b~ l- th, - national horticulture boardnhb.gov.in/guideline/ic 19th july2013.pdf1) mrs. swati arvind...

62
i , " I, .-.l '" 'J f' National Horticulture Board Ministry of Agriculture,Government of India, Plot No.85, Sector 18, Institutional Area, Gurgaon- 122 015 (Haryana) Ph. 0124-2342992,Fax: 2342991; 2341225 Website: www.nhb.gov.in NHB/CC/2 nd IC/20 13-14/ 7 b~ rjD L- Office Memorandum August 5 th , 2013 ~D ForManagfnb-Director Subject: Proceedingsof the 2 nd meeting of the Internal Committee(IC) of the National Horticulture Board held on 19.07.2013, in NHB, Head Quarters, Gurgaon, at 10.30 am- Reg. Please find enclosed herewith a copy of the proceedings of the 2 nd meeting of the Internal Committee(IC) of the National Horticulture Board held on 19.07.2013 under the Chairmanship of Managing Director, NHB. Distribution: 1) All Area OfficersjJDs 2) JD(F&A) 3) PE.to MD 4) PE to AMD 5) DD(IS) 6) Accounts Officer 7) DDG(Hort.), !CAR, Pusa, New Delhi 8) Dy. Secretary (Fin), IFD, DAC,Krishi Bhawan, New Delhi-110001

Upload: lamnga

Post on 14-Mar-2018

290 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

i,"

I, .-.l '"'J f'

National Horticulture BoardMinistry of Agriculture,Government of India,

Plot No.85,Sector18, Institutional Area,Gurgaon- 122 015 (Haryana)

Ph. 0124-2342992,Fax: 2342991; 2341225Website:www.nhb.gov.in

NHB/CC/2nd IC/20 13-14/ 7b~ rjD L-

Office Memorandum

August 5th, 2013

~DForManagfnb-Director

Subject: Proceedings of the 2nd meeting of the Internal Committee(IC) ofthe National Horticulture Board held on 19.07.2013, in NHB,Head Quarters, Gurgaon, at 10.30 am- Reg.

Please find enclosed herewith a copy of the proceedings of the 2nd

meeting of theInternal Committee(IC) of the National Horticulture Board held on 19.07.2013 under the

Chairmanship of Managing Director, NHB.

Distribution:

1) All Area OfficersjJDs2) JD(F&A)3) PE.to MD4) PEto AMD5) DD(IS)6) Accounts Officer7) DDG(Hort.), !CAR, Pusa, New Delhi8) Dy. Secretary (Fin), IFD, DAC,Krishi Bhawan, New Delhi-110001

Page 2: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

t) National Horticulture Board

I

Minutes of the Meeting of Internal CommitteellC) held on 19.07.2013,,

The 2nd meeting of Internal Committee (IC) during :the durrent financial year was 'held on

19.07.2013 at NHB Headquarter, Gurgaon under the Ch~irmanship of Shri Rajendra KumarTiwari, Managing Director, NHB to consider the projects u~der various schemes of the Board.

The following were present:

1. Shri N.C. Mistry, Add!. Managing Director, NHB '2. Dr. R.K.Sharma, Director .3. Shri P.K.Singh, Joint Director4. Shri Brajendra Singh, Joint Director5. Shri D.P.Singh,Joint Director6. Shri S.c. Jain, Joint Director(F&A)7. Shri Bani Singh, Joint Director8. Dr. Manish Das,Sr. Scientist, ICAR,Delhi9. Shri Hari Singh, Deputy Director10. Dr. R.S.Bhati, Deputy Director11. Shri LalSingh, Deputy Director12. Sh. S.N.Srivastava, Deputy Director13. Dr. K.N. Tripathi, Deputy Director14. Shri Dharam Singh, Deputy Director15. Shri Umed Singh, Deputy Director16. Dr.R.S.Rana, SHO17. Shri 5.5. Nijhar, SHO18. Shri A.K.Mishra,HO

Agenda Item No. I

Proposal under the Scheme "Development of Commercial Horticulture through Productionand Post Harvest Management": - I

(A) Projects considered for sanction of subsidy

Scheme NO.1 "Development of Commercial Horticulture through Production and Post HarvestManagement"

~

1Proceedingsof 2nd Ie meeting held on 19.07.2013

Page 3: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

1) Mrs. Swati arvind Shingade, At/Post - 'Sonkaswadi; Talu'ka - Baramati, Distt - Pune(Maharashtra)

Control No, lOI-27BMHB045460Activity . Cultivation of Carnation under Poly houseArea 1.04 Acres (4160 sqmtrs)Name ofthe Bank Bank of Baroda, Branch - Baramati, Vadujkar villa, Bhigwan

Road, Baramati, Distt. - Pune - 413102 (Maharashtra)Date of Inspection 04,05,2013Project Cost (as per Bank) 67.597 lakhProject Cost (as per JIT) 41.975 lakhTerm loan 50,00 lakhTl% 73.97 %Deduction, if any 3,05 lakhEligible Project Cost 38,925 lakh (Restrict on pro-rata basis to Rs,37.427 lakh for

4000 sqmtrs area)A/C Number 088106000101435ubsidy (25 % of EPC) 9.356lakhDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs, 9.357 lakhs (100% Full & Final) as pernorms,

2

2) Mr. Mahadev laxman Pawar & other 2, Salgaon, Pawar Industries, At/Post - Ajara,Taluka - Ajara, Distt - Kolhapur - 416505 (Maharashtra)

Name of the ProjectControl No, lOI-27BMH1035401 (Old no, MH-135401)Activity Cultivation of Cashew nut 13.50 acresArea 13.50 AcresName ofthe Bank Bank of Maharashtra, Branch - Ajara, At/Post - Ajara, Distt-

Kolhapur - 416505 (Maharashtra)Date of Inspection 11.05,2013Project Cost (as per Bank) 25.350 lakhProject Cost (as per JIT) 12.640 lakhTerm loan 15.00 lakhTl% 59,17 %Deduction, if any 0,15 lakhEligible Project Cost 9,09 lakh (Without cost of Pond & Rs.3.40 lakh)A/C Number 60020514460Subsidy (20 % of EPC) 1.818 lakhDecision Approved, the committee discussed.in details and decided that

EPC and subsidy to be calculated without including cost of"Kuccha Pond". Eligibility of pond for subsidy will be consideredseparately only if promoters undertake polythene lining of pondfor retaining water. At present EPCis Rs. 9.09 lakh and subsidyRS.1.818 lakh (100% Full & Final) as per norms, withoutincluding cost of pond.

~-Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 4: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

4) Mis. Vijay Bedna Processing Unit (Prop, Mr. Laxjan Akaram Patil), Datta Colony,I

Datta Nagar, Near Hotel Pranav, AtlPost - Wasumbe, Tal- Tasgaon, Distt - Sangli(Maharashtra) I.

3) Mis. Shri Khanderaya Grape Growers Co-op. Society ltd., AtlPost - Wayphale, Tal -Tasgaon, Distt - Sangli - 416312 (Maharashtra) I

Control No. LOI-27BMHB045199 I

Activity Setting up of RaisinGrading, Sorting and Cleaning Unit

Capacity 2400 MT/Annum I

Name of the Bank Axis Bank, Branch - Tasgaor1,Tal - Tasgaon, Distt - Sangli(Maharashtra) I

Date of Inspection 27.02.2013 IProject Cost (as per Bank) 69.640 Lakh I

Project Cost (as per JIT) 63.230 Lakh ITerm Loan 47.00 Lakh I

TL% 67.49 % IEligible Project Cost 34.979 Lakh I

A/C Number 912060008034784,912060008034785

Subsidy (40 % of EPe) 13.99 Lakh I

Decision Approved, the comm ittee toted the contents of agenda andapproved Subsidy of Rs. 13.99 Lakhs (100% Full & Final) as pernorms. I

•..•~'t-o.

~

Control No. LOI-27BMHB045251 IActivity Expansion of Existing Pre-c09ling from 5 MT to 11 MT and Plant

. & Machinery for Pack house facility

Capacity 6MT IName of the Bank Sangli District Central Co-op.!Bank Ltd., Main Branch -

Padmabhushan Vasantdada Patil Marg, Karmaveer BhauraoPatil Chowk, 5angli, Ta I - Mir~j, Distt - Sangli - 416416 (MS)

Date of Inspection 18.05.2013 IProject Cost (as per Bank) 44.02 Lakh IProject Cost (as per JIT) 35.39 Lakh I

Term Loan 25.00 Lakh I

TL% 56.79 % IEligible Project Cost 31.30 Lakh IAIC Number 1 Medium term loan I

Subsidy (40 % of EPe) 12.519 Lakh I

Decision Approved, committee notedjthat cost of false ceiling amountingto Rs.3.95 lakh has not been considered because applicant hasavailed MFPI assistance for divil structure and approved Subsidy

• I

of Rs. 12.5191akhs (100% Full & Final) as per norms.

3Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 5: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

I, '

5) Sou. Mangal Shivaji Jadhav, Shri Bandu Shankar Jadhav & Sou. Balika Bandu Jadhav,AtlPost - Bohali, Tal - Pandharpur, Distt - Solapur (Maharashtra)

Control No. . LOI-27BMH1038572 (Old LOI No - 27BMH1138572)

Activity Cultivation of Pomegranate in 14.50 acres

Area 14.50 Acres

Name ofthe Balik Bank of Maharashtra, Branch - Pandharpur, Tal - Pandharpur,Distt - Solapur (Maharas htra)

Date of Inspection 11.03.2013

Project Cost (as per 18.000 Lakh

Bank)Project Cost (as per JIT) 15.221 Lakh

Term Loan 13.50 Lakh

TL% 75.00%

Deduction, if any 1.50 Lakh

Eligible Project Cost 13.720 Lakh

AIC Number 60031055402

Subsidy (20 % of EPe) 2.744 Lakh

Decision Approved, the committee noted the contents of agenda andapproved Subsidy of Rs. 2.744 Lakhs (100% Full & Final) as per

norms.

6) Mr. Sanjay Rajaram Karale (Prop. MIs. Raj Laxmi Agro seedlings), At - ShewalwadiManjari Farm, Behind Marathi School Pune, Tal- Haveli, Distt - Pune - 412307

(Maharashtra)

4

Proceedingsof 2"' Ie meeting held on 19.07.2013

Name of the Project Mr. Sanjay Rajaram Karale (Prop. MIs. Raj Laxmi Agro seedlings),At _Shewalwadi Manjari Farm, Behind Marathi School Pune, Tal -Haveli, Distt - Pune - 412307 (Maharashtra)

Control No. LOI-27BMHB044950.

Activity Setting up of Nursery horticulture crops such as Tomato,Cauliflower, Brinjal, Gerbera

Area 1.50 Acres (6000 sqmt)

Name ofthe Bank ING Vysya Bank Ltd, Branch - Kalyani Nagar, Shop No. S-2, 3, 4 &5 F, Commercial Building, Kalyani Nagar, Distt - Pune - 411013(Maharashtra)

Date of Inspection 08.03.2013

Project Cost (as per 51.860 Lakh

Bank)Project Cost (as per JIT) 42.958 Lakh

Term Loan 35.00 Lakh -C', J..l',-'

Page 6: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

"",iTL% 67.49 % i

Deduction, if any 10.70 LakhEligible Project Cost 32,253 Lakh I

AIC Number 688042000145 ISubsidy (20 % of EPC) 6.450 Lakh IDecision Approved subsidy of Rs.6.45 I~kh (100% Full & Final) after

discussion and decided that prbposal may be placed before MDfor approval of subsidy on file ~fter receipt of followinginformation:- ' 1

(i) Source of planting materialsifor it's quality (ii) Capacity of thenursery (iii) Varieties grown are best one for area for whichopinion of Vegetable Growers /nay betaken. (iv) Find out from, Ithe bank why bank not consid~red the seed cost.

7) Mr. Suresh Hanumant ~alkwad, Plot No. 14, Indraprasth Apparment Bhangarwadl,Lonavala, Taluka - Maval, Distt - Pune - 410401 (MJharashtra)

Control No. LOI-27BMH1030641 (Old LOI No. MH130641):Activity Cultivation of Roseunder Poly ,houseArea 1.00 Acres (4000 sqmtrs) IName ofthe Bank lOBI Bank, Talegaon Dabhade Branch, Namrata Complex, Plot No.

23, Talegaon Dabhade, Talegarln Chakan Road, S. No. 18, Distt. -Pune - 410507 (Maharashtra) I

Date of Inspection 01.06.2013 IProject Cost (as per 42.000 Lakh :

Bank) I

Project Cost (as per JIT) 33.596 Lakh I

Term Loan 31.00 Lakh ITL% 73.81 % IDeduction, if any 3.79 Lakh I

Eligible Project Cost 29.806 Lakh I

AIC Number 677673200000019 ISubsidy (20 % of EPC) 5.961 Lakh IDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs. 5.961 Lakhs (100% Full & Final) as pernorms. I ~

('~:a(3

5Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 7: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

iIJI1

8) Mr. Dhanpal Ramchandra Kabade & Others 2, 1595 - 7, 5awant Vasti, At/Post -Malgaon, Taluka - Miraj, Distt - 5angli (Maharashtra)

Control No. LOI-27BMHB043048Activity Cultivation of Grapes in 9.00 acresArea 9.00 AcresName of the Bank IDBI Bank, Branch - Sangli, Vyankatesh Embassy, Opp. Sangli lila

Parishad Tal- Miraj, Distt - Sangli - 416416 (Maharashtra)Date of Inspection 27.02.2013Project Cost (as per 28.27 LakhBank)Project Cost (as per JIT) 22.88 LakhTerm Loan 21.19 Lakh (Restricted to Rs. 19.387Iakh)TL% 68.59 %Deduction, if any 1.37 LakhEligible Project Cost 21.51 LakhA/C Number 487675100001533Subsidy (20 % of EPC) 4.302 LakhDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs.4.302 Lakhs (100% Full & Final) as pernorms.

9) Mr. 5achin Dhanpal Kabade & Others 2,1595 - 7, At/Post - Malgaon, Taluka - Miraj,Distt - Sangli (Maharashtra)

gg

Control No. LOI-27BMHB043049Activity Cultivation of Grapes in 9.00 acresArea 9.00 AcresName ofthe Bank IDBI Bank, Branch - Sangli, Vyankatesh Embassy, Opp. Sangli lila

Parishad Tal- Miraj, Distt - Sangli - 416416 (Maharashtra)Date of Inspection 27.02.2013Project Cost (as per 28.66 LakhBank)Project Cost (as per JIT) 24.10 LakhTerm Loan 21.49 Lakh (Restricted to Rs. 18.42 lakh)TL% 65.16%Deduction, if any 2.77 LakhEligible Project Cost 21.33 LakhA/C Number 487675100001526Subsidy (20 % of EPC) 4.266 LakhDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs.4.266 Lakhs (100% Full & Final) as pernorms. :6:

6~

~,'),Proceedin s of 2" Ie meetin held on 19.07.2013 \

Page 8: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

10) Mr. Vi nod Ravso Kabade & Others 2, 1585, Miraj Malgaon Road, 5ubhash nagar,Taluka - Miraj, Distt - Sangli (Maharashtra)

Control No. . LOI-27BMHB043734

Activity Cultivation of Grapes in 11.00 acres

Area 11.00 AcresName ofthe Bank IDBI Bank, Branch - Sangli, Vyankatesh Embassy, Opp. Sangli Zila

Parishad Tal - Miraj, Distt - Sangli - 416416 (Maharashtra)

Date of Inspection 27.02.2013 .

Project Cost (as per 35.542 LakhBank)Project Cost (as per JIT) 30.932 LakhTerm Loan 29.65 Lakh (Restricted to Rs.29.29Iakh)

TL% 82.41 %Deduction, if any 0.66 LakhEligible Project Cost 30.272 LakhA/C Number 487675100001540

-,-Subsidy (20 % of EPe) 6.054 LakhDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs. 6.054 Lakhs (100% Full & Final) as pernorms.

11) Mr. Nivrutti Pandurang Apsunde, A/P - Jambutake, Tal- Dindori, Dist -Nashik, (MH).

Location Gat no. 281/C, 392/P, A/P- Jambutake, Tal- Dindori, Dist.- Nashik,Maharashtra.

Control No. LOI- 27DMHD038814

Activity Cultivation of Pomegranate

Area 10.50 acres (LOI was issued in 1050 acres)

Name .of the Bank Bank of Baroda, Br. - Pimpalgaon Bahula, Satpur, Nashik, (MH).

Date of Inspection 08.03.2013Project Cost (as per Bank) Rs.56.36 lakhProject Cost (as per JIT) Rs.30.67 lakhTerm Loan Rs.43.09 lakh

TL%of PC 76.45%Deduction, if any 0.00 lakhEligible Project Cost Rs.30.67 lakhAlC Number 11360600010696Subsidy (20% of EPe) Rs.6.13 lakh

Decision Approved Subsidy Rs.6.13 Lakhs (Full & Final).

J~7

Proceedingsof 2"d Ie meeting held on 19.07.2013

Page 9: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

'0 '.

12) Mr. Rajesh Ramdas Itankar & others, At - 112, Aradhana, Nandavan Lay - out, Nagpur- 440009 (MH). .\ . ." 0

o • . _'l

Location Gat no. 17/1, 17/2, 17/3, 911 At - Shivni, Tal- Samudrapur, Distt-Wardha, (MH).

Control No. LOI-MH- 27CMHC038604

Activity Hi-tech cultivation of Papaya.

Area 30.00 acres

Name of the Bank Bank of India, Br. - Jam, Tal - Samudrapur, Distt - Wardha, (MH).

Date of Inspection 23.04.2()13

Project Cost (as per Bank) Rs. 80.00 lakh 0

Project Cost (as per JIT) Rs. 42.29 lakh

Term Loan Rs. 60.00 lakh

TL %ofPC 75.00%Deduction, if any Rs. 16.63 lakh

Eligible Project Cost RS.25.66 lakh

AIC Number 970876210000244

Subsidy (20 % of EPC) Rs, 5,13 lakh

Decision Approved subsidy Rs.5.13 Lakhs (Full & Final). It is also decidedthat being higher than cost norms, JIT, NHB officer Shri B,R.Deoghare, Dy, Director, NHB, Nagpur be cautioned for futuretime in writing and copy ofthe same be placed in personal file.

13) Mrs. Nanda Shyamrao Shinde, AlP - Korate, Tal - Dindori, Distt - Nashik (MH).

Location Gat no. 21/P, 226/P, A/P- Korate, Tal- Dindori, Distt - Nashik(MH).

Control No.0 LOI - 27DMH2036407

Activity Hi tech Cultivation of Grapes,

Area 13.00 acre (LOI was issued in 13.00 acre)

Name ofthe Bank Bank of Baroda, Br. - Pimpalgaon Bahula, Satpur, Nashik (MH).

Date of Inspection 08.03.2013Project Cost (as per Bank) Rs. 45.40 lakhProject Cost (as per JIT) Rs. 40.49 lakh 0

Term Loan Rs. 35.311akh

TL % of PC 77.77%

Deduction, if any O.OOlakh

Eligible Project Cost Rs.40.49 lakh

AIC Number 11360600010326

Subsidy (20 % of EPC) Rs. 8.097 lakh

Decision Approved subsidy Rs.8.097 Lakhs (Full & Final), Subsidy would berelease on receipt of Purchase bill oftractor and term loanrestriction letter from Bank. ~

8Proceedingsof 2"' Ie meeting held on 19.07,2013

Page 10: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

14) Mr. Vishwas Murlidhar Wadje & Other-l, At & Post- Madkijamb, Tal- Dindori Distt-Nashik (MH).

Location Gat no. 110, At -Post- Madkijamb, Tal - Dindori, Distt- Nashik(MH). .

Control No. LOI- 27DMHD02566

Activity Cultivation of Grapes.

Area 7.60 acres.

Name of the Bank Dena bank, Br. - Panchavati , Tal & Distt - Nashik (MH).

Date of Inspection 26.11.2011Project Cost (as per Bank) Rs. 21.811akh •

Project Cost (as per JIl) Rs. 15.63 lakh

Term Loan Rs. 14.80 lakh

TL%of PC 67.85%Deduction, if any Rs.0.00 lakhEligible Project Cost Rs. 15.63 lakh

AIC Number OLDAlc No.- TLAGR/379 &380, New Alc No. 079154001202&079154001203

Subsidy (20 % of EPC) .Nil.

Decision Rejected, claim is submitted excessively late and after incurringover 90% expenditure by the time of submission of the project,vital components were completed ofthe project exceptsupporting requirements of farm equipments.

9

15) Mr.Akash Kagliwal Clo MIs. Prabha Farms Pvt. ltd., At - "AKASH" Paithan Road,Aurangabad, Tal & Distt - Aurangabad, (MH).

Proceedings of 2'd Ie meeting held on 19.07.2013

Location Gat no. 20, 23/1, 23/2, & 24/1, Village - Aurangpur, Buttewadi,Tal- Paithan, Distt - Aurangabad, (MH).

Control No. LOI- 27DMH2036357

Activity Cultivation of Mango.

Area 14.65 acres (LOIwas issued in 18.00 acre)

Name of the Bank The Peoples Cooperative Bank Ltd. Hingoli, Branch - Aurangabad,Devpriya Aprt., Bansilal Nagar Railway Station Road, Aurangabad -431005 (MH)

Date of Inspection 26.02.2013Project Cost (as per Bank) Rs.30.62 lakhProject Cost (as per JIT) Rs. 12.33 lakh

.Term Loan Rs. 12.50 lakh

TL% of PC 40.82%Deduction, if any Rs. 1.60 lakh

Eligible Project Cost RS.I0.73IakhA/C Number 114-TLSubsidy (20 % of EPC) Rs.2.146 lakh

Decision Approved subsidy Rs.2.146 Lakhs (Full & Final). -<'..un>

Page 11: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

' ....,

16) Mr. Ambadas shankarrao Chaudhari, At/Post - Dild,Tal : Niphad, Dist - Nashik (MH).

Location Gat no. 32/1, 32/2, 32/3, 32/4, At/Post - Dixi, Tal- Niphad, Dist-Nashik, (MH).

Control No. LOI- 27AMHOO06408

Activity Cultivation of Grapes.

Area 7.00 acre (LOI was issued in 6.88 acre)

Name of the Bank State Bank of India, Br. - Ojhar, Tal- Niphad, Distt - Nashik, (MH).

Date of Inspection 27.04.2012

Project Cost (as per Bank) Rs. 20.06 lakh

Project Cost (as per JIT) Rs. 15.211akh

Term Loan Rs. 16.00 lakh

TL %ofPC 79.77%

Deduction, if any 0.071akh

Eligible Project Cost Rs.15.14Iakh

A/C Number 30085246192

Subsidy (20 % of EPe) Rs. 3.02 lakh

Decision Approved subsidy Rs.3.02 Lakhs (Full & Final)

17) Ratnabai Damodhar Bagul, A/P - Sangamner Wani,Tal- Dindori, Distt - Nashik,(MH).

Location Gat no. 368, A/P - Kokangaon Khurd, Tal- Dindori, Distt - Nashik

(MH).

Control No. LOI- 27AMHO-02305

Activity Cultivation of Grapes

Area 11.00 acres (LOIwas issued in 11.00 acres)

Name ofthe Bank Union Bank of India, Branch - Deepali Nagar, Tal & Distt - Nashik

(MH).

Date of Inspection 16.03.2012

Project Cost (as per Bank) Rs. 31.611akh

Project Cost (as per JIT) Rs. 24.50 lakh

Term Loan Rs. 27.57 lakh

TL % of PC 84.54%

Deduction, if any 0.00 lakh

Eligible Project Cost Rs. 24.50 lakh

A/C Number 504306040000892

Subsidy (20 % of EPe) Rs.4.899 lakh .

Decision Deferred, reason for delay of various levels to be put up on file

toMD.

'"\:1,

10Proceedingsof 2"' Ie meeting held on 19.07.2013

/

Page 12: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

'}

18) Mr.Gokul Deoram Kakad & other, AlP - Nalegaon, Tal- Dindori, Distt - Nashik (MH).

Location. Gat no. 117/1B, 117/2, 71, A/P - Nalegaon, Tal- Dindori, Distt-Nashik (MH).

Control No. LOI- 27DMH2036811Activity Hi tech Cultivation of Grapes. .

Area 17.38 acre (Lal was issued in 17.50 acre)Name of the Bank Bank of India, Branch - Adgaon Naka, Nashik city, Tal & Distt -

Nashik (MH).Date of Inspection 08.03.2013

.

Project Cost (as per Bank) Rs. 71.99 lakhProject Cost (as per liT) Rs.42.78 lakhTerm Loan Rs. 52.05 lakhTL % of PC 72.30%Deduction, if any Rs.0.00 lakhEligible Project Cost Rs.42.78 lakhA/C Number 081076210000040Subsidy (20 % of EPe) Rs.8.55 lakhDecision Approved subsidy Rs.8.55 Lakhs (Full & Final). Subsidy to be

released on receipt of following:-1. Copy of bill of tractor's purchase.2. Clarification on different term loan accounts.

19) MIs. Shree Fruits Packaging (Prop. - Shri Vijay Kumar Laxmikant Paliwal), At - Mohpa,Tal - Kalmeshwar, Distt - Nagpur - 441502 (MH).

Location Gat no. 608, Village - Mohpa, Tal- Kalmeshwar, Distt - Nagpur,(MH).

Control No. LOI- 27CMHC039200Activity Orange Grading Packing line.Area 1600 MT/AnnumName of the Bank Bank of India, Br. - Kalmeshwar, Katol Road Kamleshwar, Distt-

Nagpur (MH). .

Date of Inspection 15.03.2013Project Cost (as per Bank) Rs. 24.00 lakhProject Cost (as per liT) Rs. 24.00 lakhTerm Loan Rs. 18.00 lakhTL % of PC 75.00%Deduction, if any Rs. 3.96 lakhEligible Project Cost RS.20.04lakhA/C Number 871370410000018 .

Subsidy (40 % of EPe) Rs.8.016 lakhDecision Approved subsidy Rs.8.016 Lakhs (Full & Final). ~

11\l~~Proceedingsof 2"' Ie meeting held on 19.07.2013 .~

Page 13: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

20) Smt. Maya Bai W/o Sh. VirendraSurana, 17 Bada Sarafa, Indore (MP)

Location Survey/Khasra No. 101,103,104, lOS, 22S & 989, Village-Barud,~Tehsil & District - Khandwa (MP)

Control No. NHB/LOI/23AMP/0004500Activity Aonla in 25 acres & Aonla & Mango in Nursery in nursery in 1.00

acresArea 26 acres for plantation and 1 acre for nursery

Name of the Bank Bank of India, Barud Bazar, At & Post- Barud, Block-Chhegaonmakhan, Barud, Distt.-Khandwa (MP)

Project Cost (as per Bank) Rs61.1861akhProject Cost (as per JIT) Rs24.312 lakhTerm Loan RS.35.00lakhTL%ofPC 57.20%Deduction, if any Rs0.005 lakhEligible Project Cost Rs24.307Subsidy (20 % of EPC) Rs4.861akh .

Decision The committee noted th e contents of agenda and approvedsubsidy of Rs.4.861akh (20%) against EPCof Rs.24.3071akh (100%full & final). The reasons of delay in inspection of project andprocessing for subsidy after it's completion on 15.03.2012 may beexplained on file to MD.

21) Smt. Biniyamma, Chavarnal House, Kalkunthai Village, Uppukandam Post,Udumapanchola Taluk, Idukki District (Kerala)

Location Survey/Khasra No. 101,103, 104, 105, 225 & 989, Village-Barud,Tehsil & District - Khandwa (MP)

Control No. NHB/LOI/23AMP/0004500Sy.No. 176/1, Valumedu, VandammeduVillage, Udumapanchola Taluk, Taluk - Idukki District (Kerala)

Activity Establishment of Cardamom Processing Unit with installedcapacity of 180 MTfyear

Capacity 180 MT/annumName of the Bank Federal Bank Ltd., Branch - Puttadi, Idukki District (Kerala). Term

loan a/c No. 10736600056870Date of Inspection 23.05.2013Project Cost (as per Bank) Rs25.00 lakhProject Cost (as per JIT) Rs24.50 lakhTerm Loan Rs15.00 lakh

.

TL%of PC 60.00%Eligible Project Cost Rs24.50 lakhSubsidy (40 % of EPC) Rs9.80 lakhDecision The committee noted the contents of agenda and approved

subsidy of Rs.9.80 lakh (20%) ,....12

Proceedingsof2"' Ie meeting held on 19.07.2013

Page 14: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

22) Mr. Basappa Sidhappa Bedage, At/Post - lath, Tal - lath, Distt - Sangli (Maharashtra)

Control No. LOI-27BMHB045056

Activity Primary Processing of Raisin 5hed 3.74 MT Capacity

Capacity 3.74 MTName of the Bank State Bank of India, lath - Branch, Tal - Jath, Distt - Sangli

(Maharashtra)

Date of Inspection 29.04.2013Project Cost (as per Bank) 4.66 LakhProject Cost (as per JIT) 1.87 Lakh .

Term Loan 3.65 Lakh

TL% 78.38 %Deduction, if any 0.00 Lakh

Eligible Project Cost 1.87 Lakh

A/C Number 32175177674Subsidy (40 % of EPe) 0.748 Lakh

Decision Approved, the committee noted the contents of agenda andapproved Subsidy of Rs. 0.748 Lakhs (100% Full & Final) as pernorms after receipt of CA certificate.

23) Mr. Irappa Basappa Kannure, At/Post - Simkh, Tal- lath, Distt - Sangli (Maharashtra)

Control No. LOI-27BMHB044647

Activity Primary Processing of Raisin Shed 1.99 MT Capacity

Capacity 1.99 MTName of the Bank Bank of Maharashtra, Sankh - Branch, Tal - Jath, Distt - Sangli

(Maharashtra)

Date of Inspection 02.05.2013

Project Cost (as per Bank) 4.75 LakhProject Cost (as per JIT) 1.00 Lakh

.

Term Loan 3.50 Lakh

TL% 73.68%Deduction, if any 0.00 Lakh

Eligible Project Cost 1.00 Lakh

A/C Number 60074500249 .

Subsidy (40 % of EPC) 0.398 Lakh

Decision Approved, the committee noted the contents of agenda andapproved Subsidy of Rs. 0.398 Lakhs (100% Full & Final) as pernorms after receipt of CA certificate. ..r-

.rf-.:b

13proceedingsof 2" Ie meeting held on 19.07.2013

Page 15: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

,...

24) Mrs. Karuna Parshuram Rathod, At/Post - Salmalagewadi, Tal - lath, Distt - Sangli(Maharashtra) . .

Control No. lOI-27BMHB044911

Activity Primary Processing of Raisin Shed 3.24 MT Capacity

Capacity 3.24 MT

Name of the Bank State Bank of India, Jath - Branch, Tal. Jath, Distt - Sangli(Maharashtra)

Date of Inspection 29.04.2013

Project Cost (as per Bank) 3.47 lakh

Project Cost (as per JIT) 1.62 lakh

Term loan 2.77 lakh

Tl% 79.85 %

Eligible Project Cost 1.62 lakh

A/C Number 32313920108

Subsidy (40 % of EPe) 0.648lakh

DecisionApproved, the committee noted the contents of agenda andapproved Subsidy of Rs. 0.648 lakhs (100% Full & Final) as pernorms after receipt of CA certificate.

,~).

25) Sh. C.R. Chauhan, Kahtoni Khata No. 26/43 Khasra No.- 354, ViII- Prem Nagar, Taluka

Bag, Shimla (HP)location of the Project Khata No. 26/43 Khasra No.- 354, Vill- Prem Nagar,

Taluka Bag, 5himla (HP)

Control No. NHB/LOI- 02AHPOOO3943

Activity Apple G/P Unit Type-iii

Name ofthe Bank UCO Bank, Kotkhai, Teh- Kotkhai, Dist. Shimla (H.P)term loan A/c No. 10750610002926

Date of Inspection 18.06.2013

Project Cost (as per Bank) RS.31.00 lakh

Project Cost (as per JIT) RS.18.20 lakh.

Project Cost (as per CAl Rs.31.0511akh

Term loan Rs.22.00 lakh

Tl % of PC 70.96%

Eligible Project Cost Rs. 15.70 lakh for civil work and machinery etc. and Rs.2.50 lakh for plastic crates

Subsidy recommended by liT Rs.8.63 lakh for civil work and machinery etc. for G/P

(55% subsidy+ 50%plastic Unit and Rs. 1.25 lakh for plastic crates Total=Rs.9.88

crates) lakh

DecisionThe committee noted the contents of the agenda noteand after detailed discussion approved the project forrelease of total subsidy of Rs. 9.88 lakh only (Rs. 8.63lakh for civil work and machinery etc. for G/P Unit andRs. 1.25 lakh for plastic crates) as per terms & conditionof approved guidelines of the scheme. ./"C"'

14 ,~~\1Proceedingsof 2" Ie meeting held on 19.07.2013

Page 16: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

26) 5h 5anjeev Chauhan,Khasra No. 51, Village- Bizlidhar, Taluka Theog Dist- 5hmila (HP)

location of the Project I Khasra No. 51, Village- Bizlidhar, Taluka Theog Dist- 5hmila(HP)

Control No. NHB/lOI- 02AHPOO03926--c

Activity Apple G/P Unit Type-I

Name of the Bank H.P. State Co-Operative Bank Ltd., Br. Silaroo, Dist- Shimla(H.P) term loan Ale No. 45080000018

Date of Inspection 14.05.2013

Project Cost (as per Bank) Rs8.481akh

Project Cost (as per JIT) Not Recommend

Term loan Rs.6.36 lakh

Tl%ofPC. 86.12%

Decision The committee noted the contents of the agenda note andrecommendation of the Joint inspection team and foundthat Joint inspection team rejected the proposal due to noncompletion of civil work as per laid down specification forgrading packing unit for apple type-I. After detailed

discussion Committee rejected the proposal as per

recommendation of JIT.

27) Sh.Pratap Singh Mehta, ViII- Chalali, PO-Bahar, Tehsil-Kotkhai, Distt- 5himla (HP)

location of the Project Survey/Khasra No 97, 98,99, 100, ViII- Chalali, PO-Bahar, Tehsil-Kotkhai, Distt- Shimla (HP)

Control No. NHB/lOI- 02AHPOO03926

Activity Ropeways

Name of the Bank H.P. State Co-Operative Bank ltd., Br. Kiari, Dist- Shimla (H.P)term loan Ale No. 42170200001

Date of Inspection 08.12.2012

Project Cost (as per Bank) Rs3.00 lakh

Project Cost (as per JIT) Rs.2.938 lakh

Project Cost (as per CAl Rs.3.709 lakh

Term loan Rs.2.25 lakh

Tl%ofPC 75%

Eligible Project Cost Rs2.25 lakh .

Subsidy recommended by JIT Rs.1.237 lakh (@ of 55% of EPC)

Decision The committee noted the contents of the agenda note andnoted the correction in the agenda that activity as per lOI andJoint inspection team is for establishment of Ropeways fortransportation of horticulture produce instead of apple gradingpacking unit. The dealing officer accepted the typing mistake inthe agenda note. After detailed discussion Committee approvedthe proposal for release of subsidy of Rs.1.237 lakh subject toreceipt of NOCfrom State PWD regarding establishment ofRopeways on road side and sufficient amount of outstandingterm loan as on date of release of subsidy. -"'""I1-'J)

15Proceedings of 2nd ICmeeting held on 19.07.2013

Page 17: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

28) Mis A.P. International (Partner Sh. Shyam Sunder Jain), EPIP,Vill-Kartholi, Tehsil-BariBrahamana, Dist.- Samba (J&K) . •... ..,',' ..

location ofthe Project EPIP,Kartholi, Tehsil- Bari Brahamana, Dist.- Samba(J&K)

Control No, NHB/LOI- 01AJK/0000760Activity Processing and Grading unit of Walnuts & walnut

kernelsName of the Bank Punjab National Bank Branch Gangyal Jammu 180010

term loan Ale No, 191000lBOOO16773Date of Inspection 14,06,2013Project cost (as per application) Rs59,82 lakhProject Cost (as per Bank) Rs81.87 lakhProject Cost (as per JIT) Rs52,24 lakhTerm Loan Rs.2.25 lakhTL%of PC 51.30% of ap praised cost and 83,39% of EPCEligible Project Cost Rs,52.24 lakhSubsidy recommended by JI~_ Rs,28,687 lakh only @ 55% of EPCDecision The committee noted the contents ofthe agenda note

and found that there is a mistake in the total ofappraised cost of the bank as per means of finance. Ithas been clarified by dealing officer that means offinance ofthe project are as under:

r (Rs, In lakh)Particulars Proposed as per Actual cost of-_. bank appraisal the projectPromoter sh are 25.00 25.00Bank Term L<;lon 42.00 42,00Unsecured loan 14.87 0.00Total 81,87 67.00After detailed discussion, Committee approved theproject for release of Rs.28,687 lakh as NHB subsidy (Rs.28.237 lakh for civil work and plant & machinery etc,and Rs,0.45 lakh for plastic crates) as perrecommendation of Joint inspection te<;lm.Committeealso cautioned 5hri Umed Singh, Dy. Director, forcommitting mistakes in agenda preparation for not

---_. repeating in future. A copy be placed in his personal file.

16Proceedingsof 2" Iemeeting held on 19,07,2013

Page 18: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

29) MIs Friends Kinnow Waxing & grading plant (Prop.Gurmeet Singh) VPO- Balluana,Tehsil- Abhohar, Oist- Fazilka (PB)

Location ofthe Project Killa NO.97//23/2 (2-4) 106// (4-16) 3 min (1-0) VPO-Balluana, Tehsil- Abhohar, Dist- Fazilka (PB)

Control No. NHB/LOI- 03APB/0001374Activity Kinnow Grading & Waxing plantName ofthe Bank Indian Overseas Bank, Branch: Abhohar, Dist- Fazilka,

Punjab Term Loan Ale No 191802000000468,191803251000013 ,

Date of Inspection 27:06.2013 ,Project cost (as per Rs85.68 lakhapplication)Project Cost (as per Bank) Rs85.68 lakhProject Cost (as per JIT) Rs69.98 lakhTerm Loan Rs50.00 lakhTL%of PC 51.30% of appraised cost and 83.39% of EPCEligible Project Cost Rs62.98 lakh5ubsidy recommended by JIT Rs.26.37 lakh only which 40% of the EPC(50% for

plastic crates)Decision The committee noted the contents ofthe agenda note

and found that land cost of the projecthas been appraised in the other fixed assets which hasbeen clarified by ban~ during the Joint Inspection of theproject. Further, Committee noted the deduction madeby dealing officers in the cost as recommended by JIT.After detailed discussion, Committee app'roved theproposal for release of total subsidy of Rs.26.37 lakhonly (Rs.20.46 lakh for grading packing unit of Kinnow &Rs.5.911akh for plastic crates).

30) MIs Natureland Organic Foods, Prop. Sh.Ajeet Godara, 0-326, Agro-Food Park, Oist- SriGanganagar (Rajasthan).

Location:- Plot No.- D-326, Agro-Food Park, RIICD,Dist- SriGanganagar (Rajasth an)

Control No. 08ARJOO05266Activity PHM Activity-Sorting, Washi:ng,Waxing, Grading &

Packing of Citrus Fruits, Capacity- 4800 MT/YearCapacity 4800 MT/Year .~

17Proceedingsof 20d Ie meeting held on 19.07.2013

Page 19: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

I\,

I

Name ofthe Bank lOBI Bank Ltd., Branch - Near Hotel Khurana Palace, 2A-l,Sukharia Marg, Sri Ganganagar (Rajasthan), (Term loan

. "-, -' ~ . . - ..",.' ", .,a/c No.: 0356673100000019)' •

Date of Inspection 27.02.2013 .

Project cost (as per Bank) Rs. 40.24 lakhsProject Cost (as per JIT) Rs. 40.24 lakhsTerm Loan Rs. 23.00 lakhsEligible Project Cost Rs. 34.18 lakhsSubsidy (40 % of EPC) Rs. 13.67 lakhsDecision Approved Subsidy Rs. 13.67 lakh s (Full & Final). It is also

decided that being higher than the cost norms (ie2S0/sq. mtr), JIT officer Shri Vimal Kr Sharma, Dy.Director, NHB, Jaipur be cautioned for future time in

.writing and copy of the same be placed in his personalfile.

31} Sh. Tejinder Singh & Smt. Surinder Kaur, R/o Chak- 62 GB(A}, Tehsil. Anoopgarh, Dist- SriGanganagar (Rajasthan).

o

Location:. Khasra No. (Pathar No.) 243/451, 244/451, Murabba No.17, 18 & 24, Chak. 62 GB (A), Tehsil- Anoopgarh, Dist- SriGanganagar (Rajasthan)

Control No. 08ARJOO0679Activity Kinnow -Citrus, (7.00 acres), Pomegranate (6.00 acres)Area 13.00 acresName ofthe Bank : Oriental Bank of Commerce, Branch- Anoopgarh, Dist- Sri

Ganganagar (Rajasthan), (Term loan a/c No.:05717510000250)

Date of Inspection 28.02.2013Project cost (as per Bank) Rs. 29.84 lakhsProject Cost (as per JIT) Rs. 10.67 lakhsTerm Loan Rs. 7.50 lakhsEligible Project Cost Rs. 6.23 lakhsSubsidy (20 % of EPC) Rs. 1.24 lakhsDecision Approved Subsidy Rs. 1.24 lakhs (Full & Final)

~.,'\)..•.

~!<'i~\'>7{;~ CJb

18Proceedingsof 2,d Ie meeting held on 19.07.2013

..

Page 20: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

32) Kakadiya Rameshbhai Ukabhai, 59, Mistry No. Ohara, At- Vinaygadh, Tal- Palanpur, Dist-Banaskantha (Gujarat).

Location:- Block/Survey No. 59, 60/1, 60/2 At- Vinay Gadh, Tal-Wan kaner, Dist- Rajkot (Gujarat)

Control No. 24AGJOO09014Activity Primary Processingof Pama Rosa (Distilation unit),

Capacity- 11 MT/annum.Capacity 11 MT/annum.Name ofthe Bank State Bank of India, Branch- Mesariya, Mesariya, Tal-

Wankaner, Dist- Rajkot (Gujarat), (Term loan a/c No.:32127155727)

Date of Inspection 02.03.2013Project cost (as per Bank) Rs. 28.30 lakhsProject Cost (as per JIT) Rs. 26.26 lakhsTerm Loan Rs. 21.00 lakhsEligible Project Cost : Rs. 25.26 lakhsSubsidy (40 % of EPC) Rs. 10.10 lakhsDecision Approved Subsidy Rs. 10.10 lakhs (Full & Final)

33) Nirubha Jashubha Sarvaiya, At & Post- Jadkala, Tal- Savarkundla, Dist- Amreli(Gujarat).

Location:- Block/Survey No. lOp3, 10p5/2, 10p6, 11/2 At & Post- Pa,Tal-Gariadhar, Dist- Bhavnagar (Gujarat)

Control No. 24AGJOO06341Activity Lemon (19.00 acres)

Area 19.00 acresName ofthe Bank State Bank of India, Branch- Jesar, Tal- Mahuva, Dist-

Bhavnagar (Gujarat), (Term loana/c No.: 30796393353)

Date of Inspection 30.10.2012Project cost (as per Bank) Rs. 30.00 lakhsProject Cost (as per JIT) Rs. 16.76 lakhsTerm Loan Rs. 15.00 lakhsEligible Project Cost Rs. 16.76 lakhsSubsidy (20 % of EPC) Rs. 3.35 lakhsDecision Approved Subsidy Rs. 3.35 lakhs (Full & Final)

..("0.

~3

19Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 21: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

134) Mr. Ananda Tukaram Chougule, At/Post - ErandolI"Tal- Miraj, Distt - Sangli

(Maharashtra)

Control No. LOI-27BMHB045286Activity Primary Processing of Raisin Shed 13.75 MT Capacity

Capacity 13.75 MTName ofthe Bank State Bank of India, Mi raj - Branch, Tal - Miraj, Distt - Sangli

(Maharashtra) .

Date of Inspection 10,05,2013Project Cost (as per Bank) 10.42 LakhProject Cost (as per JIT) 6.88 LakhTerm Loan 8.00 LakhTL% 76.78 %Deduction, if any 0.00 LakhEligible Project Cost 6.88 LakhA/C Number 32226196873Subsidy (40 % of EPC) 2.75 LakhDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs. 2.75 Lakhs (100% Full & Final) as pernorms after receipt of CA certificate.

35) Mr. Tatoba Narasgonda Magdhum & other 1, At/Post - ErandolI, Tal- Miraj, Distt-Sangli (Maharashtra)

Control No. LOI-27BMHB045287Activity Primary Processing of Raisin Shed 27.48 MT Capacity

Capacity 27.48 MTName of the Bank State Bank of India, Miraj - Branch, Tal- Miraj, Distt - Sangli

(Maharashtra)Date of Inspection 10.05.2013Project Cost (as per Bank) 20.21 LakhProject Cost (as per JIT) 13.74 LakhTerm Loan 14.50 LakhTL% 71.73 %Deduction, if any 0.00 Lakh .

Eligible Project Cost 13.74 LakhA/C Number 32226288529Subsidy (40 %of EPC) 5.496 LakhDecision Approved, the committee noted the contents of agenda and

approved Subsidy of Rs, 5.496 Lakhs (100% Full & Final) as pernorms after receipt of CAcertificate. ..L'

( 1'."'11

20Proceedingsof 2" Ie meeting held on 19,07,2013

Page 22: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

36) Suresh Vitthal Pingle & others, AjP- Makhamalabad, Tal & Distt - Nashik (MH)Location Gat no. 65, AjP- Jalkhed, Tal - Dindori, Distt -Nashik, (MH).

Control No. LOI- 27DMHDOO07032 ,

Activity Cultivation of Grapes.Area 10.00 acre (LOIwas issued in 10.00 acre)Name of the Bank Bank of Maharashtra, Branch - Umrale BK,Distt - Nashik,(MH)

Date of Inspection 13.10.2012Project Cost (as per Bank) Rs.31.86 lakhProject Cost (as per JIT) Rs.25.11lakhTerm Loan Rs.25.00 lakhTL%ofPC 78.46%Eligible Project Cost RS.25.11lakh .

AjC Number 20196268862Subsidy (20 % of EPC) Rs.5.02 lakhDecision Approved subsidy of Rs.5.02 Lakhs (Full & Final)

Committee also ap proved reopening of case and condonedelay in filing subsidy. Reasons of excessive delay aftercompletion of the project and responsibility may be put upbefore MD on file.

Manufacturing of Pickles and spices2.61 MT/annum23.06.201125.08.2011 to 17.08.2012( Rs.32.96)RS.49.97RS.49.97Rs.33.30 lakh (Released Rs.33.50 lakh)65.95%Rs.8.60 lakh .Rs.41.107 lakhRs.16.441akhState Bank of India, Haridakhandi Branch,

Berhampur, Distt. Ganjam (Odisha)The committee approved subsidy of Rs. 16,441akh (40%) againstEPCRs.41.1071akh (100%) as full & final.

Decision of IC:

37) Sh. Gandharb Sahoo (Managing Partner Mjs Bharati Garmina Udyog), At. Baunsiapalli,P.O- Kukudakhandi, Distt.- Ganjam (Odisha), Location: SurveyjKhata No. 836j673 &674, Mauza- Baunsiapalli, Tehsil - Kukudakhandi, Distt.-Ganjam (Odisha).

NHBjLOlj21AORj0002350Activity.CapacityDate of sanction of T/L by BankDate of disbursement of T/LProject cost (as per Bank)Project cost (as per JIT)Term LoanTerm Loan percentageDeduction, if anyEPCSubsidy (40%)Name of the Bank

\

Note: Committee decided to ask the Joint Inspection Team (Officer's) for deduction ofamount against the component/commodities may be deducted as per NHB norms. It is alsodecided hat being higher than cost norms(ie. Rs.250/sq.mtr), liT, NHB Officer Dr. S.c. Panwar,Dy. Director, NHB, Bhubaneswar be cautioned for future time in writing and a copy of the samebe placed in his personal file. ~

$\>21

Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 23: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

38) Sh. Subash Chandra Mahana (Prop. M/s Jhadeswar (Cashew Processing Unit) At.-Dengapadar, P.O- Danapur, Distt.- Ganjam (Odisha) Location: Survev/Khasra No.243/17,243/21, Plot No. 1793 & 1794/1899, Mauza- Dengapadar, Tehsil- Khallikote,

Distt.- Ganjam (Odisha)

," ~.-- ,',' "'!!", '.-

NHB/LOI/21AOR/0002367Activity:

Date of sanction of T/L by BankProject cost (as per Bank)Project cost (as per JIT)Term LoanTerm Loan percentageDeduction, if anyEPCSubsidy (40%)Name of the Bank

Cashew processing unit capacity 90MT, Primaryprocessing of Cashew Nut, unit capacity 90MT02.12.2011RS.35.45RS.33.96Rs.60.90 lakh (Released Rs.60.88 lakh)57.82%Rs.4.765 lakhRs.29.19IakhRs. 11.676 lakh

Utkal Grameen Bank, Angaragaon, Via-Sumandal, DT: Ganjam-761035, Odisha-761035, Cust ID: 72067535

Decision of IC:The committee approved subsidy of Rs. 11.6761akh (40%) againstEPCRs. 29.191akh (100%) as full & final.

39) Sh. Kailash Nath Sahu (Prop. M/s Kalua Cashew Processor) At'/P.O- Gandala, Distt.-Ganjam (Odisha) Location: Survev/Khata No. 1261/710, Plot No. 760 Mauza-Gandala, Tehsil- Hinjilikatu, Distt.- Ganjam (Odisha)

NHB/LOI/21AOR/0002352Activity:Date of sanction of T/L by BankDate of disbursement of T/LProject cost (as per Bank)Project cost (as per JIT)Term LoanTerm Loan percentageDeduction, if anyEPCSubsidy (40%)Name of the Bank

Cashew processing unit capacity 880MT02.03.2012 ( Rs. 60.90 lakh)07.03.2012 to 23.05.2012 (Rs. 60.88)RS.87.00 lakhRs.77.64 lakhRs.60.90 lakh (Released Rs.60.88 lakh)69.97%Rs.6.40 lakhRs.71.24 lakhRs.28.496 lakhUnited Bank of India, Gandala Belgaon Branch,P.O- Belgaon, Via- Bhatakumarada-761003, Distt.-Ganjam, Odisha - 761003

Decision of IC:The committee approved subsidy of Rs. 28.4961akh (40%) againstEPCRs. 71.24Iakh (100%) as full & final. ~

~~?22

Proceedingsof 20' Ie meeting held on 19.07.2013

Page 24: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

40) M/s Passion Greens Consultancy Pvt. Ltd., Director Shri Deepak Goyal, Passion GreensConsultancy Pvt. Ltd., Regd. Office. - 9, FB Scheme No. 94, First Floor, Ring Road,Indore -452016 (MP) Location: Survey/Khasra No. 42,43,61/1, 61/4 & 61/7. Village-Hunjari, Tehsil- Gunjam, District - Khargone (MP)

Hi-tech Cultivation of Pomegranate (Bhagwa) in 21 acresand Banana (G-9) in an area of 12.00 acres (Total area33.00 acres)03.04.2012 (Rs.60.00 lakh)19.04.2012 to 16.07.2012 (Rs. 60.00 lakh)Rs.93.35 LakhRs.48.906 lakhRs.Rs.60.00 lakh (Released Rs.60.00 lakh)

64.27 %Rs.3.41lakhRs.45.494 lakhRs.9.00 lakh

IDBI Bank Ltd., Branch - Sanwad (528) Distt.-Khargaon, MP)

The committee noted the contents of agenda and approved subsidy ofRS.9.00 lakh (20%) against EPe of Rs.45.017Iakh (100% full & final).

NHB/LOI/23AMP/0004500Activity

Decision of IC:

Date of sanction of T/L by BankDate of disbursement of T/LProject cost (as per Bank)Project cost (as per JIT)Term LoanTerm Loan percentageDeduction, ifanyEPCSubsidy (20%)Name ofthe Bank

Location:- Sy.No. 41/2, 41/7,42/2,41/1 & 41/3, VillageUdamakallu, Taluk Gangavathi, District Koppal,(Karnataka).

Control No. 29AKA0023585

Activity Mango (29.00 acres), Mosambi & Drumstick (as intercrop)

Area 29.00 AcreName ofthe Bank Vijaya Bank, Branch - Koppal, Sharma Complex, Hostel

Gadag Road, Koppal- 583231 (Karnataka). Term loan a/cno. 142708601000019

..

Date of Inspection 25.03.2013Project cost (as per Bank) RS.36.68LakhProject Cost (as per JIT) RS.16.09LakhEligible Project Cost RS.16.09LakhTerm loan RS.27.50 LakhTerm loan Percentage 74.98%Subsidy (20 % of EPC) RS.3.218lakhDecision :J.;;e committee noted the contents of agenda and

!approved subsidy of Rs.3.2181akh (100%Full & Final).

23 .. /~(>

41) Shri Syed Sab S/O Moula Sab, Village Chikkabaganal, P.O. Hirebagnal, Taluk &District Koppal (Karnataka)

Proceedingsof 2"' ICmeeting held on 19.07.2013

Page 25: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

location:- Sy.No. 154/185, Ke~.oprVillage, Kundapura Taluk, UdupiDistrict (Karnataka).

Control No. 29AKA0025429

Activity Primary Processing of Cashewnut .Capacity 576 MT per AnnumName of the Bank Karnataka Bank ltd., Branch - Ambagilu, Udupi - 576105

(Karnataka). Term loan ale no. 0187001800073901Date of Inspection 30.05.2013Project cost (as per Bank) RS.94.80lakhProject Cost (as per JIT) Rs.47.68IakhEligible Project Cost RS.47.68IakhTerm loan RS.54.00lakhTerm loan Percentage 56.96 %Subsidy (40 % of EPC) RS.19.072 lakhDecision The committee noted the contents of agenda and

approved subsidy of RS.19.072 lakh (100%Full & Final).

42) Mis Sri Siddhivinayaka Cashew Industries, Sy.No. 154/1B5, Kedoor Village,Kundapura Taluk, Udupi District (Karnataka).

JIIj1j~,

43) Mis SlV Cashews (Prop. Sh. Rajeeva Shetty), Sy.No. 147/1H2, Belve Village,Kundapura Taluk, District - Udupi (Karnataka).

location:- Sy.No. 147/1H2, Belve Village, Kundapura Taluk,District - Udupi (Karnataka).

Control No. 29AKA0025225

Activity Primary Processing of CashewnutCapacity 336 MT per AnnumName ofthe Bank Vijaya Bank, ARDI Branch, S.K. Road, ARDI, Kundapur

Taluk, Udupi District (Karnataka). Term loan ale no.100708391000016 & 100709041000056

Date of Inspection 31.05.2013Project cost (as per Bank)(including W.e. RS.135.00 lakh) RS.190.00lakhProject Cost (as per JIT) RS.32.86IakhEligible Project Cost RS.32.86lakhTerm loan RS.40.00lakhTerm loan Percentage(Excluding W.e.) 72.72%Subsidy (40 % of EPC) RS.13.14IakhDecision The committee noted the contents of agenda and

approved subsidy of RS.13.14Iakh (100%Full & Final).~

24Proceedings6f 2"d Ie meeting held on 19.07.2013

Page 26: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

44) Mis Ganesh Industries (Partnership Firm), 76, Badagabettu, Old Chitapady,

Taluk & District Udupi.location:- Sy.No. 54-2A4P20, 76, Badagabettu, Old Chitapady, Taluk

& District Udu pi (Karnataka).

Control No. 29AKA0024401

Activity Primary Processing of Cashewnut (Automation)

Capacity 288 MT per AnnumName ofthe Bank Corporation Bank, Udupi Branch (Karnataka). Term loan

a/c no. TlS-01/110002

Date of Inspection 18.04.2013Project cost (as per Bank) RS.9.20lakhProject Cost (as per JIT) Rs.5.42 lakhEligible Project Cost Rs.5.42 lakh

Term loan RS.6.22lakhTerm loan Percentage 67.61 %Subsidy (40 % of EPC) Rs.2.168 lakh .

Decision The committee noted the contents of agenda andapproved subsidy of RS.2.168lakh (100%Full & Final).

location:- Sy.No. 166/1, At & Post - Takkalaki, Taluk & District -Bijapur (Karnataka).

Control No. 29AKA0024800

Activity Primary Processing of Grapes

Capacity 4.50 MT per AnnumName ofthe Bank State Bank of Mysore, Branch - Bijapur, Taluk & District-

Bijapur (Karnataka). Term loan a/c no. 64090644476

Date of Inspection : 02.05.2013Project cost (as per Bank) RS.9.50lakhProject Cost (as per JIT) RS.1.69Iakh

Eligible Project Cost RS.1.69Iakh

Term loan Rs.4.75Iakh- --

Term loan Percentage(281% of EPC) 50.00%Subsidy (40 % of EPC) RS.0.676lakh

Decision The committee noted the contents of agenda andapproved subsidy of RS.67600/- (100%Full & Final).

45) Sh. Ramagonda Bhimanagouda Biradar, At & Post - Takkalaki, Taluk & District-

Bijapur (Karnataka).

25Proceedingsof 20d Ie meeting held on 19.07.2013

Page 27: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

:;',.< ".,;..,.

46) Sh. Mallikarjun Mahantappa Garor, At & Post - Gudur, Taluk • Afazalapur,

District - Gulbarga (Karnataka).Location:- Sy.No. 216/4, At & Post - Niloor, Taluk - Afazalapur,

District - Gulb arga (Karnataka).

Control No. 29AKA0024675

Activity Primary Processing of Raisin Unit.

Capacity 3.7S MT per Annum

Name of the Bank Krishna Gram een Bank, Branch - Station Ganagapur"Taluk - Afazalapur, District - Gulbarga (Karnataka). Termloan a/c no. 74004693320

Date of Inspection 19.04.2013

Project cost (as per Bank) RS.8.75Lakh

project Cost (as per JIT) RS.2.2SLakh

Eligible Project Cost RS.2.25Lakh

Term loan Rs.s.OOLakh

Term loan Percentage 57.14%

Subsidy (40 % of EPC) Rs.0.90 lakh

Decision The committee noted the contents of agenda andapproved subsidy of Rs.0.90 lakh (100%Full & Final).

Location:- Sy.No.205/ •. & 200/2, At & Post - Tiganibidari, Taluk &District - Bijapur (Karnataka).

Control No. 29AKA0025214

Activity .Primary Processing of Grapes

Capacity 4.00 MT per Annum

Name of the Bank Vijaya Bank, Branch - Babaleshwar, Taluk & District(Karnataka). Term loan a/c no. 101309051000133

Date of Inspection 29.04.2013Project cost (as per Bank) RS.7.85Lakh

Project Cost (as per JIT) RS.2.00Lakh

Eligible Project Cost RS.2.00Lakh

Term loan RS.4.50Lakh

Term loan Percentage : 57.32%

Subsidy (40 % of EPC) RS.0.80lakh

Decision The committee noted the contents of agenda andapproved subsidy of Rs.80,000/- (100%Fuli & Final).

.-r::.Q:

47) Sh. Bapulal (Bapusab) Sultanasab Walikar, At & Post - Tiganibidari, Taluk &

District - Bijapur (Karnataka).

26Proceedingsof 20

' Ie meeting held on 19.07.2013

Page 28: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

48) Sh. Basappa Vithal Badachi, At & Post - Kanamadi, Taluk & District - Bijapur.(Karnataka).

Location:- S.NO. 860/1+2/1B/2B, At & Post - Kanamadi, Taluk &. District - Bijapur (Karnataka)

Control No. 29AKA0024404

Activity Primary Processing of Grapes

Capacity 4.21 MT per annum.Name of the Bank Karnataka Vikas Grameena Bank, Kanamadi District-

Bijapur (Karnataka). Term loan a/c no. 89005719621 .

Date of Inspection 30.04.2013Project cost (as per Bank) Rs.5.00 LakhProject Cost (as per JIT) RS.2.08LakhEligible Project Cost RS.2.08LakhTerm loan RS.3.00LakhTerm loan Percentage 60.00%Subsidy (40 % of EPC) Rs.83,200/-Decision The committee noted the contents of agenda and

approved subsidy of RS.83,200/- (100%Full & Final).

Location:- Sy.No. 1042, At & Post - Kanamadi, Taluk & Distrist -Bijapur (Karnataka).

Control No. 29AKA0024610

Activity Primary Processing of Grapes

Capacity 2.825 MT per annum.Name of the Bank Karnataka Vikas Grameena Bank, Branch - Kanamadi, At

& Post - Kanama, District- Bijapur (Karnataka). Term loana/c no. 89007739179

Date of Inspection 30.04.2013Project cost (as per Bank) RS.5.00LakhProject Cost (as per JIT) Rs.1.70 LakhEligible Project Cost RS.1.70LakhTerm loan Rs.3.00 LakhTerm loan Percentage 60.00%Subsidy (40 % of EPC) RS.68,000/-Decision The committee noted the contents of agenda and

approved subsidy of RS.68,000/- (100%Full & Final).A,~

49) Sh. Mallikarjun Basappa Awarasang, At & Post Kanamadi, Taluk & District -Bijapur (Karnataka).

27Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 29: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

,'~'" ' .f.' ,'" ,,..;, .

Location:- Sy.No. 840/1B & 840/2A, At & Post - Kanamadi, Taluk &District Bijapur (Karnataka).

Control No. 29AKA0024696

Activity Primary Processing of GrapesCapacity 2.65 MT per AnnumName of the Bank Karnataka Vikas Grameena Bank, Branch - Kanamadi, At

& Post - Kanamadi, Taluk & District Bijapur (Karnataka).Term loan a/e no. 89007743017

Date of Inspection 30.04.2013Project cost (as per Bank) RS.3.65LakhProject Cost (as per JIT) RS.1.33LakhEligible Project Cost RS.1.33LakhTerm loan RS.2.00LakhTerm loan Percentage(150% of EPe) 54.79%Subsidy (40 % of EPe) .. RS.0.53lakhDecision The committee noted the contents of agenda and

. approved subsidy of Rs.53000/- (100%Full & Final).

50) Sh. Monappa Shidraya Badiger, At & Post - Kanamadi, Taluk & District - Bijapur(Karnataka).

28

Location:- Sy.No. 166/1, At & Post - Takkalaki, Taluk & District -. Bijapur (Karnataka) .

Control No. 29AKA0024798

Activity Primary Processing of Grapes

Capacity : 4.50 MT per AnnumName of the Bank State Bank of Mysore, Branch - Bijapur, Taluk & District -

Bijapur (Karnataka). Term loan a/c no. 64087895482

Date of Inspection 02.05.2013Project cost (as per Bank) RS.10.00lakhProject Cost (as per JIT) RS.2.23lakh-Eligible Project Cost RS.2.23lakhTerm loan Rs.5.00 lakhTerm loan Percentage(224% of EPe) 50.01 %Subsidy (40 % of EPe) RS.0.892lakhDecision The committee noted the contents of agenda and

approved subsidy of RS.89200/- (100%Full & Final!.rf--.'+.

. 51) Sh. Maningappa Shivalingappa Biradar, At & Post - Takkalaki, Taluk & District -Bijapur (Karnataka).

Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 30: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

52) Sh. Hiru Gangaram Lamani, At & Post - Takkalaki, Taluk & District - Bijapur(Karnataka).Location:- Sy.No. 248/2. At & Post- Dhanaragi, Taluk & District

(Karnataka).Control No. 29AKA0025194

.

Activity Primary Processing of Grapes.Capacity 3.56 MT per annum.Name ofthe Bank Canara Bank, NVM Road, Bijapur-586101, D.P.Code:504.

(Karnataka). Term loan a/c no. 0504882000032.Date of Inspection 02.05.2013Project cost (as per Bank) RS.8.35LakhProject Cost (as per liT) RS.1.78LakhEligible Project Cost RS.1.78LakhTerm loan Rs.5.00 Lakh .Term loan Percentage 59.91%Subsidy (40 % of EPe) RS.0.712lakhDecision The committee noted the contents of agenda and

approved subsidy of RS.71,200/- (100%Full & Final).

53) Sh. Mahibub Husensab Mulla, At & Post Tiganibidari, Taluk & District - Bijapur(Karnataka).Location:- Sy.No. 202/1, At & Post- Tiganibidari, Taluk & District-

Bijapur (Karnataka).Control No. 29AKA0025195

Activity Primary Processing of Raisin Unit.Capacity 4.96 MT per annum.Name ofthe Bank Vijaya Bank, Branch Babaleshwar, District Bijapur

(Karnataka). Term loan a/c no. 101309051000132.Date of Inspection 29.04.2013Project cost (as per Bank) RS.8.00LakhProject Cost (as per liT) RS.2.35LakhEligible Project Cost RS.2.35LakhTerm loan RS.4.50LakhTerm loan Percentage 56.25%Subsidy (40 % of EPe) RS.0.938IakhDecision The committee noted the contents of agenda and

._-- approved subsidy of RS.93800/- (100%Full & Final)..-eRD'

29Proceedingsof 2" Ie meeting held on 19.07.2013

Page 31: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

, .Location:- Sy.No. 259/2B, AlP -Tikota, Taluk & District - Bijapur.

(Karnataka).Control No. 29AKA0025251

Activity Primary Processing of Grapes

Capacity 4.13 MT per annum.Name ofthe Bank Karnataka Vikas Grameena Bank, Branch - Tikola, At &

Post - Tikola, laluk & District Bijapur (karnataka). Termloan ale no. 89009434267

Date of Inspection 30.04.2013Project cost (as per Bank) RS.8.00LakhProject Cost (as per JIT) RS.2.48LakhEligible Project Cost RS.2.48Lakh

Term loan RS.5.00LakhTerm loan Percentage 6250%Subsidy (40 % of EPe) RS.0.991Iakh

Decision The committee noted the contents of agenda andapproved subsidy of Rs.99100/- (100%Full& Final).

54) 5h. Ramu Gurupadappa Jambagi, AlP Tikota, Taluk & District - Bijapur (Karnataka).

Location:- Sy.No. 242/1+2+3/B1, At & Post - Kaggod, Taluk &District - Bijapur (Karnataka).

Control No. 29AKA0024421

Activity Primary Processing of Grapes

Capacity : 4.81 MT per AnnumName ofthe Bank Vijaya Bank, Branch - Bijapur Taluk & District - Bijapur

(Karnataka). Term loan ale no. 103409051000079

Date of Inspection 29.04.2013Project cost (as per Bank) RS.7.92IakhProject Cost (as per JIT) RS.2,89lakhEligible Project Cost RS.2.89lakhTerm loan Rs.4.80 lakhTerm loan Percentage 60.61%Subsidy (40 % of EPe) RS.1.154IakhDecision The committee noted the contents of agenda and

approved subsidy of Rs.115400/- (100%Full & Final).

55) 5h. Laxman Hanamant Jadhav, At & Post - Aheri, Taluk & District - Bijapur(Karnataka).

30Proceedingsof 2" Ie meeting held on 19.07.2013

Page 32: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

Location:- Sy.No. 239/2, At & Post -Takkalaki, Taluk & District-Bijapur (Karnataka).

Control No. 29AKA0025250

Activity Primary Processing of Grapes

Capacity 3.37 MT per Annum

Name ofthe Bank Central Bank of India, Branch - Bijapur Taluk & District-Bijapur (Karnataka). Term loan a/cno. 3T65522698

Date of Inspection 02.05.2013Project cost (as per Bank) Rs.7.00 lakhProject Cost (as per JIT) RS.1.69lakhEligible Project Cost RS.1.691akh

Term loan RS.3.00lakhTerm loan Percentage(178% of EPC) 42.88%Subsidy (40 % of EPC) RS.0.674Iakh

Decision The committee noted the contents of agenda andapproved subsidy of Rs.67,400/- (100%Full & Final).

56) 5h. Annappa Yallappa Samagar & other, At & Post. Takkalaki, Taluk & District-

Bijapur (Karnataka).

Location:- Sy.No. 168/2, At & Post - Takkalaki, Taluk & District-Bijapur (Karnataka).

Control No. 29AKA0025134

Activity Primary Processing of Grapes

Capacity 3.38 MT per Annum

Name ofthe Bank State Bank of Mysore, Branch - Bijapur, Taluk & District -Bijapur (Karnataka). Term loan a/c no. 64093822017

Date of Inspection 02.05.2013Project cost (as per Bank) RS.10.00lakhProject Cost (as per JIT) RS.1.69lakh

Eligible Project Cost RS.1.691akh

Term loan RS.5.00lakhTerm loan Percentage(295.85% of EPC) 50.00%Subsidy (40 % of EPC) RS.0.676lakh

Decision The committee noted the contents of agenda andapproved subsidy of RS.67,600/- (100%Full & Final).

~

57) Sh. Malkappa (Mallikarjun) Guranagouda Patil, At & Post. Takkalaki, Taluk & District

- Bijapur (Karnataka).

31Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 33: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

Location:- Sy.No. 151, At & Post - Halagunaki, Taluk - Indi, DistrictBijapur (Karnataka).

Control No. 29AKA0024435

Activity Primary Processing of Raisin Unit

Capacity 6.50 MT per Annum

Name of the Bank Syndicate Bank, Branch - Horti, At & Post: Horti, Taluk-Indi, District - Bijapur (Karnataka). Term loan a/c no.08278310000043.

Date of Inspection 29.04.2013

Project cost (as per Bank) Rs. 13.00 lakh

Project Cost (as per JIT) Rs.3.523 lakh

Eligible Project Cost RS.3.523 lakh

Term loan RS.8.00lakh

Term loan Percentage 61.53 %

Subsidy (40 % of EPe) Rs. 1.409 lakh

Decision The committee noted the contents of agenda andapproved subsidy of RS.1.409Iakh (100%Full & Final),

58) Sh. Mallikarjun Ramanna Pujari,.At &,post-I:\alagunaki, Taluk -Indi, District Bijapur(Karnataka) . , " ".

I

Location:- Sy.No. 231/A, at & Post - Valihadalagi, Taluk - Athani,District Belgaum (Karnataka)

Control No. 29AKA0025273.

'Activity Primary Processing of Raisin Unit

Capacity 5.15 MT per Annum

Name of the Bank Corporation Bank, Branch - Athani, Taluk - Athani,District - Belgaum (Karnataka). Term loan a/c no,AGTL/Ol/120026

Date of Inspection 30.04.2013

Project cost (as per Bank) Rs.9.39 lakh

Project Cost (as per JIT) RS.2.228 lakh

Eligible Project Cost RS.2.228 lakh

Term loan : Rs.6.00 lakh

Term loan Percentage 63.89 %

Subsidy (40 % of EPe) Rs. 0.8911akh

Decision The committee noted the contents of agenda andapproved subsidy of Rs,0.8911akh (100%Full & Final).

~

59) 5mt. Jayashree Babu Savadkar, At & Post - Awarakod, Taluk - Athani, District-

Belgaum (Karnataka)

32Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 34: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

Location:- Sy.No. 231/1B, At & Post - Yalihadalagi, Taluk - Athani,District Belgaum (Karnataka).

Control No. 29AKA0025272

Activity Primary Processing of Raisin Unit

Capacity 5.15 MT per AnnumName of the Bank Corporation Bank, Branch - Athani, Taluk - Athani,

District - Belgaum (Karnataka). Term loan a/c no.AGTL/Ol/120028

Date of Inspection 30.04.2013•

Project cost (as per Bank) RS.9.38lakh .Project Cost (as per JIT) RS.2.23lakhEligible Project Cost RS.2.23Iakh .Term loan RS.6.00lakhTerm loan Percentage 63.93%Subsidy (40 % of EPC) RS.0.891Iakh .Decision The committee noted the contents of agenda and

approved subsidy of RS.0.891Iakh (100%Full & Final).

60) Sh. Vinayak Babu Savadkar, At & Post - Awarakod, Taluk - Athani, District Belgaum(Karnataka).

Location:- Sy.No. 202/2, At & Post - Halagunaki, Taluk - Indi, DistrictBijapur (Karnataka).

Control No. 29AKA0024432

Activity Primary Processing of Raisin Unit

Capacity . 6.98 MT per AnnumName ofthe Bank Syndicate Bank, Branch - HortL, At & Post - HortL, Taluk

Indi, District Bijapur (Karnataka). Term loan a/c no.08278310000032

Date of Inspection 29.04.2013Project cost (as per Bank) RS.13.00lakhProject Cost (as per JIT) Rs.4.19IakhEligible Project Cost Rs.4.19 lakhTerm loan RS.8.00lakhTerm loan Percentage 61.54 %Subsidy (40 % of EPC) RS.1.675IakhDecision The committee noted the contents of agenda and

approved subsidy of RS.1.675Iakh (100%Full & Final).~)

....•.•.•.m

61) Sh. Basavaraj Mallappa Indi, At & Post - Halagunaki, Taluk - Indi, District Bijapur(Karnataka)

33Proceedingsof 2" Ie meeting held on 19.07.2013

Page 35: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

, ," .•'.

Location:- Sy.No. 180, At & Post - Halagunaki, Taluk - Indi, DistrictBijapur (Karnataka).

Control No. 29AKA0024434

Activity Primary Processing of Raisin Unit

Capacity 6.98 MT per AnnumName of the Bank Syndicate Bank, Branch - HortL, At & Post - Hartl., Taluk,I Indi, District Bijapur (Karnataka). Term loan a/c no.

08278310000024Date of Inspection 29.04.2013Project cost (as per Bank) RS.12.53IakhProject Cost (as per JITl RS.4.19IakhEligible Project Cost Rs.4.19Iakh

Term loan RS.8.00lakhTerm loan Percentage 63.87 %Subsidy (40 % of EPe) RS.1.675 lakh

Decision The committee noted the contents of agenda andapproved subsidy of RS.1.675Iakh (100%Full & Final).

62) Sh. Ningappa Malkappa Suntyal, At & Post - Halagunaki, Taluk - Indi, DistrictBijapur (Karnataka). . .,.., ,

Location:- Sy.No. 246/1, At & post - Takkalaki, Taluk & DistrictBijapur (Karnataka).

Control No. 29AKA0024962

Activity Primary Processing of Raisin Unit

Capacity 3.75 MT per Annum

Name of the Bank State Bank of Mysore, Branch Bijapur, Taluk & District-Bijapur (Karnataka). Term loan a/c no. 64091607024

Date of Inspection 02.05.2013Project cost (as per Bank) RS.10.00lakhProject Cost (as per JITl RS.2.25IakhEligible Project Cost RS.2.25lakhTerm loan RS.5.00lakhTerm loan Percentage(222% of EPe) 50.00%Subsidy (40 % of EPe) RS.0.90lakh

Decision The committee noted the contents of agenda and

--"approved subsidy of RS.0.90lakh (lOO%Full & Final).

A

63) Sh. Jalendra Uttam Ghatage, At & Post - Takkalaki, Taluk & District Bijapur(Karnataka).

34Proceedingsof 20d Ie meeting held on 19.07.2013

Page 36: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

64) Smt. Fazalunnisa Vakilahammed Inamdar, Nisar Mahalia, Main Road, Bijapur,Taluk & District - Bijapur (Karnataka)Location:- Sy.No. 46/2, At & Post - Toravi, Taluk & District - Bijapur

(Karnataka).Control No. 29AKA0024590

Activity Primary Processing of Raisin UnitCapacity 3.65 MT per AnnumName of the Bank State Bank of India, Branch Bijapur, Taluk & District -

Bijapur (Karnataka). Term loan a/c no. 31712146215Date of Inspection 11.04.2013Project cost (as per Bank) Rs.4.03 lakhProject Cost (as per JIT) RS.1.78lakhEligible Project Cost Rs.1.78 lakhTerm loan Rs.4.00 lakhTerm loan Percentage 99.21 %Subsidy (40 % of EPC) RS.0.712lakhDecision The committee noted the contents of agenda and

approved subsidy of RS.0.712lakh (lOO%Full & Final).

65) Sh. Babu Shivaputra Savadkar, At & Post - Awarakod, Taluk - Athani, DistrictBelgaum (Karnataka).Location:- Sy.No. 231/E, At & Post - Yalihadalagi, Taluk - Athani,

District Belgaum (Karnataka).Control No. 29AKA0025266

Activity Primary Processing of Raisin UnitCapacity 5.15 MT per AnnumName of the Bank Corporation Bank, Branch - Athani, Taluk - Athani,

District - Belgaum (Karnataka). Term loan a/c no.AGTL/01/120025

Date of Inspection 30.04.2013Project cost (as per Bank) Rs.9.38 lakhProject Cost (as per JIT) _.- : j-Rs.2,743IakhEligible Project Cost RS.2.743IakhTerm loan Rs.6.00 lakhTerm loan Percentage 63.96%Subsidy (40 % of EPC) Rs.1.097 lakh .

Decision The committee noted the contents of agenda andapproved subsidy of Rs.1.097 lakh (100%Full & Final).

rA\-

35Proceedingsof 2"' Ie meeting held on 19.07.2013

Page 37: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

. ~,:-',;' ,.

(8) LOI Cases

The proceedings of LOI cases are placed at Annexure-I

Scheme 3- Technology Development and transfer for Promotion of Horticulture

1) Sh. Rajesh Ku. Mohanty, General Secretary, 4th Krishi Fair-201:!, Jail Road Puri &

National Youth Awardee.

Ratified & Approved

The proposal of Sh. Rajesh Ku. Mohanty, General Secretary, 4th Krishi Fair-2013, Jail RoadPuri & National Youth Awardee from 19 - 23 May, 2013 (05 days) at MuktakashRangamancha on Saradhabali near Shree Gundicha Temple, Puri Town, Odisha wasapproved by the Competent Authority of the Board for Rs.40,000/- (Rupees Forty Thousandonly) for cost of stall charges Rs. 40,000/- for two nos. of stall charges @ Rs. 20,000/- eachstall for (size-10'x10' each) for participation by NHB, Bhubaneswar in the above said eventand to display activities/programmes of the Board on file and same was ratified andapproved in IC Meeting held on 19.07.2013 with the remarks rent charges may be paid bythe Center Incharge out of imprest amount available with Center.

2) The proposal of Indian Society for Root Crops (ISRC), Central Tuber Crop ResearchInstitute, Trivendrum for financial assistance of Rs 10.00 lakh for organizingInternational Conference on Tropical Roots and Tuber for Sustainable Livelihood underChanging Agro Climate w.eJ. 9-12 July 2013 at Hotel Mascot, Trivendrum (Kerala)

Not Approved

The Committee after detailed discussion not approved the proposal being NGO.

3) Proposal of ASM Foundation and Jain Irrigation Systems Pvt. Ltd for "Water Qualityand Management for climate resilient Agriculture".

The proposal of ASM Foundation and Jain Irrigation Systems Pvt. Ltd. Jalgaon, (MH) for "WaterQuality and Management for climate resilient Agriculture" during 28th to 31st May 2013discussed in IC meeting and committee not approved and closed the file as the proposal is notin format of NHB, reply of NHB queries not responded and event is over.

36Proceedingsof 2"' ICmeeting held on 19.07.2013

Page 38: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

4) Participate in Inter State Horti Fair Sangam, Orange Mela - 2013 during 4thto 6

thJan.

2013 at Lal Bag, Bangalore

The proposal of SHO, Nagpur for participated for Inter State Horti fair Sangam for participationfor display cum sale with their produce (Nagpuri orange) & growers in Bangalore discussed in ICmeeting Committee ratified and approved the expenditure of Rs. 1.00 lakh (Rs. One lakh only)for above event with SMT orange and fund may be released in account of NHB Nagpur office.The balance expenditure may be met by Orange Grower Association of Rs.16440/-.

5) Proposal of Maharashtra Chamber of commerce, Industry & Agriculture for KRISHI-2013 (INTERNATIONALTRADEFAIRANDCONFERENCE)during 15th to 19th Nov. 2013, atNashik

The proposal of Maharashtra Chamber of commerce, Industry & Agriculture (MACCIA), At -Sarda Sankul, MG Road Nashik (MH) of KRISHI -2013 discussed in IC meeting and committeedecided to approve in - principle the proposal of Rs. 1.00 lakh. Details of programme may beobtained.

6) Proposal of DO, NHB, Jaipur organizing the Circuit House, Govt. of Rajasthan, Bhilwara(Rajasthan) during 28 & 29 June, 2013 (two days) under the scheme "TechnologyDevelopment and Transfer for Promotion of Horticulture".

Approved

The proposal for organizing two days training programme during September 2013 (Revised) forpomegranate growers of Bhilwara through the Dy. Director, NHB, Jaipur, was discussed in detailin ICmeeting and approved for total expenditure of Rs. 1.00 lakh to be incurred by DO, NHB,Jaipur out of imprest available at Jaipur Center under above said scheme.

7. Proposal of Intellectual Property Cell (IPC) Ch Charan Singh University Meerut (UP)for conducting International conference on Global IPR system and WTO issues from14-15.09.2013 at Ch Charan Singh University campus Meerut (UP) with proposedfinancial involvement of Rs 12.00 lakh only (Control No 09CBTOTD000009)

The above said proposal of Intellectual Property Cell (IPC) Ch Charan Singh University Meerut(UP) for conducting International conference on Global IPR system and WTO issues from 14-15.09.2013 at Ch Charan Singh University campus Meerut (UP) with proposed financialinvolvement of Rs 12.00 lakh only was discussed and IC rejected as event is not related toHorticulture.

37Proceedingsof 20d Ie meeting held on 19.07.2013

Page 39: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

,-,ij

i•,

8) Proposal of Associated Chambers of Commerce and Industry of India. (ASSOCHAM) fororganizing a BIO-AGRI 2013 (Tow.ards Productive efficiencies Farmers Growth) on 19

thJune

.2013 at Hotel Le Meridien, lIIew Delhi with proposed financial involvement of Rs5.00 lakh., - '-. '. ' .

The above said proposal of Associated Chambers of Commerce and Industry of India (ASSOCHAM)for organizing a BIO-AGRI2013 (Towards Productive efficiencies Farmers Growth) on 19

thJune 2013

at Hotel Le Meridien, New Delhi with proposed financial involvement of Rs5.00 lakh was discussedin detail in IC meeting held on 19.07.2013 and after discussion committee rejected the proposal asevent was over and as per office memorandum NO.7 (1) E/Coor/2012, dated: 31.05.2012 from.

Ministry of Finance.

9) Proposal of Dr. V.S. Parmar University of Horticulture & Forestry Nauni, Solan, (HP) forDevelopment of demonstration plots for transfer of production technology of Aloe Vera,Ocimum sanctum and Withania somnifera in Himachal Pradesh with financial involvement of

Rs15.761akh

The above.said proposal of Dr. V.S. Parmar University of Horticulture & Forestry Nauni, involvementof Rs 15.76 lakh was discussed in detail in IC meeting held on 19.07.2013 and Solan, (HP) forDevelopment of demonstration plots for transfer of production technology of Aloe Vera, Ocimumsanctum and Withania somnifera in Himachal Pradesh with financial assistance of Rs. 15.76 lakhsafter discussion, committee rejected the proposal as it is not fall under new technology.

10) Proposal of International Competence Center for Organic Agriculture (ICCOA)for organizing aOrganic Himachal 2013 - Shimla "Fair and Food Festival" on 28th_30th June 2013 with financialinvolvement of Rs. 2.50 lakh

The above said proposal of International Competence Center for Organic Agriculture (ICCOA) forOrganic Himachal 2013 - Shimla "Fair and Food Festival" on 28th_30th June 2013 with financialinvolvement of Rs. 2.50 lakh was discussed in detail in IC meeting held on 19.07.2013 and afterdiscussion committee rejected the proposal as the event was over and organizer is NGOFirm..

11) Proposal of Dr. Y.S. Parmar University of Horticulture & Forestry Nauni, Solan, (HP) forPopularization of Commercial Flower Cultivation in Solan and Sirmaur District of HimachalPradesh with financial involvement of Rs26.95 lakh

The above said proposal of Dr. V.S. Parmar University of Horticulture & Forestry Nauni,Solan, (HP) for Popularization of Commercial Flower Cultivation in Solan and Sirmaur Districtof Himachal Pradesh with financial involvement of Rs26.95 lakh was discussed in detail in ICmeeting held on 19.07.2013 and after discussion committee rejected the proposal as it is

not fall under new technology.

38Proceedingsof 2nd ICmeeting held on 19.07.2013

Page 40: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

39

12) NHB, Guwahati

Participated in North East Farm & Food Tech 2013

The Proposal of NHB. Guwahati Participated in North ~ast Farm & Food Tech 2013 atManiram Dewan Trade Centre, Guwahati held on 20-23 April, 2013 (event date already over) was discussed and approved for RS.6,307only for this event.

13) Himalayan Organization for organic Agri-Produets Research & Development(HIMOARD) and Stone Fruit Growers Association of India (SFGAI), Khaneri Rampur Bsr.Shimla (H.P)

Three days training on Internal Centre System (ICS) organic farming and 1 day exposure visitof farmer for three group total 12 days

The Proposal of Himalayan Organization for organic Agri-Products Research & Development(HIMOARD) and Stone Fruit Growers Association of India (SFGAI), Khaneri Rampur Bsr.Shimla (H.P) for organizing 3 days training on Internal Centre System (ICS)organic farmingand 1 day exposure visit of farmers for three groups (total 12 days) (any mutually acceptedsuitable dates) was discussed and ICapproved forRs 5.45 lakh only for two trainings (each 3days) and programme may be participated by SHO, Shimla.

14} Department of Food .Processing Industries & Department of Horticulture, Govt. ofWest Bengal, Mayukh (4th floor), Salt Lake, Kolkata - 700091

Deferred

The proposal of Department of Food Processing Industries & Department of Horticulture, Govt.of West Bengal, Mayukh (4th floor), Salt Lake, Kolkata - 700091 for Market Promotion andBrand Promotion of Maida & Murshidabad Mangoes at Delhi Hatt from 11th June to 24th June,2013 was discussed in detailed in IC meeting held on 19.07.2013 and Committee deferred theproposal for want of list of the farmers (name and complete detailed address with 'contactnumbers and the details of the quantity of Mango/varities brought from West Bengal to Delhi)

lS} Demonstration of Model Pomegranate Production Practices for Effective Management ofBacterial blight disease

Deferred

Committee discussedthe proposal of NationalResearchCentre on Pomegranate,ICAR.Solapur(MS)anddecided that representative of NRCon Pomegranate may give presentation in next meeting aboutdetails of activities/trainings to be undertakenalongwith expenditure on various items~

~Proceedingsof 2"' ICmeeting held on 19.07.2013

Page 41: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

j!i .--)

16. . Proposal of Amity InternationafCe~ter fo/Post Harvest Technology and cold chainmanagement, Amity University Campus, Sector-125, Noida (UP) for three daysworkshop on Post Harvest Management and Cold Chain from 6-8 August 2013 atAmity University Campus, Sector-125, Noida (UP) with proposed financial

involvement of Rs 6.58 lakh only

The proposal of Amity International Center for Post Harvest Technology and cold chainmanagement, Amity University Campus, Sector-125, Noida (UP) for three days workshop on PostHarvest Management and Cold Chain from 6-8 August 2013 at Amity University Campus, Sector-125, Noida (UP) Was discussed and deferred for want of complete information i) list of participantsii) Industry contribution iii) Participation fee from. industry participants and list of speakers with their

topics.

Misc. Agenda

1) Proposalfor closing of 24 nos. of subsidy pending casesreceived from Ahmedabad Centre(Gujarat) were discussedand keeping in view of the fact that applicants are not responedinspite of repeated reminders & notices issued by NHB.Committee decided to closethese

files.

Detailsof projects placed at Annexure-II

2) To consider and decide eligibility of subsidy in the case where promoter has availed NHMsubsidy and willing to refund it for availing NHB subsidy.

Project of Yogesh Ramdas Itankar & others -2, Plot No. 112, Aradhana, Nandanvan layout,Nagpur _ 440009 (MH) for cultivation of Papaya in area of 17.00 acre discussed again and

committee decided that-

"In this case where subsidy availed under NHM scheme, proposal may be considered only ifpromoter/beneficiary refund the subsidyalready availed from NHM".

Observations

• In the background of meeting held with Hon'ble Agriculture Minister, it was opined thatin order to help promoter/entrepreneurs from interest burden, 1

stinstallment of

subsidy may be considered after sanction of term loan linked to progress after

satisfactory joint inspection.• It was also decided that the pendency of cases in Orissa and Bihar may be cleared

immediately.• It was also decided that time line for each step/stage upto release of subsidy may be

fixed under capital investment subsidy of the Board. ~40 \3

Proceedingsof 2"d Ie meeting held on 19.07.2013 < 07

Page 42: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

• On the query of JD(F&A) regarding documents. to be attached with Agenda Notes, it wasalso agreed that the details of documents required in the agenda notes may beinformed by JD(F&A).

• It was decided that the details pending cases over one year may be listed and submittedto Managing Director within a week time by a II Area Officers.

• It was opined that Area Officers may orga nize meetings for clearing the pendencywherever more cases are pending under schemeso

• It was decided that an agenda item for sim plification in procedure may be taken upbefore next Managing Committee.

• Area Officers are required to put-up a mont.hly statement regarding the cases whichhave been sanctioned before two years and in how many cases notices have beenissued.

• It was also decided that NHB may organize 3-4 good programme under scheme nO.3 inStates.

• Committee decided that a study on processing of cashew nut and raisin units beconducted regarding its further need for financial assistance.

• SFAChas constituted producer companies in the country. Ust of these companies maybe obtained from SFACfor approaching them to avail assistance under NHB scheme.

• Regarding use of machineries in horticulture, it was decided manufacturer of Indianmachineries may be called for meeting and discussion may be held regarding suitabilityof machinery in the Horticulture sector.

Meeting ended with vote of thanks to the Chair.

41Proceedingsof 2nd ICmeeting held on 19.07.2013

Page 43: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

_'. ..:.-~,_c,_,~ "",,,,_,,,""_' •••••••

LOIMlnuts for.1C meetlna 19.07.2013 Annexure-I •I,S. 'PfojeOl~." ~jQf .•..••"'j!l<:lName, ,•...... Crbpilillltiiit.,,:t~iOjel:t:rlo %TL B<lnk.N.me , ,.DilCiSlori'..' ,'., ..Rem.il<S.: '. "' ,~.Nil. . ' Re.lpt "i ,'." ,,'.' I, .....,:)lS~~" ~00iI)' •. ' - .. }f. ,.> ...."'.,.'ki ........,,';,... .•.1 27BMHB0456228.12,2012 Vlrupekshe Ganapati (GRAOING 4.00 3.00 75.00 Bank 01Baroda Rejected. . Rejected, there is no mechanization

5 Mahajan, Alp- Walwa, PACKING ,Walwa Branch, Tal I Hi tech.Tal- Welwa, Dist-Sangli UNIT,600.DO,sq Walwa, Disl-Sangli(Maharashtra) ft)' (Maharashtra)

2 27BMHB04562 03.01.2013 Namdev Shank'" Patit, (RAISiN 6.00 4.00 56.67 lOBI Bank ,Branch _ LOI approved Committee after noting the contents7 Viliage-Rejapur, Teluka UNIT,10.00 Tasgaon, Parchure of agenda note, approved issuanceTasgaon, Oist-Sangli ,TON) Building, of LOI as per Cost Norm.(Maharashira) Sidheshwar Road,

TaJuka .Tasgaon,Dist -Sangli 416312(Maharashtra)

3 27BMHB04562 08.01.2013 Gulabrao Shivgon~a (RAISIN 9.99 7.50 75.05 Bank of LOI approved Committee after noting,the contents " '9 Gadade, Village- UNIT,20.00 . Maharasht~ of agenda note, approved issuance

Pandozari, Taluka- ,TON) ,Branch - Sankh, Tal of LOI as per Cost Norm. ._~Jath, Dist - Sangli Jath, Dist-Sangli -(Maharashlra) 4164.)2

(Maharashtra)4 27BMHB04563 08.01.2013 Revakka Guming (RAISIN 9.97 7.47 74,90 Bank of india LOI approved Committee atter noting the contents

0 Hinchageri, Village- UNIT,20.00 . ,Branch - Jadar of agenda note, approved issuanceJadarbobalad, Taluka- ,TON) Bablad, Taluka • 01LOI as per Cost Norm,Jalh, Dist.Sengli Jath, Dist - SangUI'Maharashtra)' Maharashlra\ ,

5 27BMHB04563 09.01.2013 Malamma Sidharam (RAISIN 14.70 10.00 68.03 Bank of india LOI approved Committee after noting'the contents4 Borgi & Olhars 3, UNIT,12.00 ,Branch - Nimbargi, of agenda note, approved issuance ,

Village- Nimbargi, ,TON) Taluka - South of LOI as per Cost Norm.Taluka- South Solapur, Solapur, Oistt. - .Distt.- Solapur SolapurMaharashlra\ Maharashtra\

6 27BMHB04563 09,01.2013 Mahadevi Sidhramappa (RAISIN 15.85 9.00 56,78 Dena Bank ,B~anch LOI approved Committee after noting the contents5 Belam, Village- UNIT,25.00 : Navi Path, Taluka - of agenda note, approved issuance

Mandrup, Taluk8- ,TON) Solapur, Distt.- of LOI as per Cost Norm.Solapur South, Oistt.- SolapurSolapur (Maharashtra) (Maharashlra)

7 27BMHB04563 09.01.2013 Dadasaheb Bandubhai (RAISIN 9,25 7.00 75.68 Bank of india LOI approved Committee after noting the .contents6 Shaikh, Village- UNIT,8.00 ,TON) ,Branch - Nimbargi, of agenda note, approved issuance

Bhandarkawalhe, Taluka - South of LOI as per Cost Norm.Taluka. South Solapur, Solapur, Distt. -Distt.- Solapur SolapurMaharashlra\ Maharashlra\

-f •••

.J.f2.- -~~)

i-"! 'I)"

"!~i:~

Page 44: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

-~.-- '--"-- ---- - --"-----'.._.

8 27BMHB04564 22.01,2013 Madhukar Subhadar (RAISIN 19.83 14.87 75.00 Bank 01 LOI approved Committee after noting the contents4 Kale, At • Vizo"; Post- UNIT,18.00 Maharashtra of agenda note, approved 'issuance

Yashwantnagar, Taluka ,TON) ,Branch - Akluj, of LOI as per Cost Norm.- Malshlrash, Distt. - Dislt .• SolapurSolapur-413118 --'- (Maharashtra)

Maharashtral9 27BMHB04564 22.01,2013 Mahananda Sldhling (RAISIN 13.65 10.00 73.26 Stale Bank 01 India. LOI approved Committee after noting the"contents !

5 Bahirgondio, Village. UNIT,16.00 ,Branch' - Mandrup, . of agenda note, approved-issuanceSadepur, Taluka - ,TON) Tal. South Solapur, of LOI as per Cosl Norm.Soulh Solapur, Distt. - Oistt. - Solapur, -Solapur (Maharashtra) 413221

10 27BMHB04564 29.01.2013 OWaraka Bapusaheb (RAISIN 9.80 7.50 76.53 Bank of india LOI approved Committee' a.fter noting the contents7 Gurav, Village - UNIT.6.00 ,TON) ,Branch - Nimbargi, of agenda note, approved issuance

-----. Bhandarkawathe, f Taluka - South I . of LOI as per Cost Norm.Taluka. Soulh Solapur, Solapur, Oistt. -Dislt. - Solapur Solapur

Maharashtral I'Maharashtra\11 27BMHB04564 29.01.2013 Eknath Kashiram (RAISIN 9.95 7.50 75.38 Bank of india LOI approved Committee after noting the contents.

8 Madane, Village - UNIT,12.00 ,Branch - Nimbargi, . of agenda note, approved issuanceNimbargi, Taluka . ,TON) Taluka - South of LOl as per Cost Norm.South Solapur, Distt - Solapur Distt -Sola pur (Maharashlra) $olapur

12 27BMHB04564 29.01.2013 Saraswati Sunil (RAISIN 40.00 30.00 75.00 Syndicate Bank LOI approved Committee after noting the contents9 Bhosale, Village - UNIT,30.00 ,Branch':"Hotgi of agenda note, approved issuance

SayyadvalVadew, ,TON) Road, Taluka - of LOI as per Cost Norm.Taluka - Mohol, Oistt. - Solapur, Distt. -Solapur ( Maharashtra) Solapur - 413003

Maharashlral13 27BMHB04565 29.01.2013 Aaba Baba Pandhare, (RAISIN 9.95 7.50 75.38 Bank of india LOI approved Committee after noting the contents

0 Village. Nimbargi, UNIT,12.00 ,Branch - Nimbargi, of agenda note, approved. i!SsuanceTaluka - South Solapur, ,TON) Taluka - South of LOI as per Cost Norm;Dislt • Solapur Solapur, Distt-Maharashtra\ Solanur

14 27BMHB04565 29.01.2013 Manikrao Raosaheb (RAISIN 9.99 7.50 75.08 Bank of india LOI approved Committee after noting the ,contents'1 Deshmukh, Village - UNIT,10.00 ,Branch - Aherwadi, • of agenda nole, approved'issuance

Rajur, TahJka - South ,TON) Taluka. Solapur, of LOI as per Cost Norm.Sola pur : Dislt. - Distt. - SolapurSolaour'(Maharashtral MaharashtrB\

15 27BMHB04565 29.01.2013 Najurunbi.13ulab (RAISIN 9.80 7.50 76.53 Bank of india LOI approved Committee.after noting the-contents I

2 Shaikh, Village- UNIT,12,00 ,Branch. Mandrup, of agenda note, ,approved issuance ,Mandrup, Taluka - ,TON) Taluka - South of LOI as per Cost Norm-.South Solapur, Dislt- Solapur, Distt-

_r-- Solapur, (Maharashtra) Solaour

~~> -~3~o .,<$

Page 45: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

.,-.<l--. __~ ,--.. •.•••••. - ""100 •• 7W - =

27BMHB045e6 12.02.2013- --- , - - ._.

16 Pravln Oadasilhab Kala RAISIN UNIT 25.52 19.14 75.00 Bank of Baroda LOI approved Committee after noting the contents1 -I, Village- Plsawadl, (5.09 TON) ,Branch - Velapur, of agenda note, approved issuance

Taluka- Malshlrash, Packing & Taluka - Malshirash, of LOI as par Cost Norm.Distt- Solapur Grading Housa, Distt- Solapur - 413(Maharashtra) DrylngPlatlrom 113 (Maharashtra)

for 50 -Ton Raisin& 200 Ton lorfrash Grapes

17 27BMHB04566 12.02.2013 Gund Bhanupratap (RAISIN 16.50 12.35 74.65 Bank of LOI approved Committee after noting the contents4 VljaySingh, Village- UNIT,14<00 Maharashlra of agenda note, approved issuance

Mohol, Taluka- Mohol ,TON) ,Branch - Penur, of LOI as per Cost Norm.-. - Disti- Solapur Taluka- Mohol, DisttMaharashtral Solanur

18 27BMHB04567 18.02.2013 IAnkush Krishna Mali, (RAISIN 19.45 14.50 74.55 Union Bank of India LOI approved Committee after noting the contents2 Villaga- Solankarwadi, UNIT,18.00 ,Branch - Modnlmb, of agenda note, approved issuance

Taluka- Madha, Distt.- ,TON) AVPost - Modnimb, of LOI as per Cost Norm.. Sola pur (Maharashtra) Taluka - Madha,

Distt. - Sola pur19 27BMHB04567 18.02.2013 Anna Krishna Mali, (RAISIN 19.90 15:00, 75.38 Union Bank of India LOI approved Committee after noting the contents

3 Village- Solankarwadi, UNIT,18.00 ~Branch- Modnimb, of agenda note, approved issuanceTaluka- Madha Disti.- ,TON) Taluka- Madha, of LOI as per Cost Norm.Solapur (Maharashtra) Distt - Solapur

20 27BMHB04567 18.02.2013 Subhash Krishna Mali. ' (RAISIN 19.90 15.00 75.38 Union Bank of India LOI approved Committee affer noting the contents4 Village- Solankarwadi, UNIT,20.00 ,Branch - Modnimb, of agenda note, approved issuance

Taluka- Madha Dlstt.- ,TON) AVPnst - Modnimb, of LOI as per Cost Norm.Solapur (Maharashtra) Taluka - Madha,

Distt - Solapur21 27BMHB04567 20.02.2013 Seema Suresh Kale & Mango 5.00 Act, 93.39 70.0 75.0 Bank of LOI approved Committee after noting .the contents

8 Others Three, Village- Sapota 5.00 Aer, Maharashtra of agenda note, approved issuanceI. Belsar, Taluka- Custrad Apple ,Branch - Agri Hi of LOI as per Cost Norm.Purender Distt.- Pune 2.50 Aer, Tech, Sinhgad road,(Maharashtra) Mosambi 2.50 . Distt - Pune -

,Acr, 411005Pomegranate1.0 (Maharashtra)o Acr, Guava1.00 Act,Coconut 3.00Acr

22 27BMHB04560 12.12.2012 Anneso Raygonda (RAISIN 9.99 7.50 75.04 Union Bank of India LOI approved Committee after noting the. contents1 Saundatte, Village- UNIT,15.00 ,Miraj Branch, Tal- of agenda note, approved issuance

Erandoli, Taluka-Miraj, ,TON) Miraj, Disl-SangU of LOI as per Cost Norm.Dlst-SangU (Maharashlra)(Meharashlra)

. - .

.~

.....~ \'3.~51<>'tS.\\

Page 46: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

23 27BMHB04566 12.02.2013 Appasaheb Bebu PatH (Ripening 46.87 36.14 77.10 Slate Benk of India LOI approved Committee after nolin'g the -contents ,2 & Others One, Village. Chamber,30.00 ,Branch. Arag, ef agenda note, Approvrd -issuance

Arag, Teluke • Mira), ,TON) Taluka - Miraj, Distt. of LOI as per cost norms, .Distt.• Sangll '--'"

Sangli.416401(Maharashlra) (Maharashtra)

. .

24 27BMHB04569 15.03.2013 Dhondirain Tukaram (RAISIN 9.29 6.84 73.62. Union Bank of India lOI approved Committee after noting the Contents5 . Jadhav & Other One, UNIT,8.00 ,TON) ,Branch - Miraj, of agenda note, appro"ved;issuance

Village - Erandoll, Near Laxmi Market, of LOI as per Cost Norm. . .. Taluka. Mlraj, Distt- Fort Road, Taluka •

Sangli (Maharashlra) Mimi, Oistt - Sangli -416410Maharashtra\ .

25 27BMHB04569 18.03.2013 Ishwar Dnyanoba (RAISIN UNIT, 20.00 15.00 75.00 State Bank of India LOI approved Committee ~fter-noting the contents6 Gadade, Village - 40.00 MT) ,Branch - • of agenc;la note. approved-issuance

Uchethan, ialuke - Mangalwedha, Killa . of LOt as per Cost Norm.Mangalwedha, Distt.- Bhag, Taluka -Solapur (Mahareshtra) Mangalwedha. Distt.

Solapur - 413305(Maharashtra)

. .

26 27BMHB04569 18.03.2013 Mahadevi Giramal1a . (RAISIN UNIT, 4.00 3.00 75.00 Bank of india L-OI approved Committee after noting the-:contents7 Godase, Village - 4.00 MT) ,Branch - of agenda note. approved'issuance

Nandur, Taluka - Marawade, At/Post - of LOI as per Cost Norm. .. Mangalwedha, Distt.- Marawade, Taluka -,

Solapur (Maherashlra) Mangalwedha, DisttSolapUr.413319, (Maharashtra)

27 27BMHB04571 22.03.2013 Appesaheb Babu Pam Pre-cooling I 26.51 19.00 71.67 Slate Bank of India Deferred Deferred for want of infoniiation6 & Othen ,Village-Arag, Cold room ,Branch - Arag, regarding detail ofproduce"to be

Taluka-Miraj, Dist- capacity 7 MT & Taluka - Miraj, Distt- userd for pre-cooling and"tefer van.Sangli (Meharashlra) Refrigerated ,van Sangli ' 416401

capacity 1 MT (Maharashtra)

28 27BMHB04568 28.02.2013 Mahananda Sharad (RAISIN 19.75 15 75.9 Central.Bank 1>f LOI approved Committee after noting the:Contents2 Andage, Villaga , UNIT,30.00 India ,Branch - of agenda note, .approved,:issucI':Ice'

Mohol, Taluka • Mohol, ,TON) Solapur, 17, of LOI as per Cost Nonn.Distt.• Solapur . Yalleshwar(Mahereshtra) Complex, Budhawar

Path, SalivesSolapur, Distt--- Solapur ,._\

.MAhA".htr

..)2 \,> -H -;r i::::t':> '''' \

Page 47: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

_-- "'----- - - .

"

Kalpana Ramesh , (GERBERRA,1.4 81.5 61.12 75 Syndicate Bank LOI approved--,

29 27BMHB04573 28.05.2013 Committed after noting the contents

7 Kasbeker, Village- 5,ACR) ,Satya.Kamel, of agenda note, approved issuance

Vahangaon Post- Chaken Road, At- of LOI as per Cost Norm.

Wadeshwar, Taluka- .Post-Talegaon-

Maval, Distt: Pune . Dabhade, Tal.

,

(Meharashtrli) Maval, .Oistt.Pune,PIN-4104506

30 27DMHD044211 06,12.2012 Draupada Ganesh Rathed MANGO, 25.00, 71.14 53.35 75.00 6ank of Maharashtra LDI approved COmmittee noted content of agenda

&. Other.), Vlllage-Ashtl, ACR, ,Ashtl Branch, Patll nete and approved and ratlfled- of the

Tal-Partur, Dlstt-Jalna POMEGRANAlE, Building, Near Bus declslen.

(Maharashtra) 20.00 ACR Stand, At-Post-Ashtl,, Tal-Partur, Dlstt.Ja!na.

,

31 27DMHD044285 01.04.2013 Kashlnath OOdhu Pagar &. (GRAPES,15.00 63.47 47.42 74.71 State 6ank of India LDI approved COmmittee noted content of agenda

Others Three., At I Post- ,ACR) ,Branch - Kalwan, note and approved the case.

Navl 8ej &. Kalwan, Taluka Dlsl.- Nashlk,kalwan, Dist. Nashlk, (Maharashtra) ,(Maharashtra) ,

32 27DMHD044292 12.04.2013 Nathu Dagu PatU,Village-- (GRAPES,13.50 63.59 47.51 74.7 Bank.of Maharashtra LDI approved Committee noted content of agenda

Nllwandl, Taluka - ,ACR) ,Branch: Dlnderl, note and approved the case. .'Clnderl, Dlstt •• Nashlk. Taluka - Dlndori, Distt.

,."

(Maharashtra) - Nashik(Maha,",!shtra),

,

33 27DMHD044297 02.05.2013 Mrs. Ujjwala Chandrakant Guava In 2.50 56.933 45.54 79.99 punjab National Bank, LOI approved Committee noted content of agenda

Kapse &. other • 2, AlP- acre, Mango In Br. - 5aranpur Road, note and approved the case.

Garden Home Housing 6.00 acre, Nashlk (MH)SocIety Gangapur Road Pomegranate In

,;r-

,

Nashlk - 422002 (MH) 7.50 acre, COconut-,

In 2.50 acre and .',

.'.Custard Apple In "

2.50 acre,

34 27DMHD044307 13.05,2013 Bavlskar 5hashlkant (GERBERRA,1.50 77.92 58.4 74,95 6ank of Maharashtra LOI approved Committee noted content of agend~

Chlntaman &. other One, ,ACR) ,Branch: Special Agi. note and approved the case.

Village- Umarale, Taluka~ HI-Tech. Gangapur

Dlndcrl, DIstt.- Nashlk Road, Distt.- Nashlk,,

. i,",u, N•• h;> 1

35 21AOROOO235 11.06.20II ' Smt. Suna Sahu Prop. Cashew 49.8 29.88 DCO Bank, Bhapur Rejected. The Committee discussed the project hi.

3 (MIs MBa bauti Cashew Processing Unit Branch, Dhenkanal detailed and rejected/closed the

Industry), At- with installedpropo'sal for LOl, since promoter did not

Brundabanpur. P.O.~ capacity 120 MT furnish the required documents after

Ghatipiri. Dist. - per.annurn repeated reminders.

".. DhenkamaiJOdlshal.

r1"....-') ~

Page 48: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

3623AMPI ... 25.10.12 .-Suryoday AgrO(prQP:

. -- _. ._-_ ... -Ripening 70 52.5 Kamataka Bank lOi approved LOI approved with the remarks that0005110 Narayan Patil), Khasra chambers of ltd., Branch- lOI will be issued only lor plant andNo. 57/1118", S.K.2, Fruits i.e. Palasia, Indore (MP) machinery after receipt QI clearanceVillage - Lasudla MOri, Banana &

01 basic data sheet," heat loadDlstt.- Indora (Madhya " Mango in 05calculatiori and layout plari andPradesh) chamberssubject to registered lease deed.installed

capacity 80 MT

37 23AMPI 01.03.2013 Sh. Ajit Khandelwal Refer 22.5 5.62 State Bank of India, lOI approved. "0005144 S/o It. Sh. Ram Nath Van/Container JahagirabadGupt •., At Office.: E- with capacity 4.4 Bhopal, Branch2/291, Arera Colony, tone Code-01179Bhopal (MP)

lOI aooroved38 19AWBOO04447 25.07.2012 Sh. S.K. Bablu S/o Sh. Cashew processing 49.92 39.93 United Bank of India, LOI approved LOI Approved. with the remarks SubsidyS.K. Fajlu & Other one, in an area of 0.18 Danda Belboni will be released only after receipt of NOeViII. Raniya, Post - Branch, Distt. Purba " from MoFPI, NOC from PollutionControlacre

Board. However, promoter will bring the rawTengunia, P.S. - Contai, .Medinipur (WB)

material from Andhra Pradesh! Orissa,Distt • Purba MedinipurKerala. kamatka, Ta~I.Nadu,Assam &

(WB), Locatlon- J.L. No. Mizoram and also imported from Senegal.273, Plot no. 371, Kbatano. 520,521, Village-Dakhin Rani~ P.S.

" Contrai, Distt.- PurbaMedinipur (WB)

39 19AWB/OO0444 23.07.2012 Sh. Sunil Kumar Glri 510 Sh.. Cashew processing 49.92 39.93 Bangiya Gramin V1kas lOi approved Lal Approved. with the remarks Subsidy8 Padmalocha" Giri, ViiI. - In an area of 0.10 Bank, Paniparul Branch. will be released only after receipt of NaeSarisa, Post. Panlparul, P.S. Decimal Dlstt.- Murshidabad from MoFPI, Nae from PollutionControlEgra, Olstt. Purba Medinlpur (W8) Board. However. promoter will bring the raw(We), Location: J.L. No.-206material from Andhra Pradesh, Orissa,Plot No. 64. Khatian No.Kerala, karnatka, Tamil Nadu, Assam' &26312, V111.-Chandalda, P.S.Mizoram and also imported from Senegal.Egra, Olstt.- Purba

Medlnlpur (WB)---J.C:>-:IJ..- '; -I-r'f-~~~\

~',~'

Page 49: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

~8-

--~- ~ ---- .. - --" .... - ------- ~ _. ~ -- ._-~-- --40--1-9AWBJOO0:4449 25.07.2012 $h. ManoranJan Cas $/0 $h. Cashew processing 49.43 39.54 United Bank of India. LOI approved LOI Approved. with the remarks SubsidySudhir Chandan Das & In an area of 0.22 Danda Belbonl Branch, will be releaseel only after-receipt of NOeOther one, V1U.KalaplnJa, Decimal P.O. Battala, Oistt. from MoFPI, NOC from Pollution ControlPost- Sisuladan, P.S.- ._--- Purba Medinipur (WB) Board. However, promoter will bring ihe rawRamnagar, Olitt. Purbamaterial from Andhra Pradesh, Orissa,M8ctlnlpur (WB) location .•Kerala. kamatka, Tamil Nadu. Assam &JL NO.l38. Plot no~ 2937.Mizoram and also imported from Senegal.Khaltan No. 1275, Vill.-

. Kalpunja, PS. Ramnagar •Clltl. Purba Medlnlpur (WB)

.41 19AWBJ 000«85 24.09.12 MIs. Trilokl Greenfields Pvt. 02 Nos. Conveyor 12.52 8.76 Kamatka Bank Ltd .• LOI approved Lor Approved However, subsidy will be- Ltd. (Dlrector.Shri Abhlshek Belts for Potato Park Street.Branch 1. released only after receipt of renewal ofAgarwal), Sarojlnl Naidu Loading & Suram Building. Kolkata license of Cold Storage.Sarani, Shubham Building, Unloading in cold .700017Kolkata-700020 (WB) storage (capacity ----Location- JL No .•93. LR No. 14000 MT in 02 ,940, Village. Purba Magur chambers)Mari (Harimandlr Para).Taluka-Dhupguri, Dlstt.-~ Jalpaiguri (WB)

42 19AWBI 0004524 16.10.12 MIs Dhupguri Cold Storage 03 Nos. Conveyor _ 18.05 12.5 State Bank of India, LOI approved LOI Approved However, subsidy will bePvt. ltd. (Director - $hri Belts for Potato Jalpalguri Branchreleased only after receipt of renewal ofKalyan Banerjee), ViII .• Loading & Jalpaiguri • (WB)license of Cold Storage.Purba Magurmari, P.O- Unloading in Cold

Dhupguri. Tehslf.& Oistt .• Storage (capacityJalpaiguri - 735210 (WB) 15000 MTln 03Location;. J.L No. 93, 211 chambers)Kh. 222/1. 5,7, 10,12.13 Plot

I. ,.No. 124, LR No. 940. Village• Purba Maaurmarl P.O.

c43 19AWBI 0004534 02.11.12 MIs. Teest8 Cold Storage 03 Nos. Conveyor 18 12.604 Axis Bank ltd .• LOI approved LOI Approved, However, subsidy willPvt. Ltd., (Olrector-Shri Belts for Potato Jalpaigurt Branch, OBCbe released only after receipt of renewalKishore Kumar Marodla). Loading & , Road, Jalpaiguri (WB)of license of Cold Storage:Nayapara(73 more), P .0- UnloadIng In cold

Mohlt nagar, Olstt.- storage (capacityJalpalguri. 735101 (WB). 20000 MT In 03Location- SurveylKh8sra no. Chambers)1635,1837,1642,1643,1658 VilI.Nayaoara (73

-44 19AWBJ 0004535 02.11.12 MIs. Himalayan . 02 Nos ..Co_nveyor 12.1 8.47 Axis Bank Ltd., lOI approved LOI Approved However, Subsidy willEnterpreneurs Pvt. Ltd. Belts for Potato Jalpaigurl Branch. DSCbe released only after after receipt of(Director- Sh. Omprakash Loading r Road, Jalpaiguri (WB)renewal of License and copy ofKhoria). M.G Road, Unloading In cold .

Jalpaiguri - 735210 (WB). storage (eapacity approved layout plan duly signed byLocation- SurveylKhasra no . 14600 MT In-02

Promoter and Engineer..39013921394/50'6, .Vill- chambers)Patkata. Taluka & Oistt.-,c Jalpaigurt (We'

,"' ...

Page 50: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

q

- .45' 9AWBJ000.537 16.11.12 MIs. Beladeep Pvt. 02 Nos. Conveyor 12.1 6.7 State Bank OF India, LOI approved LO! Approved However. subsidy will beLtd..(Dlreetor-5h. Slndeep Belts for Potato SME Branch. 05th Fir.,released of after receipt of renewalKumar Bhadra). 114, .. Loading & Sky Star Building,

Chttlaranjan Avenue, Unloading in cald Sevoke Road. SiligiJri. license of Cold Storage.I

Kolkata-700073(WB) slolJlJle (capacitY Dlstt.-DaJjeeling (WB)Locatlo~ SUrveylKhaal1l no. 14000-MT In 02LR No. 84311. JL no. 134, dlambers) .

Mauza.Unlsh Blaha, Taluka-Mathabhang,a-II, Dlstt.-CooChbehar (WB)

.

.. -

46 19AWBfOO04538 05.12.2012 MIs. Selbari Cold Storage 02 Nos. Conveyor 12 8.47 The West Bengal State Lot approved LOI Approved However. subsidy will bePvt. Ltd. 161, Neta]i Subash Belts for Potato , CcrOperative Bank ltd.released of after receipt of renewalRoad, Rajkatra Building, 1st Loading & Calcutta Mainlicense of Cold Storage.Floor, Kolkata-700007 (WB) Unloading in cold Branch,201A, Waterloo .

Location. Khasra .LR. storage (capacity . Street, Calcutta-700069NO.10139,JL NO.-105, 15000 MT in 02Village- Puma Salban, chambers)Taluka-Ohupguri, Distt.-Jalpaiguri (WB)

.

. - _ .."" .. _. I.I.

47 19AWBJ 0004568 08.01.2013 MIs Kaljani Cold Storage For 02 Nos 12.1 8.417 United Bank of India, LOI approved LOI Approved, However subsidy will be(Pvt. "Ltd.), VlI!.- Kholta, P.O:- Conveyor belts for A1lpurduar Branch,released only after receipt of renewalKholta, P.S.- Kotwall, OIs1t.- Potato loading & Muncipal Mar1o:.etlicense of Cold Storage. .Coochbihar (WB) Location- Unloading In cold Complex, P.O.

(" LR No. 11).452.10455. J.l. storage capaCity A1ipurduar 7361?:1, DistI-No.- 27, Khtlan No, 2707, 15000 MT in 02 Jalpaiguri (WB)Mouja Kholta, Ts.luka - ChamberCoochbehar-lI, Olstt.-Coochbehar (WB) Regd.Office.- Newtown, P.O+P.S-A1ipurduar, Oistl.- Jalpaiguri(WB)

48 28AAP00233 & Sh. M.Shlvaganga Raju & - - - - - Approved The committee after detailed discussion,23038 Others 2 (A.P.)

approved the clubbing of the projectsand the LOI No. issued by. theHyderabad stands closed .

.

49 28AAP0023034 & Sh; M. Laxmlnarayana Raju - - - - - Approved The committee after detailed discussion,23036 & others 2 (AP)approved the clubbing of the projectsand the LOI No. issued by the

I.c-- . Hyderabad. .stands closed.

\, '> ..._-: •.~-''-....•.-.. ~--""".":4=i'.1.... - ..•...:.,..,....---- .- .,-, .-.__ ._.'-._,- _."- ._._._- •.. --,---..•. :--..'-,..", ,.-._"'~--••• ,.~ ~

Page 51: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

..•... _._--

50 08ARJ000531 22.03.20131

Sh. YoginderMukim. 1- PHM activity-26.86B, NorthendRoad,Civil RefrigeratedVanUnas, Delhi, LoCation: .Village- Khareta,TehsilMundawar, Olst. Alwar ---.(Rajasthan)

18.00 67 Union Bank of India, LOI ApprovedBranch-6458, KatraBaryan, ChandniChowk,Delhi

51. 08ARJ000529 12.02.20138

Dr. P60nam Mukim, 1- PHM activify- - 64.24B, NorthendRoad, Civil TataLines, Delhi, Location:- Refrigerated VanVillage-Khareta.TahsilOne Nos.Mundawar, Oi&l- AlWllr (;llpacity- a7ea(Rajasthan) CC & & Maruti

Eeco Vans-, .Three Nos..

r52 08ARJ000531 06:06.2013 Sh. Bimiesh Kumar Papaya (1.5066.08

8 Jain and Sh. Nit!nJain, acres). Rose1/189, Delhi Gate. Civil (12.00 acres).Lines, A9ra (UP), PomegranateLocation, Village- (6.00 acres),Rughnathpurs,Tehsil- Lemon (1.50Psrwstsar, 015t.-acres), AonlaNa9au,(Rajasthan) (2.00 acres) &

, Vegetablesunder net house2000 Sqm (0.50acres

42.5 66.2

49.56 75.1

Union Bank of India, LOI ApprovedBranch-6458, ketraBaryan, ChandniChowk, Delhi

HDFC Bank Ltd., LOIApprovedShop No. 3,4 &11,Block 171214,Friends Plaza,Sanjay Place, Agra(UP)

Restricted lOI for 1 Referigerated:TATA truck 407 model "and 3referigerated Eeco vans.

84.14 58.00 68.9

.

Bank of LOIApprovedBranch-

lsi

UnitedIndis.BuildingDsrwaja,Ahemdabad

Bank of Baroda,LOI ApprovedKarnls NagarBranch,Agra (U~)

Punjab National lOt ApprovedBank, Branch.M.i.A.Alwar

58.7

30.00 55.1

6.40

activity-54.45

53 08ARJ000528 11.11.2012 Mis G. R. Food PHM Activity-10.916 Products, 66-67, Banana

Gandhi Nagar I By Pass Ripening Unit.Road,Agra(UP) Total Capacity-

10MT54 08ARJOO052628.08.2012 Mis Saidham Agrotech PHM

7 Pvt. Ltd., Anand, Nagar BananaColony, . Behind Ripening Unit,Bijlighar, HanumanCapacitY- 7 MTMandir Resta, per Chamber.Khalrthal, Dlst- Alwar"Ra'a"-an'

55 24AGJ000910 01.04.2013 Mis Jay Gruh Udhyog,Primary4 Prop. Mayaben P: Processin9 of

Patel, C/58, Shakfi Mango, Lamon,Tenement, Nr. Jaspartt Tomato & OtherSociaty, lsanpur, Fruits withAhamdabad(Gujarat) instailed

capacity oi 150num

Page 52: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

56 24AGJ000846 21.07.20101

.

Oeepakbhai Oahyabhai Gerbera (6000 69.48Shah, Vrundavan Sqm.).underVatika, Sanjan-' Maroli g",e"1\ouseRoad, Village.Khalalvada, Tal.Umargam, Olst. Valsad

55.50 79,9 Ban ofBranch-(Gujarat)

.

Baroda, LOI ClosedSanjan

As per request of the promoter casemay be closed.

57 08ARJ000053 25.03.201312

.

Sh.Sunii Gupta Slo Sh, Referigerated 26.80Vinod Gupta, Plot No, retail van (29/4, Vidhyadhar Nagar, nos.) forJalpur (Rajasthan) vegetables and

other horticultureproduce. CubicCapaclty-2523

22.00 82.1 Bank of Baroda; LOI ApprovedBranch- Park Street,Jaipur

LOI would be .issued after .reciept ofRevised affidavit with -completeaddress, with location' &Confirmation of parking space .forrefer vans .

58 24AGJ000911 02.05.2013 Rashikbhai Gandabhai Color Capsicum 83.011 Pannar, Ossian (4000 Sqm.)-

Complex. Nana Bazar, Under GreenV.V. Nagar, Tal.- House. &Anand, Oist- Anand Tomato (4000(Gujarat) Sqm.)-Under

Shade Net

58:04 69.9 lOBI, Bank, Branch- LOI ApprovedAnand, Dist- Anand'

59 08ARJOO0052 02.02.2012 Mis ENSO OrganiCs Pomegranate 73.00 50.00 68.532 Pvt. Ltd., Adarsh (44.00 acres), &

Gurukul Near Bus Stop, Lemon (32.00Kumbhalgarh, Oist- acres)Rajasamand(Rajasthan)

Bank of Baroda, LOI RejectedBranch- Abu Road,Sirohi (Rajasthan)

Committee discussed the proposal,in view of the progress report of PI &latest circular dated 08.07.2013 andfound that the plahtatio~ and ot':1eractivities were completed beforesandion of term loan by the bank. Inview of above ..case is not approvedas loan sandioned after completionof project.

The Committee noted the agendanotes of the,above':said, project ofPrimary Processing (MenthaPrimary processing unit) with a.total'capacity of 4qtis. oil) per day andapproved the proposaHor issuanceof LOI as per usual terms &conditions of NHB guidelines .

LOI approved62.00 Punja National Bank,Branch: Gole Market,Ludhiana.

.

91.57 57.00.

Mentha processingun~

Mis. G.S. TradingCompany (Prop-Sukhjeet Singh)Kh.no.22011Servey no.15/2 (0-11)/6 (1.12), 25(4) Village-OyalpuraMirza, Taluka-RampuraPhull, Oist•.Bathinda.Punlab\

60 03APB/000138 13.12.2012o

i.

Page 53: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

61 02AHPOO03963 18.06.2011 Laiq Ram Austa! Village- (GRADING 17.60 12.50 71.43 State Bank of India As the expenditure The Committee noted that LOI wasRatnari, Taluka-Kotkhai, PACKING UNIT ,Baghi Branch, Dist- incurred in the issued on 29.07.2011 and NHBDist-5hlmla (Himachal for apple type-II) Shimls (Himachal project, it has been generally revalidate the LO-Ifor 1 year.

Pradesh) -- - Pradash) verified by tho The Committee obselVed that RsA.80Assitance Enginee~ lakh already incurred on civil work andof state PWD that project could not been undertaken with

.promoter has spent in validity period of LOI due to .Rs. 4.80 lakh only unprecedented hail strom during 2011-from own 12 and time limit for one year e~ensioncontribution. Hence, of LOI is only up to 28.07.2013. which is

.revalidation of LOI is very small period for conveying the .recommended for decision to lending bank for sanction of

- further 6 months up term loan. After detait discussion.... to 28.07.2013 Committee approved the re-validation of,

subject to the LOI for further 1 year & 6 months fromcondition that term the date of expiry of LOI (28.07.2012).loan released by Hence LOI is re-validated up to 28bank will be utilized Jan,2014 for sanction of term laon and

.in the project and term loan released by bank will be

. disbursement of teim utilized in the project and disbursementloan will be made to of term laon will be made to the supplier.the supplier. ,

62 02AHPOO04055 04.07.2012 Gain Chand, Village- (GRADING 17.31 12.29 71.00 State Bank of India As the expenditure The Committee noted that expenditure

Rajtri, Taluka- Kotkhai, PACKING UNIT ,Branch: Kalbog, incurred in the incurred in the project towards civil

Dist.- Shimla (Himachal for typ•..lI) Taluka. Kotkhai, Dist.- project has been work is only Rs: 4.07 lakh from the own

Pradesh) Shimla (Himachal verified by the CA sauce of the promoter against the totalPradesh) . firm. Hence, project cost of Rs. 17.31 lakh. The

issuance of LQI is expenditure incurred has been veryfiedrecommended by CA firm and inspecting offl~r of NHBsubject to the in the re-verifica.tion report of the, condition that term project site. After detailed discussion,loan released by Committee approved the proposal for .bank will be utilized issuance of LOI subject to the conditionin the project and . that term loan released by bank will bedisbursement of term utilized in the project and disbursementloan will be made to of term loan will be made to the supplier.the supplier.

63 02AHPOO04092 26.03.2013 Jagat Ram-Chauhan, (GRADING 18.76 13.26 70.67 State Bank of India Recommended for The Committee approved the proposal'

Village- Santari, Taluka- PACKING UNIT ,Branch: Kotkhai, issuance of LOI for issuance of LOI being a new activity;

Kotkahi , Oistl- Shimla for apple type-II) being new activity proposed under the project.

(Himachal Pradesh) proposed under theDroie'ct.

84 02AHPOO04093 28.03.2013 Shakti Singh. Village- (GRADING 23.00 16.50 71.74 Punjab:National Bank rejected being old The Committee rejected the proposal

Shalavat, Taluka- Rohroo, PACKING UNIT ;Branch : Rohroo , activity. being old activity as reported in the pre

Oistl- Shimla (Himachal for apple type-II) inspection report. ' ,,<"'.

Pradesh).

~l~~;l.--

Page 54: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

rtiJ!

65 09BLK0004919 06.03.13 Mrs Shweta Poddar Wlo Refer van (15 Mn 38.15 2S 65.18 'canara Bank •••ncb LOIapproved Approved in principle subject toShii Vlnayak Kumar 6<. M G SME sanJay Place Agra condition that before issue of LOr,Road Agra (UP) Location-

.(UP) promoter will submit i) earlier vehiclePlot No 0-7 Foundry Nagar

performance i.e. produce transportedAgra (UP)and their source of produce in respect toShri Vinayak Kumar LOIlO9BLK4860Shri Jitendra 1ect SinghLOIl09BLK48S8 &. Shri Virendra Jeel.

Singh LOIl09BLK48S9 ii) affidavil andiii) vehicle cost be restricted@ Rs 24.00lakh only per vehicle as per guidelinesofHMNEH

66 09BLKOOO4920 06.03.13 Mrs Dlvya % Shrl Surender Refer van (15 MT) 38.35 2S 65.18 Punjab & Sindh Bank LOIapproved Approved in principle subject toSingh 45.8 Khandari Road . branch IBDSanJay Place condition that before issue of LOI.Agra (UP) Location.Plot No Agra promoter wiU submit i) earlier vehicle26, 27, 28 26a 27a 288 26b

performance Le. produce transported27b 28b Khsra No 170 Y P .

and their source of produce in respect toPuram Mauza Sewla JaatShri Vinayak Kumar LOIl09BLK4860Tehsil & District-Agra UPShri 1itendra 1ect SinghLOIl09BLK4858 & Shri Virendra leetSingh LOIl09BLK4859 Ii} affid~vit;:at'I.diii} vehicle cost be restricted @ Rs 24.00lakh only per vehicle as per guidelinesofHMNEH67 098LKOOO4921 06.03.13 Mrs Shivani W/o Sh jitendra Reefer van (15 MT) 38.35 2S 65.18 Punjab & Sindh Bank LOIapproved Approved in principle subject to

leet Singh 45-8 Khandari branch iBDSanjay Place condition that before issue ofLOIRoad Agra (UP) Locatlon- Agra promoter will submit i) earlier vehiclePlot No 26. 27, 28 26a 278

perfonnance Le. produce transported28a 26b 27b 28b Khsra Noand their source of produce in respect to170 YP Puram Mauza Sewla I'

I Shri Vinayak Kumar LOIlO9BLK4860Jaat Tehsll & Dlstriet-AgraShri litcndra lee! SinghUPLOIl09BLK4858 & Shri Virendra leetSingh-LOIl09BLK48S9 ii) affidavit andiii} vehicle cost be [email protected] only per vehicle as per guidelines

68 09BLKOOO4922 06.03.13 Mrs Jagjeet Kaur W/o Shri Reefer van (15 MT) 38.3S 2S 65.18 Punjab & Sindh "Bank LOIapproved Approved in principle subject tovirendra Jeet Singh 45-8 branch IBDSan]ay Place condition that before issue of LOIKhandari Road ABra (UP) Agra promoter will submit i} earlier VehicleLocation-Plot No 26, 27, 28

performance Le. produce transported26a 278" 2882Gb 27b 28b

and their source of produce in.respect toKhsra No 170 Y P PuramShri Vinayak Kumar LOU09BLK4860Mauu Sewia Jaat Tehsll &Shri litendra leet SinghDistrlet-Agra (UP)LOIl09BLK48S8 &. Shri Virendra JeelSingh LOIl09BLK48S9 ii) affidavil andiii) vehicle cost be restricted @ Rs .24.00lakh only per vehicle as per guidelines..0- ofHMNEH~,.., .....s3 ~

-P"O":> .

Page 55: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

o

- ~._--- ---- .._ .. ...._--- ----'-- ----- --~--- ---- -, _._--.- --- _.- ..-- ----- ..69 09BLK0004923 - 06.3.13 Shrl Tervlnder Jeet SinghSlo Reefer van (15 Mn 38.35 25 65.18 Punjab & Slndh Bank lOI approved Approved in principle subject toShri Virendra Jeet Singh 45- branch IBD Sanjay Place condition that before issue ofLOIB Khandari Road Agra (UP) Ag", promoter will submit i) earlier vehicle. location-Plot No ~6.27, 28

performance i.e. produce transported268 27a 28a 2Gb 27b 28b- "-. and their source of produce in respect to~hsraNo 170 Y P Puram

Shri Vinayak KumarLOIJ09BLK4860Mauu Sewla Jaat Tehsil &. Shri Jitendra Jeet SinghDistrict-Asra (UP)LOIl09BLK48S8 & Shri Virendra JeetSingh LOIJ09BLK48S9 ii) affidavit &copy of bank consent/sanction letter andiii) vehicle cost be [email protected] only',per vehicle as per guidelines

. ofHMNEH-70 LOII12AARlOOO 06.03.2013 Mis Subansiri Food PIIM, PP, Tala 98.13 63 64.2 Can••• Bank, Legi LOI approved LOI approyed subject to teon loan

. 1708 Processing Industry (Prop. Mobile Complex, ltangar should be at least 70 percent of totalToka Kach) ViIlage.Oeed, Brach, Papumpare, project CO~ of Rs 98.13 lakh. hence it i~Taluka.Pistana Circle, Arunachal Pradesh proposed 64.20 percent (i.e. term loanDist- Lower Subansiri,Rs 63.00 lakh) in-LOI application.

Arunachal Pradesh

71 29AKA002523 22.11_2011 VIJAYA CASHEWS. (CASHEW 67_28 41 60.9 Syndicate Bank LoI Approved ,0 Village-Shivapura, PROCESSING ,Hebri Branch, MainT.luk.-K.rk.l. Dlst- UNIT,81 0.00 Road, KarkataUdupl (K.m.lak.) ,TON) Taluk, Udupi District

- 576112(Kamataka). ,

-?'. .

72 29AKA002535 25.04.2012 M.h.dev B. Kadam & (GRAPES,15.00 85.65 69 80.6 Bank Qf LoI Approved2 Olhars, Village- ,ACR) Maharashtra

Todalbagl, Taluka- ,Branch: Todalbagi,Jamakhandi, Dist.- Taluka:B'galkot (Kamalaka) Jamakhandi,

District: B.galko!'B.nalkol

73 29AKA002544 22.10.2012 AYESHA CASHEW (CASHEW 14.5 10 69 Syndicate Bank leI Approved LOl for Automation Machinery only.8 INDUSTRIES (PROP: PROCESSING ,BRANCH:MAHMAD RAFIQ), UNIT,450.00 HIRIADKA ubUPIVILLAGE YEDTHADI, ,TON) TALUK & DISTRICTTALUKA UDUPI, , ,UdupiDISTRICT UDUPI(KARNATAKA)

.

29AKA002545 08.11.2012 R: Krishnappa, Slo- C. (ROSE,1.25 71.8 53.85 75 Syndicala Bank leI Approved Subject to receipt of Fresh Bank consent74

6 Ramaiah, Village- ,ACR) ,Anekal Branch. Dist letter on Bank's letter head.Singasandra. Taluka. BangaloreAnaka!, Dlst-Ban9alore (Kamalaka) ,Udupi

A~I~(Kamalaka)

- Su..-, !-

,,H

Page 56: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

..•75 2SAKA002547 17.12.2012 Bharamappa Parappa (RAISIN 15.S, . 10 62.S Syndicate Bank Lol Approved

3 Ladasi & Others, UNfF,32.40 . ,Athani Branch,Villase Athani, Taluka ,TON)

. District Belgaum .Athani,District ,BelgaumBelgaum.

I.

76 29AKA002550 28.01.2013 Babasab Ashok Ladagi, (RAISIN 18 12 66.7 Corporation Bank Lol Approved5 Villaga Awa,akod, UNIT,30.CO ,13521A, Main Road,

Taluka Athani, District ,TON) Athani • 591304,Belgaum (Kamalaka) • Belgaum District.

". -'- 591304. ,Belgaum.

77 2SAKA002555 11.02.2013 SRI SHANTHADURGA (CASHEW 27.3 19 69.6 Canara Bank Lol Approved lOI for automation only.12 CASHEW PROCESSING ,Branch Kinnigoli .

PROCESSORS(PROP: UNIT,225.00 574150,BelgaumAKSHATHA KAMATH), ,TON)Village Kallamundkur,

.

Taluk Mangalore,District DakshinKannada (Kamalaka). I.

78 2SAKA002553 18.03.2013 Prince Agro (CASHEW 28.37 '16 56.4 Canara Bank Lol Approved lOI for Automation Machinery only.6 Induslrtes(P,op: PROCESSING ,Branch Kundapura.

Rajkumar Giliyar), UNIT,120.00 Distrtct UdupiVillage Beloor, Taluka ,TON) (Kamalaka). ,UdupiKundapura, DistrictUdupi(Kamataka). .

79 29AKA002554 20;05.2013 N. Manjula.& C. (GERBERRA,1.0 60 45 75 Vijaya Bank Lol Approved NHBcost norms RS.47.DO lakh/ Acre.0 Oevanands, Village o ,ACR) ,Konnangala

Konamadivals, Taluk Branch, #44,Anekal, District Saikrupa, 17thBangalore Urban main, 6th Block,(Kamataka). Konnangals,'

1 Bangalo'8-560095.Bannaln'e

80 2SAKA002554 25.03.2013 Sri Manjunath (CASHEW . 53.71 35 65.2 DCBBank ,Urban LOI Approved LOIfor Automation Machinery and Civil1 Processors (Prop. Sri • PROCESSING Bank Building, Bank Works for installation of Automation

Appa Balakrtshna UNIT,1440.00 Road, Honavar- machinery only.Mahale), Karki Village, ,TON) 581334. ,UttaraHonnavara Taluk, KannadaUttara-Kannada

.

~ District.

.u::,,(). / ~~-~~\~

7;2)~l~~l

Page 57: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

- _._--. ----------- 0 ______ ---." _______

81 29AKA002555 09.05.2013 Sri Durga Cashew (CASHEW 59.87 44 73.5 Canara Bank LoI Approved LOI for AutomationMachlnery only:5 Industries, Ulloor, PROCESSING ,Branch Kundapura,

Kandavara Village, UNIT,1200.00 District Udupi.Post Mudalakatle, ,TON) ,UdupiTaluka Kuridapura,District Udupi(Kamalaka)

82 29A 002556 31.05.2013 Mahadev Agro (CASHEW 74.6 "55 73.7 Syndicale Bank Lol Approved Applicant shall suomit RTC,of-project1 Industries, PROCESSING ,Koteshwara land mentioning lease In favour of

Mudderubatlu Road, UNIT,600.00 Branch, Kundapura applicant at the time of submission ofKumbashi Village, ,TON) Taluk, Udupi subsidy claim.Kundapura Taluk, District. ,UdupiUdupi District 576257(Kamalaka)

-

Page 58: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

National Horticulture Board Annexure-II

SR. LOINO Name of Date of Date of Querry Action Bank RemarksNO promoter LOI receipt of Address

Issued Subsidy ,

Claim

1 24AGJOOO Khetabhai 01,05.2 17,09.2009 Sanction Leiter, 13 letter/ Dena Bank, Subsidy claim received ;"1226 Mavjibhai OOB Completion reminders issued Sukhpar NHB, AHD office claim

Patel, ViiI. certificate, Extract between 17.09.0g' Roha Branch, examine & found someBhitara, Ta. of term loan, CA to 20.03,13 Dist.- Kutch document are lacking,Nakhatrana, celtificate, accordlngelly quarry leiterDist. Kutch. issued time to time but

documents still awaited.Project may be closed at

, Head office level becauseLOI issued in HO.

, Gurgaon.

2 24AGJOOOThakor 31.07.2 05.10.2009 Term loan 12 Letterl The Subsidy daim received ;"2028 Dansungji 007 clarification, reminders issued' Banaskantha NHB, AHD office claim

Kapu~i At: Attested copy of between 12,10.09 District examine & found someThaligangspur Appraisal Note fwith to 20.03,12

i Central Co- document are lacking,Ta: Kankrej item wise cost

operative accordingelly quarry letterDist: appraised by bank,

, Bank Ltd.,issued time to time but

Banaskantha. Allested copy of . documents still awaited,Term loan Sanction ; Thara Project may be closed atLeUer/s, ! Branch, Ta,- Head office level becauseExtract of term ' Kankarej, LOI issued in HO,Laon. Dist.~ Gurgaon.Term loan Banaskanthadisbursementdelails- Attestedcopy of term loanalc statement

3 24AGJOOOTulsidas 18.08.2 12.06.2008 Photocopy of 16 Letterl Bank of Subsidy claim received i"1538 Shanaji OOB original appraisal reminders issued Baroda, Anjar NHB, AHD office claim

Patidar At: note before between on Branch, examine & found someKhedoi Ta: sanction of t~rm 08.07.08 to Vankal Mata document are lacking,Anajar Dist: Loan, 20.03.13 Mandir accordingelly' quarry leiterKutch. Photocopy of

Complex,issued time to time but

original Term loan documents still awaited.Sanction letter Varshamedi Project may be closed atdated 16,08.07, Naka, Anjar, Head office level becauseNHM letter, Dist Kutch lOI issued in HO,

Gurgaon.

,

4 24AGJOOO Minaba 01.11.2 25,11.2010 Bank Inspection 7 Letterl Central Bank Subsidy claim received i"3476 Hemubha 007 Report, Appriasal reminders issued of India, NHS, AHD office claim

SocIha Note,Sanction between on Bhuj Branch, examine & found someVit1:Kotda- Leiter, ~omptetion 14.12.10 to Distt Kutch document are lacking,Roha, certificate, Extract 20.03.13 accordingelly quarry letterTa:Nakhtrana, - of term loan, CA issued time to ,lime butDist:Kulch certificate, Affidavit, documents still awaited.

Land documents Project may be closed atHead office level becauseLOI issued in HO,

-Co Gurgaon.

Page 59: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

5 24AGJOOO Mr. 24.02.2 23.12.2010 Sanction Letter, 07 letterl Bank of Subsidy claim received in

0283 Khubanbhai I. OOG Completion reminders issued Baroda, NHB, AHD office claimTowerwala, Viii certificate, Extract between on Naswadi examine & found some

Godishemala, of term loan, CA 23,02.11 to Branch. document are lacking,Ta-Naswadi, certificate. 20,03.12 Naswadi,

accordingelly quarry letterDist-Baroda. Dist.- Baroda-

issued time to time butdocuments still awaited.

391 150 Project may be closed atHead office level becauseLOllssued in HO,Gurgaon.

• 24AGJOOO Hamirbhai 03.03.2 29.07.2009 Bank Inspection, 9 letterl Slate Barik of SUbsidy claim received irl"4094 Purabhai Patel 00. Extract of term loan, reminders issued India, NHB, AHD office claim

At& Ta: CA certificate, between on Dhanera examine & found some

Ohanera 01st: Affidavit, Land 13,05.10 to Branch, document are lacking,Banaskantha. documents 20.03:13 Dhanera.

accordingelly quarry letter

Dist.~issued time to time butdocuments still awaited.

Banaskantha Project may be closed atHead office level becauseLOI issued in HO,Gurgaon.

7 24AGJOOOChauhan 21.03.2 31.12,2009 Bank Inspection, 10 lelterl Kotak Subsidy claim received in

1154 Ralansinh OOG Extract of term loan, reminders issued Mahindra NHB, AHD office claim

Srdarsinh, Vilt. Completion between on Bank Limited, examine & found some

Ranavada, certificate, 07.01.10 to 2nd Floor, document are lacking,

Ta.Kankrej, 20.03.13 Above APMCaccordingelly quarry letter

Dist.Banaskan Building,issued time to time but

tha, Gujarat. documents still awaited.

Ph.No,942689Ganja Bazar, Project may be closed at

5668Unjha. Head office level because384170 lOllssued in HO,

Gurgaon,

• 24AGJOOOSodha 18.03.2 07.12.2009 Term loan sanction 9 Letterl Dena Gujarat Subsidy daim received in

1113 Sukhdevsinh OOG letter, 2, Revised reminders issued Gramin Bank, NHB, AHO office claim

Takhatsinh At: factsheet and other between 13.05.10 Shihori examine & found some

Kasara Ta: documents 1020.03.13 Branch, document are lacking,

Kankrej Oist: incorporating Shihori,accordingelly quarry letter

Banaskanlha, second term loan Dist., issued lime to lime but

(drip iirigation) inBanaskantha,

documents still awaited.means of finance. Project may be closed at

PIN 385 550 Head office level becauseLOllssued In HO,Gurgaon. .

9 24AGJOOOBandish 08.07.2 07.04.2011 Bank Inspection 05 LetterJ Bank of Subsidy daim received in

4762 Arunbhai Shah 006 Report, Appriasal reminders issued Baroda, NHB, AHO office claim

17,Shreeji Note,Sanction between on Atmajyoti examine & found some

Shraddha Letter, Completion 25.04.11 to Ashram Road document are lacking,

Society, certificate, Extract 20.03.13 Branch,accordingelly quarry letter

Karelibaug, of term loan, CA. Indraprasth,issued time to time but

Baroda- certificate, Affidavit, documents still awaited.

390018 Land documents Opp, Ellora Project may be closed atPar1<.,Race Head office level becauseCourse Circle LOllssued In HO,(N) Gurgaon.Distt:- Baroda390007

rC'

.~~\").-& g--

. O' '-

Page 60: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

10 24AGJOOO Dhirajlal 17.12.2 24.03.2011 As inform by bank 07 Leller! Bank of Subsidy daim received

"7364 Shamjibhai OOg Ihat project ( Shade - reminders issued Baroda, NHB, AHD office daimKotadiya At & net damage & crop between on Keshod examine & found someTs: Keshod failed) querry letter 04.04.1110 Branch, document are lacking,Olst: issued 10 bank for 20.03.13

Lohana aCCOrdingellyquarry letterJunagadh. set-up shade net &Vldhyarthi issued time to time but

replantation documents still awaited.I Shavan,Project may be closed at

1st floor. Head office level becauseKapad LOI issued In HO,Market, Gurgaon.(North),Keshod-362220,Junagadh

11 24AGJOOO Navinbhai 31.08.2 05.10.2011 Promoter availed 8 Lellerl Dena Bank, Subsidy claim received

"i 8277 Radkabhai 010 NHM subsidy letter reminders issued M.G. Road, NHB. AHD office claimPatel & Others issued to promoler between on Disll- Valsad~ examine & found someI At& Po: refund Ihe NHM 05,10.1110 396001 documenl are lacking.I Kharvel (Pelad subsidy other wise 20.03.12 aceordingelly quarry Jetter, Faliya), Ta: case not consider issued time 10time butt Dharampur. by NHB documents still awailed.Dist: Valsad,Project may be closed atHead office level becauselOr Issued in HO,Gurgaon,

12 24AGJOOOPatel 04.02.2 22.07.2011 Promoler availed 05 Lelterl Central Bank Subsidy claim received

"

B007 Prafulkumar 0'0 NHM subsidy letler reminders issued of India, NHB, AHD office claimShantilal At: issued 10promoter between on Khambholaj examine & found someKhambhloj Ta refund the NHM 03.04.12 to Branch, DisU- document are lacking,& Dist Anand. subsidy other wise 20,03,13Anand accordingelly quarry letter

case not consider issued time to time butby NHB documents still awaited.

Project may be closed atHead office level becauseLOllssued In HO,Gurgaon.

3 24AGJOOOFuijibhai 03.05.2 05.10.2011 Promoter availed 08 Lelterl Dena Bank, Subsidy claim received"

811B Jalarbhai 010 NHM subsidy letter reminders issued M.G. Road, NHB, AHD office claimBhoya At& issued to promoter between on Distt~ Valsad- examine & found somePo: Tiskaritalat refund the NHM 05.10.11 to 396001 document are laexing,Ta: subsidy other wise 20.03,12 accordingelly quarry letterDharampur case not consider issued time to time butDist: Valsed by NHB documents still awaited,Project may be closed atHead office level becauselOI issued in HO,Gwgaon.

4 24AGJOOOArjunbhai 02.06.2 04.10.2011 Promoter availed 08 letterl Dena Bank, Subsidy claim received

"8119 Piliyabhai 010 NHM subsidy letter reminders issued M.G. Road, NHB, AHD office claimGanvit & issued to promoter between on Distt- Valsad- examine & found someOthers At & refund the NHM 05.10.11 to 396001 document are lacking,Po: subsidy other wise 20.03,12 aCCOrdingenyquarry leiterTiskarilalat. case not consider issued time to time butTa: by NHB documents still awaited.Dharampur,

Project may be closed atDisl: Valsad.Head office level becauselOl Issued in HO,Gurgaon.

24AGJOOOPatel Fakirbhai 17.04.2 22.07.2011 Promoter inform 05 letterl Axis Bank Subsidy claim received"

5797 Punjabhai & OOg lhat about 40% reminders issued ltd., NHB, AHD office claimOthers 8/1, plantation failiour between on 0pp.GEB, Nr. examine & found someI Vrajdeep accorandingly leiter 03.12.11 to Pizza Hut, document are lacking,Appartment, issued to Bank for 20.03.12Race Course accordingelly quarry letterRace Cource inspection the site &Circle issued time to time bulCircle, Gotri inform the stalus of(North), documents stili awaited.Road, plantation. Project may be closed atVadodara. Vadodara- Head office level because390007 LOi Issued in HO,

~ Gurgaon.------..

Page 61: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

Ii

..' ~

-60 -

16 24AGJOOO Minalben 08.07,2 0308.2011 Joint committee 4 Letterf Punjab Subsidy claim received ,n

4702 Saurinbhai 006 observaed during reminders issued National NHB, AHD office claimParikh & field visit on betWeen on Bank, examine & found someOthers 47, 13.03.2012 that 03.12.11 10 Thol Road, document are lacking,Rajeshwari promoter planted 20.03.12 Kadi, accordingelly quarry letterSociety, Thol about 45 acers bar

Distl:-issued time 10time but

Road, Kadj. plantation, promoter documents still awaited.382715, already availed the Mehsana Project may be closed atMehsana NHM subsidy in 47 Head office level because

acres land LOI issued in'HO,Gurgaon.

17 24AGJOOO Bapodra Punja 23.04.2 23.10,2008 Bank Inspection 4 letterl Vijay Bank, Subsidy claim received in3555 Bhimabhai At" 007 Report, Appriasal reminders issued Porbandar NHB, AHD office claim

BapodarTa: Note,Sanction between on Branch, Dist: examine & found someRanavav Dist: Letter, Completion 15.03.10 to Probandar document are lacking,Pomandar. certificate, Extract 06,07.11 accordingelly quarry letter

of term loan, CA issued time to time butcertificate, Affidavit, documents still awaitedLand documents Project may be closed at

Head office level becauseLOI Issued In HO,Gurgaon.

18 24AGJOOO Patel 15.01.2 30,06.2011 Joint inspection 5 Letter/ Dena Bank, Subsidy claim received in

6157 Jasvantbhai 010 carried out reminders issued Dhansura NHB, AHD office claim

Gopalbhai At: 05.10.2011 lacking between on Branch, examine & found some

Vrajpurakamp documents awaited 28.11 11 to Dhansura, document are lacking.

aTa: 12.11.12 Sabarkantha. accordingelly quarry letterDhansura Dist: issued time 10time butSabarkantha. documents still awaited.

Project may be closed atHead office level becauseLOI Issued In HO,Gurgaon.

19 24AGJOOO Mali 28.11.2 29.06.2010 Bank Inspection 4 Letter/ Kotak Subsidy claim received in

1693 Kamleshkumar 006 Report, Appriasal reminders issued Mahindra NHB, AHD office claim

Dargaji At: Nole,Sanction between on Bank Limited, examine & found some

RanupurTa: Letter, Completion 19.01.1110 325.326. 3rd document are lacking,

Dessa.Disl: certificate, Extract 17.09.11 Floor, Siddiaccordingetly quarry letter

Sabarkantha. of lerm loan, CA Vinyakissued time to time but

certificate, Affidavit, documents still awaited.Land documenls Complex. Project may be closed at

Shivranjani Head office level becauseCross Road. LOI Issued In HO,

. Satellite, Gurgaon.Ahmedabad.

20 24AGJOOOThakorbhai 22.10.2 01.04.2010 During site visit 4 Letterf Bank of Subsidy claim received in

583B Bhagubhai 009 23.10,2010 reminders issued Baroda, NHB, AHD office claim

Dhad & Others reletative promoter between on Bodhan examine & found some

At: Bothsn Ta: inform that 21.12.10 to Branch.,Man document are lacking,

Mandvi Dist: promoter is expired 14.09.11 dir Falia, accordingetly quarry letter

Kutch. committee Bodhan, Ta:issued time to time but

observed that documents 8tin awaited.project is not Mandvi, Dist Project may be closed atcompleted Surat-394140 Head office level becauseaccordingly letter LOI Issued in HO,issued to Bank with Gurgaon.copy to promoter

21 24AGJOOOVishnubhai 22.09,2 16.03.2010 Bank Inspection 4 Letterl State Bank of Subsidy claim received in

0689 Ganeshbhai 005 Report, Completion reminders issued India. NHB, AHD office claim

Patel, At Meu. certificate, Extract between on Mehsana Br., examine & found some

Tal. & Distt.- of tenn loan. CA 16.03.10 to Janta Super document are lacking,

Mehsana certificate, Affidavit, 06.07.11 Market,accordingelly quarry letter

Land documents Mehsana-issued time to time butdocuments still awailed.

384001 Project may be closed atHead office level becauseLOI issued in HO,

.r Gurgaon .

L -+->----:

Page 62: b~ L- th, - National Horticulture Boardnhb.gov.in/guideline/IC 19th july2013.pdf1) Mrs. Swati arvind Shingade, At/Post -'Sonkaswadi; Talu'ka-Baramati, Distt -Pune (Maharashtra) Control

22 24AGJOOO Chelansinh 29.10.2 19.06.2009 Appriasal Nole, 4 Letter! Dena Bank, Subsidy claim received in2049 Pravinsinh 007 Completion reminders issued Sarapdad NHB, AHD office claimJadeja Block certificate, Term between on Branch, examine & found someNo. 285, loan disbursement 23.07.09 to Sarapada. document are lacking,"Pavan statement, land 14.05.12

360110, Dist: accordingelly quarry letterManduli", documents,

Rajkot. issued time to lime butVrindavan plantation work nol documents still awaited.Society,Opp done by promoter, Project status not seenNeyari Filler,

online Project may beKalavad Road,closed at Head officeRajkot.level because LOI issuedIn HO, Gurgaon.

23 24AGJOOO Karshan bhai 11.10.2 25.02.2008 Facl Sheet, CA 08 Letter! Bank of Subsidy claim received on1586 Vishrambhai AD' certificate, Term reminders issued Baroda, NHB, AHD office claimMakani, AI: loan sanction leiter. between on Madhapar examine & found someSanosara Ta: Subsidy claim 26,02.2008 to Branch, Bhuj, document are lacking,Bhuj, Dist. affidavit, 14.01.2013

Kutch accordingelly quarry letterKutch issued time to time but

documents still awaited.Project may be closed atHead office level becauseLOI issued In HO,Gurgaon.

2. 24AGJOOO Raban 22.10.2 28.012012 Bank Inspection 04 Letter! Bank of Subsidy claim received in5796 Desaibhai 008 Report, Appriasal reminders issued Baroda, NHB, AHD office claimBabarbhai & Note,Sanction between on Sankheda examine & found someOthers, Letter, Completion 04.09.201210 Branch, document are lacking,Al:Aankakhed certificate, Extract 06.05.2013 Kharadi accordingelJy quarry lettera Ta: of term loan, CA vaga,Sankheda issued time to time butSankheda, certificate, Affidavit, , Distt. documents still awaited.Dis!: Vadodara Land documents Vadodra, Project may be closed at

Head office level becauseLOI issued in HO,

~ Gurgaon..