Fund 

Overall, key informants rated the GAFSP macro results framework as having many strengths:  

“supports planning and approval of project proposals; 

tells the story of the fund at the highest level;  

provides evidence to make the business case for financing;  

macro results are tied to Millennium Development Goals (MDGs) and international commitments 

on food security; 

incentivizes the partners to go into certain programming areas that are underserved;  

provides a basis to “adjust the dial” on incoming proposals by tweaking the Call for Proposals to 

ensure the kinds of proposals you require to achieve the full range of results will be produced”.40 

A  strength of GAFSP  is  the devolved nature of  the M&E  function  from  the  “centre”  (i.e. Fund Level). The  self‐

described role of the GAFSP CU at the fund level is that of coordinator for reporting. There is therefore reason to 

believe  that  the  administration  cost of  the M&E  function at  fund  level  is  less  compared  to  a more  centralized 

approach such as that of GEF. On a US$1.2B  fund, there are  five people  in the secretariat, with a  low overhead 

ratio).41  

The weakness  of  a more  devolved  approach  is  that  of  the  accuracy  of  information  reported. With  respect  to 

GAFSP, a  “check and balance” against a “hands‐off” approach  is  to  support partners’ M&E capacity by making 

M&E systems development and knowledge management a fundable program component. This “push” of the M&E 

capacity  to  the  country  level  means  that  M&E  systems  development  is  sustainable  as  both  the  national 

government and the ISAs are implicated in supporting it past the life of the fund. Therefore, the GAFSP approach 

to M&E  is  also  good  value  for money  as M&E  capacity  development  is  not  an  administration  cost  (i.e.  fund 

“overhead”)  but  part  of  program  spending.   Another  “check  and  balance”  is  the  provision  of  results  reporting 

                                                                          40 DFATD. (2014). MENA Transition Fund Results Feasibility Study: Questions and Answers for an Interview with Baastel Ltd. 

41 DFATD. (2014). Op. cit. 

Page 23: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

17 

 

standards at the project level as per the “menu” approach to fund‐level results reporting. This allows both ISAs to 

continue to use their own systems but also to aggregate results at the Fund‐level. 

A significant aspect for consideration by the MENA Transition Fund  is the priorities of the DIME program which 

aligns  well  with  the  MENA  Transition  Fund  objectives.  The  four  pillars  of  DIME  are:  Governance  (local 

development,  public  sector  governance,  and  legal  justice);  Shared  Prosperity  (Finance,  Private  Sector,  and 

Agriculture and Food Security);  Infrastructure  (Transport, Urban Development, Energy and Mining; and Water); 

Human Development; and Climate Change.  In addition,  the DIME website also cites  the cross‐cutting  theme of 

Fragile and Conflict Situations as another area of work. However, and as outlined in Table 4 above, IE are costly to 

implement. 

In  sum, with  respect  to what  can  be  applied  to  the MENA  Transition  Fund,  the  approach where:  a)  the M&E 

function  is devolved; b) but with offsetting capacity development for M&E “pushed” to country  level via project 

spending; c) while developing standards (such as a “menu” of results), should be given serious consideration. 

3.3. Neighbourhood Investment Facility 

The Neighbourhood Investment Facility (NIF) represents the “counter‐factual” case. That is to say, it is an example 

of a funding facility that does not have a macro‐level results framework. Thus, in some aspects, NIF represents the 

status quo for the MENA Transition Fund. 

Launched  in May 2008, the NIF has been designed to  finance capital‐intensive  infrastructure projects  in partner 

countries covered by the European Neighbourhood Policy (ENP) as well as to support their private sector. For the 

2007‐2013 period, the European Commission (EC) has earmarked a total amount of €767 million for the NIF, which 

are complemented by direct contributions from Member States kept in a trust fund managed by the EIB. To date, 

the NIF contributes €678.9 million to infrastructure and private sector projects, leveraging a total project volume 

of  more  than  €19.3  billion.  Financing  and  implementing  large  infrastructure  projects  requires  considerable 

financial resources. The NIF aims to create a partnership, pooling together grant resources from the EC and the EU 

Member States and using them to leverage loans from European finance institutions as well as own contribution 

from the ENP partner countries.42 

The organization of the NIF follows the principles of the three‐tier governance architecture agreed between the 

EC and  the Member States. The partner countries submit projects  to  the European  finance  institutions  to  seek 

finance. Between them, the European finance institutions designate a Lead Finance Institution, which presents the 

project  to  the Finance  Institutions Group  (FIG). The FIG  is a group made up of all  the eligible European  finance 

institutions  and  chaired  by  the  EC.  The  Lead  Finance  Institutions  then  present  the NIF  grant  requests  to  the 

Operational Board for final or provisional approval.  The lead administrative body is the NIF Secretariat.43 

3.3.1. Overview of NIF Results Framework 

The following is a discussion of the NIF results framework, referring to its logic model and theory of change as well 

as the results aggregation strategy, and roles and responsibilities for M&E. 

Logic Model and Theory of Change 

                                                                          42 Idem. 

43 NIF. (2013). Activity Report: 2008‐2012 Overview of Activities. 

Page 24: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

18 

 

The NIF  logic model depicted  in Figure 4 below was developed retrospectively for the purposed of the mid‐term 

evaluation, c0nducted in late 2013.  

Figure 4. NIF Logic Model44

 

Aggregation and Reporting 

In the mid‐term evaluation the aggregation strategy used was that project results and objectives were analyzed 

retrospectively  and  evaluated  for  “fit”  against  the  retrospectively  designed  intervention  logic  model.  The 

evaluators noted  in their report under the efficiency section that, “The Governance would benefit of a feed‐back 

system (monitoring, evaluation and lesson learning) from projects to inform decision making and strategies.” They 

also noted  the  following,  “The  establishment of  a  comprehensive monitoring  for  all projects  is  an  appreciable 

effort  which  would  require  adequate  resources  and  management  capacities.  The  monitoring  should  not  be 

considered a duplication of Finance  Institutions’ monitoring as  its  focus would be on  the grant component and 

achievement of blending and EC objectives. Costs would be appreciable, but contained, likely less than 1% of the 

value of the grant. Benefits in terms of aid effectiveness and improvement of the instruments would be significant 

(…)  Improved  reporting  should  not  significantly  accrue  the  cost  and  the  time  for  Financing  Institutions  and 

partners,  but may  help  to  structure  the  information  for  an  improved  understanding  and  assessment  of  NIF 

achievements.”45   

To strengthen the process, the evaluators made the following recommendations which are noteworthy: 

                                                                          44 NIF. (2013). Mid‐Term Evaluation of the Neighbourhood Investment Facility under the European Neighbourhood and Partnership 

Instrument (ENPI) 2007‐2013. 45 DRN‐ECDPM‐ECORYS‐PARTICIP.  (2013). Mid‐Term Evaluation of the Neighbourhood  Investment Facility under the European 

Neighbourhood and Partnership Instrument (ENPI) 2007‐2013. 

Page 25: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

19 

 

“Develop  a  result  based  framework  for  all  NIF  projects  with  harmonized  impact  and  performances 

indicators  (e.g.  a  system  of  impact  and  performance  indicators  should  be  developed  to  allow  data 

management and analysis); 

Monitor and measure NIF induced changes at project, regional and portfolio levels; 

Strengthen evaluation arrangements at project level.”46 

 

Roles and Responsibilities for M&E 

“NIF has not developed specific and harmonized procedures for monitoring the facility and has not established a 

mandatory result‐based framework for following up the  interventions.”47 Project monitoring  is based on periodic 

(annual) assessment of progress on delivery of specified project results towards achievement of project objectives. 

Under  the  Joint management  implementation modality,  responsibilities  for management  and  implementation 

(and  hence monitoring)  are  delegated  by  the  EC  to  the  financing  institution,  although  the  EC maintains  the 

“prerogative of control and verification”.48  

Project monitoring and  follow‐up are delegated to the Lead Finance  Institution. NIF mentions  its  intention  is to 

avoid  duplicating  tasks  already  performed  by  a  Finance  Institution  for which  procedures  have  been  positively 

assessed  (i.e.  are  supported  by  result‐based  systems).  Then  the  EC  relies  on  external  independent  audits  and 

evaluation foreseen by the Lead Finance Institution whenever it is appropriate. 

Table 6 below briefly summarizes the main roles and responsibilities of the different partners.  

Table 6. Key Roles and Responsibilities for M&E ‐ NIF49 

Partner  Key Roles and Responsibilities in M&E 

Strategic Board  Oversees NIF’s activities Determines general strategic orientations 

Operational Board  Approve (or reject) projects submitted 

FIG  Discuss technical aspects of projects presented with the EC 

Finance Institutions  Present projects to the FIG 

Beneficiaries  Country’s systems are used whenever possible 

 

3.3.2. Strengths, Weaknesses, and Opportunities for 

the MENA Transition Fund 

As mentioned  above, NIF  represents  in many ways  the  status  quo  for MENA  Transition  Fund.  The  following 

strengths and weaknesses for the NIF model are thus also those which potentially apply to the MENA Transition 

Fund.  

In terms of value for money, there are some potential cost‐efficiencies achieved in the short term; however, in the 

longer term, the lack of a fund‐level macro framework can be less efficient, as noted by the evaluators during the 

mid‐term  evaluation. Among  the main  reasons  for  this  is  that  the  lack  of  harmonized  procedures  or ways  to 

aggregate results at a macro level can hinder the ability to assess whether the fund is achieving its intended results 

or not over time, and may  impede the ability to take corrective actions  in time or to  learn from experience over 

                                                                          46 DRN‐ECDPM‐ECORYS‐PARTICIP. (2013). Op. cit.  

47 EC.  (2013). Development and Cooperation – EuropeAid. Promoting  investment through the Neighbourhood  Investment Facility 

(NIF). [online]. 48 Idem. 

49 EuropeAid. (2011). Neighbourhood Investment Facility (NIF). PPT Presentation. 

Page 26: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

20 

 

time. Overall,  the mid‐term  evaluation  report  seems  to  point  towards  the  argument  that, moving  forward,  a 

macro‐results  framework  is  necessary  to measure  the  impact  of NIF  and must  be  supported  institutionally  by 

reporting coordination  (“harmonization”) and an M&E system at  fund‐level. This  likely  increases costs, but also 

provide important benefits as it helps to structure the information for an improved understanding and assessment 

of the achievements. 

3.4. Conclusion 

This section provides a brief synthesis of  lessons  learned relevant to the development of a Macro Framework for 

the MENA Transition Fund. 

The development of a Macro Framework is more often than not a sign of maturity of the fund. As was mentioned 

above it is reasonable to expect that GEF would focus on outcomes and impacts given its longevity. On the other 

hand GAFSP, a relatively recent fund, focuses on outputs and intermediate outcomes. NIF made a tactical decision 

not to develop a fund‐level results framework at inception, as in the case of the MENA Transition Fund. However, 

the authors of the mid‐term evaluation suggested that a Macro Framework be developed for NIF as a tool to track 

and assess performance overall.50 

With respect to the aggregation strategy for a Macro Framework, the GEF methodology of a “layered” approach 

to fund‐level results framework is instructive. Essentially, there is no overarching results framework; rather there is 

a series of  results  frameworks per work area. This provides a certain  reporting  flexibility, but most  importantly, 

allows to aggregate results from vast sectors by categorizing projects under certain “pillars”. Instructive as well is 

the GEF “top down/bottom up” approach of developing fund‐level results based on an analysis of GEF projects. 

There are also lessons to be learned from GAFSP strategy for results aggregation which involves requiring projects 

to choose from a “menu” of outcome and  intermediate results specific to the area of work, notwithstanding the 

narrower sectoral focus of the GAFSP as compared to the MENA Transition Fund.    

For the case studies that do have a Macro Framework  (i.e. GAFSP and GEF), with respect to the governance of 

M&E at fund level, the approaches are fairly similar but with different emphases. Both are similar in a sense that 

results coordination  function  is  filled by  the provision of standard  reporting  tools and  templates. The emphasis 

placed on  specific M&E  functions  is determined by  the perceived  role placed by  fund management,  regarding 

M&E. GEF, compared to GAFSP, emphasizes knowledge management or, more precisely, knowledge production; 

publishing  several  documents  on M&E  policy,  technical  issues  and  the  results  of  primary  research.  GEF  also 

communicates M&E best practices  through global conferences  such as  International Conference on Evaluation, 

Environment and Sustainable Development in Alexandria, Egypt. On the other hand, GAFSP self‐described role is 

less as a producer of cutting‐edge evaluation practice and more as a  coordinator of  fund‐level  reporting and a 

developer of capacity for M&E, delegating important functions to the implementing agencies and funding capacity 

for M&E and knowledge management at  the  country  level. Also, GAFSP  seemingly  chooses  to  concentrate on 

intermediate results, delegating impact assessments to DIME. Importantly, GAFSP has “pushed” M&E capacity to 

the country level and provided explicit support for this in program design. 

                                                                          50 DRN‐ECDPM‐ECORYS‐PARTICIP. (2013). Op. cit. 

Page 27: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

21 

 

4. OPTIONS his section presents in details the following options: a) the “enhanced” status quo (i.e. with some potential 

minor changes to consider that might improve on the current process); b) moving forward with developing 

a  Macro  Framework  for  the  Fund.  This  latter  option  entails  various  options:  B1  ‐  Department  for 

International Development  (DFID)’s model  for Macro  Framework; B2‐ Project  cluster/nesting model  for 

aggregation of results at a macro level, and; B3 ‐ an hybrid option. These options reflect a major effort to capture 

the  numerous  stakeholders’  expectations  and  to  translate  them  into  concrete  options  to  help  guide  the way 

forward. 

4.1. Option A1 “Enhanced” Status Quo 

This section presents some slight alterations to the status quo suggesting how the  information collected by the 

CU, through the Progress Report, could eventually provide interesting information over time at the Fund level, and 

might contribute to addressing the need expressed by some partners who want to be able to report on the Fund’s 

impact, without  changing  the way  the monitoring  and  reporting  is  currently  structured.  The  current  Progress 

Report  that  ISAs are  required  to complete  twice a year could better contribute  to aggregated  reporting at  the 

Fund‐level over time, with some very minor adjustments.  

4.1.1. Portfolio Reporting ‐ Overview 

Project portfolio reporting could be a powerful tool to ensure that the Fund resources work together effectively 

and  deliver  results  in  the  TCs.  Portfolio  reporting would  let  SC members  look  holistically  across  the  projects 

supported to understand the portfolio’s strategic alignment and its potential to deliver expected results. Using the 

current tools for reporting set out by the Fund, the aggregation of findings across the portfolio of projects could be 

done by country,  focal area/pillars, and overall project performance. Such a simple portfolio monitoring system 

would allow the aggregation of some information sets, instead of looking at each project as an isolated event. This 

would permit development of an overview of how projects with different objectives are contributing as a set to the 

overall contribution of the MENA Transition Fund. 

Focal Areas/Pillars Portfolio Reporting 

Aggregation of information in this way would allow, in addition to country portfolio reporting (as shown in Figure 

5), an assessment of whether the overall portfolio of projects approved consistently covers all areas of results (i.e. 

pillars)  set  out  by  the  Fund  (exemplified  in  Figure  6).  In  addition,  given  the  fact  that  projects  submitted  for 

financing  are  obliged  to  respond  to  TCs’  priorities,  it  could  also  provide  information  about which  “pillars”  are 

contributing  most  towards  meeting  these.  This  could  eventually  help  balance  the  overall  portfolio  to  most 

effectively address TC priorities over time.   

T

Page 28: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

22 

 

 

Figure 6  

Figure 6. MENA Transition Fund Approved Portfolio by Pillars, YR X (by amount ~ Total amount) – Fictional 

Data 

 

 

 

 

This  approach  to  aggregate data would  not  provide  a  clear portrait  of  the macro  results  achieved by  projects 

funded at an overall regional level. Nevertheless, it could prove useful for managing investments and ensuring that 

thematic areas  are  covered  in proportion  to  the  contribution  they make,  thereby enabling donors  and  ISAs  to 

assess what types of projects TC value more on the basis of results achieved; thereby ensuring better targeting of 

resources for enhancing impact over time in the region. 

To facilitate this process moving forward, this information about pillars could be transposed under section A of the 

Progress Report template as demonstrated by yellow highlights below52: 

Table 7. Snapshot of Revisions to Improve the Progress Reporting Template 

A. Basic Project Information 

ActivityName:

Country(ies)Name: Name of Implementation SupportAgency(ies):

Total Amount Approved by theTransitionFund(US$):

Additional Funds Leveraged, if any(US$):

Steering Committee ApprovalDate:

ProjectImplementationStartDate: ProjectClosingDate:

NameofISAProjectLeader:EmailofISAProjectLeader:

Pillar(s)towhichActivityResponds(aspertheproposalapprovedbytheSteeringCommittee)

Investing in SustainableGrowth. 

Enhancing EconomicGovernance

Inclusive Development andJobCreation

Competitiveness andIntegration

Primary:

Secondary:      

Primary:

Secondary:      

Primary:

Secondary:      

Primary:

Secondary:      

                                                                          51 MENA Transition Fund. (2013). MENA Transition Fund Annual Report December 31, 2013. 

52 Since the report was submitted, there has already been some movement along the lines suggested. 

Figure 5. Percent of Funding Allocated by Country 

 

Figure 5. Percent of Funding Allocated by Country51 

 

Page 29: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

23 

 

Potential Additional Revisions to Reinforce the Process of Focal Area/Pillars Portfolio Reporting 

Developing  clearer  results  statements  under  each  pillar  could  further  improve  the  effectiveness  of  the  results 

reporting process and assist  the work  in  term of aggregating data. This could  simply be done by creating  sub‐

results category. Based on the broad definitions given for each pillar, these sub‐categories of results could look like 

the following: 

Table 8. Examples of Sub‐Categories for MENA Transition Fund Objectives53 

Pillars 

Sub‐category 

Pillar 1: Investing in Sustainable Growth 

Pillar 2: Enhancing Economic Governance 

Pillar 3: Inclusive Development and Job 

Creation 

Pillar 4: Competitiveness and 

Integration 

  Innovation  and Technology 

Good Governance (e.g. transparency, corruption, accountability, integrity, etc.) 

Youth employability  Trade and Negotiation 

Business,  private sector  development, Investment,  and Competition 

Finance  (e.g.  asset recovery,  financial management,  audit, banking system, etc.) 

Female  labor participation 

Infrastructure 

Energy  Justice  (e.g.  regulatory reforms,  consumer protection, etc.) 

Integration  of  people with disability 

Transport 

Urban & rural planning  Partnership  with  Civil Society  (e.g.  open government  

Aging  people  (e.g. pension reform) 

Private  Sector Development  

  

Then based on the sub‐category defined, it would be possible to report in the Fund Annual Report, for example, a 

graph as depicted in the figure below: 

                                                                          53 The below is provided as an example and would have to be refined based on the current portfolio of projects approved and 

the priorities defined by the partners involved in the Fund. 

Page 30: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

24 

 

Figure 7. Snapshot of Transition Objectives Pursued by Fund Projects, 2013‐2015 – Fictional Data

 

 

 

This would enhance the reporting of relevant data to partners. For example, by presenting to ISAs and TCs a set of 

“macro results” statements to which their project could align, these types of graphs could render an even more 

precise  view  about how  the  Fund  is  supporting TCs  in  their  reform processes. Another main benefit  from  this 

refinement would  be  to  potentially  better  “adjust  the  dial”  for  incoming  proposals  by  slightly modifying  and 

improving the Call for Proposals to ensure the kinds of proposals required to achieve the full range of results will be 

targeted.  It  could  also help  for  improving understanding of  future  resource needs  and  improve  alignment  and 

leveraging of  resources. Moreover,  it could enhance coordination between partners  (e.g. donors, TC,  ISAs, and 

other  actors  in  the  region)  and  catalyze  synergy by   more  clearly  showing what  type of projects  are  currently 

underway/supported by  the Fund. Finally,  it could potentially  incentivize more partners  to  join  if  they  feel  they 

have a vested interest in the kind of support the Fund provides. Even though all of the above represent interesting 

benefits for reporting in an aggregated way at the Fund level, this type of reporting would not catalyze enhanced 

reporting on the contribution of the Fund in terms of development outcomes as requested by key donors. 

Overall Portfolio Performance 

Another aspect which could be “aggregated” easily at  the Fund‐level  is  the overall project performance. During 

project implementation, each project is required to monitor the expected achievements of objectives as follows: 

Satisfactory  (S):  The  project  is  likely  to  achieve  almost  all  or  exceed  its  major  objectives 

efficiently without any significant shortcomings. 

Moderately  Satisfactory  (MS):  The  project  is  likely  to  achieve  the  majority  of  its  major 

objectives efficiently with moderate shortcomings. 

Innova

tion and Tec

hnology

Business, P

SD, Inve

stmen

t, and Competition

Energy

Urban & rural p

lanning

Good gove

rnan

ce

Finan

ce

Justice

Partnersh

ip with Civil Society

Youth employa

bility

Fem

ale labour participation

Peo

ple with disab

ility

Aging peo

ple

Trade an

d Neg

otiation

Infrastructure

Transp

ort

PSD

60%

30%

5% 5%

25%

40%

20%15%

70%

30%

0% 0%

40%

10%

25% 25%25%

40%

20%15%

40%

10%

25% 25%

60%

30%

5% 5%

60%

30%

5% 5%

40%

10%

25% 25%

60%

30%

5% 5%

25%

40%

20%15%

25%

40%

20%15%

2013 2014 2015

Pillar 1  Pillar 2  Pillar 3  Pillar 4 

Page 31: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

25 

 

Moderately Unsatisfactory  (MU): The project  is not  likely  to achieve at  least half of  its major 

objectives efficiently with moderate shortcomings. 

Unsatisfactory  (U):  The  project  is  not  likely  to  achieve most  or  any  of  its major  objectives 

efficiently. 

Systematic  analysis  of  data  provided  under  this  category  of  the  Progress  Report  could  enable  the  Fund  to 

continuously monitor  the  quality/performance  of  the  projects  under  implementation  (see  the  tables below  for 

examples). Based on the assumption that each project defines a Project Development Objective (PDO), which  is 

expected  to  contribute  to  the  transition/reform  process  in  its  TC  and measures  progress  towards  achieving 

relevant results against robust  indicators, then  it would be possible to report on the extent to which the Fund  is 

supporting “transformative” projects that will benefit the transition phase in TCs.  

Table 9. Example of a Summary of Performance Ratings Table ‐ Fictional Data 

Rating  FY1 (40 projects)  FY2 (50 projects)  FY=n (*n project) 

Progress towards achievement of objective (PDO) 

S  27%  18%  X% 

MS  65%  74%  X% 

MU  5%  0%  X% 

U  3%  8%  X% 

Implementation progress 

S  20%  18%  X% 

MS  67%  66%  X% 

MU  1%  16%  X% 

U  12%  0%  X% 

 

Table 10. Example of Performance Ratings by Country for YR X54 

Country Number  of Projects 

Progress  Towards  Achievement  of Objectives % 

Implementation Progress % 

S  MS  MU  U  S  MS  MU  U 

Egypt  XX  %  %  %  %  %  %  %  % 

Jordan  XX  %  %  %  %  %  %  %  % 

Libya  XX   %   %   %   %   %   %   %   % 

Morocco  XX   %   %   %   %   %   %   %   % 

Tunisia  XX   %   %   %   %   %   %   %   % 

Yemen  XX   %   %   %   %   %   %   %   % 

 

   

                                                                          54 These tables are presented merely as suggestions and for example purposes only.  

Page 32: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

26 

 

Table 11. Example of Performance Ratings by Pillars for YR X 

Pillars Number  of Projects 

Progress  Towards  Achievement  of Objectives % 

Implementation Progress % 

S  MS  MU  U  S  MS  MU  U 

Pillar 1  XX  %  %  %  %  %  %  %  % 

Pillar 2  XX  %  %  %  %  %  %  %  % 

Pillar 3  XX   %   %   %   %   %   %   %   % 

Pillar 4  XX   %   %   %   %   %   %   %   % 

Tables above could help to assess which thematic area (i.e. pillars) are generally more/less successful at delivering 

key results or potentially facing more/less difficulty during implementation; thus, helping identify opportunities in 

the  future. Over  time,  the  systematic  use  of  this  type  of  aggregate  reporting  through  the  Progress  Reports 

submitted  by  ISAs,  would  allow  SC  members  to  assess  what  approaches  or  interventions  contribute  most 

effectively  to achieving  specific development objectives, and would  thereby help  to  identify good practices  for 

replication. 

Revisions to Reinforce the Process of Portfolio Performance Reporting 

As discussed above, ratings and rating definitions are given for progress towards the achievement of objectives in 

the current Progress Report. In addition to this existing information, it would be possible to add definitions for the 

ratings  for  overall  implementation  progress  (as  shown  below),  which  would  enable  the  introduction  of  a 

harmonized system for ISA reporting on this aspect. For example: 

Possible Definitions for Implementation Progress Ratings 

Satisfactory  (S):    Implementation  of most  components  is  in  substantial  compliance with  the 

original/formally revised plan except for only a few that are subject to remedial action.  

Moderately  Satisfactory  (MS):    Implementation  of  some  components  is  in  substantial 

compliance with  the  original/formally  revised  plan with  some  components  requiring  remedial 

action.  

Moderately Unsatisfactory  (MU):    Implementation of  some  components  is not  in  substantial 

compliance with  the  original/formally  revised  plan with most  components  requiring  remedial 

action.  

Unsatisfactory (U):  Implementation of most components is not in substantial compliance with 

the original/formally revised plan.  

Not applicable (NA):  Implementation has not yet started.  

The  inclusion of this  information could also help pave the way  for more evaluative analysis at a  later stage. For 

example,  a  comparison  of  the  results  on  progress  on  implementation  with  those  on  progress  towards 

achievements could reveal areas in which the original project concepts (notably their explicit or implicit theories of 

change) have or have not proved correct. 

Page 33: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

27 

 

4.1.1. Steps  Required  in Moving  Forward  with  this 

“Enhanced” Status Quo Option 

As mentioned, there are some small steps required in order to develop this option and these mostly require only 

slight modifications to the current progress reporting system, specifically: 

1. Information about pillars to which projects contribute could be included under section A of the Progress 

Report template to facilitate focal areas/pillars portfolio reporting55; 

2. Ratings  and  definitions  for  overall  implementation  progress  could  be  added  to  the  Progress  Report 

template. This would harmonize how  ISAs  report on  this aspect and allow aggregation at  the portfolio 

level. 

In  addition,  developing  clearer  results  statements  (i.e.  sub‐results  categories)  under  each  pillar  could  further 

improve the effectiveness of the results reporting process and assist  in term of aggregating data. However, this 

could take some time to become effective, as all partners would need to agree on a set of results sub‐categories. 

As exemplified in GEF case study, given the fragility of any system based on self‐reported monitoring systems, it 

could be useful to also consider how targeted mid‐term evaluations, or even formative evaluations (e.g. country, 

project, sector or thematic evaluations56) might be used to refine and calibrate the monitoring‐based system. The 

issue of the need to verify self‐reported data through some system of cross‐checking/quality assurance should also 

be given some further thoughts. 

Finally,  the SC members may wish  to  consider building on  the  above by  setting  targets  for performance. This 

aspect is not developed/suggested further in this section purposefully, as given the context and stage of the Fund, 

this may not be the most efficient and effective way forward. 

4.2. Option B1 – Revise and Use the DFID‐based Logic Model 

This variation for developing a Macro Framework involves using the logic model and theory of change developed 

by DFID. The following is the logic model for the MENA Transition Fund interventions as it appears in the business 

case document for UK involvement in the Fund.  

Figure 8. Intervention Logic ‐ DFID Model57 

 

                                                                          55 Since the report was submitted, there has already been some movement along the lines suggested. 

56 Please refer to the Glossary of terms in Annex 2 for more details on each type of evaluation mentioned. 

57 DFID. (n.d.) Business Case and Intervention Summary. Middle East and North Africa (MENA) G8 Deauville Transition Fund. 

Page 34: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

28 

 

As outlined  in  this DFID model,  the Fund  is primarily aimed at  catalyzing  institutional  reforms  that will enable 

better policies and  in  turn drive  improved economic performance.  In addition,  the agreed aim of  the Fund  is  to 

improve the development and implementation of government policy in the TCs, focusing on four priority thematic 

areas:  1.  investing  in  sustainable  growth;  2.  inclusive  development  and  job  creation;  3.  enhancing  economic 

governance; and 4. competitiveness and  integration. These thematic areas will all contribute to the outcome of 

building effective policies and institutions that promote inclusive and sustainable growth as demonstrated below.  

Figure 9. Theory of Change Diagram ‐ DFID Model58

 

 

To measure  these  different  articulations  of  results,  DFID  proposes  a  “top‐down””  approach  and  has  already 

defined  indicators and  sources  to  track  these at  the Fund‐level as displayed  in Figure  10 below. This model  is 

categorized as following a “top‐down” approach since the indicators used to track achievement of results do 

not  take  into  account  the  project‐level  results  frameworks  (and  indicators)  already  in  use.  Rather,  the 

                                                                          58 Idem. 

Page 35: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

29 

 

indicators  for  each  results  level  have  been  defined without  considering  the work  on  the  ground  (i.e.  the 

project‐level).  

Figure 10. Preliminary Logical Framework ‐ DFID Model59

 

Of note  is that many stakeholders are skeptical that at this stage, the  long‐term effect of the MENA Transition 

Fund can be measured. In practice, the Fund is likely to continue to support many projects in a variety of sectors 

within each thematic area; thus, the  impact and outcome  level of this proposed results framework might be too 

general and broad  to give an accurate picture of  the  contribution of  the Fund  in  the  region. The gap between 

outputs and impacts might be too vast given the contribution of the Fund in the region and the large diversity of 

projects it funds. Some have argued that the “macro” impact of the Fund should be limited to helping strengthen 

                                                                          59 Idem. 

Indicators Sources

Annual real GDP growth in priority countries

IMF Regional Economic Outlook (projections for 2012

and 2013)

Unemployment (and female unemployment) rate

IMF Regional Update 2011; Government statistics or World Bank Development Indicators

(latest available data)

Percentage of population living on less than $2 per day (2005 prices)

World Development Indicators (latest year available)

Government Effectiveness ScoreWorld Bank Governance Indicators: Government

Effectiveness Score (annual)

Foreign direct investment (BOP, current $) total of all positive flows

World Bank, World Development Indicators

Open Budget Index Open Budget Index

Volume of funds leveraged directly as a result of technical assistance ($m)

WB Coordination Unit Six monthly report

Volume of technical assistance provided ($m) disaggregated by Implementing Support Agency (ISA)

WB Coordination Unit Six monthly report

Average percentage progress against agreed work plan (disaggregated by ISA)

WB Coordination Unit Six monthly report

Client's imprression of technical assistance effectiveness (based on Client survey, average rating on a scale of 0-10, 10 being very favourable)

WB Coordination Unit Six monthly report

80%

World Bank coordination unit

working effectively

Average time from approval to first disbursement (Number of months from approval to first disbursement) disaggregated by ISA

WB coordination unit six monthly report

Number of countries receiving at least 10% of cumulated allocated technical assistance (over achievement will be regarded as anything over 10%)

WB coordination unit six monthly report

20%Percentage of allocated technical assistance being managed by Regional ISAs

WB coordination unit six monthly report

IMPACT

Inclusive and sustainable growth

in transition countries

OUTCOMEEffective policies and institutions

OUTPUTS

Effective technical assistance which

meets country needs

Page 36: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

30 

 

capacity to deliver reforms. In order to minimize the reporting burden, current results reporting may need to focus 

on  intermediate outcomes  such  as  institutional  reform  and  capacity building. However, others  consider  that  it 

remains important to specify the long‐term results of the MENA Transition Fund using a logic model and theory of 

change.  

4.2.1. Steps  Required  In Moving  Forward  with  this 

Option 

To build a Macro Framework  following  the model above,  indicators would have  to be developed and vetted by 

partners. DFID stated  in the business case document that  it would  like to work with the SC and other donors, to 

see if the Macro Framework for the Fund can be strengthened by the addition of sector specific indicators that are 

included in Figure 11 below.60 

Figure 11. Possible Additional Indicators to be Considered for the MENA Transition Fund Pillars 

 

 

Moreover,  this option would entail, even  if  in  a  limited way,  a bureaucratic burden on  the Fund  structure  and 

reporting that perhaps only a few stakeholders are interested in. This means that the roles and responsibilities for 

M&E reporting in the Fund Operations Manual will likely need to be revised to fit the new “system”. Data collection 

on  the  new  indicators  should  represent  only  a  slight  additional  burden  since  indicators  are  collected  through 

secondary  sources, and provided  that  the approach  is  implemented with a  recognition  that higher‐level  results 

cannot and should not be measured frequently. 

Of note also  is  that  the  lower  level  (i.e. output) of  this  framework uses  the current Progress Report as a basis. 

Again, given the fragility of any system based, to some extent, on self‐reported monitoring systems,  it could be 

useful  to also consider how  targeted mid‐term evaluations or even  formative evaluations  (e.g. country, project, 

sector or  thematic evaluations) might be used  to  refine and  calibrate  the monitoring‐based  system. To ensure 

integrity of individual project reporting, a “Quality Assessment Group” could be helpful. 

                                                                          60 Idem. 

•No of micro loans (of which to women)

•No of SME loans

•No of procedures to legally start and operate a company 

•Time required to complete  each procedure (calendar days)

Investing in Sustainable Growth

•Estimated no of jobs created indirectly

•No of people trained (of which women or youth)

•Estimated no of people who have indirectly benefitted from the Transition Fund (calculated for each programme then quality assured by Coordination Unit)

Inclusive Development and Job Creation

•Public Expenditure Financial Assessment ScoresEnhancing Economic 

Governance•Revenue Watch Index

•No of documents to export

•Time to export (days)

Competitiveness and Integration

Page 37: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

31 

 

4.3. Option B2 – Developing Project Cluster/Nesting Model 

In  this model derived  from DFATD61, the concept  is  to have  two  sets of  results  frameworks  for monitoring and 

reporting; one at the project level and the other one at the Fund‐level. The relationship between the two follows a 

“nesting”  model.  Briefly,  nesting  refers  to  the  process  of  inserting/creating  detailed  project  level  results 

frameworks  that sit within a  larger macro Fund‐level  results  framework. Each nested project  results  framework 

depicts in greater detail a specific component that is part of a broader Fund‐level objective. For example, in Figure 

12 below, projects are categorized based on  the pillar  to which  they contribute, which also  represent,  to  some 

extent, the immediate outcomes in the macro Fund‐level results framework.  

Figure 12. DFATD Nesting Model ‐ Linkages 

 

 

These two sets of results frameworks are linked together because ever though the outcomes in the project results 

frameworks  vary  depending  on  the  nature  of  the  project,  they  always  link  directly  to  the  pillar  to which  they 

contribute. However, the PDO are more specific and granular in terms of who, what and where than the outcomes 

in the macro Fund‐level results framework as exemplified in Figure 13 below. 

   

                                                                          61 This  option  is  adapted  from  documents  provided  by  DFATD  and  collected  during  the  interview  phase.  To  look  at  the 

originally proposed DFATD model, please refer to Annex 5. 

Page 38: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

32 

 

Figure 13. Project Cluster/Nesting Model Linkages – Example62 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The  rationale  for  this model  is  that  the Fund  finances projects of short duration,  low budget and  limited scope. 

This type of project may realistically only achieve their defined output/intermediate results by the end of the Fund‐

financed support (or even later). The collective impact of the Fund projects on a country or area of work, (i.e. pillar) 

will take longer to manifest itself than is covered by the project results system. In order to take into account this 

lag in measurement, ISAs and TCs still need to identify the PDO and the “pillar” to which their project contributes, 

but  cannot  in  the  short‐term  realistically measure  impact  results  achievement. Thus,  individually, each project 

results framework would convey its respective results and output information against the macro Fund‐level result 

framework. This way is then recognized that it is not the ISAs’ role to monitor and report on the progress towards 

or on the achievement of the “pillars” or the intermediate and ultimate outcomes of the macro Fund‐level results 

framework,  but  their  project  level  reporting  can  be  aggregated  and  categorized  accordingly  for  this  type  of 

reporting at the higher  levels. The expected outcomes  in the macro Fund‐level result framework would describe 

broad  changes  for  the  entire  Fund which would  allow  reporting  on  the  “impact”  or  at  least  the  “intermediate 

outcomes” of the Fund. Reporting on the immediate outcomes would reflect the clusters/pillars of the overall Fund 

as visible below  in Figure 14, which  represents  the  linkages  (for pillar 2 and 3 only) between  the project  results 

framework (through their PDO) and the Fund‐level results framework.  

                                                                          62 Project‐level results frameworks are based on information as found in the Project Progress Report (2013). 

Page 39: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

33 

 

Figure 14. Linkages between Macro Fund‐level Outcomes (2&3) and PDO63 

Fund‐level 

Ultimate Outcome (Fund's impact):  

To improve the lives of citizens in TCs; and to support the transformation currently underway in TCs 

                                      Intermediate Outcomes (Fund's Objectives) 

To foster sustainable inclusive economic growth  To strengthen governance and public institutions 

                                   

Immediate Outcomes (Fund's Pillars) 

Investing in sustainable growth/Strengthening enabling environment 

Inclusive development and job creation  Enhancing economic governance Competitiveness and integration 

                                    

Project‐level 

PDO: 

 Improving employability of graduates and unemployed youth through increasing access to career guidance, job search, and on the job training. (Jordan: Support to Building Active Labor Market Program)     

(Morocco: Strengthening Micro‐Entrepreneurship for Disadvantaged Youth in the Informal Sector) 

To improve individual employability and SME capabilities for graduates and firms participating in a job‐intensive SME support pilot scheme and to inform related policies and programs. (Yemen: Enterprise Revitalization and Employment Pilot Project) 

To enhance the capacity of targeted accountability institutions to provide access to information and to improve enforcement of the anti‐corruption law. (Yemen: Accountability Enhancement Project) 

Contribute to the strengthening of government transparency, accountability and public participation (Morocco: New Governance Framework Implementation Support Project) 

To mobilize domestic resources to foster sustainable economic growth and income redistribution (Tunisia: Enhancing Domestic Resource Mobilization Through Effective Tax Systems) 

 

This model is regarded as following a “bottom‐up” approach because to measure the results in the macro Fund‐level results framework, the indicators 

would come from the individual project results framework.  

                                                                          63 Based on DFATD. (2013). CIDA‐PAD – Annex B: Logic Model for MENA Transition Fund. This figure is adapted from DFATD’s preliminary logic model posited for the Fund. To 

look at the originally proposed DFATD model, please refer to the Appendix, Annex 5.  

Page 40: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

34 

 

The main advantage of  this option  is  to build  from  the  “bottom‐up”;  thus, allowing  ISAs  to  continue  to  report  their own  indicators  in  the project  results 

framework and not change the way they conduct the monitoring and reporting for their project. This type of monitoring and reporting is possible through the 

development of consolidated indicators.64 Consolidated indicators are project level indicators that are clustered together with other related indicators to form 

one unit that will allow aggregation of related data at the macro Fund‐level. Table 12 exemplifies how this could be done for pillar 1 and 2 of the Fund. 

Table 12. Linkages from Project Results Framework Outcomes to Macro Framework – Pillars 1 &2 

Pillars  Macro Fund‐level Consolidated Indicator65  Project level indicators66 

Investing in Sustainable Growth  Number  of  policies,  laws,  agreements  or  regulations promoting  sustainable  growth  that  are  implemented  as result of the MENA Transition Fund assistance 

1) A  comprehensive  energy  pricing  and  fuel  switching  strategy  for Egypt is developed 2)  Acceptance  and  adoption  of  the  SME  development  strategy  in Libya 3) Number of policy reforms  identified  in view of strengthening the legal framework for PPPs in Tunisia 

Inclusive Development and Job Creation  Number  of  people  who  have  benefitted  from  the MENA Transition Fund  

1) Number of stakeholders participating in training 2) Number of direct green jobs created 3) Number of women entrepreneur assisted 4) Number of  youth micro‐entrepreneur who  receive post‐creation follow‐up support (of which female %) 

 

The process is also shown in Figure 15 below.    

                                                                          64 Of note is that DFATD developed guidance on how to select indicators at the program (i.e. fund level) and how to strategically select other indicators from the project level. 

DFATD’s Global Program Branch (GPB) also has a Tip Sheet on consolidated  indicators which provides guidance on the key steps required to conduct this process. DFATD’s initial model is discussed further in Annex 5. 65 The below is posited merely as an example and would have to be refined based on the current portfolio of projects approved. 

66 MENA Transition Fund. (2013). MENA Transition Fund Project Progress Report. 

Page 41: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

35 

 

Figure 15. Diagram Illustrating Different Requirement for Indicators and their Data at Different Levels67 

 

  

 

                                                                          67 Adapted from DFATD. (n.d.) Master Slide EDRMS No. 6065211. To look at the originally proposed DFATD model, please refer to the Appendix, Annex 5.  

Indicators at the Ultimate and 

Intermediate Outcomes to report 

on the Impact of the Fund 

Consolidated  Indicators  at  the 

Immediate  Outcome  level  to 

report  on  the  results  achievement 

under each pillars 

 

Project level indicators as set out in 

the  individual  project  results 

framework 

Page 42: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

36 

 

4.3.1. Steps  Required  In Moving  Forward  with  this 

Option 

This option requires the creation of project clusters/categorizations. An even simpler way would be to decide that 

the  “cluster”  simply  reflects  the  “pillars”  defined  by  the  Fund  as  each  project  is  already  required  to  identify  a 

“pillar” for which its project align in the Fund proposal form.  

This option also requires the creation of appropriate consolidated  indicators to measure the results at the macro 

Fund‐level. This  step would  require  extensive  analysis  and  comparison  of  the  projects  approved  to build  from 

these  the  Fund‐level  consolidated  indicators.  DFATD’s  Global  Program  Branch  (GPB)  has  a  Tip  Sheet  on 

consolidated indicators which provides guidance on the key steps required to conduct this process and they are as 

follow: 

1. “Review portfolio of projects, by sector (multidisciplinary team); 

2. Look for project level indicators that meet the following criteria: 

a. Dealing with the same sector; 

b. Measuring similar change, at the same level; 

c. Same of comparable units of measure; 

d. Same/similar units of analysis that could be grouped into a broader unit; 

e. Same of similar context which speak to the expected result 

3. Using  the project  level  indicators that  fulfilled  the criteria  in Step 2,  try and group  the units of analysis 

from the project indicators into a single broader (generic) category; 

4. Add a unit of measure and context (that is related to the expected result from your program) to your unit 

of analysis and your indicator is complete.”68 

The main burden of this option has to do with the “mapping” of the current project level indicators to the macro 

level and do the same process for all newly approved projects to the defined consolidated  indicators once these 

have  been  defined.  A  temporary  ad  hoc  technical  group  at  Fund  level  could  lead  this  task  or  this  could  be 

delegated to the next consultancy (to be engaged  if the Macro Framework option  is selected).  If  it  is decided to 

move  forward with developing  a Macro  Framework  for  the  Fund,  then given  there  are  consultants  coming on 

stream  to  guide  this  process,  it  could  be  their  task  to  kick‐start  this  process  and  define/posit  categories  and 

possible  consolidated  indicators based on  the  current universe of project  level  indicators. While doing  so,  they 

could map  the  current project  level  indicators  to  these newly  created  consolidated  indicators. They  could  also 

develop simple guidance material and tools that would guide this process for future project design and ongoing 

reporting, which would ease the reporting burden on the consolidated indicators when the time comes to produce 

the Annual Report. 

Potential Additional Steps to Reinforce the Process  

Eventually,  it  could  be  useful  to  provide  in  the  proposal  form  a  “menu”  of  results  statements  reflecting  the 

categories developed and even a “menu” of  indicators for the  implementers  (e.g.  ISAs and TCs) that they could 

select from. Should this avenue be pursued, it could be made clear that these “menu items” would only be posited 

as suggestions and not represent a straight‐jacket; thus keeping with the principles of flexibility and appropriation 

set out by the Fund at its inception. When the same outcome is shared by more than one project, harmonizing or 

standardizing  the  indicator within and across pillars would help  to compare and aggregate  results  for different 

                                                                          68 DFATD. Coherence Division‐RBM Technical Unit. (2014). GPB Tip Sheet. DFATD Consolidated Indicators. 

Page 43: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

37 

 

sectors, countries, and the Fund as a whole. As noted above, some guidance material to assist ISAs and TCs in this 

process into the future could be developed. This could be developed by the consultants that might be engaged to 

assist in the process of developing the Macro Framework itself. This would have the added benefit of addressing 

the challenge of standardization of terminology use with regards to ISA reporting. 

4.4. Option B3 – Reporting Against a MENA Transition Fund Theory of Change – “Hybrid” Option 

This  variation  combines  the DFID  and  project  cluster/nesting  approaches  together. Both  approaches  focus  on 

results, as well as themes in the realm of governance, capacity building or institutional reform. Thus, it is possible 

to  construct  a  combined  “top  down/bottom  up”  approach,  focusing  on  the  intermediate  outcomes  related  to 

capacity building, institutional reform and/or governance.   

Figure 16. Top‐down and Bottom‐up Approach 

 

However, instead of categorizing projects as per the project cluster/nesting model, the aim is to categorize results, 

as per the GEF methodology. In addition, instead of developing a categorization of project results according to an 

analysis of their own activities and declared expected results, the categorization could be based on a Fund‐level 

logic model and theory of change, building on that developed by DFID. Based on the previous,  individual work‐

area results framework could be derived from a single logic model and theory of change for the Fund. This could 

be done by combining the “top down/bottom up” methodology applied by DFID and the project cluster/nesting 

model respectively. 

In  going  this  route,  it  needs  to  be  well  understood  that  the  macro  objectives  results  respond  to  different 

information  needs  and  imperatives  than  the  results  at  the  ISA‐project  level.  In  order  to  reflect  fully  the 

decentralized and diverse reality, the possibility of a single, fully  integrated system  in which country and project 

goals  cascade  neatly  from  pre‐defined  broader  objectives  should  likely  be  discarded.  To  reconcile  potentially 

competing needs, an “empirical” approach could be adopted. The macro  level elements of the Fund needs to be 

developed  based  on  extensive  consultation  and  maybe  even  pilot  testing,  while  the  results  (outcomes  and 

outputs) are defined by the TC and ISAs and reflect the diversity of country needs. 

Thus,  it  is  possible  to  construct  a  combined  “top  down/bottom  up”  approach,  focusing  on  the  intermediate 

outcomes related to capacity building, institutional reform and/or governance. 

 

 

 

Page 44: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

38 

 

Figure 17. Revised Logic Model for the MENA Transition Fund 

 

Given the revised (albeit provisional) model, the proposed logic model and theory of change portrayed in Figure 17 

can be summarized as follows. 

Technical assistance from the Fund  increases beneficiary countries’  institutions (specifically  line 

ministries)  capacity  for  administrative  reform  such  as:  M&E,  Knowledge  Management, 

Information Management, Public  Financial Management, Policy  and Planning  and Grants  and 

Contributions Management. 

More efficient  line ministries affect the ability of national government to  implement reforms  in 

the key areas of a)  increased service delivery  in social and economic sectors and b) governance 

(anti‐corruption justice, etc...)   

Such  key  institutional  reforms  lead  to  full  participation  of  national  country  citizens  in  the 

economic and social  life of the country (i.e. economic and social  inclusion), which  in turn yields 

sustainable (i.e. broad‐based) economic growth.   

The intermediate results of two Fund projects were categorized using concepts taken from the revised, provisional 

logic model and theory of change described above. The results are depicted in Table 13 below.    

Table 13. Proposed Categorization of MENA Transition Fund Project Results 

MENA Trust Fund Project 

MENA Transition Fund Pillar Intermediate Result 

Indicator  

Intermediate Outcome (DFID Logic Model, revised) 

Enterprise Revitalization and Employment Pilot Project (Yemen) 

Primary:  

Investing  in Sustainable Growth 

Successfully facilitate internships and business services to private enterprises 

Number of firms requesting business services 

Institutional Reform (Service Delivery) 

Secondary:  

Inclusive Development and Job Creation 

Competitiveness  and Integration 

Number of beneficiaries completing internships  

Regional Affordable Housing Project (Morocco & Tunisia) 

Primary:   Investing in 

Sustainable Growth  

Evaluation of Government Housing Policy and Programs 

# of reports completed 

Institutional Reform (Policy and Planning) 

Secondary:   Inclusive Development 

and Job Creation  Enhancing Economic 

Governance  Competitiveness and 

Integration 

Page 45: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

39 

 

As  can  be  seen,  the  results  of  two  relatively  different  projects,  one  having  to  do  with  service  to  firms  and 

employment  training  and  the  other  targeting  affordable  housing,  can  both  be  classified  using  the  concepts 

contained  in  the  revised DFID  logic model and  theory of  change. This points  to  the possibility of developing a 

Macro Framework for the Fund. 

In order to avoid the risk of banality, a “layered” approach to developing a Macro Framework for Fund could be 

adopted.  This means  that,  instead  of  developing  a  single  overarching  results  framework,  a  series  of  results 

framework per pillar/work area  is developed. This should provide a certain  level of specificity that would address 

the risk of an overly‐generalized Macro Framework. A “layered” results framework approach means flexibility of 

reporting horizontally and  vertically  (i.e. by  country and/or pillars/area of work). Focusing on  results  related  to 

governance and/or  institutional  reform offers another dimension of  reporting, one  that cross‐cuts both area of 

work and country as displayed in below. 

Figure 18. Layered Approach

 

Aggregation Strategies 

In order to discuss possible aggregation strategies for a Fund Macro Framework, it is useful to make a distinction 

between two types of results aggregation. 

1. Count: This  is defined as  the  categorization of  results according  to  concepts  such as administrative or 

institutional  reform.    This  aggregation method  is  described  above  in  the GEF  case  study.  Using  this 

strategy,  it  is possible  to make  statements  like  the  following,  “25% of MENA Transition Fund projects 

used  policy  redesign  as  a  tactic  for  institutional  reform”;  “30%  of  MENA  Transition  Fund  Projects 

enhanced M&E Systems as part of administrative reform”. 

2. Sum: This involves the mathematical addition of results metrics. See an excerpt below from DFATD’s Tip 

Sheet regarding the consolidation of indicators which exemplifies this methodology.69 

                                                                          69 DFATD. Coherence Division‐RBM Technical Unit. (2014). GPB Tip Sheet. DFATD Consolidated Indicators. 

Page 46: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

40 

 

 

Referring again to Table 13 above, it is possible to employ the “Count” and the “Sum” aggregation strategy to the 

hypothetical Fund Macro Framework defined in this section. 

Count.  Referring  to  the  column  “Intermediate  Outcome”  one  would  count  the  number  of  results 

categories in this column. 

Sum.  Referring to the column “Indicator” and using some change in wording, it is possible to add similar 

results (beneficiary counts, for example) from different projects together. 

4.4.1. Steps  Required  In Moving  Forward  with  this 

Option 

As this variation is a combination of both the DFID and project cluster/nesting approach, steps in moving forward 

with this option are similar to those described above. To recap, this option entails: 

1. Refine/elaborate logic model and theory of change; 

2. Categorization of current Fund project results, using the new logic model and theory of change to provide 

“bottom‐up” validation; 

3. Define/build consensus on indicators for each level of results in the logic model and theory of change; 

4. Develop pillar/area of work results frameworks; 

5. Revise the M&E reporting structure/arrangements to fit the new “system”; 

6. Consider how audits and evaluations might be used to refine and calibrate the monitoring‐based system. 

As alluded to above, the DFID logic model and theory of change, while a good start, requires further elaboration.  

Some of the relationships between results need to be further specified. For example, examining DFID logic model, 

there is an implied but under‐specified relationship between social/economic inclusion and sustainable economic 

growth. The demonstration model attempts to give more specificity to the relationship between social/economic 

inclusion  and  sustainable  growth.  Also,  the  demonstration  logic  model  makes  a  distinction  between 

administrative and  institutional reform, positing that administrative reform  is a precondition of key  institutional 

EXAMPLE– How an Existing Consolidated Indicator Might Be “Unpacked” or Reflected at Project Level 

 Consolidated Indicator:  #/total of birth attendants trained in emergency obstetrical care (F/M). 

A program may have three different projects, each with a different indicator related to the training of midwives: 

 Project A: #/total of midwives trained in the management of common complications during 

delivery in country X (f/m) Project B: #/total of midwives that received refresher training on how to recognize signs of more 

severe complications in country Y (f/m) Project C: #/total of nurse practitioners trained in emergency obstetrics (f/m) 

 In this case, for the purposes of rolling up data against a common agency standard, DFATD created 

the consolidated program‐level indicator:  #/total of birth attendants trained in emergency obstetrical care (F/M). 

Page 47: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

41 

 

reform  such  as  governance  improvement  or  service  to  the  public.  These  hypothesized  relationships  between 

expected results must be first rooted in the current literature and the practice of donors and ISAs70.   

Once  this  is done,  the  categorization of current Fund project  results, using  the new  logic model and  theory of 

change,  is  carried  out,  providing  “bottom‐up”  validation.  In  addition,  as mentioned  earlier,  consensus  results 

indicators will need  to be developed  for  the  logic model. These will  form  the basis of  results  framework  to be 

developed per area of work, i.e. pillar. 

In order to reduce reporting burden, several implementation strategies can be employed. To posit two examples: 

1. Choice: Projects are given a choice of common,  fund‐level  indicators  from which to choose and against 

which they must report (i.e. a menu); 

2. Prioritization:  Careful  selection  of  which  indicators  projects  have  to  report  on  frequently  and  which, 

because  of  their  slow‐changing  nature  (i.e.  intermediate  outcomes  or  impacts), will  only  need  to  be 

reported on at  the end of  the project.  In  the  case of  slow‐changing  indicators, only  require  subjective 

evaluations  (Satisfactory/Unsatisfactory)  of  progress;  Reserve measurement  of  slow‐changing,  higher 

level results (such as catalytic effects) at fund‐level for evaluations; 

In  addition  to  the  above,  the  “hybrid  approach”,  to  some  degree,  relies  on  subjective  evaluations  of  results 

progress  at  project  level  and  therefore  project‐level  audits  should  likely  be  conducted  to  verify  the  subjective 

evaluations. Furthermore, as was noted, slower‐changing  fund‐level results at outcome and  impact  level should 

likely be measured less frequently, as there is a lag in effect. A related issue is the use of evaluation at project level. 

A RoTI approach71 as per the GEF, focusing on key issues, can provide some indications of impacts at fund‐level. 

4.5. Others 

Possible  interesting  resources  to consult,  if decided  to move  forward  in developing a Macro Framework  for  the 

Fund, are posited below: 

The WB’s Approach  to Public Sector Management  (2011‐2020), which  is  interested  in how  to 

support delivery of reforms; 

High Level  Forum on Aid Effectiveness  in Busan  (2011)  and  the Cairo Consensus on Capacity 

Building  (2011),  which  set  internationally  agreed  frameworks  for  strengthening  capacity 

development  through  technical  assistance  which  emphasizes  the  importance  of  country 

ownership, transparency and knowledge transfer. 

Other  case  studies:  Central  Asia  Regional  Economic  Cooperation  (CAREC)  Program72,  EU 

Platform on Blending. 

 

 

   

                                                                          70 It is recognized that this represents a significant step and one which may not find extensive support. 

71 Please refer to GEF EO. (2009). The RoTI Handbook: Towards enhancing the impacts of environmental projects, Methodological 

Paper #2. 72 Please refer to http://www.carecprogram.org/index.php?page=carec‐results‐framework to see CAREC’s three  levels Results 

Framework. 

Page 48: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

42 

 

ANNEX 1. METHODOLOGY 

This  independent Feasibility Assessment was carried out from Mid‐February to April 2014. The following section 

describes the assessment questions, approach and methods, and examines some constraints and limitations. 

The approach and methodology presented  in this Annex are also of utmost  importance to clarify and determine 

the scope of the mandate. These have been presented and discussed during early stages with the CU’s Program 

Manager. 

Approach & Questions 

In relation to the objectives mentioned in the main report, the following aspects were covered: the current project‐

specific  results  framework;  the motivation and  challenges  for establishing a Macro Framework  for  the Fund; a 

review of best practices in funds of similar nature, and; the main options and key next steps in establishing a Macro 

Framework for the Fund. 

A general introduction to each of these and some sample core questions are presented below: 

The current project‐specific results framework: An assessment and mapping of the status quo, 

in  order  to  identify  the  strengths  and  weaknesses  of  the  processes  associated  with  the 

monitoring and reporting function of the Fund; 

o What are the results that are currently targeted and measured through the Fund? 

o How and when is data collected by the CU? By individual ISAs? 

o What  is  the  capacity  of  implementing  partners  to  conduct M&E  of  their  individual 

projects, data gathering information technology (IT) systems in place (or not), etc.? 

Motivation and  challenges: An assessment of  the extent  to which a Macro Framework  could 

meet the objectives set forth by the stakeholders working with the Fund and would be consistent 

with  requirements,  needs,  priorities,  and  partners’  and  donors’  policies.  This  refers  more 

specifically to the opportunities, challenges, and risks. 

o What do stakeholders  involved  in the Fund see as possible benefits and challenges for 

establishing a Macro Framework? What do stakeholders  involved  in  the Fund suggest 

about the possible motivations for establishing a Macro Framework? What would be the 

value (or lack thereof) for it?  

o What are  (or could be) the strengths of having a Macro Framework when managing a 

fund?  

o What are (or could be) the weaknesses of having a Macro Framework when managing a 

fund?  

Review of best practices in funds of similar nature: A brief study of the options, challenges and 

risks based on the experience of funds of similar nature. 

o How do these funds operate  in terms of monitoring and reporting? What are the M&E 

systems in use? 

o Where evidence exists, how effective is their framework? What are the challenges? 

o How could each option be used  in the context of the MENA Transition Fund (i.e. what 

can we learn)? 

Page 49: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

43 

 

Based on answers to the previous questions and the assessment made, the recommendations – which will be more 

fully exposed in the final report ‐ will cover the following aspects: 

What  recommendations  can  be made  on  the way  forward? Where  are  the  opportunities  and 

where  is  the  resistance? What are  the pitfalls and what are  the key success  factors  in  the way 

forward? 

What options is there for the MENA Transition Fund?  

What  are  the main  steps  required  for  creating  a Macro  Framework  for  the MENA  Transition 

Fund? 

Matrix 

The main element guiding the Feasibility Assessment approach and methodology is the matrix, which is presented 

below at the end of this Annex. The matrix links overall questions to more detailed sub‐questions distilled from the 

TORs, which would be measured  through  the different data gathering and analysis methods and  from varying 

data sources, as presented in the following sub‐sections. 

Methods 

The  two  main  data  gathering  and  analysis  method,  or  lines  of  inquiry  for  the  Feasibility  Assessment  were 

document review and  interviews with key stakeholders.  In very rare cases, surveys were sent to stakeholders to 

replace  the  interview  and  to  accommodate  informants.  Everyone  involve with  the  Fund was  contacted:  TCs, 

donors, and  ISAs,  the CU. Key  focal points  in each  country and at each  ISA were provided by  the CU and  the 

consultant reached to all of them. However, not all of them responded. 

Document Review 

The document  review was  the  first  step  in  the mandate  and  allowed  the  consultant  to prepare  for  interviews. 

Further document were also gathered from the  interviews. A complete  list of document reviewed by consultant 

can be found in Annex 3. 

Interviews 

Significant time has been spent in conducting interviews with members of the SC. These included representatives 

of TCs, donors, and  ISAs. Stakeholders were contacted mostly through telephone/Skype  interviews. A complete 

list of persons interviewed during the Feasibility Assessment can be found in Annex 4. 

Key Deliverables and Calendar of Activities 

Deliverables/Key Activities  Date of Submission  

Kick off Conference Call  February 12, 2014 

Interview with Key Informants  February 24 to March 28, 2014 

First Draft Report  The week of April 7, 2014 

WB/CU Comments on 1st Draft Report  By April 14, 2014 

Second Draft Report  By April 25, 2014 

WB/CU Comments on 2nd Draft Report  By April 28, 2014 

Final Report  By May 1, 2014 

 

Page 50: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

44 

 

EVALUATION QUESTIONS AND SUB-QUESTIONS INDICATORS DATA COLLECTION METHODS

SOURCES OF INFORMATION

1. Management/Operations Overview What are the results that are currently targeted and measured through the MENA Transition Fund?

Document Review

MENA Transition Fund Operation Manual Progress Reports submitted ISAs policies and procedures (Financial Procedures Agreements (FPAs) signed with recipient entities)

Interviews Recipient entities ISAs Coordination Unit Trustee Steering Committee

2. Efficiency: How effective is the current project-oriented results framework of the Fund?

Costs/Resource Allocation Demonstrating Results/Impact Simplicity/Users Satisfaction

2.1. Efficiency of Resource Allocation and Utilization How and when (frequency) is data collected? Who is involved (i.e. how many persons/for how many days)?

Interviews Recipient entities ISAs Coordination Unit Trustee

Do you consider that the project have access to appropriate financial resources to report and conduct M&E appropriately/according to the agreements signed/set forth in the MENA Fund Operation Manual? What is the ratio of resources invested in M&E to date versus those planned?

Interviews Recipient entities ISAs Coordination Unit Trustee Steering Committee

2.2. Efficiency in Demonstrating Results How are indicators defined, and does this vary between ISA? Do definitions vary by country?

Interviews ISAs

To what extent do the current annual/progress reports provide a picture of results/progress at the macro level? What do these annual/progress reports say about the MENA Transition Fund impact? What could the annual/progress reports have said about the MENA Transition Fund impact? How can these documents be revised /enhanced to better allow for capturing effects at a more macro level?

Document Review MENA Transition Fund Annual Report Interviews Coordination Unit

Steering Committee

2.3. Simplicity/User-friendliness Do the modalities and M&E procedures constitute challenges? Interviews Recipient entities

ISAs Are the definitions of roles in terms of M&E and management clear? How do individual ISAs and transition countries use the results data in their respective work programs and strategies? How do the results influence policy decisions/actions?

Interviews Recipient entities ISAs

Would you have any recommendation to improve the efficiency of the M&E process (both in terms of costs and utilisation of findings generated)?

3. Relevance What do stakeholders involved in the MENA transition Fund suggest about the possible motivations for establishing a macro/results framework? What would be

Interviews Recipient entities ISAs

Page 51: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

45 

 

the value (or lack thereof) for it? Coordination Unit Trustee Steering Committee

What do stakeholders involved in the MENA transition Fund see as possible challenges for establishing a macro results framework?

Interviews Recipient entities ISAs Coordination Unit Trustee Steering Committee

Would you make any recommendation concerning the future or opportunity to pursue or not the establishment of such macro-aggregate results framework for the MENA Transition Fund?

Interviews Recipient entities ISAs Coordination Unit Trustee Steering Committee

What are the strengths (general, based on the experience of other similar Funds) of having a macro results framework when managing a Fund?

Document Review Studies and Assessments of M&E frameworks and the performance and governance of international funds

Interviews/Surveys Funds targeted for Case Study What are the weaknesses (general, based on the experience of other similar Funds) of having a macro results framework when managing a Fund? Challenges, risks, costs

Document Review Studies and Assessments of M&E frameworks and the performance and governance of international funds

Interviews/Surveys Funds targeted for Case Study Is there value for money of such a macro-aggregated results framework based on the experience of other similar Funds?

Value added v.s. Costs Extent to which Funds of similar nature uses information generated for decision-making

Document Review Studies and Assessments of M&E frameworks and the performance and governance of international funds

Interviews/Surveys Funds targeted for Case Study 4. Recommendations Opportunities

Threats Resources implications Possible options Next Steps

4.1. What are the prospects for success in establishing a macro results framework for the MENA Transition Fund?

Existing capacity & resistance Costs

To what extent is there sufficient ownership of the process to sustain the implementation of the macro results framework?

Information collected through interviews about “relevance”

Generally speaking, has the Fund planned enough financial resources to cover recurring costs of this macro results framework?

Interview Coordination Unit Steering Committee Trustee

4. What recommendations can be made on the way forward regarding structuring and implementing a macro-aggregate results framework?

IT system requirements Main actions required/Next Steps

What capability exists to set up cost-efficient IT-systems? What do other Funds of similar nature use as IT-system? With what costs?

Interview Funds targeted for Case Study WB IT staff

Document Review Similar Funds website What are the main steps required for creating a macro/aggregate results framework for the MENA Transition Fund?

Document Review Funds targeted for Case Study Interviews RBM & M&E experts

What are the pitfalls in the development of a macro/aggregate results framework for the MENA Transition Fund? What are the key success factors?

Page 52: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

46 

 

ANNEX 2. GLOSSARY73 

Term  Definition 

Activity  Actions  taken  or  work  performed  through  which  inputs,  such  as  funds,  technical assistance and other  types of  resources are mobilized  to produce specific products and services 

Activity indicator  Measure what  happens  during  implementation. Often  they  are  expressed  as  a  set  of completion or milestone events taken from an activity plan, and may measure the time and/or  cost  required  to  complete  them  (examples:  date  by  which  building  site  is completed, cost of developing textbooks) 

Beneficiary  The  individuals, groups, or organizations, whether targeted or not, that benefit, directly or indirectly, from the development intervention. 

Country evaluation  Evaluation of one or more donor’s or agency’s portfolio of development  interventions, and the assistance strategy behind them, in a partner country. 

Evaluation  The systematic and objective assessment of an on‐going or completed project, program or policy,  its design,  implementation and results. The aim  is to determine the relevance and  fulfillment  of  objectives,  development  efficiency,  effectiveness,  impact  and sustainability.  An  evaluation  should  provide  information  that  is  credible  and  useful, enabling the  incorporation of  lessons  learned  into the decision–making process of both recipients and donors. Evaluation also refers to the process of determining the worth or significance of an activity, policy or program. An assessment, as systematic and objective as possible, of a planned, on‐going, or completed development intervention. 

Impact  Positive  and  negative,  primary  and  secondary  long‐term  effects  produced  by  a development intervention, directly or indirectly, intended or unintended. 

Impact indicator  Measure  the  longer‐term  and more widespread  development  changes  in  the  society, economy or environment to which the project contributes. Often these are captured via national sector or subsector statistics (examples: reductions in percent of the population living  below  the  poverty  line,  declines  in  infant  mortality  rates,  reductions  in  urban pollution emission rates) 

Indicator  A  variable  that  allows  the  verification  of  changes  in  the  development  intervention  or shows results relative to what was planned 

Input  The financial, human, and material resources used for the development intervention 

Input indicator  Measure  quantities  of  physical,  human  or  financial  resources  provided  to  the  project, often expressed  in dollar amounts or amounts of employee  time  (examples: number of machines procured, number of  staff‐months of  technical  assistance provided,  levels of financial contributions from the government or co financiers) 

Lessons learned  Generalizations based on evaluation experiences with projects, programs, or policies that abstract  from  the  specific  circumstances  to  broader  situations.  Frequently,  lessons highlight strengths or weaknesses in preparation, design, and implementation that affect performance, outcome, and impact. 

Logical Framework  Management tool used to improve the design of interventions, most often at the project level.  It  involves  identifying strategic elements  (inputs, products and services, expected results,  impact) and  their  causal  relationships,  indicators, and  the assumptions or  risks that  may  influence  success  and  failure.  It  thus  facilitates  planning,  execution  and evaluation of a development intervention. 

Milestone  A significant point or event in the project 

                                                                          73 OECD. (2002). Glossary of Key Terms in Evaluation and Results Based Management. 

Page 53: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

47 

 

Monitoring  A continuing  function  that uses systematic collection of data on specified  indicators  to provide  management  and  the  main  stakeholders  of  an  ongoing  development intervention with indications of the extent of progress and achievement of objectives and progress in the use of allocated funds. 

Outcome  The likely or achieved short‐term and medium‐term effects of an intervention’s products and services. The post‐intervention state of the target group or the social conditions that an intervention is expected to have changed 

Outcome indicator  Measure  relatively  direct  and  short‐to‐medium  term  effects  of  project  products  and services on intermediary organizations or on the project beneficiaries (clients, customers) ‐‐  such  as  the  initial  changes  in  their  skills,  attitudes,  practices  or  behaviors.  Often measures of the clients’ preferences and satisfaction with product/service quality are also considered as expected results (example: percent of clients satisfied with quality of health clinic services) 

Output  The products, capital goods and services which result from a development  intervention; may  also  include  changes  resulting  from  the  intervention  which  are  relevant  to  the achievement of expected results. 

Output indicator  Track the most immediate results of the project ‐‐ that is, the physical quantities of goods produced or services delivered (examples: kilometers of highway completed, number of classrooms built) 

Program  A development program  is a  time bound  intervention  involving multiple activities  that may cut across sectors, themes and/or geographic areas 

Project evaluation  Evaluation  of  an  individual  development  intervention  designed  to  achieve  specific objectives within  specified  resources  and  implementation  schedules,  often within  the framework of a broader program. 

Results  The output, outcome or  impact  (intended or unintended, positive and/or negative) of a development intervention 

Results chain  The  causal  sequence  for  a  development  intervention  that  stipulates  the  necessary sequence to achieve desired objectives beginning with  inputs, moving through activities and products and services, and culminating in expected results, impacts, and feedback.  

Sector evaluation  Evaluation of  a  cluster of development  interventions  in a  sector within one  country or across countries, all of which contribute  to  the achievement of a  specific development goal. 

Stakeholder  Agencies, organizations, groups or individuals who have a direct or indirect interest in the development intervention or its evaluation. 

Thematic evaluation  Evaluation of  a  selection of development  interventions,  all of which  address  a  specific development priority that cuts across countries, regions, and sectors. 

 

   

Page 54: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

48 

 

ANNEX 3. LIST OF DOCUMENTS REVIEWED 

General Documentation about the MENA Transition Fund and the DP 

(2011). Deauville Partnership. IFI Statement. 

 (2013). MENA Transition Fund Fourth Steering Committee Meeting December 4 ‐ 5, 2013 (Brussels, Belgium). Meeting 

Minutes. 

DFID. (n.d.) Business Case and Intervention Summary. Middle East and North Africa (MENA) G8 Deauville Transition 

Fund. 

G8 Research Group. (2013). 2012 G8 Camp David Final Compliance Report. 

G8  UK.  (2013).  The  Deauville  Partnership  with  Arab  Countries  in  Transition  open  economies,  inclusive 

growth.[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/183533/DP_pamphlet_FS

__SOS___CH_signoff.pdf]. 

G8 UK. (2014). The Deauville Partnership with Arab Countries in Transition. Progress Report 2013. 

IMF.  (2013). Arab Countries  in Transition: Economic Outlook and Key Challenges. Deauville Partnership Ministerial 

Meeting April 19, 2013 Washington DC. 

MENA Transition Fund. (2013). Terms of Reference. Feasibility Assessment on Creating a Macro Results Framework 

for the Deauville Partnership’s Transition Fund. 

MENA Transition Fund. (2013). MENA Transition Fund Operations Manual. 

MENA Transition Fund. CU. (2013). MENA Transition Fund Project Progress Report. 

MENA  Transition  Fund.  CU.  (2013).  MENA  Transition  Fund  Annual  Report  December  31.  2013. 

[https://www.menatransitionfund.org/sites/mena_trans_fund/files/documents/MENA%20Transition%20Fund%20

Annual%20Report%20December%202013%20FINAL.pdf]. 

MENA Transition Fund. Trustee. (2013). Financial Report. 

MENA‐OECD  Investment Programme.  (2013). Challenges  for  Investment, Growth and  Job Creation  in  the MENA 

Region: Consequences for the MENA‐OECD Investment Programme. PPT. 

 

Documents Collected through Interviews  

DFATD. (n.d.) Master Slide EDRMS No. 6065211. 

DFATD. Coherence Division‐RBM Technical Unit. (2014). GPB Tip Sheet. DFATD Consolidated Indicators. 

DFATD. (2014). MENA Transition Fund: a proposal for the clustering of projects. Unpublished. 

DFATD. (2014). CIDA PAD – Annex B:  Logic Model for Mena Transition Fund. Unpublished. 

Ministry  of  Foreign  Affairs.  DANIDA.  TAS  Department.  (2013).  Danish  Arab  Partnership  Programme.  MENA 

Transition Fund. Desk Appraisal Report. 

 

 

Page 55: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

49 

 

Documents Related to the ISAs 

AfDB.(n.d.). MOPAN Management Response (Draft 23 November). 

AfDB. (2008). Multilateral Development Banks’ Common Performance Assessment System 2007 Report. 

AfDB. (2011). Monitoring and evaluation frameworks and the performance and governance of international funds. 

AfDB. Quality  Assurance  and  Results  Department  (ORQR).  (n.d.).  AfDB’s  Action  Plan  for Quality  and  Results: 

Recent Progress Communicating for and about Results. PPT. 

AfDB. Quality Assurance and Results Department (ORQR). (2010). Bank Group Results Measurement Framework. 

AfDB. Quality Assurance and Results Department (ORQR). (2012). Staff Guidance on Project Completion Reporting 

and Rating. 

AfDB. North Africa Regional Department (ORNA) Department. (2012). The Bank Group’s Participation in the Middle 

East And North Africa Transition Fund. 

BESLEY, T., DEWATRIPONT, M. & GURIEV, S. (n.d.). Transition and transition impact. A review of the concept and 

implications for the EBRD. 

BINNENDIJK,  A.(2000).  Results  Based  Management  in  the  Development  Co‐Operation    Agencies:  A  Review  of 

Experience. Background Report. 

DFID. (2011). Multilateral Aid Review: Assessment of International Finance Corporation (IFC). 

DFID.  (2013).  Multilateral  Aid  Review  ‐  Update  2013  progress  rating:  European  Bank  for  Reconstruction  and 

Development (EBRD). 

EBRD. Office of the Chief Economist. (2009). Transition Impact Retrospective: Results of EBRD Operations 2005 to 

2009. 

EIB. (2013). Measuring development results. The EIB Results Measurement (ReM) framework. 

EIB. (2012). Report on results of EIB operations outside the EU. 

IFC. (n.d.). DOTS Indicator Framework. 

IFC. (2012). IFC ROAD MAP FY13‐15. Creating Innovative Solutions in Challenging Times. 

Multilateral  Organisation  Performance  Assessment  Network  (MOPAN)  Secretariat.  (2012).  Performance 

Assessment  of  Organisational  Effectiveness  and  Reporting  on  Development  Results.  African  Development  Bank 

(AfDB). Volume I. 

Multilateral  Organisation  Performance  Assessment  Network  (MOPAN)  Secretariat.  (2012).  Performance 

Assessment of Organisational Effectiveness and Reporting on Development Results. World Bank. Volume I. 

World Bank. (n.d.). The World Bank Operations Manual. 

 

Documents Reviewed for Case Studies 

 

De Crombrugghe, D., et al. (2009). Peer Review: the Evaluation Function of the Global Environment Facility (GEF), 

Final Report. 

Page 56: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

50 

 

DFATD. (2014). MENA Transition Fund Results Feasibility Study: Questions and Answers for an Interview with Baastel 

Ltd. Unpublished. 

EuropeAid. (2011). Neighbourhood Investment Facility (NIF). PPT Presentation. 

GAFSP. (2009) Framework Document for a Global Agriculture and Food Security Program (GAFSP). 

GASFP. (2011). Fact Sheet: GAFSP Public Sector Window. 

GAFSP. (2011). Monitoring and Evaluation Plan. 

GAFSP. (2013). GAFSP Annual Report. 

 GEF.  (2005).  Project  Implementation  Review  2004  –  Overview  Report  –  World  Bank. 

[http://www.thegef.org/gef/sites/thegef.org/files/documents/GEF.C.25.ME_.Inf4_.pdf]. 

GEF. (2010). Focal Area Framework and LDCF/SCCF Framework. Excerpts from GEF‐5 Programming Document at the 

Sixth Meeting for the Fifth Replenishment of the GEF Trust Fund, April 7, 2010. 

GEF. (2010). M&E Policy. 

GEF. (2011). GEF‐5 Tracking Tool for Biodiversity Focal Area. 

GEF. (2012). Annual Performance Report: 2012. 

GEF  EO.  (2007).  Final Report  on  a Proposed Approach  to GEF  Impact Evaluation.  Impact  Evaluation  Information 

Document No. 2. 

GEF  EO.  (2009).  The RoTI Handbook:  Towards  enhancing  the  impacts  of  environmental  projects, Methodological 

Paper #2. 

GEF EO. (2012). Annual Thematic Evaluations Report (2012). 

IDB. (2012). Project Implementation Report (PIR) FY2012. 

Le Groupe‐conseil baastel ltée. (2005). Overview of Monitoring Approaches in the GEF Family.  

Le Groupe‐conseil baastel ltée. (2008). Catalogue of Results‐Based Management Practices of Key Organizations. 

NIF. (2013). Activity Report: 2008‐2012 Overview of Activities. 

NIF. (2013). Mid‐Term Evaluation of the Neighbourhood Investment Facility under the European Neighbourhood and 

Partnership Instrument (ENPI) 2007‐2013. 

Pérez del Castillo, Carlos (GEF). (2009) OPS4 Technical Document # 5: Governance of the GEF. 

Vivideconomics. (2011). Monitoring and evaluation frameworks and the performance and governance of international 

funds. 

VOLONTE, C. (GEF EO). (2011). The GEF M&E Policy. PPT Presentation. 

 

Sitography 

EBRD. (2010). Measuring transition impact. [http://www.ebrd.com/pages/research/analysis/impact.shtml]. 

EC.  (2013).  Development  and  Cooperation  –  EuropeAid.  Promoting  investment  through  the  Neighbourhood 

Investment  Facility  (NIF).  [http://ec.europa.eu/europeaid/where/neighbourhood/regional‐

cooperation/irc/investment_en.htm]. 

Page 57: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

51 

 

GASFP. (2011). GAFSP Website. [http://www.gafspfund.org/]. 

GEF. (2013). GEF Website. Investing in our Planet. [http://www.thegef.org/gef/]. 

GEF EO. (2013). Independent Evaluation Office Website. [http://www.thegef.org/gef/eo_office]. 

IFC.  (2014).  IFC  Development  Results  and  Impact. 

[http://www.ifc.org/wps/wcm/connect/Topics_Ext_Content/IFC_External_Corporate_Site/IDG_Home/Monitoring_

Tracking_Results/DOTS_Investment/]. 

MENA Transition Fund. (2013). MENA Transition Fund Website. [https://www.menatransitionfund.org/] 

The White House. Office of the Press Secretary.  (2012). Fact Sheet: G‐8 Action on the Deauville Partnership with 

Arab  Countries  in  Transition.  [http://www.whitehouse.gov/the‐press‐office/2012/05/19/fact‐sheet‐g‐8‐action‐

deauville‐partnership‐arab‐countries‐transition]. 

US  Department  of  State.  (n.d.).  Deauville  Partnership  with  Arab  Countries  in  Transition. 

[http://www.state.gov/e/eb/ecosum/2012g8/deauville/]. 

WB. (2011). Financial Intermediary Funds. [http://fiftrustee.worldbank.org/index.php?type=page&ft=fifoverview]. 

 

Newspaper 

EBRD.  (2014).  EBRD  to  lead  the  IFI  Coordination  Platform  of  the  Deauville  Partnership  in  2014. 

[http://www.ebrd.com/pages/news/press/2014/140106.shtml]. 

European  Commission.  (2012).  EU  launches  new  Platform  for  blending  funds  in  external  cooperation. 

[http://ec.europa.eu/europeaid/news/2012‐12‐12‐platform‐blending‐funds_en.htm]. 

G8 Information Centre. (2012). Fact Sheet: G‐8 Action on the Deauville Partnership with Arab Countries in Transition. 

[http://www.g8.utoronto.ca/summit/2012campdavid/g8‐transition‐factsheet.html] 

 

Others 

(2013).  Memorandum  regarding  IFIs  Harmonized  Development  Results  Indicators  for  Private  Sector  Investment 

Operations. 

DFID. (2011). Briefing Note Indicators and VFM in Governance Programming. 

EuropeAid. DG DevCo. (2013).Results Study. 

OECD.  (2002).  Glossary  of  Key  Terms  in  Evaluation  and  Results‐Based  Management. 

[http://www.oecd.org/dac/evaluation/2754804.pdf]. 

ZALL KUSEK, J. & R. C. RIST. (2004). Ten Steps to a Results‐Based Monitoring and Evaluation System. A Handbook 

for Development Practitioners. 

Page 58: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

  52   

 

ANNEX 4. LIST OF PERSONS 

MET/INTERVIEWED 

Donors 

Country  Organization  Name  Position 

Canada  DFATD 

Gina Watson  Deauville Partnership Coordinator 

Yvetta Pass  Manager,  Results‐Based  Management Technical Unit 

François‐Philippe Dubé  Analyst, Policies and Planning, Europe and Middle East Bureau Development 

Andrew Spezowka  Director, a.j. Food Security Division, Global Issues and Development Branch 

Denmark Ministry of Foreign Affairs of Denmark 

Pernille Mortensen  Head  of  Section,  Department  For Middle East And North Africa 

Jørgen Georg Jensen  Advisor 

France 

Ministry of Finance and Industry 

Cécile Pot  Deputy 

Ministry  of  Economy and Finance 

Stephane Tabarie  Civil  Administrator,  Treasury  Directorate General 

Kuwait  Ministry of Finance  Ishaq Abdulkarim  Director,  International  Economic  Co‐operation Department 

Saudi Arabia  Saudi  Fund  for Development 

Fahad A. Alnowaiser  Director General of Export Credit Dept 

Turkey  Undersecretariat  of Treasury 

Zafer Düzenli  Senior Treasury Expert 

DG  for  Foreign  Economic  Relations, Multilateral  Development  Banks  and Economic Co‐operation Department 

UAE  Ministry of Finance  H.E.Younis Alkhoori  Undersecretary 

UK  DFID 

Helen Winterton  Head,  Middle  East  and  North  Africa Department  

Tim Williams  Senior  Governance  Adviser,  Middle  East 

Page 59: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

  53   

 

Country  Organization  Name  Position 

and North Africa Department 

US US Treasury and International Affairs 

Andrew Baukol  Deputy   Assistant Secretary  for Africa and Middle East 

Mary Svenstrup  Deputy Director, Middle East Office 

Elizabeth Shortino  Director for Middle East North Africa 

 

ISAs 

Organization  Name  Position 

AfDB  Jabob Kolster  Regional Director for North Africa 

EBRD 

Adrian Keler  Principal Manager, Donor Co‐Financing 

Frederic  Lead, Transition Team 

Akhil Patel  RBM Expert 

Alan Rousso  Managing Director for External Action and Political Affairs 

EIB  Julien Serre  Policy and Strategy Advisor 

IFC  Luke Haggarty  Regional Head, IFC Advisory Services, Middle East and North Africa 

IMF  Mark Horton  Assistant Director, IMF Middle East and Central Asia Department 

IsDB  Amadou  Thierno Diallo 

Director, Office of the Vice President Operations 

OECD Andreas Schaal  Head of Sherpa Office 

Nejla Saula  Legal Adviser at the OECD Sherpa Office 

World Bank (WB) 

Preeti S. Ahuja  Manager, Development Effectiveness, MENA region 

Fareeba Mahmood  Senior Operations Officer (MNADE) 

Franck Bousquet  Coordinator, MENA region 

Victoria Gyllerup  Operations Officer, Development Effectiveness, MENA region 

 

 

Page 60: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

  54   

 

TCs 

Country  Organization  Name  Position 

Jordan 

Ministry  of  Planning  and International Cooperation 

Saleh Al‐Kharasbeh  Secretary General 

Zeina Toukan  Director  of  International Cooperation 

Morocco  Ministry  of  Economy  and Finance 

Abderrazak Yassir  Director,  Treasury  and  External Finance 

Tunisia  Ministry  of  Development  and International Cooperation 

Kalthoum Hamzaoui  General  Director  of  Multilateral Cooperation 

Yemen  Ministry  of  Planning  & International Cooperation 

Mohammed AlHawri  Deputy Minister 

 

CU 

Organization  Name  Position 

World Bank 

Hayat Al‐Harazi  Program Officer, MENA 

Yogita Mumssen  Program Manager, MENA 

Jonathan Walters  Director, Regional Programs & Partnership, MENA 

Pauline Zwaans  Operations Officer, AES 

 

 

   

Page 61: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

  55   

 

ANNEX 5. ADDENDUM 

The following represents DFATD’s clarification on its initial conception of a Project Cluster/Nesting Model. 

Parallel Nesting Model 

The  DFATD model  is  a  parallel  nesting model.  The  draft  results  feasibility  assessment  for  an  overall  results 

framework document portrays this model as  if  it were a  linear model where projects feed upward to the macro 

results  framework  (refer  to  figure  7  in  the main  report), whereas  in  the DFATD nesting model, project  results 

frameworks relate to the macro results framework in parallel as follows:  

The ultimate outcome  (impact) of the project would be a more granular expression of the ultimate outcome 

(impact) of the fund. In other words, the meaning of the ultimate outcome does not change. At the project level 

and fund  level, we are talking about a change  in state for beneficiaries,  ie.,  improving the  life of people. Except 

that  at  the  project  level,  the  ultimate  outcome  describes  an  improvement  of  the  life  of  the  specific  project 

beneficiaries (improved life of the people in the geographic location of the project), where as a the fund level, the 

ultimate  outcome  describes  improvement  of  beneficiaries  of  a  portfolio  of  projects  in  the  same  sectoral  or 

thematic area (improved lives of people in five geographic locations).  

The intermediate outcome (outcome) of the project would be a more granular expression of the intermediate 

outcome (outcome) of the fund. In other words, the meaning of the intermediate outcome (outcome) does not 

change. At the project  level and fund  level, we are talking about changes  in performance, behavior, practice or 

even  access.  Except  that  at  the  project  level,  the  intermediate  outcome  describes  an  improvement  in  the 

performance, practice, and behavior of the intermediaries (e.g., ministry, etc.) directly associated with a specific 

project.  Whereas  at  the  fund  level,  the  intermediate  outcome  describes  broader  changes  in  performance, 

behavior, and practice for intermediaries of a portfolio of project in the same sectoral or thematic area.  

The output of the project would be a more granular expression of the output  in the  fund.  In other words, the 

meaning of the outputs does not change. At the project  level and fund  level, we are talking about products and 

services, for example technical assistance provided. Except that at the project level you would specify what type 

of technical assistance.  

Figure 19. Nesting Model Linkages ‐ DFATD's Model 

 

Page 62: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

“Creating a Macro Results Framework for the Middle East and North Africa Transition Fund” Final Report Appendix 

 

  56   

 

Indicators 

The report only focuses on the consolidated  indicator  idea from our tip sheet on how to select  indicators at the 

program level. However, our criteria for selecting indicators at the program (fund level) includes guidance on how 

to strategically selected other indicators from the project level. This includes identifying common indicators, that 

are being used  to develop standards, such as a menu of commonly used  indicators. Usually  if you have several 

projects trying to achieve similar changes in different countries, you will find one or two indicators that are more 

or  less the same.  In the case of consolidated  indicators, please note that there are no consolidated  indicators at 

the project level. Consolidated indicators are created at the fund level. They are based on project level indicators.  

In addition the pyramid diagram on consolidated  indicators (page 36 of the Appendix) that came from our  input 

misrepresents  the  concept.  In  referring  to  a  consolidated  indicator  at  the meso  level,  a  link must  be  created 

between a consolidated  indicator at  the meso  level  to several  (for example, 2‐3  indicators) at  the project  level. 

However, there are other issues with the pyramid as presented, such as the mixing of levels, treating the projects 

as  if they were  leading to an  immediate outcome at the meso  level, which  is not the case.  In other words every 

indicator  in  the pyramid  is at  the same outcome  level,  for example,  intermediate outcomes at project  (micro), 

program (meso) and corporate level (macro). Since in the context of the fund, they only have two layers ‐ micro 

and macro, it would be a two layered pyramid. The diagram in the report is adapted from the following diagram: 

Figure 20. Diagram Illustrating Different Requirement for Indicators & their Data at Different Levels (Simplified)74 

 

The DFATD parallel nesting model requires a full  indicator selection menu to be effective. This  is explained  in a 

document that we provided to the consultant as way of explaining the DFATD nesting model in its entirety. 

                                                                          74 DFATD. Master  Slide  EDRMS  No.  6065211.  Adapted  from  diagram  found  in:  http://www.qp.org.nz/monitoring/monitor‐

tools.php. 

Page 63: Baastel Macro Results Framework Assessment Appendix Final · 2018-04-27 · AFESD Arab Fund for Economic and Social Development AMF Arab Monetary Fund AS ... OECD Organization for

 

 

 

Founded in 1989, Baastel’s mission is to provide decision‐makers, managers and implementation partners with the knowledge, tools and skills necessary to promote effective and efficient sustainable development. Baastel has earned its reputation as a consultancy 

firm fully committed to providing sound advice to development partners on how to strengthen the impacts of their policy and development efforts around the world 

                               North American Office 85 Victoria Street  Gatineau QC J8X 2A3 CANADA  Tel: + 1 819 595‐1421  Fax: + 1 819 595‐8586  European Office  Le Groupe‐conseil baastel sprl  Rue de la Croix de fer 23, 1° B‐1000 Brussels  BELGIUM  Tel: + 32 (0)2 893 0032  Fax: + 32 (0)2 503 3183      

www.baastel.com